Jharkhand Urja Sancharan Nigam Limited Tender
... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 90,900Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_JSEB_99397_1Bid Award Id
ViewTender No
459/PR/JUSNL/2024-25Tender Authority
Jharkhand Urja Sancharan Nigam Limited ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
LA - IR value measurement (400/220 KV) ICT SIDE: 12Nos + 400kv Line Bay: 18nos+ 220KV Line Bay: 12 Nos) (Half yearly)
78
-
-
... More
PT/CVT (set)- IR Value measurement (400/220 KV) 400KV &220KV BUS-I&II SIDE: 12Nos + 400kv Line Bay: 18nos+ 220KV Line Bay: 12 Nos) (Half yearly)
78
-
-
... More
Service charge (indoor and out door) (Split AC - 10, CASSETTE AC- 08 CENTRALISED AC (8.5T)- 01 VOLTAS MAKE)--Every 4MONTHS
57
-
-
... More
Supply of Consumables viz. Markin cloth, Distilled water, grease, Mobil, Nuts & Bolts, cotton waste, Joute, Petrolium Jelly, Kerosine, WD-40 rust remover etc. Required time to time for O&M works of GSS.
12
-
-
... More
CT (of a Bay)- IR Value measurement (400/220 KV) (Half yearly)
120
-
-
... More
400kV /220kv CT,PT/CVT, incl cable terminal
2
-
-
... More
400kV Main Bus I & Bus II Nut bolt tightening, adjustment, cleaning, greasing, mobilization & jelly putting in clamp & Connectors, Earthing flat, jumpers and other equipments related with Insulators, Isolator, PT
8
-
-
... More
Testing of 400/220kV, 315MVA Power Transformer of GSS
-
-
-
... More
Measurement & Testing of any grid equipment using any kit available in JUSNL or Grid (400/220 kV)
20
-
-
... More
S/C Impedence test
1
-
-
... More
400kV Bay/ 220 kV Bay-Nut bolt tightening, adjustment of contacts (Male/female) cleaning, greasing, mobilization & jelly putting in clamp & connectors, Earthing flat, jumpers and other equipments related with Insulators, Isolators, CT, PT, CB, LA, dropping and panel of a Bay. (as per direction of E/I) (a) 400KV BAYS : 401 to 412.....(10nos+ 2nos Future bays) (b) 400KV BAYS: 413 to 418......(4nos+ 2nos future bays) (c) 220KV BAYS: 201 to 207 & 209....(8Nos + 1nos future bay)
40
-
-
... More
Minor repairing of CB- Meggering, Gas filling, checking of MCB, contactors, motors, spring and tripping or closing coils, SF6 gas filling etc... Including all or any (400/220 KV)
18
-
-
... More
Contingency (To &fro charges incl. Fooding & lodging)
2
-
-
... More
Repaire & Overhauling of submersible pump incl. materials lifting and laydown of submersible pump from borewell,repair of water supply pipe all complete job and transport cost
2
-
-
... More
Minor repairing of Transformer- Meggering with opening of bushing connectors, checking of PRV, vent pipe & Buchholz relay, oil top-up etc... Including all or any. (400/220 KV)
4
-
-
... More
Magnetic Balance test
1
-
-
... More
Repair of 220 kV SF6 Breaker 3PH/1PH spring charged motor if required
6
-
-
... More
Replacement of 400kv/220KV side Clamp & connectoors/PG/Jumper Konia
6
-
-
... More
IR Test incl. PI
1
-
-
... More
Winding Resistance test yearly
1
-
-
... More
Replacement of Isolator Blade/Blade base (400kV /200KV Side)
6
-
-
... More
Dismentalling of following equipments with crane/derriek at site with handling of materials/equipments carefully at site incl labour charges for all incidents and operational items of works (Excl. cost of transportation charges from store to site)
-
-
-
... More
SF6 Gas Filling in CB
12
-
-
... More
Water content
2
-
-
... More
Measurement of Earth footing resistance of all earth pits
78
-
-
... More
Repaire & Overhauling of submersible pump incl. materials lifting and laydown of submersible pump from borewell,repair of water supply pipe all complete job and transport cost
2
-
-
... More
Testing Transformer oil by reconized laboratory incl. supply of sampling bottle
-
-
-
... More
Maintenance / Emergency Maintenance of Grid Substation as per schedule and JOB provided by Engineer In-charge.
-
-
-
... More
Circuit Breaker- IR Value measurement (400/220 KV) (Half yearly)
40
-
-
... More
Supply of Hydra/ Crane (upto 8MT capacity) as per requirement.
10
-
-
... More
Transformer- Nut bolt tightening, cleaning in clamps & connectors, Earthing flat, jumpers silica gel filling and other equipments related with transformer body.(400/220 KV) (Yearly)
2
-
-
... More
Minor repairing of Isolators- Adjustment of contacts & moving parts etc… (400/220 KV)
60
-
-
... More
220 kV Main Bus I , Bus II & Transfer Bus - Nut bolt tightening, adjustment, cleaning, greasing, mobilization & jelly putting in clamp & Connectors, Earthing flat, jumpers and other equipments related with Insulators, Isolator, PT (Quaterly)
12
-
-
... More
Maintenance and Cleaning of Solar PV Modules incl. Battery installed inside the control Room and outside the CR i.e Lighting Posts
12
-
-
... More
Transportation of materials by small/ medium size truck from transmission central stores Namkum or any other Place/ GSS within 100 km radius to 400/220KV GSS,Patratu
16
-
-
... More
Minor repairing of CT- Meggering, opening of top cover, replacement of Gasket & CT Stud, oil top-up etc... Including all or any (400/220 KV)
20
-
-
... More
Maintainence service for Installed 2nos. ONLINE DRYOUT SYSTEM ( Every Quarter)
8
-
-
... More
Replacement of Nut- bolts (400/220 KV)
50
-
-
... More
DGA Yearly
2
-
-
... More
Rectification of lighting and auxiliary power supply in Grid premises
200
-
-
... More
Gas filling charge
40
-
-
... More
Replacement of Insulator (400kv /220KV Side)
6
-
-
... More
Turn ratio test yearly
1
-
-
... More
Misc. work of Grid Substation as per schedule and JOB provided by Engineer In-charge
-
-
-
... More
BDV
3
-
-
... More
SST-1 (33/.4KV) - Nut bolt tightening, adjustment, cleaning, clamp & connectors, Earthing flat, jumpers, silica gel filling and other equipments related with SST body. (Half Yearly)
4
-
-
... More
Minor repairing of Panel- Looping & wiring of cables, loose contact rectification, replacement of lugs, ferrules etc… (400/220 KV)
200
-
-
... More
400kV /220 kv CT,PT/CVT, incl cable terminal
2
-
-
... More
Material/Equipment manual shifting & movement in Grid Premises
50
-
-
... More
Repair of 400 kV SF6 Breaker 3PH/1Ph spring charged motor if required
8
-
-
... More
Checking and Observation of 400/220KV S/Y (1. Clamp, connectors & jumpers. 2. Air & Gas Pressure. 3. Batteries & Battery System. 4. Control & Relay Panels. 5. Transformers Oil & Winding temperature, Fans, Oil Level, Silica Gel, Oil leakage and Equipment noise. (a) 400KV BAYS : 401 to 412.....Mainteanance Period: 01 years (b) 400KV BAYS: 413 to 418......Maintenance Period : for 6months (c) 220KV BAYS: 201 to 207 & 209....Mainteanance Period: 01 years
365
-
-
... More
400kV /220 kv LA
2
-
-
... More
Replacemnt of 400KV/220KV Side Jumper(Conductor /strip)
6
-
-
... More
Minor repairing of PT/CVT- Meggering, opening top cover, replacement of Gasket & PT stud, oil topup etc...including all or any (400kv/220 KV)
10
-
-
... More
Air condition maintenance charges
-
-
-
... More
Tan Delta Test of HV & LV bushing yearly
1
-
-
... More
Replacement of 400KV /220KV Side Female Contact/contact base
6
-
-
... More
Laying of Control Cable.
400
-
-
... More
Preventive/ Routine Maintenance of Grid Sub-station as per schedule provided by Engineer Incharge.
-
-
-