Department Of Archaeology Museum And Heritage Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Department Of Archaeology Museum And Heritage Tender

Works
Civil And Construction
Building Construction
Opening Date20 Mar 2025
Closing Date3 Apr 2025
Tender Amount₹ 84,60,300.95 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
code04 - Provision for careful removal of vegetation from/on the building facade by manual means by cutting the branches first and inserting mixture of asafetida or roundup or any other weediside and quick lime three times a day through the hole made in the trunk untill the root dries out and removing all the roots carefully causing minimum damage to the structure along with clearing of mosses/algae growth with necessary scaffolding, lead and lift etc., and disposal of debris away from the site premis as per direction of Engineer incharge/ Conservation Architect. (Approved data from Sardar Mahal, Hyderabad 2023)

10

489

4899.9

... More
code05 - Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerincharge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. (SN 21.2, KPWD V2 2023)

1156

313

361966.72

... More
code06 - KSRB 46.2 Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for suspended floors, landings, balconies and likes, thickness upto 200 mm including cost of all materials, labour complete as per specificaitons for heights more than 3.50m from ground level. 0 to 6 mtrs. Specification No. KBS 4.6.2 (Sl no. 4.29.3, Page No. 16, KPWD 201819 Mysore Circle) Using MS Tubular members and hydrualic jacks to rise the sunken wooden structural framework Ceiling area or wooden floor area inside dome

100

597

59740

... More
code07 - WATER PROOFING WORKS Removing existing layer of bitumen waterproofing coat and removing debries from the work spot with a lead of 150m to a corner of the site or outside and brushing/scrapping the surface with steel wire brush to remove any residue of bitumen, including cost of materials, consumables, tools, labour charges etc., complete as per the directions of Engineer in charge. (Date rate)

270

48

12960

... More
code08 - Dismantling cement concrete manually/ by mechanical means including disposal of material to the appropriate disposal area as per direction of Engineerincharge. (SN 19.2.1, KPWD V2 2023)

2.8

1712

4796.092

... More
code09 - Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineering charge. In cement mortar

0.8

1059

847.896

... More
code10 - Dismantling old plaster (lime or cement) screed layer upto 1525mm from terace surface wherever damaged and cleaning the surface for plaster including disposal of rubbish to the dumping ground to the appropriate disposal area as per direction of Engineerincharge. (SN 19.55, KPWD V2 2023)

270

38

10289.7

... More
code11 - Dismantling tile work (2 layers of chadurbille tiles) in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm. (CPWD Vol II 15.23.1)

270

95

25917.3

... More
code12 - Dismantling old & decayed Lime concrete on roof terrace bit by bit with chisels and including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineerincharge. (T.T.12.22 )

40.5

2079

84239.595

... More
code13 - Providing and covering whole/partial roof area by using 350 GSM Turpalin material stitched and fixed with punched rings at every 3.0 ft at end of turpalin to facilitate while tieing at that roof level with a plastic rope of approx 8mm dia to protect from the rain water percolation into structure including cost all materials and labour as per the specifications. (Observed data)

560

109

61594.4

... More
code14 - Providing and Laying Limesurkhi concrete of (13)Prop. using 20mm to 30mm down size brick jelly to a required slope for the easy flow of water to existing channel or spout, rammed to achive 100% compaction and finishing with Jaggery and Karakaya treatment by beating the surface for 10 days using wooden taapi upto where the indentation on concrete will not appear, applying lime slurry and ramming to treat new cracks wherever required during or after compaction due to shrinkage of concrete or fast setting of concrete due to lack of proper curing or weather conditions, including rounding of junctions (gola) of parepet wall to avoid the leakage at joints and curing by spreading fooder or gunny bags including lead and lift, access to roof, cost of all materials and labour charges etc, complete., as per the directions of Engineerin charge. (Approved data from Sardar Mahal, Hyderabad 2023)

40.5

16710

676755

... More
code15 - Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WCBathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geotextile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. (SN 15.1, KPWD V2 2023)

2700

841

2272077

... More
code16 - DOME WOODEN STRUCTURAL WORKS Investigation and dismantling of wooden structural system wrought timber in roof or floors as per condition mapping to recycle serviceable materials and disposal of unserviceable materials to debris truck point with all cost and conveyance of labours, consumables including convey of debries away from the work spot with all lead and lift from the primisis of the Sardar Mahal as per the directions of the engineer incharge. (Approved data rates from Kpwd Mysore Circle)

2.82

10484

29564.88

... More
code17 - Reusing serviceable wooden members like rafters, beams, planks, joists etc., for reuse after removing decayed part of a structural member by cutting and plaining after removing old fixtures and fittings making good for reuse with all necessary wood carpentary works including cost of all labours,materials and transportation etc complete as per the directions of site incharge. (Approved data rates from Kpwd Mysore Circle)

1.41

46568

65660.88

... More
code18 - Supply of new wooden sectional members of well seasoned teak wood of superior quality materials for beams, brackets,beam capitals, columns to a required dimension with necessary approval from the Govt. authority with all necessary plaining and cutting including cost of all transportation, loading and unloading to the site etc complete as per material specification. (Approved data rates from Kpwd Mysore Circle)

1.13

333190

376504.7

... More
code19 - Labour charges for erection of reusable wooden sectional members rafters, beams, planks, joists etc., by necessary carpentary and joinery works including cost all cosumables like fevicol, nails and joineries etc complete as per directions of site incharge. (Approved data rates from Kpwd Mysore Circle)

2.82

46566

131316.12

... More
code20 - Insitu strengthening of deteriorated end supporting part of a beams and beam capitals by fixing MS capping to length 600 mm x as per site sectional dimension made up of using 4mm thick MS sheets / plates which is bent to a required shape, epoxy treatment to protection steel caping from corrosion with out causing any damages to the existing members etc complete as per the specification. (Approved data rates from Kpwd Mysore Circle)

10

2644

26440

... More
code21 - Cleaning of reinforcement /steel members from rust by Alkaline solution thoroughly as per direction of Engineer in charge of work. (SN 20.120, KPWD V2 2023)

200

189

37904

... More
code22 - Painting with black anticorrosive bitumastic paint of approved brand and manufacture to give an even shade One or more coats on old work (Page no. 288 , Slno. 13.102.1 of CPWD DSR V2 2021)

200

77

15410

... More
code23 - DOME MASONRY AND DOWNTAKE PIPE REPAIR WORKS Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineerincharge. In lime mortar (SN 19.7.2, KPWD V2 2023)

40

600

24019.6

... More
code24 - Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineerincharge. In cement mortar (SN 19.7.3, KPWD V2 2023)

40

1059

42394.8

... More
code25 - Provision for constructuion of brick work with common burnt clay bricks of class as per Table1 of IS10771992 nonmodular, class designation 7.5 average compressive strength in super structure above plinth level in lime mortar 13 (1 lime 3 coarse sand) as per existing design and technique including all costs of materials, labours, curing, excluding scoffolding etc., as per the directions of conservation architect. (CPWD Vol I 6.4.1)

27.59

9682

267130.7944

... More
code26 - Provision for (sealing of cracks) Stitching of cracks using stone lintels (50x300x1000mm) for the cracks in the masonry walls as specified including making groove, cutting and inserting stone slab 75mm thick packing with mortar and making good the bonding with masonry work as per the directions of Engineer incharge/ Conservation Architect. (Approved data rates from Kpwd Mysore Circle)

6

3420

20520

... More
code27 - Providing and exposing the crack over the wall for crack sealing after necessary drilling and fixing with fastners for inserting the SS clamp madeup of 12mm dia rod of length 0.75mtr bent into a U shape and grouting the hole using using fine lime mortar or any binder material to achive the firmness and fixity including cost of all materials, machineries and Labours as per the directions of Engineer incharge. (Approved data rates from Kpwd Mysore Circle)

6

483

2898

... More
code28 - Provision for Grouting the masonry cracks by using lime based slurry (slaked lime & fine sand (1400 microns)) with pozzolonic additives (0.5% polymer fluidiser) including cost of low pressure grout pump & agitator (inserting nozzles and low pressure pumping to consolidate the walls) as per direction of Engineer incharge. (Approved data rates from Kpwd Mysore Circle)

150

140

21000

... More
code29 - Provisoin for supply and installation of openable tracks in walls along the wall surface for regular maintainance of downtake pipes and to avoid concealed pipes leakages into the wall using aluminium track of 300mm wide fit into wall with frame works with all necessary consumables like hinges , handles, latche system for opening tracks doors etc., including all costs of materials, labours, tools, consumables etc., complete for finished item of works. Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS 733 and IS1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineering charge. (Glazing, paneling and dash fasteners to be paid for separately) For Fixed Portion Anodised aluminium (anodised transparent or dyed to required shade according to IS 1868, Minimum anodic coating of grade AC 15) including cost of materials, labour, usage charges of machinery complete as per specifications) (SN 11.35.1.1, KPWD V2 2023

540

465

251402.4

... More
code30 - Providing and fixing cast iron downtake pipes with necessary fixtures including cost of all materials, labours, tools, consumables etc., complete for finished item of works.

36

1950

70200

... More
code31 - PLASTERING AND CORNICE WORKS Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead (SN 19.55, KPWD V2 2023)

1164.8

38

44390.528

... More
code32 - Dubbing out on old irregular walls of average 50mm thick and making good the surface using pressure grinded lime mortar 11 proportion and brick pieces to achieving the even surface to the next coat of plastering works including surface curing cost of materials, labour, complete as per specifications. (Approved data rates from Kpwd Mysore Circle)

116.48

956

111354.88

... More
code33 - Provision for Plastering with Lime Surkhi plaster of thickness 25mm to 50mm including preparation of mortar by traditional methods (by pressure mixing in chakki) in two courses of base course and finished course including tamping, beating, curing till the shrinkage cracks disappear, the work is to be done with all leads and lifts, each coat to be done after 3 days of previous coat, surfaces to be plastered shall be thoroughly cleaned of all dust, grease, oil and loose mortar, the entire surface shall then be thoroughly washed with nylon brush and clean water. All surfaces to be plastered shall be thoroughly wetted for 24 hours before commencing plaster and shall be kept damp during the progress of work. At the same time the wall should not be too wet, as plaster is then likely to fall out . It is essential to maintain uniform suction of water by receiving surfaces, which shall be ensured by damping evenly all dry patches before applying plaster,the Engineerincharge/ conservation architect will inspect & approve all preparatory work before the commencement of plastering work, Curing to be done for 21 days with help of water spray pump etc complete as per direction of Engineer incharge. (Approved data rates from Kpwd Mysore Circle)

1048.32

1602

1679408.64

... More
code34 - Restoration of masonry decorative Cornices and ornamentation works from thickness of 50mm to 300mm and above careful removal of loose plaster by gentle scrubbing, inserting wooden/steel stakes wherever missing/damaged and rebuilding the profile using 113 lime mortar (LM) topped by 112 fine grind lime mortar (FGLM) to achieve original shape and details using traditional masonry tools and art masons. (Approved data rates from Kpwd Mysore Circle) cornice thickness between 50 150mm including ornamentation

40

2838

113520

... More
code35 - cornice thickness between 150 300mm including ornamentation

80

4217

337360

... More
code36 - cornice thickness between 300mm above including ornamentation

40

5768

230759.6

... More
code37 - JOINERYWORKS Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking to the appropriate disposal area as per direction of Engineerincharge. (SN 19.12.1, KPWD V2 2023)

14

247

3460.8

... More
code38 - Taking out doors, windows and clerestory window shutters (steel or wood) including stacking to the appropriate disposal area as per direction of Engineerincharge. (SN 19.13.1, KPWD V2 2023)

14

96

1355.48

... More
code39 - Fixing small pieces ( not exceeding 0.015 m3 ) for making good wherever hinges etc., have been removed from frames or joinery etc., with teak wood excluding cost of materials but including cost of labour, complete as per specifications. (SN 20.62, KPWD V2 2023)

60

38

2286.6

... More
code40 - Renewing bars, stiles and rails, straight for joinery upto 50mm thick including mitres, haunching, mortices etc., and removing the old defective pieces and replacing with Teak wood including cost of materials, labour, complete as per specification (SN 20.66, KPWD V2 2023)

14

2107

29503.32

... More
code41 - Rewedging, cramping joinery of any description with new wedges in glue or white lead and repinning including rehanging or refixing of shutters, hinges or pivots, exceeding one m² but not exceeding two m² per leaf, removing or dismantling excluding cost of wood but including cost of labour, complete as per specifications. (SN 20.70, KPWD V2 2023)

16

1126

18029.12

... More
code42 - Removal of old broken glass panes (any thickness of size, quality or description) from wooden frames, glazed with putty or fixed with beads including cost of labour, complete as per specifications. (SN 20.76, KPWD V2 2023)

26.13

183

4790.6742

... More
code43 - Providing and fixing plain rolled glass 4mm thick with teakwood beading of 10mm thick. (SN 20.107, KPWD V2 2023)

26.13

1181

30870.2433

... More
code44 - Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 136 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications (SN 12.51, KPWD V2 2023)

7

1046

7325.36

... More
code45 - Fixing of window frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 136 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debries with lead upto 50 m. including cost of materials, labour charges, complete as per specifications (SN 12.52, KPWD V2 2023)

17

796

13535.23

... More
code46 - Fixing of door, windows shutters in an existing frame includig cost of labours, tools etc., complete for finished item of works exclusing cost of fixtures.

10

376

3760

... More
code47 - Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (SN 12.11, KPWD V2 2023)

0.165

142216

23465.6763

... More
code48 - Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) (SN 12.17, KPWD V2 2023)

1.26

7297

9194.913

... More
code49 - Providing and fixing fixtures and Fitting in postion of Wooden door and Windows, made of approved materials and designs including cost of Labour, Materials and HOM etc complete as per specification. (Market rate) MS custom Handle

8

970

7760

... More
code50 - MS custom Tower Bolts

16

770

12320

... More
code51 - MS custom 3 and 4 Hinges

8

345

2767.92

... More
code52 - MS custom 5 and 6 Hinges

16

545

8735.84

... More
code53 - MS custom Aldrops

8

569

4559.92

... More
code54 - MS custom Stays

8

509

4079.92

... More
code55 - FLOORING WORKS Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer in charge. (SN 19.2.1, KPWD V2 2023)

10

1712

17128.9

... More
code56 - Providing and laying red oxide flooring 40 mm thick, with an under layer of 30mm thick M15 cement concrete and top layer of 10mm thick plaster with 13 cement mortar mixed with red oxide finished with floating coat of neat cement mixed with red oxide (mix of same proportion), including cost of materials, labour, curing, complete as per specifications. (SN 9.37, KPWD V2 2023)

100

1712

171289

... More
code57 - PAINTING WORKS Removing the multiple layers of ( 3 to 4 Layers) old enamel paint or polish from wood / or wood based surfaces with paint remover (by applying unipeel paint remover for 2 to 3 times for more than 60 Mins to soak of approved brand / manufacturer and making surface even by removing the recedue of a enamel paint to prepare an surface by buffing by manual means using embry paper including cost of materials, labour, complete. (Approved data rates from Kpwd Mysore Circle)

493.06

332

163695.92

... More
code58 - Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scraches, cost of labour, complete as per specifications. (Approved data rates from Kpwd Mysore Circle)

152.88

53

8102.64

... More
code59 - Providing white or lime washing in four to five coats with filtered Shell lime of 6.0 Kgs, synthetic adhesive of 1.0 kg and Saras of 0.5 Kg of approved quality to give an even shade after thoroughly mixing with water to a required consistency and brushing the surface to remove all dirt and remains of loose powedered application of materials on new or old plaster surface including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete as per specification. (Approved data rates from Kpwd Mysore Circle)

1456

182

264992

... More
code60 - Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineerincharge. (SN 8.33.2, KPWD V2 2023)

493.06

142

70083.5484

... More
code61 - Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineerincharge. (SN 8.33.3, KPWD V2 2023)

150

143

21475.5

... More
code62 - ANTI TERMITE TREATMENT Providing and injecting chemical emulsion for Preconstructional AntiTermite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. (SN 4.2, KPWD V2 2023)

100

121

12154



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.