The RWD has issued a formal invitation for competitive bids for the Rural Works Department project, for Sirum To Landupdih Road in Khunti, Jharkhand. The bid opening date for this tender is 21-09-2024 and the last date for bid submission is 28-09-2024. Interested bidders for Rural Works Department tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 4,02,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Sirum To Landupdih Road
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RWD_93568_1Bid Award Id
ViewTender No
RWD-KHUNTI-20/2024-25Tender Authority
Rural Works Department ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications
0.67
88585
59352.02
... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.
217
112
24432.03
... More
Compacting Original ground Case I Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.
75
52
3945
... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
1.91
12413
23709.98
... More
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. PCC Grade M15 PCC Grade M15 using batching plant & manual placing
77.62
5158
400404.32
... More
Direction and Place Identification Signs with size more than 0.9 sqm size Board.(Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm Angle mounted on two nos. of mild steel circular pipe 65 NB, 3.2mm thickness and 4.5m meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)
3.15
13704
43168.55
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work. Ordinary Soil Manual Means ( Depth upto 3 m)
567.04
55
31640.83
... More
Plastering with cement mortar (1:3) on brick work in substructure as per technical specifications
258.26
118
30686.45
... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M25 Height upto 5m RCC Grade M25 using batching plant, transit mixer & concrete pump For Deck Slab
4.68
6102
28559.14
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications Coursed rubble masonry (first sort)
27.32
5245
143311.16
... More
Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of class-C Type XI retro reflective sheeting fixed over 2mm thick aluminium sheeting vide clause 801.3, 3/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over back support frame of min 25 x 25 x 3 mm Angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The sign shall be maintained as per section 12 of IRC 67. 80 cm x 60 cm rectangular
2
7526
15052
... More
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
1360.92
6800
9254487.36
... More
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting)
50
545
27290
... More
Labour Cess -
19861105.6
-
198611.06
... More
Construction of Embankment with Material Deposited from Roadway Cutting. Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.Rate per cum after adding royalty@Rs 27.48/cum
396.93
61
24403.26
... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Hectometer Stone (Precast)
7
542
3800.3
... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications Height upto 5m PCC Grade M20 using batching plant, transit mixer & concrete pump
3.54
5637
19955.58
... More
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Random Rubble masonry (coursed/uncoursed)
343.7
4988
1714437.47
... More
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
4221.04
131
554222.55
... More
Goods & Service Tax (G.S.T.) -
16831445.42
-
3029660.18
... More
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Square Rubble Coursed Rubble masonry (first sort)
38.82
5100
198006.84
... More
Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications Sandy material
16.12
782
12612.45
... More
Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area by manual means
0.54
19760
10670.56
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications Random Rubble Masonry (Coursed/uncoursed)
247.38
4934
1220661.98
... More
By Mix in Place Method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-I Material
1102.34
2638
2908424.88
... More
Dry Rubble Flooring. (Construction of dry rubble flooring at cross drainage works for relatively less important works.)
9.26
2632
24380.65
... More
Pointing with cement mortar (1:3) on brick work in substructure as per technical specifications
157.5
61
9684.68