State Industrial Development Corporation

Jammu, Jammu & Kashmir

  • Opening Date

    03 Sep 2019

  • Closing Date

    23 Sep 2019

  • Tender Amount

    ₹ 12,50,000

  • EMD

    ₹ 12,500

Reminder

Follow

Download
Are you Looking for Joint Venture Partners, Contractor Consortium, Back-to-Back Contractor, Project Financier?
We will help you to find the right match for FREE.
Summary

Construction Of 8 No Rcc Culvert For Cross Drainage Road No. F18, F19 R1, R2, L3, L4 N Main Spine Road (phase Iind) Balole Industrial Estate Samba.

Don't have sufficient eligibility, BG funds or resources?
We will help you to find the right match for FREE.
BOQ Items
... more
Earth work in execution by manual means in trenches for foundation drains, pipes, cables etc. (Not exceeding 1.54mtr in wide) and for shafts wells, cesspits and the like not exceeding 10 sqm. on plan, dept. up to 1.5 mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth is to be leveled and neatly dressed in all kind of soil.

194

-

-

... more
Providing and laying in position cement concrete of specified grade excluding cost of centering and shuttering for all works upto plinth level (1:4:8)

12

-

-

... more
Providing and laying in position cement concrete of specified grade excluding cost of centering and shuttering for all works upto plinth level (1:3:6)

62

-

-

... more
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering shuttering, finishing and reinforcement – All works upto plinth level : 1:1.5:3 (1 cement:1.5 coarse sand: 3 graded stone aggre 20mm nominal size)

28

-

-

... more
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth & string courses, fillets, columns, pillars,piers,abutments, posts andsturts, etc. upto floor five level excluding cost of centering shuttering, finishing & reinforcement 1:2:4 (in cement : 2 coarse sand : 4 graded crushed stone aggregate 20mm nominal size) in place of advertised item viz : cement concrete 1 : 2 : 4.

29

-

-

... more
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.

3780

-

-

... more
12 mm thick cement plaster fair side wall 1:4 (1 cement : 4 Coarse sand)

84

-

-

... more
Centering and shuttering including strutting propping etc and removal of the same.

-

-

-

... more
a)Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

168

-

-

... more
b) Edges of Slabs

159

-

-

... more
C)Suspended floor

56

-

-

... more
Removal of malba/building rubbish from designated sites and its disposal as per direction of Engineer-in-charge, all inclusive.

116

-

-

... more
Cement concrete flooring 1:2:4 ( 1 cement : 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cemnt slurry, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate Crushed

42

-

-

... more
Carriage of material by Mechanical transport.

-

-

-

... more
Sand for 17 Km.

54

-

-

... more
Stone average for 8 Km.

125

-

-

Jammu & Kashmir State Industrial Development Corporation Limited, Construction Division, Industrial Complex, Bari Brahmana Phone/Fax- 01923-220910 FRESH E-Nit No : 05 of 2019-20 Dated: - 23/08/2019 TENDER NOTICE For and on behalf of Managing Director, J&K SIDCO, the tenders are invited in double cover system by e- tendering mode on item rate basis from approved and eligible Self Help Engineering Groups registered with Distract Employment Samba of the following Civil works:- S. No. Name of the work Estimated Cost ( in lacs) Earnest Money Cost of Document Time of Completion Class of Contractor 1. Supply and Filling of RBM in low lying areas including watering, ramming consolidating with Road Roller 8 - 10 tone at Industrial Estate Balole (Group I) (Complete Job) Rs. 20.00 Rs. 20000 Rs.2000 15 days SHG (Dist. Samba) 2. Supply and Filling of RBM in low lying areas including watering, ramming consolidating with Road Roller 8 - 10 tone at Industrial Estate Balole (Group J) (Complete Job) Rs. 20.00 Rs. 20000 Rs.2000 15 days SHG (Dist. Samba) 3. Supply and Filling of RBM in low lying areas including watering, ramming consolidating with Road Roller 8 - 10 tone at Industrial Estate Balole (Group K) (Complete Job) Rs. 20.00 Rs. 20000 Rs.2000 15 days SHG (Dist. Samba) 4. Supply and Filling of RBM in low lying areas including watering, ramming consolidating with Road Roller 8 - 10 tone at Industrial Estate Balole (Group L) (Complete Job) Rs. 10.00 Rs. 10000 Rs.1000 10 days SHG (Dist. Samba) 5. Construction of road from extended road No. 11 to proposed CETP site downstream Balole Nallah by way of earth work/RBM and WBM (Water Bound Macadam) Grade 1 & 2 (Length-300 mtr) at Industrial Estate Balole Rs. 13.69 Rs. 13690 Rs.1400 20 days SHG (Dist. Samba) 6. Construction of storm drains starting from end of Extended road No. 11 to site of proposed CETP at downstream side of Balole Nallah.(Length -300 mtr) at Industrial Estate Balole Rs. 20.54 Rs. 20540 Rs.2000 25 days SHG (Dist. Samba) 7. Construction of Pump House of Tube Well No 13 with compound wall, laying of Girder & supply of Chain pully at Industrial Estate Birpur at Industrial Estate Balole Rs. 13.50 Rs. 13500 Rs. 1000 60 days SHG (Dist. Samba) 8. Construction of Pump House of Tube Well No 14 with compound wall, laying of Girder & supply of Chain pully at Industrial Estate Balole Rs. 13.50 Rs. 13500 Rs. 1000 60 days SHG (Dist. Samba) 9. Construction of 8 No RCC Culvert for CROSS DRAINAGE Road No. F18, F19 R1, R2, L3, L4 & Main spine road (phase IInd) Balole Industrial Estate Samba. Rs. 12.50 Rs. 12500 Rs. 1000 40 days SHG from Distt. Samba 10. Construction of RCC Surface drain on Road R5, R6, R7, at Industrial Estate Balole(Left Side) Length = 187 mtrs. Rs. 10.33 Rs. 10330 Rs. 1000 15 days SHG from Distt. Samba 11. Construction of RCC Surface drain on Road R5, R6, R7, at Industrial Estate Balole (Right Side) Length = 187 mtrs. Rs. 10.33 Rs. 10330 Rs. 1000 15 days SHG from Distt. Samba 12. Construction of RCC Surface drain on Road R8, R9, R10, R11 , at Industrial Estate Balole (Left Side) Length = 223 mtrs. Rs. 12.34 Rs. 12340 Rs. 1000 15 days SHG from Distt. Samba 13. Construction of RCC Surface drain on Road R8, R9, R10, R11 at Industrial Estate Balole (Right Side) Length = 223 mtrs Rs. 12.34 Rs. 12340 Rs. 1000 15 days SHG from Distt. Samba 14. Construction of RCC Surface drain on Road in between Road No R6 &R7 at Industrial Estate Balole Length = 210 mtrs Rs. 11.60 Rs. 11600 Rs. 1000 15 days SHG from Distt. Samba 15. Construction of RCC Surface drain on Road in between Road No R8&R9 at Industrial Estate Balole Length = 210 mtrs Rs. 11.60 Rs. 11600 Rs. 1000 15 days SHG from Distt. Samba 16. Construction of RCC Surface drain on Road in between Road No R7, R8,R9 & R10 at Industrial Estate Balole Rs. 7.55 Rs. 7550 Rs. 700 10

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.