Forest Department Tender
... More
The FD has issued a formal invitation for competitive bids for the Forest Department project, for Formation Of Plantation Unit In Co. 29 Batote Under Campa 2023-24 in Doda, Jammu & Kashmir, with an estimated contract value of Rs. 9,36,410. The bid opening date for this tender is 21-07-2023 and the last date for bid submission is 29-07-2023. Interested bidders for Forest Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Forest Department - FD Tender
Agriculture or Forestry Works
Eprocure
Opening Date21 Jul 2023
Closing Date29 Jul 2023
Tender Amount₹ 9,36,410
Costs
EMD
₹ 18,728Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_FD_222832_1Bid Award Id
ViewTender No
Re Tender 06 of 2023-24Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://jkforest.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Fencing Work:- Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared.
2085.5
-
-
... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. . To be paid as per actual
70
-
-
... More
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
302.4
-
-
... More
Sign board incl carriage PAINTING & WRITING COMPLETE JOB. Os Size: 5.00 x 3.00 Ft with vertical iron angle 2 Nos of size 40x40x6 mm iron angle of height 7 ft with 1 mm thick M.S sheet.
1
-
-
... More
Erecting c.conc. Poles in position with all lifts and carriages
510
-
-
... More
Supply of precast cement conc. poles of size 75mmx100mmx1800mm (including carriage)
510
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete
236.99
-
-
... More
Patch sowing work:- Cost and carriage of Conifer/Broad Leaved seed to the above work site, site clearance, digging patches of size 45cmx45cmx15cm including excavation of soil and sowing of Deo/Kail/Fir/Chir/Broad Leaved in the Patches, refilling with clean surface soil after sowing with provision for water harvesting structure and maintenance for period of one month. The item includes all carriages.
12000
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size) Crushed including all leads,lift and carriage complete job.
16.56
-
-
... More
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, , last but one end post and corner post shall be strutted on both sides and end post one side only, provided with 5 horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire . To be paid as per actual
11405.95
-
-
... More
Planting of Poly Bagged Plants in Pits:- Transportation of saplings(Plants) from Batote nursery to the above work site, then site clearance, digging of pits of 45cmx45cmx45cm including excavation of soil and planting of seedlings/saplings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of one month. The item includes all carriages.
2000
-
-
... More
Planting of Naked Root Plants in Pits:- Transportation of saplings(Plants) from Batote nursery to the above work site, then site clearance, digging of pits of 45cmx45cmx45cm including excavation of soil and planting of seedlings/saplings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of one month. The item includes all carriages.
5000
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements