The Mormugao Port Trust has issued a formal invitation for competitive bids for Reconstruction Of Collapsed Compound Wall Along Gate No.1 To Gate No.2 Road In Mohp Area in South Goa, Goa, with an estimated contract value of Rs. 30,53,096. The bid opening date for this tender is 03-04-2025 and the last date for bid submission is 24-04-2025. Interested bidders for Mormugao Port Trust tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 50,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_mptgo_855228_1Bid Award Id
ViewTender No
CE/12/2025Tender Authority
Mormugao Port Trust ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Transporting and dumping surplus excavated material/dismantled material in the low lying areas, including loading, unloading, transporting, rough levelling etc. within lead of 5km at places as directed by the Chief Engineer or his representative. All labour and material etc. complete.
245
352
86240
... More
Soling with hard laterite rubble stone of 20 cm to 30 cm size including hand packing etc. complete. All labour & material etc. complete
25
1750
43750
... More
Providing & fixing shuttering for the compound wall foundation of size and shape as directed including cleaning, oiling, closing, gaps, removing shuttering after concreting, provisions of necessary props, bracings and other supports etc. All labour and material etc. complete
434
568
246512
... More
Hiring of JCB with bucket, operator, fuel as and when required for work in MOHC area All tools, plants, labour and materials etc. complete.
32
1500
48000
... More
Supplying & erecting in position structural steel work in single section (light sections less than 34 kg./m) incl. Cutting, hoisting, fixing in position and cleaning the surface, painting two coats of approved quality synthetic enamel paint of approved colour/ shade over a coat of red oxide zinc chromite primer etc. All labour & materials tools & plant etc. complete.
360
135
48600
... More
Providing & fixing P.V.C. soil pipes 110mm dia (heavy) including all specials required, making joints water tight with required solution P.V.C holder bat clamps, cutting & fixing to the wall making good the wall etc. All labour & material complete. including keeping one filter bag filled with 20mm graded aggregate etc. including cost of aggregates etc. complete
108
552
59721.84
... More
Excavation in dense or hard soil/murrum etc. including removal of obstructions such as small trees, vegetation etc. and removal of excavated material upto a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc. complete.,
300
1308
392400
... More
Cement concrete (1:3:6) using 40mm graded black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, consolidating, levelling, curing etc. All labour & material etc. complete.
13
5821
75673
... More
Excavation in loose or soft/sandy soil including removal of obstructions such as small trees, vegetation etc. and removal of excavated material upto a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc. complete.
6
637
3822
... More
Providing and fixing reinforcement with TMT Fe -500 bars conforming to IS:1786 or equivalent including cutting, bending, tying grills, placing in position, holding in position during concreting etc. including cost of binding wire. All labour & material etc. complete.
6050
89
542745.5
... More
Demolishing of dry stone pitching including stacking the serviceable material & disposal of unserviceable material at place pointed out within a lead of 100m including all labour & material, tools & plant etc. complete.
7
1343
9401
... More
Supply of unskilled labours in short notice period for 8 hours a day with necessary tools, including EPF, ESI, transport etc. complete.
50
869
43450
... More
Demolishing and clearing away laterite brick or rubble masonry in C.M including stacking serviceable material & disposal of unserviceable material at places pointed out upto a lead of 100m including all tools & plant labour & material complete.
27
2855
77085
... More
Providing and laying Reinforced RMC M25 grade cement concrete using 20 mm graded black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, consolidating, levelling, curing for RCC wall of compound wall, including necessary scaffolding etc. all labour and material etc. complete.
113
11107
1255091
... More
Demolishing and clearing of cement concrete in trap stone metal, disposal of unserviceable material within a lead of 100m including all tools & plant, labour and material complete
4
4255
17020
... More
Providing and fixing GI barbed wire (9.38kg per100m length) fencing in 10 horizontal lines fixed to the MS angles with clips of 6mm dia MS rods welded to the angles …. Etc. complete
50
273
13650
... More
Trimming of tree branches prone danger to life and property near collapsed portion of compound wall of approximately 60 to 90cm girth or above etc. including loading/ unloading, cutting wooden logs, transporting away leaves and other unserviceable materials … etc. complete
10
1000
10000