Wood Tenders

Wood Tenders

Wohnungsbau Und verwaltungsgesellschaft Vorspreewald MbH Tender

Civil And Construction...+1Civil Works Others
Germany
Details: Complete demolition The demolition object consists of 2 residential buildings which are built next to each other and form a structural living and usage unit. The two residential buildings can basically be described as follows. The rising walls are made of brickwork (plastered) - Avv 170102. The roof covering consists of roof tiles. The canopy of the southern residential building has a roof covering made of tar paper of Avv 170903*. The roof structure is made of wooden trusses / wooden beams / wooden battens (avv 170204*). The sloping roofs and parts of the ceiling were partially covered with plasterboard (avv 170802). The objects have 4 brick chimneys. These are assigned to Avv 170106*. One chimney is used by both objects. The chimneys were used to vent the exhaust air from the tiled stoves inside. The interior walls are wallpapered and partially covered with wood paneling (avv 170204*). The windows are framed with plastic frames. The doors and paneling of the installation ducts are largely made of wood or chipboard from Avv 170204*. The electrical installation and sanitary facilities are largely intact. Demolition of a septic tank (12m³ capacity, filled with Avv 200304 - 6m³ and Avv 170503* - 3m³ fillings), rising walls from Avv 170106*. There are only slight signs of rubbish inside the objects. In addition to the actual demolition of the building, the dismantling of immediately adjacent access routes and ancillary facilities (garden arbors / shelter areas) is planned. Delivery of filling materials and topsoil, landscaping, delivery of replacement quarters for "species protection for bats". Dimensions: Residential building (southern property): Floor area = 95.19m² Average height (including basement) = 7.15m Resulting M³ Ur = 680.61m³ Residential building (northern property): Floor area = 145.81m² Average height (including basement) = 9.83m Resulting M³ Ur = 1,433.31m³ Total volume of structures to be demolished = 2,113.92 M³u.r Sealed areas = 180m²
Closing Date14 Jan 2025
Tender AmountRefer Documents 

PROVINCE OF ZAMBOANGA DEL NORTE Tender

Civil And Construction...+2Building Construction, Construction Material
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Province Of Zamboanga Del Norte Bids And Awards Committee Provincial Capitol, Estaka, Dipolog City Email Add: Bidsandawards22@gmail.com December 05, 2024 Invitation To Bid The Provincial Government Of Zamboanga Del Norte Through The Bids And Awards Committee (bac) Is Inviting Interested Parties/ Bidders To Bid For The Following Contract: Contract Id: Pr#300(18)24-12-499(o) & 300(18)24-12-498(o) Contract Name: Procurement Of General Merchandise (hardware And Construction Supplies) Location/purpose: For The Use In The Repair & Improvement Of Primary Clinical Laboratory At Sibuco Hospital, Poblacion, Sibuco, Zamboanga Del Norte. Approved Budget For The Contract (abc): Pr#300(18)24-12-499(o) – P169,833.62 Pr#300(18)24-12-498(o) - 2,856.00 Grand Total P172,689.62 (inclusive Of All Applicable Taxes)  Bidders/contractors Must Have An Expertise In Undertaking A Similar Project, Completed At Least Two Similar Contracts Which The Equivalent Amount Is At Least 25% Of The Proposed Project For Bidding Within The Last Three Years.  Bidders Are Inform That The Delivery Term Is 30 Calendar Days Upon Receipt Of Notice To Proceed.  Bidders/ Contractors Shall Submit Their One (1) Copy Sealed Envelope Containing Their Technical And Financial Documents  Documents Submitted Must Be In Accordance With The Checklist Provided And Must Have A Corresponding Label Or Name Plates.  The Eligibility Check/ Screening As Well As The Preliminary Examination Of Bids Shall Use The Non- Discretionary "pass/ Fail" Criteria.  Post Qualification Of The Lowest/ Single Bids Shall Be Conducted.  All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Evaluation Of Bids, Post Qualification And Award Of The Contract Shall Be Governed By The Pertinent Provision Of Ra 9184 And Its Implementing Rules And Regulations (irr).  All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms In The Amount Stated In Itb Clause 14.  Bidding Is Restricted To Filipino Citizens/ Sole Proprietorships, Partnerships Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. The Schedules Of Activities Are Listed As Follows: Bac Activities Schedule Advertisement / Posting December 06 - 12, 2024 Availability And Issuance Of Bidding Documents December 06 - 13, 2024@ 08:30am Deadline For The Submission Of Bids December 13, 2024@ 08:30 Am Bid Opening And Evaluation December 13, 2024@ 09:00am  Payment For Bidding Documents Is A Non- Refundable Amount Of Five Hundred Pesos Only (php500.00) Payable To The Office Of The Provincial Treasurer, Provincial Capitol Building, Dipolog City.  Prospective Bidders May Obtain Further Information From The Office Of The Bids And Awards Committee, Provincial Capitol Building During Office Hours @ 8:00am - 5:00pm.  Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Address Stated Above.  The Provincial Government Of Zamboanga Del Norte Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders.  Bidding Documents Will Be Electronically Uploaded To The Philgeps Website Of The Provincial Office Of Zamboanga Del Norte At Bidsandawards22@gmail.com. Atty. Rafael R. Osabel, Jr. Bac Chairman Annex A: Procurement Of General Merchandise (hardware And Construction Supplies) Pr#300(18)24-12-499(o) Abc: P169,833.62 1. 41 Bags Portland Cement 2. 66.6 Kgs Dsb 10mm Ø X 6.0m (18 Pcs) 3. 270 Pcs 100 Mm Thk Chb 4. 1 Kgs Tie Wire #16 5. 15 M Pvc Pipe 50mmø, Series 1000 (5 Pcs) 6. 9 M Pvc Pipe 100mmø, Series 1000 (3 Pcs) 7. 12 Ea 2” Ø Pvc Elbow 90° 8. 8 Ea 2” Ø Pvc Elbow 45° 9. 8 Ea 2”ø X 2”ø Pvc Wye 10. 2 Ea 2”ø Pvc Clean-out W/ Plug 11. 1 Ea 2”ø Pvc Tee 12. 2 Ea 4”ø Pvc Clean-out W/ Plug 13. 4 Ea 4”ø Pvc Elbow 90° 14. 5 Ea 4”ø Pvc Elbow 45° 15. 4 Ea 4”ø X 4”ø Pvc Wye 16. 3 Ea 4”ø Pvc Coupling 17. 8 Cans Solvent Cement – 400c 18. 18 Pcs 1/2"ø Pvc Elbow 19. 7 Pcs 1/2"ø Pvc Tee 20. 3 Pcs 1/2"ø Pvc Coupling 21. 3 Pcs 1/2"ø Pvc Female Adoptor 22. 5 Pcs 1/2"ø Pvc Male Adoptor 23. 1 Pc 1/2"ø Gate Valve 24. 5 Rolls Teflon Tape 3/4” 25. 6 Pcs Pvc Pipe 13mmø, Blue 26. 3 Sets Water Closet With Complete Fittings & Accessories 27. 2 Sets Countertop Lavatory With Complete Fitting & Accessories 28. 3 Sets Stainless Floor Drain 4” X 4” 29. 3 Pcs Stainless Faucet 1/2"ø 30. 17 Pcs Fiber Cement Board 6mm 31. 20 Pcs Metal Studs 0.60mm Thk X 35mm X 76mm X 3.0m 32. 7 Pcs Metal Tracks 0.60mm Thk X 35mm X 76mm X 3.0m 33. 2626 Pcs Blind Rivets 1/8”ø X 1/2" 34. 90 Pcs Metal Screw 1” 35. 3 Sets Door Knob 36. 5.04 M² Wooden Panel Door 0.80m X 2.10m 37. 5 Sets Loosepin Hinges 4” X 4” 38. 3 Pcs 1/8” Thk X 2” X 4” Rectangular Aluminum Tube, Analoc (for Door Jamb & Header, 3-sets D-1) 39. 15.84 M² Unglazed Tiles 0.60m X 0.60m (44 Pcs) 40. 7 Bags Tile Grout 41. 1 Pc Diamond Cutting Wheel 4” 42. 38.16 M² Glazed Tiles 0.60m X 0.60m (106 Pcs) 43. 6 Bags Tile Adhesive (25kg/bag) 44. 1 M Hardware Cloth 45. 1 Gals Concrete Neutralizer 46. 2 Gals Concrete Sealer/primer 47. 2 Gals Patching Compound 48. 4 Gals Semi-gloss (two Coat) 49. 4 Pint Tinting Color (optional) 50. 2 Sets Roller Paint 6” W/pan 51. 2 Pc Paint Brush 2” 52. 1 Pc Paint Brush 4” 53. 20 Pcs Sand Paper #120 54. 3 Gals Glazzing Puty 55. 2 Gals Flatwall Enamel 56. 2 Gals Quick Dry Enamel 57. 4 Gals Paint Thinner 58. 3.78 M² 0.60m X 2.10m Pvc Door W/ Jamb & Comp. Acc., (3 Sets) 59. 1 Pc Hacksaw Blade 60. 12 Pcs Led Bulb, 12 Watts 61. 12 Pcs Receptacle Socket 2”ø Plastic 62. 2 Rolls Electrical Tape, Big Sub-total: P169,833.62 Pr#300(18)24-12-498(o) Abc: P2,856.00 1. 3.5 M3 Sand Sub-total: P2,856.00 Grand Total: P172,689.62 ***nothing Follows***
Closing Date3 Jan 2025
Tender AmountPHP 172.6 K (USD 2.9 K)

Oriental Mindoro Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Bid For Construction Of Multi-purpose Building (municipal Compound) At Santiago, Naujan, Oriental Mindoro 1. The Provincial Government Of Oriental Mindoro (pgom), Through The 20% Development Fund 2024 Intends To Apply The Sum Of Nineteen Million Nine Hundred Ninety Four Thousand Five Hundred Seventy Five Pesos And 93/100 (php 19,994,575.93) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For “construction Of Multi-purpose Building (municipal Compound) At Santiago, Naujan, Oriental Mindoro (ib No. Cw-2025-007)”. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of Oriental Mindoro (pgom) Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required 318 Calendar Days. Bidders Should Have A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Item No. Description Qty/unit A.1.1(3) B.3 B.7 (1) B.5 800(1) 803(1)a 804(1)a 804(1)b 804(4) 807(7) 900(1)c2 900(1)c3 900(1)c4 900(1)c5 900(1)c6 902(1)a 903(2) 1046 (2) A1 1046 (2) A2 1004(2) 1007(1)a 1008(2) 1010(2)b Spl-1 1003(1)a1 1003(1)e2 1018(5) 1018(2) 1053(1)a 1027 (1) 1051(6) Spl-2 1032(1)a 1032 (1) С 1032 (2) 1016(1)b 1013(2)a2 & 1013(2)b1 1014)1)b2 1047(2)a 1047 (2) B 1047(10) 1001(10) & 1002(24) 1002(4) 1001(6) 1001(11) 1100 (10) 1101(33) 1102 (1) 1103(1) 807(2) Construction Of Field Office For The Engineer Permits And Clearances Occupational Safety And Health Program Project Billboard/ Sign Board Clearing And Grubbing Structure Excavation (common Soil) Embankment From Structure Excavation Embankment From Borrow Gravel Fill Garden Soil Structural Concrete (footing And Slab On Fill), Class A, 28 Days Structural Concrete (footing Tie Beam), Class A, 28 Days Structural Concrete (column), Class A, 28 Days Structural Concrete (suspended Slab), Class A, 28 Days Structural Concrete (beams/girders), Class A, 28 Days Reinforcing Steel (deformed), Grade 40 Formworks And Falseworks 100mm Chb Non-load Bearing (including Reinforcing Steel) 150mm Chb Non-load Bearing (including Reinforcing Steel) Finishing Hardwares Aluminum Framed Glass Door (sliding Type) Aluminum Glass Windows Wooden Panel Door Fabricated Stainless Steel Signages 4.5mm Fiber Cement Board Ceiling On Metal Frame Ceiling Prepainted Metal Panel Ceiling On Metal Frame Glazed Tiles Unglazed Tiles Carpet Floor Tiles Cement Plaster Finish Railings Interior Design Painting Works, Masonry, Concrete & Ceiling Painting Works, Steel Varnishing Works Waterproofing Fabricated Metal Roofing Accessory Prepainted Metal Sheets, Long Span, Above 0.427mm, Rib Type Structural Steel, Trusses Structural Steel Purlins Metal Structure Accessories Pipes With Fittings Connection & Cold Water Lines Plumbing Fixtures Catch Basin Septic Vault (concrete/chb) Conduit, Boxes, And Fittings (conduit Works/conduit Rough-in) Wires And Wiring Devices Panelboard With Main & Branch Breakers Lighting Fixtures And Lamps Softscape 1.00 L.s 1.00 L.s 5.70 Mo. 1.00 Ea 399.52 M2 732.83 M3 661.40 M3 459.34 M3 32.04 M3 27.83 M3 130.09 M3 20.77 M3 47.64 M3 55.52 M3 84.84 M3 50,155.35 Kg 1,897.63 M2 827.29 M2 502.85 M2 1.00 L.s 6.30 M2 1.00 L.s 56.88 M2 1.00 L.s 492.82 M2 176.16 M2 388.50 M2 241.13 M2 90.56 M2 2,255.99 M2 1.00 L.s 1.00 L.s 2,748.81 M2 836.07 M2 113.76 M2 26.50 M2 126.63 M 320.52 M2 5,299.86 Kg 1,588.26 Kg 1.00 L.s 1.00 L.s 1.00 L.s 1.00 L.s 1.00 L.s 1.00 L.s 1.00 L.s 1.00 L.s 1.00 L.s 1.00 L.s 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bids And Awards Committee Of The Pgom And Inspect The Bidding Documents At The Address Given Below From 8:00 A.m. To 5:00 P.m. Of Mondays To Fridays. The Pgom Will Hold A Pre-procurement Conference On January 10, 2025 At 9:00 A.m. At Bac Conference Room, Provincial Capitol Complex, Camilmil, Calapan City, Oriental Mindoro Which Shall Be Open To Prospective Bidders. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 20, 2025 To February 03, 2025 From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty Five Thousand Pesos (php 25,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 6. The Pgom Will Hold A Pre-bid Conference On January 20, 2025 At 9:00 A.m. At Bac Conference Room, Provincial Capitol Complex, Camilmil, Calapan City, Oriental Mindoro Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 03, 2025 At 8:30 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 03, 2025 At 9:00 A.m. At Bac Conference Room, Provincial Capitol Complex, Camilmil, Calapan City, Oriental Mindoro. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Activity. 10. The Pgom Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Engr. Jollie Ver E. Lasic Head, Bac Secretariat Pgo – Procurement Division Provincial Capitol Complex Camimil, Calapan City, Oriental Mindoro (january 20, 2025) Atty. Earl Ligorio R. Turano Ii Bac Chairperson
Closing Date3 Feb 2025
Tender AmountPHP 19.9 Million (USD 341.9 K)

PROVINCE OF ZAMBOANGA DEL NORTE Tender

Civil And Construction...+1Building Construction
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Province Of Zamboanga Del Norte Bids And Awards Committee Provincial Capitol, Estaka, Dipolog City Email Add: Bidsandawards22@gmail.com December 04, 2024 Invitation To Bid The Provincial Government Of Zamboanga Del Norte Through The Bids And Awards Committee (bac) Is Inviting Interested Parties/ Bidders To Bid For The Following Contract: Contract Id: Pr#300/200 - 24-12-485(o) Contract Name: Construction Of Nala Elementary School Outdoor Stage And Dressing Room (phase 1), Municipality Of Sibuco, Zamboanga Del Norte Location/purpose: For The Use In The Construction Of Nala Elementary School Outdoor Stage And Dressing Room (phase 1), Municipality Of Sibuco, Zamboanga Del Norte Approved Budget For The Contract (abc): P1,499,999.73 (inclusive Of All Applicable Taxes)  Bidders/ Contractors Must Have An Expertise In Undertaking A Similar Project, Completed At Least Two Similar Contracts Which The Equivalent Amount Is At Least 50% Of The Proposed Project For Bidding Within The Last Three Years.  Bidders Are Inform That The Delivery Term Is 75 Calendar Days Upon Receipt Of Notice To Proceed.  Bidders/ Contractors Shall Submit Their One (1) Copy Sealed Envelope Containing Their Technical And Financial Documents  Documents Submitted Must Be In Accordance With The Checklist Provided And Must Have A Corresponding Label Or Name Plates.  The Eligibility Check/ Screening As Well As The Preliminary Examination Of Bids Shall Use The Non- Discretionary "pass/ Fail" Criteria.  Post Qualification Of The Lowest/ Single Bids Shall Be Conducted.  All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Evaluation Of Bids, Post Qualification And Award Of The Contract Shall Be Governed By The Pertinent Provision Of Ra 9184 And Its Implementing Rules And Regulations (irr).  All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms In The Amount Stated In Itb Clause 14.  Bidding Is Restricted To Filipino Citizens/ Sole Proprietorships, Partnerships Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. The Schedules Of Activities Are Listed As Follows: Bac Activities Schedule Advertisement / Posting December 05 - 11, 2024 Pre-bid Conference December 12, 2024 @09:00am Availability And Issuance Of Bidding Documents December 05 - 27, 2024 @ 08:30am Deadline For The Submission Of Bids December 27, 2024 @ 08:30am Bid Opening And Evaluation December 27, 2024 @ 09:00am  Payment For Bidding Documents Is A Non- Refundable Amount Of Five Thousand Pesos Only (php5,000.00) Payable To The Office Of The Provincial Treasurer, Provincial Capitol Building, Dipolog City.  Prospective Bidders May Obtain Further Information From The Office Of The Bids And Awards Committee, Provincial Capitol Building During Office Hours @ 8:00am - 5:00pm.  Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Address Stated Above.  The Provincial Government Of Zamboanga Del Norte Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders.  Bidding Documents Will Be Electronically Uploaded To The Philgeps Website Of The Provincial Office Of Zamboanga Del Norte At Bidsandawards22@gmail.com. Atty. Rafael R. Osabel, Jr. Bac Chairman Annex: Construction Of Nala Elementary School Outdoor Stage And Dressing Room (phase 1), Municipality Of Sibuco, Zamboanga Del Norte Pr#300/200-24-12-485(o) Abc: P1,499,999.73 Item Activity Description Unit Qty Part A Other General Requirements A.1.4(1) Provision Of Progress Photograps Ea 63.00 A.1.1(3) Provision Of Field Office For The Engineers L.s 1.00 Part B General Requirements B.3 Permits And Clearances L.s 1.00 B.5 Project Billboard/signboard Ea 1.00 B7(2) Occupational Safety And Health Program L.s 1.00 B.9 Mobilization/demobilization L.s 1.00 Part C Civil, Structural, Architectural & Metal Works 803(1)a Structure Excavation (common Soil) M3 41.54 804(4) Gravel Bedding M3 11.43 804(1)b Embankment From Common Borrow M3 45.00 900(1)c2 Structural Concrete For Footing And Slab On Fill (class A, 28 Days) M3 12.45 900(1) Structural Concrete For Footing Tie Beam, Column, Suspended Slab, Girder/beam (class A, 28 Days) M3 9.57 902(1) Reinforcing Steel Of Reinforced Concrete Structures For One-storey, Grade 40/grade 60 Kg 1,644.96 903(2) Formworks And Falseworks (for One-storey Building) Sq.m 69.06 Part D Architectural / Finishing Works 1008 Aluminum Glass Window (sliding/casement/awning/fixed Type) M2 9.96 1010(1) Frames (jambs, Still, Head, Transoms And Mullions) Set 6.00 1010(2)b Wooden Panel Door M2 3.78 1043(1) Pvc Doors And Frames M2 2.52 1004(2) Finishing Hardware Set 4.00 1013(2) Fabricated Metal Roofing Accessory (ridge/hip Rolls/flashing/counter Flashing/valley Roll) M 7.40 1014 Prepainted Metal Sheets (rib Type, Long Span, Below .427 Thk/above .427 Thk) M2 136.90 1027(1) Cement Plaster M2 293.03 1046 100mm Chb Non-load Bearing/load Bearing (including Reinforcing Steel) M2 189.36 1047(2)b Structural Steel Roof Truss Kg 2,021.12 1047(2)c Structural Steel Purlins Kg 360.75 1047(3)b Metal Structure Accessories (sagrods) Pc 33.00 1047(3)c Metal Structure Accessories (turnbuckles) Pc 4.00 Part E Electrical Works 1100 Junction/utility/pull/square Box L.s 1.00 1100(30) Conduit Works, Boxes And Fittings L.s 1.00 1100(6)a 15mmø – 32mmø Polyvinyl Chloride (pvc) Pipes Length 32.00 1100(6)b 15mmø – 32mmø Polyvinyl Chloride (pvc) Pipes Length 5.00 1101 Switches Set 3.00 1101 Switches Set 3.00 1101 Duplex Convenience Outlet Set 10.00 1101(2) 1.60mm2 – 5.5mm2 Electric Wire (tw/thhn/twhn2) M 140.00 1101(2) 8.00mm2 – 22mm2 Electric Wire (tw/thhn/twhn2) M 30.00 1102 Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50amp – 200amp Set 1.00 1103(5) Downlight/pinlight Fixture With One-compact Fluorescent Lamp(cfl) Or Led Bulb, 1 Bulb Set 20.00 Part F Plumbing Works 1001(8) Sewer Line Works L.s 1.00 1002(4)a 65mmø-100mmø Polyvinyl Chloride (pvc) Pipe, Blue Pc 12.00 1001(1)a 50mmø-100mmø Pvc Pipe, Series 600/series 1000 M 9.00 1002(5) Water Closet/urinal With Complete Accessories Set 1.00 1002(5) Wall Hung Lavatory With Complete Accessories Set 1.00 1002(5) Faucet Pc 1.00 1002(5)h Floor Drain Plates Set 1.00 ***nothing Follows***
Closing Date13 Jan 2025
Tender AmountPHP 1.4 Million (USD 25.6 K)

City Of Bayawan Tender

Others
Philippines
Details: Description "republic Of The Philippines Province Of Negros Oriental City Of Bayawan" Bids And Awards Committee "(035) 531-0020 Local 202 (035) 430-0439 (telefax) Email: Bac.bayawan@gmail.com Http://www.bayawancity.gov.ph" Request For Quotation Rfq No. Svp 25-c-010 Date January 22, 2025 Pr Reference 100-25-01-022 Philgeps Reference No. 11677848 End-user Cswdo Closing Date January 31, 2025 January 28, 2025 Bid Opening February 4, 2025 "designated Places Of Submission (bid Box Designated Locations)" 1. Bac Office, Cabcabon, Bayawan City 2. Sidlakan Extension Office (dgte. City) Note: Please Attach The Following Documentary Requirements Together With This Rfq: 1. Mayor's / Business Permit 2. Philgeps Registration No: A. Philgeps Red Membership (for Svp, Shopping, Highly Technical Consultants ) B. Certificate Of Philgeps Registration (platinum Membership) (np- Two Failed Bidding) 3. Omnibus Sworn Statement Name Of Business: Address: Name Of Store: Business Permit No.: Tax Identification No.: Philgeps Reg. No.: " The Local Government Unit Of Bayawan City, Through Its Bids And Awards Committee, Intends To Procure Goods/services As Enumerated In The Proposal Form. Please Submit Your Quotations/proposals Duly Signed By You Or Your Duly Authorized Representative Not Later Than The Closing Date For The Item(s) Described, Subject To The Terms And Conditions Provided At The Back Portion Of This Request For Quotation (rfq). A Copy Of Your Current Business Permit And Philgeps Certificate Or Registration Is Also Required To Be Submitted Along Withyour Quotation/proposal. Quotations May Be Submitted Manually, Or Through Facsimile Or Email At The Address And Contact Numbers Indicated Below. For Any Clarification, Please Contact The Bac Secretariat At Telephone Number (035) 430-0281 Local 1210/1212 Or Email Address At Bac.bayawan@gmail.com." Virginia D. Sadiasa Bac Chairperson Acknowledgement Receipt I/we Hereby Acknowledge Receipt Of This Request For Quotation (rfq), And Hereby Agree To The Terms And Conditions Set Therein. We Assume Responsibility To Deliver/submit Our Proposal On Or Before The Closing Date And Time At The Designated Bid Boxes; Otherwise, Lgu Bayawan City Can Consider Us Not Interested To Quote. (signature Over Printed Name / Date) "republic Of The Philippines Province Of Negros Oriental City Of Bayawan" Bids And Awards Committee "(035) 531-0020 Local 202 (035) 430-0439 (telefax) Email: Bac.bayawan@gmail.com Http://www.bayawancity.gov.ph" Terms And Conditions 1 Bidders Shall Provide Correct And Accurate Information Required In This Form. Errors In Price Quotation Shall Be Exclusively The Supplier’s Responsibility. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initiated By You Or Any Of Your Duly Authorized Representative/s. 2 Price Quotation/s, To Be Denominated In Philippine Peso Shall Include All Taxes, Duties, And/or Levies Payable. All Prices Offered Must Be Valid For A Period Of Thirty (30) Calendar Days From The Date Of Submission. 3 Quotations Exceeding The Approved Budget For The Contract (abc) Shall Be Rejected. 4 Indicate In The Proposal The Brand, Model And Technical Specifications Of The Items Quoted; Otherwise, The Bid Will Be Rejected. Specifying The Country Of Origin, The Terms “generic”, “original”, And The Like Are Not Considered Brand Names. Indicate No Brand If The Item Quoted Is Generally Unbranded. 5 Alternative Bids Shall Be Rejected Outright. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 6 Award Will Be Made To The Lowest Calculated And Responsive Bid (lcrb) – The Bid Determined, After Post-qualification, As Complying To The Eligibility And Bid Requirements. 7 Basis Of Evaluation For This Rfq: Per Lot Per Item 8 Breaking Of Ties. A Non-discretionary Method Of Breaking Ties Will Be Used, I.e. Tossing Of Coin (for Two Bidders) Or Draw Lots (for Three Or More Bidders). 9 The City Of Bayawan Reserves The Right Not To Award Any Contract To A Bidder Having A Pending And Overdue Delivery Obligation To The City And Defaulted The Prescribed Delivery Period In Previous Award/s From The City Of Bayawan. 10 The Prescribed Delivery Period Is Within Thirty (30) Calendar Days, Unless Explicitly Indicated In The Proposal. Extension Of Delivery Period, If Granted, Shall In No Case Exceed The Original Delivery Term. Unless Otherwise Stated, The Default Place Of Delivery Is F.o.b. Bayawan City Warehouse, Cabcabon, Bayawan City. 11 Supplier/s Must Deliver The Items Awarded Within The Period Specified In The Purchase Order. Purchase Order Issued Shall Automatically Be Cancelled If No Delivery Is Made After Thirty (30) Calendar Days After Receipt Thereof, Without Prejudice To Legal Courses Of Action (e.g. Imposition Of Liquidated Damages, Suspension And Blacklisting) Provided In Republic Act 9184 And Its Irr. The Rescinded Contract May Be Re-awarded To The Next Lowest Calculated And Responsive Bidder. 12 Warranty. To Assure That Manufacturing Defects Are Corrected By Supplier, A Warranty Security Shall Be Required For A Minimum Of Three (3) Months For Expendable Supplies, And One (1) Year In The Case Of Non-expendable Supplies. The Obligation Shall Be Covered By Retention Money(1%) Of The Contract Price And Shall Be Released Only After The Lapse Of The Warranty Period Or In The Case Of Expendable Supplies, After Consumption Thereof: Provided, However, That The Supplies Delivered Are Free From Patent And Latent Defects And All The Conditions Imposed Under The Contract Have Been Fully Met. Rfq Proposal Form Rfq Reference: Svp 25-c-010 Total Abc: Php 225,200.00 After Having Carefully Read And Accepted The Terms And Conditions, I/ We Submit Our Quotation For The Item(s) As Follows: Item No. Description Qty Unit Of Issue Approved Budget For The Contract ( Unit Cost Per Line Item ) Offer Compliance With Technical Specifications (please Check) Remarks (indicate The Price, Brand/model And Specifications. Attach Brochure If Available.) Yes No Unit Cost Total Cost Brand/model And Technical Specifications Purpose : Delivery Of Agricultural Supplies Needed For Cicl Center Operation. Lot. I Farm/garden Tools And Accessories 1 "forged Bolo, Steel With Wooden Handle High Quality" 2 Piece 500.00 [ ] [ ] 2 Mulching Film, 1.2 Meters X 400 Meters 1 Roll 4,000.00 [ ] [ ] 3 Anti-uv Sunshade Net, 3m-6m 1 Set 2,500.00 [ ] [ ] 4 Anti-uv Sunshade Net, 3m-8m 1 Set 2,500.00 [ ] [ ] 5 Anti-uv Sunshade Net, 4m-10m 1 Set 2,500.00 [ ] [ ] 6 Garden Hose Connector, 1/4" 1 Piece 300.00 [ ] [ ] 7 Garden Hose Connector, 1/2" 1 Piece 300.00 [ ] [ ] 8 Garden Hose Connector, "3/4 1 Piece 300.00 [ ] [ ] 9 Garden Hose Connector, 1" 1 Piece 300.00 [ ] [ ] 10 Garden Hose Reel, 45m By 1/2", Heavy Duty 1 Piece 1,200.00 [ ] [ ] 11 Chicken Net, Thick, 18strands Size, 100 Meters Length, 5-7 Feet, Wide 1.5 Inches 181 Meter 300.00 [ ] [ ] Lot. Ii Feeds 12 Pre-starter Pellets, 25kg/bag 8 Bag 1,900.00 [ ] [ ] For Pig 13 Hog Starter Pellets, 50kg/bag 12 Bag 2,100.00 [ ] [ ] For Pig 14 Hog Grower Pellets, 50kg/bag 23 Bag 2,050.00 [ ] [ ] For Pig 15 Chicken Starter, Crumble, 50kg/bag 30 Bag 2,080.00 [ ] [ ] Lot. Iii Other Supplies 16 Nylon, #100 5 Kilo 490.00 [ ] [ ] 17 Nylon, #210 4 Kilo 450.00 [ ] [ ] 18 Nylon, #260 4 Kilo 450.00 [ ] [ ] ***nothing Follows*** ( Supplier Must Provide Complete Data For The Information Required Below ) Delivery Period Warranty Place Of Delivery Signature Over Printed Name Designation Name Of Business Address Telephone/mobile/fax No Email Address
Closing Date31 Jan 2025
Tender AmountPHP 225.2 K (USD 3.8 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: This Is A Sources Sought Notice Only. this Is Not A Solicitation For Bids, Proposals, Proposal Abstracts, Or Quotations. The Purpose Of This Sources Sought Notice Is To Obtain Information Regarding The Availability And Capability Of Qualified Sources To Perform The Potential Requirement. This Sources Sought Notice Is Part Of Market Research Effort And Invites Contractors Capable Of Fulfilling The Requirement In Accordance With The Statement Of Work And Salient Characteristics.â  The Responses Received From Interested Contractors Will Assist The Government In Determining The Appropriate Acquisition Method. the Department Of Veterans Affairs (va), Network Contracting Office (nco) 23, Is Conducting Market Research To Identify Potential Sources Which Can Provide The Following:â  statement Of Work mold Remediation Services introduction/background air Quality Testing In A Va Building, Revealed Levels Of Airborne Microbial Particles That Exceed An Acceptable Level For A Healthcare Facility. Due To This Hazard, The Building Has Been Vacated Of All Patients And Staff And Will Remain So Until It Is Safe To Occupy. project Objective remediation Services To Remove Or Clean All Surfaces And Materials Located Inside Building. Building To Be Placed Under Negative Pressure, With Additional Units To Be Used As Air Filtrations. Hvac System To Be Isolated, All Diffusers Removed, Cleaned, Then Set Aside, All Flex Ducting To Be Removed (to Later Be Replaced), And All Duct Openings To Be Sealed. All Carpet In The Building To Be Removed. All Ceiling Tiles In The Building To Be Removed. All Drywall (including Above The Drop Ceiling) That Has Microbial Growth Or Moisture Damage To Be Removed. All Pipe And Ductwork Insulation Showing Evidence Of Growth Or Moisture Damage To Be Removed. All Building Semi And Non-porous Surfaces - Such As But Not Limited To Cabinetry, Countertops, Metal, Glass, Rubber Baseboards, Lighting And Plumbing Fixtures - Needs To Be Thoroughly Disinfected Via Appropriate Cleaning Methods. specifications mold Remediation Technical Specifications part 1 General scope this Specification Covers The Remediation Of Mold Including Removal, Cleanup And Disposal Of Mold Contaminated Materials From A Va Building. The Methods And Procedures In This Specification Are Based On The Observations And Previously Collected Background Air Samples. an Estimate Of The Amount Of Material To Be Removed Or Cleaned Is Not Given. The Determination Of The Actual Amounts, For Bidding Purposes, Is The Responsibility Of The Contractor. By Submitting A Bid, The Contractor Acknowledges That He Has Investigated And Satisfied Himself As To: the Conditions Affecting The Work, Including, But Not Limited To, Physical Conditions Of The Site Which May Affect Site Access, Handling And Storage Of Tools And Materials, Access To Water, Electricity Or Other Utilities, Or Otherwise Affect Performance Of Required Activities. the Character And Quantity Of All Surface And Subsurface Materials Or Obstacles To Be Encountered As Far As This Information Is Reasonably Ascertainable From An Inspection Of The Site, Including Exploratory Work Done By The Building Owner Or A Designated Consultant, As Well As Information Presented In Drawings And Specifications Included With This Contract. Any Failure By The Contractor To Acquaint Himself With Available Information Will Not Relieve Him From The Responsibility For Estimating Properly The Difficulty Or Cost Of Successfully Performing The Work. The Building Owner Is Not Responsible For Any Conclusions Or Interpretations Made By The Contractor On The Basis Of The Information Made Available By The Building Owner. description the Work Specified Herein Shall Be The Remediation Of Mold By Competent Persons trained, Knowledgeable And Qualified In The Techniques Of Remediation, Handling And Disposal Of Mold Contaminated Materials And The Subsequent Cleaning Of Contaminated Areas, Who Comply With All Applicable Federal, State And Local Regulations And Are Capable Of, And Willing To Perform, The Work Of This Contract. the Contractor Shall Supply All Labor, Materials, Services, Insurance, Permits, licenses, Patents, And Equipment Necessary To Carry Out The Work In Accordance With All Applicable Federal, State And Local Regulations And These Specifications. the Contractor Is Responsible For Restoring The Work Area And Auxiliary Areas Utilized During The Remediation To Conditions At Least Equal To Original Conditions. (this Excludes Any Material Removed As Part Of Scope.) Any Damages Caused During The Performance Of Remediation Activities Shall Be Repaired By The Contractor (e.g., Paint Peeled Off By Barrier Tape, Nail Holes, Water Damage, Broken Glass) At No Additional Expense To The Owner. applicable Standards And Guidelines all Work Under This Contract Shall Be Done In Strict Accordance With All Applicable Federal, State, And Local Regulations, Standards, And Codes Governing Mold Remediation And Any Other Trade Work Done In Conjunction With The Remediation. the Most Recent Edition Of Any Relevant Regulation, Standard, Document Or Code Shall Be In Effect. Where Conflict Among The Requirements Or With These Specifications Exists, The Most Stringent Requirements Shall Be Utilized. specific Requirements: title 29, Code Of Federal Regulations, 1926. Occupational Safety And Health Administration (osha), U.s. Department Of Labor. quality Assurance bidders Must Be Licensed As Required By The Iowa Bureau Of Labor. bidders Shall Demonstrate Prior Experience On Mold Remediation Projects Of Similar Nature And Scope Through The Submission Of Letters Of Reference From The Owners Including The Name, Address, And Telephone Numbers Of Contact Person (someone Specifically Familiar With The Contractor's Work) For At Least Three (3) Previous Users Of Service If Requested By The Owners. the Owner Reserves The Right To Reject Bids For Any Reason That Serves The Best Interests Of The Owner Or Building Occupants. The Owner Also Reserves The Right To Waive Any Technicality Or Irregularity In A Bid. Failure To Submit Requested information/documentation Can Result In Automatic Disqualification Of Bid Package. submittals And Notices pre-remediation: submit The Location Of The Landfill To Be Used For Disposal Of The Mold Contaminated Material. submit A List Of All Personnel Who Will Be Involved In The Remediation Activity Including, Supervisors, Workers, And Any Other Personnel Or Agent Who May Be Responsible For Any Aspect Of The Remediation Activities. submit Documentation From A Physician That All Employees Or Agents Have Been Medically Monitored To Determine Whether They Are Physically Capable Of Working While Wearing The Respirator Required Without Suffering Adverse Health Effects. submit Documentation Of Respirator Fit Testing For All Employees And Agents Who Must Enter The Work Area. Document Niosh Approval Of All Respiratory Protective Devices Utilized On-site. submit A List Of Equipment For This Project. with The Owner Or Owner's Representative, Inspect The Premises Wherein All Remediation And Remediation Related Activities Will Occur And Submit A Statement Signed By Both, Agreeing On Building And Fixture Condition Prior To The Commencement Of The Work. submit Manufacturer's Certification That Hepa Vacuums, Negative Pressure Ventilation Units, And Other Local Exhaust Ventilation Equipment Conform To Ansi 29.2-79. when Rental Equipment Is To Be Used In Remediation Areas Or To Transport Mold Contaminated Waste, A Written Notification Concerning Intended Use Of The Rental Equipment Must Be Provided To The Rental Agency With A Copy Submitted To The Owner. during Remediation Activities: submit Weekly Job Progress Reports Detailing Remediation Activities And Progress. submit Copies Of All Transport Manifests, Trip Tickets And Disposal Receipts For All Mold Waste Materials Removed From The Work Area During The Remediation Process. post In The Clean Room Area Of The Worker Decontamination Enclosure: a List Containing The Names, Addresses, And Telephone Numbers Of The Contractor, The Owner, The Assessment Professional, The Testing Laboratory And Any Other Personnel Who May Be Required To Assist During Remediation Activities. a Logbook To Record Names Of All Personnel Who Enter The Work Area. a Copy Of Emergency Procedures. telephone Numbers Of All Emergency Personnel And Principals For This Remediation Project. the Project Will Not Be Considered Completed Until All Submittals Are Received By The Owner. This Will Affect Payment For The Project. site Security the Work Area Is To Be Restricted Only To Authorized, Trained, And Protected Personnel. These May Include The Contractor's Employees, Employees Of subcontractors, Owner Employees And Representatives, State And Local Inspectors And Any Other Designated Individuals. entry Into The Work Area By Unauthorized Individuals Shall Be Reported Immediately To The Owner By The Contractor. access To The Work Area Shall Be Through A Single Worker Decontamination System. All Other Means Of Access (doors, Windows, Hallways, Etc.) Shall Be Blocked Or Locked So As To Prevent Entry To Or Exit From The Work Area. The Only Exceptions For This Rule Are The Waste Pass Out Airlock Which Shall Be Sealed Except During The Removal Of Containerized Mold Waste From The Work Area, And Emergency Exits In Case Of Fire Or Accident. Emergency Exits Shall Not Be Locked From The Inside; However, They Shall Be Sealed With Polyethylene Sheeting And Tape Until Needed. the Contractor Shall Have Control Of Site Security During Remediation Operations Whenever Possible, In Order To Protect Work Efforts And Equipment. contractor Will Have Owner's Assistance In Notifying Building Occupants Of Impending Activity And Enforcement Of Restricted Access By Owner's Employees. emergency Planning emergency Planning Shall Be Developed Prior To Remediation Initiation And Agreed To By Contractor And Owner. emergency Planning Shall Include Considerations Of Fire, Explosion, Toxic Atmospheres, Electrical Hazards, Slips, Trips And Falls, Confined Spaces, And Heat Related Injury. Written Procedures Shall Be Developed And Employee Training In Procedures Shall Be Provided. employees Shall Be Trained In Evacuation Procedures In The Event Of Work Place Emergencies. part 2 Materials And Equipment materials general: deliver All Materials In The Original Packages, Containers, Or Bundles Bearing The Name Of The Manufacturer And The Brand Name. store All Materials Subject To Damage Off The Ground, Away From Wet Or Damp surfaces, And Under Cover Sufficient Enough To Prevent Damage Or Contamination. polyethylene Sheeting For Walls And Stationary Objects Shall Be A Minimum Of 4 Mil Thick. For Floors And All Other Sheeting Of At Least 6 Mil Thickness Shall Be Used In Widths Selected To Minimize The Frequency Of Joints. tape - Duct, Glass Fiber, Or Other Type Capable Of Sealing Adjacent Sheets Of Polyethylene And Capable Of Sealing Polyethylene To Dissimilar Finished Or Unfinished Surfaces Under Both Wet And Dry Conditions Including The Use Of Amended Water. polyethylene Sheeting Utilized For Worker Decontamination Enclosure Shall Be Opaque White Or Black In Color. disposal Bags Shall Be Of 6 Mil Polyethylene. disposal Drums Shall Be Metal Or Fiberboard With Locking Ring Tops. equipment general: a Sufficient Quantity Of Negative Pressure Ventilation Units Equipped With Hepa Filtration Shall Be Utilized To Provide One Workplace Air Change Every 15 Minutes Or A Static Pressure Within The Work Area Of At Least -0.02 Inches Of Water Column. These Ventilation Units Must Be Commercially Produced Units And Not Self-manufactured. Ventilation Units To Be Exhausted Outside.the Contractor Shall Furnish A Copy Of Their Calculations To Obtain This Air Flow Or Static Pressure If Requested By The Owner. air Purifying Respirators Equipped With Hepa Filters Will Be Required. A Sufficient Supply Of Filters Shall Be Available In The Clean Change Area. This Requirement May be Modified By The Assessment Professional If Air Sampling Results Indicate The Need For More Protection. air Purifying Respirators With Dual High Efficiency (hepa) Filters May Be Utilized During Work Area Preparation Activities. Spectacle Kits And Eyeglasses Must Be Provided For Employees Who Wear Glasses And Who Must Wear Full Face Piece Respirators. Respirators Shall Be Provided That Have Been Tested And Approved By The National institute Of Occupational Safety And Health For Use In Mold Contaminated Atmospheres. full Body Disposable Protective Clothing, Including Head, Body And Foot Coverings (unless Using Footwear As Described In Section 2.02 (a)(6) Consisting Of Material Impenetrable By Mold (tyvek Or Equivalent) Shall Be Provided To All Workers In Sizes Adequate To Accommodate Movement Without Tearing. additional Safety Equipment (e.g., Hard Hats, Eye Protection, Safety Shoes Meeting The Applicable Ansi Standard, Disposable Pvc Gloves) As Necessary, Shall Be Provided To All Workers And Authorized Visitors. nonskid Footwear Shall Be Provided To All Remediation Workers. Disposable Clothing Shall Be Adequately Sealed To The Footwear To Prevent Body Contamination. a Sufficient Supply Of Disposable Mops, Rags And Sponges For Work Area Decontamination Shall Be Available. mobile Radios, Telephones, Etc. As Required By The Project Will Be Provided By The Contractor. removal/cleaning Equipment: sufficient Supply Of Scaffolds, Ladders, Lifts And Hand Tools Shall Be Provided As Needed. sprayers With Pumps Capable Of Providing A Water Stream Or Mist For Dust Control. rubber Dustpans And Rubber Squeegees Shall Be Provided For Cleanup. brushes Utilized For Removing Loose Mold Containing Material Shall Have Nylon Or Fiber Bristles, Not Metal. a Sufficient Supply Of Hepa Filtered Vacuum Systems Shall Be Available During Cleanup. part 3 Execution preparation post Caution Signs At Any Location And Approaches To A Location Where Airborne Concentrations Of Mold May Exceed Ambient Background Levels. Additional Signs May Need To Be Posted Following Construction Of Workplace Enclosure Barriers. shut Down And Lock Out Electric Power To All Work Areas As Necessary If Wet Conditions Warrant. Provide Temporary Power And Lighting. Ensure Safe Installation (including Ground Faulting) Of Temporary Power Sources And Equipment By Compliance With All Applicable Electrical Code Requirements And Osha Requirements For Temporary Electrical Systems. shut Down And Lock Out All Heating, Cooling And Air Conditioning System (hvac) Components That Are In, Supply Or Pass Through The Work Area. Seal All Intake And Exhaust Vents In The Work Area With Tape And 6 Mil Polyethylene. Also Seal Any Seams In System Components That Pass Through The Work Area. Remove All Hvac System Filters And Place In Labeled 6 Mil Polyethylene Bags For Staging And Eventual Disposal As Mold Contaminated Waste. due To Hvac Being Offline During Winter Conditions, Contractor To Provide Temporary Heat To Maintain Indoor Temperature Of 60 Degrees Fahrenheit Throughout Building. the Contractor Shall Provide Sanitary Facilities For Remediation Personnel Outside Of The Enclosed Work Area And Maintain Them In A Clean And Sanitary Condition Throughout The Project. seal Off All Windows, Doorways, Elevator Openings, Corridor Entrances, Drains, Ducts, Grills, Grates, Diffusers, Skylights, And Any Other Openings Between The Work Area And Uncontaminated Areas Outside Of The Work Area With 4 Mil Polyethylene Sheeting And Tape. barrier Walls Will Be Constructed Of 4 Mil Polyethylene Sheeting Extending From The Ceiling To Floor. workplace Exits worker Decontamination Enclosure System: worker Decontamination Enclosure Systems Shall Be Provided At All Locations Where Workers Will Enter Or Exit The Work Area. worker Decontamination Enclosure Systems Constructed At The Work Site Shall Utilize 6 Mil Opaque White Or Black Polyethylene Sheeting Or Other Acceptable Materials For Privacy. Detailed Descriptions Of Portable, Prefabricated Units, If Used, Must Be submitted For The Owner's Approval. Plans Must Include Floor Plan With Dimensions, Materials, Size, Thickness, Plumbing, And Electrical Utilities. the Worker Decontamination Enclosure System Shall Consist Of At Least A Clean Room And An Airlock. entry And Exit From The Decontamination Enclosure System Chamber Shall Be Through Curtained Doorways Consisting Of Two Sheets Of Overlapping Polyethylene Sheeting. One Sheet Shall Be Secured At The Top And Left Side, The Other Sheet At The Top And Right Side. Both Sheets Shall Have Weights Attached To The Bottom To Ensure That They Hang Straight And Maintain A Seal Over The Doorway When Not In Use. the Clean Room Shall Be Sized To Adequately Accommodate The Work Crew. Benches Shall Be Provided As Well As Hooks For Hanging Up Street Clothes. Shelves For Storing Respirators Shall Also Be Provided In This Area. Clean Work Clothes: Clean Disposable Clothing, Replacement Filters For Respirators, Towels, And Other Necessary Items Shall Be Provided In Adequate Supply In The Clean Room. A Location For Postings Shall Also Be Provided In This Area. Whenever Possible, A Lockable Door Shall Be Used To Permit Access Into The Clean Room From Outside The Work Area. Lighting, Heat, And Electricity Shall Be Provided As Necessary For Comfort. This Space Shall Not Be Used For Storage Of Tools, Equipment Or Materials, Or As An Office Space. waste Container Pass Out Airlock: the Waste Container Pass Out Airlock Shall Be The Same As The Exit Entry Airlock. emergency Exits: emergency Exits Shall Be Established And Clearly Marked With Duct Tape Arrows Or Other Effective Designations To Permit Easy Identification From Anywhere Within The Work Area. They Shall Be Secured To Prevent Access From Uncontaminated Areas And Still Permit Emergency Exiting. These Exits Shall Be Properly Sealed With Polyethylene Sheeting Which Can Be Cut To Permit Egress If Needed. These Exits May Be The Worker Decontamination Enclosure, The Waste Pass Out Airlock And/or Other Alternative Exits Satisfactory To Fire Officials. isolation Of The Workplace maintenance Of Enclosure Systems: following Completion Of The Construction Of All Polyethylene Barriers And Decontamination System Enclosures, Allow Overnight Settling To Ensure That Barriers Will Remain Intact And Secured To Walls And Fixtures Before Beginning Actual Remediation Activities. all Polyethylene Barriers Inside The Workplace, In The Worker Decontamination Enclosure System, In The Waste Container Pass Out Airlock And At Partitions constructed To Isolate The Work Area From Occupied Areas Shall Be Inspected At Least Twice Daily, Once Prior To The Start Of Each Day's Remediation Activities. Document Inspections And Observations In The Daily Project Log. damage And Defects In The Enclosure System Are To Be Repaired Immediately Upon Discovery. negative Pressure To Be Monitored With A Continuous Reading Device. A Record Of This Shall Be Furnished To The Owner. Use Smoke Tubes To Test The Effectiveness Of The Barrier System When Directed By The Owner. at Any Time During The Remediation Activities After Barriers Have Been Erected, If Visible Material Is Observed Outside Of The Work Area Or If Damage Occurs To Barriers, Work Shall Immediately Stop, Repairs Be Made To Barriers, And Debris/residue Cleaned Up Using Appropriate Hepa Vacuuming And Wet Mopping Procedures. install And Initiate Operation Of Negative Pressure Ventilation Equipment As Needed To Provide One Air Change In The Work Area Every 15 Minutes Or Produce A Static Pressure Of -0.02 Inches Of Water Column. (see Section 2.02 (a)) Openings Made In The Enclosure System To Accommodate These Units Shall Be Made Airtight With Tape And/or Caulking As Needed. If More Than One Unit Is Installed, They Should Be Turned On One At A Time, Checking The Integrity Of Wall Barriers For Secure Attachment And The Need For Additional Reinforcement. Ensure That Adequate Power Supply Is Available To Satisfy The Requirements Of The Ventilating Units. Negative Pressure Ventilation Units Shall Be Exhausted To The Outside Of The Building Whenever Feasible. Additional Negative Pressure Ventilation Units May Be Exhausted Inside The Work Area To Provide Continuous Air Cleaning. They Shall Not Be Exhausted Into Occupied Areas Of The building. Twelve-inch Extension Ducting Shall Be Used To Reach From The Work Area To The Outside When Required. Careful Installation, Air Monitoring And Daily Inspections Shall Be Done To Ensure That The Ducting Does Not Release Fibers Into Uncontaminated Building Areas. once Constructed And Reinforced As Necessary, With Negative Pressure Ventilation Units In Operation As Required, Test Enclosure For Leakage Utilizing Smoke Tubes. Repair Or Reconstruct As Needed. workplace Entry And Exit Procedures personnel Entry And Exit: all Workers And Authorized Personnel Shall Enter The Work Area Through The Worker Decontamination Enclosure System. Workers Shall Not Eat, Chew, Or Smoke Once They Have Entered The Work Area. Eating May Take Place Just Outside The Clean Room. Smoking, At Any Time During The Project, Is Prohibited On The Campus. all Personnel, Before Entering The Work Area, Shall Read And Be Familiar With All Posted Regulations, Personal Protection Requirements (including Workplace Entry And Exit Procedures) And Emergency Procedures. A Sign Off Sheet Shall Be Used To Acknowledge That These Procedures Have Been Reviewed And Understood By All Personnel Prior To Entry. all Personnel Shall Proceed First To The Clean Room And Appropriately Don Respiratory Protection And Launderable And/or Disposable Coveralls, Head Covering, And Foot Covering. Hard Hats, Eye Protection, And Gloves Shall Also Be Utilized If Required. Clean Respirators And Protective Clothing Shall Be Provided And Utilized By Each Person For Each Separate Entry Into The Work Area. personnel Wearing Designated Personal Protective Equipment Shall Proceed From The Clean Room Through The Airlock Into The Main Work Area. before Leaving The Work Area All Personnel Shall Remove Gross Contamination From The Outside Of Respirators And The Outer Protective Clothing By Brushing And/or Wet Wiping Procedures. Each Person Shall Clean Bottoms Of Protective Footwear Just Prior To Entering The Airlock. personnel Shall Proceed To The Airlock Where They Remove The Outer Protective equipment Except Respirators. Deposit Disposable And/or Launderable Clothing Back Into The Work Area Into Appropriately Labeled Containers For Disposal And/or laundering. reusable, Contaminated Footwear Shall Be Stored In The Airlock When Not In Use In The Work Area. Upon Completion Of Remediation, It Shall Be Disposed Of As Mold Contaminated Waste. Rubber Boots May Be Decontaminated At The Completion Of The Remediation Project For Reuse. still Wearing Respirators, Personnel Shall Proceed To The Clean Room, Clean The Outside Of The Respirators And The Exposed Face Area Under Running Water Prior To Removal Of Respirator. Various Types Of Respirators Will Require Slight Modification Of These Procedures. don Clean Disposable And/or Launderable Clothing If There Will Be Later Reentry Into The Work Area Or Street Clothes If It Is The End Of The Work Shift. these Procedures Shall Be Posted In The Clean Room And Equipment Room. waste Container Pass Out Procedures: mold Contaminated Waste That Has Been Containerized Shall Be Transported Out Of The Work Area Through The Waste Container Pass Out Airlock Or Through The Worker Decontamination Enclosure If A Separate Airlock Has Not Been Construction. waste Pass Out Procedures Shall Utilize Two Teams Of Workers, An "inside" Team And An "outside" Team. the Inside Team Wearing Appropriate Protective Clothing And Respirators For Inside The Work Area Shall Clean The Outside, Including Bottoms, Containers (bags, Drums, Or Wrapped Components) Using Hepa Vacuums And Wet Wiping Techniques And transport Them Into The Waste Container Pass Out Airlock. the Outside Team, Wearing Appropriately Assigned Respirators, Shall Enter The Airlock From The Outside Of The Work Area, Remove Them From The Airlock To The Outside. No Worker From The Outside Team Shall Further Enter The Work Area Through This Airlock. The Exit From This Airlock Shall Be Secured When Not In Use To Prevent Unauthorized Entry. personnel Protection Requirements training: prior To Commencement Of Remediation Activities, The Contractor Shall Have One Person Designated As A Competent Supervisor. This Person Shall Be On-site At All Times. special On-site Training On Equipment And Procedures Unique To This Job Site Shall Be Performed As Required. training In Emergency Response And Evaluation Procedures Shall Be Provided. respiratory Protection: all Respiratory Protection Shall Be Provided To Workers In Accordance With The Written Respiratory Protection Program, Which Includes All Items In osha 29 Cfr 1910.134 (b)(1-11). This Program Shall Be Posted In The Clean Room Of The Worker Decontamination Enclosure System. workers Shall Be Provided With Personally Issued, Individually Identified Respirators. respirator Types Shall Be Utilized According To The Following Schedule: full Face Air Purifying Respirators With Dual Hepa Filters Shall Be Utilized By Workers During Remediation Operations. full Face Powered Air Purifying Respirators Equipped With Hepa Filters May Be Used During Remediation Activities. fit Testing: workers Must Perform Positive And Negative Air Pressure Fit Tests Each Time A Respirator Is Put On, Wherever The Respirator Design So Permits. Powered Air Purifying Respirators Shall Be Tested For Adequate Flow As Specified By The manufacturer. workers Shall Be Given A Qualitative Fit Test In Accordance With Procedures Detailed In The Osha Lead Standard (29 Cfr 1910.1025, Appendix D, Qualitative Fit Test Protocols) For All Respirators To Be Used On This Remediation Project. An Appropriate administered Quantitative Fit Test May Be Substituted For The Qualitative Fit Test. documentation Of Adequate Respirator Fit Must Be Provided To The Owner. no One Wearing A Beard Shall Be Permitted To Don A Respirator And Enter The Work Area. protective Clothing: disposable Clothing Including Head, Foot, And Full Body Protection Shall Be Provided In Sufficient Quantities And Adequate Sizes For All Workers And Authorized Visitors. launderable Clothing, If Required, Shall Be Provided In Sufficient Quantities And Adequate Sizes For All Workers And Authorized Visitors. hard Hats, Protective Eyewear, Gloves, Rubber Boots, And/or Other Footwear Shall Be Provided As Required For Workers And Authorized Visitors. Safety Shoes May Be Required For Some Activities. commencement Of Work enclosure Systems Have Been Constructed And Tested. negative Pressure Ventilation Systems Are Functioning Adequately. all Pre-remediation Submissions, Notifications, Postings, And Permits Have Been Provided And Are Satisfactory To The Owner. all Equipment For Remediation, Cleanup, And Disposal Are On Hand. all Worker Training Is Completed. contractor Receives Written Permission From The Owner To Commence Remediation. removal/cleaning Procedures protection Of Materials Not Being Removed: materials That Are Not Being Removed Are To Be Protected From Any Damage That May Occur During Work. The Acoustic Ceiling Tile Suspension Grid Is To Be Cleaned Yet Remain In Place And Is Not To Be Damaged During The Removal Of The Tiles. level One: clean And Isolate Active Work Areas In Accordance With Section 3.01. wet All Mold Containing Materials With An Approved Biocide Solution Using Equipment Capable Of Providing A Fine Spray Mist, To Reduce Airborne Concentrations When The Material Is Disturbed. Keep All Removed Material Wet Enough To Prevent Release Until It Can Be Containerized For Disposal. removal And Cleaning: all Acoustic Ceiling Tiles, All Carpet Throughout The Entire Building Are To Be Removed And Properly Disposed Of. non-porous Materials - All Non-porous Surfaces Are To Be Cleaned Using A detergent Solution Or Solution Of Contractor's Choice That Will Re Move Mold. Hepa Vacuums May Be Used Along With The Solution For Cleaning. all Materials Need To Be Dried. Examples Of Non-porous Materials Include: metal glass hard Plastics plumbing Fixtures all Hvac Diffusers Are To Be Removed, Thoroughly Cleaned (as Detailed Above) And Set Aside Per Owner S Direction To Be Re-installed Later. semi-porous (e.g. Wood Doors, Unsealed Concrete) All Semi-porous Surfaces Are To Be Cleaned Using A Detergent Solution Or Solution Of Contractor's Choice That Will Remove Mold. This Solution Must Be Approved By Owner. Hepa Vacuums May Be Used Along With The Solution For Cleaning. All Materials Need To Be Dried. Examples Of Semi-porous Materials Include: wood concrete porous Materials - Remove All Porous Materials Where Visible Mold Growth Or Evidence Of Moisture Is Present. The Materials Should Be Removed, Bagged And Discarded. Examples Of Porous Materials Include: drywall insulation Of All Types carpet (all Being Removed, Regardless Of Evidence) acoustic Ceiling Tiles (all Being Removed, Regardless Of Evidence) containers (6 Mil Polyethylene Bags) Shall Be Sealed When Full. Bags Shall Not Be Overfilled. They Should Be Securely Sealed To Prevent Accidental Opening And Leakage By Tying Tops Of Bags In An Overhead Knot Or By Taping In gooseneck Fashion. Do Not Seal Bags With Wire Or Cord. Bags Shall Be Decontaminated On Exterior Surfaces By Wet Cleaning And Hepa Vacuuming. large Components Removed Intact May Be Wrapped In 2 Layers Of 6 Mil Polyethylene Sheeting Secured With Tape For Transport To The Landfill. mold Containing Waste With Sharp Edged Components (e.g., Nails, Screws, Metal Lath, Tin Sheeting) Will Tear The Polyethylene Bags And Sheet And Shall Be Reinforces With Extra Bags Or Wrapping. cleanup Procedure remove And Containerize All Visible Accumulations Of Mold Containing Material And Mold Contaminated Debris Utilizing Rubber Dust Pans, Rubber Squeegees, Hepa vacuums, Etc. remove All Containerized Waste From The Work Area And Waste Container Pass Out Airlock. decontaminate All Tools And Equipment And Remove At The Appropriate Time In The Cleaning Sequence. inspect The Work Area For Visible Residue. If Any Accumulation Of Residue Is Observed, It Will Be Assumed To Be Mold And The Work Area Must Be Re-cleaned. the Work Area Shall Be Cleaned Until It In Compliance With Criteria Agreed Upon By The Contractor And Owner Prior To Initiation Of Remediation Activities. following The Satisfactory Completion Of Clearance Criteria Remaining Barriers May Be Removed And Properly Disposed Of. A Final Visual Inspection By The Owner Shall Ensure That No Contamination Remains In The Work Area. Unsatisfactory Conditions May Require Additional Cleaning And Air Monitoring (see Section 3.11, Reestablishment Of The Work Area). clearance Testing following The Completion Of Cleanup Operations, The Remediation Contractor Shall Notify The Owner (or Industrial Hygiene Consultant Selected By Owner) When The Building Area Is Ready For Clearance Testing. Remediation Contractor Will Not Be Responsible For Performing Clearance Testing. The Owner (via Contracted Industrial Hygienist) Shall Arrange For Collecting Samples. 3.10 Disposal Procedures general: as The Work Progresses, To Prevent Exceeding Available Storage Capacity Onsite, Sealed And Labeled Containers Of Mold Containing Waste Shall Be Removed And Stored In The Dumpster On-site Until It Is Transported To The Prearranged Disposal Location. all Waste Shipment Records Shall Be Delivered To The Owner. A Recommended Record Keeping Format Utilizes The Waste Shipment Record (wsr) Which Includes The Names And Addresses Of The Generator (owner), Contractor, Transporter, And Disposal Site, The Estimated Quantity Of The Mold Waste And The Type Of Containers Used. transportation To The Landfill: once Drums, Bags And Wrapped Components Have Been Removed From The Work Area, They Shall Be Loaded Into An Enclosed Truck Or Dumpster For Transportation. any Debris Or Residue Observed On Containers Or Surfaces Outside Of The Work Area Resulting From Cleanup Or Disposal Activities Shall Be Immediately Cleaned Up Using Hepa Filtered Vacuum Equipment And/or Wet Methods As Appropriate. large Metal Dumpsters Are Sometimes Used For Mold Waste Disposal. These Should Have Doors Or Tops That Can Be Closed And Locked To Prevent Vandalism Or Other Disturbance Of The Bagged Mold Debris And Wind Dispersion Of Mold Fibers. Bags Shall Be Placed, Not Thrown, Into These Containers To Avoid Splitting. disposal At The Landfill: upon Reaching The Landfill, Trucks Are To Approach The Dump Location As Closely As Possible For Unloading Of The Mold Containing Waste. bags, Drums, And Components Shall Be Inspected As They Are Off Loaded At The Disposal Site. Waste Containers Shall Be Placed On The Ground At The Disposal Site, Not Pushed Or Thrown Out Of The Trucks. following The Removal Of All Containerized Waste, The Truck Cargo Area Shall Be Decontaminated Using Hepa Vacuums And/or Wet Methods To Meet The No Visible Residue Criteria. 3.11 Re-establishment Of The Work Area And Systems re-establishment Of The Work Area Shall Only Occur Following The Completion Of Cleanup Procedures And After Clearance Criteria Have Been Met And Documented To The Satisfaction Of The Owner. the Contractor And Owner Shall Visually Inspect The Work Area For Any Remaining Visible Residue. Evidence Of Contamination Will Necessitate Additional Cleaning Requirements In Accordance With Section 3.07. following Satisfactory Clearance Of The Work Area, Remaining Polyethylene Barriers May Be Removed And Disposed Of As Mold Contaminated Waste. at The Discretion Of The Contractor, Mandatory Requirements For Personal Protective Equipment May Be Waived Following The Removal Of All Barriers. re-secure Mounted Objects Removed From Their Former Positions During Area Preparation Activities. relocate Objects That Were Removed To Temporary Locations Back To Their Original Positions. reestablish Hvac, Mechanical And Electrical Systems In Proper Working Order. Remove Contaminated Hvac System Filters And Dispose Of As Mold Contaminated Waste. Decontaminate Filter Assembly Using Hepa Vacuums And Wet Cleaning Techniques. Install New Filters In Hvac Systems. Dispose Of Old Filters. repair All Areas Of Damage That Occurred Because Of Remediation Activities. period Of Performance upon Notice To Proceed, Contractor Shall Have 30 Calendar Days To Complete The Scope Detailed In This Document.
Closing Date14 Jan 2025
Tender AmountRefer Documents 

Municipality Of Aborlan, Palawan Tender

Textile, Apparel and Footwear
Corrigendum : Closing Date Modified
Philippines
Details: Description Supply Of The Following: 4 Pcs Baton For Men, Aluminum, Imported Rolled Edges, Iaaf Standard 1 Pcs Javelin For Boys - Iaaf Standard, Aluminum Steel Alloy, Imported, 400 Gms 1 Pcs Javelin For Girls - Iaaf Standard, Aluminum Steel Alloy, Imported, 300 Gms 1 Pcs Discuss For Boys, Fiber Glass With Steel Rim, 1.75 Kg For Sec. Iaaf Standard 1 Pcs Discuss For Girls, Fiber Glass With Steel Rim, 0.75 Kg For Elem. Iaaf Standard 1 Pcs Iron Shotput For Boys - Iaaf Standard, 5 Kg. For Elem 1 Pcs Iron Shotput For Girls - Iaaf Standard, 3 Kg. For Elem 1 Pcs Starting Gun 26 Pcs Spike Shoes Arnis 36 Sets Wooden Espada And Knife 80 Pcs Interlocking Rubber Mats Doutone 25mm 40 Pcs Blue Padded Stick Standard 40 Pcs Red Padded Stick Standard Badminton 4 Pcs Badminton Net Standard 40 Tubes Shuttle Cock Standard 4 Pcs Badminton Racket Basketball 4 Pcs Size 7 (29.5") 22 Oz. Basketball Ball(sec.boys) 12 Pcs Size 6 (28.5") 72.5 Basketball Ball(girls,3x3 Boys & Girls) 4 Pcs Size 5(27.5")69.5 Cm Basketball Ball(elem) Boxing 1 Pc Heavy Duty Punching Bag 10 Pcs Red Book 3 Pcs Swing Ball Baseball 9 Pcs Baseball Right Hand Gloves 2 Pcs Baseball Catchers Gloves 2 Pcs Baseball Left Hand Gloves 1 Pc Baseball Batting Helmet- Left Hand 1 Pc Baseball Batting Helmet- Right Hand 2 Pcs Baseball Bat 1 Pc Baseball Catchers Facemask 1 Pc Baseball Body Protector 2 Pcs Leg Guard 10 Pcs Baseball Ball- 9 Inches Chess 8 Sets Green And Cream Vinyl Roll-up Board Measures 20"with 2.25 Inch Squares, Chess Mat. Word Chess Federation Standard. 8 Pcs 16.1cm X 10cm X 6.2 Cm Aa Battery Powered Chess Clock Dancesports 2 Pcs Dancing Shoes, Female Latin, Elementary (see Attached Design) 2 Pcs Dancing Shoes, Female Latin, Secondary (see Attached Design) 2 Pcs Dancing Shoes, Female Standard, Elementary (see Attached Design) 2 Pcs Dancing Shoes, Female Standard, Secondary (see Attached Design) 2 Pcs Dancing Shoes, Male Latin, Elementary (see Attached Design) 2 Pcs Dancing Shoes, Male Latin, Secondary (see Attached Design) 2 Pcs Dancing Shoes, Male Standard, Elementary (see Attached Design) 2 Pcs Dancing Shoes, Male Standard, Secondary (see Attached Design) 4 Pcs Male Socks For Latin And Standard- Elementary (black) 4 Pcs Male Socks For Latin And Standard- Secondary (black) 4 Pcs Female Socks For Latin And Standard- Elementary (white) Football 18 Pcs Size 4 63-66cm(25-26") Circumference School Pereyda Soccer Ball 3000f4l3000-wb White X Metallic Blue F4l3000-wb 18 Pcs Size 5 68-70cm(27-28") Circumference Original Soccer Ball F5v3400 Vantaggio Series With 32 Panels And Pu Leather 2 Pcs Agility Ladder, 18 Pcs Soccer Trainer Belt 36 Pcs Soccer Shin Guard 50 Pcs Football Training Cone Disc(see Attached Design) 2 Pcs Soccer Ball Bag 2 Pcs Goal Keeper's Gloves Futsal 10 Pcs Futsal Ball 62.5-63.5cm,410-430g Size 4 50 Pcs Training Cone 1 Pc Ball Bag 10 Pcs Trainer Belt 1 Pc Goal Keeper's Gloves Gymnastics 75 Pcs Puzzle Mat, 100 X 100 X 2.5 Cm, Color: Blue 2 Pcs King Size Foam With Leather Cover 6 Pcs Rhythmic Gymnastic Rubber Stick, Fiber Glass, 60 Cm 6 Pcs Rhythmic Gymnastic Ribbon, Silk, W: 1.5 Inches; L: 6 Meters 6 Pcs Rhythmic Gymnastics Ball, 160 - 180 Diameter, 300 G Minimum 6 Pcs Rhythmic Gymnastic Rope - Multicolor 50 Pairs Weighted Bangle 1kg Adjustable Pair Set 50 Pairs Knee Pads( See Attached Type) 1 Set Gymnastics Horizontal Bars, Height: 5-7ft; Width: 208 Cm; Length: 149 Cm 1 Unit "bluetooth Speaker Portable Professional Speaker System Active Portable Amplifier Power Output: 250 Watts Woofer: 12" Bluetooth 2 Pcs. Wireless Microphone Lcd Display 5 Band Equalizer 12vdc/220vac Rechargeable Battery Guitar Input/ Mic2 Input Usb/sd Port Fm Radio Aux Line In/ Line Output Remote Control Unit Dimension (lxwxh): 34 X 37 X 60 Cm Lawn Tennis 24 Tubes Slazenger Wimbledon Tennis Ball 2 Pcs Tennis Net 4 Pcs Tennis Racket 2 (4 1/4) Sepak Takraw (elementary) 8 Pcs Marathon Sepak Takraw Competition Ball For Men (mt-908 Rubber Ball) 4 Pcs Marathon Sepak Takraw Competition Ball For Women (mt-909 Rubber Ball) 4 Pcs Marathon Sepak Takraw Traininng Ball (mt-201) 3 Pcs Marathon Sepak Takraw Competition Net (mn-801) Sepak Takraw (secondary) 3 Pcs Sepak Takraw Competition Net- Fine Nylon Cord,mesh Of 0.06m To 0.08m,0.7m In Width, Not Shorter Than 6.1m In Height 4 Pcs Sepak Takraw Training Ball 12holes,20 Intersections,0.42m To 0.44m Circumference,150g To 160g 15 Pcs Sepak Takraw Training Ball (marathon Mt 908) Softball(secondary) 5 Pcs Softball Right Hand Gloves 2 Pcs Softball Catchers Gloves 2 Pcs Softball Left Hand Gloves 1 Pc Softball Batting Helmet- Left Hand 1 Pc Softball Batting Helmet- Right Hand 1 Pc Softball Catchers Facemask 1 Pc Softball Body Protector 2 Pcs Leg Guard 5 Pcs Softball Ball- 9 Inches Swimming 3 Pcs Whistle 30 Pcs Swimming Goggles(see Attached Design) 30 Pcs Kickboard(styro)(see Attached Design) 40 Pcs Pull Bouy(see Attached Design) Table Tennis 8 Pcs Rubber For Table Tennis Racket, Black 8 Pcs Rubber For Table Tennis Racket, Red 4 Pcs Table Tennis Net 5 Pcs Rubber Glue For Racket, 250 Ml 8 Bags Double Fish Net 40+mm Taekwondo 2 Pcs Armor Ellipse #xs 2 Pcs Armor Ellipse #2 100 Pcs Inter Locking Rubber Mats Duo Tone Reversible Red/blue 4 Pcs Armor Ellipse #3 6 Pcs Headgear With Chin Guard Red/blue S,m 2 Set Lpss Electronic Socks Xs, M 4 Pcs Male Groin Guard, Size S,m 4 Pcs Female Groin Guard S,m 2 Set Arm Guard White S,m 2 Set Shin Guard White S,m 2 Pcs Pu Arm Guard With Elbow S,m 2 Pcs Pu Shin Guard S,m 4 Pcs Takewondo Face Shield 12 Pcs Mouth Guard(junior) 4 Pcs Takewondo Kicking Shields Ellipse 10 Pcs Double Ellipse Kicking Pag 1 Pc Punching Bag Large 2 Pcs Bullet Shield Small 2 Pcs Bullet Shield Large 4 Pcs Shoulder Net Bag For Complete Taekwondo Gear #2 2 Pcs Shoulder Net Bag For Complete Taekwondo Gear #3 Volleyball 34 Pcs Volleyball, 18-panel Design, High Grade Synthetic Leather, Construction: Laminated, Color: Yellow/blue, Weight: 260-280 Gms, Size:65-67 Cm, (v200w) 6 Pcs Volleyball Net With Cable, Nylon, Size 9.5 X 1 M, Weigh 1.2 Kg, Black 6 Pcs Volleyball Spike Trainer High Elasticity Adjustable Wear-resistant Flexible Spike Training Belt, Material: Polypropylene Webbing Foam Stick Weight:145 G 4 Sets Disc Marker 10 Pcs Agility Ladder 4 Pcs Whistle 48 Pcs Volleyball Knee Pads (small)
Closing Date30 Jan 2025
Tender AmountPHP 1.9 Million (USD 33.9 K)

Municipality Of Banaue, Ifugao Tender

Textile, Apparel and Footwear
Philippines
Details: Description Republic Of The Philippines Province Of Ifugao Bids And Awards Committee Banaue, Ifugao Invitation To Bid For Provincial Meet Uniform Publication No. Itb - G-2025-1-a 2nd Publication The Local Government Unit Of Banaue, Ifugao, Through The Lgu Fund Intends To Apply The Sum Of Three Hundred Twenty-seven Thousand Eight Hundred Seventy Pesos (php 327,870.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For Provincial Meet Uniforms Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Local Government Unit Of Banaue, Ifugao, Now Invites Bids For Supply And Delivery Of The Provincial Meet Uniforms With The Following Descriptions; Item No. Quantity Unit Of Issue Description Of Article Estimated Unit Cost Total Estimated Cost 1 T-shirts (cotton, Round Collar With Print)-yellow 7 Pcs Extra Small 190.00 1,330.00 56 Pcs Small 200.00 1,200.00 34 Pcs Medium 210.00 7,140.00 3 Pcs Large 220.00 660.00 4 Pcs Teens 190.00 760.00 2 Pcs Size 18 180.00 360.00 7 Pcs Size 20 180.00 1,260.00 17 Pcs Small 200.00 3,400.00 87 Pcs Medium 210.00 18,270.00 34 Pcs Large 220.00 7,480.00 2 Pcs Extra Large 230.00 460.00 2 Polo Shirt, With Collar- Full Sublimation 18 Pcs Small 550.00 9,900.00 31 Pcs Medium 550.00 17,050.00 66 Pcs Large 550.00 36,300.00 4 Pcs Extra Large 550.00 2,200.00 1 Pcs 3 Xl 550.00 550.00 1 Pcs 5 Xl 550.00 550.00 3 Jersey (shorts And Tanggo) Full Sublimation - 11 Pcs Small 800.00 8,800.00 28 Pcs Medium 800.00 22,400.00 18 Pcs Large 800.00 14,400.00 4 White T-shirts With Red Sleeve (raglan, Round Collar With Print) See Attached Size 1 Extra Small 400.00 400.00 6 Small 400.00 2,400.00 8 Medium 400.00 3,200.00 1 Large 400.00 400.00 5 16 Pcs Red Jogging Pant For Arnis (garterize With Draw String Waist, Single Face Stretchable) See Attached Size 1 Extra Small 600.00 600.00 6 Small 600.00 3,600.00 8 Medium 600.00 4,800.00 1 Large 600.00 600.00 6 9 Pcs Wushu Sandra (yellow And Black, Boxing Suite Style, Microshiny With Event Print And Team Banaue)-all In Medium Size 1,600.00 14,400.00 7 Swimsuit(1 Pc Spandex.,polyster,fit,shapes And Lining)elem-8; Sec- 4 - 4 Pcs Extra Small 1,100.00 4,400.00 4 Pcs Small 1,100.00 4,400.00 1 Pcs Medium 1,100.00 1,100.00 1 Pcs Size 18 1,100.00 1,100.00 2 Pcs Size 20 1,100.00 2,200.00 8 Swimming Trunks-(spandex Lightweight And Breathable Materials And Elastic Waistband)elem-10; Sec- 4 - 4 Pcs Small 1,100.00 4,400.00 4 Pcs Medium 1,100.00 4,400.00 1 Pcs Size 18 1,100.00 1,100.00 5 Pcs Size 20 1,100.00 5,500.00 9 Arnis - 8 Pcs Arnis Sword 600.00 4,800.00 8 Pcs Daggers 400.00 3,200.00 6 Pair Wooden Sword 300.00 1,800.00 6 Pcs Daggers 400.00 2,400.00 8 Pcs Arnis Padded Stick (red) 350.00 2,800.00 8 Pcs Arnis Padded Stick (blue) 350.00 2,800.00 8 Pcs Kicking Pad 200.00 1,600.00 10 Wushu - 2 Pair Boxing Gloves (12 Ounce) 1,800.00 3,600.00 2 Pcs Groin Protectors (male) 800.00 1,600.00 2 Pcs Groin Protectors (female) 800.00 1,600.00 2 Pcs Head Gears (1blue, 1 Red) 700.00 1,400.00 2 Pair Shin Guard 500.00 1,000.00 11 Chess - 2 Set Chess Mat (big Size) 600.00 1,200.00 12 Swimming - 10 Kls Chlorine 200.00 2,000.00 10 Pair Hand Paddles Small 400.00 4,000.00 1 Pcs Kickboard 2,000.00 2,000.00 4 Pair Ear Plug 700.00 2,800.00 2 Pcs Nose Clip 450.00 900.00 5 Pcs Pull Bouys 300.00 1,500.00 13 Teakwando - 5 Pcs Junior Size Mouth Guard 250.00 1,250.00 5 Pcs Senior Size Mouth Guard 250.00 1,250.00 2 Pcs Sensor Socks Generation 2 600.00 1,200.00 14 Badminton - 10 Pcs Tube -shuttle Cock 1,000.00 10,000.00 10 Pcs Badminton Net 400.00 4,000.00 15 Basketball - 2 Pcs Basketball (size 7) 3,000.00 6,000.00 1 Pc Timer 700.00 700.00 Table Tennis - 4 Pcs Table Tennis Ball-3 Star 300.00 1,200.00 16 Volleyball - 4 Pcs Volloyball Balls (2 Male, 2 Famale) 3,000.00 12,000.00 2 Pc Volleyball Net 600.00 1,200.00 2 Pair Antenna (male & Female) 500.00 1,000.00 Sepak - 8 Pcs Takraw Balls (male) 1,000.00 8,000.00 4 Pcs Takraw Balls (female) 1,000.00 4,000.00 17 Athletics - 2 Pcs Timer 500.00 1,000.00 4 Pcs Javeline 1,000.00 4,000.00 4 Pcs Discus Throw 1,000.00 4,000.00 1 Pc Measuring Tape 600.00 600.00 Total 327,870.00 Delivery Of The Goods Is On Site At The Municipal Hall, Poblacion, Banaue, Ifugao Bidders Should Have Completed, Within [7 Calendar Days] From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 3. Interested Bidders May Obtain Further Information From Bac Secretariat, At The Municipal Mayor’s Office, Banaue, Ifugao And Inspect The Bidding Documents At The Address Given During 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Starting January 15, 2025 To January 21, 2025 From The Address Given And Upon Payment Of A Non-refundable Fee For The Documents In The Amount Of Five Hundred Pesos Only (php.500.00) 4. Bids Must Be Duly Received By The Bac Secretariat At The Bids And Awards Committee On January 23, 2025 At 1:30pm Before The Bid Opening. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be At 2:00 Pm On January 23, 2025 At Bids And Awards Committee, Mayor’s Office Conference Hall. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 5. The Local Government Unit Of Banaue, Ifugao, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 6. For Further Information, Please Refer To: Bids And Awards Committee Mbac Office, Municipal Hall, Poblacion, Banaue, Ifugao Date Publication: January 14, 2025 Samson D. Cabbigat Bac Chairperson
Closing Date23 Jan 2025
Tender AmountPHP 327.8 K (USD 5.5 K)

ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY LEON CAMPUS Tender

Laboratory Equipment and Services
Corrigendum : Closing Date Modified
Philippines
Details: Description Lot 1: Agricultural Equipments - Php 350,850.00 (abc) 1 Digital Water Quality Tester "5 In 1 Water Quality Tester Includes: Ph, Ec, Tds, Salinity, And Thermometer; Battery Powered; Waterproof Rating: Ip67 Display Size: 33*24mm Item Size: 180 * 37mm / 7.1 * 1.5in Item Weight: 86g / 3.0ounce" 5 Set 2 Digital Refractometer 0-93% Digital Brix Refractometer Sugar Content Measuring 1 Set 3 Refractometer Handheld Refractometer (brix Refractometer); Inlusions Are Transport Case, Pipette, Calibration Screwer And Guide 3 Set 4 Current Meter River Current Water Velocity Portable Flow Meter For Open Channel; Measure Velociy, Flow Rate And Depth 1 Set 5 Turbidimeter Portable Turbidimeter Microcomputer Accuracy Testing With Range From 0-200 Ntu; Size:210*75*70mm/8.3*3.0*2.8in; Product Inclusions: Turbidimieter, Power Cable, Glass, Storage Box 1 Set 6 Dissolved Oxygen Analyzer Ph Meter And Dissolved Oxygen Tester Water Quality Tester Set 2 Set 7 Rain Gauge 8 In/200mm Diamter Rain Gauge Stainless Steel; Set Includes A Receiving Funnel, Internal Measuring Tube, Outercylinder For Overflow, Mountinf Tripod And Parts Can Are Detachable For Easy Cleaning 5 Set 8 Rain Gauge Capacity: 11"/280mm; Resolution: 0.01"/0.2mm; Diameter Size 4"*14h (102mm*356mm); Set Includes A Receiving Funnel, Internal Measuring Tube, Outercylinder For Overflow And Mounting Tripod/bracket And Parts Can Are Detachable For Easy Cleaning 5 Set 9 Rain Gauge Plastic Rain Gauge: Approx Size:25cm*4.5cm*2.7cm 5 Pc 10 Sling Psychrometer Slide Rule; Dimension 1" Dia * 7-1/2" Length; Non-mercury, Black Plastic 5 Unit 11 Soil Detector 6 In 1 Soil Detector (rotatable); With Sensitive Sensing Probe; Soil Ph, Soil Fertility, Soil Temperature, Soil Moisture, Environmental Illumination, Humidity; Battery Powered; Led Large Screen Display 5 Set Lot 2: Scientific Materials And Equipment - Php 249,400.00 (abc) 1 Digital Analytical Balance Capcity: 500g; Accuracy: 0.001g; Tray Size: Ø 120 Mm; Dimensions 320*195*280mm; With Screen Display; With Dual Power Supply; Stainless Steel Plate And Bubble Level 2 Unit 2 Digital Weighing Scale Capacity: 10kg; Resolution: 0.1g Digital Precision Electronic Weighing Balance W/ Counting Table Top Scale; Tare Function Stainless Steel Pan With Level Bubble; Dual Power Supply; Scale Pan Size: 180*180mm; Dimension: 260*180*64mm 2 Unit 3 Digital Food Weighing Scale Weigh Range: 0.1 G-3000g; Resolution:0.01g; Dimensions:4.1*5.0 In With Stainless Steel Plate Dimension Of 3.9*3.9 In; Battery Power Supply 3 Unit 4 Digital Food Thermometers "stainless Steel Probe; Weight: 36g; Size: 22.5*2cm Power Supply: Built-in Battery, Can Be Used Directly" 3 Unit 5 Digital Food Thermometers Digital Thermometer Infrared Laser Gun With Led Screen; Size: 75*50*145mm;battery Powered 2 Unit 6 Thermocouples Digital Thermocouple With Dual Channels 4 Probes Handheld; Battery Powered 2 Set 7 Sieves Standard Laboratory Test Sieves; 8 In/20cm Diameter And Height Of 5cm; Filter Mesh With Grit Size #10, #12, #14, #16, And #18 2 Set 8 Bulk Density Apparatus Astm 1895 Apparent Bulk Density Apparatus; Wieght = 9 Kg, Dimensions: 240x330x520mm (wxdxh) 2 Set 9 Tachometer Laser Digital Non-contact Tachometer; Measuring Range: 2.5-99999 Rpm; Lcd Screen With White Backlight, Meauring Distance:2-20in(50-500mm); Dimension 145*85*35mm; Auto Power Off; Battery Power Supply 3 Set 10 Tachometer Contact Digital Handheld Tachometer; Lcd Screen; Battery Powered; Item Size: Approx. 165*60*28mm; Set Inlcusion: Digital Tachometer, 2 Measurement Idler Wheels, 2 Measurement Touch Tips, Lengthening Bar, Portable Bag And User Manual 3 Set 11 Steel Cabinet Steel Cabinet: Dimension: 90*46*185cm; 2-door Locker With One Side For Long Tools Storage 2 Unit 12 Steel Cabinet Steel Cabinet Dimension: 90*46*185cm; 2-door Lock With 4 Adjustable Shelves 2 Unit 13 Digital Vernier Caliper Digital Vernier Caliper; 150 Mm Metal 60inch Pure Stainless; Withlcd 5 Pc 14 Digital Anemometer Digital Anemometer With Data Hold Backlight Function 3 Set 15 Sound Level Meter Digital Sound Level Meter Decibel Moinitoring; Measurement Range: 30-130db With Spongeball; Inclusions: Sound Level Meter, Operation Manual, 1 Spongeball 2 Set 16 Aluminum Tool Box Set "multiple Layered Tool Box With: Layer 1. 1x Multiprise Plier 250mm, 1x Diagonal Cutting Pliers 150mm, 1x Pliers 1/2 Long Round 150mm, 1x Universal Plier 150mm 1x All-rounder, 1x Thumb Wrench 250 Mm, 1x Box 6 Compartment Layer 2. 1x Magnetic Bimonthly Torpedo Level 25cm, 1x Measure 5m X 19mm Bimatiere Tylon, 8x Screwdriver - Bit Holder- Ph1-ph2- Pz1-pz2- Mechanic 6.5x1505.5x100-3x75, 1x Test Screwdriver, 9x Clés Males (1.5-2-2.5-3-4-5-6-8-10) Layer 3. 1x Hacksaw, 1x Pen Lamp, 1x Cutter 18mm, 1x Hammer Wooden Handle 300g Layer 4. 1x Ratchet 72 Teeth 1/4’’, 10x 1/4’’ (6-sided) Sockets: 5.5 – 6 – 7 – 8 – 9 – 10 – 11 – 12– 13 – 14 Mm, 2x 1/4’’ Extensions: 75 Mm – 150 Mm, 1x 1/4’’ Bit Holder, 1x 1/4’’ Universal Cardan, 1x Ratchet 72 Teeth 1/2’’, 16x 1/2’’ (6-piece) Sockets: 10 – 11 – 12 – 13 – 14 – 15 – 16 –17 – 18 – 19 – 21 – 22 – 24 – 27 – 30 – 32 Mm, 2x 1/2’’ Extensions: 75 Mm – 250 Mm, 1x Universal Cardan 1/2’’, 3x Sockets For 1/2’ Candle: 16 – 19 – 21 Mm, 12x Combination Wrenches: 8 – 9 – 10 – 11 – 12 – 13 – 14 –15 – 16 – 17 – 18 – 19 Mm, 1x 1/4"" 25mm Screw Bit Box – 61pcs In Pre-formed Foam" 1 Set Lot 3: Surveying Materials And Equipment - Php 199,750.00 (abc) 1 Total Station Theodolite Digital Theodolite Surveying Instrument High Accuracy 30x Electronic With Laser; Main Unit, Tool Kit, Plumb Bob, Rain Cover, Rechargeable Battery, Battery Charger, Aa Dry Battery Case, Operational Manual, Heavy Duty Carrying Case 1 Unit 2 Tripod Surveying Instrument Aluminum Tripod Double Lock With Extended Length Upto 1.7m; Head Diameter 160mm; 3kg Weight 1 Unit 3 Measuring Staff Stadia Rod Surveying Stadia Rod Extended Upto 5m; Retracted Length 0.5m 3 Pc 4 Range Pole Range Pole,3m-3 Section For Surveying 3 Pc 5 Marking Pins Surveying Color Scheme: Red And White; 50 Pc 6 Heavy Duty Measuring Tape 100m Tape Measure Fiber Glass, High Quality, Heavy Duty Meter Tape Ruler Wheel 5 Pc 7 Steel Tape 5m Steel Measuring Tape-heavy Duty 5 Pc
Closing Date15 Jan 2025
Tender AmountPHP 800 K (USD 13.6 K)

Lenzen Elbtalaue Office For The City Of Lenzen Tender

Civil And Construction...+1Civil Works Others
Germany
Details: General building description: The client is planning to renovate the building at Neustadtstrasse 5 (former executioner's house) in Lenzen. The building is a listed building (individual monument). The building ensemble is made up of three building sections, each with its own roof structure and two or three smaller extensions. The oldest part of the building and part of the residential building is the so-called executioner's tower. The two-storey part of the building consists of brickwork with a 1.50 m high base structure. The wall thickness on the ground floor is 1-1.2 m and on the upper floor 40-50 cm. To the south of the tower, a half-timbered extension is attached as an extension to the residential building. The two-storey extension is built using carpentry as a half-timbered construction. The brick infills are coated with a colored lime slurry. The roof structure is a collar beam roof with a double standing chair. To the north-east, a rectangular stable building with a cantilevered upper floor adjoins the tower. The building is a purely half-timbered structure, filled with bricks and clay stakes. The roof is a gable roof with a collar beam roof as the roof support, with double-standing chairs. The roof covering is designed as a crown covering with plain tiles. An outbuilding, built as a solid, two-storey building with a pent roof and a brick facade, borders the ensemble at the north-west corner of the property. According to the expert reports, all parts of the building have significant structural defects and damage caused by moisture and dry rot. The planned services include the renovation of the damaged findings and the structural reinforcement of undersized structural components. The following construction measures are to be carried out: scaffolding, demolition work, bricklaying and plastering work, carpentry work, roofing work, joinery work, painting work. The overall work will be awarded and carried out according to combined or individual trades in accordance with the following division into lots: Lot 2 - scaffolding Lot 3 - demolition work Lot 4 - main construction trade Lot 5 - carpentry work Lot 6 - roofing work Lot 7 - joinery work Lot 8 - painting work Subject of this tender: Lot 7 - joinery work with the following essential services: covering 30 m² of staircase, wood-based panels 24 wooden single-pane windows, reworking 30 m² window opening provisionally closing 8 slatted frames with wood fiberboard, up to 2.5 m² 10 wooden interior doors, single-leaf, make accessible 2 board shutters, door, larch, 900/2000 mm
Closing Date4 Feb 2025
Tender AmountRefer Documents 
3601-3610 of 3626 archived Tenders