Drinking Water And Sanitation Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
10 Hp Cf Mpump Set Sf C Panel Etc At Cw Rws Scheme Nadiya 50hp And 60 Hp Cf M Pump Set Cw Rws 20 Hp Vt Pump Set At Akashi 40 Hp Vt Pump Set No1 30 Hp Cf P Set No1 Rws Scheme Kairo Supply Ins And Com Of 63 Kva Power Tf And Cable Termination At Kairo
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DWSD_97896_1Tender No
e-Quotation No - 02/2024-25 (2ND CALL)Tender Authority
Drinking Water And Sanitation Department ViewPurchaser Address
-Website
http://https://jalshakti-ddws.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
S/F of coupling unit suitable for 10HP pump set at site
2
-
-
... More
Supplying and laying MS suction pipe 4” dia 10’ long-02 nos,MS pipe bend 4” dia-02 nos, flange-6 nos,suitable nut bolt and washer-7kg.4” dia foot valve and its washer including removing of damaged suction pipe and transportation charge.
1
-
-
... More
Cost for S/F of sluice valve-02 nos,NR valve-02 nos,with suitable size nut bolt and washer,4” dia ms bend-02 nos,4” dia flange-04 nos. cutting and welding of pipevto common header with gas cutter and welding set and making leak proof joint.
2
-
-
... More
Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for jointing all suction and delivery pipe etc at site
2
-
-
... More
Cost for supplying, installation and commissioning of motor control panel made of 2 mm thick cubical panel board heat and vermine proof, proper ventilated two coats of appoxy painted comprising of (A) Incoming feeder-
(i) 100 amp MCCB- 01 no.
(ii) 100 amp copper bus bar arrangemen(4pole)
(iii) Phase indicating lamp-03 nos.
(B) Out going feeder- (i) 63 amp MCCB- 02 nos. (ii) Volt meter- 02 nos.
(iii) Amp meter-02 nos. (iv) Pilot lamp- 06 nos.
(v) Selector switch- 04 nos.
(vi) FASD (ml-03) starter-02 nos.
(vii) Single phase preventer-02 nos.
Complete internal wiring with suitable size of copper wire and testing on load.
1
-
-
... More
Cost for supplying and laying of 16 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor.
30
-
-
... More
Cost for supplying and fitting 100 amp change over switch of L&T /Havell’s/C&S make or ISI reputed make.
1
-
-
... More
Repairing and Maintenance of 50HP C/F motor pump set, 60 HP C/F motor pump set FASD starter, control panel at clear water rural water supply scheme Akashi.
-
-
-
... More
Supplying all labour tools and tackles for complete dismantling and opening of 50 HP, 3 phase induction motor, cutting burnt wire and rewinding super enameled copper wire , insulating paper, tape bamboo stick etc. Heating , Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials (burnt wire wt. 22 Kg approx)
2
-
-
... More
Cost for supplying labour, tools and tackles for repairing of C/F pump of 50 HP pump set with opening and refitting after repairing with S/F of new rotating unit complete having C.I impeller, shaft, neck ring, bearing, bearing housing etc. all complete with transportation charge.
2
-
-
... More
Supplying all labour tools and tackles for complete dismantling and opening of 60 HP, 3 phase induction motor, cutting burnt wire and rewinding super enameled copper wire , insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials.
2
-
-
... More
Cost for supplying labour, tools and tackles for repairing of C/F pump of 60 HP pump set with opening and refitting after repairing with S/F of new rotating unit complete having C.I impeller, shaft, neck ring, bearing, bearing housing etc. all complete with transportation charge.
2
-
-
... More
Cost of consumable material for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut, bolt etc required for jointing all dismantled parts.
1
-
-
... More
Cost towards repairing of 50HP- 02 NOS. and 60HP-02 NOS. FASD starter by replacing its contactor, relay & timer and socketing, Cu lugs etc.
4
-
-
... More
Cost for supplying and laying of 35 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor.
30
-
-
... More
Cost towards dismantling 200 amp, 3 phase industrial type floor mounted L.T. distribution control panel board repairing and fitting with new copper cable for internal jointing/connection, lugs, selector switch, CT coils- 3 nos, voltmeter (0-500), ampere meter(0-100), MCCB(100A)-2 no, ICTP main switch -1 no,3 phase indicating lamps-3 nos, 4 strip copper bus bar- 4 nos. included hardware etc all complete at site. and complete internal wiring with suitable size of copper wire and testing on load etc all complete at site.
1
-
-
... More
Repairing of 20 HP Vertical Turbine Pump set and other allied works at Akashi Raw water pumping plant.
-
-
-
... More
Cost of dismantling the motor and taking out bowl assembly from the intake well by supplying all labour, tools and tackles etc at site.
2
-
-
... More
Cost towards dismantling, checking and repairing and rewinding of 20 H.P VT WPIL Limited squirrel cage induction motor with all labour, tools & tackles including fitting new taper roller thrust bearing-7310 SKF make – 1 no. and rewinding material such as supper enameled copper wire of proper gauge and weight, heating, varnishing and refitting etc at site. (Weight 22 kg approx)including loading unloading and transportation charge.
2
-
-
... More
Cost for complete opening dismantling and refitting after repairing of 20 HP VT ball assembly with S/F top and bottom G.M. Bush – 2 Nos. as per sample, intermediate bush 6 Nos. as per sample, pump shaft of S.S. making as per sample size 1” dia x 6’ long – 1 No., wearing ring – 5 Nos. G.M. impeller as per sample – 5 Nos. including remetalling turning & polishing and making same size of ball assembly housing etc. all complete with all labour and materials as required on site.
2
-
-
... More
Making and fitting shaft coupling of sleeve muff
12
-
-
... More
Supplying and fitting intermediate rising main shaft bearing
12
-
-
... More
Cost for S/F of head shaft of S.S. non-magnetic materials as per sample.
1
-
-
... More
Cost for S/F of heavy duty M.S. column pipe size 6” dia x 10’ long with one side long socketed.
6
-
-
... More
Cost for S/F of C.I. spider bearing with cut less rubber bush for suitable of 6” dia column pipe.
6
-
-
... More
Cost for repairing with new making and fitting of stuffing box bush with gland packing tightner of in discharge head 20 HP VT p/sets with all labour and materials.
2
-
-
... More
Cost for S/F of line shaft of S.S. non-magnetic materials as per sample.
6
-
-
... More
Cost of consumable materials such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for jointing all suction and delivery pipe etc at site .
2
-
-
... More
Supplying and laying 25 mm2 PVC insulated and PVC sheathed 3 core copper cable from panel to starter and motor.
30
-
-
... More
Repairing and maintenance of 40 HP VT pump set no-1, 30 HP C/F pump set No-1, ,FASD starter etc. ,control panel etc. and other allied work at Rural W/S scheme Kairo
-
-
-
... More
Raw Water pumping plant
-
-
-
... More
Cost of dismantling the motor and taking out bowl assembly from the intake well by supplying all labour, tools and tackles etc at site.
1
-
-
... More
Supply all labour tools and tackles for complete dismantling & opening 40 HP 3 phase VT motor, cutting burnt wire and rewinding supper enameled copper wire, insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials.
1
-
-
... More
Cost of repairing of 40 HP VT pump set no-1 supplying fitting of pump shaft 1 No top and bottom bush 2-No. Intermediate bush 4 Nos. lock 4-nos. CI impeller etc. all required materials as per requirement including dismantling and refitting all complete with all labour and tools after deducting the cost of scrap materials.
1
-
-
... More
Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for jointing all suction and delivery pipe etc at site
1
-
-
... More
Cost for repairing of FASD starter for 40 HP pump set by replacing its contactor,relay & Timer and socketing Cu lugs etc.
1
-
-
... More
Cost towards dismantling 200 amp, 3 phase industrial type floor mounted L.T. distribution control panel board repairing and fitting with new copper cable for internal jointing/connection, lugs, selector switch, CT coils- 3 nos, voltmeter (0-500)-01,amperemeter(0-100)-01 , MCCB(100A)-1 no, ICTP main switch -1 no,contactor-01,relay-01, control transformer-01, 3 phase indicating lamps-3 nos, 4 strip 200 A copper bus bar- 4 nos. included hardware etc all complete at site.
1
-
-
... More
Cost for supplying and erecting of chemical earthing station as per IE rule including the cost of earth pit, 8 SWG copper wire, G.I. pipe all complete with sand, charcoal and salt etc to all electrical in double way wire connection.
1
-
-
... More
Cost towards supplying all labour ,tools & tackles for replacing damage parts and changing with new parts and testing on full load at site.
1
-
-
... More
Cost for supplying and laying of 35 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor.
40
-
-
... More
Cost for supplying and laying of 50 mm² x 3.5 core Aluminum cable PVC insulated and sheathed from Transformer to control panel
50
-
-
... More
Supplying and fitting 45 w led street light at pumping plant. Including its accessories labour, tools and technicians at site etc. all complete .
2
-
-
... More
Clear water pumping plant
-
-
-
... More
Supplying all labour tools and tackles for complete dismantling and opening of 30 HP 3 phase inducting motors, cutting burnt wire and rewinding supper enameled copper wire, insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials (burnt wire Wt. 22 Kg approx.) for set No-1
1
-
-
... More
Cost for supplying labour, tools and tackles for repairing of C/F pump of 30 HP pump set No-1 with opening and refitting after repairing with S/F of new rotating unit complete having C.I impeller, shaft, neck ring, bearing, bearing housing etc. all complete with transportation charge.
1
-
-
... More
Supplying and fitting Foot valve 4inch dia. and its washer.
1
-
-
... More
Cost for repairing of FASD starter for 30 HP pump set.
1
-
-
... More
Cost towards dismantling 200 amp, 3 phase L.T. distribution control panel board repairing and fitting with new copper cable for internal jointing/connection, lugs, selector switch, CT coils- 3 nos, voltmeter (0-500)-01,amperemeter(0-100)-01 , MCCB(100A)-1 no, ICTP main switch -1 no,contactor-01,relay-01, control transformer-01, 3 phase indicating lamps-3 nos, 4 strip 200 A copper bus bar- 4 nos. included hardware etc all complete at site.
1
-
-
... More
Cost for supplying and laying of 35 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor.
40
-
-
... More
Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for jointing all suction and delivery pipe etc at site.
1
-
-
... More
Cost for supplying and erecting of chemical earthing station as per IE rule including the cost of earth pit, 8 SWG copper wire, G.I. pipe all complete with sand, charcoal and salt etc to all electrical in double way wire connection.
1
-
-
... More
Supplying and fitting 45 w led street light at pumping plant. Including its accessories labour, tools and technicians at site etc. all complete
1
-
-
... More
Supply, installation and commissioning of 63 KVA power transformer and cable termination etc. at intake water pumping plant Rural water supply scheme Kairo
-
-
-
... More
Supplying, installation, testing and commissioning of outdoor type 63 KVA 11/ 0.433 KVA copper wound distribution transformer with offload tap changer -12.5% to 2.5% in step of 2.5% continuously rated for three phase, 50 Hz. full load and temperature rise not exceeding 45˚C by transformer in oil and 50˚C by the resistance in winding after continuous run at full load rating, the transformer should have oil immersed winding having vector group of DY11, HT side connect in delta and LT side connect in star with neutral brought out connected. The transformer should have power terminal bushing arrangement on HT side and cable box in LT side with standard fitting for mounting of transformer with first filling of transformer oil including all accessories etc. Transformer shall be latest manufacturing standard and as per amended I.S specification and the load and no losses shall be limited to the values given or as per I.S or norms issued by JSEB all complete with all materials. Make Kirloskar/ Synergy/ Servocon.
1
-
-
... More
Electric Sub Station:- Cost of construction of DP structure for transformer, supplying and erecting steel tubular pole, top bracket, channel, back clamp,11 KV disc insulator with hardware, earthling set complete. MS nut and bolt, MS angle, GI wire, clamp for transformer base, top channel, D.O fuse angle, stay set complete 11 KV lightning arrestor etc. complete as per the site requirement and as per the direction of E/I all complete.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%