Public Works Department Tender
Calculate bid estimation of Goa PWD Tender
Costs
EMD
₹ 21,740Document Cost
₹ 5,000Tender Fee
₹ 2,174
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_19463_1Bid Award Id
ViewTender No
6/4/PWD-WD-XIII (R)/ASW/22/2024-25L4Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork in excavation for roadway as per drawing and specification, in all types of strata comprising any of the material such as soil, silt, sand, clay, gravel, murrum of all varieties, shingles, pebbles all types of conglomerates, laterites rock, etc soft rock, ordinary rock or disintegrated rock fissured shattered/ decomposed rock or weathered rock all such material as described under appendix to those specification either in full or in parts as the case may be adopting mechanical means (hydraulic excavator) or any approved method or methods as the case may be convenient or permitted inclusive of chiseling and wedging etc in all conditions such as dry, moist,saturated, submerged, foul condition etc including setting out, construction of shoringand bracing, removal of stumps and other deleterious matter, dressing sides, ramming of bottoms,getting out the excavated soil/rock to be leveled and neatly dressed, pumping and bailing out of water, back filling the excavated earth to the extent required and utilizing the remaining earth locally for road work, barricading, danger lightening, guarding and disposal of excavated earth as directed by the engineer in charge all complete including all leads and lifts and upto depth of excavation as per MORT&H Specification 301.
835
230
192050
... More
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 mm nominal size) excluding cost of centering, shuttering and finishing : a)All works upto plinth level .
8
6635
53080
... More
Centering & shuttering including Strutting, Propping & removal of forms for :Foundations, Footings, Bases for columns .
19.5
407
7936.5
... More
Providing and laying 50mm (consolidated thickness) full grout using granitic or basaltic stone of specified grading at 6.00 cu.m. per 100 sq.m. grouting with hot bitumen straight run bitumen(or with such bituminous material of grade and type as specified by the Engineer-in-Charge)at 5.0kg. per sq. m. binding with key aggregate of granitic or basaltic stone of specified grading at 1.5 cu.m. per 100 sq.m. including Providing and laying seal coat sealing the voids in a bituminious surface laid with F.E loader with 1 Cu.m. bucket capacity to the specified levels, grade and cross fall using Type A seal coat with 0.98 kg/sqm of bitumen of grade as per MoRT&H specifications clause 513.
1050
631
662550
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
3
2211
6633