Website Tenders
Website Tenders
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+2Others, Building Construction
United States
Closing Date12 Feb 2025
Tender AmountRefer Documents
Details: Page 11 Of 11
amendment 1 Revised Notice With Updated Selection Criteria And Date Extension.
this Is Not A Request For Proposal. This Is A Request For Standard Form (sf) 330 Architect-engineer Qualifications Packages Only. All Information Needed To Submit Sf 330 Documents Is Contained Herein. No Solicitation Package, Technical Information, Or Bidder/plan Holder List Will Be Issued. The Government Will Not Pay, Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. general Information veterans Health Administration (vha) Regional Procurement Office West (rpow) Network Contracting Office 20 (nco20) Is Seeking Sources And Intends To Award A Firm Fixed Price Design Contract For Architect-engineering (a-e) Services For The Development Of Complete Construction Documents, Which Include Working Drawings, Specifications, And Reports, And Construction Period Services For Project # 463-25-101 Generator Physical Security Upgrades At The Alaska Va Healthcare System Outpatient Clinic Located At 1201 N Muldoon Rd, Anchorage, Ak 99504-6104. The A-e Services Contract That Is Anticipated To Be Awarded Will Be Procured In Accordance With The Selection Of Architects And Engineers Statute [formerly Known As The Brooks Architect Engineer Act], Federal Acquisition Regulation (far) Subpart 36.6 Architectural And Engineering Services, Va Acquisition Regulation (vaar) 836.6, And Va Acquisition Manual (vaam) M836.6 Architect-engineer Services. In Accordance With Far 36.209, Construction Contracts With Architect-engineer Firms, No Contract For The Construction Of A Project Shall Be Awarded To The Firm That Designed The Project Or Its Subsidiaries Or Affiliates, Except With The Approval Of The Head Of The Agency Or Authorized Representative. project Information this Project Is A 100% Set-aside For Service-disabled Veteran-owned Small Business (sdvosb) Concerns. The Naics Code For This Procurement Is 541330 Engineering Services And The Annual Small Business Size Standard Is $25.5m. A Full Design Team Is Required To Complete This Project. The Va Expects To Award The Anticipated A-e Contract Approximately Early March 30, 2025. the Anticipated Period Of Performance For Completion Of Design Is 164 Calendar Days After Notice Of Award (noa). The Vaar Magnitude Of Construction Is Between $695,000.00 And $1,000,000.00. Please Note That The 164 Calendar-day Period Of Performance For The Design Completion Begins With The Issuance Of The Noa And That A Notice To Proceed (ntp) Will Not Be Issued For The Completion Of A Design Project. submission Requirements: the Below Information Contains The Instructions And Format That Must Be Followed For The Submission Of The Sf 330 Statement Of Qualifications: submit One (1) Sf 330 Statement Of Qualifications To Contract Specialist Melita Bernardo At Nco20aesf330@va.gov And Melita.bernardo@va.gov. This Must Include Parts I And Ii And Any Applicable Attachments. the Submission Must Include The Sf 330, Architect-engineer Qualifications Form Is Available Online At: Http://www.cfm.va.gov/contract/ae.asp Or Https://www.gsa.gov/system/files/sf330-21.pdf the Sf 330 Submission Is Due By February 12, 2025, 3:00pm (pst). the Sf 330 Must Be Submitted In One Email And Have A File Size No Larger Than 5 Mb. No Hard Copies Will Be Accepted. the Subject Line Of The Email Must Read: Sf 330 Submission 36c26025r0045 Project 463-25-101, General Physical Security Upgrades.
the Sf 330 Submission Must Not Exceed A Total Of 50 Pages. This Includes Title Page, Table Of Contents, And Any Other Relevant Information. Any Pages Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. Each Page Must Be In Arial Size 12 Font, Single Spaced. Part Ii Of The Sf 330 And Any Cpars Or Ppqs Will Not Count Toward The Page Limitation. a Ppq Obtained For Another Sf 330 Submission May Be Submitted For This Project. However, If Significant Portions Of The Project Have Been Completed Since The Ppq Was Filled Out, A New Ppq Should Be Submitted To Accurately Assess The Project. firms Must Include The Following Information In Section B Of The Sf 330 Submission: sam Unique Entity Identifier tax Id Number cage Code primary Point Of Contact S Email Address And Phone Number all Questions Must Be Submitted To Melita.bernardo@va.gov With The Subject Line Sf 330 Questions - 36c26025r0045 Project 463-25-101 Generator Physical Security Upgrades. The Cutoff For Question Submission Is January 22, 2025, 3:00pm Pst. Questions Will Be Answered Through Amendment To The Notice Posted To Contract Opportunities At Sam.gov. this Procurement Is A 100% Set-aside For Sdvosb Concerns. Offers Received From Other Than Sdvosbs Will Not Be Considered. Offerors Must Be Certified As Sdvosbs By The U.s. Small Business Administration (sba) And Visible In The Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov/) At The Time Of Sf 330 Submission, Written Response Submission, And Award. Failure To Be Certified In The Vetcert Database At These Times Will Result In The Offeror Being Deemed Ineligible For Award. all Joint Ventures Must Be Sba Certified At The Time Of Sf 330 Submission, Written Response Submission, And Award And Must Submit Agreements That Comply With 13 Cfr 128.402 Prior To Contract Award. all Prime Firms Must Meet The Naics Code Requirement Specified In This Notice. The Contracting Officer Will Verify The Naics Code In Vetcert. Failure To Meet The Naics Code Requirement May Result In The Rejection Of The Sf 330 Submission. sf 330 Submissions Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. firms Not Providing The Required Information May Not Be Evaluated. All Information Must Be Included In The Sf 330 Submission Package. it Is The Offeror S Responsibility To Check The Contract Opportunities Website At Sam.gov For Any Revisions To This Announcement Prior To Submitting Their Sf 330. a-e Selection Process firms Who Timely Submit Sf 330s In Response To This Announcement, And In Accordance With Submission Requirements, Will Be Considered For Evaluation. The Selection Will Be Made As Follows: sf 330s Will Be Evaluated In Accordance With The Primary Selection Criteria As Stated In This Notice. These Evaluations Will Determine The Most Highly Qualified Firms For This Particular Requirement. in Accordance With Far 36.602-3(c), At Least Three Of The Most Highly Qualified Firms Will Then Be Notified Of The Government S Intent To Hold Discussions. Firms That Were Not Selected For Discussions Will Be Notified At This Time. In Accordance With Far 36.607(b), Any Requested Debriefings Of Successful And Unsuccessful Firms Will Be Held After Final Selection Has Taken Place And Will Be Conducted, To The Extent Practicable, In Accordance With 15.503, 15.506(b) Through (f), And 15.507(c). Note That 15.506(d)(2) Through (d)(5) Do Not Apply To Architect-engineer Contracts. discussions Will Be Held With Top Three Firms In The Form Of Written Responses. The Firms Invited To Participate In Discussions Will Be Notified By Contract Specialist Or Contracting Officer By Email With Detailed Instructions That Will Include Questions Or Topics To Address. following The Completion Of Discussions, The Firms Will Be Evaluated And Ranked Based On The Primary And (if Necessary) Secondary Selection Criteria. The Final Evaluation And Ranking Will Consider The Sf 330 Submission For Each Firm, As Well As Additional Information Obtained Via Discussions. The Highest Rated Firm Will Be Selected To Receive The Solicitation And Engage In Negotiations. the Solicitation Will Be Issued To The Highest Rated Firm As A Request For Fee Proposal (rfp). All Sow Attachments And Site-specific Documentation Will Be Provided To The Highest Rated Firm With The Rfp. A Site Visit May Be Authorized During The Negotiation Process. an Award Will Then Be Made As Long As The Negotiation Of Rates And Hours Leads To A Fair, Balanced, And Reasonable Determination Of The Final Contract Price. If Negotiations With The Highest Rated Firm Are Unsuccessful, The Firm Will Be Notified That Negotiations Have Been Terminated. Negotiations Will Then Be Initiated With The Next Highest Rated Firm, And So On Until Award Can Be Made Or This Announcement Is Cancelled. primary Selection Criteria: firms Responding To This Notice Will Be Evaluated And Ranked Using The Primary And Secondary Selection Criteria Listed Below. The Factors Are Listed In Descending Order Of Importance. The Evaluation Will Consider How Each Factor Is Addressed And How It Is Formatted To Coincide With The Selection Criteria. selection Criteria 1, Professional Qualifications (sections C Through E): The Evaluation Will Consider The Professional Qualification Necessary For Satisfactory Performance Of Required Service. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. The A-e Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure.
a Resume For Each Of These Key Positions Must Be Provided Via Section E Of The Sf330. Key Positions And Disciplines Required For This Project May Include Among Others:
architect (leed Certified) cadd Technician civil Engineer cost Estimator electrical Engineer environmental Engineer fire Protection Engineer geotechnical Engineer industrial Hygienist life Safety Engineer mechanical Engineer physical Security Specialists plumbing Engineer project Manager quality Assurance structural Engineer offer Must Include The Following Statement Of Sdvosb Compliance On The Cover Page When Submitting The Personnel Proposed To Perform The Work Under This Requirement: I [signatory Authority] ___________________, [company Or Joint Venture] __________________, Certify That The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Certified Sdvosbs By The Small Business Association S Veteran Small Business Certification (vetcert) In Compliance Of Va Acquisition Regulation (vaar) 852.219-75. the Information Provided In Sections C Through E Of The Sf 330 Will Be Used To Evaluate This Evaluation Factor. Do Not Include This Information In Section H, Unless It Is Pertinent To Support The Information Listed In The Other Sections. selection Criteria 2, Specialized Experience And Technical Competence (sections F, G, And H):
the Evaluation Will Consider Specialized Experience And Technical Competence In Design And Construction Period Services For Demolishing And Regrading Corridor. Provide Information For Example Projects Which Best Illustrate The Proposed Team S Experience And Competencies For This Contract. Submissions Shall Include Information Regarding Experience And Competence In These Areas: relocate The Exterior Bulk Storage Fuel Tank, And All Associated Piping And Appurtenances That Serves The Backup Generator, To A Location That Provides A Minimum Of 25 Ft Standoff Distance From The Service Drive. provide A Blast Resistant Screen Wall Or Barrier, To Protect The Relocated Bulk Storage Fuel Tank, Per The Va Physical Security & Resiliency Design Manual (2024, Pg 8-15). reconfigure The Backup Generator S Exterior Radiator So That It Does Not Collect Snow When It Is Not Running. Submissions Shall Include The Following Information For Example Projects: project Title, Location And Detailed Narrative Describing The Scope Of Services Provided Including The Type Of Work Performed By The Offeror And Its Role In The Project I.e., Prime Contract, Teaming Partner, Or Subcontractor. project Owner, Owner S Point Of Contact Including Telephone Number And Email Address. services & Deliverables Provided Under The Contract Or Task Order. period Of Performance, Including Start And Completion Dates total Dollar Value Of The Project contract Number Associated With The Project. submissions Shall Include No More Than Five (5) And No Less Than Three (3) Recent And Relevant, Government And Private Experience, Example Projects, Similar In Size, Scope, Construction Features And Complexity, Which Clearly Illustrate Experience And Competencies Listed Above And In Other Portions Of This Solicitation. Recent Is Defined As Services Provided In The Five (5) Years Prior To The Closing Date Of This Solicitation. Relevant Is Defined As Projects, Within The United States, Its Territories, Or Possessions, Requiring Tasks Identified In This Solicitation. Similar Complexity Is Considered Projects Of An Operational, Construction, Or Design Likeness To The Work Covered In This Solicitation. two (2) Of The Example Projects Must Have Construction Completed Or Construction Substantially (50%+) Complete. submit Example Project Information In Section F Of The Sf 330. section G Of The Sf 330 Will Be Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On The Provided Example Projects. the Evaluation Will Also Consider Narratives Addressing The Following Topics For The Offeror, And Key Consultants, In Section H Of The Sf 330: the Management S Approach. the Coordination Of Disciplines And Subcontractors quality Control Procedures, And familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. the Narratives Should Clearly Illustrate How Each Of The Topics Were Addressed. Re-stating Or Reiterating This List Or The Scope Of Work In Section H Will Not Be Sufficient.
narratives Submitted In Section H Of The 330, Shall Not Exceed One (1) Page In Length For The Offeror And Each Key Consultant. The Narrative Submissions Shall Not Exceed Ten (10) Pages Total For This Criterion. selection Criteria 3, Capacity (section H) the Evaluation Will Consider The Team S Plan And The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded During The Previous 12 Months And The Full Potential Value Of Any Current Indefinite Delivery Contracts. offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Completion Percentages And Expected Completion Date For Projects Awarded In The Previous 12 Months. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Team/personnel Provided In The Sf 330. selection Criteria 4, Past Performance (section H) the Evaluation Will Consider The Firm S Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Rating System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Cpars Entry. Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted With Each Project In Section F So Cpars Can Be Reviewed In The Database. for Any Project That Does Not Have Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Requested Complete Ppq From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. evaluations May Also Include Additional Performance Related From The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers May Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf 330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. for Ppqs, Please Utilize The Attached Ppq Document Only. Completed Ppqs Should Be Incorporated Into The Sf 330 Directly. Ppqs Should Not Be Submitted Separately To Nco20 Directly. Any Ppqs Will Not Be Counted Towards The Page Limitations For This Submission. However, Any Narratives Provided For Past Performance In Section H Shall Not Exceed Two (2) Pages In Length And Will Be Counted Toward The Total Submission Page Limit. selection Criteria 5, Knowledge Of The Locality (section H), the Evaluation Will Consider The Knowledge Of The Locality, Including Specific Knowledge Of Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations Of The Area Of Anchorage, Ak. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Project Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. Information Related To The Firm S Location Shall Be Provided In Section H Under Secondary Selection Criterion Factor 1, Geographic Location. See Below. selection Criteria 6, Experience In Construction Period Services, (section H) the Evaluation Will Consider Experience In Construction Period Services (cps) Necessary For Performance Of This Contract. Submissions Shall Provide Information Which Clearly Illustrates Cps Experience In The Following: solicitation Support Services professional Field Inspections During The Construction Period, Both Scheduled And Emergent coordination With Commissioning Requirements/commissioning Services review Of Construction Submittals For Design Conformance, Variance, And Applicable Code/standard Compliance support In Answering Requests For Information (rfi) During The Construction Period support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates maintaining A Comprehensive Submittal Log Inclusive Of Material Data, Shop Drawings, Certifications, Etc. providing Timely And Complete Responses To Requests For Information providing Supporting Documentation (statements Of Work, Cost Estimates, Technical Reports, Etc.) For Construction Modifications providing Record Drawing Documentation process For Correcting Design Errors/omissions Identified During Construction attendance At Pre-bid, Post-award, And Commissioning Kick Off Construction Project Conferences providing Minutes Of Weekly Construction Meetings Throughout The Duration Of Construction site Visits During Construction Both Scheduled And Emergent ensuring Compliance With The Design Drawings And Specifications preparation Of Site Visit Reports generation Of Punch-list Reports review Of Construction Project Modifications For Cost And Technical Acceptability attendance And Participation During The Final Acceptance Inspection preparation Of Record Drawings Of The Completed Construction Project Based On The Construction Contactor S As-built Drawings maintenance Of Rfi Logs attendance At Weekly Conference Calls providing Minutes Of Meetings Between The Ae, Va, And Contractors pre-final Inspection Site Visits production Of As-built Documentation the Information For This Factor Shall Be Provided In Section H Of The Sf 330. secondary Selection Criterion: Geographic Location. location Of The Firm, As Measured By The Driving Distance (miles) Between The Offeror S Principal Business Location And The Alaska Va Healthcare System At 1201 N Muldoon Rd, Anchorage, Ak. Determination Of The Mileage Will Be Based On Google Maps. (https://www.google.com/maps/dir/). *the Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Discussions. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf 330 Submission Highly Qualified Or Not Highly Qualified. see Attached Document: 463-25-101 Sow 10-8-2024.
see Attached Document: Ppq Nco 20 - Generator Security - Project No 463-25-101.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
United States
Closing Date7 Feb 2025
Tender AmountRefer Documents
Details: This Is Not A Request For Proposal. This Is A Request For Standard Form (sf) 330 Architect-engineer Qualifications Packages Only. All Information Needed To Submit Sf 330 Documents Is Contained Herein. No Solicitation Package, Technical Information, Or Bidder/plan Holder List Will Be Issued. The Government Will Not Pay, Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. general Information veterans Health Administration (vha) Regional Procurement Office West (rpow) Network Contracting Office 20 (nco20) Is Seeking Sources And Intends To Award A Firm Fixed Price Design Contract For Architect-engineering (a-e) Services For A Complete Design For Project # 663-22-105 Sea Building 1 Hood Control System At The Va Puget Sound Healthcare System In Seattle, Washington. The A-e Services Contract That Is Anticipated To Be Awarded Will Be Procured In Accordance With The Selection Of Architects And Engineers Statute [formerly Known As The Brooks Architect Engineer Act], Federal Acquisition Regulation (far) Subpart 36.6 Architectural And Engineering Services, Va Acquisition Regulation (vaar) 836.6, And Va Acquisition Manual (vaam) M836.6 Architect-engineer Services. In Accordance With Far 36.209, Construction Contracts With Architect-engineer Firms, No Contract For The Construction Of A Project Shall Be Awarded To The Firm That Designed The Project Or Its Subsidiaries Or Affiliates, Except With The Approval Of The Head Of The Agency Or Authorized Representative. project Information this Project Is A 100% Set-aside For Service-disabled Veteran-owned Small Business (sdvosb) Concerns. The Naics Code For This Procurement Is 541330 Engineering Services And The Annual Small Business Size Standard Is $26m. A Full Design Team Is Required To Complete This Project. The Va Expects To Award The Anticipated A-e Contract In Late March 2025. the Anticipated Period Of Performance For Completion Of Design Is 301 Calendar Days After Notice Of Award (noa). The Vaar Magnitude Of Construction Is Between $1,000,000 And $2,000,000. Please Note That The Period Of Performance For The Design Completion Begins With The Issuance Of The Noa And That A Notice To Proceed (ntp) Will Not Be Issued For The Completion Of A Design Project. submission Requirements: the Below Information Contains The Instructions And Format That Must Be Followed For The Submission Of The Sf 330 Statement Of Qualifications: submit One (1) Sf 330 Statement Of Qualifications To Contract Specialist Kaycee Benson At Kaycee.benson@va.gov And Contracting Officer Ty Draszt At Nco20aesf330@va.gov. This Must Include Parts I And Ii And Any Applicable Attachments. the Submission Must Include The Sf 330, Architect-engineer Qualifications Form Is Available Online At: Http://www.cfm.va.gov/contract/ae.asp Or Https://www.gsa.gov/system/files/sf330-21.pdf . the Sf 330 Submission Is Due By February 7, 2025 By 12pm Pacific Time. the Sf 330 Must Be Submitted In One Email And Have A File Size No Larger Than 5 Mb. No Hard Copies Will Be Accepted. the Subject Line Of The Email Must Read: Sf 330 Submission 36c26024r0100_2 Project 663-22-105 Sea Building 1 Hood Control System.
the Sf 330 Submission Must Not Exceed A Total Of 50 Pages. This Includes Title Page, Table Of Contents, And Any Other Relevant Information. Any Pages Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. Each Page Must Be In Arial Size 12 Font, Single Spaced. Part Ii Of The Sf 330 And Any Cpars Or Ppqs Will Not Count Toward The Page Limitation. a Ppq Obtained For Another Sf 330 Submission May Be Submitted For This Project. However, If Significant Portions Of The Project Have Been Completed Since The Ppq Was Filled Out, A New Ppq Should Be Submitted To Accurately Assess The Project. firms Must Include The Following Information In Section B Of The Sf 330 Submission: sam Unique Entity Identifier tax Id Number cage Code primary Point Of Contact S Email Address And Phone Number all Questions Must Be Submitted To Kaycee.benson@va.gov With A Courtesy Copy To Ty.draszt@va.gov With The Subject Line Sf 330 Questions - 36c26024r0100_2 Project 663-22-105 Sea Building 1 Hood Control System. The Cutoff For Question Submission Is January 17, 2025 By 10am Pacific Time. Questions Will Be Answered Through Amendment To The Notice Posted To Contract Opportunities At Sam.gov. this Procurement Is A 100% Set-aside For Sdvosb Concerns. Offers Received From Other Than Sdvosbs Will Not Be Considered. Offerors Must Be Certified As Sdvosbs By The U.s. Small Business Administration (sba) And Visible In The Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov/) At The Time Of Sf 330 Submission, Written Response Submission, And Award. Failure To Be Certified In The Vetcert Database At These Times Will Result In The Offeror Being Deemed Ineligible For Award. all Joint Ventures Must Be Sba Certified At The Time Of Sf 330 Submission And Award And Must Submit Agreements That Comply With 13 Cfr 128.402 Prior To Contract Award. all Prime Firms Must Meet The Naics Code Requirement Specified In This Notice. The Contracting Officer Will Verify The Naics Code In Vetcert. Failure To Meet The Naics Code Requirement May Result In The Rejection Of The Sf 330 Submission. sf 330 Submissions Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. firms Not Providing The Required Information May Not Be Evaluated. All Information Must Be Included In The Sf 330 Submission Package. it Is The Offeror S Responsibility To Check The Contract Opportunities Website At Sam.gov For Any Revisions To This Announcement Prior To Submitting Their Sf 330. a-e Selection Process firms Who Timely Submit Sf 330s In Response To This Announcement, And In Accordance With Submission Requirements, Will Be Considered For Evaluation. The Selection Will Be Made As Follows: sf 330s Will Be Evaluated In Accordance With The Primary Selection Criteria As Stated In This Notice. These Evaluations Will Determine The Most Highly Qualified Firms For This Particular Requirement. in Accordance With Far 36.602-3(c), At Least Three Of The Most Highly Qualified Firms Will Then Be Notified Of The Government S Intent To Hold Discussions. Firms That Were Not Selected For Discussions Will Be Notified At This Time. In Accordance With Far 36.607(b), Any Requested Debriefings Of Successful And Unsuccessful Firms Will Be Held After Final Selection Has Taken Place And Will Be Conducted, To The Extent Practicable, In Accordance With 15.503, 15.506(b) Through (f), And 15.507(c). Note That 15.506(d)(2) Through (d)(5) Do Not Apply To Architect-engineer Contracts. discussions Will Be Held With Top Three Firms In The Form Of Written Responses. The Firms Invited To Participate In Discussions Will Be Notified By Contract Specialist Or Contracting Officer By Email With Detailed Instructions That Will Include Questions Or Topics To Address. following The Completion Of Discussions, The Firms Will Be Evaluated And Ranked Based On The Primary And (if Necessary) Secondary Selection Criteria. The Final Evaluation And Ranking Will Consider The Sf 330 Submission For Each Firm, As Well As Additional Information Obtained Via Discussions. The Highest Rated Firm Will Be Selected To Receive The Solicitation And Engage In Negotiations. the Solicitation Will Be Issued To The Highest Rated Firm As A Request For Fee Proposal (rfp). All Sow Attachments And Site-specific Documentation Will Be Provided To The Highest Rated Firm With The Rfp. A Site Visit May Be Authorized During The Negotiation Process. an Award Will Then Be Made As Long As The Negotiation Of Rates And Hours Leads To A Fair, Balanced, And Reasonable Determination Of The Final Contract Price. If Negotiations With The Highest Rated Firm Are Unsuccessful, The Firm Will Be Notified That Negotiations Have Been Terminated. Negotiations Will Then Be Initiated With The Next Highest Rated Firm, And So On Until Award Can Be Made Or This Announcement Is Cancelled. primary Selection Criteria: firms Responding To This Notice Will Be Evaluated And Ranked Using The Primary And Secondary Selection Criteria Listed Below. The Factors Are Listed In Descending Order Of Importance. The Evaluation Will Consider How Each Factor Is Addressed And How It Is Formatted To Coincide With The Selection Criteria. selection Criteria 1, Professional Qualifications (sections C Through E): The Evaluation Will Consider The Professional Qualification Necessary For Satisfactory Performance Of Required Service. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. The A-e Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure.
a Resume For Each Of These Key Positions Must Be Provided Via Section E Of The Sf330. Key Positions And Disciplines Required For This Project May Include Among Others: cost Estimator cadd Technician
civil Engineer
fire Protection Engineer
industrial Hygienist
mechanical Engineer
physical Security Specialist
plumbing Engineer
project Manager
structural Engineer
environmental Engineer
offer Must Include The Following Statement Of Sdvosb Compliance On The Cover Page When Submitting The Personnel Proposed To Perform The Work Under This Requirement: I [signatory Authority] ___________________, [company Or Joint Venture] __________________, Certify That The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Certified Sdvosbs By The Small Business Association S Veteran Small Business Certification (vetcert) In Compliance Of Va Acquisition Regulation (vaar) 852.219-75. the Information Provided In Sections C Through E Of The Sf 330 Will Be Used To Evaluate This Evaluation Factor. Do Not Include This Information In Section H, Unless It Is Pertinent To Support The Information Listed In The Other Sections. selection Criteria 2, Specialized Experience And Technical Competence (sections F, G, And H):
the Evaluation Will Consider Specialized Experience And Technical Competence In Design And Construction Period Services For Expansion And Renovations In Research & Development (r&d) Laboratory Spaces Within Specialty Care Clinics. Provide Information For Example Projects Which Best Illustrate The Proposed Team S Experience And Competencies For This Contract. Submissions Shall Include Information Regarding Experience And Competence In: medical Center Additions And Renovations For R&d Laboratory Spaces, repair Existing Conditions And Issues In The Renovated And New Construction Space provide New Mechanical, Telecommunications, Electrical And Fire Protection, For The New And Renovated Spaces. phasing Of The New Construction And Renovation To Minimize Disruption To The Hospital Which Must Remain Operational Throughout Construction. other Specialized Experience Includes Experience In Critical Path Scheduling, Fire Protection, Seismic Design, Construction Infection Control Protocols, Energy Conservation, Transition, Pollution Prevention, Waste Reduction, Use Of Recovered Materials Sustainable Design Practices And Decommissioning And Coordination.
submissions Shall Include The Following Information For Example Projects: project Title, Location And Detailed Narrative Describing The Scope Of Services Provided Including The Type Of Work Performed By The Offeror And Its Role In The Project I.e., Prime Contract, Teaming Partner, Or Subcontractor project Owner, Owner S Point Of Contact Including Telephone Number And Email Address. services & Deliverables Provided Under The Contract Or Task Order period Of Performance, Including Start And Completion Dates total Dollar Value Of The Project contract Number Associated With The Project. submissions Shall Include No More Than 5 And No Less Than 3 Recent And Relevant, Government And Private Experience, Example Projects, Similar In Size, Scope, Construction Features And Complexity, Which Clearly Illustrate Experience And Competencies Listed Above And In Other Portions Of This Solicitation. Recent Is Defined As Services Provided In The Five (5) Years Prior To The Closing Date Of This Solicitation. Relevant Is Defined As Projects, Within The United States, Its Territories, Or Possessions, Requiring Tasks Identified In This Solicitation. Similar Complexity Is Considered Projects Of An Operational, Construction, Or Design Likeness To The Work Covered In This Solicitation. three (3) Of The Five (5) Example Projects Must Have Construction Completed Or Construction Substantially (50%+) Complete. submit Example Project Information In Section F Of The Sf 330. section G Of The Sf 330 Will Be Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On The Provided Example Projects. the Evaluation Will Also Consider Narratives Addressing The Following Topics For The Offeror, And Key Consultants, In Section H Of The Sf 330: the Management S Approach the Coordination Of Disciplines And Subcontractors quality Control Procedures, And familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. the Narratives Should Clearly Illustrate How Each Of The Topics Were Addressed. Re-stating Or Reiterating This List Or The Scope Of Work In Section H Will Not Be Sufficient.
narratives Submitted In Section H Of The 330, Shall Not Exceed One (1) Page In Length For The Offeror And Each Key Consultant. The Narrative Submissions Shall Not Exceed Ten (10) Pages Total For This Criterion. selection Criteria 3, Capacity (section H) the Evaluation Will Consider The Team S Plan And The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded During The Previous 12 Months And The Full Potential Value Of Any Current Indefinite Delivery Contracts. offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Completion Percentages And Expected Completion Date For Projects Awarded In The Previous 12 Months. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Team/personnel Provided In The Sf 330. selection Criteria 4, Past Performance (section H) the Evaluation Will Consider The Firm S Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Rating System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Cpars Entry. Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted With Each Project In Section F So Cpars Can Be Reviewed In The Database. for Any Project That Does Not Have Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Requested Complete Ppq From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. evaluations May Also Include Additional Performance Related From The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers May Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf 330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. for Ppqs, Please Utilize The Attached Ppq Document Only. Completed Ppqs Should Be Incorporated Into The Sf 330 Directly. Ppqs Should Not Be Submitted Separately To Nco20 Directly. Any Ppqs Will Not Be Counted Towards The Page Limitations For This Submission. However, Any Narratives Provided For Past Performance In Section H Shall Not Exceed Two (2) Pages In Length And Will Be Counted Toward The Total Submission Page Limit. selection Criteria 5, Knowledge Of The Locality (section H), the Evaluation Will Consider The Knowledge Of The Locality, Including Specific Knowledge Of Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations Of The Area Of Seattle, Washington. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Project Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. Information Related To The Firm S Location Shall Be Provided In Section H Under Secondary Selection Criterion Factor 1, Geographic Location. See Below. selection Criteria 6, Experience In Construction Period Services, (section H) the Evaluation Will Consider Experience In Construction Period Services (cps) Necessary For Performance Of This Contract. Submissions Shall Provide Information Which Clearly Illustrates Cps Experience In The Following: solicitation Support Services professional Field Inspections During The Construction Period, Both Scheduled And Emergent coordination With Commissioning Requirements/commissioning Services review Of Construction Submittals For Design Conformance, Variance, And Applicable Code/standard Compliance support In Answering Requests For Information (rfi) During The Construction Period support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates maintaining A Comprehensive Submittal Log Inclusive Of Material Data, Shop Drawings, Certifications, Etc. providing Timely And Complete Responses To Requests For Information providing Supporting Documentation (statements Of Work, Cost Estimates, Technical Reports, Etc.) For Construction Modifications providing Record Drawing Documentation process For Correcting Design Errors/omissions Identified During Construction attendance At Pre-bid, Post-award, And Commissioning Kick Off Construction Project Conferences providing Minutes Of Weekly Construction Meetings Throughout The Duration Of Construction site Visits During Construction Both Scheduled And Emergent ensuring Compliance With The Design Drawings And Specifications preparation Of Site Visit Reports generation Of Punch-list Reports review Of Construction Project Modifications For Cost And Technical Acceptability attendance And Participation During The Final Acceptance Inspection preparation Of Record Drawings Of The Completed Construction Project Based On The Construction Contactor S As-built Drawings maintenance Of Rfi Logs attendance At Weekly Conference Calls providing Minutes Of Meetings Between The Ae, Va, And Contractors pre-final Inspection Site Visits production Of As-built Documentation the Information For This Factor Shall Be Provided In Section H Of The Sf 330. secondary Selection Criterion*: Geographic Location. location Of The Firm, As Measured By The Driving Distance (miles) Between The Offeror S Principal Business Location And The Va Puget Sound Healthcare System In Seattle, Washington. Determination Of The Mileage Will Be Based On Google Maps. (https://www.google.com/maps/dir/). *the Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Discussions. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf 330 Submission Highly Qualified Or Not Highly Qualified. attachments
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date18 Feb 2025
Tender AmountRefer Documents
Description: Contact Information|4|n743.43|wwf|717-605-3992|noelle.m.smith10.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C & E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version (jun 2002)|8|x||x||||||
general Information-fob-destination|1|a|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|n50286|tbd|||n/a||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year|365 Days After The Last Delivery Under This Contract|||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (feb2024))|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (feb 2024)|13|332722|500||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 18 February 2025.
tdp Was Updated.
1. Reference (a) Request To Take Exception To The Fracture Toughness Testing For The Subject Counter Sunk Socket Head Cap Screws.
in Response, Provided The Source Material Is 1/2 Inch Or Less In Diameter Or 1/2 Inch Or Less Thick, Fracture Toughness Testing Is Not Required.
the Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 14 June 2024.
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On 2.the Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt
final Delivery Of Material (210 Days)
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(b); Applies To This Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=7329673 |53711| A| |a|0001 | A|49998|0136140
document Ref Data=ff-s-86 | | |g |210127|a| | |
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=sae Ams 5662 | | |l |000701|a| | |
document Ref Data=sae Ams 5663 | | |n |160601|a| | |
document Ref Data=sae Ams 5664 | | |e |010101|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
3. Requirements
3.1 ;the Screw, Cap, Sch, Cntsk Must Be 3/8-24unrf-3a X 4.25, Ff-s-86 Ty Iv Inconel 718 Per Dwg 7329673 And Csd 443, Except As Amplified Or Modified Herein.;
3.2 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd443; In Ecds At Https://register.nslc.navy.mil/
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;screw;
material - ;inconel 718 Per Sae/ams 5664, Sae/ams 5662, Or Sae/ams 5663 With The Additional Heat Treatments Per Paragraph 2.2 Of Drawing 7329673. All Material Must Meet The Mechanical Properties Of;
3.3.1 ;fracture Toughness Test Results To Include Size, Geometry, Thread Type, And Length Of Material And Type.;
3.3.2 ;the Remainder Of The Test Block Must Be Supplied With Shipment.;
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - ;liquid Penetrant;
item - ;screw, Hex Socket, Flat Countersunk Head;
performance - ;t9074-as-gib-010/271;
acceptance - ;navsea Drawing 7329673, Paragraph 3.e;
3.5 ;the Contractor Must Maintain A Complete Record On File Of All Heat Treatment Operations Given Each Piece. The Contractor Must Provide A Certification Statement Signed By An Authorized Company Representative With A Sequential Description Of All Heat
treatment Operations In Accordance With All Requirements Of Navsea Drawing 7329673, Paragraph 5.3;
3.6 ;the Contractor Must Submit A Manufacturing Procedure In Accordance With Drawing 7329673, Paragraph 4.3 For Navsea Review And Approval Prior To Commencing Manufacturing.;
3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.8 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.8.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.8.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.8.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.8.4 A Copy Of The Final Waiver/deviation (both Approved And Disapproved) Must Be Forwarded With The Applicable Asset(s).
3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^
3.10 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.10.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.10.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.10.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Deep Submergence Systems Program (dssp) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco)
prior To Award Of Any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At Navicp-mech May Request The Pco Waive This Requirement.
3.10.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.10.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.11 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved
and Rejected And The Nature Of Corrective Action Taken As Appropriate.
3.11.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.11.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions
provided By The Government Representative.
3.12 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured/performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization Of
the Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased.
when The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of
this Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract
management Agency (dcma) Office. In The Event That A Local Government Representative Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.13 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.13.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.13.2 Inspection For Completeness And Proper Type.
3.13.3 Verification Of Material Quality Received.
3.13.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.13.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.13.6 Identification And Protection From Improper Use Or Disposition.
3.13.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.13.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.13.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.14 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Dssp Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And And Other Required Objective
quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, Section C
of This Contract/purchase Order.
3.14.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order.
3.14.2 The Contractor Must Develop Written Procedures That Implement The Material Control Requirements Stated Herein, Within Di-misc-81020, And Elsewhere In This Contract/purchase Order.
3.15 Material Traceability - Material Traceability Codes Must Be Permanently Applied To The Material And Annotated On Test Reports For Each Individual Heat/heat Treatment Of Material Supplied. Where Heat Traceability Is Not Possible Due To Manufacturing
processes (e.g. Continuous Pour Operations), Lot Traceability Must Be Provided As Defined In The Applicable Material Specification And, When Applicable, As Further Defined In The Contract/purchase Order. Traceability Marking Must Either Be Heat/lot Number, A
unique Vendor Traceability Number/code, Or A Combination Thereof To Maintain Complete Traceability To Certification Oqe. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.15.1 Procurement/receipt Inspections - Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Ports By Traceability Codes That Are Marked On The Material And Identified On The Test Reports. The
certification Data Requirements Contained In Di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Dssp Material.
3.15.2 Receiving Inspection Must Include As A Minimum - Verification That The Traceability Number Marked On The Material Agrees With That On The Certification Test Reports. Verification That Certification Test Reports Are Legible And Complete. Verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.16 Material Handling - All Raw Materials Must Be Marked With A Unique Traceability Number (except As Specified Below).
3.16.1 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.16.2 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrfabrication Process, The Marking Must Be Recorded Prior To Removal And Be Imimmediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An
appropriate Material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The
traceability Marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.16.3 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.16.4 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And
marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.16.5 For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties.
3.17 Final Inspection - The Following Inspection Must Be Performed Prior To Shipping Material.
3.17.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.17.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.17.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports
must Also Be 100% Inspected For Completeness And Legibility.
3.17.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.18 Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.18.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Heat Identification Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.18.2 Reidentification And Recertification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect It's Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Recertification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Redetermined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Reidentified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, The
original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Number ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat Number ________________ And Heat Treat Number ________________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.18.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.18.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
note: If Material Is Received Without The Required Certification Papers, The Material Will Be Rejected.
3.19 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking
requirements On Applicable Drawings And/or Specifications, Marking With A Traceability Code Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.19.1 Permanent Markings Are Not Required For Welding And Brazing Joints.
3.19.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.19.3 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.19.4 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.20 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address, Phone Number And Date, Quantity
inspected, Identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The
acceptance Criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.21 ;see Cdrl Di-mgmt-81580 (manufacturing Procedures) - The Vendor Must Submit A Manufacturing Plan In Accordance With Dwg 7329673, Paragraph 4.3 For Navsea Review And Approval Prior To Commencing.;
3.22 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address, Phone Number And Date.
2. The Contract/purchase Order Number (i.e. N00104-11-p-fa12).
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (i.e. 1h 4820 012345678 D4) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds. ("n/a" When Not Applicable).
5. Cure Date ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement For Any Hull, Mechanical And Electrical (hm&e) Testing Required That Include The Name Of The Test And That It Was Performed Satisfactorily. If No Hm&e Testing Is Required, The Statement Should Read "hull, Mechanical And Electrical (hm&e) Testing
n/a."
9. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements.
10. Contractor's Or Authorized Personnel's Signature.
3.22.1 For Connectors, Cables, And Junction Boxes Procured To Eb Specs S-5343934-1, S-5343934-2, S-5343934-3, Or Dry Deck Shelter Specification S-5486639-1, The Certificate Of Compliance Must Also Include The Information Below:
11. A Notation That 32 Root Mean Square (rms) Finishes Are In Accordance With The Specifications And Are Free Of Imperfections.
12. Direct Reading Of O-ring Surface Diameters With Specified Standard.
3.22.2 For Self-locking Hex Nuts Procured To Nasm 25027, The Certificate Of Compliance Must Also Include The Information Below:
13. A Statement To The Effect That Qualification Testing In Accordance With Nasm 25027 Paragraph 3.2 Is Satisfactorily Performed.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 10, 12 - Submit One Copy Of The Repair Procedure Prior To Performing Any Repair Work.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date4 Feb 2025
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report ? Certifications Combo ? Receiving Report & Invoice ? Material ||tbd|n00104|tbd|tbd|n50286|tbd|||n/a||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Closing Date Is Extended To 04 February 2025.
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2.drawings Can Be Accessed Thru: Beta.sam.gov.
3.navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000.
4.portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference To N00102 Within This Order Should Be Updated To N50286.
5.all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, End Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Here In.
6.the Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt
final Delivery Of Material (300 Days)
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
drawing Data=eb-2000 |96169| C|sp |d|0001 | C|49998|0484385
drawing Data=4384678 |80064| C| |d|0001 | C|49998|1136401
drawing Data=4385049 |53711| D| |d|0001 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0002 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0003 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0004 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0005 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0006 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0007 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0008 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0009 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0010 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0011 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0012 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0013 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0014 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0015 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0016 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0017 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0018 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0019 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0020 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0021 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0022 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0023 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0024 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0025 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0026 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0027 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0028 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0029 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0030 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0031 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0032 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0033 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0034 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0035 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0036 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0037 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0038 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0039 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0040 | D|00026|0000000
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
3. Requirements
3.1 ;seats For A Size 8-inch Ball Valve To Be In Accordance With Naval Ship Systems Command Drawing 4385049 Piece 3 Along With Naval Ship Systems Command General Notes Drawing 4384678, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;seats (q3), Piece 3;
material - Mc903 (type 6 Cast Nylon Produced With Polyepsilon Caprolactam By The Direct Polymerization Process) As Manufactured By The Polymer Corporation Or Equal In Accordance With Electric Boat Division Specification 2000. (properties Specified Below Only)
item Property Test Method Value
(a) Melting Point Astm E794 Or Astm D3418 221 Deg C +/- 9
(b) Relative Viscosity Astm D789 (notes 1 And 4) 2000 Minimum
(c) Specific Gravity Astm D792 1.15-1.17 At 23 Deg C
(d) Dimensional Change Notes 2 & 4 0.2% Maximum
(e) Tensile Impact Astm D1822 Type S 80 Ft-lbs/in�2 Specimen (notes 5 & 6) Minimum (note 3)
(f) Tensile Yield Stress Astm D638 (note 6) 9000 Psi Min. (note 3)
(g) Compressive Strength^ Astm D695 (note 6) 9000 Psi Min. (note 3) ^(at 1 Percent Offset)
(h) Water Absorption 24 Hour Astm D570 1.3 Percent Maximum Saturation Astm D570 7.0 Percent Maximum
(i) Rockwell "m" Hardness Astm D785 5 Minimum
note 1: The Test Specimen Must Be Finely Ground Particulates. After Immersion The Material Must Be Checked Daily For Dissolution And Must Dissolve No Longer Than One Hundred Twenty (120) Hours From The Start Of Immersion. Within Twenty-four (24) Hours Of The
test Specimen Determined To Be Fully Dissolved, It Must Be Tested For Viscosity.
note 2: Dimensional Stability Testing Must Be Performed In Accordance With The Dimensional Stability Method Per Astm D5989 Or Equivalent. The Percent Change In Each Dimension, Outside Diameter, Inside Diameter And Thickness Must Not Be Greater Than The Value
specified.
note 3: These Values Are Minimum Averages. Separate Specimens Results May Vary By 25%.
note 4: Any Change To An Already Established Heat Or Annealing Cycle To Achieve Both Relative Viscosity And/or Dimensional Stability Must Be Presented To The Procuring Activity For Approval Along With Justification For The Change.
note 5: Tensile-impact Test Specimens Are To Be Type S In Accordance With Astm D1822, Or Round Cylindrical Specimens In Accordance With Mil-dtl-32286, Paragraph 3.8
note 6: Prior To Test, The Specimens Must Be Dried In Accordance With Federal Specification L-p- 410a, Paragraph 4.4.5.
3.3 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On The
drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be
required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension.
3.4 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/.
3.5 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.5.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.5.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.5.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.6 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.7 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.8 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.8.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^
3.9 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System
3.9.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.9.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.9.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.9.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.9.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.10 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved
and Rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.10.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.10.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Command (dcmc) Office. In The Event That A Local Government Representative Or Dcmc Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.11.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.11.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.11.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.11.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must
be Established. Records Of This Effort Must Be Available For Review By The Government.
3.11.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.12 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.12.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.12.2 Inspection For Completeness And Proper Type.
3.12.3 Verification Of Material Quality Received.
3.12.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.12.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.12.6 Identification And Protection From Improper Use Or Disposition.
3.12.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.12.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.12.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.13 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.13.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That Implement The Material
control Requirements Stated Herein, And Elsewhere In This Contract/purchase Order.
3.14 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Batch Of Non-metallic Material, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.14.1 Material Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size
scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats. When Permanent Marking Is Required, It Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And
function Of The Material. ;seats To Be Marked On The Outer Cylindrical Surface.;
seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification.
3.15 See Cdrl Di-misc-80678 (seat Material) - Material Certification - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The
class, Form, Grade, Type, Process, And/or Composition, As Applicable, Of The Material Supplied.
3.16 Material Handling - The Written Material Control Process Must Include The Following:
3.16.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.16.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.16.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Batches Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.16.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Codes That Are Marked On The Material And Identified On The Test Reports. The Certification Data Requirements Herein
must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.16.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.17 Receiving Inspection -
3.17.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.17.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Number Marked On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.18 Discrepancy Reporting -
3.18.1 Nonconforming Products Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To The Responsible Sub-tier
supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.19 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.19.1 Sampling For Certification Must Be On The Basis Of One Set Of Test Specimens From Each Heat/lot Or Batch.
3.20 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- Mar 22 2011 - Added Traceability Requirements For Non-metallic Seats
- Jul 02 2013 - Allowed Ball Valve Seats To Be Marked Using Mil-std-792 Type Ix In Addition To Type I
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date7 Feb 2025
Tender AmountRefer Documents
Description: Contact Information|4|n743.49|wvb|7176052147|benjamin.t.spangler.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|||||||||
variation In Quantity (apr 1984)|3|0|5||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040|n50286|tbd|133.2|n/a|n/a|n39040|n/a|n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.
mil Benjamin.t.spangler.civ@us.navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|365 Days After Acceptance Of Material|365 Days After Acceptance Of Material|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|331221|1000||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286.
3. The Following Proposed Delivery Schedule Applies:
submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery. Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 365 Days After Effective Date Of The Resulting Contract.
4. Any Contract Awarded As A Result Of This Solicitation Will Be "do" Rated Order; "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
5. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000.
6. Far 52.232-25(a)(5), Entitled Prompt Payment, Constructive Acceptance Is Changed From 7 Days To 45 Days After Delivery Of The Supplies In Accordance With The Terms And Conditions Of The Contract.
7. This Order Is Issued Pursuant To Emergency Acquisition Flexibilities (eaf).
8. Viq 0+/5- Applies To This Order.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b666 | | | |201101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=sae Ams 2806 | | |c |080301|a| | |
document Ref Data=sae Ams 2807 | | |a |000901|a| | |
document Ref Data=sae Ams 2809 | | |a |070801|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=sae Ams-std-185 | | | |000901|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|2 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae-ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
3. Requirements
3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Sae-ams-qq-s-763 Except As Amplified Or Modified Herein. Sae-ams-qq-s-763 Ordering Data Information Is Provided Below:
(a) Steel Bars, Wire, Shapes, And Forgings, Corrosion Resisting Steel; Sae-ams-qq-s-763.
(b) Class - ;410 ; Condition - ;t; Form - ;bar, 2 Inches (round) ; Finish - Any Appropriate Finish Option Of Sae-ams-qq-763 Except Hot Finished, Scale Not Removed.
(c) Melting Practice - Electric Furnace, Electric Induction, Vacuum Furnace, Electroslag Remelt (esr), Or Argon Oxygen Decarburization (aod). Other Suitable Commercial Processes Must Be Submitted And Navy Approved Before They May Be Used.
(d) Special Cleaning Processes Are Not Applicable.
(e) Allowances For Machining Are Not Applicable.
(f) Major Stress Surface Areas Of The Finished Part Are Not Applicable.
(g) Low Magnetic Permeability Is Required For 300 Series Austenitic Corrosion Resistant Steels When Ordered In The Annealed Condition. The Relative Magnetic Permeability Must Be Determined And Must Not Exceed 2.0 (air - 1.0). Low Magnetic Permeability Is Not
required For Conditions B, H, Or T Unless Otherwise Specified.
(h) Length - Under 5" Dia. = 8 Feet Min / 12 Feet Max (plus Or Minus 10%) 5" Dia & Over = 5 Feet Min / 12 Feet Max (plus Or Minus 10%) Or As Specified Elsewhere In The Contract/purchase
(i) Forgings Are Not Applicable.
(j) Identification Marking Is Required In Accordance With Paragraph 3.10.1 Of Sae-ams-qq-s-763 And As Further Defined Elsewhere In This Contract/purchase Order.
(k) Lot Definitions Of Forgings Are Not Applicable.
(l) More Than The Usual Number Of Macrostructure Tests Is Not Required.
(m) Forging Prolongations For Testing Are Not Applicable.
(n) One Retest Is Permitted In Accordance With Paragraph 4.5.5 Of Sae-ams-qq-s-763.
(o) Packaging And Packing Requirements Must Be As Specified Elsewhere In The Contract/purchase Order.
(p) Special Marking For Shipment Must Be As Specified Elsewhere In The Contract/purchase Order.
3.2 Bar, Pipe, And Tube Quantities - When This Order Results In Supplying Fewer Than 5 Pieces As Defined In The "length" Paragraph Above, All Material Must Be From A Single Heat Of Material.
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;macrostructure ;
item - ;bar, Metal (see Specification For Sample Size) ;
performance - ;sae-ams-qq-s-763 ;
acceptance - ;sae-ams-qq-s-763 ;
3.4 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government Inelectronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.4.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. Requests Must Include The
information Listed Below.
a. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor.
b. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration.
c. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To Theoperational Use Of The Product.
d. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.4.2 Requests For Waivers/deviations For Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.4.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
a. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification.
b. A Complete Description Of The Change To Be Made And The Need For That Change.
c. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis.
d. Proposed Changes To Documents Controlled By The Government.
e. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration.
f. Recommendations About The Way A Retrofit Should Be Accomplished.
g. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of Theproduct.
h. Impacts To The Operational Use Of The Product.
i. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
j. Milestones Relating To The Processing And Implementation Of The Engineeringchange.
3.5 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.6 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.7 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.8 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.8.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government To Determine The System's Effectiveness In Meeting The Quality Requirements
established In The Contract/purchase Order.
3.8.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, Make His Facilities
available For Audit By The Contracting Officer Or His Authorized Representative.
3.8.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.8.4 This Contract Provides For The Performance Of Government Quality Assurance At Destination. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer.
3.8.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco.
3.9 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.9.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made Available For
operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.9.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By The
government.
3.10 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Any Purchasing Documents To A Subcontractor Must Cite The
applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility,
applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This Order, Promptly Notify The Prime Contractor Who Will Notify The Pco So That Appropriate
planning For Government Inspection Can Be Accomplished.
3.10.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.10.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.10.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.10.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.10.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.11 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.11.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.11.2 Inspection For Completeness And Proper Type.
3.11.3 Verification Of Material Quality Received.
3.11.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.11.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.11.6 Identification And Protection From Improper Use Or Disposition.
3.11.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.11.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.11.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.12 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other
required Objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within
paragraph 3, Section C Of This Contract/purchase Order.
3.12.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In The Contract/purchase Order.
3.13 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.14 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. In Addition To The Marking Requirements On Applicable Specifications, Marking For Traceability Is Required. Pipe, Tube, And Metal Bar Must Have
both Permanent Marking And Temporary Marking Applied As Specified Below.
3.14.1 Permanent Marking - Permanent Traceability Marking Must Be Marked On Each End Of Each Pipe, Tube, And Metal Bar. (monel And K-monel Bar: 3/4 Inch To 1 Inch Rods, And 7/8 Inch Hex Bar May Be Marked On The Surface Near The End Of Bar/rod, And Rod Less
than 3/4 Inch And Hex Bar Less Than 7/8 Inch May Be Bundled And Tagged Or Boxed With The Traceability Marking On The Tag Or Box.) All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792. An Alternate Marking Method Is Permissible
provided It Is An Available Option In The Contractually Invoked Specification, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order, And Differs From That Specified In The Specification. Electric Arc Marking Or Impression
marking Is Strictly Prohibited On Thin Wall Tubing. (wall Thickness Of Less Than 0.125 Inch).
3.14.2 Temporary Marking - Temporary Marking Must Consist Of:
name Or Trademark Of Manufacturer, Specification And Grade (as Applicable), Size, Contract Number, And The Traceability Marking. Pipe And Tube Marking Must Also Include Sml (for Seamless). Marking Must Be In Accordance With The Material Specification And
sae-ams-2806, Sae-ams-2807, Sae-ams-2809, Table I Of Sae-ams-std-185, Or Astm-b666 As Applicable. Application Must Be In Accordance With Mil-std-792, Type A (temporary Ink Stenciling). An Alternate Method Is Permissible For Monel And K-monel Bar Provided It
is An Available Option (temporary Marking Only) In The Applicable Material Specification, Except That Hot Finished Rod With Rough Ground Surface 3/4 Inch And Under May Be Bundled And Tagged Or Boxed With The Traceability Marking On The Bag Or Box.
contamination Levels For Ink Stenciling Must Be As Outlined In Paragraph 5.2 Of Mil-std-792.
3.15 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.15.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.15.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, The
original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number ______________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.15.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.15.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.15.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.16 Material Handling - The Written Material Control Process Must Include The Following:
3.16.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.16.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.16.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.16.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.16.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.17 Receiving Inspection -
3.17.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.17.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.18 Discrepancy Reporting -
3.18.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government.
3.19 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.19.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.19.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.19.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.19.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.20 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To The Contractor -
4.1.1 The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. The Departure Must Be
considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Record Of These Departures, Traceable To The Applicable Part Number And
contract Number Must Be Submitted To The Pco.
4.1.3 The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions, And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied
conforms To The Specified Requirements.
6.1.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.10 A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Nov 15 2011 - Combined 304/304l And 316/316l Niins Meeting Chem/mech Of Both - Dual Marking
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- May 16 2013 - Removed Gsi From This Material.
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section ; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Department Of Education Division Of Sultan Kudarat Tender
Electronics Equipment...+2Machinery and Tools, Electrical and Electronics
Philippines
Closing Date4 Feb 2025
Tender AmountPHP 4.9 Million (USD 84 K)
Details: Description Invitation To Bid Project No.: (25-01-02) Procurement Of Tvl Tools - Cookery (7 Schools) 1. The Department Of Education (deped) Division Of Sultan Kudarat, Through The Cy 2024 Government Appropriations Act (gaa), Intends To Apply The Sum Of Four Million Nine Hundred Twenty Thousand Eight Hundred Seventy-four Pesos (p4,920,874.00), Being The Approved Budget For The Contract (abc), To Eligible Payments Under The Contract For Procurement Of Tvl Tools - Cookery (7 Schools) Under Republic Act 11975 –fy 2024 Gaa. Bids Received That Exceed The Abc Shall Be Rejected At Bid Opening. Lot 2 Stock/ Property No. Unit Item Name Design Specification Quantity Unit Cost Total Cost 1 Pc Apple Corer Type: Apple Corer Body Shape: Tubular Material: Stainless Steel Total Length: 18 Cm (minimum) Handle Material: Hard Plastic, Polypropylene Handle Dimension: Length-10 Cm X Diameter-2 Cm (minimum) Blade Size: Length-8cm X Diameter-2 Cm (minimum) Preferably With Packing Case Dishwasher Safe 28 1,264.00 35,392.00 2 Pc Bain Marie, Table Type: Bain Marie Table (food Warmer) Body Shape: Rectangular Material: 304 Stainless Steel, 0.8 Mm Thick (minimum) Dimensions: Length-1500 Mm X Width-700mm X Height-800 Mm (minimum) Power Soiuce: Voltage: 220 Volts - 230 Volts, 50 Hz/ 60 Hz With Royal Cord 1.5 Meter Long With Attachment Standard Type A Male Plug Or Provide Plug Adopter 10a/220v 14 44,303.00 620,242.00 3 Pc Blender, Electric Type: Blender Machine Body Shape: Round Jar Material Housing: Plastic (polypropylene) Jar Height : 25 Cm To 28 Cm Jar Thickness: 4 Mm To 8 Mm Heat Resistant Glass Jar With Cover Source Voltage: 220 Volts / 240 Volts,50 Hz / 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v. Power Wattage: 300 To 700 Watts Blade: Stainless Steel, 3 To 4 Metal Blades 7 5,600.00 39,200.00 4 Pc Board, Chopping/ Cutting, Plastic Type: Cutting Board Body Shape: Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 15 Inches (minimum) Width: 12 Inches (minimum) Thickness: 0.5 Inch (minimum) With Hole For Storage Purposes Preferably With Packing Case Food Grade And Dishwasher Safe 112 1,408.00 157,696.00 5 Pc Boiler, Double Material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Rivetedhandle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) 7 5,120.00 35,840.00 6 Pc Braising Pan, Medium Type: Braising Pan Body Shape: Round Material: Enameled Cast Iron And Stainless Steel Size: Diameter: 28 Cm X Height: 10 Cm (minimum) Capacity: 4 Liters (approximate) With Stainless Steel Cover, Solid Cast Stainless Steel Side Handles And Riveted Handle On Both Side: Length: 10 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm 56 10,800.00 604,800.00 7 Pc Can Opener Type: Can Opener Body Shape: Materials: Stainless Steel Dimension: Length-21 Cm X Width 10 Cm X Depth:2.5cm (minimum) Multi-use: 3 In 1 Can Opener Also Opens Bottle Tops- Can Lids And Tabs 7 1,278.00 8,946.00 8 Pc Cart, Utility Type: Utility Cart Body Shape: Rectangular Material: Plastic, Polypropylene(pp) Dimension: (l X W X H) 84 Cm X 43 Cm X 95 Cm (minimum) Capacity: 330 Lbs (150 Kg) Loads (minimum) Three (3) Shelving With At Least 25 Cm Distance Between Shelves Tub Shelf Measure (l X W X D) 84 Cm X 43 Cm X 7 Cm (minimum) With Four (4) Swivel Caster, 10 Cm Diameter, Two Which Have Locking Brakes Preferably With A Packing Case Easy Grip Handles On Each End Of Cart 7 5,280.00 36,960.00 9 Pc Casserole, Medium Type: Casserole Pot Body Shape:round Material:stainless Steel, 0.7 Mm Thick Dimension: Diameter- 24 Cm X Height -14 Cm (minimum) Tempered Glass Lid Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Preferably With Packing Case 28 4,000.00 112,000.00 10 Pc Casserole, Small Type: Casserole Pot Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick Dimension: Diameter- 20 Cm X Height -12 Cm (minimum) Tempered Glass Lid Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm 84 2,400.00 201,600.00 11 Pc Colander, Medium Type: Colander, Medium Body Type: Round Material: 304 Stainless Steel Diameter: 30 Cm (minimum) Capacity: 8 Quarts (9 Liters) Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 To 10 Mm 14 400.00 5,600.00 12 Pc Colander, Small Type: Colander (small) Body Shape: Round Material: 304 Stainless Steel Diameter: 26 Cm (minimum) Capacity: 5 Quarts (5.6 Liters) Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Body Thickness: 0.8 Mm (minimum) Full-ring Support Base, 15 Cm Diameter Preferably With Packing Case Food Grade And Dishwasher Safe 56 240.00 13,440.00 13 Set Cup, Measuring (for Solid) Type: Measuring Cup Set Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick (minimum) Each Set Contains The Following: 1 Pc - 1 Cup (237 Ml) 1 Pc - 1/2 Cup (118 Ml) 1 Pc - 1/3 Cup (79 Ml) 1 Pc - 1/4 Cup (59 Ml) Handle Dimension: Length-12 Cm X Width-1 Cm (minimum) Measuring Capacity Engraved On The Handle Strip Handles Have Provision For Hanging Preferably With Packing Case Smooth Surfaces And Dishwasher Safe 56 192.00 10,752.00 14 Pc Dispenser, Paper Towel Type Paper Towel Dispenser Body Shape: Rectangular Material: Abs Plastic Dimensions: Length =260 Mm X Width =100 Mm X Height = 211 Mm (minimum) Capacity: 200 Paper Paper Size: Length-20 Cm X Width- 8 Cm (approximate) Mounting Style: Wall Mounted Tissue Box 28 1,248.00 34,944.00 15 Pc Fan, Electric Stand Fan, Electric Material: Metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220 / 240 Vac, 50 / 60 Hz, Single Phase Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Removable Metal Guard On Front And Rear 3-speed Settings Comes With 1.5 Meters Power Cord And With Molded Male Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) Smooth Surface, No Sharp Edges Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, 7 4,480.00 31,360.00 16 Pc Fire Extinguisher (with Contents) 1.for Type A, B, C Fire: Dry Chemicals (monoammonium Phosphate) 2.portable Type 3.capacity : 5 - 6 Kgs 4.rechargeable Cylinder Metal 5.working Pressure Of Cylinder : 400 Psi 6.brass Valve With Pressure Gage 7.with Rubberized Hose And Aluminum Nozzle Attached 8.with Squeeze Lever To Discharge And Safety Pin 10.painted With Metal Primer And Red Enamel Paint 7 1,760.00 12,320.00 17 Pc Fish Poacher, Medium Type: Fish Poacher Body Shape: Oval Pot For Poaching Material: Stainless Steel, 0.64 Mm Thick Dimensions (l X W X D): 45 Cm X 15 Cm X 12 Cm (minimum) Handle Material: Stainless Steel Riveted Looped Handles On Both Side, 7 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm 7 6,400.00 44,800.00 18 Pc Fork, Carving Type: Carving Fork Body Shape: Square Shape Prong Prong Material:high Carbon Stainless Steel Overall Length: 30 Cm (minimum) Blade Dimension: Length- 15 Cm X Width- 0.5 Cm X Thickness- 0.3 Cm (minimum) Number Of Prongs: 2 Prong Comes With Square- Shaped Prongs And Pointed Tips Abs Plastictriple-riveted Handle Preferably With Packing Case 21 2,080.00 43,680.00 19 Pc Fork, Kitchen Type: Kitchen Fork Body Shape: Standard Material: Stainless Steel Dimension: Length - 32 Cm X Width- 3.5 Cm (minimum) Fork Size: Length: 8 Cm X Width -3.5 Cm (minimum) Handle :abs Plastic Number Of Tines: 2 Tines With Tapered End 56 64.00 3,584.00 20 Pc Frying Pan, Large Type: Frying Pan (large) Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-30 Cm (minimum) X Height- 5.5 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 20 Cm Long (minimum) Preferably With A Packing Case Oven Safe Up To 250⁰f 14 4,000.00 56,000.00 21 Pc Frying Pan, Medium Type: Frying Pan (medium) Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-24 Cm (minimum) X Height- 4.5 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 19 Cm Long (minimum) Preferablywith A Packing Case 56 1,920.00 107,520.00 22 Pc Frying Pan, Small Type: Frying Pan (small) Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-20 Cm (minimum) X Height- 3.8 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 12 Cm Long (minimum) Preferably With A Packing Case Oven Safe Up To 250⁰f 28 1,280.00 35,840.00 23 Pc Funnel, S/s, Medium Type:stainless Steel Funnel Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-15 Cm (minimum) X Height- 15.8 Cm (minimum) Tube Diameter: 2 Cm X Length: 7.3 Cm (minimum) Comes With Handle For Easy Hanging Preferably With Packing Case Dishwasher Safe 28 192.00 5,376.00 24 Pc Funnel, S/s, Small Type: Stanless Steel Funnel Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-11 Cm (minimum) X Height- 10 Cm (minimum) Tube Diameter: 1.5 Cm X Length: 5 Cm (minimum) Comes With Handle For Easy Hanging Preferably With A Packing Case Dishwasher Safe 28 128.00 3,584.00 25 Pc Garbage Bin Type: Swivel Lid Garbage Bin Body Shape: Round Material: Hard Plastic, Polypropylene Dimension: Diameter-26 Cm X Height-47 Cm (minimum) Capacity: 4 Gallons (minimum) Removable Dome Shape Lid With Spring Return Swivel Preferably With A Packing Case Color: Any Color 28 160.00 4,480.00 26 Pc Glass Rack Type: Glass Rack Body Shape: Square Material: Polypropylene Plastic Overall Dimensions: Length - 19 1/2 Inches X Width - 19 1/2 Inches X Height - 4 Inches (minimum) Compartments: Full-size 25 Individual Compartment Glass Rack Compartment Dimensions: Length - 3 1/2 Inches X Width - 3 1/2 Inches X Height - 4 Inches (minimum) Easy Grip Handles Molded Into All Four Sides Preferably With A Packing Case 84 400.00 33,600.00 27 Pc Knife, Boning Type: Flexible Boning Knife Body Shape: Ergonomic Material: High Carbon Steel Overall Length: 28 Cm (minimum) Blade: Length-15 Cm X Width- 3 Cm (minimum), Pointed Tip Cutting Edge Angle From Tip To The Heel Is 13 To 14 Degrees Handle Length: 12 Cm (minimum) Handle Material: Hard Plastic Handle With Rivets Preferably Wiht Packing Case Dishwasher Safe 14 912.00 12,768.00 28 Pc Knife, Chef Type: Chef's Knife Body Shape: Flat Materials: Stainless Steel Overall Length: 30 Cm (minimum) Blade Size: Length - 20 Cm X Width-4 Cm (minimum) Blade Thickness: 2.5 Mm (minimum) 70 400.00 28,000.00 29 Pc Knife, Cleaver Type: Cleaver Knife Body Shape: Flat Blade Material: Forged Stainless Steel Heavy Duty Blade Length: 17 Cm (minimum) Overall Length: 30 Cm (minimum Cutting Edge: Straight Handle Material: Ergonomic Wood Handle With Triple Rivets 28 640.00 17,920.00 30 Pc Knife, Oyster Type: Oyster Knife Body Shape: Ergonomic Blade Material: Stainless Steel Blade Dimension: Length - 7 Cm (minimum) X Width - 2 Cm (minimum) Blade Thickness: 2 Mm (minimum) Handle Material: Smooth Wooded Handle Rounded Handle Size: Length-10 Cm X Diameter- 3.5 Cm (minimum) Total Length (from The Tip Of The Handle Up To Tip Of The Blade) :17 Cm (minimum) 28 288.00 8,064.00 31 Pc Light, Emergency Emergency Light, 2 Heads Led Materials: Metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector 7 1,440.00 10,080.00 32 Pc Meat Slicer, Small Type: Meat Slicer Body Shape: Circular Housing Material: Die Cast Aluminum Alloy And Body Painted Dimensions: Width-40.5 Cm X Depth- 45.7 Cm X Height- 38 Cm (minimum) Stainless Steel Rotary Blade Diameter: 190 Mm (minimum) Power Source: 220 Volts-230 Volts, 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v 7 2,080.00 14,560.00 33 Pc Pan, Roasting Type: Roasting Pan Body Shape:rectangular Material: Stainless Steel Dimension: Length: 40 Cm X Width-35 Cm X Height -7 1/2cm (minimum) Thickness: 1.5 Mm Thick (minimum) Welded Handles On Both Sides Removable Stainless Steel Wire Rack 28 840.00 23,520.00 34 Pc Peeler, Y-type Type: Y-type Peelers Body Shape: Ergonomic Material: Stainless Steel Overall Dimensions (l X W X H): 7 Inches X 2 1/4 Inches X 1 Inch (minimum) Blade Material: 304 Stainless Steel, 0.7 Mm Head Dimension: (l X W X H) 2 1/4 Inches X 2 1/4 Inches X 1 Inch (minimum) Handle Material: Stainless Steel Handle Length: 4 3/4 Inches X 1 Inch Diameter (minimum) 2 In 1 Design With 2 Blade Reel, Built In Potato Eye Remover And Hole For Hanger Preferably With A Packing Case 56 240.00 13,440.00 35 Set Pepper And Salt Mill Type: Pepper & Salt Mill Body Shape: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Screw Cap At The Top Of The Mill To Adjust The Thickness Of Peeper Or Spices Preferably With A Packing Case 56 560.00 31,360.00 36 Pc Piping Bag Type : Piping Bag Body Shape: Triangular Material: Transparent Disposable Plastic For Dispensing Ingredients To Pastries Length: 9 Inches Minimum Width: 3 Inches (minimum) Volume: 500 Ml (approximate) 56 110.00 6,160.00 37 Pc Plate Rack Type: Plate Rack Body Shape: Rectangular Material: 304 Stainless Steel Dimension: Length-475 Mm X Width- 290 Mm X Height- 380 Mm (minimum) 84 1,280.00 107,520.00 38 Pc Preparation Table With Sink Type: Preparation Table With Sink & Sheleves Body Shape: Rectangular Material: Stainless Steel, 1 Mm Thick (minimum) Dimensions: L-1200 Mm X W - 700 Mm X H - 850 Mm (minimum) Stainless Steel Table Top And Stainless Steel Under Shelf Fully Welded Construction Sink: Left Side Single Bowl Sink With Drainer 4 Inches & Faucet Provision Sink Dimension (l X W X D) 400 Mm X 500 Mmx 25 Mm (minimum) 35 19,200.00 672,000.00 39 Pc Pressure Cooker Type: Pressure Cooker Body Shape: Round Material: Polished Aluminum Dimension: Diameter: 32 Cm X Height: 25 Cm (minimum) Capacity: 10 Quarts (11.3 Liters) Side Handles For Secure Carrying Equipped With Safety Opening Mechanism, Spring Safety Valve, Rubber Seal Ring 7 960.00 6,720.00 40 Pc Scissor, Kitchen Type:kitchen Scissor Body Shape: Ergonomic Blade Material: Stainless Steel, 2 Mm Thick Handle Material Heavy Duty Acrylonitrile Butadiene Styrene (abs) Plastic Overall Length: 20 Cm (minimum ) Width: 7.5 Cm (minimum) 56 65.00 3,640.00 41 Pc Scooper, Ice Cream Type: Ice Cream Scooper Body Shape: Round Material: Stainless Steel Scoop: Diameter- 5 Cm X Deep-2.5 Cm (minimum) Handle Length: 10 To 12 Cm 14 400.00 5,600.00 42 Pc Siever, Small Type: Fine Mesh Siever Body Shape: Round Material: Stainless Steel Diameter: 20 Cm (minimum) Depth: 7 Cm (minimum) Twin Wire Handle: Length 20 Cm X 5 Mm Diameter (minimum) Fine Mesh: 0.7 Mm (1/32 Inch) (minimum) Preferably With A Packing Case 56 112.00 6,272.00 43 Pc Skimmer, Fine Type: Medium Fine Mesh Skimmer Body Shape: Round Material: Stainless Steel, Polished Overall Length: 34 Cm (minimum) Skimmer Head: Diameter -10 Cm X Depth- 4 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle: Length- 12 Cm X Diameter- 2 Cm (minimum) Handle Has Hole For Hanging Preferably With A Packing Case 56 112.00 6,272.00 44 Pc Skimmer, Spider Type: Skimmer, Spider Body Shape: Round Material: Stainless Steel, Polished Overall Length: 35 Cm (minimum) Skimmer Head Diameter: 15 Cm X Depth 4 Cm (minimum) Handle Length: 12 Cm X 2 Cm Diameter (minimum) Preferably With A Packing Case Dishwasher Safe 56 320.00 17,920.00 45 Pc Soup Cup Rack Type: Soup Cup Rack Body Shape: Square Material: Polypropylene Plastic Dimension: Length: 50 Cm X Width: 50 Cm X Height: 10 Cm (minimum) Compartment Length: 11 Cm Compartment Width: 11 Cm Compartment /inside Height: 6.7 Cm No. Of Compartment: 16 Compartments 84 560.00 47,040.00 46 Pc Soup Ladle, 3 Oz Type: Soup Ladle Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 28 Cm (minimum) Capacity: 3 Oz. (85 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe Must Be Branded 14 192.00 2,688.00 47 Pc Soup Ladle, 6 Oz Type: Soup Ladle Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 30 Cm (minimum) Capacity: 6 Oz. (170 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe 56 240.00 13,440.00 48 Pc Soup Ladle, 8 Oz Type: Soup Ladle Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 30 Cm (minimum) Capacity: 8 Oz. (236 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case 21 270.00 5,670.00 49 Pc Soup Ladle,12 Oz Type: Soup Ladle Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 34 Cm (minimum) Capacity: 12 Oz. (341 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe 56 400.00 22,400.00 50 Pc Spatula Type: Offset Spatula Body Shape: Flat Blade Material: Stainless Steel 316 Handle Material: Hardwood (smooth Finish) With Rivets Blade Dimension: Length= 7 .5 Inches X Width-1.5 Inches (minimum) Thickness Of Blade: 1.7 Mm Thick (minimum) Total Length = 12 To 14 Inches Preferably With A Packing Case Dishwasher Safe Must Be Branded. 56 192.00 10,752.00 51 Pc Spoon, Kitchen Type: Kitchen Spoon Body Shape: Oval Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type Preferably With A Packing Case Heat Resistant Up To 220 ° C Dishwasher Safe Must Be Branded. 56 64.00 3,584.00 52 Pc Spoon, Kitchen (slotted) Type: Kitchen Spoon Slotted Body Shape: Oval With Slot Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type With Slot At Least 6 Rectangular Slots Preferably With A Packing Case Heat Resistant Up To 220 ° C Dishwasher Safe 56 432.00 24,192.00 53 Set Spoon, Measuring Type: Measuring Spoon Body Shape: Bowl In Shape Material: Stainless Steel, 0.7 Mm Thick (minimum) The Set Consists Of The Following Sizes: 1 Pc - 1 Tbsp. (15 Ml) 1 Pc - 1/2 Tbsp. ( 7.5 Ml) 1 Pc - 1 Tsp. (5 Ml) 1 Pc - 1/2 Tsp. (2.5 Ml) 56 128.00 7,168.00 54 Pc Spoon, Parisienne Type: Parisiennes Spoon Body Shape: Round Double Headed Parisiennes Scoop Bar Tool Material: Stainless Steel, Polished Overall Length: 240 Mm (minimum) Scoop Diameter: 30 Mm And 24mm (minimum) With Plastic Handle (polypropylene), Size: 130 Mm X Width-20 Mm (minimum) Draining Small Hole In The Scoop 56 368.00 20,608.00 55 Pc Spoon, Serving Type: Serving Spoon Body Shape: Oval Materials: Stainless Steel Dimension: Length: 23 Cm X Width: 5 Cm (minimum) Scoop Dimension (l X W X D): 7 Cm X 5 Cm X 0.9 Cm (minimum) Spoon Thickness: 1.6 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 168 98.00 16,464.00 56 Pc Spoon, Wooden Type: Wooden Spoon Body Shape: Oval Material: Hardwood Dimensions: Length- 10 Inches X Width- 2 Inches (minimum) Bowl Dimension: Length -3 Inches X Width 2 Inches X Depth -3/4 Inches (minimum) Total Length: 10 Inches (minimum) Preferably With A Packing Case Smooth Surface Finished And No Sharp Edges 56 121.00 6,776.00 57 Pc Stock Pot, Large Type: Stock Pot, Large Body Shape: Round Material: Stainless Steel, 0.8 Mm Thick (minimum) Top Diameter: 30 Cm (minimum) Height: 31 Cm (minimum) Capacity: 20 Quarts (22.7 Liters) Oven Safe To 350⁰f And Dishwasher Safe. With Aluminum Disc Layer In Bottom For Even Heat (5 Mm Aluminum 14 1,808.00 25,312.00 58 Pc Strainer Chinois, Medium Type: Strainer Chinois, Medium Body Shape: Conical Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Handle Has Provision For Hanging Preferably With A Packing Case Dishwasher Safe Must Be Branded 21 4,800.00 100,800.00 59 Pc Strainer Chinois, Small Strainer Chinois, Small Body Shape: Conical Material: Stainless Steel Strainer Diameter: 14 Cm (minimum) Strainer Depth: 13 Cm (minimum) Handle Length: 15 Cm (minimum) With 1 Mm (approx.) Fine Mesh Handle Has Provision For Hanging Preferably With A Packing Case Dishwasher Safe Must Be Branded 21 4,000.00 84,000.00 60 Pc Strainer Medium, Fine Type: Strainer, Medium Fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 7 Cm (minimum) Handle Length: 18 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Strainer’s Two Layers Of Tightly Woven Mesh Catches Handle Has Provision For Hanging Preferably With A Packing Case Dishwasher Safe Must Be Branded. 56 320.00 17,920.00 61 Pc Strainer Small, Fine Type: Strainer, Small Fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 13 Cm (minimum) Strainer Depth: 5 Cm (minimum) Handle Length: 13 Cm (minimum) With 1 Mm. (approx.) Fine Mesh Handle Has Provision For Hanging Preferably With A Packing Case Dishwasher Safe Must Be Branded. 56 280.00 15,680.00 62 Pc Table, Working Type: Working Table, Stainless Steel Body Shape: Rectangular Material: 304 Stainless Steel, 1.29 Mm Thick (gauge 16) Minimum Length: 1220 Mm (minimum) Width: 700 Mm (minimum) Height: 850 Mm (minimum) Tubular Stainless Steel Legs, 38mm (minimum) With 4 Adjustable Bullet Feet Fully Welded Construction Thickness:gauge 16 (1.29 Mm Thick) Minimum Stainless Steel Table Top With Stainless Steel Undershelf Distance Between Table Top And Undershelf Is 650 Mm (minimum) Preferably With A Packing Case Or Crate No Sharp Edges And Rough Surfaces Must Be Branded. 14 24,000.00 336,000.00 63 Pc Tenderizer, Medium Type: Tenderizer Body Shape: Ergonomic Material: Cast Aluminum Overall Length: 26 Cm (minimum) Dual-sided Hammer, Square Head: 6 Cm X 6 Cm (minimum) Ridged Surface With Rows Of Dull, Pyramid-shaped Spikes Weight: 250 Grams To 500 Grams Preferably With A Packing Case Dishwasher Safe Must Be Branded 56 288.00 16,128.00 64 Pc Thermometer, Pocket /pin Type: Pocket/pen Thermometer Body Shape: Tubular Pen Style Digital Thermometer Product Size: 100 Mm X 40 Mm X 14 Mm (minimum) Display Size: 40 Mm X 20 Mm (minimum) Prove Length: 200 Mm (minimum) Measuring Range: -50 °c To 300 °c (-58 ⁰f To 372 ⁰f) Resolution: 0.1 °c / 0.2 °f 21 240.00 5,040.00 65 Pc Tong, 12 Inches Type: Tong , 12 Inches Body Shape: Standard Material: Stainless Steel Size: 12 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe Must Be Branded 56 210.00 11,760.00 66 Pc Tong, 8 Inches Type: Tong, 8 Inches Body Shape: Standard Material: Stainless Steel Size: 8 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe 70 128.00 8,960.00 67 Pc Tray, Baking, Small Type: Baking Tray Body Shape: Rectangular Material: Stainless Steel Dimension: 20 Cm X 30 Cm X 3.7 Cm (minimum) Body Thickness: 0.7- 1.0 Mm Preferably With Packing Case Dishwasher Safe Must Be Branded. 56 176.00 9,856.00 68 Pc Tray, Utility Type: Utility Tray Body Shape: Rectangular Material: Stainless Steel Dimension: Length- 48 Cm X Width-32 Cm X Height-2.5 Cm (minimum) Reinforced Edges Finish: Polished Preferably With A Packing Case Washable And Oven Safe 84 128.00 10,752.00 69 Pc Tube, Pastry Type: Pastry Tubes Body Shape: Tube In Different Shape Of Nozzles Material: Stainless Steel Set Contain: 24 Different Shapes Of Nozzles (minimum) Tube Height: 3.5 Cm To 5 Cm Tube Diameter: 2 Cm To 3.5 Cm Thickness: 0.5 Mm (minimum) Tube Tip: Assorted Designs (create Swirls, Rosettes, Flowers, Stars, Leaves And Other Designs 56 5,520.00 309,120.00 70 Pc Turner 3" X 6" Type: Slotted Turner, 3" X 6" Body Shape: Straight Material: Stainless Steel Blade Size (lx W): 6 Inches X 3 Inches (minimum) Handle Length: 5 Inches (minimum) Overall Length: 13 Inches (minimum) Solid Turner With Straight Slotted Blade Wooden Handle With Triple Rivets Preferably With A Packing Case Dishwasher Safe Must Be Branded 56 2,880.00 161,280.00 71 Pc Weighing Scale, 1 Kg, Digital Type: Digital Weighing Scale Body Shape: Rectangular Materials: Engineering Plastic And Stainless Steel Weighing Plate Capacity: 1 Kg Accuracy: 1 Gram Back Light Lcd Display With 15 Mm Minimum High Digits Weighing Units: Gram, Ounce, Pound Size: (l X W X H Mm ) 163 Mm X 245 Mm X 79 Mmm (minimum) 28 1,600.00 44,800.00 72 Pc Weighing Scale, 5 Kilograms, Mechanical Type: Mechanical Weighing Scale Body Type: Circular Bowl Material: Stainless Steel Bowl And Metal Body (coated) Mechanism Type: Spring Lever Capacity: 5 Kg /11 Lb. Sensitivity/graduated By 10 Gm Measurement Units: Gram/kilogram Manual Setting On Zero, Must Be Accurate And Durable Calibrate The Scale Using The Adjustment Knob Preferably With A Packing Case Delivery Must Include Instruction Manual Written In Good English With Service Centers Located In The Major Cities In The Philippines Warranty Period Of 1 Year (parts And Service) Must Be Branded 21 2,400.00 50,400.00 73 Pc Wire Skimmer, Small Type: Skimmer, Wire Mesh Body Shape: Round Material: Stainless Steel, Polished Overall Length: 40 Cm (minimum) Skimmer Head Diameter: 12 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle Has Hole For Hanging Preferably With A Packing Case Dishwashing Safe Must Be Branded. 63 318.00 20,034.00 74 Pc Wire Whisk, Heavy Duty Type: Wire Whisk, Heavy Duty Body Shape: Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 14 368.00 5,152.00 75 Pc Wire Whisk, Medium Type Wire Whisk, Medium Body Shape: Ballon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 25.4 Cm X 7 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 70 304.00 21,280.00 76 Pc Wire Whisk, Small Type: Wire Whisk, Small Body Shape: Baloon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 20.3 Cm X 6 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 63 304.00 19,152.00 77 Pc Wok, Medium Type: Wok, Medium Body Shape:round Material: Carbon Steel Thickness: 1.8 Mm Thick (minimum) Dimensions (dia. X H): 45 Cm X 14 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 10 Cm (minimum) With Flat Bottom Preferably With A Packing Case Dishwashing Safe Must Be Branded 14 5,601.00 78,414.00 78 Pc Wok, Small Type: Wok, Small Body Shape: Round Material: Carbon Steel Thickness: 1.5 Mm Thick (minimum) Dimensions (dia. X H): 36 Cm X 10 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 8 Cm (minimum) With Flat Bottom Preferably With A Packing Case Dishwashing Safe Must Be Branded 28 2,080.00 58,240.00 79 Pc Zester Type: Cheese Zester Body Shape: Standard Material: Stainless Steel Grating Surface Dimensions (l X W): 20.3 Cm X 4 Cm (minimum) Overall Length: 32.5 Cm (minimum) Handle Material: Plastic (polypropylene) Ergonomic Handle Preferably With A Packing Case Dishwasher Safe The Plastic Material Used Must Be Non-toxic Must Be Branded. 56 690.00 38,640.00 Certified Allotment Available: Total 4,920,874.00 2. Deped-division Of Sultan Kudarat, Through Its Bids And Awards Committee (bac), Now Invites Bids For The Above-mentioned Procurement Project. Prospective Bidders Must Have An Experience Of Having Completed At Least One (1) Contract That Is Similar To The Contract To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii, Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non- Discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. 4. Bidding Is Restricted To Filipino Citizens/sole Proprietorships/partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interests Or Outstanding Capital Stocks Belonging To Citizens Of The Philippines. 5. A Complete Set Of Bidding Documents May Be Acquired Or Purchased At Deped-division Of Sultan Kudarat Bac Secretariat, Located At National Hi-way Brgy, Kenram, Isulan, Sultan Kudarat Upon Accomplishing A Bidder’s Information Sheet And Payment In Cash Of A Non-refundable Fee By Interested Bidders In The Amount Of Five Thousand Pesos (php5,000.00) Per Lot To The Division Cashier. Only Bidders Who Purchased The Bidding Documents Will Be Allowed To Submit Bids (itb 6.8). It May Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), Www.philgeps.net, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped- Division Of Sultan Kudarat Will Be Having The Following Procurement-related Activities. Activity Date & Time Venue Issuance Of Bidding Documents January 15–february 04, 2025 Division Office, National High-way,brgy Kenram, Isulan, Sul. Kudarat Pre-bid Conference January 23, 2025 (10:00 Am) Division Kalimudan Hall, Brgy. Kenram, Isulan Sultan Kudarat Submission And Opening Of Bids February 04, 2025 (10:00 Am) Division Kalimudan Hall, Brgy. Kenram, Isulan Sultan Kudarat 7. Prospective Bidders Are Strongly Encouraged To Order Or Download The Electronic Copy Of The Bidding Documents From The Philgeps Website: Www.philgeps.net, For Them To Be Included In The Document Request List Of The Project. 8. Bids Must Be Delivered To The Address And On The Date And Time Stated Herein. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. A Valid Bid Securing Declaration Must Accompany The Bid(s) In Lieu Of The Bid Security. 9. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Opening Of Bids At The Address Stated Herein. Late Bids Shall Not Be Accepted. 10. Deped Division Of Sultan Kudarat Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Not Award The Contract(s), Or Annul The Bidding Process Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Melvin P. Fortuna Chairperson, Bac Secretariat Department Of Education
DEPT OF THE AIR FORCE USA Tender
Electronics Equipment...+2Publishing and Printing, Electrical and Electronics
United States
Closing Soon24 Jan 2025
Tender AmountRefer Documents
Details: Amendment 1 - 30 December 2024 the Following Changes Have Been Made Tofa8201-24-q-0007 Mylar Digitization Services For Aflcmc/lzp, Hill Afb Ut. 1. The Date To Request Mylar Originals From The Government Has Been Changed For Technical Subfactor 2 And Technical Subfactor 3. The Date To Request The Mylar Originals Is Nownlt 9 January 2024. 2. The Due Date Of Offers Has Changed. The Due Date For Offers Is Now Friday, 24 January 2025, 12:00 Pm Mountain Daylight Time. the Description Below And The Attached Document Entitledmylar Digitization Services Combination Synopsis Solicitation 30 December 2024 Have Been Edited To Reflect These Changes. fa8201-24-q-0007 Mylar Digitization Services For Aflcmc/lzp, Hill Afb Ut 30 December 2024 12.603streamlined Solicitation For Commercial Products Or Commercial Services Procedures Are Being Used, The Synopsis Required By 5.203 And Solicitation Is Being Issued As A Single Document. description: This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format Insubpart12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. solicitation Number Fa8201-24-q-0007 Mylar Digitization Services For Aflcmc/lzp, Hill Afb Ut Is The Solicitation Number And Solicitation Is Issued As Request For Quotation (rfq). fa8201-24-q-0007 Mylar Digitization Services For Aflcmc/lzp, Hill Afb Ut Sources Sought Published 02 May 2024 Is Related To This Solicitation. federal Acquisition Circular: The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular Number 2024-07 / Effective Date September 30, 2024. naics And Fsc: North American Industry Classification System (naics) 325992 Photographic Film, Paper, Plate And Chemical Manufacturing, Size Standard Number Of Employees 1,500 And Federal Supply Code 7670 Microfilm, Processed Are Applicable To This Effort. offerors Reps And Certifications 52.212-3(c)(1) Offerors Representations And Certifications - Commercial Items Is Applicable. Those Naics Codes For Which You Are Identified To Complete The Representation In 52.212-3(c)(1) Will Be Used To Verify If The Company Has A Current Registration In Sam.gov And If Registered Under Naics 325992 Photographic Film, Paper, Plate And Chemical Manufacturing, Size Standard Number Of Employees 1,500. to Be Eligible For Award, 52.212-3(c)(1), The Electronic Annual Representations And Certifications In Sam.gov Must Include Naics 325992 Photographic Film, Paper, Plate And Chemical Manufacturing, Size Standard Number Of Employees 1,500. dates Of Delivery/ordering Period: 1 Feb 2025 To 31 Jan 2028 place(s) Of Delivery: aflcmc/lzp 6032 Fir Ave Building 1237 hill Afb Ut 84056 acceptance And Fob Point: Destination estimated Date Of Award:29 January 2025 description Of Requirements For The Items To Be Acquired. blanket Purchase Agreement (bpa) For Hybrid Mylar Digitization Service, Mylar Precision Plotting Services And On-demand Mylar Restoration Services For The Air Force Life Cycle Management Center (aflcmc)/lzp Engineering Data Service, Hill Afb Ut 84056 Over A 3-year Ordering Period. for Description Of Requirement, See Attached Statement Of Work (sow) Mylar 1 Mar 2024, 4 Pages. 52.212-1, Instructions To Offerors-commercial Products And Commercial Services Applies To This Acquisition. The Following Addenda Replaces 52.212-1 In Its Entirety. list Of Contract Line Items (clins): offerors Shall Input Prices For All Clins. the Unit Prices Need To Include All Costs Including Labor, Materials, Shipping, And Delivery: clin 0001 mylar Digitization Servicein Accordance With Sow Paragraph 1.1 Through 1.1.2 For Price Call Period 1 Feb 2025 To 31 Jan 2026. ffp Quantity Unit Unit Price 1 Each $ clin 0001 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0002 mylar Precision Plotting Servicesin Accordance With Sow Paragraph 1.2 Through 1.2.3 For Price Call Period 1 Feb 2025 To 31 Jan 2026. ffp Quantity Unit Unit Price 1 Each $ clin 0002 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0003 on-demand Mylar Restoration Servicesin Accordance With Sow Paragraph 1.3 Through 1.3.1 For Price Call Period 1 Feb 2025 To 31 Jan 2026. ffp Quantity Unit Unit Price 1 Each $ clin 0003 Delivery Date:on Or Before 3 Business Days After Receipt Of Call clin 0004 mylar Digitization Servicein Accordance With Sow Paragraph 1.1 Through 1.1.2 For Price Call Period 1 Feb 2026 To 31 Jan 2027. ffp Quantity Unit Unit Price 1 Each $ clin 0004 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0005 mylar Precision Plotting Servicesin Accordance With Sow Paragraph 1.2 Through 1.2.3 For Price Call Period 1 Feb 2026 To 31 Jan 2027. ffp Quantity Unit Unit Price 1 Each $ clin 0005 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0006 on-demand Mylar Restoration Servicesin Accordance With Sow Paragraph 1.3 Through 1.3.1 For Price Call Period 1 Feb 2026 To 31 Jan 2027. ffp Quantity Unit Unit Price 1 Each $ clin 0006 Delivery Date:on Or Before 3 Business Days After Receipt Of Call clin 0007 mylar Digitization Servicein Accordance With Sow Paragraph 1.1 Through 1.1.2 For Price Call Period 1 Feb 2027 To 31 Jan 2028. ffp Quantity Unit Unit Price 1 Each $ clin 0007 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0008 mylar Precision Plotting Servicesin Accordance With Sow Paragraph 1.2 Through 1.2.3 For Price Call Period 1 Feb 2027 To 31 Jan 2028. ffp Quantity Unit Unit Price 1 Each $ clin 0008 Delivery Date:on Or Before 7 Days After Receipt Of Call clin 0009 on-demand Mylar Restoration Servicesin Accordance With Sow Paragraph 1.3 Through 1.3.1 For Price Call Period 1 Feb 2027 To 31 Jan 2028. ffp Quantity Unit Unit Price 1 Each $ clin 0009 Delivery Date: On Or Before 3 Business Days After Receipt Of Call technical Subfactors instructions technical Subfactor 1: offers Must Provide Documentation To Demonstrate How The Requirements Of The Sow Including The Delivery Dates On The Clins Will Be Met. To Be Technically Acceptable, The Documentation Provided Must Demonstrate How The Requirements Of The Sow Including The Delivery Dates On The Clins Will Be Met. Reference Sow Paragraph 1.4, Thresholds Items 1 Through 5. Offerors Must Provide Documentation For Each Item Listed In Paragraph 1.4, Items 1 Through 5. technical Subfactor 2: offerors Are Required To Request And Receive The Four Mylar Originals Nlt 9 January 2024. mylars Submitted For Evaluation Should Be Sent At No Cost To The Government Via Fedex To Aflcmc/lzpef 6032 Fir Ave, Bldg 1237 hill Afb, Ut 84056 mylars Must Be Received By The Government For Evaluation No Later Than 72 Hours After Receipt Of The Mylar Original. The Mylar Originals Will Be Returned. technical Subfactor 3: offerors Are Required To Request And Receive A Large Format Mylar To Convert To A Raster Image Iaw Sow 1.1 And Subparagraphs Nlt 9 January 2024. the Mylar Submitted For Evaluation Should Be Sent At No Cost To The Government Via Fedex To Aflcmc/lzpef 6032 Fir Ave, Bldg 1237 hill Afb, Ut 84056 the Mylar Must Be Received By The Government For Evaluation No Later Than 72 Hours After Receipt Of The Mylar Original. The Mylar Original Will Be Returned. discussions the Government Intends To Award Without Discussions, Based On The Initial Quotes Received, But Reserves The Right To Conduct Discussions If Determined Necessary. Any Discussions Will Be Conducted In Accordance With Far 15.306. (end Of Provision) 52.212-2, Evaluation-commercial Products And Commercial Services Applies To This Acquisition. The Following Addenda Replaces 52.212-2 In Its Entirety. unless The Requirement Is Cancelled, The Government Will Award A Contract Resulting From This Request For Quote To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers. factors price offerors Shall Input Prices For All Clins In Accordance With 52.212-1 Instructions. A No Bid Or An Omitted Price May Result In An Incomplete, Unacceptable Quote. a Price Evaluation Will Be Performed By The Contracting Officer To Determine The Cost To The Government Will Be Fair And Reasonable. cost Or Pricing Data. In Accordance With Far 15.403-1(b) And 15.403-3(a), Data Other Than Certified Cost Or Pricing Data May Be Required To Support A Determination Of Price Reasonableness. Data Shall Be Provided Iaw Far 15.403-5, Instructions For Submission Of Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data. If, After Receipt Of Quotes, The Pco Determines That There Is Insufficient Data Available To Determine Price Reasonableness And None Of The Exceptions In Far 15.403-1, Prohibition On Obtaining Certified Cost Or Pricing Data (10 U.s.c. 2306a And 41 U.s.c. 254b) Apply, The Offeror Shall Be Required To Submit Additional Cost Or Pricing Data. technical technical Subfactor 1: to Be Technically Acceptable, The Documentation Provided Must Demonstrate How The Requirements Of The Sow Including The Delivery Dates On The Clins Will Be Met. Reference Sow Paragraph 1.4 Thresholds Items 1 Through 5 technical Subfactor 2: to Be Technically Acceptable, The Four Produced Mylar Digitization’s Shall Be Provided Within 72 Hours After Receipt Of The Mylar Original And Meet The Technical Specification Of Sow Paragraph 1.2 And Subparagraphs. technical Subfactor 3: to Be Technically Acceptable, The Converted Large Format Mylar Drawing Shall Be Provided Within 72 Hours After Receipt Of The Mylar Original And Shall Meet The Technical Specification Of Sow Paragraph 1.1 And Subparagraphs. past Performance iaw Far 15.304(c)(3)(iii) The Contracting Officer Has Determined That Past Performance Is Not An Appropriate Factor For This Acquisition And The Past Performance Evaluation Is Waived. relative Order Of Importance Of Factors And Subfactors. Iaw 15.304(e)(3) All Evaluation Factors, Other Than Cost Or Price, When Combined, Are Equally Important To Cost Or Price. (b)options. This Effort Does Not Require Options. (c)a Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (end Of Provision) (x)offerors Are Advised They Are Required To Include A Completed Copy Of The Provision At52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services, With Its Offer. as Prescribed In12.301(b)(2), Insert The Following Provision: offeror Representations And Certifications—commercial Products And Commercial Services the Offeror Shall Complete Only Paragraph (b) Of This Provision If The Offeror Has Completed The Annual Representations And Certification Electronically In The System For Award Management (sam) Accessed Throughhttps://www.sam.gov. If The Offeror Has Not Completed The Annual Representations And Certifications Electronically, The Offeror Shall Complete Only Paragraphs (c) Through (v)) Of This Provision. to Be Eligible For Award, The Offeror Is Required To Have Completed The Annual Representations And Certification In Sam.gov And Have A Current Registration In Sam.gov At The Time Of Award. (end Of Provision) (xi)offerors Are Advised The Following Clauses And Provisions Are Incorporated Into The Solicitation: section B – Bpa Terms And Conditions bpa Terms And Conditions: description Of Agreement: blanket Purchase Agreement (bpa) For Hybrid Mylar Digitization Service, Mylar Precision Plotting Services And On-demand Mylar Restoration Services For The Air Force Life Cycle Management Center (aflcmc)/lzp Engineering Data Service, Hill Afb Ut Over A 3-year Ordering Period. the Contractor Will Abide By Firm Fixed Pricing Agreed Upon On This Date. The Contractor Shall provide All Personnel, Labor, Equipment, Tools, Materials, Supervision And Other Items Required To Supply And Maintain Requirements Defined In The Statement Of Work (sow) Dated 1 Mar 2024. the Terms And Conditions Below Will Be Met: 1. Minimum/maximum Order/not To Exceed Contract Value minimum Order: $100.00 maximum Order: $25,000.00 the Total Not To Exceed (nte) Price For The 3-year Contract Value Is $250,000.00 (current Simplified Acquisition Threshold). 2. Delivery Period And Ordering Period: 3 Years, 1 Feb 2025 To 31 Jan 2028. Calls Can Be Placed Any Time During The Delivery Period; No Delivery Is Required After 31 Jan 2028. 4. North American Industry Classification System (naics) Code And Federal Supply Code (fsc) To Be Used On Basic Bpa And Calls. naics: 325992 Photographic Film, Paper, Plate And Chemical Manufacturing, Size Standard Number Of Employees 1,500 fsc: 7670 Microfilm, Processed 5. The Bpa And Call Orders Will Be Written With The Following Contract Line Item (clin) Structure And Use The Price Call Period Unit Price Based On The Effective Date Of The Call. Prices On The Calls Will Not Be Prorated Using Different Price Call Periods. For Example, A Call With An Effective Date Of 15 Feb 2025, The Clin(s) 0001 Through 0003 For Price Call Period 1 Feb 2025 To 31 Jan 2026 Will Be Used To Price The Call. A Call With An Effective Date Of 26 March 2026, The Clin(s) 0004 Through 0006 For Price Call Period 1 Feb 2026 To 31 Jan 2027 Will Be Used To Price The Call. 6. Quantity Discounts: None 7. Prompt Payment Terms: Net 30 Days 8. Government Purchase Cards (both Gpc And Expanded Use) Are Accepted At Or Below The Simplified Acquisition Threshold (sat). Government Purchase Cards Are Not Accepted Above The Simplified Acquisition Threshold (sat). *please Note That The Most Common Form Of Payment Will Be The Government Purchase Card (gpc). Offerors Are Required To Accept The Gpc As A Form Of Payment. 9. Foreign Items (listed By Country Of Origin). None 10. Time Of Delivery: See Clins For Specified Delivery Dates. 11. Fob Point(s): Destination For All Clins 12. Government Furnished Materials/property: This Requirement Does Not Use Government Furnished Property. 13. Delivery Address: Aflcmc/lzp, 6032 Fir Ave Building 1237, Hill Afb Ut 84056 14. Ordering Address: Aflcmc/lzp, 6032 Fir Ave Building 1237, Hill Afb Ut 84056 15. Payment Address: Established Per Call 16. Warranty Provision: Standard Commercial Warranty 17. If Applicable, Indicate That Section 508 Compliance Information Is Available On Electronic And Information Technology (eit) Supplies And Services And Show Where Full Details Can Be Found (e.g. Contractor's Website Or Other Location). not Applicable. 18. Extent Of Obligation: The Government Is Obligated Only To The Extent Of The Calls/purchases Placed Against This Blanket Purchase Agreement (bpa) And Shall Not Be Liable In Any Manner In The Event No Calls Are Made. the Total Bpa Estimated Ceiling Is $250,000.00. 19. Call Limitation: No Individual Call Under This Agreement Shall Exceed $25,000.00. 20. Individual Authorized To Purchase Under The Bpa: This Is A Decentralized Bpa. Contracting Officers In Pzio And Authorized Gpc Cardholders At Hill Afb Ut Are Authorized To Purchase Under This Bpa. 21. Effective Period: This Bpa Is Effective For 3 Years, From 1 Feb 2025 To 31 Jan 2028. 22. Delivery Tickets: a Requirement That All Shipments Under The Agreement, Except Those For Newspapers, Magazines, Or Other Periodicals, Shall Be Accompanied By Delivery Tickets Or Sales Slips That Shall Contain The Following Minimum Information: (i) Name Of Supplier (ii) Bpa Number (iii) Date Of Purchase (iv) Purchase Number (v) Itemized List Of Supplies Or Services Furnished (vi) Quantity, Unit Price, And Extension Of Each Item, Less Applicable Discounts (unit Prices And Extensions Need Not Be Shown When Incompatible With The Use Of Automated Systems, Provided That The Invoice Is Itemized To Show This Information). (vii) Date Of Delivery Or Shipment 23. Invoices: an Itemized Invoice Shall Be Submitted At The Completion Of Each Call Or Upon Expiration Of This Bpa, Whichever Occurs First, For All Deliveries Made During A Billing Period And For Which Payment Has Not Been Received. These Invoices Need Not Be Supported By Copies Of Delivery Tickets. See Wawf Clauses In The Bpa (dfars 252.232-7003 And 252.232-7006). 24. Basis Of Call Award/issue: Calls Will Be Awarded For The Bpa For Three (3) Years, 1 Feb 2025 To 31 Jan 2028, Or Until The $250,000.00 Dollar Limit Has Been Reached. The Government Reserves The Right To Award The Calls On A Sole Source Basis In Accordance With Far 6.302-1 Only One Responsible Source And No Other Supplies Or Services Will Satisfy Agency Requirements. 25. Ordering Procedures: The Government Will Utilize The Following Procedures For Placing Orders. call Orders Issued Under This Agreement Will Be Placed By Contracting Officers In Pzio And Authorized Gpc Card Holders At Hill Afb Ut, The Bpa Issued Contractor Will Be Allowed A Maximum Of 48 Hours (2 Business Days) Response Time To The Call Order. the Government Will Review Paragraph 4, And The Bpa And Call Orders Will Be Written With The Contract Line Item (clin) Structure And Use The Delivery Dates And Price Call Period Unit Price Based On The Effective Date Of The Call, The Agreed Upon Pricing In Compliance With The Requirements Of The Individual Call Order And Issue An Order To The Contractor. allowed Per Call: minimum Order: $100.00 maximum Order: $25,000.00 contractor Obligation To Deliver: Estimated Maximum $250,000.00 Dollars, U.s. gpc Card Holders And Af Form 9 Certifiers Are Required To Track Calls Placed To Ensure The Total Bpa Estimated Ceiling Of $250,000.00 Is Not Exceeded. The Gpc Order Tracker Will Be Maintained By The Contract Specialist And Contracting Officer. section C - Description/specifications/statement Of Work requirements blanket Purchase Agreement (bpa) For Hybrid Mylar Digitization Service, Mylar Precision Plotting Services And On-demand Mylar Restoration Services For The Air Force Life Cycle Management Center (aflcmc)/lzp Engineering Data Service, Hill Afb Ut 84056 Over A 3-year Ordering Period. statement Of Work (sow) Dated 1 Mar 2024. section D – Packaging And Marking section E – Inspection And Acceptance supplies/services Will Be Inspected / Accepted At: inspect And Accept Is The Following For All Clins inspect At inspect By accept At accept By government government government government section F – Deliveries Or Performance see Delivery Requirements For Each Clin In List Of Contract Line Items (clins) Section Of This Document. section G – Contract Administration Data section H – Special Contract Requirements (xiv)this An Unrated Order, Without A Defense Priorities And Allocations System Assigned Rating. (xv)offers Are Required To Be Emailed To Both The Contract Specialist Colton Esplin At Email Colton.esplin@us.af.mil And The Contracting Officer Joseph Laing At Email Joseph.laing@us.af.mil. The Due Date For The Offers Is Friday, 24 January 2025, 12:00 Pm Mountain Daylight Time. (mdt). (xvi)for Information Regarding The Solicitation, Please Email Both The Contract Specialist Colton Esplin At Email Colton.esplin@us.af.mil And The Contracting Officer Joseph Laing At Email Joseph.laing@us.af.mil. The Contracting Office Address Is As Follows: Afsc Ol:h/pzioa, 6038 Aspen Ave, Bldg 1289 Ne, Hill Afb Ut 84056. section I – Contract Clauses please See Attachted Document Entiltedmylar Digitization Services Combination Synopsis Solicitation 10 December 2024 For A List Of Clauses (xvii) Attachments mylar Digitization Services Combination Synopsis Solicitation 10 December 2024 sow Mylar 1 March 2024 solicitation - Fa820125q0001 far 52.204-24 - Fill-in Provision
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Machinery and Tools
United States
Closing Soon30 Jan 2025
Tender AmountRefer Documents
Details: Combined Synopsis-solicitation For Commercial Products And Commercial Services Description This Is A Combined Synopsis/solicitation For Commercial Products And Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. This Solicitation Is Issued As An Rfq. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-02, Effective 01/03/2025. This Solicitation Is Set-aside For 100% Service-disabled Veteran-owned Small Business (sdvosb). This Is A Firm Fixed Price Contract. The Associated North American Industrial Classification System (naics) Code For This Procurement Is 811210 Electronic And Precision Equipment Repair And Maintenance With A Small Business Size Standard Of $34.0 Million. The Fsc/psc Is J065 Maintenance, Repair, And Rebuilding Of Equipment- Medical, Dental, And Veterinary Equipment And Supplies The Award Will Be Made To The Response Most Advantageous To The Government And Best Meets The Requirement Described In The Statement Of Work. Price And Other Factors: See Attachment 2, Far 52.212-2 Evaluation . Statement Of Work 1. Contract Title: Candela Vbeam Perfecta Preventative Maintenance And Corrective Maintenance 2. Backround / Scope: The Contractor Shall Provide All Necessary Labor, Materials, Supplies, Parts, Software (needed For The General Operation Of The Equipment), Tools, Equipment, Travel, Transportation Expenses, And Other Related Costs To Provide Preventive Maintenance Inspection (pmi) And Corrective Maintenance Services On The Selected Government-owned Candela Vbeam Perfecta Unit At The Participating Facility Listed Herein At The Greater Los Angeles Va Healthcare System. Candela Laser Model# Vbeam Perfecta S/n 9914-0300-1115 Ee# 129137 Bldg. 500 Room 1672 Dermatology It Is The Intent Of The Government To Enter Into A Single Award Contract For Pmi Services On The Candela Vbeam Perfecta Equipment In Accordance With The Terms And Conditions Contained Herein. The Contract Period Shall Be For One (1) Base Year With The Government Having The Option To Exercise Four (4) - One-year Options. 3. General Requirement: All Work Shall Be In Accordance With Manufacturer S Instructions, Including, But Not Limited To, Adjustments, Calibration, Cleaning, Lubrication, Testing, Disassembly, Replacement Of Defective Parts, Etc. The Above Shall Be Performed As Necessary As Required To Keep Each Equipment In Optimal Working Condition. 4. Participating Facility: Va Greater Los Angeles Healthcare System 11301 Wilshire Blvd. Los Angeles, Ca 90073 5. Hours Of Work: This Contract Is A Full-service Contract To Include Dispatch And Technical Support Five (5) Days Per Week, Monday Through Friday, 8:30am-5:00pm Local Time Excluding National Holidays. On-site Service Shall Be Included Five (5) Days Per Week, Monday Through Friday, 8:30am- 5:00pm Local Time, Excluding National Holidays. On-call Emergency Telephone Support Service Should Be Included Weeknights After 5:00pm Et, National Holidays, And Weekends. Any Service Performed During Other Than Normal Work Hours Must Have Prior Approval And Coordinated With The Poc And Co. National Holidays: New Year S Day January 01 Martin Luther King S Birthday Third Monday In January President S Day Third Monday In February Memorial Day Last Monday In May Juneteenth June 19 Independence Day July 04 Labor Day First Monday In September Columbus Day Second Monday In October Veterans Day November 11 Thanksgiving Day Fourth Thursday In November Christmas Eve December 24 Christmas Day December 25 If The Holiday Falls On A Sunday, The Following Monday Will Be Observed As A National Holiday. When A Holiday Falls On A Saturday, The Preceding Friday Is Observed As A National Holiday By U.s. Government Agencies, And Any Day Specifically Declared By The President Of The United States Of America. 6. Intervening Service Call: When Repairs Are Needed Between Regular Scheduled Pmi, Such Repairs Are Rendered As Directed Only By The Poc Or The Contracting Officer (co). These Repairs Shall Be Verbally Directed To The Contractor S Employees, Requested In Writing, Be Transmitted Electronically, By Telephone, Or Any Manner Consistent With Accepted Commercial Business Practices. When Intervening Service Is Required, Contractor Shall Respond Within 24 Hours And Be On-site Within 48 Hours. Any Alternate, On-site Response Time Will Require Approval From The Poc Or Site Designee. 7. Overtime & Holiday Pay: Any Overtime And/or Holiday Pay That May Be Entitled To The Contractor S Employees Shall Be The Sole Responsibility Of The Contractor And Shall Not Be Billed To Nor Reimbursed By The Government. Contractor Will Bill And Be Paid For Actual Services Provided By Contractor Personnel. Contractor Will Not Be Paid For Availability Or On-call Services Unless Otherwise Provided Herein. 8. Qualification: Personnel Performing Maintenance And Repair Services Must Be Fully Qualified, Competent Field Service Engineers (fse) Who Has Been Trained To Perform Work On The Specific Equipment In Accordance With The Original Manufacture S Pmi/ Repair Procedures. Fully Qualified Is Defined As Factory-trained Or Equivalent* And Experienced To Work On The Equipment Assigned. 9. Contractor Specific Tasks: A. Preventive Maintenance: I. Contractor Shall Conduct Preventive Maintenance Inspections (pmi). On-site Pmi Shall Be Performed Once Per Calendar Year By A Manufacturer-certified Vendor In Accordance With The Equipment Manufacturer During The Life Of The Contract. All Equipment Must Also Be Maintained In Such A Condition That Will Satisfy The Requirements Of The Joint Commission. The Contractor May Request A Copy Of The Joint Commission Standards From The Poc. Ii. Pmi Must Be Scheduled At Least Three (3) Days In Advance With The Poc. Iii. The Contractor Shall Provide All Necessary Labor, Travel Expenses, And Parts At No Expense To The Government. Iv. The Contractor Shall Provide Performance Related Equipment Enhancements And Updates That Can Be Installed In The Field To The Equipment Listed Above. V. The Contractor Shall Provide Service Reports To The Poc To Note All Service, Repair, And Maintenance Activities. The Report Must Be Legible And Signed By The Poc After The Contractor Has Demonstrated To The Poc And The Equipment User That The Equipment Is In Proper Operating Condition And Meets The Manufacturer S Specifications. The Report At A Minimum Must Contain Company Name, Service Technician S Name, Contact Telephone Number, Date Of Service, Detailed Description Of All Services Performed On The Equipment (model Number And Location Included), Signs Of Misuse Or Neglect, Findings Of Problems And Correction, Including All Performance Verification, Listing Of Replacement Parts, When Applicable; Total Hours Of Service; Safety Check; Performance Data; And Recommendations Necessary To Maintain The Equipment. B. Corrective Maintenance: I. Contractor Shall Conduct Corrective Maintenance Or Repair Services As Required By The Government. All Equipment Must Also Be Maintained In Such A Condition That Will Satisfy The Requirements Of The Joint Commission. The Contractor May Request A Copy Of The Joint Commission Standards From The Poc. Ii. The Contractor Shall Respond Within 24 Hours Of Notification Of Needed Service And Repairs. Iii. If On-site Repair Is Required, The Contractor Shall Be On-site Within 48 Hours Of Response To Customer, Unless Otherwise Specified By The Customer. Iv. Contractor Shall Provide All Necessary Labor, Travel Expenses, And Parts At No Expense To The Government. V. The Contractor Shall Provide Service Reports To The Poc To Note All Service, Repair, And Maintenance Activities. The Report Must Be Legible And Signed By The Poc After The Contractor Has Demonstrated To The Poc And The Equipment User That The Equipment Is In Proper Operating Condition And Meets The Manufacturer S Specifications. The Report At A Minimum Must Contain Company Name, Service Technician S Name, Contact Telephone Number, Date Of Service, Detailed Description Of All Services Performed On The Equipment (model Number And Location Included), Signs Of Misuse Or Neglect, Findings Of Problems And Correction, Including All Performance Verification, Listing Of Replacement Parts, When Applicable; Total Hours Of Service; Safety Check; Performance Data; And Recommendations Necessary To Maintain The Equipment. 10. Parts: Only Standard New Or Like-new Parts Shall Be Furnished By The Contractor. All Parts Shall Be Of Current Manufacture And Shall Have Versatility With Presently Installed Equipment. All Major Components And Parts Furnished Shall Carry The Manufacturers Standard Commercial Warranty. All Newly Installed Parts Will Become Property Of The Government. Replaced Parts Are To Be Disposed By The Contractor After Approval Of Poc. All Worn Or Defective Parts Are To Be Replaced At No Cost To The Government. Operating And Consumable Supplies Are Not Included In This Contract. Contractor Will Provide Replacement Parts Within 1 Business Day Of Notification From Poc Or Co. The Veterans Affairs Healthcare Facility Shall Not Furnish Parts, Service Manuals And/or Test Equipment For The Performance Of This Contract. It Is The Responsibility Of The Contractor To Bring The Appropriate Equipment And /or Supplies Necessary To Complete The Work As Required. 11. Reporting: The Contractor Shall Submit A Complete Field Service Report (fsr) Electronically To The Poc Within 7 Calendar Days Of The Work Being Completed. The Fsr At A Minimum Must Contain Company Name, Service Technician S Name, Contact Telephone Number, Date Of Service, A Detailed Description Of Any Services Performed On The Equipment (model Number And Location Included), Serial Number Of The Equipment Being Worked On, Customer Asset Number (ee#), Signs Of Misuse Or Neglect, Findings Of Problems And Correction, Including All Performance Verification, Listing Of Replacement Parts, When Applicable; Total Hours Of Service; Safety Check; Performance Data; And Recommendations Necessary To Maintain The Equipment In Optimum Operating Condition. 12. General Information: Contractor S Program Manager: The Contractor Shall Provide A Program Manager Who Shall Be Responsible For Managing The Performance Of Work. The Name Of This Person Shall Be Designated In Writing To The Contracting Officer. The Contractor S Program Manager Shall Have Full Authority To Act For The Contractor On All Matters Relating To Daily Operations Of This Contract. Contractor Employees: The Contractor Shall Not Employ Any Person For Work On This Contract If Such Employee Is Identified To The Contractor As A Potential Threat To The Health, Safety, Security, And General Well-being Of The Public. Both The Check-in And Check-out Procedures For All Va Stations Are Mandatory And Shall Be Strictly Enforced. Parking: It Is The Responsibility Of Contractor Personnel To Park Only In Designated Parking Areas. Not Every Visn 22 Facility To Be Serviced Under This Contract Will Have On-site Parking Available For Contractor Personnel. The Contractor Shall Make Alternate Arrangements For Its Personnel To Park Off- Site If Motor Vehicles Are Required To Access Those Facilities. Parking Information Is Available From The Va Police & Security Service Office. The Va Will Not Invalidate Or Make Reimbursement For Parking Violations Of The Contractor's Personnel Under Any Circumstances. The Contractor Assumes Full Responsibility For Any Parking Violations. Smoking: Smoking Is Prohibited On Va Property, Items To Include: Cigarettes, Cigars. Pipes, Any Other Combustion Of Tobacco, Or Non-federal Drug Administration (fda) Approved Electronic Nicotine Delivery Systems (ends), Electronic/e-cigarettes, Vape Pens, Or E-cigars. 13. Security: The C&a Requirement Do Not Apply, And The Security Accreditation Package Is Not Required. This Service Does Not Involve Contractor Connection Of One Or More Contractor-owned It Devices (such As Laptop Computer Or Remote Connection From A Contractor System) To A Va Internal Trusted (i.e., Non-public Network) Therefore Information Technology (it) Security Certification And Accreditation (authorization) (c&a) Requirements Do Not Apply Per Va Handbook 6500.6. 14. Invoicing & Payment: Invoicing & Payment: 14.1 The Contractor Shall Submit A Monthly Invoice That Will Be Paid In Arears. 14.2 The Contractor Shall Submit In Arrears A Properly Completed Itemized Invoice In Commercial Items Via Tungsten Network: Http://www.tungsten-network.com/customer-campaigns/veterans-affairs/ No Advance Payments Shall Be Authorized. Payment Shall Be Made Monthly For Services Provided During The Billing Month In Arrears In Accordance With Far 52.212-4, Para. (i). Upon Submission Of A Properly Prepared Invoice For Prices Stipulated In This Contract For Services Delivered And Accepted In Accordance With The Terms And Conditions Of The Contract, Less Any Deductions Stipulated In This Contract. 15. Delivery Schedule: Base Plus Four (4) Option Years To Follow. 16. Insurance Coverage: The Contractor Agrees To Procure And Maintain, While The Contract Is In Effect, Workers Compensation And Employee S Public Liability Insurance In Accordance With Federal And State Of California Laws. The Contractor Shall Be Responsible For All Damage To Property, Which May Be Done By Him, Or Any Employee Engaged In The Performance Of This Contract. The Government Shall Be Held Harmless Against Any Or All Loss, Cost, Damage, Claim Expense Or Liability Whatsoever, Because Of Accident Or Injury To Persons Or Property Of Others Occurring In The Performance Of This Contract. Before Commencing Work Under This Contract, The Contracting Officer Shall Require The Contractor To Furnish Certification From His/her Insurance Company Indicating That The Coverage Specified By Far 52.228-5 And Per Far Subpart 28.307-2 Has Been Obtained And That It May Not Be Changed Or Canceled Without Guaranteed Thirty (30) Day Notice To The Contracting Officer. Contractor Is Required To Provide Copies Of Proof Of Workers Compensation And Employee Public Liability Insurance Within Fifteen (15) Calendar Days After Notification Of Contract Award. All Interested Companies Shall Provide Quotations For The Following: **price/cost Schedule Base Year Line Item Description Quantity Unit Of Measure Unit Price Total Price 0001 Vbeam Perfecta Preventative/ Corrective Maintenance Serial #, Model # Option Year One (1) Line Item Description Quantity Unit Of Measure Unit Price Total Price 1001 Vbeam Perfecta Preventative/ Corrective Maintenance Serial #, Model # Option Year Two (2) Line Item Description Quantity Unit Of Measure Unit Price Total Price 2001 Vbeam Perfecta Preventative/ Corrective Maintenance Serial #, Model # Option Year Three (3) Line Item Description Quantity Unit Of Measure Unit Price Total Price 3001 Vbeam Perfecta Preventative/ Corrective Maintenance Serial #, Model # Option Year Four (4) Line Item Description Quantity Unit Of Measure Unit Price Total Price 4001 Vbeam Perfecta Preventative/ Corrective Maintenance Serial #, Model # **please Use The Format Above For Pricing** The Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.htm. The Following Solicitation Provisions Apply To This Acquisition: Far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services (sep 2023) Far 52.212-3, Offerors Representations And Certifications- Commercial Products And Commercial Services Addendum To 52.212-1, Instructions To Offerors Commercial Products And Commercial Services Applies To And Is Included With This Acquisition. Far 52.252-1, Solicitation Provisions Incorporated By Reference (feb 1998) Http://www.acquisition.gov/far/index.html (far) And Http://www.va.gov/oal/library/vaar/index.asp (vaar) Far 52.204-1, System For Award Management (nov 2024) Far 52.204-16, Commercial And Government Entity Code Reporting (aug 2020) Far 52.204-20, Predecessor Of Offeror (aug 2020) Far 52.217-5, Evaluation Of Options (jul 1990) (end Of Addendum To 52.212-1) Offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. The Following Contract Clauses Apply To This Acquisition: Far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services (nov 2023) Addendum To Far 52.212-4, Contract Terms And Conditions- Commercial Products And Commercial Services Applies To And Is Included With This Acquisition. Far 52.252-2, Clauses Incorporated By Reference (feb 1998) Http://www.acquisition.gov/far/index.html (far) And Http://www.va.gov/oal/library/vaar/index.asp (vaar) Far 52.204-13, System For Award Management Maintenance (oct 2018) Far 52.204-18, Commercial And Government Entity Code Maintenance (aug 2020) Far 52.217-8, Option To Extend Services (nov 1999) Far 52.217-9, Option To Extend The Term Of The Contract (mar 2000) Vaar 852.203-70, Commercial Advertising (may 2018) Vaar 852.219-73, Va Notice To Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses (jan 2023) (deviation) Vaar 852.219-75, Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (jan 2023) Vaar 852.232-72, Electronic Submission Of Payment Requests (nov 2018) Vaar 852.242-71 Administrative Contracting Officer (oct 2020) (end Of Addendum To 52.212-4) Far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products And Commercial Services (jan 2025) The Following Subparagraphs Of Far 52.212-5 Are Applicable: (b)(4), (5), (9), (12), 18(i), (23), (25), (26)(i), (33), (34)(i), (36), (39)(i), (46), (51), (55), (59), (c)(5) All Quoters Shall Submit The Following In Accordance With Far 52.212-1, Attachment 1, Instructions To Offerors- Commercial Products And Commercial Services (sept 2023 . All Quotes Shall Be Sent To The Network Contracting Office (nco) 22 Contract Specialist, Loan Dho At Loan.dho@va.gov. Award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13. Comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Most Favorable To The Government. Decision Factors To Be Considered Are Technical Capability, Past Performance, And Cost Schedule (see Attachment 2), Addendum To Far 52.212-2, Evaluation- Commercial Products And Commercial Services . Quote Evaluations For Technical Capability Will Be Based On The Following: Capabilities Statement: Interested Offeror Can Perform The Tasks Listed In The Statement Of Work; Past Performance: Prior Experience In Maintaining Equipment Listed In Statement Of Work; Qualifications: Personnel Performing Maintenance And Repair Services Must Be Fully Qualified, Competent Field Service Engineers (fse) Who Has Been Trained To Perform Work On The Specific Equipment In Accordance With The Original Manufacturer S Maintenance And Repair Procedures. Fully Qualified Is Defined As Factory-trained And Experienced To Work On The Equipment Assigned. This Contract/ Purchase Order Will Consist Of An Estimated Base Plus Four (4) Option Year Period Of Performance: 03/01/2025 02/28/2030. The Award Will Be Made To The Response Most Advantageous To The Government And Best Meets The Requirement Described In The Statement Of Work. Responses Should Contain Your Best Terms, Conditions. To Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." Or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" Quoters Shall List Exception(s) And Rationale For The Exception(s), If Any. Questions Should Be Submitted No Later Than January 23rd, 2025 At 14:00 Pacific Standard Time To Loan Dho At Loan.dho@va.gov. All Responses To Questions Will Be Posted Via Amendment On Sam.gov On Or About January 24th, 2025. Submission Of Your Response Shall Be Received No Later Than January 30th 2025 At 14:00 Pacific Standard Time At Loan.dho@va.gov. Subject Line Shall Include: "response To Rfq 36c26225q0342" For Consideration. Late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). Any Questions Or Concerns Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The Point Of Contact Listed Below. Point Of Contact Contract Specialist Loan Dho Loan.dho@va.gov Attachment One: Far 52.212-1 Addendum Instructions To Offerors Attachment Two: Far 52.212-2 Evaluation Attachment Three: Vaar 852.219-73 Notice Of Total Set-aside For Certified Sdvosb Attachment Four: Var 852.219-75 Sdvosb Certification
Western Visayas Sanitarium Doh Tender
Healthcare and Medicine
Philippines
Closing Date5 Feb 2025
Tender AmountPHP 34.6 Million (USD 591.8 K)
Details: Description Invitation To Bid For Supply, Delivery And Installation Of Various Hospital Equipment Ib No. 2025-01-01-g The Western Visayas Sanitarium, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors To Apply For Eligibility And To Bid For The Hereunder Project: Name Of Project : Supply, Delivery And Installation Of Various Hospital Equipment Location : Western Visayas Sanitarium And General Hospital, Inangayan, Santa Barbara, Iloilo Approved Budget For : Php 34,665,000.00 The Contract (abc) Fund Source : Caf No. 2025-001-gf Delivery Period : Within Ninety (90) Working Days After Receipt Of The Notice To Proceed Line Items Abc: Php 34,665,000.00 Lot 1 No. Description Unit Of Measure Quantity Approved Budget Cost (php) 1 Electrical Machine. Brand New. Product Specifications: Combination Of Electrotherapy And Ultrasound; With 3 Independent Channels And Body Diagram Installed; Power Supply: Ac 100- 240 V, Number Of Channels: 3 Independent (2 For Electrotherapy, 1 For Ultrasound) Electrotherapy; Ten& Ems, Ultrasound Functions; Electrode Pads For Tens & Ems; Us Probe Head: Large And Small. Warranty -1 Year From Delivery And Installation. Unit 1 290,000.00 2 Hand Dynanometer. Brand New. Product Specifications: Hydraulic Adjustable Handle. Strength Can Be Viewed In Pounds Or Kilogram. Can Measure Up To 90kg (200lbs.). Durable Metal Gauge. Warranty –at Least 6 Months Upon Delivery And Installation. Unit 1 55,000.00 3 Parallel Bars. Brand New. Product Specifications: Adjustable And Foldable. Stainless Steel Bars And Steel Base. Height Adjust Within 26''-40''. Width -24''-36". Length Ranges: 7-10 Feet. Warranty -at Least 6 Months Upon Delivery And Installation Unit 1 50,000.00 4 Pulley System. Brand New. Product Specifications: Single Handle/dual Tower. Chest And Floor Height Mounted Handle. Easily Adjustable Handles. Wheelchair Accessible. Warranty –at Least 1 Year Upon Delivery And Installation. Unit 1 150,000.00 5 Pbx, Smart Hybrid. Brand New. Product Specifications: Designed For Telemedicine Use. Genuine And High Quality Brand. Pabx Built-in Extensions 16 Analog. At Least 2 Card Slots And 2 Slots Trunk Extension Card Switch System. Ability To Equip Sub-frame Ns-320; 12-32 Trunk Extensions. Sub-frame To Extend Pbx Ns300. Port Connected To The Main Frame. Dimensions: 40-45 X 35-36 X 86-90 Cms. Warranty –at Least 6 Months From Delivery And Installation * Unit 1 100,000.00 6 Uninterrupted Power Supply. Brand New. Products Specifications: Designed For Telemedicine Operation. 3000va. Output Power Capacity-3000va, Mount: 3u Rack Mountable. Nominal Output Voltage -230v. Dimensions: 20-22 X 19-20 X 5-6 Inches. Warranty –at Least 6 Months Upon Delivery And Installation. * Unit 1 400,000.00 7 Medical Waste Shredder. Brand New. Product Specifications: 20hp Motor Slow-speed And High Torque Dual Shaft Shredders, 5/16″ Wide Cutters, With Bearing Protection And Cleaning Fitters. Features: Efficiently Shred Syringes, Face Masks, Boxed Medical Waste, Pill Bottles, Etc., Available With A Split Cutting Chamber That Allows For Two Different Shred Widths Within One Shredder, The Manner Of In Feed And Output Are Also Divided. Includes Training And Certification, Warranty 1 Year Upon Installation Unit 1 350,000.00 8 Portable Multi-parameter Analyzer Flow Water Quality Testing. Brand New. Product Specifications: Measures Water Quality Parameter For Ph/ec/ise/do/temp. Mv/orp/px/resistivity/tds/sal./do Saturation. Features: Portable Device, Color High Contrast Lcd Touchscreen, Data Storage1000 Sets For Each Parameter, Support For Usb Communication, Ip65 Waterproof, Includes All Necessary Accessories And Consumables, Includes Training And Certification For Use, Warranty For 1 Year Upon Installation Unit 1 200,000.00 9 Water Purification System. Brand New. Product Specifications: 6000 Gdp Reverse Osmosis Machine. Up To 1200 Containers Per Day. Double U.s. Membrane. 2 Tanks 1000ltrs. For Raw & Product Water. At Least 28 Stages Of Water Filtration. To Include Piping Line From Water Station To Specified Areas Within The Health Facility. To Include Necessary. Building/structure For The Water Station. Service Warranty 1 Year After Delivery And Installation. To Include Service And User Training. Including Consumables: 50 Gallons Round Containers, 50 Gallons Slim Containers, 1 Sack Industrial Salt. * Unit 1 350,000.00 10 Anesthesia Machine With Cardiac Monitor. Brand New. Product Specifications: Main Gas Supply -oxygen, Air. Pin Index Supply System: Oxygen, Air. Ventilatior: With At Least Six (6) Ventilation Modes. Machine Must Be Able To Ventilate Patient Using The Preset Settings Provided By The End-user Even Presence Of Driving Gas Is Temporarily Unavailable. Ventilator Must Be Enclosed With Metal Casing To Prevent Entry Of Foreign Items Including Fluid. Ceramic Type Of Inspiratory And Expiratory Valve. Ventilator Must Have High Pressure Valve That Ensures Release Of Excess Pressure When Required. Ventilator Must Be Functional When Machine Is Connected Either Through Direct Power Supply Or Back Up Battery. Breathing System: The Volume Of The Compact Breathing System And Co2 Absorber Must Be 1.7l Excluding Hoses And Breathing Bag. Volume Of Co2 Absorber Reusable Canister Must Be 1.5l. With Bypass Valve Located In Breathing System Allowing Continuous Machine Operation While Changing Co2 Absorber. With Fresh-gas Decoupling Valve That Prevents Direct Entry Of Pressure In The Patient Airway When Pressing The O2 Flush Button, Peep And Pressure Limitation. With Breathing System That Can Be Detached From The Main Unit Without Tools Required. Breathing System Should Be Separated From The Main Unit With Mounting That Can Be Positioned From Any Direction Without Moving The Entire Anesthesia Machine. With Ceramic Type Of Inspiratory And Expiratory Valve. With Sample Gas Return Port. With Pup Off Pressure Release Valve Located At The Apl Valve. With Moisture Reduction System. Hot Steam Sterilization Can Be Carried Out At 134 ° C (273.2 ° F). With Heated Breathing System. Anesthesia Gas Supply Module: Range Of Fresh Gas Flow Indicators: 0.0 To 12.0 L/min. O2 Flush (bypass): At 87 Psi (6 Kpa X 100): Max. 75 L/min At 41 Psi (2.8 Kpa X 100): Min. 25 L/min. With Metering Valve And Dual Flow Tubes For Fresh-gas. With Integrated O2 Monitoring Located In The Screen. Vaporizer: With Two (2) Selectatec Vaporizer Mounting. With One (1) Unit Sevoflurane And One (1) Unit Isoflurane Vaporizer. Vaporizer Must Have No Cloth Component Which Allows Item To Be Functional Immediately Even Transporting It In An Upside Down Position. Oxygen Sensor: With Oxygen Sensor That Measures Percentage Of Oxygen. Flow Sensor: With Constant Temperature Hot-wire Anemometer Flow Sensor. Must Be Located Within The Anesthesia Unit Distal To The Patient Area. Flow Sensor Must Be Reusable. Auxillary Low Flow Oxygen: With Integrated Low Flow Oxygen Supply For Mask And Nasal Cannula Application. Writing Table/drawers/mounting: With At Least 3 Drawers As Storage For Other Accessories. With A Retractable Writing Table That Can Hold At Least 10kgs. Advanced And Safety Features: Functional Even The Battery Is Completely Discharged, All Pneumatic Functions Continue To Be Available (apl Valve, Breathing Pressure Gauge, Cylinder And Pipeline Gauges, Fresh Gas And Agent Delivery, And O2, Air, Flow Meters).manual Or Spontaneous Ventilation Can Be Maintained During Power Failure And Discharged Of Battery. In Case Of No Power And Totally Discharged Battery, Machine Must Be Shifted Automatically From Ventilator Mode To Manual Mode Without Any Switch Or Button Required. Start-up Time Must Be Less Than 15 Seconds. Power Input Data: Power Supply: Rating Non-configurable 100 To 240 Vac, 50/60 Hz, 145 Va. Battery Operation Time: Up To 2 Hours, Minimum Of 45 Minutes. Parameters: Minimum Tidal Volume (vt) Required: 20 Ml. Breathing Frequency (rate): 4 To 60 Bpm (1/min). Inspiratory Pressure: Peep + 5 To 65 Cmh2o. Inspiratory Flow (inspflow): 10 To 75 L/min In Volume And Pressure Control Modes, 10 To 85 L/min In Pressure Support And Simv/ps Modes. Inspiration Pause: 0 To 50 %. Simv Inspiratory Time: 0.3 - 4.0 Sec. Positive End Expiratory Pressure: (peep) 0 To 20 Cmh2o. Inspiration/expiration Ratio: (ti:te) 4:1 To 1:4. Pressure Limiting: 70 Cmh2o. Range Of Fresh Gas Flow Indicators: 0.0 To 12.0 L/min. Pressure Support Level: Peep + 3 To 20 Cmh2o. Min. Frequency For Apnoe-ventilation: (freq. Min.) 3 To 20 Bpm And “off”. Trigger Level: 2 To 15 L/min. Standard Accessories: One (1) Unit O2 Regulator, One (1) Unit Air Regulator, O2, Air Fittings And Hose Clamps, One (1) Unit Adult Anesthesia Circuit With 2l Bag. Biolight M12 Patient Monitor (basic Configuration). Technical Specification: Display/waveforms: Screen Size Display: Not Less Than 12" Color Tft Screen. Screen Navigation: Touch Screen With Quick Volume And Brightness Adjustment. Support Quick Key, Able To Access Specific Functions Or Perform Operations Easily And Quickly. No. Of Waveforms: At Least 7 Waveforms (using Standard Screen Display). Battery: Internal Battery Duration Must Be: ≥ At Least 240 (built In Battery). Can Upgrade Lithium Battery, Battery Power Supply ≥480 Min. Ecg: Ecg Leads: 3/5 Leads, Display Sensitivity: ×0.25, ×0.5, ×1, ×2, ×4,auto Gain, Must Have A Smart Lead Off Feature, Must Have An Ecg Calibration Feature, Must Have An St Segment Analysis And Monitoring. Heart Rate Range Must Be: Adu: 10 To 300 Bpm, Ped/neo: 10 To 350 Bpm, Must Have Two (2) Hr Averaging Method. With Ecg Multi-lead Synchronous Analysis Function, Analysis Of Multiple Cardiac Leads At The Same Time, Can Be Accurately Monitored In The Case Of Individual Lead Interference, With Intelligent Lead Fall Monitoring Function. St-segment Analysis Can Show The St Graphic, Which Help Indicates The St Alarm Status More Faster. Nibp: Nibp Measurements Must Comply With The American National Standard For Electronic Or Automated Sphygmomanometers: - (ansi/aami/iso 81060-2:2009, Ansi/aami Sp10:2002) In Relation To Mean Error And Standard Deviation. Measurement Mode: Manual, Auto, Stat, And Sequence. Sequence Mode Could Support 5 Different Modes. Maximum Measuring Interval In Auto Mode Must. Must Have An Overpressure Protection For Nibp. Temperature: Must Have Dual-channel Body Temperature Monitoring With Difference Display Measurements. Must Support Skin And/or Oral/rectal. If More Than One Temperature Probe Is Used, The Monitor Will Be Capable Of Calculating And Displaying A Delta Reading. Measuring Range: 0~50 ℃. Spo2: Must Be Used In Low Pi (perfusion Index). Resp: Detection Method: Respiratory Rate And Respiratory Waveform Must Be Monitored By Pulse Wave. Trends: Trend Data For All Parameters In Tabular And Graphic Formats Must Be: 180h. Stored Nibp Measurements Must Be: Up To 2400 Groups. Stored Alarm Events Must Be: 3000 Groups And Associated Waveform. Holographic Waveform Must Be 72 Hours. Printer/recorder: Must Support 3-channel Recorder To Realize Thermal Printing; Support Network Printing Function. Network Capability: The Ip Address Of Each Patient Monitor Shall Be User Configurable. Features: -the Monitor Must Provide Electronic Early Warning Scor (ews, Glasgow Coma Scale (gcs), And Oxycrg Screen. -oxycrg Screen Shows Two Trend Curves And A Compression Waveform, Support To Review 48 Hours Trend Curve And Compression Waveform On The Oxycrg Review Screen. -accessories Storage Box, Help Manage Accessories And Prevent Accessories Missing Or Broken Problem. -user Shall Be Able To Freeze The Waveforms On The Screen And Then Review It To Carefully Observe The Patient During This Time. -up To 4 Timers Shall Be Able To Be Configured On Monitor Display To Count Up Or Down The Required Time In Minute And Second With Audio Alarm To Alert User. - The Monitor Shall Provide Following Specific Working Modes: Standby, Intubation, Night, Privacy, And Demo Modes. Accessories Included: 3/5 Lead Ecg Cable, 3/5 Lead Ecg Lead Wires, Adult Spo2 Sensor, Pediatric Spo2 Sensor, Temperature Probe Skin, Temperature Probe Oral/rectal, Nibp Cuff Adult, Nibp Cuff Pedia, Wall Mount / Trolley, One (1) Unit Pediatric Anesthesia Circuit With 1l Bag, Two (2) Units Power Adapter. Includes Avr Machine For Anesthesia Machine. Warranty -2 Years From Delivery, Installation, And Training/orientation. Unit 1 3,300,000.00 11 Cardiac Monitor With Capnograph. Brand New. Product Specifications: Display/waveforms: Screen Size Display: Not Less Than 12" Color Tft Screen. Screen Navigation: Touch Screen With Quickly Volume And Brightness Adjustment By Gestures Operate. Support Quick Key, Can Easily And Quickly Access Some Functions Or Perform Operations. No. Of Waveforms: At Least 7 Waveforms (using Standard Screen Display). Size Must Be: At Least 175mm X 320mm X262mm. With Auto Speech Recognition Module Implements The Voice Interaction With The Patient Monitor. Battery: Internal Battery Duration Must Be: ≥ At Least 240 (built In Battery). Can Up-grade Lithium Battery Power Supply ≥480min. Ecg: 5 Leads Display Sensitivity: ×0.25, ×0.5, ×1, ×2, ×4, Auto Gain. Must Have A Smart Lead Off Feature, Must Have An Ecg Calibration Feature, Must Have An St Segment Analysis And Monitoring. Heart Rate Range Must Be: Adu: 15 To 300 Bpm, Ped/neo: 10 To 350 Bpm. Must Have Two (2) Hr Averaging Method. With Ecg Multi-lead Synchronous Analysis Function, Analysis Of Multiple Cardiac Leads At The Same Time, Can Be Accurately Monitored In The Case Of Individual Lead Interference, With Intelligent Lead Fall Monitoring Function. St-segment Analysis Can Show The St Graphic, Which Help Indicates The St Alarm Status More Faster. Nibp: Nibp Measurements Must Comply With The American. National Standard For Electronic Or Automated. Sphygmomanometers: - (ansi/aami/iso 81060-2:2009, Ansi/aami. Sp10:2002) In Relation To Mean Error And Standard Deviation. Measurement Mode: Manual,auto, Stat, And Sequence,sequence Mode Could Support 5 Different Modes. Maximum Measuring Interval In Auto Mode Must. Must Have A Dual Overpressure Protection For Nibp. Temperature: Must Have Dual-channel Body Temperature Monitoring With Difference Display Measurements. Must Support Skin Or Oral If More Than One Temperature Probe Is Used, The Monitor Will Be Capable Of Calculating And Displaying A Delta Reading. Measuring Range: 0~50 ℃. Spo2: Must Be Used In Low Pi (perfusion Index). Resp: Detection Method: Respiratory Rate And Respiratory Waveform Must Be Monitored By Pulse Wave. Ibp: Support 2-channel Ibp Measurement Range: -50mmhg~+350mmhg. Types Of Measuring Blood Vessels: Arterial Pressure (art), Pulmonary Artery Pressure (pa), Central Venous Pressure (cvp), Right Atrial Pressure (rap), Left Atrial Pressure (lap), Intracranial Pressure (icp); Pulmonary Artery Wedge Pressure (pawp); Cerebral Perfusion Pressure (cpp). The Monitor Will Calculate The Ppv Based On Any Arterial Pressure Value Between Heartbeats. Etco2: Measuring Range: Etco 2 0 To 150 Mmhg. Fico: 3 To 50 Mmhg. Awrr: 0 To 150 Rpm (mainstream). Trends: Trend Data For All Parameters In Tabular And Graphic Formats Must Be: 180h. Stored Nibp Measurements Must Be: Up To 2400 Groups. Stored Alarm Events Must Be: 3000 Groups And Associated Waveform. Holographic Waveform Must Be 72 Hours Printer/recorder: Must Support 3-channel Recorder To Realize Thermal Printing; Support Network Printing Function Network Capability: The Ip Address Of Each Patient Monitor Shall Be User Configurable. The Upper/lower Limits Of Alarms Can Be Configured Via Networking From The Central. The Alarms At Bedside Can Be Paused Or Muted Via Networking From The Central. Features: -the Monitor Must Provide Electronic Early Warning Scor (ews), Glasgow Coma Scale (gcs ), And Oxycrg Screen. -oxycrg Screen Shows Two Trend Curves And A Compression Waveform, Support To Review 48 Hours Trend Curve And Compression Waveform On The Oxycrg Review Screen -accessories Storage Box, Help Manage Accessories And Prevent Accessories Missing Or Broken Problem -all-in-one Monitoring Adult, Children, And Newborn Patients. -user Shall Be Able To Freeze The Waveforms On The Screen And Then Review It To Carefully Observe The Patient During This Time. -up To 4 Timers Shall Be Able To Be Configured On Monitor Display To Count Up Or Down The Required Time In Minute And Second With Audio Alarm To Alert User. - The Monitor Shall Provide Following Specific Working Modes: Standby, Intubation, Night, Privacy, And Demo Modes. Warranty -1 Year From Delivery And Installation. Unit 2 500,000.00 12 Ceasarian Instrument Set. Brand New. Product Specifications: Made Of Heavy Duty Stainless Steel. Includes The Following Items: 1 Pc. Scalpel Handle #3 With Measure 125mm, 1 Pc. Scalpel Handle #4 135mm, 1 Pc. Tc Metzenbaum Scissors Cvd 180mm, 1 Pc. Lexer Scissors Narr Str 165mm, 1 Pc. Mayo-lexer Scissors Cvd 165mm, 1 Pc. Lister Bandage Scissors Hvy 180mm, 1 Pc. Standard Forceps Serr 160mm, 1 Pc. Standard Tissue Forceps 1x2 160mm, 5 Pcs. Lorna Towel Clamp Non-perf 130mm, 6 Pcs. Halsted-mosquito Forceps Delstr125mm, 6 Pcs. Halsted-mosquito Forceps Del Cvd125mm, 2 Pcs. Kelly Forceps Del Str 140mm, 6 Pcs Moynihan Hemostatic Forceps, Crv, 150mm, 1 Pc. Tc Mayo-hegar Ndlholderhvyserr150mm, 1 Pc. Tc Hegar Needle Holder Hvy-serr 205mm, 1 Pc. Us-army Retrac.26x15/43x15-23x15/40x15, 1 Pc. Richardson-eastman Bt471rbt472r, 6 Pcs. Boys-allis Forceps 5x6 155mm, 2 Pcs. Kidney Tray Stainless Steel 250mm, 1 Pc. Bottom For 3/4 Container Height:135 Mm, 1 Pc. Primeline Pro 3/4 Lid Red, 1 Pc. 3/4 Size Perf Basket 406x253x76mm, 1 Pc. Silicone Basket Liner 3/4 Size, 1 Pc.mayo Safety Pin F/ring-hdl Inst 140mm, 1 Pc. Ident. Label Up To 13 Letters Red. Warranty –at Least Eat 1 Year From Delivery. Set 2 1,520,000.00 13 Chemical Analyzer. Brand New. Product Specifications: Combined Instrument With Two Complementary Technologies: Raman Spectroscopy And Colorimetric Detection Confirmatory Testing: One Instrument Capable Of Confirmatory Testing Using Two Technologies Including 1) Swgdrug Category A Technique For Presumptive Testing, And 2) Swgdrug Category C Technique For Confirmatory Testing Safety Of Features For Measuring Energetic Samples: Trace Detection Testing For Energetics Without Need For Opening The Container Nor Inducing Laser Light To The Sample, Scan Delay Timer: 15 Sec – 10 Min Sample Size: Able To Detect / Identify Samples From 1 Microgram Traces To Large Bulk Samples Materials Covered: Common Raman Substances, Explosives, Narcotics, Cwas, Tics, Tims, Precursors, Common Chemicals, Fluorescent Materials Not Covered By 785nm Raman: E.g. Colored Materials, Heroin, Colored Mdma Pills, Oils, Npss, Etc., Low Concentration Materials Not Covered By Any Raman Instruments: Lsd, Thc, Magic Mushrooms, Gunpowder, Etc. Raman Excitation Wavelength: 1064nm Minimizes Fluorescence Effects: Allows For Direct Analysis Of Colored/impure Chemicals Through Colored Packaging. Spectral Wavelength Range 200 – 2500 Cm-1 Portability Power: Small Handheld Device, Optimized For One Handed Operation. , 18.5cm-20cm (l) X 15cm-20cm (w) X 7.9cm-10cm (h), 3.65lbs-5lbs (1.65 Kg-2.27kg)., Quantity 2 Lithium Ion Rechargeable Batteries With Battery Life Of More Than 6 Hours Per Charge Per Battery. Cr123a Rechargable Batteries Can Be Used. Including Spare 2 Lithium-ion Battery. Ruggedness Decontamination: Us Mil-std 810g Designed Rugged., Ip 68 Rated For Use In Varying Environmental Conditions And For Complete Decontamination. Operational Temperature Range: Unit Can Be Operated In -20°c To +50°c Temperatures., Withstands Temperature Fluctuations And Humidity Fluctuations. Rapid Start-up Rapid Results: 60 Seconds From Power On To Analysis., Analysis Results In Less Than One Minute. Operational Mode Options: Raman Analysis And Colorimetric Analysis Oraman: • Auto-collect Adjusts Raman Settings Automatically Optimizes Use For Routine Operations • Advanced User Adjustable Raman Settings For Advanced Operators And Custom Library Build: • Laser Power Level 30-490 Mw Adjustable In 5 Mw Increments Exposure Time 5ms To 30s In Increments • Custom Applications Optimize Raman Analysis Parameters Specific To Material Type Ocolorimetrics: • Pouches Including Both Swipes And Colorimetric Chemicals In One Pouch • Pouches For Explosives And Narcotics • General Pouches For Detecting A Wide Range Of Explosives Or Narcotics • Specific Pouches For One Explosive/narcotic Substance Or Substance Group Easy Raman Operation: • Scans In Direct Contact And Through Translucent Plastic Or Glass Containers. • Universal Sample Holder For Analysis Of Samples In Varying Forms And Packaging. • Smartphone Like Touch-screen Interface Or Large Button Activation. • User Prompted Step-by-step Onscreen Analysis Activation. • Typically, 4 Button Presses To Receive Analysis Result. • Onboard System Status Monitoring And Calibration. Reduces Down-time And Necessity For Re-calibration At A Service Depot Analytical Performance: • Liquids, Solids, Powders, Pastes, Gels, Invisible Traces. • Colored Substances And Substances Found In Colored Translucent Packaging. These Types Of Substances Are Most Often Encountered In Real-world Samples. • Comparative Spectral Analysis Overlay Easily Performed Onboard. • User Adjustable Focus Ensures Analysis Of Material And Not The Packaging. • 4c Software Automatically Monitors Results For Combinations Of Precursors Used In Threat, Drug Manufacturing, And Other Recipes. Users Receive Onscreen Alert To Potential Threat Or Clandestine Drug Manufacturing Activity. Library: Raman: • Over 12,000 Substances. • Resq Library Includes The Latest Explosives, Precursors, Cwas, Tics/tims, Narcotics And Psychotropic Drugs, Steroids, Cutting Agents, Pharmaceuticals, Diluents And Pesticides. • Easily Expandable To Add Emerging Threats And Other Substances. • Fleet Management And Library Transfer To Units In The Field. • 4c Library With Explosive, Drug Manufacturing And Other Types Of Threat Manufacturing Recipes. • Library Updates Provided More Than Once A Year Colorimetrics: • General Narcotics Pouches: Multi Drug Test Incl. Fentanyl, Special Opiate Pouch, Cannabinoids • General Explosives Pouches: Chlorates/perchlorates, General Explosives • Specific Pouches: Cocaine, Ephedrine, Heroin, Ketamine, Lsd, Meth/mdma, Mushrooms, Opiates, Pcp, Thc, Ghb Evidence Documentation Traceability: • Onboard 5mp Camera Captures Image Of Sample And Surroundings, As Well As Colorimetric Swab. • Image(s) Stored Along With Analysis Results In Tamper-resistant File. All Analysis Results Are Traceable And Include Unique Date, Time And Serial Number Stamp. • Ability To Activate Password Protect Operator Log-in. Record Of User Associated Activity Stored Onboard And Cannot Be Deleted. Data Access And Transfer Reporting: • View Results In Real Time On Cell Phone Or Tablet, Computer Or Laptop (pc, Ios, Android, Linux) Via Wifi (can Be Disabled). • Exportable Data In Numerous File Formats. • Data Access And Transfer On Computer Or Laptop Via Usb And Wifi (can Be Disabled). • Easy Report Generation. Customer Support Package: • 24/7/ 365 Days Reachback Service For The Life Of The Unit. • Library Updates Provided For The Life Of The Unit. • Software Updates Provided For The Life Of The Unit. • Support: Online, Phone, Email, And In Some Cases Text Message For The Life Of The Unit Cql Complete Package: • Rugged Shipping Case With Custom Foam Insert. • Qty 2 Rechargeable Lithium-ion Batteries. • Cr123a Battery Cartridge (does Not Include Cr123a Batteries). • External Battery Charger. • Ac Power Supply. • Adjustable Base Adaptor. • Universal Sample Holder. • Certified Benzonitrile Performance Verification And Calibration Standard. • Flash Drive Containing User Manual And Supporting Documentation. • Quick Start Guide. • Usb-c To Usb-a Data Transfer Cable. • 1064nm Laser Test Card. • Including Hand Strap And Wrist Strap. . Training: • Comprehensive Onsite Training For An Unlimited Number Of Users. Add-on Accessories And Software: • Periscope Adaptor. • Vial Holder. • Bottle Adaptor. • Integrated Quickdetect Automated Colorimetrics • Detect Trace Quantities Of Non-visible Residues Left On Surfaces: • Explosives And Explosive Precursors • Narcotics Standard Requirements: • Bidder’s Certificate That Will Provide Manual In English Language (2 Copies Of Operator's/user's Manual And 2 Copies Of Service/technical And Maintenance Manual) Upon Delivery. • Brochure/sales Literature. Training Requirements: • Bidder’s Certificate That Will Conduct Free Technical Training And Product Demo For The End-user/s And In-house Biomed On Equipment Operation And On Maintenance Of Equipment. • After Sales Service: Bidder’s Certificate That Parts Shall Be Available At The Authorized Philippine Service Center/s For A Period Of Five (5) Years After The Warranty Period. • Certification From Local Distributor On The Availability Of Service Technicians And/or Biomedical Engineers In Case Of Equipment Breakdown. Preventive Maintenance - • Bidder’s Certificate Free Quarterly Preventive Maintenance During The Warranty Period With Preventive Maintenance Plan. Warranty Certificate: • Warranty Certificate Minimum Of Five (5) Years For Service And Three (3) Years For Parts. The Warranty Period Shall Commence From The Date Of Acceptance By The End-user After Testing And Commissioning. • Calibration: With Certificate Of Calibration Upon Delivery. The Bidder Must Be Iso 9001 And The Manufacturer Should Be Iso 13485 Certified Unit 1 6,900,000.00 14 Common Bile Duct Exploration Supplement Set. Brand New. Product Specifications: Made Of Heavy Duty Stainless Steel. Includes The Following Items: 1 Pc. Randall Kidney-stone Frcpsslt-cvd225mm, 1 Pc. Randall Kidney-stone Forceps Cvd225mm, 1 Pc. Randall Kidney-stone Frcpshvy-cvd225mm, 1 Pc. Randall Kidney-stone Frcps U-cvd225mm, 1 Pc. Bakes Bile-duct Dilator 1mm, Bakes Bile-duct Dilator 2mm, 1 Pc. Bakes Bile-duct Dilator 3mm, 1 Pc. Bakes Bile-duct Dilator 4mm, 1 Pc. Bakes Bile-duct Dilator 5mm, 1 Pc. Bakes Bile-duct Dilator 6mm, 1 Pc. Bakes Bile-duct Dilator 7mm, 1 Pc. Bakes Bile-duct Dilator 8mm, 1 Pc. Bakes Bile-duct Dilator 9mm, 1 Pc. Bakes Bile-duct Dilator 10mm, 1 Pc. Randall Kidney-stone Forcepscvd190mm, 1 Pc. Randall Kidney-stone Fcpshvy-cvd190mm, 1 Pc. Bottom For 1/2 Container Height:135mm, 1 Pc. Prime Line Pro 1/2 Lid Green, 1 Pc. 1/2 Size Perf Basket 243x253x76mm, 1 Pc. Identification Label Green. Set 1 590,000.00 15 Defibrillator. Brand New. Product Specifications: General Features: 7-10 Inch Lcd Display, Maximum Of 3 Waveforms. High Contrast Display Mode For Bright Environments. Ambulance-ready, Rugged Casting: Ip44, Impact Test Of 0.75m. Output Energy: 1-360j. Charge Times Of <3s T O200j, <7s To 360j. Auto-volt With Smart Charging. Lithium-ion Battery Supports To 6 Hours Monitoring/200 Shocks @360j/ 4.5 Hours Pacing, With Built-in Led Power Level Indicator. Lightweight At 4-5kg., Full Configuration, Main Unit. Automatically Switch Defibrillator Energy, Cpr Prompts, And Alarm Limits Depending On Patient Type. Display Ecg During Aed Mode. Ecg Recovery Within 2.5s Or Less. Contact Status Can Be Checked Through Paddle And Monitor, Impedance Value Can Be Checked In Monitor. Auto-testing Includes Maximum Energy Discharge Test. Parameters: 3/5 Lead Ecg, Pacer. Includes: Thermal Recorder, External Paddle Kits, Ecg Cable And Lead Wires, Ecg Electrode, Multifunction Electrode Pad. Printer Paper, Electrode Gel, Power Cord, Lithium-ion Battery. Unit 5 1,500,000.00 16 Dish Sterilizer. Brand New. Product Specifications: − High Light Led Display, − With Special Boiler Temperature Drainage Settings, − Washing (non-recycling) Parameters Can Be Set Free And With Control Memory Function, − Can Meet Different Washing Demand, − Self - Research Internal Water Softener, − Double Construction Design For Top Cover, − Power: 380v/50hz, − Basket Dimension : 500x500mm, − Washing Ability : At Least 60 Basket / H, − Rinse Water Quantity : 3 L/h, − Inlet Height :400-430mm, − Machine Dimension : 800-850x800-820x1450-1500mm, − Rated Power : 14.75kw, − Gross Weight : 140-150, − Net Weight : 100-110, − Packing Size : 890-900x900-910x1630-1700mm. Warranty Period- Within 1 Year Upon Delivery And Installation To Cover Parts (excluding Wearable Parts) And Service With Preventive Maintenance Every 6 Months Within 2 Years Period. Provides Orientation And Training To End-user Representative.* Unit 1 500,000.00 17 Electrocardiography Machine (ecg) Brand New. Product Specifications. High Resolution Lcd Touch Screen, 320-330x240-250vivid Waveform Display. 12 Leads Ecg Resolution Thermal Printer. Built-in Rechargeable Li-ion Battery, Ac/dc Power Supply. Anti-defibrillator And Pace Maker Detection. Complete Digital Filtering, Resisting Baseline Drift, Automatic Baseline Adjustment. Automatic Ecg Measurement And Interpretation. Large Patient Data Storage; 150 Cases, Equipped With Usb Port For Data Transfer. Three (30 Printing Formats (auto, Manual And Rhythm) Selectable. 1/2/3 Channel Ecg Waveform And Rhythm Leads Record Out. Lead Status Diagram Display. Unit 4 200,000.00 18 Electrosurgical Dessicator Machine. Brand New. Product Specifications: Use For Removal Of Lesions, Warts, Skin Tags, And Other Blemishes Easily With Minimally-invasive Treatment. For Superficial Treatments, Safe To Use Around The Eye And Nose Area. Includes Re-usable Pen And Tips. Unit Specifications: Depth:4-5 Inches, Width:8-9 Inches, Height:7-8 Inches, Weight:6-8 Pounds, Output Power -low At 0-20watts (1/10 Watt Increments Up To 10 Watts), High At 0-35 Watts, Bipolar: 0-35 Watts. Offers Hand-or-foot Activated Operation. Autoclavable, Reusable Hand Control Pencil With Power Adjustment Buttons. Pencils Are Designed With Non-spinning Hex Collar For Multi-positional Fall-safe Blade Locking. Equipped With Mobile Stand. Includes Consumables.warranty-6 Months From Delivery And Installation. Set 1 100,000.00 19 Fetal Maternal Monitoring System: Brand New. Product Specifications: Foldable Screen. Probe Rack And Wall Mounting Rack. Handle For Easy Carrying. User-friendly Gui With 3 Display Modes. Four (4) Optional Color Background. Capable Of 24 Hours Ctg Storage. Fast Print For Store Traces. "smart Notes" Annotation (color Optional). Signals Overlap Verification. Real-time And Offline Data Transmission To Pc. 10-12 Inch Color Touch Screen. Excellent Algorithm. 12-crystal And 1 Mhz Water-proof Transducer For Accurate Detection. Configuration: Dual-fhr, Toco, Fm, Afm, Mecg, Nibp, Mspo2, Temp. Includes: 3 Each Belt, 1 Each Event Marker, 1 Bottle Ultrasound Gel, 1 Ea. Fhr Transducer, Purple, 1 Each Transducer, Yellow (color Optional), 1 Each Spo2 Sensor, Adult, 1 Each Temperature Probe, Skin, 1 Each Toco Probe, 1 Each Nibp Cuff, Adult, 1 Each Nibp Tube, Adult. Unit 3 1,110,000.00 20 Infusion Pump. Brand New. Product Specifications: Mechanism: Peristaltic Pump, Operating Mode: Flow Rate Mode, Drip Rate Mode(optional), Preset Volume: 1-9999 Ml, Flow Rate Range: 1 – 600 Ml/h (or Wider), Increment: 1, 10, 100 (ml/h), Accuracy: ± 5%, Kvo Rate: 1 Ml/h, Bolus Rate: 600 Ml/h, Drop Rate Range: 1 – 400 Drop/min (or Wider) With Optional Drip Sensor, Screen: 2.7 Inches B/w Lcd (or Wider), Information: Flow Rate, Preset Volume, Accumulated Infusion Volume, Completion, Occlusion, Air Bubble, Bed No, Ac Power Indicator, Battery Capacity, Battery Charge Indicator, Iv Set, Etc., Status Indicator: Stop, Run, Bolus, Kvo, Alarm Type: Air Bubble, Finish, Occlusion, No Ac Power, Low Battery, Battery Empty, Reminder To Operate, Communication Error (err1), Operation Error (err2), Drops Error (err3), Handle Open (err4), Air Bubble Level: 1-3 Levels Adjustable, Universal Compatibility, Turn On/off, Occlusion Alarm Pressure Range: 3 Levels: 60kpa, 100kpa, 140kpa (±20kpa), Battery Type: Lithium Polymer, Battery Life: Up To 4 Hours Continuous Operation 25 Ml/h Flow Rate, With Delivery And Installation, Provision Of Trainings Of Staff With Certificates, And Manual. Unit 4 320,000.00 21 Laboratory Oven. Brand New. Product Specifications: Working Temperature Range At Least 5 Above Ambient Temperature To +300 °c; Setting Accuracy Temperature Up To 99.9 °c: 0.1 / From 100 °c: 0.5; Setting Temperature Range +20 To +300°c; Temperature Sensor 1 Pt100 Sensor Din Class A In 4-wire-circuit. Control Cockpit Single Display. Adaptive Multifunctional Digital Pid-microprocessor Controller With High-definition Tft-colour Display; Timer Digital Backwards Counter With Target Time Setting, Adjustable From 1 Minute To 99 Days; Adjustable Parameters: Temperature (celsius Or Fahrenheit), Air Flap Position, Programme Time; Ventilation: Natural Convection, Vent Connection With Restrictor Flap; Works Calibration Certificate : Calibration At +160°c; Door Fully Insulated Stainless Steel Door With 2-point Locking (compression Door Lock); Internals 1 Stainless Steel Grid(s), Electro Polished; Stainless Steel Interior; Interior Easy-to-clean Interior, Made Of Stainless Steel, Reinforced By Deep Drawn Ribbing With Integrated And Protected Large-area Heating On Four Sides; Volume 32 L; Dimensions W(a) X H(b) X D(c): 400 X 320 X 250 Mm; Max. Number Of Internals: 3; Max. Loading Of Chamber 60 Kg; Max. Loading Per Internal 20 Kg; With Free Power Back-up System, With Free Installation And Demonstration. Unit 1 130,000.00 22 Newborn Hearing Screening Test Equipment. Brand New. Product Specifications: • Capable Of Screening And Diagnostic Testing With Te And / Or Dpoae. • Fast Automatic Test With Pass / Refer And Graphical Test Result Display. • Direct Evaluation Via Value And Bar Diagram. • Up To 12 Frequencies Displayed Within The Device, Dp Up To 12 Khz. • 5 Dp / 2 Te Protocols With User Customizable Parameters (diagnostic Version). • High Noise Immunity For Operation In Normal Clinical Environment. • Lightweight, Small Ear Probe. • Environmentally Friendly Due To Long Life, Rechargeable Battery. • Bluetooth Communication To Optional Printer And Pc • Evaluation Of Results In Pc. Screener With At Least 4 Frequency Dpoae Testing Protocols. • Qualified Protocols Built Into The Device. • 4 Dpoae Test Frequencies Reported. • Integration To State Tracking Systems, Hi-track Or Oz. Diagnostic With Up To 12 Frequency Dpoae Testing Protocols. • 1.5 To 12 Khz Frequency Range With Up To 12 Test Frequencies Reported. • Customizable Test Protocols Teoae Available As An Upgradeable Option. Measurement Type: Distortion Product Otoacoustic Emissions (dpoae) Transient Evoked Otoacoustic Emissions (teoae). Frequency Range: Screener Version: Dpoae: 2.0 Khz To 5.0 Khz Teoae: 1.5 Khz To 4.0 Khz. Diagnostic Version: Dpoae: 1.5 Khz To 12.0 Khz Teoae: 0.7 Khz To 4.0 Khz. Stimulus Intensity Range: Dpoae: 40 Db Spl To 70 Db Spl Teoae: 83 Db Spl Peak Equivalent (±3 Db). Microphone System Noise: -20 Db Spl @ 2 Khz (1 Hz Bandwidth)/ -13 Db Spl @ 1 Khz (1 Hz Bandwidth). Dimensions And Weight (unit): 2.5 To 3” W X 1.2 To 1.8” D X 5.5 To 6.5” H 6.2 To 6.8 Oz. Power Supply: Lithium-ion Rechargeable. Battery Life: 1000 Tests Per Charge, Minimum 15 Hours On-time. Connectors/ Communications: Integrated Usb Communication Capability For Battery Charging And Communication With Pc-based Database Programs Or An Optional Printer. Hdmi Connector For Connection To The Micro-probe. Integrated Bluetooth Class 2 + Edr With Spp. Protocol For Communication With Optional Printer. Standard Accessories: Micro-probe, Box Of Single Use Ear Tip And Ear Tip Remover, Package Of Probe Tubes, Micro-usb Power Supply For Charging Lithium Ion-battery, Pc Database Software With Manual, Micro B To A Usb Cable For Pc Communicator/charging, Protective Carrying Case, Data Management Tool That Provides The Ability To Transfer Patient. Oae Test Data From The Testing Device To A Pc For The Purposes Of Viewing, Archiving, Managing And Printing Oae Reports. Using The Database Also Gives You The Means To Create Letter Sized, Detailed Reports That Can Be Easily Filed Or Faxed. You Can Also Create A “paperless” Office By Saving The Test Results As A Pdf For Electronic Filing Or Email. Dpoae: 40 Db Spl To 70 Db Spl Teoae: 83 Db Spl Peak Equivalent (±3 Db). Includes Ups. Warranty –at Least 1 Year After Delivery And Installation. Provision Of Training For End-user To Accredited Newborn Screening Center. All Expenses Should Be Shoulder By The Lowest Calculated Bidder. Unit 1 1,000,000.00 23 Operating Room Lights. Brand New. Product Specifications: Dual Head- Ceiling Type. Major Operating Room Light Multi-color. Merging Of Light Fields, Light Intensity Control. Comfortable Display Of Key-pad On Major Lighting Head. Back Light Key Pad Display. Depth And Merging Light Field Should Be Operated At The Sterilizable Handle. Cool Light Temperature Increasing In Head Area: 0.5 ºc. 360° Continuous Rotation Around All Major Joints. Anti-bacterial Coating Head. - Light Head Diameter: 66cm. Ideal Laminar Flow Ceiling System. With Endo Mode: Must Be Color Green Light. Main Light Head. Electronic Light Intensity Control At Lamp Head. - Light Intensity At 1 Meter Distance: 160,000 Lux. Colour Rendering Index Ra At Kelvin: 98 (for Better Quality Image Of Skin, Blood And Tissues). Colour Rendering Index R9 At Kelvin: 99 (for Better Quality Image Of Skin, Blood And Tissues). Focusable Light Field Size: 19-30 Cm. Colour Temperature: 3,750, 4,000, 4,250, 4,500, 4,750 K. - Adjusting The Shadow Activating Via The Touch Panel. - Maximum Of Four Groups Of Lenses Are Dimmed Simultaneously. Shadow Management System. Number Of Led’s: 99 On Lamp Head. Life Span Of Leds: > 60,000 H. Working Distance: 70-160 Cm. Light Intensity Control (standard): 5% - 100%. Outstanding Depth Illumination: 70, 100, 130 Cm. Laser Pointer On Head (main Light Head Only). Lf-index Leenemann: 26. Lf-index Oostlander: 28. Input Voltage: Single Phase 110 ~ 230 Vac Free Volt. Total Power Consumption: 82 - 92watts. Adjustable Brakes At The Horizontal Arm. Light Head Weights: 18.5 Kg. Protection Type Lamp Head: Iec60529. - Aluminum Housing. Satellite Head. Electronic Light Intensity Control At Lamp Head. - Light Intensity At 1 Meter Distance: 140,000 Lux. Colour Rendering Index Ra At Kelvin: 98 (for Better Quality Image Of Skin, Blood And Tissues). Colour Rendering Index R9 At Kelvin: 99 (for Better Quality Image Of Skin, Blood And Tissues). Focusable Light Field Size: 18-30 Cm. Colour Temperature: 3,750, 4,000, 4,250, 4,500, 4,750 K. Number Of Led’s: 69 On Lamp Head. Life Span Of Leds: > 60,000 H. Working Distance: 70-160 Cm. Light Intensity Control (standard): 5% - 100%. Outstanding Depth Illumination: 70, 100, 130 Cm. Input Voltage: Single Phase 110 ~ 230 Vac Free Volt. Total Power Consumption: 82-92 Watts. Adjustable Brakes At The Horizontal Arm. Light Head Weights: 17.9 Kg Minimum. - Aluminum Housing. Protection Type Lamp Head: Iec60529. Standard Accessories: - Sterilized Handle: 2 Pcs/ Lamp Head, - Ceiling Anchorage Ring With Screws, - Spring Arm, - Ceiling Cover, Including Installation Of Brackets To Embed Overhead Ceiling- User Manual, - Ups. Warranty Of Two (2) Years For Parts And Labor With Free Preventive Maintenance Every Quarter Within Warranty Period Five (5) Years Warranty For Led Bulb Only. Unit 1 2,500,000.00 24 Operating Room Table (motorized). Brand New. Product Specifications: Total Length: 2000-2100 Mm. Width Including Side Rails: 600-630 Mm. Mattress Width: 550-570 Mm. Total Weight: 200-210 Kg. Safe Working Load (swl): Up To 250 Kg. Height Adjustment Range: From 595 Up To 1005 Mm. Castors: Four Ø 120-125 Mm Central Locking Twin Castors. Head Section: -58° ... +37°, 135 Mm. Back Section: -10° ... +70°. Leg Section: -80° ... +10°. Lateral Tilt: 20° / 20°. Trendelenburg/anti-trendelenburg: 30° / 20°. Sliding Tabletop For C-arm Function: 300-320 Mm. Flex / Reflex: 220° / 120°. Electrical System: 24 Vdc, Battery Operated, 100 - 240 Vac, 50/60 Hz. Controls: Hand Control And Integrated Control Panel On The Column. Memory Positions: Four Programmable Positions. Visco-elastic Mattresses. Radio Lucent Tabletop For X-ray. Accessories For General Surgery: 1. Arm Rest, 2. Anesthesia Frame With Clamp And, 3. Attachment Clamp. Transport And Storage Conditions: Temperature 7 10° C + 50° C. Relative Humidity 10 %, 85 %. Air Pressure 700 Hpa, 1060 Hpa. Operating Condition: Temperature +10° C, + 40° C. Relative Humidity 30 %, 75 %. Air Pressure 700 Hpa 1060 Hpa. Side Rail Accessories: 25 X 10mm. Warranty-1 Year From Delivery And Installation. Certificate Of Parts Available In The Next 5 Years. Includes Training To End-user. Includes Product Manual. Unit 2 5,500,000.00 25 Radiant Warmer With Phototherapy Units. Brand New. Product Specifications: Fixed Height Radiant Warmer, Mounted On A Column. The Unit Is Supported By A T-shaped Sturdy And Stable Wheeled Base. Bases Is Provided With A Minimum Three (3) Anti-static Swivel Casters. At Least Two (2) Of The Casters Are Equipped With Brakes. The Base Is Equipped With A Side Handle/rail For Easy Positioning. The Design Of The Base Is Suitable To Be Fitted Over Standard Cradles, Cribs, And Bassinets. Overhead Radiant Heater At A Fixed Height Of 1.80-2.0m. Radiant Heating Is Achieved By Quartz/ceramic Elements, Placed In A Parabolic Reflector. The Radiator Is Equipped With A Safety Grid. The Unit Support Three (3) Modes: Pre-heating, Manual And Servo Mode. The Unit Allows For Instant Switching Been The Different Operating Modes. The Minimum Skin Temperature Setting Range Is 32°c To 37°c. The Resolution Of The Temperature Is: ± 0.5°c Or Better. In Manual And Pre-heating Modes Heating Settings Allow For A Range Of 0 – 100%. Led Spotlight(s) For Examination Are Integrated In The Overhead Radiant Heater, The Angle Of The Overhead Light Is Adjustable. Warm-up Time < 30 Min To 25°c. Power Requirements: 1 Ph, 100 - 240 Volts - 50/60 Hz 900 To 1300va (with Ups And Avr). Display Features: The Display Panel Is Integrated In The Column For Visualizing Working Parameters And Alarms. The Display Indicates: - The Current Active Mode: Pre-heating, Manual Or Servo, - The Current Heating Power In Percentages, - The Current Pre-set Temperature, - The Current Actual Skin Temperature, - The Current Air Temperature. The Unit Is Equipped With A Self-check Feature. Alarm And Safety Features: Alarms Are Audible And Visible. Alarms Indicating: - Sensor Disconnection Or Malfunction. - Power Failure. - Skin Temperature, After Stabilizing, Varying Beyond 0.5° To 1°c From Set-point. - 10 To 15 Minutes After Manual Mode Has Been Engaged An Audible Alarm Will Sound. In Addition, The Unit Will Either Reduce Or Cut The Power To The Heater. In Skin Mode, When The Temperature Exceeds 39°c, The Unit Will Cut The Power To The Heater. Supplied With: Instructions For Assembly, Use And Maintenance In English: 1 X Installed And 2 X Spare Reusable Skin Temperature Sensors, Including Connection Cable And Plug. 1 X Spare Quartz/ceramic Heating Element Or The Same With Installed Heating Element. 2 X Spare Examination Light Bulbs. 1 X Set Of Spare Fuses, If Applicable. Accessories: A Durable Light Weight Cradle/crib And Mattress. Oxygen Regulator Including A Pressure Gauge, Flow Meter, Humidifier Bottle And All Required Tubing. Integrated Weighing Scale. Electrically Operated, Slow Suction Unit Including A Vacuum Regulator, Vacuum Gauge And Autoclavable Collection Jar. Electrical Height Adjustment. T-piece Resuscitator. Integrated Phototherapy Unit. Led Phototherapy Unit 36cm: 620-2800μw/c㎡. Led Phototherapy Unit 50cm: 400-1620μw/c㎡. Estimated Life Span: Eight Years. Includes Avr. Unit 3 600,000.00 26 Refrigerator (biological). Brand New. Product Specifications: External Dimension: W = 700-750 Mm D = 730-750 Mm H = 2000-2100 Mm. Inside Dimension: Useful Space On Top W = 600-620 Mm D = 550-570 Mm H = 500-550 Mm. Useful Space At The Bottom W = 590-610 Mm D = 540-560 Mm H = 500-550 Mm. Capacity: 600 L Temperature Range: Top 2°c To 20°c Bottom 2°c To 20°c. Optional: Other Temperature Ranges. Housing Galvanized Sheet Steel With High Quality White Coating, Antibacterial Coated. With 4 Feet, Height Adjustable. Optional: Set Of 4 Casters, 2 With Brakes. Interior Space Inner Case Of Galvanized Sheet Steel With High Quality White Coating, Antibacterial Coated. Cleaning Friendly By Rounded Corners, Slippery Surface In The Interior, Meets Highest Hygiene Requirements Insulation High Density Foamed-in-place Polyurethane, With A Thickness Of 60 Mm. Cfc-free. Circulation Air Cooling For Rapid And Uniform Temperature Control, Reducing Temperature Gradients To A Minimum. When The Door Is ""open"" The Circulating Fan Is Switched Off Automatically By A Micro Switch In Order To Prevent Warmer Ambient Air Being Drawn In. Door 2 Pcs. Three-layer Thermally Insulating Glass Door (arranged On Above The Other), Supplied As Standard With Right Hand Hinge, Also Available With Left Hand Hinge At No Extra Cost. Grease Resistant Magnetic Seal. Optional: With Door Lock. Interior Fittings 4 Pcs. Grating-type Shelves (dim.: 530x550 Mm), White Coated. Interior Lighting With Automatic On/off Micro Switch. Optional: Stainless Steel Shelves Or Stainless-steel Drawer Compartments, With 3 Lengthwise Dividers With Telescopic-type Guides On Rollers With Stops, Drawer Dimensions: 500x480x77 Mm (wxdxh) Usable With Between The Lengthwise Dividers: 106 Mm (lengthwise Dividers Easily Removable). Working Range 1 From 2°c To 20°c (assuming The Ambient Temperature Is Approximately 4°c Above The Set Point). Temperature Accuracy +/- 1,8°c After Stabilization (with 50% Of Loading). Acoustics Signal When The Set Value Is Undercut Or Exceeded Potential-free Connection Socket For Extern Alarm Refrigerating Unit 2 Pcs. Fully Hermetically Sealed, Forced Ventilation, Fitted On Vibration – Absorbing Mounts (ambient Temperature Max. 32°c), Low Noise (48dba/1m), Energy Saving Compressor With High Quality Vaporization System. Refrigerant: R 290 Or Equivalent Defrost Automatically With Thermal And Time Limit. Condensate Evaporation In Heated Tray. During The Defrost Period, The Temperature Inside The Cabinet (only The Air Temperature – Not The Stored Goods) Will Arise For A Short Time. Electrical Date: Power Supply220-230 V/50 Hz/single Phase Optional: 60 Hz. Power Input 2x 0,20 Kw. Fuse 16a. Power Cable: 2x 1,5 M. Packing Details (palletized) Dimensions: Approx. 85x98x224 Cm. Net Weight: 150-170 Kg. Gross Weight: 180-200 Kg. Include Avr. Unit 1 100,000.00 27 Rigid Video Procto-sigmoidoscope. Brand New. Product Specifications: Plastic Obturator. Video Camera. Stainless Steel Tube. Handle Of Polyacetal (delrin), Usb Male Connector. Analogue To Digital Converter Nozzle For Gas. Instrumentation Channel. Silicone Washer. Includes Universal Fiber Optic Light Source Machine And Tube Connector From The Proctoscope To The Light Source Machine. Warranty -6 Months From Delivery And Installation. Set 1 50,000.00 28 Stretcher, Transport Type. Brand New. Product Specifications: Hydraulic Stretcher. Numbers Of Function: Five-function. Certification: Ce, Fda, Iso13485. Size: 2000-2100 Mm (l)*770-800mm (w)*600-610/900-920mm (h). Height:600mm-930mm. Lowest Position-floor To Platform-580mm. Highest Position-floor To Platform-905mm. Side Rail Height Above Mattress Platform-340 To 360mm. Maximum Back Rest-0-80 Degrees. Maximum Knee Rest-0-30 Degrees. Maximum Trendelenburg Reverse Tr-0-16 Degrees. Mattress Size -1850-1880 X 650-670 X 80-90mm. Loading Capacity -up To 200 Kg. Side Rails: Collapsible Aluminum Alloy Side Rails. Bed Platform: X-ray Transparent. Specification: Ce, Fda, Iso. Other Features: 1. Central Brake System: Equipped With Four Brake Pedals On All Sides Of The Bed Make The Brakes At The Optimal Position Effectively Or Central Brake Pedal Located At Both Ends Of The Bed. 2. Multi-function Instrument Support: The Instrument Support Can Put The Monitor And Can Also Be Used As A Headboard To Prevent Accidental Slippage Of The Patient. 3. Push Handle: Reducing The Workload And Preventing The Injuries. 4. High Quality Mattress: Waterproof Cloth With The Smooth Surface Of The Mattress, Easy To Clean And Not Misplaced. 5. Large Diameter Wheel: Using The Imported 7 To 8-inch Silent Caster Make It Flexible And Durable. 6. The Fifth Wheel: The Fifth Wheel Can Provide A Smaller Radius Of Gyration. The Telescopic Collapse Design Can Slide Smoothly Even On The Rough Surface Or Obstacles Such As The Elevator Sill, Reducing Effectively The Damage Caused By Transport To Patients. 7. Plastic Coated Side Rails: The Side Rails With Stainless Steel Column Guardrail Covers Almost Entire Length Of Bed. 8. High-strength Carbon Steel Structure And Spray Procedure: The High Quality Carbon Steel And Robot Welding Guarantee The Mechanical Strength. The Spray Surface Treatment Is Easy To Clean And Guarantees A Longer Life Or Equivalent. 9. Rapid Lifting Hydraulics: The Imported Dual-pressure Lifting System Can Be Used To Quickly Lift The Bed Or The Push Handle For 2 Seconds In An Emergency, And The Bed Will Automatically Locate The Height To Form A Special Body Position Of The Patient. 10. X-ray Imaging: Equipped With X-ray Material Bed Surface And X Ray Cassette Holder, The Whole Body Can Be X-rayed. 11. With Oxygen Cylinder Holder. Warranty -1 Year From Delivery And Installation. Unit 18 5,400,000.00 29 Suction Machine. (heavy Duty). Brand New. Product Specifications: Floor, Standing Type. Oil-less Piston Suction Motor. Double Anti-overflow Protection (mechanical Float And Electronic Sensor). Flow Rate: 40-50 Liter Per Minute. Water Displacement. Vacuum -700-800mmhg. Includes 2x3 Liters Polycarbonate Collection Jar. Attach/detach Abs Plastic Cover Jar. Anti-bacterial And Hydrophobic Filter. Patented Anti-vibration System. Dimensions: 300-400mm X 380-420mm X 800-850mm (lxwxh). Weight -15-25 Kg. Equipped With Foot Switch. Power -250w. Power Requirement -ac 200, 50-60hz. Silicone Hose. Operation And Service Manual Included. Warranty Of 6 Months From Delivery And Installation. Includes Orientation And Training Of End-user Staff. Unit 2 600,000.00 30 Syringe Pump. Brand New. Product Specifications: With Delivery And Installation, Provision Of Trainings Of Staff With Certificates, And Manual. Applicable Syringes (universal Compatibility To Various Brands): 10ml, 20ml, 30ml, 50ml/60ml, Accuracy: ±2% (mechanical ±1%). Flow Rate: 10ml: 0.1 Ml/h -300ml/h, 20ml: 0.1 Ml/h -600ml/h, 30ml: 0.1 Ml/h -900ml/h, 50ml: 0.1 Ml/h -1500ml/h. Bolus Rate: 10ml: 100-300ml/h (default 300ml), 20ml: 100-600ml/h (default 600ml), 30ml: 100-900ml/h (default 900ml), 50ml: 100-1500ml/h (default 1500ml). Purge Rate: 10ml: 300ml, 20ml: 600ml, 30ml: 900ml, 50 Ml: 1500ml. Volume To Be Infused: 0.1ml~1000ml. Injection Increment: 0.1ml. Infusion Mode: Rate Mode, Time Mode. Time Mode: Volume Limit: 0.1~999.9ml. Pre-set Time: 1min To 99h99min. Remaining Time: **h **min. Occlusion Pressure: 3 Adjustable Occlusion Pressure Settings: Low, Middle And High. Alarm Function: Infusion Completion, Near Completion, Empty, Occlusion, Low Battery, Syringe Disengaged, Incorrect Installation Of Syringe Plunger, No Ac Power Supply, Low Battery, Battery Exhausted, Malfunction Etc. Battery: Rechargeable Lithium Polymer Battery, 7.4v, 2100mah, Can Operate For More Than 3 Hours After Fully Charged At 25ml/h. Unit 5 300,000.00 Total 34,665,000.00 Note: Winning Bidder Shall Conduct Product Demonstration/end-user’s Training Of The Actual Unit And Issue Training Certificate To The End-user And Medical Equipment Technician Of Wvsgh. The Bidder’s Single Largest Completed Contract Similar To The Contract To Be Bid Should Have Been Completed Within 3 Years From The Date Of The Deadline Of Submission And Receipt Of Bids, Award For This Contract Should Have Been Awarded By A Hospital Or Health Facility And Not By Another Supplier, Except For Line Items With Asterisk (*) Which Have Been Awarded By A Non-health Facility. Likewise, The Contract Price Of The Slcc Should Be At Least 50% Of The Sum Of The Abc Of The Line Items Joined. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Interested Bidders May Join The Pre-bid Conference And Opening Of Bids Virtually Via Google Meet In The Link Provided: Meet.google.com/deb-mcrk-wqm. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. The Complete Schedule Of Activities Is As Follows: Bac Activities Schedule Availability Of Bidding Documents January 16, 2025 At 8:00 Am To 4:00 Pm And Up To Before 9:00 Am Of February 5, 2025, At The Procurement/bac Office, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Pre Bid Conference January 24, 2024 (friday), 9:00 Am At The 3rd Floor, Im Conference Room, New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Opening Of Bids February 5, 2025 (wednesday), 9:00 Am At The 3rd Floor, Im Conference Room, New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Bid Documents May Be Acquired By Interested Bidders On The Dates And Address Above And Upon Payment Of Applicable Fee For The Bidding Documents In The Amount Of: Php 25,000.00 Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac/procurement Office On Or Before 9:00 Am Of February 5, 2025. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Wvs.doh.gov.ph , Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Western Visayas Sanitarium And General Hospital Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Mr. Jasond Rex A. Huyaban/jessie H. Jarbadan Bac Secretariat Western Visayas Sanitarium And General Hospital Sta. Barbara, Iloilo Tel. No.: (033) 332-4778 Loc. 119 Email: Wvsbac.procurement@gmail.com Website: Wvs.doh.gov.ph Renia Grace G. Salapare, Md, Fpafp, Mpa Bac Chairperson
ORLEN TERMIKA S A Tender
Electrical and Electronics...+1Electrical Works
Poland
Closing Soon29 Jan 2025
Tender AmountRefer Documents
Details: In connection with the commencement of the Public Procurement Procedure for the purchase of 8 pieces of winter tires in size 215/55 R17 94v, the Transport Department of the Municipal Provincial Police Headquarters in Katowice requests the submission of a price offer in the proceedings in question. Subject of the Proceedings The subject of the Proceedings is the purchase of winter tires in the following sizes: 215/55 R17 94v - 8 pieces. Attention!!! The Ordering Party requires the Contractor to offer winter tires in this Procedure only from a closed catalog of manufacturers including the tire brands indicated in the description of each item, i.e. Tires of the following brands: Bridgestone, Continental, Dunlop, Goodyear, Michelin, Nokian Pirelli, Vredestein, Yokohama. Firestone, Kleber The Contractor Indicates the Name of the Offered Tire Brand in the Description of Each Offered Item. Conditions: The order will be fulfilled on the basis of a one-time delivery resulting from the signed order. Delivery of the order must be completed within 3 days from signing the order. The Contractor undertakes to deliver the subject of the order at his own expense to the warehouse of So Katowice, Transport Department, Kwp W Katowice 40-068 Katowice Ul. Lompy 19; Delivery should be made from Monday to Friday between 8:00 a.m. and 2:00 p.m.; Payment type transfer; Payment term: Min. 30 Days Warranty: Manufacturer's warranty The delivered assortment must be manufactured as brand new, free from technical and legal defects, approved for trading and of the first quality. The tire's production date cannot be older than 12 months from the date of delivery. The Ordering Party reserves the right to withdraw from awarding the order without giving a reason, which may not constitute the basis for any claims of the invited contractor against the Ordering Party. Please submit all inquiries via the Purchasing Platform. In case of problems with submitting an offer, please contact the Eb2b Helpdesk - Contact in the footer of the website.
8531-8540 of 8601 active Tenders