South Central Railway Tender

... More
The SCR has issued a formal invitation for competitive bids for the South Central Railway project, for Refurbishment Of Demu Power Packs - Refurbishment Of Demu Power Packs (cummins Kta50l Engine), E-check Schedule In 10 Nos Engines Of Carriage Workshop Lallaguda, Secunderabad. in Latehar, Jharkhand, with an estimated contract value of Rs. 6,38,20,154. The bid opening date for this tender is 17-05-2025 and the last date for bid submission is 16-06-2025. Interested bidders for South Central Railway tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

South Central Railway - SCR Tender

Works
Automobiles and Auto Parts
Ireps
Opening Date17 May 2025
Closing Soon16 Jun 2025
Tender Amount₹ 6,38,20,154.3 
Notes
Download

AI Insights

Bid Capacity
... View More
The formula for bid capacity is Available Bid Capacity = [A x N x 2] – 0.33xNxB. For a Joint Venture (JV), the bid capacity is the arithmetic sum of individual "bid capacity" of all the members, which can be written as Bid Capacity of JV = Σ (Bid Capacity of each member) or Bid Capacity of JV = Bid Capacity of Member 1 + Bid Capacity of Member 2 +... + Bid Capacity of Member n.
Technical Capacity
... View More
The required prior work experience for the bidder includes substantially completed work or completed work. A substantially completed work means an ongoing work in which payment equal to or more than 90% of the present contract value has been made to the contractor. The bidder must have successfully completed or substantially completed any one of the following categories of work(s) during the last 07 years: - Three similar works each costing not less than 30% of the advertised value of the tender, - Two similar works each costing not less than 40% of the advertised value of the tender, - One similar work costing not less than 60% of the advertised value of the tender. For substantially completed work, the total gross amount already paid, including the price variation amount, shall be considered as the cost of substantially completed work, with a payment of at least 90% of the present contract value. For completed work, the value of the final bill, including the price variation amount, shall be considered as the completion cost of work. If the final bill is pending, only the total gross amount already paid, including the price variation amount, shall be considered as the completion cost of work. In the case of subletting of work, the subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years. However, for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for. The bidder should have successfully completed at least one work similar to the work proposed, costing not less than 35% value of the work to be done, in the last 5 years.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
LUMPSUM PROVISION for cost of CONDITION BASE CHANGE items (CB item), during E- 3 Check schedule overhauling, of 10 nos engines, including applicable GST. (Lumpsum provision is 1/3rd of total cost of condition base items, list of 22 items as per Annexure-E2) NOTE:-(1)The bidder should quote overall rate on this schedule item and subsequently should also upload Annexure-E-2, duly mentioning the offer rate for each item. (2) The tender will be evaluated by considering the total of

10

1813825

18138250.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.