Goa Industrial Development Corporation Tender
... More
The GIDC has issued a formal invitation for competitive bids for the Goa Industrial Development Corporation project, for Construction Of Laterite Compound Wall For Plot No.u-01 In Phase Iv At Verna Industrial Estate. in South Goa, Goa, with an estimated contract value of Rs. 31,20,065. The bid opening date for this tender is 07-02-2025 and the last date for bid submission is 21-02-2025. Interested bidders for Goa Industrial Development Corporation tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 62,401Document Cost
₹ 4,000Tender Fee
₹ 6,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_GIDCo_19887_1Bid Award Id
ViewTender No
GIDC/GM (E)/Tender Notice/2024-25/A-5/B/5Tender Authority
Goa Industrial Development Corporation ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.
143
5186
741598
... More
Finishing wall with superior quality waterproofing cement paint (super snow hem or equivalent) of required shade on new work (three or more coats) to give an even shade.
1019
103
104957
... More
Providing and fixing prefabricated compound gate of G.I. pipes 40 – 50 mm dia (medium) with 12mm M.S. square bars of G.I. pipes grill work as per drawing including providing & fixing locking arrangements, pintals, hold fast embedded in cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 granitic or basaltic aggreate 20mm nominal size) including applying priming coat with ready mixed red lead paint and painting 2 or more coats with superior ready mixed paint of approved brand and manufacture in all shades as per direction complete.
10
5352
53520
... More
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) All works upto plinth level
1.29
7178
9259.62
... More
Centering and shuttering including struttings, propping etc. and removal of formwork for :
vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
10
479
4790
... More
Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
104
87
9048
... More
Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.
Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level.
232
6115
1418680
... More
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer amming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
68
245
16660
... More
Applying priming coat with ready mixed primer of approved brand and manufacture on steel work.
10
51
510
... More
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :
All works upto plinth level
39
6635
258765
... More
Applying one coat of cement primer of approved brand and manufacture on wall surface.
1019
53
54007
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements