Power Development Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Power Development Department - PDD Tender
Eprocure
Opening Date28 Feb 2025
Closing Date20 Mar 2025
Tender AmountRefer Documents
Costs
EMD
₹ 30,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PDD_273351_1Tender No
Enit 04 of 2025-26 Dated 25-02-2025Tender Authority
Power Development Department ViewPurchaser Address
-Website
http://http://www.jkpdd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Unloading of ST Poles 13 Mtr Long
1
-
-
... More
Unloading of ST Poles 11Mtr Long
1
-
-
... More
Unloading of ST Poles 9 Mtr Long
1
-
-
... More
Unloading of ST Poles 8 Mtr Long
1
-
-
... More
Loading of PCC Poles 11 Mtr Long
1
-
-
... More
Loading of PCC Poles 9 Mtr Long
1
-
-
... More
Loading of PCC Poles 8 Mtr Long
1
-
-
... More
Loading of ST Poles 13 Mtr Long
1
-
-
... More
Loading of ST Poles 11Mtr Long
1
-
-
... More
Loading of ST Poles 9 Mtr Long
1
-
-
... More
Loading of ST Poles 8 Mtr Long
1
-
-
... More
Dragging of PCC/ST Poles at an average distance upto 50 Mtr for stacking to accessible place for loading/Unloading Purpose and its stacking
1
-
-
... More
Unloading of /New ACSR Conductor
1
-
-
... More
Loading of Old/New ACSR Conductor
1
-
-
... More
Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking
1
-
-
... More
Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking
1
-
-
... More
Unloading of 25 KVA Transformer (New/Write Back Transformer)
1
-
-
... More
Unloading of 63 KVA Transformer (New/Write Back Transformer)
1
-
-
... More
Unloading of 100 KVA Transformer (New/Write Back Transformer)
1
-
-
... More
Unloading of 250 KVA Transformer (New/Write Back Transformer)
1
-
-
... More
Unloading of 400 KVA Transformer (New/Write Back Transformer)
1
-
-
... More
Unloading of 630 KVA Transformer (New/Write Back Transformer)
1
-
-
... More
Loading of 25 KVA Transformer
1
-
-
... More
Loading of 63 KVA Transformer
1
-
-
... More
Loading of 100 KVA Transformer
1
-
-
... More
Loading of 250 KVA Transformer
1
-
-
... More
Loading of 400 KVA Transformer
1
-
-
... More
Loading of 630 KVA Transformer
1
-
-
... More
Dragging of existing /New /Damaged 25 KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
... More
Dragging of existing /New 63 KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
... More
Dragging of existing /New /Damaged 100 KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
... More
Dragging of existing /New /Damaged 250 KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
... More
Dragging of existing /New/Damaged 400KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
... More
Dragging of existing /New/Damaged 630KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
... More
Dragging of existing /New /Damaged 25 KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking
1
-
-
... More
Dragging of existing /New 63 KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking
1
-
-
... More
Dragging of existing /New /Damaged 100 KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking
1
-
-
... More
Dragging of existing /New /Damaged 250 KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking
1
-
-
... More
Dragging of existing /New/Damaged 400KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking
1
-
-
... More
Dragging of existing /New/Damaged 630KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking
1
-
-
... More
Unloading of Channel/Angle/Flat Iron
1
-
-
... More
Loading of Channel/Angle/Flat Iron
1
-
-
... More
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
... More
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking
1
-
-
... More
Unloading of Link/Knife/HG/DO/LA Set
1
-
-
... More
Loading of Link/Knife/HG/DO/LA/GO Set
1
-
-
... More
Unloading of CT/PT Unit
1
-
-
... More
Loading of CT/PT Unit
1
-
-
... More
Unloading of DPC CU/AL Wire
1
-
-
... More
Unloading of Bush Rods and other allied workshop material
1
-
-
... More
Unloading of allied material for HT/LT Line/Substations (i.e., Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc.)
1
-
-
... More
Loading of allied material for HT/LT Line/Substations/workshop material (i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bush rods etc etc)
1
-
-
... More
Shifting of allied material for HT/LT Line/Substations (i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc) from unloading site to stacking site and stacking properly
1
-
-
... More
Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rods etc) for making space for other store material
1
-
-
... More
Unloading/Loading of Bammboo Ladder
1
-
-
... More
Unloading/Loading of Single/Three Phase Meters
1
-
-
... More
Unloading of PVC Cable single core 95/120/185mmsq
1
-
-
... More
Unloading of PVC Cable single core 300/400/630mmsq
1
-
-
... More
Loading of PVC Cable single core 95/120/185mmsq
1
-
-
... More
Loading of PVC Cable single core 300/400/630mmsq
1
-
-
... More
Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines
1
-
-
... More
Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines
1
-
-
... More
Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines
1
-
-
... More
Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines
1
-
-
... More
Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly
1
-
-
... More
Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly
1
-
-
... More
Loading of Aluminium and Copper wire
1
-
-
... More
loading of Bush Rods and other allied Workshop material
1
-
-
... More
Unloading/Loading of Single phase/three phase meters
1
-
-
... More
Stacking of Single/Three phase meters
1
-
-
... More
Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines
1
-
-
... More
Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc
1
-
-
... More
Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc
1
-
-
... More
Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc
1
-
-
... More
Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.
1
-
-
... More
Unloading of Cement Bags
1
-
-
... More
Carrigae of Cement Bags from unloading site to stacking site (Upto 50 Mtr)
1
-
-
... More
Stacking of Cement bags
1
-
-
... More
Loading of Cement Bags
1
-
-
... More
Fixing/Installation/Dismantaling of LED Larries/Stipes of 15 Mtr Length
1
-
-
... More
Fixing/Installation/Dismantaling of LED Larries/Stipes of 30 Mtr Length
1
-
-
... More
Rental charges for 15 Mtr/30 Mtr Larries/Stripes for consequtive days
1
-
-
... More
Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents
1
-
-
... More
Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store
1
-
-
... More
Straightening of tilted fencing posts in the store premises for repair of fencing
1
-
-
... More
Insertion of new fencing Posts in the store for repair of fencing
1
-
-
... More
Dismantling of existing mesh fencing
1
-
-
... More
Fixing of mesh Fencing
1
-
-
... More
Fixing of CGI Sheets
1
-
-
... More
Dismantling of CGI sheets
1
-
-
... More
Meggering, tightening of nuts and bolts, oil seals, breathers checking, visual inspections of Transformers 25/63/100 KVA
1
-
-
... More
Meggering, tightening of nuts and bolts, oil seals, breathers checking, visual inspections of Transformers 250/400/630KVA
1
-
-
... More
Lifting of Unserviceable items like, Damaged Transformers (Outer frame of DTs), Broken Insulators of sorts, Al/ Cu/ Scrap/ Bush rods of sorts, Empty Barrells, Broken CGI Sheets, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking
1
-
-
... More
Painting (Red oxide/Aluminium Paint) of Fabricated Material.
1
-
-
... More
Fabrication of MS Angle/Channel/ Flat for making of Braces, Clamps, X-Arms etc.
1
-
-
... More
Unloading of old loose conductor and making bundles
1
-
-
... More
Checking & maggering of 11Kv LA set HG set GO set CT/PT unit
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%