Indian Army Tender
... More
The Indian Army has issued a formal invitation for competitive bids for BOQ Title: Repair maintenance of 63 KVA in Vadodara, Gujarat, with an estimated contract value of Rs. 2,28,803. The bid opening date for this tender is 09-12-2024 and the last date for bid submission is 18-01-2025. Interested bidders for Indian Army tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Indian Army Tender
Opening Date9 Dec 2024
Closing Date18 Jan 2025
Tender Amount₹ 2,28,803 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Summary
BOQ Title: Repair maintenance of 63 KVA
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
GEM/2024/B/5626342Bid Award Id
ViewTender No
GEM/2024/B/5626342Tender Authority
Indian Army ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
brief_details_2024-11-20-10-20-43_22c2c238f399511f2ac47bcf9463578a.pdf
boq_2024-02-16-17-30-35_c077553faa875bd05bea780788c_2024-11-20-10-20-43_3ca8569167a18d2515362ad29bdf6ffd.csv
BOQ Items
... More
Material and Labour HV copper coil replacement , Material and Labour HV copper coil replacement per phase as per IS
1
-
-
... More
Material and labour for transformer oil , Material and labour for transformer oil
56
-
-
... More
Material and Labour LV copper coil replacement , Material and Labour LV copper coil replacement per phase as per IS
2
-
-
... More
Removing excavated material not exceeding 50m and depositing where directed , Removing excavated material not exceeding 50m and depositing where directed as a level not exceeding 1 point 5 m above the starting points
2
-
-
... More
Material and labour silica Gel breather with assembly , Material and labour silica Gel breather with assembly
1
-
-
... More
Excavation in trenches not exceeding 1 point 5 m wide and not exceeding 1 point 5 m deep , Excavation in trenches not exceeding 1 point 5 m wide and not exceeding 1 point 5 m deep and getting out in Dense soil for laying of cable complete all as specified
5
-
-
... More
Material and Labour LV bushing , Material and Labour LV bushing
3
-
-
... More
Supply and laying unreinforced pre cast flat concrete cable protection cover , Supply and laying unreinforced pre cast flat concrete cable protection cover of class HV type 1 size 300 mm into 180mm into 40mm factory made complete all as specified and directed by the engineer in charge
111
-
-
... More
Taking down carefully transformer 63KVA from pole oblique plinth by dismantling disconnecting HT and LT side , Taking down carefully transformer 63KVA from pole oblique plinth by dismantling disconnecting HT and LT side earthing of transformer supporting angles cross arms for repair opening of top cover replacing of all joints types of gaskets HV oblique LV coils HV oblique LV bushings LV metal parts breather assembly etc and reassembling the same after repairs installing recomissioning the transformer at its original place connecting up HT and LT sides earthing and supporting angles cross arms etc and testing
1
-
-
... More
Rubbersied cork sheet gasket of 6mm thickness , Rubbersied cork sheet gasket of 6mm thickness for top cover of transformer
5
-
-
... More
Supply and laying XLPE insulated screened PVC bedded galvanised steel strip , Supply and laying XLPE insulated screened PVC bedded galvanised steel strip or wire armoured electric power cables heavy duty with aluminium conductor 11000 volts earthed grade cross sectijnal area 95 sqmm complete all as specified and directed by engineer in charge
30
-
-
... More
Material and labour for sand filling with clean dry find sand unwashed including , Material and labour for sand filling with clean dry find sand unwashed including gently punning around cables in trenches ducts for cable protection complete all as specified and directed by Engr in charge
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements