The IFC has issued a formal invitation for competitive bids for the Irrigation And Flood Control Department project, for Construction Of Gate Structures Of Dol Of Mrc Near Ring Road Crossing in Jammu, Jammu & Kashmir, with an estimated contract value of Rs. 33,000. The bid opening date for this tender is 22-03-2025 and the last date for bid submission is 28-03-2025. Interested bidders for Irrigation And Flood Control Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Irrigation And Flood Control Department - IFC Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date22 Mar 2025
Closing Date28 Mar 2025
Tender Amount₹ 33,000
Costs
EMD
₹ 660Document Cost
₹ 200Tender Fee
Refer Documents
Summary
Construction Of Gate Structures Of Dol Of Mrc Near Ring Road Crossing
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_IFC_274746_1Tender No
eNIT47 of 2024-25Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-Website
http://http://ifcjmu.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and fixing 20MM dia nuts and bolts 450Mm in length)
8
300
2400
... More
Filling availale excavated earth ( excluding rock ) in trenches plinth sides of foundations etc in layers not exceeding 20CM in depth, consolidatingv each deposited layer by ramming and watering lead upto 50M in and lift upto 1.50m.
0.57
180
102.91
... More
Centering and shuttering including strutting, propping etcProviding and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.08
628
2566.12
... More
Centering and shuttering including strutting, propping etc. and removal of form work for:
a) Foundations, footings, bases for columns
1.26
286
360.8
... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
0.14
9395
1334.19
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
14
123
1724.8
... More
Carriage of material from source to site of work Sand and stone agg. Average distance 20 KM by MT.
3.78
409
1549.57
... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size)
0.22
5202
1144.64
... More
Centering and shuttering including strutting, propping etc.Columns, pillars, piers, abutments, posts and struts
4.76
742
3534.54