Summary

Diamond Core Drilling For Geo-technical Investigation At Dam Axis Of Chaura Reservoir Scheme In Bokaro District Of Jharkhand Under Neid-i, Cwc, Silchar

BOQ Items
ItemQuantityUnitsRateAmount
... more
Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading unloading and security complete up to 500 kms.
2Each Trip1.01 -
... more
In hard rock formation 100m depth (50%)
65m5.03 -
... more
Dismantling, transportation and assembling of Drilling Machines of different capacity complete by head load including cost of labour, T&P, etc as per directions of Engineer-in-charge
04 -
... more
Diamond Core Drilling Carrying out of vertical Diamond Core Drilling in NX size in different formations and locations other than under water not involving construction of floating platform including preservation of cores in core boxes of slandered dimensions made of seasoned local wood as per BIS standards, their making and taking colour photographs of the preserved cores etc complete with cost of all labours, T&P and POL as per directions of Engineer-in-charge. (For Vertical Drill Hole and Total Depth 130 m)
05 -
... more
Up to 100m
35Each6.01 -
... more
Transportation cost of Drilling
01 -
... more
Construction of Platform with locally available material
03 -
... more
In soft rock formation up to 100m depth (30%)
39m5.02 -
... more
Water Permeability Tests at different depths:
06 -
... more
Upto 100m lead
7Each Machine4.01 -
... more
Upto 200 m.
3Nos2.01 -
... more
In over burden soil and sandy strata up to 100m depth (20%)
26m5.01 -
... more
Laying of temporary water supply pipelines (25 mm diameter and above) of varying lengths from nearest water source and construction of temporary Water Retaining pit of size 2 m x 1 m x 0.5 m complete with cost of all labour, material, T&P and transport as per direction of Engineer in charge Including the cost of GI pipe and fittings.
02 -
... more
Construction of Platform with locally available material of size 6m x 6m x 1m for housing the Drilling Machine materials complete with cost of labour, material, T&P and transport as per direction of Engineer-in-Charge.
8Nos3.1 -

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.