Bharat Sanchar Nigam Limited Tender
... More
The BSNL has issued a formal invitation for competitive bids for the Bharat Sanchar Nigam Limited project, for Civil Works For Precautionary Safety Measures In Regards To Structurally Unsafe Projected Balconies Box Louvers At Fourth Floor On Front Side Of Te Building At Kachi Chawni, Jammu. in Jammu, Jammu & Kashmir, with an estimated contract value of Rs. 5,63,387. The bid opening date for this tender is 24-05-2025 and the last date for bid submission is 05-06-2025. Interested bidders for Bharat Sanchar Nigam Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Bharat Sanchar Nigam Limited - BSNL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 May 2025
Closing Date5 Jun 2025
Tender Amount₹ 5,63,387
Costs
EMD
₹ 11,268Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BSNL_236426_1Tender No
06/EE/DIV/JT/2025-26Tender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Civil works for precautionary safety measures in regards to structurally unsafe projected balconies Box louvers at fourth floor on front side of TE Building at Kachi Chawni, Jammu.
Civil works for precautionary safety measures in regards to structurally unsafe projected balconies Box louvers at fourth floor on front side of TE Building at Kachi Chawni, Jammu.
BOQ Items
... More
10x80mm
63
100
-
... More
Sub-Head : Roofing
-
-
-
... More
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design :
-
-
-
... More
In 75x75 mm deep chase
30
100
-
... More
Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /seIf tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
23
100
-
... More
Sub-Head : Finishing
-
-
-
... More
18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement: 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement: 3 coarse sand) finished rough with sponge.
76
100
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade :
-
-
-
... More
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
76
100
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade :
-
-
-
... More
Old work (One or more coat applied @ 0.90 ltr/10 sqm).
50
100
-
... More
Sub-Head : Repairs to Building
-
-
-
... More
Renewing glass panes, with putty and nails wherever necessary including racking out the old putty:
-
-
-
... More
Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm).
10
100
-
... More
Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In- Charge.
10
100
-
... More
Sub-Head : Dismanteling and Demolishing
-
-
-
... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
7
100
-
... More
Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge.
2
100
-
... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
-
-
-
... More
In cement mortar
9
100
-
... More
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
76
100
-
... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
20
100
-
... More
Credit to the work
-
-
-
... More
TMT bars obtained from dismantlement
150
100
-
... More
Sub-Head : Conservation of Heritage Buildings
-
-
-
... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note :- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.
750
100
-
... More
Sub-Head : New Technologies and Materials
-
-
-
... More
Providing and fixing Scaffolding net of required width made of high density Polyethylene UV stabilized knitted on warp knitting machines having density 100grams/sqm and shading coefficient minimum 75% around the construction site/ for vertical extension as per requirement including fastening/tying with uilding/scaffolding pipes or with any other fixtures etc. complete as per direction of Engineer-in-Charge. (One time payment shall be made for providing Scaffolding net from start of work till completion of work including shifting if any. The Scaffolding net shall be the property of the contractor on completion of the work
300
100
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%