Housing And Urban Development Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Housing And Urban Development Department - HAUDD Tender
Eprocure
Opening Date11 Mar 2020
Closing Date18 Mar 2020
Tender Amount₹ 5,20,000
Costs
EMD
₹ 10,400Document Cost
₹ 600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_HAUDD_94933_1Bid Award Id
ViewTender No
JDA-I/2019-20/e-NIT/228 Dated 11.03.2020Tender Authority
Housing And Urban Development Department ViewPurchaser Address
-Website
http://http://jkhudd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Mixing earth and sludge or manure in proportion specified or directed by officer in charge.
232
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed
22
-
-
... More
Earthwork in surface excavation not exceeding 30cm in depth but exceeding 1.5mtr in width as well as 10sqm on plan including disposal of excavated earth upto 1 mtr from cutting edge, lift upto 1.5mtr, disposed earth to be levelled and neatly dressed in : All kinds of Soil:
238
-
-
... More
Steel work welded in built up sections/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladders, railings, brackets, gates & similar works icluding Logo JDA CHENAB VALLEY.
2550
-
-
... More
Supplying & stacking sludge at site including royalty and carriage complete ( sludge measured in stakes will be reducd by 8% for payment.
27
-
-
... More
Grassing with selection no. 1 grass including watering & maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds & fit for mowing including suppling of good earth if needed (the good earth shall be paid seperately.) In rows 15 cm apart in either direction
238
-
-
... More
Spreading of sludge, dump manure or/and good earth in required thickness as per directions of officer incharge (cost of sludge, dump manure or/and good earth to be paid seperately
232
-
-
... More
Fine dressing of the ground
238
-
-
... More
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
73
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) (A) Crushed
3
-
-
... More
Centring and shuttermg including strutting, propping etc. and removal of form for· Foundations: footings, bases of columns etc. for mass concrete.
133
-
-
... More
Supplying and stacking of good earth at site including royalty and carriage complete (earth measured in stacks will be reduced by 20% for payment)
179
-
-
... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil
11
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements