Bharat Coking Coal Limited Tender
... More
The BCCL has issued a formal invitation for competitive bids for the Bharat Coking Coal Limited project, for (1) Making Of 04 Nos. Of Motor Dala End Cover And 04 Nos.bearing Grease Cap Of At Akwmc For 150hp And 167 Hp.(2) Fabrication Of Base Plate H.t Pump Motor To Be Installed At Ocp Pump.(3) Dismantling Of 3000 Gpm Pump Flow More An in Dhanbad, Jharkhand, with an estimated contract value of Rs. 7,58,128. The bid opening date for this tender is 02-06-2025 and the last date for bid submission is 14-06-2025. Interested bidders for Bharat Coking Coal Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 9,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BCCL_336716_1Tender No
BCCL/KA/IV/ENM/E-TEN/25-26/09 DT.02.6.2025Tender Authority
Bharat Coking Coal Limited ViewPurchaser Address
-Website
http://http://www.bcclweb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
COVER SIDE FINISHING & MACHINING AS PER SIZE
1
5500
-
... More
HOLE DRILLING AND THREAD MAKING
6
550
-
... More
BEARING PORTION MACHINING AS PER BEARING SIZE
1
2500
-
... More
LABOR CHARGES :- (A) H/S 04 HEAD X 06 SHIFT = 24 HEAD
24
502
-
... More
(B) SKILLED 02 HEAD X 06 SHIFT = 12 HEAD
12
434
-
... More
FOR 41143.08 X 03 NO
3
41143
-
... More
(B) FOR 01 NO.BEARING CAP MAKING AND MACHINING:- COST OF C.I ROUGH MATERIALS FOR CAP
18
140
-
... More
COST OF BENZOID POWDER
2
195
-
... More
CAP FINISHING & MACHINING AS PER SIZE
1
1800
-
... More
COST OF HOLE DRILLING AND THREAD MAKING
6
300
-
... More
FOR 6510.00 X 03 NOS BEARING CAP
3
6510
-
... More
© COST OF WOODEN PATTERN FOR DALA END COVER
1
4500
-
... More
(D) COST OF GREASE CAP PATTERN
1
1500
-
... More
(2) M.S GHATER 300M X 15 CM X ICM SIZE CUTTING WELDING DRILLING :- OXYGEN CYLINDER
5
1038
-
... More
D.A CYLINDER
16
143
-
... More
WELDING ELECTRODE (DBL)
15
634
-
... More
CHARGES OF WELDER
8
502
-
... More
CHARGES OF WELDER HELPER
8
434
-
... More
CHARGES OF HAMMER MAN
4
434
-
... More
DRILLING FOR HAND DRILL
2
502
-
... More
FOR 01 NO. BASE PLATE MAKING CHARGES
3
27231
-
... More
(3)(A) 3000 GPM PUMP :- DISMANTLING OF 3000 PUMP MOTOR COMPLETE SET WITH 10" DIA SECTION FOOT VALVE/DELIVERY NRV,SLUICE OF CABLE ETC.TRANSPORTING EAST SIDE.AMPL OCP. 502.44X4=2009.76+434.96X8=3479.6 TOTAL RS.5489.44
7
5489
-
... More
INSTALLATION OF 3000 GPM PUMP MOTOR SET SECTION,FOOT VALVE ON PONTOON EAST SIDE AMPL OCP. RS.502.44X2=1004.88+434.96X8=3479.68 TOTAL=4484.56
7
4484
-
... More
TRANSPORTING OF PONTOON WITH COMPLETE 3000 GPM PUMP MOTOR SET EAST SIDE TO WEST SIDE.AMPL OCP. RS.502.44X2=1004.88+434.96X8=3479.68 TOTAL=4484.56
6
4484
-
... More
EXTENSION OF DELIVERY WITH EXITING DELIVERY & NRV/SLUICE VALVE COMMISSIONING OF WEST SUMP AMPL OCP. RS.502.44X2=1004.88+434.96X8=3479.68 TOTAL=4484.56
6
4484
-
... More
FABRICATION/COMMISSIONING OF MATCH PIECES(SECTION & DELIVERY OF 3000 GPM PUMP )10" M.S PIPE CUTTING OF PICES FOR FLANGE FROM OLD SCRAP PLACES DRILLING AS PER BODY FLANGE OF PUMP CUTTING WELDING HOLLERING BOUGHT SHORT PIECES MECHING DELIVERY WEST SUMP AMPL SIDE. 502.44X4=2009.76+434.96X6=2609.76 TOTAL RS. 4619.52
6
4619
-
... More
D.A CYLINDER,AS PER MARKET RATE
2
1037
-
... More
OXYGEN CYLINDER AS PER MARKET RATE
6
143
-
... More
(B) 3000 GPM PUMP :- DISMANTLING OF 3000 PUMP MOTOR COMPLETE SET WITH 10" DIA SECTION FOOT VALVE/DELIVERY NRV,SLUICE OF CABLE ETC.TRANSPORTING EAST SIDE.AMPL OCP. 502.44X4=2009.76+434.96X8=3479.6 TOTAL RS.5489.44
7
5489
-
... More
INSTALLATION OF 3000 GPM PUMP MOTOR SET SECTION,FOOT VALVE ON PONTOON EAST SIDE AMPL OCP. RS.502.44X2=1004.88+434.96X8=3479.68 TOTAL=4484.56
7
4484
-
... More
'TRANSPORTING OF PONTOON WITH COMPLETE 3000 GPM PUMP MOTOR SET EAST SIDE TO WEST SIDE.AMPL OCP. RS.502.44X2=1004.88+434.96X8=3479.68 TOTAL=4484.56
6
4484
-
... More
EXTENSION OF DELIVERY WITH EXITING DELIVERY & NRV/SLUICE VALVE COMMISSIONING OF WEST SUMP AMPL OCP. RS.502.44X2=1004.88+434.96X8=3479.68 TOTAL=4484.56
6
4484
-
... More
FABRICATION/COMMISSIONING OF MATCH PIECES(SECTION & DELIVERY OF 3000 GPM PUMP )10" M.S PIPE CUTTING OF PICES FOR FLANGE FROM OLD SCRAP PLACES DRILLING AS PER BODY FLANGE OF PUMP CUTTING WELDING HOLLERING BOUGHT SHORT PIECES MECHING DELIVERY WEST SUMP AMPL SIDE. 502.44X4=2009.76+434.96X6=2609.76 TOTAL RS. 4619.52
6
4619
-
... More
'D.A CYLINDER,AS PER MARKET RATE
2
1037
-
... More
OXYGEN CYLINDER AS PER MARKET RATE
6
143
-
... More
(4) BREAK DOWN DSM-2 PUMP 2 NOS.AT T.V WARD PUMPO ROOM NO.1 AND NO.2 PUMP DISMANTLING,LOWERING FROM FOUNDATION AND CARRYING UP TO LOADING POINT AT RHK TILATAND. 08 HEAD X 02 SHIFT (H/SK-1X502.44+SK-7X434.96)= 3547.16
2
3547
-
... More
02 NOS.(TWO)DSM -3 PUMPS LOADING UNLOADING AND TRANSPORTING FROM COAL DUMP COLONY TO KCC WORK SHOP FOR REPAIRING. 08 HEAD X 02 SHIFT (H/SK-1X502.44+SK-7X434.96)= 3547.16
2
3547
-
... More
AFTER REPAIRING TWO(02) NOS.DSM-2 PUMPS LOADING,UNLOADING AND TRANSPORTING FROM KCC WORK SHOP TO RHK TILATAND T.V WARD . 08 HEAD X 02 SHIFT (H/SK-1X502.44+SK-7X434.96)= 3547.16
2
3547
-
... More
AFTER REPAIRING TWO(02) NOS.DSM-3 PUMPS CARRYING FROM LOADING POINT TO PUMP ROOM AND PLACING ON FOUNDATION NO.1 AND NO.2 AND PROPER BY INSTALLATION WITH MACHING SACTION AND DELIVERY RANGE AT COAL DUMP COLONY. 08 HEAD X 02 SHIFT (H/SK-1X502.44+SK-7X434.96)= 3547.16
2
3547
-
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%