The HPSEBL has issued a formal invitation for competitive bids for the Himachal Pradesh State Electricity Board Limited project, for Tender For Prov. And Erect. Shifting And Raising Of Height Of Exist. Poles Of 3-ph. And 11 Kv Ht Line Due To Road Widening Of Amb-athwan Link Road In (e) Section Koharchann On Partial Turnkey Basis Under Esd Mubarikpur. in Una, Himachal Pradesh, with an estimated contract value of Rs. 7,97,840. The bid opening date for this tender is 28-05-2025 and the last date for bid submission is 03-06-2025. Interested bidders for Himachal Pradesh State Electricity Board Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date28 May 2025
Closing Date3 Jun 2025
Tender Amount₹ 7,97,840
Costs
EMD
₹ 7,978Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Tender For Prov. And Erect. Shifting And Raising Of Height Of Exist. Poles Of 3-ph. And 11 Kv Ht Line Due To Road Widening Of Amb-athwan Link Road In (e) Section Koharchann On Partial Turnkey Basis Under Esd Mubarikpur.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HPSEB_106473_1Tender No
GED-23/2025-26Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
12
1648
-
... More
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
8
1167
-
... More
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. and 1-Phase L.T Line complete in all respect.
2.24
12871
-
... More
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
0.56
3971
-
... More
Dismentalling of existing LT conductor i.e. Removal of Conductor & GI Wire from Insulator, De -Stringing & Rolling of Conductor and GI Wire complete in all respect
2.24
9507
-
... More
Dismentalling of existing L.T Pole complete in all respect and Hand over pole to the Engineer Encharge complete in all respect
6
1200
-
... More
Dismantlling of existing PVC cable from dismantled poles and Re-connection with shifted poles as per direction of Engineer Encharge complete in all respect.
1
2499
-
... More
Supply Part of 3-Phase LT line (T.S. No. 16/2025-26)
-
-
-
... More
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}
0.15
47747
-
... More
Prov. Steel Tubular Pole 9 Mtr Long along with base plate complete in all respect.
6
15777
-
... More
Filling of RCC Muffs with concerete ratio 1:2:4 complete in all respect.
6
174
-
... More
Prov. Steel Section U type MS Channel 75x40x4.8 Length 2.40 mtr. For Height Piece
5
1433
-
... More
Prov. Shackle Insulator (16 Kn)
30
26
-
... More
Prov. D-Iron (U-Clamps)
30
86
-
... More
Prov. Earth Knob
6
12
-
... More
Prov. LT Stay Set
12
970
-
... More
Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set
72
96
-
... More
Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set]
22
339
-
... More
Prov. Earthing Set complete
8
767
-
... More
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
5
96
-
... More
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
12
130
-
... More
Prov. Aluminium Paint.
12
366
-
... More
Prov. Red Oxide
9
249
-
... More
Erection/Shifting Part of 11 KV HT Line (T.S. No. 17/2025-26)
-
-
-
... More
Erection of new Steel Tubular Pole 11 mtr. Long Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
4
5015
-
... More
Erection of Height Piece for HT Pole:- Erection of Height Piece include drilling of holes in X-Arm and fixing with pole and painting complete in all respect.
18
804
-
... More
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
8
1468
-
... More
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
10
1929
-
... More
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.81 (80 mm2) Conductor of 11 KV HT line complete in all respect.
1.8
12871
-
... More
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
1.6
3971
-
... More
Dismentalling of existing HT Pole complete in all respect and Hand over pole to the Engineer Encharge complete in all respect
2
1200
-
... More
Dismentalling of existing HT conductor i.e. Removal of Conductor & GI Wire from Insulator, De -Stringing & Rolling of Conductor and GI Wire complete in all respect
1.8
9507
-
... More
Supply Part of 11 KV HT Line (T.S. No. 17/2025-26)
-
-
-
... More
Prov. Steel Tubular Poles 11 Mtr Long along with base plate complete in all respect
4
25189
-
... More
Prov. (AAAC 7/3.81 mm 80 mm²) mm Conductor
0.15
69885
-
... More
Filling of RCC Muffs with concerete ratio 1:2:4 complete in all respect.
4
174
-
... More
Prov. Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side) x 8 structure
4
1023
-
... More
Prov. Cross Arm: [Channel Iron (75x40x4.8 mm), Length: 1500 mm for Height Piece
18
895
-
... More
Prov. Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
8
280
-
... More
Prov. Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
4
327
-
... More
Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure
33
163
-
... More
Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Straight stapples & Bend Stapples etc.) x (3 No. conductors) x (2 No. sides) complete in all respect.
6
1708
-
... More
Prov.Nuts and Bolts of Various Sizes
26
130
-
... More
Prov.MS Half Clamp
18
170
-
... More
Prov.MS Full Clamp/stay
16
340
-
... More
Prov. Barbed Wire
12
96
-
... More
Prov.Eye/Earth Hook
11
52
-
... More
Prov.11kv Stay set complete in all respect
10
1176
-
... More
Prov. Stay Wire HT (10 kg. per Stay Set)
100
96
-
... More
Prov.11kv Earthing set complete in all respect.
8
1306
-
... More
Prov. Aluminium Paint.
8
366
-
... More
Prov. Red Oxide
6
249
-
... More
Loading of HT and LT line materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of DTR and allied Material For Average Distance From Road To Site Of Work .(If required as per site).
1
8000
-
... More
Providing 3 Nos. earthing for 1 Nos. Sub Station by prov. 50kg salt charcoal in each earthing i/c construction of pits for earthing as per REC standard complete in all respect i/c replacement of Surge Arresters 9kv, 5kA rating and dismentling of old earthing, G.I Wire and Connections and Painting of Subtation structure complete in all respect.
5
24898
-
... More
Prov. Chain Link fencing , Angle Iron ,Gate etc for transformer fencing complete in all respect.
3
23999
-
... More
Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3% (Sag, Earthing, Cross lacing above road and wastage)} @ 0.102 kg/m
107.1
96
-
... More
Prov. Eye Hook for earth wire
11
52
-