Irrigation And Flood Control Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date12 Mar 2025
Closing Date24 Mar 2025
Tender Amount₹ 2,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Stone avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

15

15.4

... More
For additional Lead of every Km beyond 20Km Lead

1

50

50

... More
Mutton Kanti With Naan

1

250

250

... More
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.66

... More
Sand/20mm Agg/Stone Dust for an average lead upto 05 Kms

1

200

200.74

... More
Placing in dry

1

9

9.25

... More
Suuplying and Stacking of Stone Dust at Site Including Royality(Complete)

1

770

770

... More
Tea Namkeen each Cup.

1

20

20

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.

1

7

7.8

... More
Empty Cement Bags for an avg. lead upto 05 Kms

1

80

80.3

... More
Crates for an avg. lead upto 04 Kms

1

489

489.56

... More
Engagement of JCB including POL and driver complete for variou canal operations including removal of encroachments

1

1400

1400

... More
Empty Cement Bags for an avg. lead upto 04 Kms

1

73

73.43

... More
Crates from an avg. lead beyond 20 Kms per additional Km

1

29

29.43

... More
Dumping stone excluding cost of stones.

-

-

-

... More
Idle Chrages

1

800

800

... More
Earth for an avg. lead upto 05 Kms

1

250

250.92

... More
Sand/20mm Agg/Stone Dust for an average lead beyond 10 Kms upto 20 Kms (per Km)

1

13

13.09

... More
Normal Mutton Kabab

1

280

280

... More
Mutton (Rogan josh)/Rista/Gustaba etc.

1

150

150

... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil

1

592

592.9

... More
Earth for an avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

16

16.38

... More
Empty Cement Bags for an avg. lead of upto 01 Kms

1

51

51.5

... More
stones for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

51

51.4

... More
Crates for an avg. lead upto 05 Kms

1

535

535.3

... More
Bread Slice

1

10

10

... More
Crates from an avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

34

34.9

... More
Sand/20mm Agg/Stone Dust for an average lead upto 04 Kms

1

183

183.58

... More
Crates for an avg. lead upto 03 Kms

1

442

442.23

... More
Stone avg. lead upto 5 Kms

1

236

236.16

... More
Empty Cement Bags for an avg. lead upto 02 Kms

1

58

58.98

... More
Sand/20mm Agg/Stone Dust for an average lead beyond 20 Kms per additional Km

1

11

11.04

... More
Earth for an avg. lead upto 04 Kms

1

229

229.48

... More
Earth for an avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

19

19.58

... More
Empty Cement Bags for an avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

5

5.23

... More
loading/unloading sand/earth filled bags in lorries lead upto 50 Mtr

1

4

4.95

... More
Engagement of Poclain/L&T-110/70/60(Chain Driven ) Including POL and driver Complete.

1

2400

2400

... More
Banana.

1

10

10

... More
Idle Chrages

1

800

800

... More
Engagement of Labourer (Skilled)

1

960

960

... More
Sand/20mm Agg/Stone Dust for an average lead of upto 01 Kms

1

128

128.75

... More
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.

1

286

286.35

... More
Providing and fixing 0. 50mm thick (zinc coating not less than 275gm's/Sqm), Plane G.S. Sheets over wooden frames for flumes incuding curved, vertical surfaces fixed with G.I. limpet washers, nails and other accessories. excluding the cost of wood work but including cutting to size and shape weherever required including all sorts of carriages as per the directions of the Engineer-In-Charge Complete Job in all respects.

1

500

500

... More
Steel for an every additionaal lead of 50Mtrs or part thereof beyond 1st 50Mtrs

1

36

36.63

... More
Empty Cement Bags for an avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

6

6.27

... More
Earth for an avg. lead upto 03 Kms

1

207

207.3

... More
Water Bottle One litre.

1

20

20

... More
Butter Toast

1

20

20

... More
Sand/20mm Agg/Stone Dust for an average lead upto 50Mtr

1

200

200.67

... More
Dal 50 g Pack.

1

10

10

... More
Stone avg. lead upto 2 Kms

1

173

173.46

... More
Earth for an avg. lead of upto 01 Kms

1

160

160.93

... More
Unloading sand/earth filled bags from boats

-

-

-

... More
Engagement of Contract Carrier for carriage of material within jurisdiction including Driver and (POL) if and when needed Upto an average lead of 20Km's Journey or a part thereof. (Complete) a) Tata Mobile Having a load carrying capacity of 1MT.

1

1000

1000

... More
Empty Cement bags for an average lead upto 50Mtrs

1

37

37.46

... More
Steel for an average lead upto 50Mtr

1

249

249.61

... More
Engagement of Labourer (Unskilled)

1

725

725

... More
Plain Rice Plate

1

60

60

... More
Providing wood work in frames of false ceiling, partitions, flumes etc, sawn and fixed in position including all sorts of carriages and other incidentals /accessories etc (Complete Job). Poplar Wood

1

850

850

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded

1

138

138.2

... More
Boiled Egg.

1

10

10

... More
Empty Cement Bags for an avg. lead upto 03 Kms

1

66

66.33

... More
Supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%)

1

700

700

... More
Stone avg. lead upto 4 Kms

1

215

215.98

... More
Placing in Water

1

18

18.5

... More
200mm dia

1

1747

1747

... More
Normal Chicken Biryani

1

150

150

... More
Sand/20mm Agg/Stone Dust for an average lead upto 02 Kms

1

147

147.44

... More
Crates for an avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

41

41.77

... More
Earth for an avg. lead beyond 20 Kms per additional Km

1

13

13.8

... More
Providing and fixing of Sign boards/ Flex banners of required size as per the directions of Engineer In-charge attached with light wieght square section Mild steel frame including all sorts of carraige complete.

1

40

40

... More
Engagement of Cutting Saw Machine Including POL and Operator(Complete)

1

1350

1350

... More
Stone avg. lead beyond 20 Kms per additional Km

1

12

12.98

... More
Sand/20mm Agg/Stone Dust for an average lead beyond 5 Kms upto 10 Kms (per Km)

1

15

15.66

... More
Stone avg. lead of upto 1 Km

1

151

151.47

... More
Earth for an avg. lead upto 02 Kms

1

184

184.3

... More
In Horizontal on level

1

237

237.9

... More
Crates for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

21

21.5

... More
Cement for an avg. lead upto 50 mtr.

1

116

116.22

... More
Carriage of material from Approved Source up to dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport

-

-

-

... More
Veg Fried Rice/Biryani Veg

1

120

120

... More
Empty Cement bags for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

8

8.16

... More
Crates for an avg. lead upto 01 Kms

1

343

343.32

... More
Tea Sugar each Cup.

1

20

20

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

1

371

371.15

... More
Spreading, laying and fixing of LDP/HDP to check/stop the leakages of canals including the fixing/locking arrangements by any means through the entire length/breadth as per the requirement at site of work and as desired by Engineer Incharge. Complete in all respects.

1

20

20

... More
Crates for an average lead upto 50Mtrs

1

146

146.51

... More
Sand/20mm Agg/Stone Dust for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
Opening out old wire crates those and re-binding after filling.

1

35

35.6

... More
On Slopes (Behind pitching)

1

261

261.45

... More
Stone avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

18

18.43

... More
Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment)

1

281

281.3

... More
Chicken Kanti With Naan

1

220

220

... More
Earth for an average lead upto 50Mtrs

1

200

200.67

... More
315mm dia

1

4872

4872

... More
Sand/20mm Agg/Stone Dust for an average lead upto 03 Kms

1

165

165.84

... More
Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
Crates for an avg. lead upto 02 Kms

1

393

393.17

... More
Providing refreshment to supervisory staff for restoration of water during night /day or the participants of the Independence Day , Republic day or other official Functions complete job including packing at venue with following Menu :

-

-

-

... More
Stones for an avg. lead upto 50 mtr.

1

236

236.08

... More
Empty Cement Bags for an avg. lead beyond 20 Kms per additional Km

1

4

4.41

... More
Providing, Supplying, Lowering, Laying, Jointing, testing and Commissioning of PE-100 and PN-10 HDPE Pipes in standard lengths confirming to IS 4984/ 14151/ 12786/ 13488 with necessary jointing material and all kinds of pipe specials including Transportation, Freight charges, Inspection charges, Loading, Un-Loading charges, jointing procedure as per relevant IS code (if applicable) complete with materials for jointing procedure with all labours and including making necessary connections where ever required as directed by Engineer in Charge as per IS 7634- Part-II, (including cost of all materials Labour and Water) for specified lengths inclusive of all kinds of taxes and carriage complete. HDPE Pipe PE-100, PN-10- 140mm dia

1

807

807.59



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.