Goa Tourism Development Corporation Limited Tender
View complete overview of Goa GTDC Tender
Costs
EMD
₹ 65,667Document Cost
₹ 4,000Tender Fee
₹ 4,000
Summary
Amc Of Transformer Rmu Htand Lt Panels Installed At Paryatan Bhavan Patto Panaj Igoa
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_GTDCL_3936_1Bid Award Id
ViewTender No
GTDC/PC/EE(N)/2022-23/e-02Tender Authority
Goa Tourism Development Corporation Limited ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filtration of transformer insulating oil of 500 KVA 11 Kv/440V transformer . After filtration the BDV test of the upper level and bottom level will be carried out. This activity will be carried out once in a year.Job also includes change of silica gel in the breather.
5
-
-
... More
Filtration of transformer insulating oil of 200 KVA 11 Kv/440V transformer . After filtration the BDV test of the upper level and bottom level will be carried out. This activity will be carried out once in a year.Job also includes change of silica gel in the breather.
5
-
-
... More
Supply and top up of transformer insulation oil required for top up in the conservator level .
2000
-
-
... More
Supply and topping up of silica gel in the breather.
10
-
-
... More
Servicing of 11 KV Vacuum Circuit breaker panels having a draw out type VCB trolley and Control panel having various relays and indication annuciator.Make: Megawin. During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will be charged extra at actual market rates. The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
15
-
-
... More
LT Side :- Servicing Of Main Incomer ACB panel housing 1 Nos of 1000 Amps ACB.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicing of ACB sub main panel Housing 2 nos of 1000 Amps ACB and 1 Nos of 400 Amps MCCB.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicng of PCC-1 panel housing 3 Nos of 1000 Amps and other feeder switchgear MCCB's , MCB,s ,Contactors, control circuits, etc.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicing of 130 KVAR APFCR panel .During AMC our service engineers will visit your site four times in a year. The servicing will include necessary inspection of all circuit breaker, measurements current distribution on capacitors and checking of contactors . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicng of 200 KVA DG panel .During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicing of Common service area panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicing of 400 Amps MCCB and 400 Amps changeover panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicing of 400 Amps MCCB Standalone panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicing of Ist floor panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicing of Second floor panel .During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicing of UPS distribution panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-
... More
Servicing of AC outdoor panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist.
At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
5
-
-