Irrigation And Water Resources Department Tender
... More
The Irrigation And Water Resources Department has issued a formal invitation for competitive bids for Replacement Of V.r. Bridge At Rd 7m 6f 310 Ft Of Hathindisty. C.m Code No. 22399 Dt. 10.06.2018 in Palwal, Haryana, with an estimated contract value of Rs. 20,65,000. The bid opening date for this tender is 06-08-2019 and the last date for bid submission is 13-08-2019. Interested bidders for Irrigation And Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 20,650Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_HRY_92125_1Tender No
5575/25-A dt. 01.08.19-7M-6F-HathinTender Authority
Irrigation And Water Resources Department ViewPurchaser Address
-Website
http://https://hid.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Replacement of V.R. Bridge at RD 7M 6F 310 ft of Hathin Disty. C.M Code No. 22399 dt. 10.06.2018
BOQ Items
... More
Laying cement Concrete 1:3:6 with stone aggregate 20mm nominal size in foundation and plinth (HSR item 10.40
134.25
-
-
... More
Dry brick on edge paving sand grouted over 50 mm thick earth and mud plaster (HSR item No. 14.20)
160.54
-
-
... More
First Class brick work laid in cement stone dust mortar 1:3 in first story upto 4.0 mtr above plinth level (HSR item 11.30)
61.24
-
-
... More
Earth work excavation in all kind of soil with alead of 15 Mtr.
230.05
-
-
... More
First Class brick work laid in cement, stone dust mortar 1:3 in foundation and plinth (HSR item 11.25)
126.09
-
-
... More
Filling expension joint with bitumen filler 12 mm wide (HSR no. 24.34)
1656.22
-
-
... More
First Class brick work laid in cement, stone dust (From Crusher ) mortar 1:7 in foundation and plinth (HSR item 11.21)
6
-
-
... More
Design Mix Cement Concrete of grade M 20 with minimum cement content 300 K.G p/cum infoundation and plinth (HSR no. 10.65)
16.24
-
-
... More
Cement pointing 1:2 deep varity on brick and Tile work.(HSR item 15.60)
117.92
-
-
... More
Centring & Shuttering for faces of concrete in foundation and foundation beam (HSR item 9.13)
150.05
-
-
... More
Dismantling reinforced cement concrete with cleaning and straightening and cutting of bars if required (HSR item No. 8.6e)
16.82
-
-
... More
Earth work excavation in all kind of soil with a lead of 495 Mtr (HSR item No. 6.2 C (i) & (V)
306.74
-
-
... More
Laying of RCC Pipe i/C supply and carriage 4' dia (1200 mm) NP2 (HSR item No. 28.60)
20
-
-
... More
Weep Hole in F.O. Walls and wall along section C.C. (5' Horizontal & 5' vertical )
60
-
-
... More
Dismantling cement concrete 1:4:8 (HSR item No. 8.6b)
11.21
-
-
... More
Dismantling Stone masonry in lime (HSR item 8.1c)
110.68
-
-
... More
Cement concrete 1:4:8 with stone aggregate 20 mm Nominal size in foundation and plinth (HSR item No. 10.38)
4.41
-
-
... More
Design Mix Cement Concrete of grade M 25 with minimum cement content 300 K.G p/cum in first story up to 4 mtr above plinth (HSR no. 10.73)
79.74
-
-
... More
Earth work excavation in all kind of soil with a average lead of 22.5 mtr for making road ramp.
800
-
-
... More
Centering and shuttering for Slab exceeding 3m to 6m .(HSR item 9.18 b + note 5).
78.6
-
-
... More
Re-handling of earth work HSR noteII
469.64
-
-