Forest Department Tender
Download documents of Goa Forest Department Tender
Costs
EMD
₹ 16,814Document Cost
₹ 2,000Tender Fee
₹ 1,681
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_FD_18943_1Bid Award Id
ViewTender No
CAMPA/GFRTI/24-25/1648Tender Authority
Forest Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
a) All works upto plinth level
75
6810
-
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
30
2211
-
... More
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
-
-
-
... More
a) Size 900 x 400 x 150 mm with steel reinforcement not less than 7 kg per unit -30 T capacity.
55
1460
-
... More
Centering and shuttering including struttings, propping etc. and removal of formwork for :
-
-
-
... More
Earthwork in excavation of foundation of structures of culverts,abntments piers, retaining walls etc. as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilising the remaning earth locally for road work upto 3.00 m depth as per MORTH Specification 304. Excluding dewatering
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements