Website Tenders
Website Tenders
Province Of Davao De Oro Tender
Civil And Construction...+1Road Construction
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Province Of Davao De Oro Bids And Awards Committee Secretariat Cabidianan, Nabunturan, Davao De Oro Cwitb No. 25-001 Invitation To Bid For Improvement/concreting Of Road At Matagdungan, Bukal, Nabunturan, Davao De Oro [concreting Of 249.54 Ln.m. Road And Installation Of 1-910mm Dia. X 8 Ln.m With Headwall Both Sides] 1. The Provincial Government Of Davao De Oro, Through The Ab Cy 2025 – 20% Df Intends To Apply The Sum Of Four Million Eight Hundred Seven Thousand Nine Hundred Fifty Four Pesos And Eighty One Centavos (php4,807,954.81) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Improvement/concreting Of Road At Matagdungan, Bukal, Nabunturan, Davao De Oro [concreting Of 249.54 Ln.m. Road And Installation Of 1-910mm Dia. X 8 Ln.m. With Headwall Both Sides] – Ab Cy 2025 – 20% Df With Purchase Request No. 25-0015 Under Civil Works No. Cw25-006. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of Davao De Oro Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required One Hundred Thirty (130) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information Bids And Awards Committee (bac) Secretariat Office, 3rd Floor, Right Wing, Provincial Capitol Building, Cabidianan, Nabunturan, Davao De Oro Province And Inspect The Bidding Documents At The Address Given Below From Mondays To Fridays (8:00 A.m. To 5:00 P.m.). 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 7, 2025 From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents To The Provincial Government Of Davao De Oro, Thru Provincial Treasurer’s Office, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (php 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 6. The Provincial Government Of Davao De Oro Will Hold A Pre-bid Conference On January 14, 2025, 1:00 P.m. Onwards At 3rd Floor, Bids And Awards Conference Room, Provincial Capitol, Cabidianan, Nabunturan, Davao De Oro Province Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before January 28, 2025 Until 8:30 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On January 28, 2025, 9:30 A.m. Onwards At 3rd Floor, Bids And Awards Conference Room, Provincial Capitol, Cabidianan, Nabunturan, Davao De Oro Province. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. On The Opening Of Bids, Representative Of Bidders Must Present Proof Or Authority (special Power Of Attorney) 11. The Provincial Government Of Davao De Oro Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Jenes B. Miñoza Head – Bac Secretariat Bids And Awards Committee (bac) Secretariat Office 2nd Floor, Right Wing, Provincial Capitol, Cabidianan, Nabunturan, Davao De Oro Province - 8800 Cel. #: 09958124941 Email Address: Davaodeorobac@gmail.com 13. You May Visit The Websites: For Downloading Of Bidding Documents: Philgeps.gov.ph / Davaodeoro.gov.ph Date Of Issue: January 7, 2025 Sgd: Lara Zaphire Kristy N. Bermejo, Mpa Pg Department Head - Phrmdo Bac – Chairperson
Closing Soon30 Jan 2025
Tender AmountPHP 4.8 Million (USD 81.9 K)
Province Of Pampanga Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Province Of Pampanga City Of San Fernando Invitation To Bid No. 2025-06 Ig – Bac Invitation To Bid For Purchase Request Nos. 25-0131, 24-5945, 24-4305 And 24-6100 The Provincial Government Of Pampanga (“province”) Intends To Apply The Following Sums From The Following Funds, As Follows: Source Of Funding/year Approved Budget For The Contract (abc) Purchase Request Number Description Trust Fund/ General Fund 62,985,903.11 #25-0131 To Supply Labor, Materials And Necessary Equipment For The Construction Of Multi-purpose Building (diagnostic Building) At Sta. Catalina, Lubao, Pampanga. Special Education Fund 6,199,782.06 #24-5945 To Supply Labor, Materials And Necessary Equipment For The Construction Of Four (4) Classroom School Building With Comfort Rooms At Dalan Baliti Elementary School At Sta. Maria Libutad, Macabebe, Pampanga General Fund 6,466,369.81 #24-4305 To Supply Labor, Materials And Necessary Equipment For The Renovation/improvement Of Former Provincial Planning Development Office At Capitol Building, Capitol Compound, Sto Nińo, City Of San Fernando, Pampanga. General Fund 3,996,875.91 #24-6100 To Supply Labor, Materials And Necessary Equipment For The Construction Of Two (2) Storey Multi-purpose Building At Balucuc, Apalit, Pampanga Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Province Invites Bids For The Foregoing Projects. Completion Of The Works Is Required As Follows: Purchase Request Number Expected Contract Duration #25-0131 300 Calendar Days From Receipt Of Notice To Proceed #24-5945 150 Calendar Days From Receipt Of Notice To Proceed #24-4305 180 Calendar Days From Receipt Of Notice To Proceed #24-6100 150 Calendar Days From Receipt Of Notice To Proceed 2. #24-5841the Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From The Province And Inspect The Bidding Documents At The Bids And Awards Committee (bac) Secretariat Office, Ground Floor, Provincial Capitol, City Of San Fernando, Pampanga Between 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 15, 2025 (wednesday) Between 8:00 A.m. To 5:00 P.m. Up To February 4, 2025 (tuesday) Until 8:30 A.m. Only From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Purchase Request Number Abc Amount #25-0131 62,985,903.11 50,000.00 #24-5945 6,199,782.06 10,000.00 #24-4305 6,466,369.81 10,000.00 #24-6100 3,996,875.91 5,000.00 6. The Province Will Hold A Pre-bid Conference On January 23, 2025 (thursday), 10:00 A.m. At The Executive House, 2nd Floor, Provincial Capitol, City Of San Fernando, Pampanga, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bids And Awards Committee (bac) Secretariat Office Thru Manual Submission At Ground Floor, Provincial Capitol, City Of San Fernando, Pampanga On Or Before 8:45 A.m. Of February 4, 2025 (tuesday). Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Opening Of Bids Will Be On February 4, 2025 (tuesday), 10:00 A.m. At The Executive House, 2nd Floor, Provincial Capitol, City Of San Fernando, Pampanga. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Activity. 10. Online Bid Submission Is Not Applicable. 11. The Province Reserves The Right To Accept Or Reject Any And All Bids, Declare A Failure Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Hereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Filipina R. Sevilla Chairperson-bids And Awards Committee (bac) Secretariat Bac Secretariat Office, Ground Floor, Provincial Capitol, City Of San Fernando, Pampanga 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.pampanga.gov.ph January 14, 2025 _____________________________ Francis V. Maslog Chairman Bids And Awards Committee
Closing Date4 Feb 2025
Tender AmountPHP 3.9 Million (USD 68.1 K)
Western Visayas Medical Center Tender
Philippines
Details: Description Republika Ng Pilipinas Kagawaran Ng Kalusugan Panlabas Ng Pagpapaganap Pampurok Ng Tanggapang Pangkalusugan Blg. 6 Western Visayas Medical Center Q. Abeto Street, Mandurriao, Iloilo City Tel. No.: (033) 330-77-00 Wvmcbacgeneralservices@gmail.com Invitation To Bid For The Fabrication And Supply Of Made-to-order Polo Shirt With Design To Be Used By The Wvmc Employees During The Launching Of The 75th Anniversary Of Wvmc Ib No. Gs 2025-007 Western Visayas Medical Center Through The Cy2025 Regular Agency Fund-gaa Intends To Apply The Sum Of One Million One Hundred Forty Thousand Pesos Only (php 1,140,000.00) Being The Abc To Payments Under The Contract For Ib No. Gs 2025-007 Fabrication And Supply Of Made-to-order Polo Shirt With Design To Be Used By The Wvmc Employees During The Launching Of The 75th Anniversary Of Wvmc. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. The Western Visayas Medical Center Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required To Be Delivered No Later Than February 26, 2025. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. Prospective Bidders May Obtain Further Information From Bids And Awards Committee (bac) Of The Western Visayas Medical Center And Inspect The Bidding Documents At The Address Given Below From Mondays Through Fridays 8:30 Am To 4:30 Pm. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Upon Payment Of A Non-refundable Applicable Fee For The Bidding Documents, In The Amount Of Five Thousand Pesos (php 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment Personally For The Fees. The Schedule Of The Bidding Activities Which Shall Be Open To Prospective Bidders Are As Follows: Activities Schedule Advertisement/ Posting Of Invitation To Bid January 27, 2025 Issuance And Availability Of Bidding Documents January 27, 2025 - February 16, 2025, Mondays To Fridays, 8:00 Am To 5:00 Pm February 17, 2025, On Or Before 9:00 Am Bac Dm/gs Office (beside Our Lady Of Candles Ii Ward), Wvmc, Q. Abeto St., Mandurriao, Iloilo City Pre-bid Conference February 5, 2025, 9:00 Am, Bac Dm/gs Office (beside Our Lady Of Candles Ii Ward), Wvmc, Q. Abeto St., Mandurriao, Iloilo City Or Via Cisco Webex Teleconferencing Meeting Link To Be Announced Via Supplemental Bid Bulletin Submission Of Bids February 17, 2025, 9:00 Am, Bac Dm/gs Office(beside Our Lady Of Candles Ii Ward), Wvmc, Q. Abeto St., Mandurriao, Iloilo City Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. The Western Visayas Medical Center Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Bac Secretariat For General Services Western Visayas Medical Center Q. Abeto St., Mandurriao, Iloilo City Telefax No.: (033) 330-77-00 Or 321-28-43 Loc. 354 Wvmcbacgeneralservices@gmail.com You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Www.wvmc.doh.gov.ph January 27, 2025 Lemuel A. Umahag, Md Bac Chairperson For General Services
Closing Date17 Feb 2025
Tender AmountPHP 1.1 Million (USD 19.4 K)
City Of Tayabas Tender
Philippines
Details: Description Republic Of The Philippines Province Of Quezon City Government Of Tayabas Invitation To Bid For Project # 25-019 Improvement/concreting Of Farm To Market Road - Brgy. Masin Leading To Ilayang Palale, City Of Tayabas 1. The City Government Of Tayabas, Through The 20% Development Fund Continuing Intends To Apply The Sum Of Two Million Nine Hundred Ninety-nine Thousand Eight Hundred Ninety-six Pesos And 02/100 (php 2,999,896.02) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Project # 25-019 Improvement/concreting Of Farm To Market Road - Brgy. Masin Leading To Ilayang Palale, City Of Tayabas. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Tayabas Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required Within 120cd Upon Receipt Of Notice To Proceed. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From City Government Of Tayabas And Inspect The Bidding Documents At The Address Given Below From 8:00 Am – 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 27, 2025 (monday) From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Offive Thousand Pesos (p 5,000.00)the Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees 6. The City Government Of Tayabaswill Hold A Pre-bid Conference On February 03, 2025 (monday) 10:00 Am At Bids And Awards Committee Office, 2nd Floor New City Hall, Brgy. Baguio, Tayabas City, Which Shall Be Open To Prospective Bidders 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before February 17, 2025 (monday) 10:00 Am, Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On February 17, 2025 (monday) 10:01 Am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Procuring Entity Is The City Government Of Tayabas With Email Address Of Bidsandawards@gmail.com For The Use Of A Back-up Data Or Cloud Storage For Large Files Uploaded For Online Bid Submission. 11. The City Government Of Tayabas Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Raymond S. Bermudez Bac Secretariat 2nd Floor New City Hall Brgy. Baguio Tayabas City, Quezon (042) 793-3778 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://notices.philgeps.gov.ph/gepsnonpilot/tender/splashopportunitiessearchui.aspx?menuindex=3&clickfrom=openopp&result= Item No. Unit Description Qty. Improvement/concreting Of Farm To Market Road - Brgy. Masin Leading To Ilayang Palale, City Of Tayabas I. L.s. Construction Of Field Office For The Engineer 1.00 Ii. L.s. Project Billboard/signboard 1.00 Iii. L.s. Occupational Safety And Health Program 1.00 Iv. Sq.m. Clearing And Grubbing 579.00 V. Cu.m. Roadway Excavation 135.21 Vi. Cu.m. Embankment From Roadway Excavation 41.80 Vii. Cu.m. Aggregate Sub-base Coarse 57.90 Viii. Sq.m. Aggregate Base Coarse 57.90 Ix. Sq.m. Pcc Pavement (plain) – Conventional Method, 200mm Thk. 115.80 X. Cu.m. Stone Masonry 49.35 Xi. Unit Box Culvert 1.00 X-x-x-x-x-x-x----nothing Follows ----x-x-x-x-x-x-x January 27, 2025 ________________________________ Wilfredo S. Tomines Chairperson, Bids And Awards Committee
Closing Date17 Feb 2025
Tender AmountPHP 2.9 Million (USD 51.1 K)
City Of Tayabas Tender
Philippines
Details: Description Republic Of The Philippines Province Of Quezon City Government Of Tayabas Invitation To Bid For Project # 25-022 Construction/installation Of Water Supply System In Slsu Compound - Brgy. Ibabang Palale, City Of Tayabas 1. The City Government Of Tayabas, Through The 20% Development Fund Continuing Intends To Apply The Sum Of Four Million Six Hundred Seventy-three Thousand Two Hundred Eight Pesos And 69/100 (php 4,673,208.69) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Project # 25-022 Construction/installation Of Water Supply System In Slsu Compound - Brgy. Ibabang Palale, City Of Tayabas. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Tayabas Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required Within 121cd Upon Receipt Of Notice To Proceed. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From City Government Of Tayabas And Inspect The Bidding Documents At The Address Given Below From 8:00 Am – 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 27, 2025 (monday) From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Offive Thousand Pesos (p 5,000.00)the Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees 6. The City Government Of Tayabaswill Hold A Pre-bid Conference On February 03, 2025 (monday) 10:00 Am At Bids And Awards Committee Office, 2nd Floor New City Hall, Brgy. Baguio, Tayabas City, Which Shall Be Open To Prospective Bidders 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before February 17, 2025 (monday) 10:00 Am, Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On February 17, 2025 (monday) 10:01 Am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Procuring Entity Is The City Government Of Tayabas With Email Address Of Bidsandawards@gmail.com For The Use Of A Back-up Data Or Cloud Storage For Large Files Uploaded For Online Bid Submission. 11. The City Government Of Tayabas Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Raymond S. Bermudez Bac Secretariat 2nd Floor New City Hall Brgy. Baguio Tayabas City, Quezon (042) 793-3778 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://notices.philgeps.gov.ph/gepsnonpilot/tender/splashopportunitiessearchui.aspx?menuindex=3&clickfrom=openopp&result= Item No. Unit Description Qty. Construction/installation Of Water Supply System In Slsu Compound - Brgy. Ibabang Palale, City Of Tayabas I. L.s. Occupational Safety And Health 1.00 Ii. Lm Well Development 120.00 Iii. Unit Construction Of Office For The Engineer 1.00 Iv. Sq.m. Clearing And Grubbing 81.00 V. Cu.m. Excavation Works 28.51 Vi. L.s. Formworks And Scaffolding 1.00 Vii. Cu.m. Reinforced Concrete And Hardware 28.34 Viii. Sq.m. Masonry And Plastering Works 17.40 Ix. L.s. Plumbing Works 1.00 X. L.s. Electrical Works 1.00 Xi. Ea Project Billboard/signage 1.00 X-x-x-x-x-x-x----nothing Follows ----x-x-x-x-x-x-x January 27, 2025 ________________________________ Wilfredo S. Tomines Chairperson, Bids And Awards Committee
Closing Date17 Feb 2025
Tender AmountPHP 4.6 Million (USD 79.6 K)
City Of Tayabas Tender
Philippines
Details: Description Republic Of The Philippines Province Of Quezon City Government Of Tayabas Invitation To Bid For Project # 25-023 Construction Of Southern Luzon State University Access Road (phase Ii) - Brgy. Ibabang Palale, City Of Tayabas 1. The City Government Of Tayabas, Through The 20% Development Fund Continuing Intends To Apply The Sum Of Nine Million Nine Hundred Ninety-nine Thousand Seven Hundred Ninety-eight Pesos And 22/100 (php 9,999,798.22) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Project # 25-023 Construction Of Southern Luzon State University Access Road (phase Ii) - Brgy. Ibabang Palale, City Of Tayabas. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Tayabas Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required Within 227cd Upon Receipt Of Notice To Proceed. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From City Government Of Tayabas And Inspect The Bidding Documents At The Address Given Below From 8:00 Am – 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 27, 2025 (monday) From Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Often Thousand Pesos (p 10,000.00)the Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees 6. The City Government Of Tayabaswill Hold A Pre-bid Conference On February 03, 2025 (monday) 10:00 Am At Bids And Awards Committee Office, 2nd Floor New City Hall, Brgy. Baguio, Tayabas City, Which Shall Be Open To Prospective Bidders 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before February 17, 2025 (monday) 10:00 Am, Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On February 17, 2025 (monday) 10:01 Am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Procuring Entity Is The City Government Of Tayabas With Email Address Of Bidsandawards@gmail.com For The Use Of A Back-up Data Or Cloud Storage For Large Files Uploaded For Online Bid Submission. 11. The City Government Of Tayabas Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Raymond S. Bermudez Bac Secretariat 2nd Floor New City Hall Brgy. Baguio Tayabas City, Quezon (042) 793-3778 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://notices.philgeps.gov.ph/gepsnonpilot/tender/splashopportunitiessearchui.aspx?menuindex=3&clickfrom=openopp&result= Item No. Unit Description Qty. Construction Of Southern Luzon State University Access Road (phase Ii) - Brgy. Ibabang Palale, City Of Tayabas I. L.s. Construction Of Field Office For The Engineer 1.00 Ii. Lm Project Billboard/signboard 1.00 Iii. Unit Occupational Safety And Health Program 1.00 Iv. Sq.m. Clearing And Grubbing 3,350.00 V. Cu.m. Roadway Excavation (soft Rock) 2,470.29 Vi. L.s. Aggregate Sub-base Coarse 162.00 Vii. Cu.m. Aggregate Base Coarse 227.00 Viii. Sq.m. Pcc Pavement (plain)-conventional Method, 200mm Thk. 1,620.00 Ix. L.s. Box Culvert 1.00 X. L.s. Concrete Slope Protection (line Canal) 378.00 X-x-x-x-x-x-x----nothing Follows ----x-x-x-x-x-x-x January 27, 2025 ________________________________ Wilfredo S. Tomines Chairperson, Bids And Awards Committee
Closing Date17 Feb 2025
Tender AmountPHP 9.9 Million (USD 170.5 K)
Department Of Health Chd, Zamboanga Peninsula Tender
Philippines
Details: Description Invitation To Bid Contract Id: 25-01-020 Contract Name: Procurement Of Medical And Laboratory Supplies & Reagents Approved Budget For The Contract (abc): Php 3,088,500.00 Cost Of Bidding Documents: Php 5,000.00 1. The Department Of Health – Zamboanga Peninsula – Center For Health Development, Through The General Appropriation Act Of 2025 Intends To Apply The Sum Of (please See Bid Data Sheet Clause 19.3 For The Abc Corresponding To Each Lot, For The Procurement Of Drugs And Medicines Under Contract Id: 25-01-020 Being The Abc To Payments Under The Contract For Each Item. Bids Received In Excess Of The Abc For Each Item Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Health – Zamboanga Peninsula – Center For Health Development Now Invites Bids For The Procurement Of Drugs And Medicines Under Contract Id: 25-01-020.1 Delivery Of The Goods Is Required As Specified In Section Vi. Schedule Of Requirements. Bidders Should Have Completed, Within One (1) Year From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. B. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. 4. Prospective Bidders May Obtain Further Information From Department Of Health – Zamboanga Peninsula – Center For Health Development And Inspect The Bidding Documents At The Address Given Below During 8:00 A.m - 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be May Be Acquired By Interested Bidders From January 27,2025 To February 18,2025 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb Fee For The Bidding Documents In The Amount Stated Above. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Department Of Health - Zamboanga Peninsula - Center For Health Development , Will Hold A Pre- Bid Conference2 Through Video Conferencing On February 4,2025 At 9:00 A.m. In The Conference Room, Doh - Zamboanga Peninsula - Center For Health Development, Upper Calarian, Zamboanga City Which Shall Be Open To Prospective Bidders. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 8. Bid Opening Shall Be At February 18,2025 At 9:00 A.m. At The Given Address Below And Ca Be Witness Live (video Conferencing) By Prospective Bidders Through Webex Platform. Bids Will Be Opened In The Presence Of The Bidders' Representative Who Choose To Attend The Activity. 1 A Brief Description Of The Type(s) Of Goods Should Be Provided, Includ Ing Quantities, Location Of Project, And Other Information Necessary To Enable Potential Bidders To Decide Whether Or Not To Respond To The Invitation. 6 May Be Deleted In Case The Abc Is Less Than One Million Pesos (php1,000,000) Where The Procuring Entity May Not Hold A Pre-bid Conference. 9. The Department Of Health - Zamboanga Peninsula - Center For Health Development Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Bac - Secretariat Department Of Health - Zamboanga Peninsula - Center For Health Development Upper Calarian, Zamboanga City Doh9procurementservice@gmail.com 062 - 957-4803 Ro9.doh.gov.ph 11. You May Visit The Following Websites: For Downloading Of Bidding Documents: Ro9.doh.gov.ph January 27,2025 Date Of Posting Lenny Joy Johnson - Rivera,md.,mdm.,ceso Iv Director Iii Bac – Chairperson
Closing Date18 Feb 2025
Tender AmountPHP 3 Million (USD 52.6 K)
DEPT OF THE NAVY USA Tender
Machinery and Tools
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n744.10|er4|n/a|zachary.r.morrill.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C And Section E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
production Lot Testing|1|186|
inspection And Acceptance - Short Version|8|x||x||||||
desired And Required Time Of Delivery (june 1997)|29|clin0001aa|17|186|clin0001ab|18|186||||||||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications; Combo - Receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|tbd|w25g1u - 17; W62g2t - 18|tbd|n/a|n/a|n/a|n/a|n/a|n/a|see Dd1423||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
first Article Approval--contractor Testing (sep 1989)|10|1|w25g1u|30 Days |tbd|zachary Morrill & Zachary.r.morrill.civ@us.navy.mil|tbd|w62g2t|tbd|||
option For Increased Quantity (mar 1989)|1|180|
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||x ||||||||||||
annual Representations And Certifications (jan 2025)|13|332991|1250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Of First Article Testing|3||||
1. This Requirement Is Pursuant To Emergency Acquisition Flexibilities (eaf).
2. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
3. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issued" Contractual Documents As Detailed Herein.
4. If Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Name, Street Address, And Cage Of The Facility.
5. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Shall Be A Rated Order.
6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page Under Contract Opportunities On Sam.gov Website. After Requesting Access, Send An Email To The Poc Listed On The Solicitation.
7. The Government Retains The Option To Order An Additional Quantity Up To 100% Of This Order For 180 Days Aro At The Same Price. The Government May Choose To Exercise This Option Or Not.
8. This Solicitation Requires First Article Testing (fat). See Far 52.209-3 First Article Approval - Contractor Testing For More Details.
\
1. Scope
1.1 ;this Procurement Specification Contains The Requirements For Manufacture And The Contract Quality Requirements For ;bearing, Mast; For Use On Navy Submarines.;
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.1.3 The "document Changes" Section Provides Supersessions/changes To Referenced Documents.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
drawing Data=4491147 |53711| J| |d|0001 | J|49998|0437522
document Ref Data=mil-std-973 | | | |000930|a| |04|
document Ref Data=mil-std-130n | | | |121116|a| |01|
document Ref Data=asme B46.1 | | | |090101|a| | |
document Ref Data=iso 10012 | | | |030415|a| | |
document Ref Data=ncsl Z540.3 | | | |060803|a| | |
document Ref Data=fed-std-28/20b | | | |940310|a| | |
document Ref Data=mil-i-45208a | | | |951103|a|2 | |
document Ref Data=astm B150/b150m-2019 | | | | |a| | |
document Ref Data=iso9001 | | | |150915|a| | |
document Change Data=mil-b-24059 |astm B150/b150m
3. Requirements
3.1 ;design And Manufacturing - The ;bearing, Mast; Furnished Under This Contract/purchase Order Shall Meet The Material, Physical And Mechanical Requirements As Specified On Drawing 4491147, Item No. 7 Including Associated Specifications Mentioned In This
procurement.;
3.1.1 ;the ;bearing, Mast; Shall Be Manufactured From Nickel-aluminum-bronze Material Per Specification Astm B150/150m In Lieu Of Mil-b-24059 Listed On Drawing 4491147, Item No. 7.;
3.2 ;marking Requirements - The Supplier Shall Permanently Identify And Mark Each Production Lot Unit ;bearing, Mast; In Accordance With Notes 5 And 12 (a) And (b) Of Drawing 4491147 Per Mil-std-130.;
3.2.1 ;the Supplier Shall Mark ;bag Or Tag; Each Part With Contract And Heat Number Per Mil-std-130.;
3.3 ;notification - The Supplier Shall Notify Naval Surface Warfare Center, Philadelphia Division, (nswcpd), 5001 S. Broad Street, Philadelphia, Pa 19112-1403 By Email Matthew.ogilvie@navy.mil, Code 242mo After Award Of Contract.;
3.3.1 ;the Nswcpd Is The Acceptance Activity For The Contract Data Requirements List (dd1423) Data Items. Nswcpd Wawf/irapt ;acceptor; Dodacc Is ;n64498;.;
3.4 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.4.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority.
Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below.
The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788.
Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.5 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 ;inspection System - The Supplier's Quality Inspection System Shall Be In Accordance With Mil-i-45208 Or Iso 9001 And Ncsl Z540.3 Or Iso 10012. The Supplier Shall Develop And Submit Their Written Quality Inspection And Test Plan As Indicated On The
contract Data Requirements List (dd Form 1423). Government Approval Of The Supplier's Written Quality Inspection And Test Plan Is Required By The Contract.
cdrl: Quality Inspection & Test Plan Per Mil-i-45208, Ncsl Z540.3 And Di-qcic-81110;
4.5 ;surface Roughness - All Surface Finishes Are In Rms Measurements. Where The Degree Of Surface Roughness Is Indicated, The Surface Shall Free From All Visible Imperfections As Defined By Standard Asme B46.1.;
4.6 ;finished Edges - Finished Edges Shall Be In Accordance With The Applicable Drawing Requirements.;
4.7 ;threads - Threads Shall Be Inspected In Accordance With Fed-std-h28/20 System 21 Requirements. Thread Inspection Shall Include The Measurement And Recording Of The Major Diameter For External Threads And The Minor Diameter For Internal Threads.;
4.8 ;material Control - The Supplier Shall Have An Effective Material Control System That Provides For Certified Quantitative Mill Or Industrial Laboratory Reports Of Chemical And Physical Analysis By Heat, Lot Or Batch For Raw Material Ordered For
production Units. If The Material(s) Is Subsequently Heat-treated, A Certification Of Physical Analysis, After Heat Treatment, Is Also Required For Each Heat, Lot Or Batch. Also, Where The Applicable Material Specification Calls Out (e.g. Corrosion Resistance
test, Macro-etch Test, Etc.,) These Test Results Shall Also Be Reported On The Applicable Mill Or Industrial Laboratory Report. The Physical Analysis Shall Establish The Following Properties For Metallic Part: Ultimate Tensile Strength, Yield Strength And
elongation.;
4.9 ;production Lot.;
4.9.1 ;visual/dimensional Inspection - The Supplier Shall Visually And Physically Inspect 100% The Production Lot Units And Record The Actual Measurements Of Each Dimension And Thread (including The Minor Diameter For Internal Threads) Identified On The
applicable Drawing. Threads Shall Be Inspected 100% And Results Recorded.;
4.10 ;production Lot Inspection/acceptance - (supplier Testing/inspection). The Supplier Shall Submit For The Production Lot Units, The Inspection And Test Reports Identified In The Objective Quality Evidence Records Section Of This Document And As
indicated On The Contract Data Requirements List (dd Form 1423). Government Approval Is Required Prior To Shipment Of Production Units.;
4.11 ;final Inspection And Acceptance - Final Inspection And Acceptance Of Production Lots Shall Be Made By The Cognizant Dcma-qar. Nswcpd Shall Either Issue Specific Government Inspection Instructions Or Inspection Hold Points Based On Whether Dcma Or
nswcpd Will Be Performing The Required Inspections/tests. In Addition To The Normal Dcma Surveillance, The Production Unit(s) Shall Be Under The Surveillance Of Nswcpd Quality Assurance Specialist As Required.;
4.12 ;objective Quality Evidence Records - The Supplier Shall Maintain Objective Quality Evidence Data (oqeds) Of Raw Material And Finished Parts. Records Shall Be Traceable By Drawing/item, Heat And Contract Number. All Oqeds Shall Be Clearly Legible
including Name And Title. The Supplier May Provide Exact (quality) Photocopies Of Objective Quality Evidence Records Being Delivered Under This Purchase Order Instead Of Originals.;
4.12.1 ;the Supplier Shall Furnish A Copy Of The Following Oqeds Listed Below And As Indicated On The Contract Data Requirements List (dd Form 1423) For Acceptance. The Reports Shall Be Correlated To The Drawing/item, Heat And Contract Number. Supplier
format Is Acceptable For The Below Listed Cdrls.
A. Certified Quantitative Mill Or Industrial Laboratory Certification (chemical And Physical Analysis).
cdrl: Certified Quantitative Mill Certification Per Di-misc-80678
B. Visual/dimensional Inspection Reports Shall Show All The Characteristics, The Actual Measurement Of Each Dimension Inspected Including Threads (also The Minor Diameter For Internal Threads) Contract Number, Name Of Supplier, Drawing/item Number, Drawing
revision Letter And Heat Number Of Finished Parts, Item Nomenclature And Inspector's Acceptance Signature And Date.
cdrl: Visual/dimensional Inspection Report Per Di-ndti-80809b
C. Mercury Exclusion Certification (representing The Contract Units Shipment)
cdrl: Mercury Exclusion Certification Per Di-misc-80678;
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
5.2 Special Marking Requirements - Carderock Division, Naval Surface Warfare Center, Code 9613, Will Furnish The Dcmc-qar With A Special Stamp And Instruction For Marking The Package Of Each Acceptable Production Unit. The Dcmc-qar Or The Contractor (as
directed) Shall Stamp The Package Of Each Accepted Production Unit Prior To Shipment.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Statement Of Prior Approval Data - If The Item(s) Being Offered Meet The Requirements Specified In The Contract/purchase Order And Is An Exact Duplicate Of Item(s) Previously Approved By The Government, Furnish The Nsn, Name Of Prime Manufacturer, Drawing
number, Technical Manual Number, And Previous Contract Number. Provide This Information On Company Letterhead Signed By A Responsible Company Official.
6.2 Special Assistance From Submarine Sail Systems Department (sssd) - Commander, Carderock Division, Naval Surface Warfare Center (cdnswc),code 961, U.s. Naval Base, Philadelphia, Pa 19112-5083, Will Make Available Trained And Experienced Personnel Who Are
qualified To Offer Assistance And Guidance To The Contractor By Pointing Out Areas Of Usual Difficulty. This Will Aid The Contractor In Producing A Higher Percentage Of Acceptable Material.
Contractors Who Have Not Previously Furnished This Material To The Government And Whose Plant Facilities Have Not Been Evaluated, Or Personnel Have Not Been Given Special Instruction By A Representative From Submarine Sail Systems Department (sssd), Are
requested To Contact Cdnswc Through The Cognizant Contract Administration Service Component Representative Office.
Sssd May Initially Contact The Contractor To Make Arrangements For These Services.
The Sssd Representative Will Coordinate His Work Closely With The Contract Administration Services Component Representative. However, Any Recommended Changes In Specifications Relative To Navicp Contract Shall Be Presented To Navicp For Approval And
confirmation Via The Contract Administration Service Component Representative.
The First Article And Production Units(s) Shall Be Under The Surveillance Of Cdnswc Quality Assurance Specialist As Required.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.4 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
6.5 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navicp Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navicp Does Not Regularly Purchase Only Technical Manuals Without
Purchasing Hardware And Related Tdp Software. Therefore,
Most Navicp Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, F Or X Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Defense Logistics Service Center (dlsc) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Forign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcmc Or Nspcc The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Ar To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offerer Is To Enter The
Appropriate Price Group. The Price Group Are Defines As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered Inpricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Becoded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
date Of First Submission=asreq
;approval Of The Quality Inspection Plan By Nswc Philadelphia Division Is Required Prior To Production.;
;nswcpd Is The Acceptance Activity For Cdrl Data Item A001. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;
date Of First Submission=asreq
;supplier Format Is Acceptable.;
;approval Of The Certification By Nswc Philadelphia Division Is Required Prior To Shipment Of Production Lot Units.;
;nswcpd Is The Acceptance Activity For Cdrl Data Item A002. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;
date Of First Submission=asreq
;approval Of The Report By Nswc Philadelphia Division Is Required Prior To Shipment Of Production Lot Units.;
;nswcpd Is The Acceptance Activity For Cdrl Data Item A003. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;
date Of First Submission=asreq
;supplier Format Is Acceptable.;
;approval Of The Certification By Nswc Philadelphia Division Isrequired Prior To Shipment Of Production Lot Units.;
;nswcpd Is The Acceptance Activity For Cdrl Data Item A004. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;
Closing Date21 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n744.4|er1|email Only|james.e.lewis5@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|||||||||
desired And Required Time Of Delivery (june 1997)|29|0001|10|365|||||||||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|receiving Report And Invoice Combo|na|tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
integrity Of Unit Prices (nov 2021)|1||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
limitation Of Liability--high-value Items ($100k)(feb 1997)|1||
limitations On Pass-through Charges (jun 2020)|1||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (feb 2024)|13|334220|1250||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021))|7||||||||
type Of Contract (apr 1984)|1|fpp|
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data--basic (feb 2024))|1||
the Following Clauses Are Hereby Removed:
252.225-7021
252.225-7035
252.225-7036
clause 52.211-9 Item No. Is Corrected From X To 0001.
closing Date Extended To 20 Feb 2025.
\
solicitation Is Hereby Extended To 20 Dec 2024.
tdp Is Updated From Version 002 To 003.
clause 252.225-7020 And 52.211-8 Are Hereby Removed.
clause 52.211-9 Is Hereby Added And Incorporated In This Rfp.
the Following Remarks Are Hereby Removed:
1. Notice To Contractor's Providing Surplus Material:a Surplus Material Certificate And Label Must Accompany Your Quotation Forsurplus/new Surplus/new Manufactured Surplus Material. All Surplus Materialmust Have Traceability Back To A Government Contract In Order
to Be Consideredfor Award. Without This Information We Are Unable To Determine When Thegovernment Purchased And Inspected The Item And Therefore, We Cannot Beassured Of Technical Acceptability.
if Submitting Your Quotation Via Edi, A Faxed Or Email Copy Of The Surpluscertificate, Along With A Photo Of The Box And Label Must Be Sent To The Buyerasap.
2. If Quoting As A Distributor Or Dealer To The Oem, Please Submit Fulltraceability Back To The Oem With Your Quote.
\
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To This Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or Sent
By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
in Accordance With Dfar 217.7301, Contractors Shall Identify Their Sources Of Supply In Contracts For Supplies. If The Item Currently Being Procured Is A Non-value Added Item, Please Provide:
actual Manufacturer:
cage Code:
address:
delivery Lead Time: __________________________
If Incremental Deliveries Are Possible, Please Provide A Proposed Schedule To Include Specific Delivery Times For All Units.
offer Valid For ___________________ Days.
please Provide Email Address For Follow-up Communications_______________________________________.
packaging Location If Different Than Offeror:
name/cage ___________________________________________
address______________________________________________
notice To Contractor's Providing Surplus Material:
a Surplus Material Certificate And Label Must Accompany Your Quotation For Surplus/new Surplus/new Manufactured Surplus Material. All Surplus Material Must Have Traceability Back To A Government Contract In Order To Be Consideredfor Award. Without This Information
We Are Unable To Determine When The Government Purchased And Inspected The Item And Therefore, We Cannot Be Assured Of Technical Acceptability.
if Submitting Your Quotation Via Edi, A Faxed Or Email Copy Of The Surplus Certificate, Along With A Photo Of The Box And Label Must Be Sent To The Buyerasap.
this Order Requires A Higher Level Inspection.
the Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
if Quoting As A Distributor Or Dealer To The Oem, Please Submit Full Traceability Back To The Oem With Your Quote.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The As4674/u Ant-radome .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
document Ref Data=mil-std-130 | | |m |051202|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=iso9001 | | | |010417|a| | |
3. Requirements
3.1 Cage Code/reference Number Items - The As4674/u Ant-radome Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;16848 252016-1;
3.1.1 ;a) Drawing Changes To Remove Obsolescence (such As The Fiberglass Radome) Have Been Approved Via Signed Notice Of Revisions (nor), Dd Form 1685. These Ch Anges Have Not Been Incorporated In The Drawings Yet. But The Nor Form Is Approved For
manufacture. An Updated Tdp With Signed Nor Forms Will Be Provided To Navsup For The Solicitation.
b) Lockheed Martin Had Manufacturing Difficulty With Semi-rigid Cables. Nuwc Will Develop A Design For Alternative Ez-flex Rf Cables Instead. Nuwc Will Create A New Drawing And Provide Any Subsequent Nors For This Design Change And Provide The Tdp For The
solicitation.
c) Nuwc Will Provide, As Gfm, Qty 10 Of Obsolete Mesfet, Ne650103m.;
3.2 Source Control Item - Previous Delivery Of The Specified National Stock Number Or Similar Item Manufactured To Technical Procurement Specifications And/or Drawings Supplied By A Government Activity Or Price Contractor Does Not In Itself Qualify A Supplier
as A Government Approved Source. Only Those Sources For This Item Previously Approved By The Government Have Been Solicited. The Time Required For Approval Of A New Supplier Is Normally Such That Award Cannot Be Delayed Pending Approval Of The New Source.
If You Have Not Been Solicited And You Can Furnish Either (a) Proof Of Your Prior Approval As A Supplier Of This Item, Or (b) Data Showing You Have Produced The Same Or Similar Items Satisfactorily For The Government Or A Commercial Source, Or (c) Test
data Indicating Your Product Can Meet Service Operating Requirements, Or (d) Other Pertinent Data Concerning Your Qualificatin To Produce The Required Item, Notify The Procurement Contracting Officer In Writing, Furnishing Said Proof Of Data For Evaluation
possibly Leading To Your Firm Being Authorized As An Approved Source For This Procurement Or Subsequent Procurements.
3.3 Marking - This Item Shall Be Physically Identified In Accordance With Mil-std-130.
3.4 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Spcc Contracting Officer Has Been Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Or A Detailed Description Of The Change, Explaining The Reason Therefore. If Finished Detail Drawings Are Not Available, Shop Drawings Inthe Form Used By The Manufacturer
will Be Acceptable For Government Evaluation. When Notifying The Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change/minor Design Change - If The Manufacturer's Part Number Or Item Design Indicated Thereon Has Changed, But Form, Fit And Function Of The Item Is Not Affected Thereby, And The Design Change Meets The Criteria For Minor, By Not
effecting Form, Fit, Function, Reliability Or Safety , Supply The Item And Advise Spcc Immediately Of The New Part Number, Furnishing A Detail Drawing And/or A Detailed Description Of The Change, As Applicable.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace
New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.5 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Inspection System Requirements - The Supplier Shall Provide And Maintain An Inspection/quality System Acceptable To The Government. The Inspection System Requirements For This Contract/purchase Order Shall Be In Accordance With Mil-i-45208. Suppliers
certified To Perform Under Iso 9001 Or Iso 9002 Are Granted Permission To Utilize The One Desired In Lieu Of Mil-i-45208.
4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
Closing Date20 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|combo ||tbd|n00104|tbd|tbd|tbd|tbd|tbd|tbd|tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
integrity Of Unit Prices (nov 2021)|1||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023))|9||||||||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
contractor Purchasing System Administration-basic (may 2014)|1||
limitation Of Liability--high-value Items ($100k)(feb 1997)|1||
authorized Deviations In Clauses (nov 2020)|2|||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7||||||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|334412|750 Employees||||||||||||
type Of Contract (apr 1984)|1|ffp|
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Reason For This Amendment Is The Add The Below Terms To This Solicitation / Resultant Contract:
1: The Government's Required Delivery Date (rdd) Is 31 December 2026 Or Earlier On All Deliveries.
2: The Following Term Applies To This Solicitation And Resultant Contract/order:
"this Order �solicitation� Is Issued Under And Pursuant To The Provisions Of The Basic Ordering Agreement (boa). The Terms And Conditions Of The Boa Are Hereby Incorporated By Reference And, Except As Provided Herein By This Order �solicitation�, Remain In Full
force And Effect. If Any Conflict Arises In The Terms Of This Order Versus The Terms In The Boa, The Terms Of The Boa Shall Apply."
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;53711 5190124;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;53711 5190741;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Heater Assembly,rad .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Heater Assembly,rad Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;53711 5188230;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; .
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Motional Joint Asse .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Motional Joint Asse Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;53711 5188416;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;53711 5190733;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;53711 5543203;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;53711 5942884;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Supply,electric .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Supply,electric Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be
performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor
or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;15090 6309885;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
Closing Date15 Apr 2025
Tender AmountRefer Documents
9271-9280 of 9621 active Tenders