Water Resources Department Tender
Take tender evaluation notes for Goa WRD Tender
Costs
EMD
₹ 47,140Document Cost
₹ 3,000Tender Fee
₹ 4,713
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WRD_20424_1Bid Award Id
ViewTender No
WDII/TECH/F17/56e/2024-25/SN2Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
All works upto Plinth level.
112.77
-
-
... More
Centering and shuttering including struttings, propping and removal of forms for :
Foundations, footings, bases for columns.
130.82
-
-
... More
vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
131.72
-
-
... More
In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level
31.76
-
-
... More
Rubble packing with hard laterite stones under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
42.03
-
-
... More
Heading and pointing whole bally piles 150mm diameter including only rings, providing and fixing pile shoes, cutting of heads after driving and taking out rings removing cut off portions to departmental store as specified.
117
-
-
... More
Providing and fixing weep holes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge. 110mm dia.
117.8
-
-
... More
Laterite boulder masonry in cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate of 20 mm nominal size) in foundation.
118.4
-
-
... More
Earthwork in excavation by mechanical / manual means in all types of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured/shattered, decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water / dewatering, including setting out construction of shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. with all leads and lifts etc. as per specification and drawing and as directed by the Engineer in Charge. etc. complete.
417.29
-
-
Evaluation Notes How It Works ?