Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 14,200Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Construction Of Rcc Drain And Culvert At Shyam Nagar Khorha Toli Road No-02, Kokar From House Of Albert Toppo To House Of Ramkripal Singh Under Ward No-7
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UDD_97222_4Tender No
234/ENGTender Authority
Urban Development Department ViewPurchaser Address
-Website
http://http://juidco.jharkhand.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying and laying (properly as per design and drawing ) rip-rap with good quality of boulders duty packed including the cost of materials royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.
9.81
1756
17230.28
... More
Reinforced cement concrete work in beam, suspended floors, roofs having slope up to 15° landing,balconies, shelves, chajjas, lintel, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinfocement, with 1:1.5:3(1 cement : 1.5 coarse sand(zone-iii) : 3 graded stone aggregate 20mm nominal size)
26.32
6082
160090.08
... More
Providing Tor steel reinforcement of 8 mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
12.19
6308
76905.13
... More
Providing Tor steel reinforcement of 8 mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
1.22
83314
101976.36
... More
Providing Tor steel reinforcement of 8mm,10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site ,cutting bending and binding with annealed wire with cost of wire ,removal of rust ,placing the rods in position all complete as per building specification and direction of E/I.
1.84
82096
150729.25
... More
Centering and Shuttering including struting,propping etc and removal of from for Foundation, footing s bases of Coloumns etc for mass Concrete.
162.59
194
31623.76
... More
Sand with lead of 49 km
16.56
848
14056.46
... More
Stone dust lead 22 km
3.83
447
1712.24
... More
Stone Boulder with lead of 36 km
9.81
679
6667.46
... More
Stone chips with lead of 22 km
33.12
447
14806.63
... More
Earth (lead 01 KM)
60.49
117
7109.99
... More
Good & Service Tax (GST)
593423.5
-
106816.23
... More
Labour Cess
700239.73
-
7002.4