The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Providing Flood Control Measures And Bank Stabilization At Kushawati River In Cond, Cotombi Village Of Quepem Constituency (re-tender) in South Goa, Goa, with an estimated contract value of Rs. 27,74,184. The bid opening date for this tender is 17-01-2025 and the last date for bid submission is 30-01-2025. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Water Resources Department - WRD Tender
Opening Date17 Jan 2025
Closing Date30 Jan 2025
Tender Amount₹ 27,74,184
Costs
EMD
₹ 55,484Document Cost
₹ 4,000Tender Fee
₹ 5,548
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WRD_19472_1Bid Award Id
ViewTender No
WDXII/TECH/F10/18e/2024-25/sr2Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing construction joints with 30mm thick thermocol sheet including cutting and placing in position etc . Complete.
1
-
-
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
38.64
-
-
... More
b)In tees, angles, flats and channels
-
-
-
... More
Earthwork in excavation by mechanical/manual means in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock,ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, stritting and bracing, removal of stump and other deleterious matter, dresing of sides and bottom, providng barricading, danger lightining, guarding etc and backfilling the excavated earth to the extent required and disposing of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge complete.
523.48
-
-
... More
Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
8055.26
-
-
... More
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge. A) 110mm Dia.
24.75
-
-
... More
Drilling basaltic stone/Hard rock including the cost of drilling of dia. 32mm bore and 600mm depth cleaning the hole with pressure washing/air jetting, inserting 20mm dia. TMT Steel reinforcement to a depth of 600mm and 1000mm above the basaltic rock/Hard rock, grouting including the cost of binding materials, consumable, plants and equipment, tools and tackles, labour, supervision, platform etc. complete and as per directive of Engineer-in- charge.
13.8
-
-