Irrigation And Water Resources Department Tender

... More
The GoH has issued a formal invitation for competitive bids for the Irrigation And Water Resources Department project, for Laying Underground 200 Mm Dia Ac Mazza 2.5 Kg/sqcm Pressure Pipeline For Dewatering Of Flood Water From Low Laying Fields Of Village Baniyani To Outfall Rd 1800-r Of Baniyani Sub Link Drain in Rohtak, Haryana, with an estimated contract value of Rs. 9,56,000. The bid opening date for this tender is 26-05-2025 and the last date for bid submission is 02-06-2025. Interested bidders for Irrigation And Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Irrigation And Water Resources Department - GoH Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date26 May 2025
Closing Date2 Jun 2025
Tender Amount₹ 9,56,000 
Notes
Download

Costs

  • EMD

    ₹ 19,120
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
[20.108.3]Providing , lowering, laying, aligning, cutting (cut surface to be finished uniformly), jointing with coupling and EPDM rubber rings marked with IS: 5382 and testing, AC pressure water supply pipes (Class-15) manufactured with Mazza process as per IS 1592:2003 and specials into trenches for all levels/depths including carriage, loading/ unloading, stacking, handling, rehandling etc. complete in all respects to the satisfaction of the Engineer in charge (Rates are inclusive of couplers, EPDM rubber rings and specials but exclusive of excavation and refilling) 3. 200mm i/d [Through Rate]

805

827

-

... More
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]

683.852

78

-

... More
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]

653.96

46

-

... More
[6.1.3]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 3. 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) [Through Rate]

4.123

3426

-

... More
[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate]

24.67

2911

-

... More
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]

2.014

4374

-

... More
[6.35.1]Steel reinforcement for R.C.C. work ready to use `cut and bend` rebars of approved make from factory/workshop to construction site including placing in position and binding all complete up to plinth level. 1. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate]

91.58

63

-

... More
[7.83.1]Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with : 1. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]

1.368

2935

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.