If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 2,00,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Ss/b895-ppa-pf-t-4510/1010 - Compressed Air And Nitrogen Plant For Polypropylene Project-kochi Refinery Of M/s Bharat Petroleum Corporation Limited (bpcl)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_EIL_854714_1Bid Award Id
ViewTender No
SS/B895-PPA-PF-T-4510/1010Tender Authority
Engineers India Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Total Lumpsum Charges for 5 (Five) years of PWCAMC
1
-
-
... More
SP-3=Break-up of Construction/Installation as above included in SP-0 prices
1
-
-
... More
Construction / installation, Hook up & tie-in, pre-commissioning, commissioning etc and completion of work in all respects for Compressed Air & Nitrogen Plant Package, Transportation to site of supply material covered under SP-2, Receipt, storage, conservation, preservation and handling of material and consumables at site required for the work, fabrication, construction, assembly, erection at site , all piping, civil, structural, architectural, mechanical, electrical and instrumentation works within battery limit, insulation, coating, painting etc, providing all temporary works / structures and equipment for completion, obtaining statutory approvals, final hook-up with owner facilities, precommissioning, commissioning, performance testing, guarantee runs, supply of all labour, materials, tools & tackles (excluding those covered under supply portion); providing experienced personnel for pre- commissioning / commissioning (till hand over stage of the plant to owner) providing construction aids and all safety devices for construction, providing training to OWNER'S personnel, completing all the work in all respects to make system smooth operable and handing over as per Bidding Document requirements all complete as per Bidding Document and directions of Engineer-in-Charge.
-
-
-
... More
5 (Five) years Post Warranty Comprehensive Annual Maintenance Contract (PWCAMC) for ANALYZERS (Process stream (except density, moisture, PH/conductivity) as per technical portion of bidding document & as per preamble to SOP
-
-
-
... More
Total Lumpsum Charges for 5 (Five) years of PWCAMC
1
-
-
... More
5 (Five) years Post Warranty Comprehensive Annual Maintenance Contract (PWCAMC) for Package PLC and all associated items as per technical portion of bidding document & as per preamble to SOP
-
-
-
... More
SP-1=Break-up of Design & Engineering Prices included in SP-0 Prices
1
-
-
... More
Procurement, supply, Shop fabrication, assembly testing of all items / Equipment’s / Components / Materials / bought outs, Procurement of raw materials and sub-ordered equipment, bought outs, shop fabrication/assembly, inspection including Third Party Inspection charges, Ocean freight / air freight; all taxes, duties, levies etc. custom clearance, stevedoring; nsurance, inland transportation, receipt, accounting, storing & preservation of materials including all other activities incidental to procurement and supply, testing, supply of all spares, consumables, lubricants, adsorbents, chemicals, catalysts, as required, special tools and tackles required for work as per Bidding Document requirements for Package
-
-
-
... More
BREAK UP OF LUMPSUM PRICE FOR COMPRESSED AIR AND NITROGEN PLANT
(For Modularization / Construction/Installation, Start-up, Pre-Commissioning, Commissioning, Guarantees & PGTR, Training)
FORM SP-3
-
-
-
... More
COMPRESSED AIR & CRYOGENIC NITROGEN PLANT PACKAGE WITH COMPLETE ACESSORIES AND AUXILLARIES:
Package Scope includes Basic Engineering, Detailed engineering, Procurement of raw materials and subordered equipments, shop fabrication / assembly, statutory approval, route survey, inspection including Third Party Inspection (if any), testing, painting, packing & forwarding, packing (seaworthy when sea transportation), transportation to site, receipt, local site handling, storage, conservation, preservation and handling of material and consumables at site required for civil, structural, architectural, mechanical, electrical and instrumentation works within defined battery limit, site assembly, erection, hook up & tie in, testing, Fire Proofing, pre- commissioning, commissioning, performance guarantee test etc. Package comprises of Air compressors, Air Receivers, Instrument Air Dryers including filters, adsorber vessel, Nitrogen Generation unit, Vessels, Pumps, filters, Exchangers, vents & drains, valves fittings & mountings etc., piping within the Battery Limit as defined in the technical part of bidding document, supply of all UG piping as specified elsewhere within the battery limit, Instruments, controls and electrical, Civil Work/ Structures / Platforms / staircases, insulation, coating, painting including all spares etc, providing all temporary structures / works and equipment for completion, obtaining statutory approvals (at installation state), supply of all instruments /gauges etc. for testing / pre-commissioning / commissioning, lubricants, chemicals as mentioned in technical part & as required, special tools, tackles and jigs & fixtures, completing all the works in all respects and handing over on lump sum turnkey basis within the battery limits as per the detailed scope of work,supply & services mentioned in tender documents including mandatory spares, first fill and consumables/adsorbents/ catalysts/chemicals for first 12 months of operation including training to Owner’s personnel for operation & maintenance including the supply of all training materials.
-
-
-
... More
SP-0= SP-1+SP-2+SP-3
1
-
-
... More
COMPRESSED AIR AND NITROGEN PLANT PACKAGE ON LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS:
FORM-SP-0
-
-
-
... More
BREAK UP OF LUMPSUM PRICE FOR COMPRESSED AIR AND NITROGEN PLANT (For Design & Engineering)
FORM SP-1
-
-
-
... More
5 (Five) years Post Warranty Comprehensive Annual Maintenance Contract (PWCAMC) for Machine Monitoring System as per technical portion of bidding document & as per preamble to SOP
-
-
-
... More
SP-2=Break-up of Supply Prices included in SP-0 Prices Note: Bidder to include the prices for Imported supplies in INR currency only.
1
-
-
... More
BREAK UP OF LUMPSUM PRICE FOR COMPRESSED AIR AND NITROGEN PLANT