Forest Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Forest Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date3 May 2025
Closing Date10 May 2025
Tender Amount₹ 30,00,000 
Notes
Download

Costs

Summary

Stage Contract-temporary Restoration Work In Jambu Zoo By Way Of Slip Clearance And Other Allied Works

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the Non-pressure NP-3 class (Medium duty) R.C.C. pipes 450 mm dia. R.C.C. pipe

1

2008

2008.8

... More
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the Non-pressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe

1

2415

2415.8

... More
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the Non-pressure NP-3 class (Medium duty) R.C.C. pipes 900 mm dia. R.C.C. pipe

1

3951

3951.65

... More
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the Non-pressure NP-3 class (Medium duty) R.C.C. pipes 1000 mm dia. R.C.C. pipe (laying by manual/mechanical

1

4653

4653.3

... More
Dry random rubble masonry with hard stone in foundation and plinth Without bond stone (Nallah stone) - Complete job

1

3262

3262.1

... More
Breaking of Boulders by manual means coming under the alignment/already existed in drains, road etc. including all lead and lift (whenever required as per the necessity of the site) L.S.

1

1500

1500

... More
Breaking of Boulders by mechanical means coming under the alignment/already existed in drains, road etc. including all lead and lift (whenever required as per the necessity of the site) L.S.

1

2000

2000

... More
Supply of Labour to remove the mulba from the blocked/choked drains and for carrying out other allied works (whenever reqired) with all necessary tools and disposal of mulba at the site provided by the at site incharge of the Forest Department (Complete Job)

1

716

716.14

... More
Supply of Skilled Labour at site such as welder, plumber, electrician etc as equied for maintenance of the Jambu Zoo infrastructure (Complete Job)

1

809

809.38

... More
Providing and laying of River Bed Material in layers not exceeding 20 cm in depth including spreading rolling, watering and compacting in with power road roller 8 to 10 tonne power capacity road roller. Complete job (LMR)

1

400

400

... More
Providing & making crates of mesh size 100 by 100 mm( size of crates 6.00 m x 1.20 m x 1.20 m) as per direction of Engineer-in-charge excluding carriage of stone but includes handpacking of stones, knitting of crates-complete job

1

2100

2100

... More
Silt clearance Dry

1

111

111

... More
Silt clearance Wet

1

184

184.95

... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kind of soil

1

592

592.9

... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary rock

1

940

940.3

... More
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge-All kind of soil

1

187

187.3

... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary rock

1

392

392.8

... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge-all kind of soil

1

576

576.45

... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge-ordinary rock

1

1013

1013.55

... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

1

181

181.6

... More
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in charge. Made of G.I. wire of dia 4 mm

1

809

809.9

... More
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge

1

929

929.35

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20 % boulders Qty of concrete

1

5733

5733.6

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20 % boulders Qty of stones

1

647

647.5

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size (Complete Job)

1

4826

4826.5

... More
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25

1

1883

1883.5

... More
Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters.

1

153

153

... More
Consolidation of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade

1

2

2.8

... More
Providing and fixing on wall face un-plasticized Rigid PVC rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion. (i) Single socketed pipes110 mm diametre

1

366

366.3

... More
Applying priming coat: 13.58.1 With ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood)

1

64

64.6

... More
Providing and applying white cement based putty of specified thickness,of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete 1 mm thick

1

138

138.1

... More
Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work, over and including water thinnable priming coat to give an even shade

1

127

127.95

... More
Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm)

1

185

185.2

... More
Steel work welded in built up sections/framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works., Stand Barrier Railing Height

1

181

181.6

... More
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes

1

156

156.95

... More
12 mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) (Complete Job)

1

266

266.95

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level (Complete Job)

1

123

123.2

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

6591

6591.25

... More
Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick. Float glass panes 9.8.13.1 4 mm thick glass pane (weighing not less than 10 kg/sqm)

1

1985

1985.85

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): First class teak wood

1

192677

192677.45

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class teak wood

1

161716

161716.15

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): First class deodar wood

1

164074

164074.65

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class deodar wood

1

151248

151248.45

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): First class kail wood

1

108897

108897.35

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class kail wood

1

101081

101081.85

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Sal wood

1

142085

142085.65

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Kiln seasoned and chemically treated hollock wood

1

74353

74353.45

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new rock.

1

131

131.85

... More
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand)

1

7571

7571.55

... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colou r& pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge. 60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern.

1

875

875.95

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.6

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)

1

7275

7275.25

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.

1

286

286.35

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

628

628.95

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms.

1

718

718.2

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Shelves (cast-in-situ)

1

718

718.2

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers.

1

577

577.25

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts.

1

742

742.55

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls: Under 20 cm wide

1

262

262.2

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.

1

123

123.2

... More
Carriage of Slip/Earth/Silt 1 KM

1

160

160.93

... More
Carriage of Slip/Earth/Silt 2KM

1

184

184.3

... More
Carriage of Sand/Aggregates/Bajri 10 km Mt

1

279

279.04

... More
Carriage of Sand/Aggregates/Bajri 50m HL

1

200

200.67

... More
Carriage of Sand/Aggregates/Bajri 100m HL

1

244

244.36

... More
Carriage of Sand/Aggregates/Bajri 150 m HL

1

288

288.05

... More
Carriage of Sand/Aggregates/Bajri 200 m HL

1

331

331.74

... More
Carriage of Stone 10 km MT

1

328

328.31

... More
Carriage of Stone 50M HL

1

236

236.08

... More
Carriage of Stone 100 M HL

1

287

287.48

... More
Carriage of Stone 150 M HL

1

338

338.88

... More
Carriage of Stone 200 M HL

1

390

390.28

... More
Carriage of NP3 pipe10 Km Mt

1

101

101.66



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.