Zilla Panchayat Tender

... More
The Zilla Panchayat has issued a formal invitation for competitive bids for Construction Of Mantap Of Shree Shantadurga Devasthan At Moicawada In V.p. Pilerne In Reis Magos Z.p. Constituency. in North Goa, Goa, with an estimated contract value of Rs. 11,85,368. The bid opening date for this tender is 03-04-2025 and the last date for bid submission is 11-04-2025. Interested bidders for Zilla Panchayat tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Zilla Panchayat Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date3 Apr 2025
Closing Date11 Apr 2025
Tender Amount₹ 11,85,368 
Notes
Download

Costs

  • EMD

    ₹ 23,707
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 2,371

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.

17.14

5186

88867.3

... More
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size)

-

-

-

... More
Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth

155.88

412

64222.56

... More
Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level

18.79

6192

116347.68

... More
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) all types of soil

78.73

291

22910.43

... More
In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level

24.2

8709

210757.8

... More
Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.

4012

105

421260

... More
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.

54.54

245

13362.3

... More
Foundations, Footings, Bases for columns

13.5

407

5494.5

... More
Centering & shuttering including Strutting, Propping & removal of forms for :

-

-

-

... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.

37.39

2211

82669.29



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.