Airports Authority Of India Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Airports Authority Of India - AAI Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date30 Jul 2024
Closing Date20 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Repairing Of Distressed Portion, Pot-holes And

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repairing of damaged portion of rigid pavement with Elastomeric concrete compound (Flex-O-Patch of Choksey chemicals/ Delpatch of D.S Brown or equivalent) after marking, cutting, chipping the pavement up to required size by using mechanical chippers, side locking on the vertical face, cleaning the prepared area by sand blasting with medium grit sand, masking and pouring the compound, finishing & texturing complete as per manufacturer specifications and the direction of EIC with required machines & tools. Note: The rate quoted shall be exclusive of cost of flexo patch & Primer RDL-942

400

-

-

... More
Cleaning of existing expansion joints and providing & filing with polysulphide joint sealing compound (confirming to grade BS:5212, Part-I, 1990) of Dr. Fixit or equivalent including painting the side of slab with approved primer and filling the groove 25 mm or more in width as per actual joint width status at site x 45mm deep ( inc. of backer rod depth) including inserting the backer rod of Supreme or equivalent of appropriate dia (minimum 30mm or more as per actual joint width status at site) of approved make to receive the specified sealing compound, providing and applying bond breaking tape on top edges of joint to prevent accidental spillage of sealant on top surface and to give a neat finish to the sealant has been applied and tooled, all complete as per specification and direction of EIC. Note: The rate quoted shall be exclusive of cost of Primer RDL-942

1005

-

-

... More
Cleaning of existing dummy/construction joints and providing & filling with polysulphide joint sealing compound (confirming to grade BS: 5212, Part-I, 1990) of approved make Dr. Fixit or equivalent including painting the sides of slab with approved primer and filling the groove 10mm or more in width as per actual joint width status at site x 25mm deep ( inc. of backer rod depth) including inserting the backer rod of Supreme or equivalent of appropriate dia minimum 12mm or more, of approved make to receive the specified sealing compound, providing and applying bond braking tape on top edges of joint to prevent accidental spillage of sealant on top surface and to give a neat finish to the sealant has been applied and tooled, all complete as per specification and direction of EIC. Note: The rate quoted shall be exclusive of cost of Primer RDL-942

3084

-

-

... More
Supply of SW-CRETE T-01 or equivalent high performance fast setting repair compound for full depth, distress and other distress in pavement concrete with graded aggregates. Material should be self-flowing having compressive strength 4 hrs.-20MPA, 1 day - 40 MPA, 28 days - 50MPA, pull strength after - 28 days-2.0 MPA, (minimum) Expansion Rate-0.1% (maximum) should accept traffic within Three hours as per specifications and directions of Engineer-in-Charge

4400

-

-

... More
Laying of SW-CRETE T-01 or equivalent high performance fast setting repair compound for full depth, distress and other distress in pavement concrete with graded aggregates. Material should be self-flowing having compressive strength 4 hrs.-20MPA, 1 day - 40 MPA, 28 days - 50MPA, pull strength after - 28 days-2.0 MPA, (minimum) Expansion Rate-0.1% (maximum) . Rate inclusive of marking, cutting the old concrete, chiseling for required width & depth, compressed air cleaning, high pressure air/ water jet cleaning, mixing of Swcrete-T01 with aggregates 20mm & 10mm in machine, pouring, finishing texturing cutting the joints, etc. all complete to accept traffic in 3 hrs. after pouring as per specifications and directions of Engineer-in-Charge. Note: a) Rate Excluding material cost for SW CRETE- T01 B) Rate Includes the material aggregate cost for graded aggregates of 10mm ( and below) and 20mm.

4400

-

-

... More
Supply of SW-CRETE T-02 or equivalent high performance thin layer rapid repair compound. Material should be self-flowing having compressive strength after 2 hrs. 20MPA after 1 day - 30 MPA after 28 days 50 MPA. Pull strength after 28 days - 1.0 MPA. (Minimum) Expansion rate 0.10%. (maximum). Curing time should be 2 hrs. to accept traffic as per specifications and directions of Engineer-in-Charge.

3500

-

-

... More
Laying of SW-CRETE T-02 or equivalent high performance thin layer rapid repair compound. Material should be self-flowing having compressive strength after 2 hrs. 20MPA after 1 day - 30 MPA after 28 days 50 MPA. Pull strength after 28 days - 1.0 MPA. (Minimum) Expansion rate 0.10%. (maximum) . Rate inclusive of milling the old surface area for required depth & matching with the existing profile, cleaning with compressed air, high pressure water jet cleaning, mixing of SW-CRETE T-02 in machine, pouring, finishing, texturing, curing time should be 2 hrs. to accept traffic as per specifications and directions of Engineer-in-Charge. a) Rate Excluding material cost for SW CRETE- T02

3500

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.