Department Of Archaeology Museum And Heritage Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Department Of Archaeology Museum And Heritage Tender

Civil And Construction
Civil Works Others
Building Construction
Opening Date16 Aug 2024
Closing Date30 Aug 2024
Tender Amount₹ 84,28,975.24 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
code04 - Numbering and removing the BEAMS stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 13

15

735

11025

... More
code05 - Numbering and removing the CAPITALS stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc,complete as per directions of higher authorities. SL no 8

4

520

2080

... More
code06 - Numbering and removing the PILLAR stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 7

7.2

735

5292

... More
code07 - Numbering and removing the PILLAR BASE stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 6

4

520

2080

... More
code08 - Numbering and removing the VEENERING WALL stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 3

15.2

660

10032

... More
code09 - Numbering and removing the LINTEL stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 12

7

735

5145

... More
code10 - Numbering and removing the DOOR JAM stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 11

4

785

3140

... More
code11 - Numbering and removing the DOOR BASE stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 10

5.8

575

3335

... More
code12 - Numbering and removing the ADISTHANA stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 01

50

575

28750

... More
code13 - Numbering and removing the THIRTHA NALA stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 22

1

1230

1230

... More
code14 - Numbering and removing the FLOORING stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 21

64.17

385

24705.45

... More
code15 - Supplying of solid granite stone all sizes of from Gulur,Chikkaballapura District quarry to main road with 10km lead and labour charges including hiring charges for chain and pulley block transportation etc., complete as directedby Engineer in charge of work SL no 03

9.84

17400

171216

... More
code16 - KSRRB-M100-4.1- Cost of Haulage Excluding Loading and Unloading MORTH-100/Chapter 1 Case 1Surface road

9.84

8234

81027.0864

... More
code17 - Providing dressing to WATER SPOUTS stone members of all sizeses as per the existing style including Conveying From stacked Position lifting by chain and pulley blocks with all lead ,lifts and labour charges including hire charges for chain and pulley, tools and plants ,cutting charges, chistling charge etc., complete as per the directions of engineer in charge SL no 44

1.79

6210

11115.9

... More
code18 - KSRB5-8.3 Providing one line dressing to granite stone slabs/granite stone masonry as per specification KBS 5.1.13 SR2018-19 I no 5.18 P no 27

45.3542

877

39811.91676

... More
code19 - Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth excluding rock in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m

22.32

508

11343.024

... More
code20 - Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.

14.4

2816

40551.84

... More
code21 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other ppurtenances required to complete the work as per technical pecifications.Mix 148 Using 40 mm nominal size graded crushed coarse aggregates.

1.24

5947

7374.528

... More
code22 - Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 16 1 cement 6 coarse sand.

1.86

6708

12477.717

... More
code23 - Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregate

2.1

7966

16730.658

... More
code24 - Treatment of soil with Chloropyriphos/Lindane E.C. 20 with 1 concentration under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 2 1 cement 2 Coarse sand to match the existing floors.

30

365

10950

... More
code25 - Resetting of the ADHISTHANA stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 48

50

870

43500

... More
code26 - Resetting of the THIRTHA NALA stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 69

1

1270

1270

... More
code27 - Resetting of the PILLAR BASE stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 53

20

680

13600

... More
code28 - Resetting of the PILLAR stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 54

7.2

980

7056

... More
code29 - Resetting of the CAPITAL stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 56

4

925

3700

... More
code30 - Resetting of the DOOR BASE stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 57

5.8

870

5046

... More
code31 - Resetting of the DOOR JAM stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 58

14.79

950

14050.5

... More
code32 - Resetting of the DOOR LINTEL stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 59

7

870

6090

... More
code33 - Resetting of the VENEERING SLAB stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 50

38

860

32680

... More
code34 - Resetting of the BEAMS stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 60

24

980

23520

... More
code35 - Resetting of the CEILING SLAB stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 61

63

965

60795

... More
code36 - Resetting of the CHEJJA stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 62

14

965

13510

... More
code37 - Resetting of theWATER SPOUTS stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 67

1

1245

1245

... More
code38 - Resetting of the FLOORING stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 68

68.14

380

25893.2

... More
code39 - Providing Coursed rubble masonry first sortwith hard stone in foundation and plinth with Cement mortar 16 1 cement 6 coarse sand

2.4

6476

15543.36

... More
code40 - Providing Brick work with common burnt clay non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 16 1 cement 6 coarse sand including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.

8.12

8367

67943.694

... More
code41 - Providing lime concrete terracing on roofing for weather proof course arrange thickness 100mm laid to slope with 25mm nominal size brick jelly and 50 lime surkhi mortar 12 one lime putty two surkhirammed & finished with gur and beligiri treatment rounding off junctions at parapets, including cost of materials, labour complete as per specifications. SL no 73

63

1560

98280

... More
code42 - Providing 12mm thick cement plaster in single coat with CM 13 to Brick masonry including rounding of corners where ever required smooth rendering , providing & removing scaffolding including cost of material labour curing complete as per specification.

64

339

21705.6

... More
code43 - Providing flush/ruled pointing to square rubble, course oruncoursed stone masonry with cement mortar13, 20mm deep, afterraking joints to depth of 20mm nicely lining, including cost of materials,labour, curing complete as per specifications SL no 74

559.31

210

117455.1

... More
code44 - Cleaning the sand stone surface and removing dirt, dust, bird dropping,grease, oil, algae, fungus, monkey beats, vegetable growth etc.,including providing, applying and washing the surface with liquidAmmonia Chemical of 5 solution and other chemical cleaning agentas approved by Archaeological Survey of India/ Engineer-in-charge,of approved brand and manufacturer, with the help of required scrubbers and also cleaning with machine operated water jet mixedwith desired quantity of fine silica where ever required, without causingany scratching/ damage to the stone surface and finally washing thesurface with clean water with the help of pressure jet machine, completein all respect, including taking all precautions to safeguard ventilators,windows, doors etc. by suitable covering so as to avoid any damage tothe building/ structure, all as per direction of Engineer-in-charge.The rate is inclusive of all materials & labours involved except scaffolding.

249.76

149

37239.216

... More
code45 - Removing debries such as brick bats ,rubbles earth wastage materials ,wpc,beyond 5 km outside the monument through vehical icluding hire charges ,crew charges, labour charges for loading & unloading etc., complete as directed by the higher authorities SL no 75

87.63

130

11435.715

... More
code46 - Providing and fixing board displaying information, such as Name of work, Tender cost, Name of Contractor, Work completion and liability period etc, having rectangular shape of 1.20m x 0.90m size made out 18 gauge 1.25mm thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 148 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. no. As directed by Engineer in Charge & MoRTH specification 80

1

9000

9000

... More
code47 - Providing and fixing of typical Citizen Information Board B as per specifications and drawing. Two ACP Sheet of 4mm thick having minimum 0.25mm thick aluminum skin both sides and fixed over a back support of Ms plate of 5mm thick. Supported on frame post of 2 nos of MS Suare hallow section 75mmx75mmx6mm which is duly embedded in cement concrete M20 Grade of 600x600x750mm,600mm below ground level.All MS will be stove enameled on both the sides.All sections of framed posts,MS sheet and Stell tubes will be painted with primer and two coats of epoxy paint as per drawing etc..Retro-Reflective Sheet as per IRC 67 fixted over a two nos of Aluminum composite materialACP sheeting of size 900x750mm of 4mm thick duly bolted/reveted with MS plate of 5mm thick on backside of ACP heet.Including cost and conveyance of all aterials,equipment,machinery and labour with all leads and lifts,loading charges charges necessary for satisfactory completion of work as per directed by engineer incharge. i For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. ii A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/DirTech 7 Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type-1

1

21480

21480

... More
code48 - TEMPLE-3 Demolishing brick work manually/ by mechanical means including stack- ing of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.

28.34

1080

30619.953

... More
code49 - Dismantling weather proof course and removing and conveying the debris to a distance upto 200m.

18.9

604

11430.72

... More
code50 - Numbering and removing the CHEJJA stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 15

60.76

820

49823.2

... More
code51 - Numbering and removing the KAPOTHA stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities SL no 15

25.172

820

20641.04

... More
code52 - Numbering and removing the CEILING SLABS stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 14

94.48

765

72277.2

... More
code53 - Numbering and removing the BEAMS stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 13

64

735

47040

... More
code54 - Numbering and removing the CAPITALS stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc,complete as per directions of higher authorities. SL no 8

4

520

2080

... More
code55 - Numbering and removing the PILLAR stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 7

7.6

735

5586

... More
code56 - Numbering and removing the PILLAR BASE stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 6

4

520

2080

... More
code57 - Numbering and removing the VEENERING WALL stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 3

173.6

660

114576

... More
code58 - Numbering and removing the LINTEL stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 12

3.7

735

2719.5

... More
code59 - Numbering and removing the DOOR JAM stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 11

7.6

785

5966

... More
code60 - Numbering and removing the DOOR BASE stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 10

3.7

575

2127.5

... More
code61 - Numbering and removing the ADISTHANA stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 01

173.6

575

99820

... More
code62 - Numbering and removing the THIRTHA NALA stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 22

1

1230

1230

... More
code63 - Numbering and removing the FLOORING stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 21

36.9

385

14206.5

... More
code64 - Supplying of solid granite stone all sizes of from Gulur,Chikkaballapura District quarry to main road with 10km lead and labour charges including hiring charges for chain and pulley block transportation etc., complete as directedby Engineer in charge of work SL no 03

44.67

17400

777258

... More
code65 - KSRRB-M100-4.1- Cost of Haulage Excluding Loading and Unloading MORTH-100/Chapter 1 Case 1Surface road

44.67

8234

367833.3282

... More
code66 - Providing dressing to ADHISTANA stone members of all sizeses as per the existing style including Conveying From stacked Position lifting by chain and pulley blocks with all lead ,lifts and labour charges including hire charges for chain and pulley, tools and plants ,cutting charges, chistling charge etc., complete as per the directions of engineer in charge SL no 25

17.36

3935

68311.6

... More
code67 - Providing dressing to BEAMS stone members of all sizeses as per the existing style including Conveying From stacked Position lifting by chain and pulley blocks with all lead ,lifts and labour charges including hire charges for chain and pulley, tools and plants ,cutting charges, chistling charge etc., complete as per the directions of engineer in charge SL no 37

57.6

3740

215424

... More
code68 - Providing dressing to VENEERING WALL stone members of all sizeses as per the existing style including Conveying From stacked Position lifting by chain and pulley blocks with all lead ,lifts and labour charges including hire charges for chain and pulley, tools and plants ,cutting charges, chistling charge etc., complete as per the directions of engineer in charge SL no 25

164.92

3530

582167.6

... More
code69 - Providing dressing to WATER SPOUTS stone members of all sizeses as per the existing style including Conveying From stacked Position lifting by chain and pulley blocks with all lead ,lifts and labour charges including hire charges for chain and pulley, tools and plants ,cutting charges, chistling charge etc., complete as per the directions of engineer in charge SL no 44

1.79

6210

11115.9

... More
code70 - KSRB5-8.3 Providing one line dressing to granite stone slabs/granite stone masonry as per specification KBS 5.1.13 SR2018-19 I no 5.19 P no 27

182.08

877

159829.824

... More
code71 - Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth excluding rock in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m

96.87

508

49229.334

... More
code72 - Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.

19.2

2816

54069.12

... More
code73 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other ppurtenances required to complete the work as per technical pecifications.Mix 148 Using 40 mm nominal size graded crushed coarse aggregates.

4.34

5947

25810.848

... More
code74 - Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 16 1 cement 6 coarse sand.

7.81

6708

52392.9945

... More
code75 - Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregate

2.1

7966

16730.658

... More
code76 - Treatment of soil with Chloropyriphos/Lindane E.C. 20 with 1 concentration under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 2 1 cement 2 Coarse sand to match the existing floors.

64

365

23385.6

... More
code77 - Resetting of the ADHISTHANA stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 48

217

870

188790

... More
code78 - Resetting of the THIRTHA NALA stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 69

1

1270

1270

... More
code79 - Resetting of the PILLAR BASE stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 53

4

680

2720

... More
code80 - Resetting of the PILLAR stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 54

7.6

980

7448

... More
code81 - Resetting of the CAPITAL stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 56

4

925

3700

... More
code82 - Resetting of the DOOR BASE stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 57

3.7

870

3219

... More
code83 - Resetting of the DOOR JAM stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 58

7.6

950

7220

... More
code84 - Resetting of the DOOR LINTEL stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 59

3.8

870

3306

... More
code85 - Resetting of the VENEERING SLAB stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 50

164.92

860

141831.2

... More
code86 - Resetting of the BEAMS stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 60

94

980

92120

... More
code87 - Resetting of the CEILING SLAB stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 61

94.48

965

91173.2

... More
code88 - Resetting of the CHEJJA stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 62

68.572

965

66171.98

... More
code89 - Resetting of theWATER SPOUTS stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 67

1

1245

1245

... More
code90 - Resetting of the FLOORING stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 68

36.9

380

14022

... More
code91 - Providing Coursed rubble masonry first sortwith hard stone in foundation and plinth with Cement mortar 16 1 cement 6 coarse sand

7.81

6476

50580.684

... More
code92 - Providing Brick work with common burnt clay non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 16 1 cement 6 coarse sand including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.

14.17

8367

118566.7665

... More
code93 - Providing lime concrete terracing on roofing for weather proof course arrange thickness 100mm laid to slope with 25mm nominal size brick jelly and 50 lime surkhi mortar 12 one lime putty two surkhirammed & finished with gur and beligiri treatment rounding off junctions at parapets, including cost of materials, labour complete as per specifications. SL no 73

94.48

1560

147388.8

... More
code94 - Providing 12mm thick cement plaster in single coat with CM 13 to Brick masonry including rounding of corners where ever required smooth rendering , providing & removing scaffolding including cost of material labour curing complete as per specification.

52.08

339

17662.932

... More
code95 - Providing flush/ruled pointing to square rubble, course oruncoursed stone masonry with cement mortar13, 20mm deep, afterraking joints to depth of 20mm nicely lining, including cost of materials,labour, curing complete as per specifications SL no 74

224

210

47040

... More
code96 - Cleaning the sand stone surface and removing dirt, dust, bird dropping,grease, oil, algae, fungus, monkey beats, vegetable growth etc.,including providing, applying and washing the surface with liquidAmmonia Chemical of 5 solution and other chemical cleaning agentas approved by Archaeological Survey of India/ Engineer-in-charge,of approved brand and manufacturer, with the help of required scrubbers and also cleaning with machine operated water jet mixedwith desired quantity of fine silica where ever required, without causingany scratching/ damage to the stone surface and finally washing thesurface with clean water with the help of pressure jet machine, completein all respect, including taking all precautions to safeguard ventilators,windows, doors etc. by suitable covering so as to avoid any damage tothe building/ structure, all as per direction of Engineer-in-charge.The rate is inclusive of all materials & labours involved except scaffolding.

370.77

149

55281.807

... More
code97 - Removing debries such as brick bats ,rubbles earth wastage materials ,wpc,beyond 5 km outside the monument through vehical icluding hire charges ,crew charges, labour charges for loading & unloading etc., complete as directed by the higher authorities SL no 75

144.11

130

18806.355

... More
code98 - Providing and fixing board displaying information, such as Name of work, Tender cost, Name of Contractor, Work completion and liability period etc, having rectangular shape of 1.20m x 0.90m size made out 18 gauge 1.25mm thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 148 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. no. As directed by Engineer in Charge & MoRTH specification 80

1

9000

9000

... More
code99 - Providing and fixing of typical Citizen Information Board B as per specifications and drawing. Two ACP Sheet of 4mm thick having minimum 0.25mm thick aluminum skin both sides and fixed over a back support of Ms plate of 5mm thick. Supported on frame post of 2 nos of MS Suare hallow section 75mmx75mmx6mm which is duly embedded in cement concrete M20 Grade of 600x600x750mm,600mm below ground level.All MS will be stove enameled on both the sides.All sections of framed posts,MS sheet and Stell tubes will be painted with primer and two coats of epoxy paint as per drawing etc..Retro-Reflective Sheet as per IRC 67 fixted over a two nos of Aluminum composite materialACP sheeting of size 900x750mm of 4mm thick duly bolted/reveted with MS plate of 5mm thick on backside of ACP heet.Including cost and conveyance of all aterials,equipment,machinery and labour with all leads and lifts,loading charges charges necessary for satisfactory completion of work as per directed by engineer incharge. i For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. ii A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/DirTech 7 Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type-1

1

21480

21480

... More
code100 - Temple-4 Demolishing brick work manually/ by mechanical means including stack- ing of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.

26.75

1080

28902.0375

... More
code101 - Dismantling weather proof course and removing and conveying the debris to a distance upto 200m.

17.84

604

10789.632

... More
code102 - Numbering and removing the CHEJJA stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 15

56.83

820

46600.6

... More
code103 - Numbering and removing the KAPOTHA stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities SL no 15

23.548

820

19309.36

... More
code104 - Numbering and removing the CEILING SLABS stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 14

2.5

765

1912.5

... More
code105 - Numbering and removing the BEAMS stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 13

8.9

735

6541.5

... More
code106 - Numbering and removing the CAPITALS stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc,complete as per directions of higher authorities. SL no 8

1

520

520

... More
code107 - Numbering and removing the PILLAR stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 7

1.9

735

1396.5

... More
code108 - Numbering and removing the PILLAR BASE stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 6

1

520

520

... More
code109 - Numbering and removing the VEENERING WALL stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 3

81.2

660

53592

... More
code110 - Numbering and removing the LINTEL stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 12

3.7

735

2719.5

... More
code111 - Numbering and removing the DOOR JAM stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 11

7.6

785

5966

... More
code112 - Numbering and removing the DOOR BASE stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 10

3.7

575

2127.5

... More
code113 - Numbering and removing the ADISTHANA stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 01

121.8

575

70035

... More
code114 - Numbering and removing the THIRTHA NALA stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 22

1

1230

1230

... More
code115 - Numbering and removing the FLOORING stone members of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculputures and stacking the stones with in the monument premises including cost and conveyance of all materials , labour charges etc , complete as per directions of higher authorities. SL no 21

36.9

385

14206.5

... More
code116 - Supplying of solid granite stone all sizes of from Gulur,Chikkaballapura District quarry to main road with 10km lead and labour charges including hiring charges for chain and pulley block transportation etc., complete as directedby Engineer in charge of work SL no 03

36.37

17400

632838

... More
code117 - KSRRB-M100-4.1- Cost of Haulage Excluding Loading and Unloading MORTH-100/Chapter 1 Case 1Surface road

36.37

8234

299487.3102

... More
code118 - Providing dressing to ADHISTANA stone members of all sizeses as per the existing style including Conveying From stacked Position lifting by chain and pulley blocks with all lead ,lifts and labour charges including hire charges for chain and pulley, tools and plants ,cutting charges, chistling charge etc., complete as per the directions of engineer in charge SL no 25

36.54

3935

143784.9

... More
code119 - Providing dressing to BEAMS stone members of all sizeses as per the existing style including Conveying From stacked Position lifting by chain and pulley blocks with all lead ,lifts and labour charges including hire charges for chain and pulley, tools and plants ,cutting charges, chistling charge etc., complete as per the directions of engineer in charge SL no 37

36

3740

134640

... More
code120 - Providing dressing to VENEERING WALL stone members of all sizeses as per the existing style including Conveying From stacked Position lifting by chain and pulley blocks with all lead ,lifts and labour charges including hire charges for chain and pulley, tools and plants ,cutting charges, chistling charge etc., complete as per the directions of engineer in charge SL no 25

154.28

3530

544608.4

... More
code121 - Providing dressing to WATER SPOUTS stone members of all sizeses as per the existing style including Conveying From stacked Position lifting by chain and pulley blocks with all lead ,lifts and labour charges including hire charges for chain and pulley, tools and plants ,cutting charges, chistling charge etc., complete as per the directions of engineer in charge SL no 44

1.79

6210

11115.9

... More
code122 - KSRB5-8.3 Providing one line dressing to granite stone slabs/granite stone masonry as per specification KBS 5.1.13 SR2018-19 I no 5.19 P no 27

87.6025

877

76897.4745

... More
code123 - Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth excluding rock in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m

50.34

508

25582.788

... More
code124 - Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.

16

2816

45057.6

... More
code125 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other ppurtenances required to complete the work as per technical pecifications.Mix 148 Using 40 mm nominal size graded crushed coarse aggregates.

4.06

5947

24145.632

... More
code126 - Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 16 1 cement 6 coarse sand.

8.12

6708

54472.614

... More
code127 - Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregate

2.1

7966

16730.658

... More
code128 - Treatment of soil with Chloropyriphos/Lindane E.C. 20 with 1 concentration under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 2 1 cement 2 Coarse sand to match the existing floors.

103

365

37636.2

... More
code129 - Resetting of the ADHISTHANA stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 48

203

870

176610

... More
code130 - Resetting of the THIRTHA NALA stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 69

1

1270

1270

... More
code131 - Resetting of the PILLAR BASE stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 53

4

680

2720

... More
code132 - Resetting of the PILLAR stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 54

7.6

980

7448

... More
code133 - Resetting of the CAPITAL stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 56

4

925

3700

... More
code134 - Resetting of the DOOR BASE stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 57

3.7

870

3219

... More
code135 - Resetting of the DOOR JAM stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 58

7.6

950

7220

... More
code136 - Resetting of the DOOR LINTEL stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 59

3.8

870

3306

... More
code137 - Resetting of the VENEERING SLAB stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 50

77.14

860

66340.4

... More
code138 - Resetting of the BEAMS stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 60

60

980

58800

... More
code139 - Resetting of the CEILING SLAB stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 61

87.14

965

84090.1

... More
code140 - Resetting of the CHEJJA stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 62

12.18

965

11753.7

... More
code141 - Resetting of theWATER SPOUTS stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 67

1

1245

1245

... More
code142 - Resetting of the FLOORING stone members including conveying from stacked position lifting by using chain and pully block and setting on its position correct line, plumb and level with all lead and lifts, labour charges and hire charges for chaing pully block, steel rope, etc., as per the direction of engineer incharge of work SL no 68

60.7

380

23066

... More
code143 - Providing Coursed rubble masonry first sortwith hard stone in foundation and plinth with Cement mortar 16 1 cement 6 coarse sand

4.87

6476

31540.068

... More
code144 - Providing Brick work with common burnt clay non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 16 1 cement 6 coarse sand including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.

13.37

8367

111872.8065

... More
code145 - Providing lime concrete terracing on roofing for weather proof course arrange thickness 100mm laid to slope with 25mm nominal size brick jelly and 50 lime surkhi mortar 12 one lime putty two surkhirammed & finished with gur and beligiri treatment rounding off junctions at parapets, including cost of materials, labour complete as per specifications. SL no 73

89.2

1560

139152

... More
code146 - Providing 12mm thick cement plaster in single coat with CM 13 to Brick masonry including rounding of corners where ever required smooth rendering , providing & removing scaffolding including cost of material labour curing complete as per specification.

97.44

339

33046.776

... More
code147 - Providing flush/ruled pointing to square rubble, course oruncoursed stone masonry with cement mortar13, 20mm deep, afterraking joints to depth of 20mm nicely lining, including cost of materials,labour, curing complete as per specifications SL no 74

224

210

47040

... More
code148 - Cleaning the sand stone surface and removing dirt, dust, bird dropping,grease, oil, algae, fungus, monkey beats, vegetable growth etc.,including providing, applying and washing the surface with liquidAmmonia Chemical of 5 solution and other chemical cleaning agentas approved by Archaeological Survey of India/ Engineer-in-charge,of approved brand and manufacturer, with the help of required scrubbers and also cleaning with machine operated water jet mixedwith desired quantity of fine silica where ever required, without causingany scratching/ damage to the stone surface and finally washing thesurface with clean water with the help of pressure jet machine, completein all respect, including taking all precautions to safeguard ventilators,windows, doors etc. by suitable covering so as to avoid any damage tothe building/ structure, all as per direction of Engineer-in-charge.The rate is inclusive of all materials & labours involved except scaffolding.

299.77

149

44695.707

... More
code149 - Removing debries such as brick bats ,rubbles earth wastage materials ,wpc,beyond 5 km outside the monument through vehical icluding hire charges ,crew charges, labour charges for loading & unloading etc., complete as directed by the higher authorities SL no 75

94.94

130

12389.67

... More
code150 - Providing and fixing board displaying information, such as Name of work, Tender cost, Name of Contractor, Work completion and liability period etc, having rectangular shape of 1.20m x 0.90m size made out 18 gauge 1.25mm thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 148 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. no. As directed by Engineer in Charge & MoRTH specification 80

1

9000

9000

... More
code151 - Providing and fixing of typical Citizen Information Board B as per specifications and drawing. Two ACP Sheet of 4mm thick having minimum 0.25mm thick aluminum skin both sides and fixed over a back support of Ms plate of 5mm thick. Supported on frame post of 2 nos of MS Suare hallow section 75mmx75mmx6mm which is duly embedded in cement concrete M20 Grade of 600x600x750mm,600mm below ground level.All MS will be stove enameled on both the sides.All sections of framed posts,MS sheet and Stell tubes will be painted with primer and two coats of epoxy paint as per drawing etc..Retro-Reflective Sheet as per IRC 67 fixted over a two nos of Aluminum composite materialACP sheeting of size 900x750mm of 4mm thick duly bolted/reveted with MS plate of 5mm thick on backside of ACP heet.Including cost and conveyance of all aterials,equipment,machinery and labour with all leads and lifts,loading charges charges necessary for satisfactory completion of work as per directed by engineer incharge. i For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. ii A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/DirTech 7 Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type-1

1

21480

21480



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.