Oil And Natural Gas Corporation Limited Tender
... More
The ONGC has issued a formal invitation for competitive bids for the Oil And Natural Gas Corporation Limited project, for Carpeting Of Bt Road Over The Damaged Existing Village Road Of Pilludra And Bhramanvasi Leading To Drill Site Dbbk. in Bharuch, Gujarat, with an estimated contract value of Rs. 80,28,320. The bid opening date for this tender is 12-02-2025 and the last date for bid submission is 06-03-2025. Interested bidders for Oil And Natural Gas Corporation Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Oil And Natural Gas Corporation Limited - ONGC Tender
Opening Date12 Feb 2025
Closing Date6 Mar 2025
Tender Amount₹ 80,28,320
Costs
EMD
₹ 1,61,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ONGC_216681_2Bid Award Id
ViewTender No
AC32C24002Tender Authority
Oil And Natural Gas Corporation Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Spreading of Quarry Spoil / Stone Dust / GSB Gd.-I CBR Value-30 / GSB Gd.-II CBR Value-25 / WMM on road crust and filling the gaps of rubble and metal to required gradient and camber as directed by EIC.
2079
-
-
... More
Providing and laying asphalt painting on BT surface with bitumen VG-30 at rate of 10 KG/10 Sqm and spreading stone dust on painting surface at the rate of 0.03 cum/10 Sqm with rolling with PTR roller
4331.25
-
-
... More
Hire charges of providing Hydraulic Excavator of 1 Cum Bucket for taking up any job specified by EIC in Gandhar area including transportation of Hydraulic Excavator to work site, operative charges, diesel, lubricants, watch and ward etc. complete as directed by EIC.
96
-
-
... More
Earth work for foundation upto 1.5m depth including sorting out and stacking of useful material and disposing off excavated stuff upto 50 m lead. (A) Loose or soft soil
564
-
-
... More
Brick Work using common burnt clay building bricks having crushing strength not less than 35 kg.per sqcm in cement mortar 1:6 (1cement : 6 coarse sand) including curing in Foundation & Plinth with Conventional Bricks.
5.52
-
-
... More
Supplying, collecting, carting, loading, unloading and stacking at site of work Quarry spoils as directed by EIC.
792
-
-
... More
Filling in Plinth with Sand under floors including watering, ramming, consolidating and dressing completed.
4.8
-
-
... More
Supplying, Collecting, Carting, Loading, Unloading and Stacking in measurable stacks Wet Mix Macadam (WMM) (size range 53 mm to 0.075 mm)specification including premixing the material with water at OMC in for all leads & lifts ,laying in uniform layers with mechanical paver finisher in sub-base/base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density,complete as per specifications and directions of Engineer in charge.(Charges of spreading and rolling shall be paid for separatly)
1287
-
-
... More
Supply and fixing reinforced concrete heavy duty non pressure pipe with collar for culvert for heavy traffic as per IS 458-1991specification including setting and jointing in cement mortar :2 watering and laying (to level or slopes) of class NP-3 of following internal diameter (v) 450 mm dia
10
-
-
... More
Providing ISI Marked Thermo-Mechanically Treated Bars of Grade Fe-500D or more reinforcement for R.C.C. work including bending, binding & placing in position complete upto floor two level.
200
-
-
... More
Providing and laying Pre-mix Seal Coat in a layers of 12 mm thick @ 0.18 cum/10sqmt Hot mix(loose), hot laid with paver finished using bitumen binder of bitumen pentration VG-30 (60/70) grade @ 5.00 % by weight of the mix with stone grit/dust as per gradation, conducting operation of hot mix plant of minimum capacity 60 TPH, machineries, cost of materials including labour charges for laying premixed bituminous macadam/carpet/seal coat materials etc. by hot mix laid process of heating the asphalt, stone aggregates in continuous hot mix batching process plant,transporting the hot mix materials from hot mix plant to site by hydraulic tippers and spreading the same by paver finisher and consolidation with tandem road roller in stages and including cleaning the existing road surface by wire/steel brush,removing caked mud etc. sweeping with brooms and finally cleaning with gunny bags to remove all loose dust and dirt etc. complete as directed by EIC.
116.94
-
-
... More
Providing and laying levelling course (bitumenous macadum) in a layers of 50mm thick @ 0.70 cum/10sqmt (loose) Hot mix, hot laid with paver finished using bitumen binder of bitumen pentration VG-30 (60/70) grade @ 3.00 % by weight of the mix with Stone aggregate as per gradation,conducting operation of hot mix plant of minimum capacity 60 TPH, machineries, cost of materials including labour charges for laying premixed bituminous macadam/carpet/seal coat materials etc. by hot mix laid process of heating the asphalt, stone aggregates in continuous hot mix batching process plant,transporting the hot mix materials from hot mix plant to site by hydraulic tippers and spreading the same by paver finisher and consolidation with tandem road roller in stages and including cleaning the existing road surface by wire/steel brush,removing caked mud etc. sweeping with brooms and finally cleaning with gunny bags to remove all loose dust and dirt etc. complete as directed by EIC.
509.36
-
-
... More
Spreading of Quarry Spoil / Stone Dust / GSB Gd.-I CBR Value-30 / GSB Gd.-II CBR Value-25 / WMM on road crust and filling the gaps of rubble and metal to required gradient and camber as directed by EIC.
80
-
-
... More
Supply and fixing reinforced concrete heavy duty non pressure pipe with collar for culvert for heavy traffic as per IS 458-1991 specification including setting and jointing in cement mortar :2 watering and laying (to level or slopes) of class NP-3 of following internal diameter (v) 900 mm dia.
10
-
-
... More
Providing 10 mm thick Cement Plaster in single coat on brick wall for plastering upto floor two level, finishing even & smooth in cement mortar 1: 6 ( 1 cement :6 coarse sand).
25.2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements