Waterproofing Tenders

Waterproofing Tenders

Department Of Agrarian Reform Tender

Textile, Apparel and Footwear
Philippines
Details: Description 1. The Department Of Agrarian Reform (dar), Catanduanes Provincial Office Through The Cy-2025 National Expenditure Program (nep) Intends To Apply The Sum Of One Hundred Thirty-eight Thousand Three Hundred Eighty Pesos & 00/100 (php 138,380.00) Being The Abc To Payments Under The Contract For Cy-2025 Procurement Of Janitorial Supplies Of Dar Catanduanes Provincial Office (darcat-pb-epa2025-014). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Item No. Description Unit Of Measure Quantity Price / Unit Total Price 1 Alcohol, Ethyl Gallon 24 350.00 8,400.00 2 Cleaner, Toilet Bowl And Urinal Liter 24 220.00 5,280.00 3 Detergent Powder, All Purpose Kilo 24 300.00 7,200.00 4 Bleaching Liquid Gallon 4 150.00 600.00 5 Disinfectant Spray, 340g Per Bottle Bottle 50 460.00 23,000.00 6 Dust Pan (big) Piece 3 130.00 390.00 7 Furniture Cleaner, Beeswax Bottle 6 320.00 1,920.00 8 Hand Soap, Liquid, 250 Ml Per Bottle Bottle 50 150.00 7,500.00 9 Trash Bag, Xxl, 10 Pc Per Roll Roll 10 120.00 1,200.00 10 Trash Bag, Medium, 10 Pc Per Roll Roll 40 60.00 2,400.00 11 Trash Bag, Small, 10 Pc Per Roll Roll 20 50.00 1,000.00 12 Muratic Acid Gallon 4 410.00 1,640.00 13 Albatros Deodorizer, 100g Per Pc, 12 Pc Per Pack Pack 24 150.00 3,600.00 14 Brush For Toilet Bowl Piece 10 100.00 1,000.00 15 Glass Cleaner, 500ml Bottle 24 250.00 6,000.00 16 Waterproof Apron Stain Resistant For Kitchen, Medium Piece 4 100.00 400.00 17 Sponge, Big Piece 30 130.00 3,900.00 18 Fabric Conditioner, 900ml Gallon 24 300.00 7,200.00 19 Dishwashing Liquid Gallon 30 250.00 7,500.00 20 Mop With Foam Piece 4 200.00 800.00 21 Trash Bin, 25 Liters Piece 20 300.00 6,000.00 22 Spin Mop Piece 2 500.00 1,000.00 23 Termite X, 1 Liter/bottle Bottle 4 1,600.00 6,400.00 24 Naphthalene Balls, 12 Pcs Per Pack Pack 50 50.00 2,500.00 25 Multi-insect Killer Spray, 600ml Net Bottle 25 400.00 10,000.00 26 Battery, 4pcs Per Pack, Aa, Chargeable Pack 10 200.00 2,000.00 27 Battery, 4pcs Per Pack, Aaa Pack 5 150.00 750.00 28 Glue Gun With Glue Stick Piece 2 600.00 1,200.00 29 Led Bulb, 20 Watts Piece 50 240.00 12,000.00 30 Kitchen Knife, 8” Long Blade Piece 2 150.00 300.00 31 Bolo With Good Quality Handle Piece 2 650.00 1,300.00 32 Disposable Rugs, Round Piece 50 6.00 300.00 33 Doormat (cloth), Rectangle/oblong Piece 50 50.00 2,500.00 34 Sharpening Stone (10x2) Piece 2 200.00 400.00 35 Hand Gloves, Cotton Thick, Big Piece 8 40.00 320.00 36 Rubber Gloves, Big Piece 8 60.00 480.00 Note: Inclusive Of Delivery At Dar Catanduanes Provincial Office Total Abc: Php 138,380.00 2. The Department Of Agrarian Reform (dar), Catanduanes Provincial Office Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By A Period Sixty (60) Days. Bidders Should Have Completed, Within At Least Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Department Of Agrarian Reform (dar), Catanduanes Provincial Office And Inspect The Bidding Documents At The Address Given Below During Regular Office Hours (8:00 Am To 5:00 Pm), Mondays Thru Fridays, Valid For The Duration That This Particular Bidding Activity Is Open From December 19, 2024 – January 7, 2025 Until 12:00 Noon. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 19, 2024 – January 7, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos (php 500.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Presented In Person, By Mail, Or Through Electronic Means. 6. The Department Of Agrarian Reform, Catanduanes Provincial Office Will Hold A Pre-bid Conference For This Particular Procurement On December 26, 2024, Thursday, 9:00 Am At Dar Catanduanes Provincial Office, Constantino (pob.), Virac, Catanduanes. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below, (ii) Online Or Electronic Submission As Indicated Below, Or (iii) Both On Or Before January 7, 2025 Tuesday, Until 12:00 Noon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 7, 2025 Tuesday, 1:00 Pm At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Agrarian Reform (dar), Catanduanes Provincial Office, Through The Provincial Bids & Awards Committee (bac) Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ms. Ma. Katrina M. Sarausa Arpo I /head Bac Secretariat Department Of Agrarian Reform (dar) Catanduanes Provincial Office Brgy. Constantino (pob.), Virac, Catanduanes Cellphone Hotline: 09634442986 Email Address: Bacsec.catan@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website For Online Bid Submission: Bacsec.catan@gmail.com 19 November 2024 Atty. Cherry A. Agmata Bac Chairperson
Closing Date7 Jan 2025
Tender AmountPHP 138.3 K (USD 2.3 K)

Bureau Of Fisheries And Aquatic Resources Region Xii Tender

Electronics Equipment...+2Electrical and Electronics, Solar Installation and Products
Philippines
Details: Description Laptop (i5) 2 Units ₱90,000.00 Intel® Core™ I5-1155g7 Display: 15.6" Fhd (1920x1080) Memory: Ddr4 8gb (3200mhz) Storage: 512gb Nvme Pcle Ssd Os: Windows 11 Home Connectivity: Hdmi,dp,type-c,usb Port System Type: 64-bit Video Graphics: Intel® Iris® X E Graphics Monitor 27" Fhd Smart Monitor W/ Mobile Connectivity 1 Unit ₱20,000.00 Resolution: 1920 X 1080 Aspect Ratio: 16:9 Connectivity: Built-in Wifi & Bluetooth 60 Hz, 2 Hdmi Port Usb Hub: 2 Port Connect To Share With Speaker Connect To Share With Speaker Color: White Optical Usb Mouse 2 Pieces ₱1,200.00 Keyboard 2 Pieces ₱1,300.00 Mouse Pad 2 Pieces ₱1,200.00 Mouse (wireles) 6 Pieces ₱12,960.00 Laptop Charger 1 Piece ₱4,000.00 Specification: Ac Adapter Adlx65ccgu28 Laptop Charger 1 Piece ₱4,000.00 Specification: Ac Adapter Tpn-la15 Keyboard 3 Pieces ₱12,648.00 Specification: Rgb Keyboard Mouse Mat (xxl) 6 Pieces ₱9,420.00 16 Gb Ddr4 3200mhz Fury Beast Rgb(1x16gb) Memory Module 1 Unit ₱3,055.00 Cpu Cooler Fan (black) 1 Unit ₱2,340.00 Specification: Cooler Master Hyper 212 Argb Internal Drive 3 Units ₱8,385.00 Specification: Ssd 480gb 3 2.5" Solid State Drive Sata Graphics Card 1 Unit ₱11,050.00 Specification: Core 15-12400 Desktop Processor 6 Cores Threads Alder Lake Lga1700 Processor 8gb Ddr4 3200mhz Fury Beast Ram 2 Units ₱3,250.00 Cpu 2 Units ₱23,390.00 Specification: Core 15-2400 Desktop Processor 6 Cores 12 Threads Alder Lake Lga 1700 Processor Motherboard 2 Units ₱12,298.00 Prime H610m-k Ddr4 / Ddrs Lga 1700matx Power Supply 2 Units ₱5,460.00 Sst-st50f-es230 500w 80+true Rated Power Storage 480gb 2 Units ₱5,590.00 A400 Ssd 480gb 3 2.5" Solid State Drive Sata Cpu Cooler 2 Units ₱1,190.00 Tw-003 Hydro Bering Cpu Air Cooler Case S100 Tempered Glass Micro Chasis 2 Units ₱6,500.00 Mx-22 21.5" 1920 X 1080 Tn 75hz 7ms Monitor 2 Units ₱6,500.00 Ups 650va 2 Units ₱4,300.00 Powerbank Specifications: 20,000 Mah Portable Water Station 1 Unit ₱38,400.00 Specification: Sizeable 768wh Capacity And 800w Output Provide Upto 1.8kwh A Day With Solar Charging Fastest Recharge 0-100% In Only 70 Min Safest Lfp Battery Provides 10 Years Of Use X-boost Output To 1600w And Run 80% Of High Wattage Appliances 4 Ways To Charge: Ac, Car, Solar, And Usb-c Lightweight At Only 7.8kg Smart App Control With Bluetooth Or Wi-fi Drone 1 Unit ₱49,999.00 Specification: Up To 4k60p Video & 48mp Row Stills Tri-directional Obstacle Avoidance Regulation-friendly 8.8 Oz Weight Up To 34 Minutes Of Flight Time Rotating Gimbal For Vertical Shooting Slow Motion Video At Full Hd 1080p120 Upto 7.5 Mile Range With Ocusync 3 Focustrack Subject Tracking System Foldable Design For Easy Travel/storage Drone Battery 2 Pieces ₱8,640.00 Specification: Inteligent Flight Battery Backpack For Drone 1 Piece ₱16,200.00 Specification: Fits Pro Mirrorless Or Dslr With 70-200mm, 4-5 Extra Lenses Maxfit Divider System For Maximum Capacity & Snug Protective Fit Travel Friendly: Stowable Shoulder Straps, Removable Waist Belt 256gb Micro Sd Card 2 Pieces ₱6,300.00 Lens (16/64/256) 1 Pieces ₱5,600.00 Landing Pad 50cm Waterproof 1 Piece ₱950.00 Propeller (pair) X 2 Screws X 12 Diameter X Tread 2 Pieces ₱1,020.00 Phitch: 6.0 X 3.0 Inches Weight (each): 0.9 Grams Charging Hub 1 Piece ₱3,000.00 Wifi 6 Bluetooth 5.0 Pcie Adapter 5 Pieces ₱13,000.00 Specification: Unrivalled Wifi 6 Speed- Breaks The Gigabit Barrier With Speed Up To 2402 Mbps (5ghz) + 574 Mbps (2.4 Ghz) Reliable Connections-intel® Wi-fi 6 Chipest Brings Faster And Clearer Wi-fi To Fully Unlock The Potential Of Your Wi-fi 6 Router Luetooth 5.0 Rj45 Connector Cat6 200 Pieces ₱1,600.00 Rj45 Crimp Tool Kit 1 Set ₱1,600.00 Eight In One Docking Station Dmi Mode 100mbps Network Port 7 ₱4,550.00 Specifications: 100mbps Network Port High Speed Transmission Pd Power Supply Sd/tf High Definition Image Quality 7 Ports Led Usb 2.0 Adapter Hub Power On/off Switch For Pc Laptop Computer 3 ₱600.00 Solid State Drive (ssd) 1tb 3 ₱12,000.00 Powershared 10ml 9l Micro Cut Shredder 1 ₱24,200.00 Specification: Shreds 10 Shets Of Paper At A Time Into 1x12mm Micro-cut Particles (security Level P-5) That's 2000+ Particles Per A4 Sheet Safety Lock Manually Disables The Shredder To Prevent Accidental Activation Shreds Non-stop For Up To 10minutes 19l Pull-out Bin For Easy Disposal Of Paper Waste Shreds Staples And Credit Cards Xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx-xx General Conditions: 1. All Entries Must Be Typewritten And Legible; *** 2. Bidders Must Submit Certificate Of Philgeps Registration; 3. Bidders Must Submit Necessary Business Permits (sec; Lgu; Dti; Cda, Etc.); 4. Place This Rfq In A Sealed Envelope And Type The Following Details On The Face Of The Envelope: * Your Company Name * Pr No. * Rfq No. * Philgeps Reference No. 5. Delivery Period Must Be At Least Within Seven (7) Calendar Days Upon Receipt Of The Notice Of Award/ Purchase Order (indicate Days Of Delivery In The Bidder’s Certification Box); 6. Item/s Delivered Must Have Warranties For Unit Replacements, Parts, Labor Or Other Services; 7. Price Validity Shall Be For A Period Of Three (3) Months; 8. Quoted Prices Must Be Inclusive Of Taxes, And Other Charges Or Fees And Shall Not Exceed The Approved Budget For The Contract (abc); 9. Transactions With Bfar Shall Mean Compliance By The Winning Bidder With The Bid And Delivery Requirements Before The Issuance Of Check Payment; 10. Failure To Comply With These Conditions Shall Mean Disqualification Of Your Bid Proposal. 11. Terms Of Payment: At Least Thirty (30) Days Upon Effectivity Of Purchase Order.
Closing Date21 Jan 2025
Tender AmountPHP 470.1 K (USD 8 K)

ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY LEON CAMPUS Tender

Laboratory Equipment and Services
Corrigendum : Closing Date Modified
Philippines
Details: Description Lot 1: Agricultural Equipments - Php 350,850.00 (abc) 1 Digital Water Quality Tester "5 In 1 Water Quality Tester Includes: Ph, Ec, Tds, Salinity, And Thermometer; Battery Powered; Waterproof Rating: Ip67 Display Size: 33*24mm Item Size: 180 * 37mm / 7.1 * 1.5in Item Weight: 86g / 3.0ounce" 5 Set 2 Digital Refractometer 0-93% Digital Brix Refractometer Sugar Content Measuring 1 Set 3 Refractometer Handheld Refractometer (brix Refractometer); Inlusions Are Transport Case, Pipette, Calibration Screwer And Guide 3 Set 4 Current Meter River Current Water Velocity Portable Flow Meter For Open Channel; Measure Velociy, Flow Rate And Depth 1 Set 5 Turbidimeter Portable Turbidimeter Microcomputer Accuracy Testing With Range From 0-200 Ntu; Size:210*75*70mm/8.3*3.0*2.8in; Product Inclusions: Turbidimieter, Power Cable, Glass, Storage Box 1 Set 6 Dissolved Oxygen Analyzer Ph Meter And Dissolved Oxygen Tester Water Quality Tester Set 2 Set 7 Rain Gauge 8 In/200mm Diamter Rain Gauge Stainless Steel; Set Includes A Receiving Funnel, Internal Measuring Tube, Outercylinder For Overflow, Mountinf Tripod And Parts Can Are Detachable For Easy Cleaning 5 Set 8 Rain Gauge Capacity: 11"/280mm; Resolution: 0.01"/0.2mm; Diameter Size 4"*14h (102mm*356mm); Set Includes A Receiving Funnel, Internal Measuring Tube, Outercylinder For Overflow And Mounting Tripod/bracket And Parts Can Are Detachable For Easy Cleaning 5 Set 9 Rain Gauge Plastic Rain Gauge: Approx Size:25cm*4.5cm*2.7cm 5 Pc 10 Sling Psychrometer Slide Rule; Dimension 1" Dia * 7-1/2" Length; Non-mercury, Black Plastic 5 Unit 11 Soil Detector 6 In 1 Soil Detector (rotatable); With Sensitive Sensing Probe; Soil Ph, Soil Fertility, Soil Temperature, Soil Moisture, Environmental Illumination, Humidity; Battery Powered; Led Large Screen Display 5 Set Lot 2: Scientific Materials And Equipment - Php 249,400.00 (abc) 1 Digital Analytical Balance Capcity: 500g; Accuracy: 0.001g; Tray Size: Ø 120 Mm; Dimensions 320*195*280mm; With Screen Display; With Dual Power Supply; Stainless Steel Plate And Bubble Level 2 Unit 2 Digital Weighing Scale Capacity: 10kg; Resolution: 0.1g Digital Precision Electronic Weighing Balance W/ Counting Table Top Scale; Tare Function Stainless Steel Pan With Level Bubble; Dual Power Supply; Scale Pan Size: 180*180mm; Dimension: 260*180*64mm 2 Unit 3 Digital Food Weighing Scale Weigh Range: 0.1 G-3000g; Resolution:0.01g; Dimensions:4.1*5.0 In With Stainless Steel Plate Dimension Of 3.9*3.9 In; Battery Power Supply 3 Unit 4 Digital Food Thermometers "stainless Steel Probe; Weight: 36g; Size: 22.5*2cm Power Supply: Built-in Battery, Can Be Used Directly" 3 Unit 5 Digital Food Thermometers Digital Thermometer Infrared Laser Gun With Led Screen; Size: 75*50*145mm;battery Powered 2 Unit 6 Thermocouples Digital Thermocouple With Dual Channels 4 Probes Handheld; Battery Powered 2 Set 7 Sieves Standard Laboratory Test Sieves; 8 In/20cm Diameter And Height Of 5cm; Filter Mesh With Grit Size #10, #12, #14, #16, And #18 2 Set 8 Bulk Density Apparatus Astm 1895 Apparent Bulk Density Apparatus; Wieght = 9 Kg, Dimensions: 240x330x520mm (wxdxh) 2 Set 9 Tachometer Laser Digital Non-contact Tachometer; Measuring Range: 2.5-99999 Rpm; Lcd Screen With White Backlight, Meauring Distance:2-20in(50-500mm); Dimension 145*85*35mm; Auto Power Off; Battery Power Supply 3 Set 10 Tachometer Contact Digital Handheld Tachometer; Lcd Screen; Battery Powered; Item Size: Approx. 165*60*28mm; Set Inlcusion: Digital Tachometer, 2 Measurement Idler Wheels, 2 Measurement Touch Tips, Lengthening Bar, Portable Bag And User Manual 3 Set 11 Steel Cabinet Steel Cabinet: Dimension: 90*46*185cm; 2-door Locker With One Side For Long Tools Storage 2 Unit 12 Steel Cabinet Steel Cabinet Dimension: 90*46*185cm; 2-door Lock With 4 Adjustable Shelves 2 Unit 13 Digital Vernier Caliper Digital Vernier Caliper; 150 Mm Metal 60inch Pure Stainless; Withlcd 5 Pc 14 Digital Anemometer Digital Anemometer With Data Hold Backlight Function 3 Set 15 Sound Level Meter Digital Sound Level Meter Decibel Moinitoring; Measurement Range: 30-130db With Spongeball; Inclusions: Sound Level Meter, Operation Manual, 1 Spongeball 2 Set 16 Aluminum Tool Box Set "multiple Layered Tool Box With: Layer 1. 1x Multiprise Plier 250mm, 1x Diagonal Cutting Pliers 150mm, 1x Pliers 1/2 Long Round 150mm, 1x Universal Plier 150mm 1x All-rounder, 1x Thumb Wrench 250 Mm, 1x Box 6 Compartment Layer 2. 1x Magnetic Bimonthly Torpedo Level 25cm, 1x Measure 5m X 19mm Bimatiere Tylon, 8x Screwdriver - Bit Holder- Ph1-ph2- Pz1-pz2- Mechanic 6.5x1505.5x100-3x75, 1x Test Screwdriver, 9x Clés Males (1.5-2-2.5-3-4-5-6-8-10) Layer 3. 1x Hacksaw, 1x Pen Lamp, 1x Cutter 18mm, 1x Hammer Wooden Handle 300g Layer 4. 1x Ratchet 72 Teeth 1/4’’, 10x 1/4’’ (6-sided) Sockets: 5.5 – 6 – 7 – 8 – 9 – 10 – 11 – 12– 13 – 14 Mm, 2x 1/4’’ Extensions: 75 Mm – 150 Mm, 1x 1/4’’ Bit Holder, 1x 1/4’’ Universal Cardan, 1x Ratchet 72 Teeth 1/2’’, 16x 1/2’’ (6-piece) Sockets: 10 – 11 – 12 – 13 – 14 – 15 – 16 –17 – 18 – 19 – 21 – 22 – 24 – 27 – 30 – 32 Mm, 2x 1/2’’ Extensions: 75 Mm – 250 Mm, 1x Universal Cardan 1/2’’, 3x Sockets For 1/2’ Candle: 16 – 19 – 21 Mm, 12x Combination Wrenches: 8 – 9 – 10 – 11 – 12 – 13 – 14 –15 – 16 – 17 – 18 – 19 Mm, 1x 1/4"" 25mm Screw Bit Box – 61pcs In Pre-formed Foam" 1 Set Lot 3: Surveying Materials And Equipment - Php 199,750.00 (abc) 1 Total Station Theodolite Digital Theodolite Surveying Instrument High Accuracy 30x Electronic With Laser; Main Unit, Tool Kit, Plumb Bob, Rain Cover, Rechargeable Battery, Battery Charger, Aa Dry Battery Case, Operational Manual, Heavy Duty Carrying Case 1 Unit 2 Tripod Surveying Instrument Aluminum Tripod Double Lock With Extended Length Upto 1.7m; Head Diameter 160mm; 3kg Weight 1 Unit 3 Measuring Staff Stadia Rod Surveying Stadia Rod Extended Upto 5m; Retracted Length 0.5m 3 Pc 4 Range Pole Range Pole,3m-3 Section For Surveying 3 Pc 5 Marking Pins Surveying Color Scheme: Red And White; 50 Pc 6 Heavy Duty Measuring Tape 100m Tape Measure Fiber Glass, High Quality, Heavy Duty Meter Tape Ruler Wheel 5 Pc 7 Steel Tape 5m Steel Measuring Tape-heavy Duty 5 Pc
Closing Date15 Jan 2025
Tender AmountPHP 800 K (USD 13.6 K)

Department Of Public Works And Highways Tender

Furnitures and Fixtures
Corrigendum : Closing Date Modified
Philippines
Details: Description Lot 1 - C-0113-0374-24 Repair Improvement Of Pabx Room, Ground Floor, Main Building I. Carpentry (ceiling) 1 Metal Furring Channel 0.6m X 19mm X 50mm X 5m 22 Pcs 2 Metal Furring 0.6m X 12mm X 38mm X 5m 10 Pcs 3 W-clip 30 Pcs 4 Wall Angle 0.6m X 25mm X 25mm X 2.4m 10 Pcs 5 Blind Rivets 1/8 ꬾ X 1/2" 1000pcs/box 1 Box 6 1" Black Screw, Pointed, 500pcs/bag 3 Bags 7 9mm Thk. 4' X 8' Gypsum Board 7 Pcs 8 Riveter, Good Quality 1 Set Ii. Painting A. Ceiling 9 Flat Latex, White, Pq 2 Gallon 10 Boral Powder, 25kilos/ Bag 1 Bag 11 No.100 Sanding Paper 2 Meters 12 4" Paint Roller W/ Tray 1 Set 13 2" Paint Brush 1 Pc B. Wall 14 Semi Gloss Latex, White Pq 2 Gal 15 Hanza Yellow, Achre Color 1 Pint C. Roof Deck 16 Thoroseal, Water Proofing 2 Gals 17 4" Paint Brush 2 Pcs 18 Steel Brush W/ Handle 2 Pcs Iii. Fabrication Of Wooden Cabinet A. Carpentry 19 3/4 Thick 4' X 8' Marine Plywood 5 Pcs 20 1/4 Thick 4' X 8' Marine Plywood 2 Pcs 21 1/2" X 1" X 10' Wood Edging 15 Pcs 22 Stickwel Glue 1 Qrt 23 2" X 4" X 6' Kd Good Lumber 3 Pcs 24 2" Finishing Nail 1 Kg 25 1 1/2 " Finishing Nail 1 Kg 26 4" Pull Handle Stainless 5 Pcs 27 Drawer Guide 18" Heavy Duty Hydraulic 2 Sets 28 Heavy Duty Drawer Lock 2 Pcs 29 No. 3 Concealed Hinges 2 Pcs B. Painting 30 Flat Enamel 2 Gals 31 Q.d.e Odorless, Water Base 2 Gals 32 Poly Tuff W/ Hardener 1 Qrt 33 Paint Thinner 2 Gals 34 No. 100 Sand Paper 1 Meter 35 No. 280 Sand Paper 3 Pcs 36 Stopa Rags, 6" 1 Kl 37 2"paint Brush 1 Pc 38 Achre Color Hanza Yellow/bulletin Red 2 Pint Iv. Electrical 39 Emergency Light, Rechargeable Twinhead Led, 230v, 60hz, 2heads (24 X 0.60 Watts, Led), 6v, 4.5ah Sealed Lead Acid Battery, External Safety Fuse And Battery Test Switch 1 Unit 40 Recessed Type Led Panel Light, 18 Watts, Daylight, 230v, 60hz, Square Type 15 Sets 41 Duplex Convenience Outlet, Wide Series Parallel Slot, Universal 16a, 250vac 1 Set 42 3.5 Mm² Thhn Electrical Wire, Stranded, Black 1 Box 43 20mm Dia. Pvc Pipe / 3mtr 10 Pcs 44 20mm Elbow Pipe 6 Pcs 45 20mm Adaptor With Locknuts 35 Pcs 46 Utility Box (pvc) 4" X 2" X 2" 5 Pcs 47 Junction Box (pvc) 4" X 2" X 2" 18 Pcs 48 Flexible Hose 1/2" Pvc 20 Meters 49 Electrical Tape, Big, 8' Black Color 5 Pcs 50 One Gang Switch, Wide Series, Parallel Slot, 230 Vac 1 Set 51 Three Gang Switch, Wide Series, Parallel Slot, 230 Vac 1 Set Subtotal Lot 2 - C-0113-0385-24 Improvement Of Storage And Pantry Area At Icc Building, 5th Fl. Ims A. Carpentry Works: 1 Wall Angle 0.6mm X 25mm X 25mm X 2.4m 7 Pcs 2 Metal Furring 0.6mm X 19mm X 38mm X 5m 30 Pcs 3 Carrying Channel 0.6mm X 19mm X 50mm X 5m 7 Pcs 4 Riveter, Heavy Duty, Good Quality 1 Pc 5 Screw Adapter 1 Pc 6 Drill Bit 1/8" ꬾ 10 Pcs 7 Diamond Tile Cutter, Blade 4" ꬾ 1 Pc 8 W-clip 100 Pcs 9 Hardiflex, 4.5mm Thk X 4' X 8' 14 Pcs 10 1" Black Screw, Pointed, 500pcs/box 1 Box 11 Blind Rivets, 1/8 ꬾ X 1/2, 1,000 Pcs/box 2 Boxes 12 Cutting Disc For Metal 5 Pcs B. Masonry Works: 13 Ceramic Floor Tiles 40 X 40 (approved By The End-user, Colored Texture) 145 Pcs 14 Tile Adhesive 5 Bags 15 Cement 15 Bags 16 Sand Bistay 100 Bags 17 Tile Grout, 2kg/bag 3 Bags 18 Empty Sacks For Debris 50 Pcs 19 Cutting Disc, 4" For Tiles, Good Quality 2 Pcs C. Painting Works: 20 Flat Latex Paint, White, Premium Quality 1 Pail 21 Semi-gloss Latex, White, Premium Quality 1 Pail 22 Acri-color, Raw Sienna 1 Qrt 23 Acri-color, Lamp Black 1 Qrt 24 Paint Roller With Tray, 9" 1 Set 25 Paint Brush, 2" 1 Pc 26 Boral Powder 1 Bag 27 Sanding Paper #100 2 Mtrs 28 Sand Paper #280 Waterproof 12 Pcs D. Supply And Delivery Of Steele Shelve 29 Prepainted Metal Shelve W/ Hole Nut & Washer (see Attached Plan) 4 Sets 1.02mm Thk. (gauge 18) 1m X .40m X 1.80cm Assembled Slotted Metal Rack Heavy Duty Standard (gray) E. Electrical Works 30 Panel Light 18watts, Led, M Daylight, 1800lm, 50,000 Hrs, 230vac, 8 Set 60hz, Square Type 31 Duplex Convenience Outlet, Wide Series Parallel Slot, Universal 16a, 250vac 7 Set 32 3.5mm2 Thhn Electrical Wire,, Stranded, Black 2 Box 33 Pvc Pipe 1/2" (orange) 10 Length 34 Pvc Elbow1/2" (orange) 6 Pcs 35 Flexible Hose 1/2" Pvc 100mtrs/roll 1 Roll 36 Junction Box (pvc) 4" X 4" X 2" Orange 12 Pcs 37 Utility Box (pvc) 4" X 4" X 2" Orange 15 Pcs 38 Three Gang Switch W/ Element 1 Set 39 One Gang Switch W/ Element 1 Set 40 Electrical Tape 8" (big) Black 5 Pcs 41 Emergency Lights Two (2) Led Lamps, 220vac, 60hz, Wall Mounted With 2 Unit Complete Accessories Total Amount (php) Please Specify Total Amount In Words (php) "terms And Conditions : " "1. All Entries Must Be Typewritten Or Legibly Written. " 2. Delivery Period Within 20 Working Days Upon Receipt Of The Approved Funded Purchase Order (p.o). Administrative Penalties Pursuant To Sec. 69 Of The Revised Irr-ra 9184 Shall Be Imposed For Non- Delivery Without Valid Reason. "3. Warranty Shall Be For A Mininum Of One (1) Year For Equipment And Three (3) Months For Supplies From Date Of Acceptance " By The End-user. "4. Price Validity Shall Be For A Period Of Sixty (60) Calendar Days. " "5. Philgeps Registration Number And Mayor's Permit Shall Be Attached Upon Submission Of The Quotation. " Dti /sec And Latest Tax Clearance Shall Be Submitted Before The Award Of Purchase Order (p.o.). 6. To Establish Financial Capability, Bidders May Attach/includenin Its Quotation A Commited Line Of Credit (clc) Equivalent To 10% Of The Abc, From A Commercial Or Universal Bank. 7. Bidders Must Qoute For All Of The Items And Shall Submit A Proposal On Each Item And Evaluation And Award Of Contract Will Be Undertaken On A Lump Sum Basis. 8. Any Erasure, Correction Or Alteration Made By The Bidders In Any Of The Items Shall Render The Bid Non-complying, Hence, A Ground For Disqualification. 9. The Dpwh Reserves The Right To Accept Or Reject Any Bid To Annul The Bidding Process, And To Reject " All Bids At Any Time Prior To Contract Award Without Thereby Incurring Any Liability To The Affected Bidder. " "10. Please Indicate The Brand And Model For Each Items Being Offered. " "medmier G. Malig Assistant Secretary For Technical Services And Information Management Service Chairperson, Bac For Goods "
Closing Date15 Jan 2025
Tender AmountPHP 217.8 K (USD 3.7 K)

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|tbd|tbd|tbd|tbd| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12||||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|334513, 750||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|334513|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| a Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory. unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation. Please Specify (if Other Than 60 Days) ______________ Days. If You Are Submitting Your Quote Via Email Or Neco, Please Specify The number Of Days Pricing Is Valid. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein. the Following Applies If Reports Of Test And Inspection (roti) Are Required: the Recommended Method For Roti Submittals Is Via Wawf Or An Alternative High Quality Electronic Means (ie: Fax Or Email Your Post Award Poc Listed Above). A Dedicated Roti Fax Has Been Added For Your Submittal Convenience. \ 1. Scope 1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence. 2. Applicable Documents 2.1 Applicable Documents; technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At (https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To the Award. this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator. 3. Requirements 3.1 Navsup Wss-mech Code N94 Additional Technical Documentation order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004 a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows: 1. Amendments To The Purchase Order/contract 2. Schedule Of Supplies Of The Purchase Order/contract. 3. Terms And Conditions Of The Purchase Order/contract. 4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable. 5. Any Invoked Standard Technical Requirements (strs). 6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable. 7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable. b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later. c. Use Of Document Revisions In Their Entirety: 1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document). d. Vendor Waiver/deviations On Critical Contracts. 1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected. 2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation is Submitted Or Prior To Manufacture. 3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With your Request. 4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation. 5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided. 6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within five Working Days After Receipt. e. Exclusion Of Mercury 1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract. 4. Quality Assurance 4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod). the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein. records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract. 5. Packaging 5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts applies. (1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing, and Marking. requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc. (a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States, "components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)". (2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply: (a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other requirements Identified Within The Irpod. the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods. (b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements for The Use Of Green Poly Bags, Then They Are Required And Take Precedence. (4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. 6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. 6.3 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From: contracting Officer navsup Wss-mech code N943 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document. 2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents. mark The Packaging Label With Nomenclature Cited On Irpod. Use Vendor's Carrying Case. Apply A Delicate Instrument Marking To All Levels Of Packaging, Including The Gage Carrying Case. The Carring Case Must Be An Impact Resistant, Waterproof Carry Case. The Case shall Be Equipped With Cut Or Molded Foam Cushioning To Provide The Best Gage Protection Possible From Shock And Vibration (equivalent To To Pelican Products, Inc. 1500 Case Or Bettera), A Copy Of The Certified Test Results And The Gage Warranty Conditions Shall be Provided In Case. date Of First Submission=eoc submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired. the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco. a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services. di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev).
Closing Date16 Jan 2025
Tender AmountRefer Documents 

Bureau Of Fisheries And Aquatic Resources Region Xi Tender

Food Products
Philippines
Details: Description 1 Catering Services For Governor Generoso 1 Lot ₱131,000.00 *30 Pax/day For 2 Days *1 Meal And 2 Snacks *preffered Menu (buffet Lunch 3 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) Snacks Am & Pm: Bread/pastries/kakanin/siopao With Juice Or Softdrinks *with Free Flowing Water And Coffee *deliver On Activity Venue Training On Basic Business Recording Cum Entrepreneurial Mind Setting And Value Formation 30 Pax Venue: Governor Generoso, Davao Oriental Date: March 2025 Hands-on Training On Post Harvest Technology (fish Handling And Value Adding, Packaging And Labelling) 30 Pax Venue: Governor Generoso, Davao Oriental Date: March 2025 Hands-on Training On Bangus Production And Management 30 Pax Venue: Governor Generoso, Davao Oriental Date: June 2025 Quarterly Meeting For Saad Beneficiaries *1 Meal For 20 Pax/day For 1 Day *preferred Menu (buffet Lunch 2 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) 1st Quarter Meeting 20 Pax Venue: Governor Generoso, Davao Oriental Date: March 2025 2nd Quarter Meeting 20 Pax Venue: Governor Generoso, Davao Oriental Date: June 2025 3rd Quarter Meeting 20 Pax Venue: Governor Generoso, Davao Oriental Date: September 2025 4th Quarter Meeting 20 Pax Venue: Governor Generoso, Davao Oriental Date: December 2025 Ceremonial Turn-over For Saad Project 40 Pax *1 Meal For 40 Pax/day For 1 Day *preferred Menu (buffet Lunch 3 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) 2 Catering Services For Tarragona 1 Lot ₱98,000.00 *30 Pax/day For 2 Days *1 Meal And 2 Snacks *preffered Menu (buffet Lunch 3 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) Snacks Am & Pm: Bread/pastries/kakanin/siopao With Juice Or Softdrinks *with Free Flowing Water And Coffee *deliver On Activity Venue Training On Basic Business Recording Cum Entrepreneurial Mind Setting And Value Formation 30 Pax Venue: Tarragona, Davao Oriental Date: March 2025 Hands-on Training On Post Harvest Technology (fish Handling And Value Adding, Packaging And Labelling) 30 Pax Venue: Tarragona, Davao Oriental Date: March 2025 Quarterly Meeting For Saad Beneficiaries *1 Meal For 20 Pax/day For 1 Day *preferred Menu (buffet Lunch 2 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) 1st Quarter Meeting 20 Pax Venue: Tarragona, Davao Oriental Date: March 2025 2nd Quarter Meeting 20 Pax Venue: Tarragona, Davao Oriental Date: June 2025 3rd Quarter Meeting 20 Pax Venue: Tarragona, Davao Oriental Date: September 2025 4th Quarter Meeting 20 Pax Venue: Tarragona, Davao Oriental Date: December 2025 Ceremonial Turn-over For Saad Project 40 Pax *1 Meal For 40 Pax/day For 1 Day *preferred Menu (buffet Lunch 3 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) 3 Catering Services For Baganga 1 Lot ₱98,000.00 *30 Pax/day For 2 Days *1 Meal And 2 Snacks *preffered Menu (buffet Lunch 3 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) Snacks Am & Pm: Bread/pastries/kakanin/siopao With Juice Or Softdrinks *with Free Flowing Water And Coffee *deliver On Activity Venue Training On Basic Business Recording Cum Entrepreneurial Mind Setting And Value Formation 30 Pax Venue: Baganga, Davao Oriental Date: April 2025 Hands-on Training On Post Harvest Technology (fish Handling And Value Adding, Packaging And Labelling) 30 Pax Venue: Baganga, Davao Oriental Date: April 2025 Quarterly Meeting For Saad Beneficiaries *1 Meal For 20 Pax/day For 1 Day *preferred Menu (buffet Lunch 2 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) 1st Quarter Meeting 20 Pax Venue: Baganga, Davao Oriental Date: March 2025 2nd Quarter Meeting 20 Pax Venue: Baganga, Davao Oriental Date: June 2025 3rd Quarter Meeting 20 Pax Venue: Baganga, Davao Oriental Date: September 2025 4th Quarter Meeting 20 Pax Venue: Baganga, Davao Oriental Date: December 2025 Ceremonial Turn-over For Saad Project 40 Pax *1 Meal For 40 Pax/day For 1 Day *preferred Menu (buffet Lunch 3 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) 4 Catering Services For Boston 1 Lot ₱98,000.00 *30 Pax/day For 2 Days *1 Meal And 2 Snacks *preffered Menu (buffet Lunch 3 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) Snacks Am & Pm: Bread/pastries/kakanin/siopao With Juice Or Softdrinks *with Free Flowing Water And Coffee *deliver On Activity Venue Training On Basic Business Recording Cum Entrepreneurial Mind Setting And Value Formation 30 Pax Venue: Boston, Davao Oriental Date: April 2025 Hands-on Training On Post Harvest Technology (fish Handling And Value Adding, Packaging And Labelling) 30 Pax Venue: Boston, Davao Oriental Date: April 2025 Quarterly Meeting For Saad Beneficiaries *1 Meal For 20 Pax/day For 1 Day *preferred Menu (buffet Lunch 2 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) 1st Quarter Meeting 20 Pax Venue: Boston, Davao Oriental Date: March 2025 2nd Quarter Meeting 20 Pax Venue: Boston, Davao Oriental Date: June 2025 3rd Quarter Meeting 20 Pax Venue: Boston, Davao Oriental Date: September 2025 4th Quarter Meeting 20 Pax Venue: Boston, Davao Oriental Date: December 2025 Ceremonial Turn-over For Saad Project 40 Pax *1 Meal For 40 Pax/day For 1 Day *preferred Menu (buffet Lunch 3 Viands (non-pork)): Chicken Adobo With Egg/bam-i/garlic Shrimp Or Chicken/bistek/fish Or Chicken Tinola/chicken Curry/beef Nilaga/chopsuey/fish Fillet, Softdrinks Or Juice And Dessert (fresh Fruits/fruit Salad/buko Pandan) 5 Training Supplies: 1 Lot ₱23,545.00 Customized Retractable Ballpen With Uv Sticker (black Or Blue) 80 Pcs Customized Bfar Notebook (size: 5.5x8.5 Inches, Cover: Coated 180 Lbs, Colored, Inside: Newsprint White One Color, Binding: Saddle Stitch, 25 Pages) 200 Pcs Customized Long Envelope With Zipper & With Bfar Logo 170 Pcs Spiral Notebook (80 Leaves) 103 Pcs Sticker Paper, Good Quality 10 Sheets/pack 10 Packs Tarpaulin, 4x6 6 Pcs Molar File With Cover Legal Size Blue 11 Pcs 6 Post-harvest Training Materials And Ingredients: 1 Lot ₱41,455.00 Fresh Squid (3.5''-4.5'') 150/kilo 24 Kilos Fresh Matambaka (7''-8'') 200/kilo 24 Kilos Rock Salt 20 Kgs Apron, Color White, Waterproof 30 Pcs Hairnet. Thick, Color Black 60 Pcs "rectangular Chopping Board- Heavy Duty ( 34cm X 24cmx 1cm); Antibacterial; Color: White" 20 Pcs Stainless Steel Knife, 8 Inches 20 Pcs Kitchen Scissors 8 Pcs "polypropylene Plastic Tray (13.5inches X 10.55inches) Color: White/creamy White" 16 Pcs Pe Plastic Cellophane .0002, 5x8, 100 Pcs/pack 4 Packs Pe Plastic Cellophane .0002, 7x8, 100 Pcs/pack 4 Packs Stainless Steel Colander With Base 8 Pcs Plastic Basin, 23'' Dia, Color White 4 Pcs Measuring Spoon And Cups, Plastic, Color White, 5pcs/set 5 Set 7 Iec Supplies: 1 Lot ₱30,000.00 Token - Zipper Type Customized Tote Bag With Umbrella (printed With Bfar Logo) And Malong 30 Pcs Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Nothing Follows Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Purpose: For The Conduct Of Marketing Assistance And Enterprise Development (maed) Related Trainings Under The Saad Phase 2 Implementation In Davao Oriental For Cy 2025.
Closing Date14 Jan 2025
Tender AmountPHP 520 K (USD 8.9 K)

Bulacan State University Tender

Textile, Apparel and Footwear
Corrigendum : Tender Amount Updated
Philippines
Details: Description Combative Sports Equipment 1 40 Pairs Arnis Padded Sticks "size: 28 Or 30 Inches Long Color : Red 20 Pcs Color: Blue 20 Pcs." 2 2 Pcs Arnis Live Stick Armor "color Blue (1 Pc) Color Red (1 Pc) Size: # 1 For Adult " 3 20 Pcs Painted Live Stick (rattan) "color: Red (10 Pcs) 'color: Blue (10 Pcs)" 4 5 Pcs Arnis Wooden Sword Replica "material: Mahogany Wood / Yakal / Bahi Wood 'weapon Type: Kris 'use For Arnis Anyo" 5 5 Pcs Arnis Wooden Dagger Replica "material: Mahogany Wood / Yakal / Bahi Wood 'weapon Type: Knife 'use For Arnis Anyo" 6 2 Pairs Arnis Live Stick Hand Gloves "size: # 1 Color: Blue Size : # 1 Color: Red Velcro Strap" 7 4 Pairs Arnis Live Stick Leg Guard "size : # 2 Large Color : Blue Size : # 2 Large Color : Red Velcro Strap And Garter Strap " 8 4 Pcs Arnis Live Stick Arm Guard "size : # 2 Color : Blue Size : # 2 Color : Red Velcro Strap And Garter Strap " 9 2 Pcs Taekwondo Head Gear "with Thick Gartered Strap And Chin Protector 'round Air Channels 'double-layer Ear Padding 'color: Red Sizes: 1 Pcs. Large 'color: Blue Sizes: 1 Pcs. Large 'philippine Taekwondo Association (pta) Approved." 10 30 Pcs Single Mouth Guard "color: Transparent Design: Single Mouth Guard Size : 30 Pcs. Senior Size" 11 2 Pcs Taekwondo Body Armor "size Large (1 Pc) 'size Extra Large (1 Pc) High-grade, Leatherette Material 'criss-cross Tying System, Shoulder Guards, And Back Guards. Colors: Blue, Red (reversible) Philippine Taekwondo Association (pta) Approved " 12 3 Pcs Taekwondo Groin Guard (male) "1 Pcs. Large '2 Pcs Xtra Large 'dual-velcro Strap Color : White Philippine Taekwondo Association (pta) Approved " 13 3 Pcs Taekwondo Groin Guard (female) "2 Pcs. Medium '1 Pcs Large 'dual-velcro Strap Color : White Philippine Taekwondo Association (pta) Approved " 14 3 Set Taekwondo Pu Elite Shin And Arm Guard With Elbow Support "2 Pcs. Large '1 Pc Xl '(pu Shin And Arm With Elbow Guard Protection) 'color: White 'philippine Taekwondo Association (pta) Approved" 15 3 Pairs Taekwondo Hand Gloves "1 Pcs. Size : Xtra Large 2 Pcs. Size : Large 'color : White 'soft Synthetic Leather 'semi-open Palm 'spandex Type Strap With Velcro Strip Philippine Taekwondo Association (pta) Approved " 16 3 Pairs Taekwondo Foot Gloves "1 Pc. Size : Medium '1 Pc. Size : Large 1 Pc. Size : Extra Large 'color : White 'soft Synthetic Leather 'semi-open Palm 'spandex Type Strap With Velcro Strip Philippine Taekwondo Association (pta) Approved " 17 8 Pcs Double Kick Pad "dual Face Targets 'with Wrist Strap 'color : Black 'made From Synthetic Leather And Eva Foam 'philippine Taekwondo Association (pta) Approved" 18 5 Pcs Taekwondo Kick Shield "color : Black 'made From Synthetic Leather And Eva Foam '6 - 8 Inches Thick Foam With 2 Back Hundle " 19 8 Pairs Karate - Gloves And Hand Protector "world Karate Federation (wkf) Approved 'removable Foot Attached To The Shin With Velcro 'size Small (1pc Red, 1 Pc Blue) 'size Medium (1 Pc Red, 1 Pc Blue) 'size Xtra Large (2 Pcs Red, 2 Pcs Blue) 'high-grade, Leatherette Material 'criss-cross Tying System, Shoulder Guards, And Back Guards. 'colors: Blue And Red " 20 8 Pairs Karate - Do In Step Shin Guard And Foot Protector "world Karate Federation (wkf) Approved 'removable Foot Attached To The Shin With Velcro 'size Small (1pc Red, 1 Pc Blue) 'size Medium (1 Pc Red, 1 Pc Blue) 'size Xtra Large (2 Pcs Red, 2 Pcs Blue) 'high-grade, Leatherette Material 'criss-cross Tying System, Shoulder Guards, And Back Guards. 'colors: Blue And Red " 21 5 Pcs Karate Chest Body Protector "world Karate Federation (wkf) Approved 'thickness : 4-6cm, Lace Type, 'hick High-elastic Foam 'size: Small 1 Pc 'size: Medium 2 Pcs 'size: Xtra Large 2 Pcs Color : White" 22 10 Pcs Badminton String "gauge0.61 Mm / 22 Ga 'length 10 M (33 Ft) 'core High Intensity Nylon Multifilament 'color: Any" 23 50 Tube Shuttlecocks "material: Grade Feathers Goose '12 Pcs. Per Tube 'speed : 77 '25 To 28 Mm (0.98 1.10 In Diameter Cork '62 To 70 Mm (2.4 To 2.8 In) Length 16 Pcs. Goose Feather For Competition Standard " Boxing Equipment 24 1 Pair Boxing Gloves "100% Genuine Leather Velco Wrist Strap Weight : 16 Oz Color : Any Color 1 Pair Weight : 16 Oz Association Of Boxing Alliances In The Philippines (abap) Approved " 25 2 Pairs Boxing Mitts "material : Syntetic Leather, Eva Foam Velco Wrist Strap Pad Area: 23cm H X 18.5 Cm W" 26 8 Pcs Boxing Mouth Guard "8 Pcs. Senior Size 'color: 4 Red And 4 Blue 'association Of Boxing Alliances In The Philippines (abap) Approved " Ball Games Equipment 27 4 Pair Football And Futsal Goalkeeper Gloves "material: Polyurethane, Ethylene Vinyl Acetate, Rubber Size: 2 Pairs Large And 2 Pairs Extra Large Color: Any Color For Adults" 28 12 Pcs Football Ball "leather Or Synthetic Leather. 'circumference Of 68–70 Cm (27–28 In) 'weight Of Between 410–450 G (14–16 Oz) 'size : 5 'fifa-approved" 29 6 Pcs Futsal Ball "leather Or Synthetic Leather. 410 – 430 G Size : 4 'fifa-approved" 30 10 Pcs Volleyball Ball "circumference (mm) 650- 670 Weight (g) 260- 280 For Indoor Volleyball Double Dimpled Microfiber Mv 300 Size : 5 'latest World Fivb Official Ball Approved " 31 10 Pcs Sepak Takraw Ball "3 Pcs For Women Size And 7 Pcs For Men Size Size: 0.41m To 0.43m 12 Holes And 20 Intersections Circumference (13 Cms Diameter) 42 To 44 Cm (16.5–17.3 In) For Men And From 43 To 45 Cm (16.9–17.7 In) For Women 'approved By Istaf" 32 6 Pcs Basketball Ball (women) "circumference: 29.5 Inches (75 Cm) Size :6 Weight: 22 Oz 12 Panel And 2 Tone Design" 33 4 Pcs Basketball Ball (men) "circumference: 29.5 Inches (75 Cm) Size :7 Weight: 22 Oz 12 Panel And 2 Tone Design" 34 2 Pcs Coaching Board "sport: Basketball Material : Pvc" 35 24 Pcs Baseball Ball "material: Lether Cushioned Cork Center 9 To 9.25 Inches (229 To 235 Mm) Weight: 5 To 5.25 Ounces Official Ball" 36 24 Pcs Softball Ball "optic Yellow Synthetic Cover With Red Stitching Cor .52, Max 300 Lbs. Size: 11"", 12"" Material: Synthetic Leather" 37 2 Pc Volleyball Net "material : Mesh Rein Nylon 210t, 60 Reins Upper Cable: Steel Cable 3.0mm Upper Belt: 7cm, Bottom Belt 5cm, Tarpaulin Meets Fivb Regulation Color: Black Size 1m (width), 9.5m (length), 10cm Square Box Net" 38 1 Pc Beach Volleyball Line "outside Sand Court Dimensions: 52.5 Ft Length By 26.2 Ft Width Or 16 M By 8 M 2 Inches Line Width Material: Nylon Color Black + Anchors 'with Carrying Bag" Athletics Equipment 39 2 Pcs Starting Block "height: 50 Mm Length: 86 Mm Width:82mm (rail Width) 'chrom Plated 8mm Steel Plate 'weight : 9kg Aluminuim Pedal: Block Rubber Matt Pedal Size1: 20mm×190mm Adjustable Height :15-22cm Bottom Is Equipped With Nail And World Athletics Approved" 40 400 Pcs Stainless Spikenails "shape: Pyramidal Form Size : 6 Mm 400 Pcs For All Brand Of Track And Field Shoes" 41 2 Pcs Athletic Discus "weight :1 Pc 2 Kg / 22cm In Diameter For Men Weight: 1 Pc 1 Kg / 18cm In Diameter For Women" 42 1 Pcs Meter / Metro Length: 100 Meter 43 2 Pcs Javelin "1pc 600g For Women 1pc 800g For Men World Athletics Approved" 44 1 Set Athletics Relay Baton "300 Mm Long X 38 Mm Diameter For Adults 8 Pcs Per Set World Athletics Approved" 45 8 Pcs Athletic Hurdles "adjustable Material: Aluminum And Hard Pvc Plastic Height : 0.76 - 1.06 Cm Length: 1.2 M Depth 0.71m Weight: 14kg " 46 20 Pcs Muller Tape "made Of Hospital-grade, 100% Cotton Backcloth Size: 1 And 1/2 Inche 3.8cm For Sports (1 Roll) Color: White" 47 20 Pcs Pro Warp Tape "size: 1 And 3/4 Inches Material:foam" 48 20 Pcs Muscle Tape (kinesiology Tape) "elastic Waterproof 16 Ft. Uncut Roll Color : Any Color" 49 30 Cans Topical Aerosol Rapid Relief Spray 50ml Table Tennis Equipment 50 20 Boxes Table Tennis Ball "size 44 'color: White Tri Star Professional Competition Standard" 51 10 Pcs Table Tennis Rubber Sheets "class: High Tension Pimples - In 'surface: Pimples - In 'speed: 13 Spin: 10 Thickness : 2.1 Mm Color : Black 10 Pcs. Hardness: 35 Professional Competition Standard (for Varsity Athletes)" 52 10 Pcs Table Tennis Rubber Sheets (backhand) "class: High Tension Pimples - In 'surface: Pimples - In 'speed: 13 'spin: 10 'thickness : 2.1 Mm Color : Red 10 Pcs. Hardness: 35 'professional Competition Standard (for Varsity Athletes)" 53 2 Pcs Table Tennis Racquet Adhesive "100 Ml 'water Base Glue" Swimming Equipment 54 6 Pcs Kick Board "color: Any '17 X 11.5 Inches 'for Adults" 55 6 Pair Hand Paddle "length: 21 Width: 18 Size Small (2pcs) 'length: 23 Width: 20 Size Medium (2pcs) 'length: 25 Width: 21 Size Large (2pcs) For Adults" 56 4 Pairs Swimming Fins "size: 8 (1 Pc) Size: 9 (1 Pc) Size: 10 (1pc) Size: 11 (1pc) For Adults" 57 4 Pcs Snorkle (front) "silicone Mouthpiece Front Configuration 44 Cm / 17.32 Inches" 58 2 Pcs Swimming Resistance Parachute "30 Cm - 40 Cm (2pcs) With Belt And Clip " 59 4 Unit Massage Gun Machine "30 Speed (5 Constant Speed And 2 Automatic) '6 Heads 'battery Capacity: 1500mah 'material: Plastic And Metal Paint 'rechargable 2-3 Hours" 60 15 Pcs Yoga Column Roller "size: 33 X 14 Cm 'material: Eva 'color: Any Color" 61 25 Tubes Lawn Tennis Ball "4 Pcs Per Tube 'color: Yellow Green 'itf Approved (for Professional)" Note: All Equipment Is To Be Double-checked By The Bulsu Coaches For Authentication Purposes. By Lot
Closing Date17 Jan 2025
Tender AmountPHP 746.6 K (USD 12.7 K)

Bureau Of Corrections Muntinlupa City Metro Manila Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (procurement/contract No. 009) Sixth Edition July 2020 Bids And Awards Committee 202 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 59 Section Viii. Bill Of Quantities 60 Section Ix. Checklist Of Technical And Financial Documents 61 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) 1. The Bureau Of Corrections, Through The National Expenditure Program (nep) Of 2025 Capital Outlay, Intends To Apply The Sum Of Three Hundred Million Pesos Only (₱300,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) With Identification Number _epa-009__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections Super Maximum Security Facility, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _december 28, 2024 (08:00am To 05:00pm) To January 20, 2025 (01:29 Pm)_____ From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On _january 06, 2025 (01:30pm)__ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before __january 20, 2025 (01:30pm)_____. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)____ At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf), With Project Identification Number__________________. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Million Pesos Only (₱300,000,000.00). 2.2. The Source Of Funding Is: Nga, The National Expenditure Program 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is One Tenth Of One Percent Of The Total Contract Price. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Terms Of Reference Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Sablayan Prison And Penal Farm, Occidental Mindoro 1. Project Information 1.1 Project Description The Mission Of The Bucor Is To Protect Society By Confining Offenders In The Controlled Environments Of Prisons And Community-based Facilities That Are Safe, Humane, Cost-efficient, And Appropriately Secure, And That Provide Self-improvement Opportunities To Assist Offenders In Becoming Law-abiding Citizens. The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Shall Be Conducive To The Reformation And Rehabilitation Of Inmates That Will Bring Them Back Into The Mainstream Of Society As Useful Citizens Of The Country. The Contract Will Involve The Design And Build Scheme Leading To The Construction Of The Bureau Of Corrections Super Maximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm, Sablayan, Occidental Mindoro. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Bucor Planning And Design Division Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bureau Of Corrections Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Bucor Super Maximum Prison Facility (phase 2) Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. This Project Aims To Be Completed Within A Year, Aligning With Our Decongestion Program. This Expedited Timeline Underscores Our Commitment To Addressing Urgent Needs Within The Correctional System And Providing Timely Solutions For The High Risk Committed Pdl. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Division (pdd) Under. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Construction Of Super Maximum-security Facility Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdd. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Director Of Directorate For Engineering Services (des). B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdd Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: I. One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Oncomposed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. Ii. 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); Iii. Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); Iv. Road Networks And Culverts • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts." 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdd For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdd. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A. Render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical. All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdd Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate, When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdd Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The Engineering Services (es) Of The Sppf On Behalf Of The Bucor Pdd • Sppf-es To Impose To Contractor Testing Of All Items After Installation And/or Application. Es To Send Pdd Copy Of The Test Report/s. • Sppf-es To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Sppf- Es To Inform Pdd Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdd) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdd Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Sppf Es Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Ippf Es Will Be Reviewed And Approved By Pdd - Nhq Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdd. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdd And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply And Distribution System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Sewage Treatment Plant • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Electrical System Layout 4. Mechanical System Layout 5. Instrumentation And Control System Diagrams 6. Piping And Instrumentation Diagrams (p&ids) 7. Equipment Details And Specifications 8. Electrical Power Distribution 9. Emergency Power Systems 10. Grounding And Lightning Protection 11. Control And Monitoring Systems, If Applicable 12. Safety Systems 13. Miscellaneous Details B. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Backup Power Generator With Capacity Not Less Than Total Computed Kva Load Without Demand Factor. D. 3-phase Electrical Supply Shall Be Sourced From The Local Electrical Utility. E. Power Line Connection From Main Source To The Facility Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements  Technical Specifications  Boring Test  Structural Design And Analysis And Computation  Final Design And Construction Plans  Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdd Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bureau Of Corrections. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following:  An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or  Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184 V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 5. Minimum Heavy Equipment Requirement (as Needed) For Site Development Such As: No. Item Specification 1. Backhoe 0.8 Cu. M. 2. Backhoe Wheel Mounted With Breaker 0.90 Cu. M. 3. Cargo/service Truck 2-5 Mt., 160 Hp 4. Dump Truck 12 Cu. Yd. 5. Motorized Road Grader G710a, 140hp 6. Payloader 1.5 Cu. M. 7. Vibrator Roller 10 Mt 8. Bulldozer 170 Hp 9. Scraper 515 Hp 10. Truck Mounted Crane, Hydraulic Telescopic Bommer Capacity: 41 – 45 Mt. 11. Crawler Crane 41-45 Mt 12. Generator Set 300 Kw/375 Kva 13. Water Pump 100mm Suction Dia. 14. One Bagger Mixer 4-6 Ft3/min 15. Concrete Vibrator Ey20, 5hp, 32-70mm 16. Vibro Hammer 45000 Kg-m 17. Excavator 17.5 Kw Or Any Specify Types Of Heavy Equipment Needed For A Site Development Will Be Determined By The Winning Bidder. 6. Environmental Compliance 7. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 8. Billboard 9. Traffic Management (if Applicable). Vii. Building Construction 1 Lot One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Composed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. 1 Lot 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); 1 Lot Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); 1 Lot Road Networks And Culverts • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts. A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finished - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. (at Elevated Water Tank Area) J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Contractor Encouraged To Adapt: Lpf Flush Valve For Water Closet Or Stainless Toilet-lavatory Combination. Waterless Urinals N. Sprinkler System To All Prison Dormitories In Accordance With The Provisions Of Revised Plumbing Code Of The Philippines. O. Contractor To Provide A Water System To Supply The Facility 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 300,000,000. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php300,000,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D. Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criteria That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Safety And Security: Excellent (100%): The Design Features Robust Perimeter Walls, Guard Towers, And Security Features Ensuring Optimal Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Highly Reliable, With Comprehensive Safety Measures For Both Psdl And Staff. Good (80%): The Design Incorporates Effective Perimeter Walls, Guard Towers, And Security Features, With Minor Areas For Enhancement. Fire Protection And Detection Systems Are Reliable, With Adequate Safety Measures For Psdl And Staff. Acceptable (70%) The Design Includes Satisfactory Perimeter Walls, Guard Towers, And Security Features, Meeting Basic Requirements For Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Functional, With Sufficient Safety Measures For Psdl And Staff. Some Reservations (50%): The Design Features Partially Effective Perimeter Walls, Guard Towers, And Security Features, With Notable Deficiencies In Pdl Containment And Facility Security. Fire Protection And Detection Systems Lack Reliability, With Limited Safety Measures For Psdl And Staff. Serious Reservations (20%): The Design Lacks Effective Perimeter Walls, Guard Towers, And Security Features, Compromising Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Inadequate, Posing Significant Risks To Psdl And Staff Safety. Unacceptable (0%): The Design Neglects Perimeter Walls, Guard Towers, And Security Features, Failing To Ensure Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Absent Or Non-functional, Posing Severe Risks To Psdl And Staff Safety. D. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. E. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Ninety (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued Doc. No. _____ Page No. _____ Book No. _____ Series Of ____ Company Letterhead Omnibus Sworn Statement Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________
Closing Date20 Jan 2025
Tender AmountPHP 300 Million (USD 5.1 Million)

Municipality Of Mercedes, Camarines Norte Tender

Solar Installation and Products...+1Electrical and Electronics
Philippines
Details: Description Republic Of The Philippines Province Of Camarines Norte Municipality Of Mercedes Bids And Awards Committee Bids And Awards Committee Office, Lgu - Mercedes, Camarines Norte Invitation To Bid For Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte. The Local Government Unit Of Mercedes, Camarines Norte, Through The Trust Fund Intends To Apply The Sum Of Two Million Seven Hundred Twenty-five Thousand Two Hundred Sixty-six Pesos Only (php2,725,266.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte - Identification Number 401-24-11-1495/1496/1497/1498/1499. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Local Government Unit Of Mercedes, Camarines Norte, Now Invites Bids For The Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte As Follows: Item No. Qty Unit Description Lot 1 - Hardware Tools 1 1 Unit Air Compressor Machine, Motor: 1/2 Hp; No. Of Cylinder: 2; Phase: 1; Pressure: 85 Psi; Capacity 46 Liters; Approximate Dimension: 95-100cm (l) X 31-35cm (w) X 64-70cm (h); Weight: 47kg; Inflation Time: 53min; Air Displacement: 208l/min 2 1 Unit Air Spray Gun, Standard Nozzle:1.4mm, Pattern Width:180-250mm, Paint Capacity:600cc, Suitable For Finishing Coat, Optional Nozzle:1.3-2.5mm, Operating Pressure:2-3.5bar Air Cons:4.2-7.1cfm(119-200l/min)" 3 11 Set Angle Grinder Cutting Disk, 10 Pcs.per Set; Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8") 4 11 Unit Angle Grinder, Rated Input Power: 730w; Wheel Diameter: 4"; Rated Voltage: 220v; Frequency: 60hz; No Load Speed: 12,000 Rpm; Weight: Approximately 1.6kg; Grinding Spindle Thread: M10; Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h) 5 7 Pc Chipping Hammer, Item Weight: ‎atleast 13.8 Ounces; Product Dimensions: ‎11" (l) X 1" (w) X 7.5" (h); Material:, Genuine Leather Grip And Forged Steel 6 3 Set Circular Saw With Diamond Blade, 1400w, 185 Mm Blade, Spindle Lock With 24t Diamond Blade 7 3 Pc Claw Hammer, Head Weight: 16oz; Overall Weight: 17oz-23oz; Forged Steel Head; Smooth Face; Fiberglass Handle With Rubber Cushion; Overall Length: 12-14" 8 3 Pc Concrete Chisel, 10'' Forged Steel Chisel 9 3 Pc Crow Bar, 36" Long; Length Tolerance: +- 1/8; Forged Steel Carbon 10 1 Pc Electric Planer; Voltage: 220-240v; Input Power: 1050w; No Load Speed: 1600rpm; Planing Width And Depth: 82x3mm; Heavy Duty Aluminum Base; 11 1 Pc Framing Hammer, Handle Material: Alloy Steel; Item Dimensions: Approximately 16-17" (l) X 5.75-6" (w) X 1.5-2" (h); Item Weight: Atleast 1.4 Pounds 12 1 Unit Gasoline Marine 7hp Speed Type, Single Cylinder; 4 Stroke, Forced Air Cooling; Ohv Displacement (cc): 196 Compression Ratio: 8.5:1 Bore X Stroke (mm): 68x54 Min. Fuel Consumption;395/(kw.h) Valve Clearance: Input Valve: 0.10-0.15mm Idle Speed (rpm): 1400+-140 Max A.c. Output/rpm:3.8/3600 Noise Level:70db (a) Ignition System: Transistorize Magento Ignition Max Torque (n.m/rpm): 10.7/300 Starting System: Recoil Start (recoil Start/electric Starting) 13 10 Pc Hacksaw With Blade, Adjustable Aluminun Alloy Frame With Soft-grip Handle, 90" Adjustable Bladec Angle, 12 Inches (+/- 1/4") Bi-metal Hacksaw Blade, 24 Tpi 14 10 Unit Heavy Duty Corded Drill, Rated Input Power: 750w; Chuck Capacity: Upto 13mm; Drill Capacity: Metal (16mm), Wood (25mm), Masonry (12mm); Dimension: 268mm (l) X 69mm (w) X 192mm (h); Weight W/out Cable: Approximately 1.6-1.8 Kg; Spindle Collar Diameter Of 43 Mm 15 1 Pc Level, Box Beam Style, Material: Alluminum; Dimension: Approximately 24-24.5" (l) X 2-2.6" (w) X 1.2-1.5" (h); Weight: Atleast 0.8 Pounds 16 3 Pc Mashing Hammer, 3 Lb With Fiberglass Handle, Forged Steel Head 17 3 Pc Masonry Hammer, 800g Solid Rubber Head, Fiberglass Core And Bi-material Slip-resistant Handle, 18 3 Pc Masonry Hand Saw, 15" 380mm Carbon Steel 19 3 Pc Masonry Square, 24"x 16"aluminum, 1/8 '' Thick 20 3 Pc Mason's Level, 60cm Aluminum Reinforced Frame 21 3 Tube Mason's Line, #18 Braided Nylon, 500 Ft, 170 Lb Test 22 10 Set Metal Drill Bit Set, Material: High Speed Steel; 19pcs Per Set (1mm,1.5mm,2mm,2.5mm,3mm,3.5mm,4mm,4.5mm,5mm,5.5mm,6mm,6.5mm,7mm,7.5mm,8mm,8.5mm,9mm,9.5mm,10mm); Point Angle:118degree C; Standards: Din 338; Bit Geometry: Standard Twist Bit 23 8 Pc Meter Tape With Magnetic Hook, Blade Material: Nylon Coated Blade; Dimensions: 16ft (l) X 25mm (w) 24 7 Pc Mig Welding Pliers, Overall Length: Atleast 210mm; Material: High Carbon Steel; Handle Material: Thermoplastic Rubber 25 1 Unit Portable Hand Drill, Power Sourced: Battery Powered - 2pc 21 Volt 1500mah Lithium-ion Batteries; Maximum Rotational Speed: 1500 Rpm; Voltage: 21v; Amperage: 1.5 Amps; Chuck Size: 0.38"; Bit Heads Diameters: From 0.8mm - 10mm; Product Dimensions: ‎9.6" (l) X 2.1" (w) X 7.5" (h); Material: ‎plastic, Rubber, Metal; Item Dimensions: Approx. ‎9.6" (l) X 2.1" (w) X 7.5" (h); Item Weight: Atleast ‎2.5 Pounds; Item Torque: 330 Inch Pounds; Inclusions: 1x21 Volt Inspiritech Cordless Power Drill, 2x Rechargeable Battery, 1x English User Manual, 10x Self-drilling Drywall Anchors,10x Screwdriver Bits, 2x Double Ended Bits, 3x Drilling Bits, 1x Magnetic Extension Socket Bit Holder, 10x Anchors With Screws,1x One-hour Fast Charger, 1x Flexible Extension Shaft, 1x Carrying Bag 26 7 Unit Portable Welding Machine, Input Voltage: 220-240; Frequency: 50-60hz; Output Current: 10-220a; Led Display; No-load Voltage: 85v; Max. Output Current: 220a; Diameter Of Electrode: 1.6-3.2mm; Inclusions: 1 Pc Electrode Holder, 1 Pc Earth Clamp With Cable, 27 3 Pc Pull-push Rule, Blade Length 8m/26ft, Blade Width 1", High Impact Abs Case With Durable Rubber, Corrosion Resistant Tru-zero End 28 3 Pc Putty Knife, 3" Stainless Steel With Rubber Handle 29 1 Pc Roofing Hammer: Item Weight: ‎1.25 Pounds; Product Dimensions: Approx. 13.7" (l) X 6.75" (w) X 1.5" (h) 30 1 Unit Sander, Item Dimensions: Approx 11.63" (l) X 5.63" (w) X 6.19" (h); Voltage: 110 Volts; Power Source: Corded Electric; Amperage Capacity:‎ 8.8 Amps; Variable Speed Control Dial (690 -1,440 Ft./min.); Grit Number: 80; Item Weight: Atleast ‎9.5 Pounds; Included Components: ‎belt Sander, 1 Belt, Dust Bag 31 3 Pc Shovel, Rectangular End, Tempered Steel Blade (0.8mm Gauge Orv Higher), 17-23 Cm Blade Tip Width,22-28cm Blade Tip Lenght, All Metal Handle, Overall Lenght 100cm-115 Cm 32 3 Pc Shovel, Round End, Tempered Steel Blade (0.8mm Gauge Orv Higher), 17-23 Cm Blade Tip Width,22-28cm Blade Tip Lenght, All Metal Handle, Overall Lenght 100cm-115 Cm 33 1 Pc Speed Square, Material: Cast Aluminum; Size: About 18x18x2cm/7.09x7.09x0.79"; Weight: About 130g; Triangle-shaped 34 3 Pc Spirit Level Bar, Aluminum Frame With Magnet, Size 12" (+-1/8"), With 3 Vials (horizontal, Vertical And 45 Degrees) 35 3 Pc Steel Float/plastering Trowel, Thickness 0.7 Mm, Surface Measurement 280mm X 125 Mm(+/- 1mm), High Carbon Steel, Soliod Forged Steel With Plastic Handle 36 1 Pc Trim Hammer, Handle Material: Wood; Head Material: Alloy Steel; Item Dimensions Approximately: 14-15" (l) X 5-6"(w) X 1-2" (h); Item Weight: Atleast 594 Grams 37 3 Pc Trowel, 280x120mm Stainless Plastering Trowel With Plastic Handle 38 1 Pc Utility Knife, Handle Material: Aluminum; Material: Aluminum Alloy; Weight: 120g/pcs; Blade Size: 19mm (w) X 61mm (h) X 0.6mm (t); Blade Material: Steel; Thickness: Atleast 0.6mm 39 7 Pc Welding Helmet, Auto Darkening Helmet, Power Supply: Battery And Solar Powered; Light Shade: Din9-1;, Dark Shade: Din4; Switching Time: 1/25000s; Delay Time: 0.1-0.8s; Sensitivity Adjustment: Stepless Control; Operation Temperature: -5 Degrees- 55 Degrees; Active Viewing Area: 93mmx43mm; Active Viewing Area Size: (+/- 10mm); Item Weight: Atleast 1.85 Pounds; Package Dimensions: ‎approximately 12-12.4" (l) X 9-9.61" (w) X 7-7.68" (h) 40 7 Set Welding Magnets, 6 Pcs/set, Overall Length: Atleast (3"); Hold Capacity: Up To 25lbs; Arrow Design Supports Angle: 45°, 90°, And 135°; Item Weight: 295g; Package Dimensions: ‎4.88 X 4.72 X 3.98 Inches; ‎material: Steel; Magnets Size: Approximately - Top (1-1.4cm), Bottom (6.5-7cm), Side (7-7.5cm) Thickness (1-1.3cm) 41 1 Set Wood Chisel; 4-piece Set (6mm; 12mm; 19m; 25mm); Tempered Chrome Carbon Steel Blade; Hardened Shank; Rust-resistant, Lacquered Coated Blade; Bi-material Handle 42 3 Pc Wooden Float, 18"x 32", Multi-layered Lot 2 - Food Preparation 1 1 Unit 3 In 1 Burger Griller With Deep Fryer And Steamer, Gas Type; Made Of Stainless Steel And Polished Metal Griddle Plate; Dimensions: Burger Griddle - 18" (l) X 12" (w); Deep Fryer - 8" (l) X 12" (w), Capacity: 2.5 L; Steamer: 11" (l) X 12" (w) 2 6 Unit Barbeque Grill With Sauce Holder And Top Grill, Material: Stainless Steel, Dimension(lwh): 24 In X 12 In X 30 In (3.5 In Grill Pan's Depth) 3 33 Pc Basin; Stainless; Diameter: 22"; Base: 16"; Depth: 7"; Thickness: 1cm 4 47 Pc Beach Umbrella; Round-shaped; Material: Poly Canvass; Diameter: 40""; Pole Stand Length: At Least 45""; Pole Material: Stainless Steel Chrome" 5 6 Pc Boiler Caldero; Big Size & Heavy Duty; Size: Diameter 48cm; Height: 42cm; Makapal, Material: Aluminum 6 6 Pc Boning Knife, 27.3cm, Blade Length:14.6cm, Blade Thickness: 4mm, Wood Handle 7 32 Pc Butcher's Knife; Materials: Stainless; Wood Handle; Size: About 10" 8 29 Pc Caldero With Double Handle; Aluminum Material; Diameter: 46cm; Height: 37cm; With Double Handle; Capacity 5kilos/20l(volume Capacity) 9 48 Set Casserole Set, Stainless Steel, 28, 30 And 32cm Diameter; 16, 18, 20cm Height 10 50 Pc Chef's Knife; About 10 3/4" Long; Material: Stainless Steel; Blade: Full Tang; Riveted Handle 11 56 Pc Chest Cooler, Item Package Dimensions: ‎25.8" (l) X 16.2" (w) X 15.7" (h), Package Weight: ‎5.76kg, Inside Dimensions: 24.95" (l) X 14.58" (w) X 14.77" (h), Material: ‎plastic, Chamber Depth: 24.95", Capacity: 52l, Color: Any Color 12 51 Pc Chopping Board; Thick Wood; 12"x12" 13 6 Pc Cleaver Knife, 11" Stainless Steel, Weight: 310-340g, Blade Size: 6.5 Inches 14 48 Pc Colander; Stainless Steel; 11"diameter; With Stainless Base And Handle 15 6 Unit Digital Weighing Scale ,30kg Capacity,stainless Tray Size: 35x23cm For 30kg Capacity Weighing Scale, Dual - Display : Weight, Unit Price, Amount, High Light Led Display, Rechargeable Battery, Power Supply: Ac/dc Charger (included) 16 47 Unit Double Burner Gas Stove; Stainless Top And Front; Automatic Ignition; Reversible Trivet; Double Detachable Top Burner; Removable Drip Pan; Dimension: 700mm(l) X 390mm(w) X 140mm(h) 17 7 Unit Double Ring Burner; Heavy-duty Cast Iron; Includes Pol Regulator And 1-metre Hose 16750 Btu Brass Valve With Individual Gas Control Minimal Assembly Required Weight; 3.9kg, Material;cast Iron, Dimensions: (lwh) 36cm X 20cm X 9cm, Fuel Type: Lpg Tank Cylinder With Content And Accessories 18 2 Pc Egg Ring, Stainless Steel, 8.5cm Diameter, 1.5cm Height 19 4 Box Face Masks; 3 Ply Non-woven Disposable Earloop Mask; Quantity: 50pcs/box 20 30 Pc Fish Drying Rack, 4-layer, 45x45x66cm, Foldable 21 6 Pc Fish Scaler, 20cm Stainless Steel 22 6 Pc Fish Scraping Tool, 20cm Stainless Steel 23 54 Unit Food Shelve, 2 Layers: Glass Thickness: 3/16 And 1/4, (w-14" X H-17" X L-30"); Adjustable Layer, Material: Glass & Aluminum With Sliding Door, Offer: Screen Sliding Door To Prevent Moisture 24 204 Pc Food Tray With Glass And Stainless Lid/cover, Stainless Body, Rubberized Stand 32x28x10cm 25 12 Pc Food Tray, Flat, Stainless, 60x40x2cm, Depth: 2cm 26 2 Unit Freezer Chest Type, Gross / Net Volume 10.6 Cu.ft. (10 Liters) / 10.1 Cu.ft. (286 Liters), Functionality 3-in-1 Function – Chilling | Freezing | Fast Freezing, Defrosting System: Manual Defrost, Evaporator:aluminum Defrost,led: 6 Led’s, P:2w, Lamp Life: Min. 50,000 Hours, Weight 40 Kg, Dimensions L 63 X W 111.4 X H 84.7 (cm), Key Features: Inverter Compressor, Sliding Glass Door, Embossed Door & Cabinet, Recessed Side Handle (left & Right), Led Light, Removable Gasket , 1x Basket Wire Shelf, 4x Roller Wheel 27 5 Pc Fruit Crate Plastic 21 X 15 X 12 Inches, Heavy Duty Plastic Material, Color : Black 28 37 Pc Frying Pan 14" In Diameter, Cast Iron 29 4 Unit Gas Range, Approx. 55-70cm (l) X 50-60cm (w) X 86-93cm (h); 4-gas Burner; 62l Gas Oven; Button Ignition; Top Glass Lid; Net Weight: Maximum Of 28kg; Pan Support: Light Cast Iron Pan Support 30 1 Box Gloves; 100pcs; Food Grade; Size: Medium(7.5cm); Thermoplastic Elastomer(tpe) Material 31 23 Pc Hairnet With Cap; White; Nylon; Washable 32 1 Unit Industrial Oven Stainless Steel, With Wall Insulator To Minimize Penetration Of Heat To The Walls, With Temperature Gauge, Approx. Outer Dimension: 46.5 X 23.5 X 30 Inches; Oven Stand/rack Is Made Of Metal With Rollers And Braking Systems; Stainless Steel Front Panel, With See Thru Glass; About 4 Inch Thickness Of Walls With 2 Trays Per Deck - 4 Trays Capacity; Gas Type 33 35 Pc Kawa 62 Cm Diameter 18 Cm Height, Aluminum With 2 Aluminum Handles 34 12 Pc Kitchen Apron, Waterproof; Stain Resistant Leather Apron 35 6 Pc Kitchen Scissors, Material: Stainless Steel And Plastic Silicone, Size: 22.5x7.3x1.2cm 36 3 Pc Long Handle Stainless Steel Soup Spoon; Color: Silver; Caliber Length; Approx. 12cm.14cm.16cm.18cm, Handle Length; Approx.45cm(17.72inches) 37 6 Pc Long Wooden Ladle; 14" Stainless Steel 38 58 Set Lpg Tank, 11kg Cylinder With Gas Regulator, 1.8m Hose & Steel Hose Clamp 39 9 Set Measuring Cup (set For Liquid), 1 Measuring Cup With Red Graphics; Made Of Nonporous Glass That Won't Warp, Stain, Or Absorb Odors; Glass Is Preheated Oven, Microwave, Fridge, Freezer & Dishwasher Safe; Dimension: Approx. 7.13" (l) X 6.75" (w) X 4.38" (h); Measuring Capacity: 500ml 40 9 Set Measuring Cups (set For Dry), Smithcraft Stainless Steel Measuring Cups Set Have 8 Cups.the Sizes Are: 1 Cup (240ml), 3/4 Cup (180ml), 2/3 Cup (160ml), 1/2 Cup (120ml), 1/3 Cup (80ml), 1/4 Cup (60ml), 1/8 Cup (30ml), 1/16 Cup (15ml),1 Locking Ring. 41 6 Unit Mini Electric Fan 7.5" - With Base 10'' 69hz 20w (for Bbq), Non-adjustable Height; Any Color; Electric Powered Fan; 3 Blade 42 21 Pc Mixing Bowl Medium, Approx. Diameter: 28cm, Height:11.2cm; Material: Stainless; Capacity: Atleast 4l 43 200 Pc Monoblock Chair Front:monoblock Chair, Front Legs Distance: 355mm Width Seat, With Backrest, Color: Beige, Seat Width :375 Mm, Deapth: 330 Mm, Side Legs Distance Left: 378 Mm, Side Legs Distance Right 378 Mm, Back Legs Distance: 210 Mm, Back Rest Height:779 Mm, Set Back Height: 405 Mm, Seat Height: 376 Mm, Gross Weight: 2.25 Kgs 44 54 Pc Monoblock Table, 36x36 Inches, H- 28 Inches, Color: Beige, Atleast 3mm Thick 45 2 Pc Non-slip Rectangular Chopping Board; Materials:polypropylene Plastic; Approx Length: 40cm; Width: 25cm; Thickness: 0.5cm; Color : White 46 45 Pc Palamigan Container W/ Gripo 15l, Dimension: 31.8x23.8x48.5cm, Material: High Quality Durable Plastic 47 1 Unit Pressure Cooker 50 Liters Capacity, Aluminum Alloy Material, Pressure: 90kpa, Dimension: 44cm Diameter X 47cm Height 48 40 Pc Round Glass Jars With Lid, 220ml 49 41 Pc Sandok, Stainless Steel, 24.7" Length, With Wooden Handle 50 33 Pc Sandok, Stainless Steel, Length: 14" 51 39 Pc Shansi, Stainless Steel, Length: 14" 52 9 Pc Stainless Steel Dough Cutter Scraper Baking Smoother Cake , Approx. Size: 14-15cm (l) X 11.5-12cm (w) And 22cm (h); Material: Stainless Steel 53 41 Pc Stainless Steel Food Tong 14" Length 54 5 Unit Steamer; Aluminum; About 16"/42cm Diameter; 3 Layers With Cover; With Handle Per Layer 55 3 Unit Vacuum Sealer Machine, 220v, 90w, Sealing Width: 270mm, Power Supply: Ac100-240v/50-60hz, Temperature Control Range: 170-210 Celsius, Abs Material, Size: 370*75*50 (mm) 56 15 Pack Vacuum Sealer Storage Pouches | Bpa Free, Commercial Grade For Food Storage & Sous Vides, Size: 17 X 25cm Material: Plastic, 100pcs/pack 57 27 Pc Water Jug/dispenser With Faucet, 5 Gallons, 20 Liters, Color: Blue, Durable And High Quality Plastic Material 58 7 Unit Weighing Scale; Analog; 20kg Capacity; Approx. Dimensions: 6-7" (l); 8-9" (w); 10-11" (h); Dual Unit (kg And Pounds) 59 2 Pc Wide Mouth Funnel, Stainless Steel, Top Opening: At Least 17 X 5.5 X 6cm, Bottom Opening: At Least 13 X 3.7 X 4cm 60 8 Pc Wire Whisk, Large, Stainless, Approx. 14-15" (l) Lot 3 - Fabrication Of Food Cart 1 7 Unit Bicycle With Sidecar: Bicycle Specifications: Bmx Type Bike (frame 1//2 Gi Hd, Rim Set Front X 10 G Wide Jap Hub, Rim Set Rear X 10g Wide Jap Hub, Tire 20 X 2.125 Jumbo, Tube 20 X 2.125, Handle Bar Painted Black, Fork Ex-900 Landing Gear Cp, Head Parts Nikyo/whw, H-post Bmx Ord.m, H-grip Ord. Opc Parts Neco Bearing Type, Opc Plate 36t, Chain Cp Bmx, Freewheel 24t, Pedal Opc Bearing Type, Seat Clamp/s-pin/ S-post P, Saddle With Spring, Footbreak With Spring "full Size" Frame, 175-180mm Cranks Side Car With Provision Of Umbrella And 2 Chest Coolers (52l Capacity) - Dimensions: ‎25.8" (l) X 16.2" (w) X 15.7" (h) Materials: 1/2 J1 Pipe 540, 316 X 1 Flat Square Bar, J1 Pipe De Una 520, 1/4 X 2 Flat Bar, 6203 Gi Set, Tire 20 X 2.125 Jumbo, Note: With Dole, Dilp Logo Fully Painted In A Galvanized Sheet Iron Attached On The Front Of The Sidecar With Approx. 15.7 Inches(h)x15.7 Inches(l) Fully Painted Color: Any Color 2 1 Unit Motorcycle Sidecar (for Fruits And Vegetable Vending): Metal Body, Dimensions L-4ft W-2ft H-2ft, With 17inch Side Wheel 3 11 Unit Negocart With Bicycle Roofing Materials: Bolt & Nut W/ Washer 3/16 X 1 Polycarbonate 6mm X 1.2 X 1.70 Welding Rod Body Materials:tubular 1 X 1 X 1.5;flat Bar 1/8 X 1;flat Bar 2' X 3/8 X 1;plain G.i.;sheet 4' X 8' #26;cylindrical Hinge 1/2" ᴓ;blind Rivets 1/8 X 1/2;cylindrical 1/2;cabinet Handle;cabinet Lock;round Bar 8mm ᴓ;transparents Barrier 1/4 X 4' X 8';welding Rod;stainless Sheet 4' X 8';plain Round Bar 16mm ᴓ: Bicycle Specs: Bmx Type Bike Frame, Front And Rear Free Wheel Hub For Rim Set Single Speed (wheel Set), Tire Size (20"x2.125 Jumbo), Interior Tube (20"x2.125), Bmx Handle Bar, Bmx Fork, Head Parts (h Post, Handle Grip), Chain (single Speed), Pedal (bearing Type), Seat Clamp, Saddle With Spring, Foot Brake (clamp W/ Spring), Crank Pedals (175mm-180mm Cranks) Note: With Dole, Dilp Logo And Tourism Spot At The Front And Side Of Cart, Logo Material: Weather Proof Sticker, Sizes Of Sticker: H-60cm X W-130cm (for Front Of Cart) And H-60cm X W:75cm (for Side Of Cart) Or H-23.6" X W-51" And H-23.6" X W-29.5" Fully Painted Color: Light Blue Lot 4 - Grooming Tools 1 1 Pc All Purpose Comb, 7inch, Plastic Material 2 3 Pc Barber Apron, With Two Pockets, Waterproof, Material: Fiber Size: Approximately 89x69cm - 35x27.2 Inches 3 1 Pc Barber Cape, 140cmx100cm Silk, Waterproof 4 1 Unit Barber Chair, Reclining, Modern Style, Chair Back Height: High-back; Upholstery: Faux Leather; Material: Stainless Steel; Dimension: 21"x22.5"x38" 5 1 Unit Clipper, Cordless, Includes 3 Metal Clip Attachment Comb Cutting Guides, 1/16", 1/8",3/16, 6.25 Inches And Weighs 13 Oz, Equipped With A 2191 Adjustable 0000 Blade 6 2 Unit Curling Iron, 38.5cm, Tourmaline Ceramic, 25-39w, 360 Degree Rotatable 7 2 Set Eyebrow Grooming Kit, 6pcs (2 Eyebrow Razor, 1 Facial Razor, 1 Brush, 1 Scissors, 1 Tweezer) 8 1 Pc Fade Brush, Material: Plastic & Nylon, (hxw) 12.3 X 2.3 Cm, Weight: 0.015 Kg 9 2 Unit Flat Iron, Ceramic Wide Plate, 100-240v Dual Votage, 40-59w, 27.8cm Long 10 2 Unit Hair Blower, 2 Speed - 3 Heat Settings, 2400w, Removable Filter Cover, Cool Shut Function, Dimension: 21.5x8.5x26.5cm 11 1 Set Hair Clips, Plastic, Size: Approximately 7.8cm 12 2 Set Hair Dying Tool Set, (5-pc) Small Brush - 19.5cmx4.5cm, Big Brush - 20.5x6cm, Secondary Comb - 19x5.5cm, Small Bowl - 13x4.5cm, 1 Pair Of Earmuffs 8x4.5cm 13 3 Pc Hair Shear, 6.9 Inch Stainless 14 10 Pc Hair Towel Turban, 49x18cm Microfiber 15 2 Set Make Up Brush Kit, 12 Pcs With Box 16 2 Set Make Up Kit, 35pcs (1 Eyeshadow, 1 Concealer, 4 Osmetic Brush, 3 Lipgloss, 1 Eyebrow Pencil, 1 Pressed Powder, 4 Lipstick, 4 Face Makeup, 1 Lip Balm, 1 12.5cmx19cm Makeup Bag, 1 Eyebrow Cream, 1 Primer, 1 Powder Puff, 1 Mascara) 17 2 Pc Makeup Kit Organizer, 50cmx39.5cmx21.5cm, Black,046 Glittery, Checkered 18 1 Pc Mirror, Double Sided Folding Mirror, (wxh) 24x 37cm, Weight: 0.532 Kg 19 1 Pc Neck Duster, Weight : 100g , Size : 18x7x7cm 20 1 Roll Neck Strips, (28cmx6.5cm) Self Adhesive, Material: Paper 21 4 Set Plastic Hair Roller, 25mm Assorted, 10-pc Large 22 3 Pc Pomade, 80g, Water-based 23 1 Pack Razor Blades, Durable, Stainless, 100 Pcs, (lxwxh) 14x10x1 24 1 Set Shaver, Abs Material,110-220v, Power: 3w, Size: 16.6x5.8cm, Battery Capacity: 600mah 25 2 Pc Shaving Gel, 195g With Aloe 26 2 Pc Talc Powder, 500g 27 1 Set Trimmer, Rechargable, 2 Blades, Power: 50-60 Hz, Voltage:100-240v, Dimension: 11.5x6.5x3cm 28 4 Pc Wide-tooth Comb, 16cm Plastic, Durable 29 1 Pc Wide-tooth Comb, Size: Approximately 21.5x5 Cm, Plastic Material Lot 5 - Sewing 1 7 Set Ball Point Pins, 250 Pcs Per Box With 8 Colors; Durable 2 8 Unit Bobbin Case, Diameter: 20.3mm Width: 11.7mm 3 8 Pc Bobbin, Diameter: 20.3mm Width: 11.7mm 4 4 Set Dressmaker's Shears, Material: Stainless Steel; Item Dimensions: Approximately 0.8" (l) X 3.9" (w) X 10" (h); Blade Length: 8"; Item Weight: Approximately 8.8 Ounces 5 1 Pc Edging/ Overlock Sewing Machine, Metal Material; Overlocker; 1 Stitch; Dimension(lxwxh) 12x13x14 6 3 Pc Electric High Speed Sewing Machine, Power: 90w; Rated Voltage: 220v; Gross Weight: About 7kg; Max Sewing Speed: 1,100 Stiches/min; Materials: Stainless Steel Needle Plate, Metal Frame; Dimensions: Approximately 44cm (l) X 16cm (w) X 28cm (h); Voltage: 220v, Secondary Lifting Height Or Presser Foot: 14mm; Needle Pitch: From 0-4.5mm, Needle Width: From 0-7.0mm 7 4 Pc Flat Iron, 1200w; Stainless Steel Sole Plate; Power Light Indicator; With Steaming/spray Function 8 4 Set French Curve, Dimension(21.65x0.39x7.09); 4.6 Ounce; Made Of Aluminum Or Plastic 9 4 Pc L-square, Material: Stainless; Item Weight: 0.32oz; Product Dimensions: Approx. 14" (l) X 24" (w) 10 1 Pc Manual Sewing Machine With Motor And Foot Controller, Metal Material, Heavy Duty, 9kg Weight, 1 Stitch Dimensions, (lxwxh) 12x13x14 11 4 Unit Meter Stick, Yellow Color; Wood Type 12 4 Pc Needle Threader, Metal Material; Oval Shape; 1 Inch Size 13 31 Pack Sewing Machine Needle, Flat Needles 10pcs/pack 14 11 Pc Sewing Threads 12pcs/box, Material: Cotton; Package Dimensions: Approx. 5.71" (l) X 3.74" (w) X 2.36" (h); Thread Size: Approx. 56mm (h) X 22mm (w); 550 Yards Each Roll 15 25 Pc Tailor’s Chalk, Square Shape; Orange Color;fades Or Brushes Away Easily 16 4 Pc Tape Measure, Material: Durable Soft Plastic; Color: Blue; Measurements: Inches (can Measure Upto 60") And Centimetres (can Measure Upto 150cm) Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 2. Delivery Of The Goods Is Required Ninety (90) Calendar Days Delivery Period And Upon Receipt Of Notice To Proceed And Purchase. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Mercedes, Camarines Norte-bac Secretariat And Inspect The Bidding Documents At The Address Given Below During Office Hours - 8:00 Am-12:00 To 1:00 Pm-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 14, 2024 Until 8:30 Am Of January 6, 2025 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only Php5,000.00. 6. The Local Government Unit Of Mercedes, Camarines Norte Will Hold A Pre-bid Conference On December 23, 2024 9:00am At Bids And Awards Committee Office- Second Floor Jpl Sports Complex - Municipal Compound, Eco Avenue Street, Barangay 5, Mercedes, Camarines Norte Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below, On Or Before 8:30am January 6, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 9:00 Am Of January 6, 2025 At The Bids And Awards Committee Office- Second Floor Jpl Sports Complex - Municipal Compound, Eco Avenue Street, Barangay 5, Mercedes, Camarines Norte. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Mercedes, Camarines Norte, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Macario B. Totanes Municipal Planning And Development Office Lgu Mercedes Municipal Compound, Barangay 5, Mercedes, Camarines Norte 0998-576-8321 Arsenia M. Ordiales Bac Secretariat Bids And Awards Committee Office 2nd Floor Jpl Sports Complex, Lgu Mercedes Municipal Compound, Barangay 5, Mercedes, Camarines Norte 0908-896-9684 Email Address: Lgubac.mercedes@yahoo.com 12. You May Visit The Website: For Downloading Of Bidding Documents: Www.mercedes.gov.ph December 13, 2024 ________________________________ Macario B. Totanes Bac Chairman
Closing Date6 Jan 2025
Tender AmountPHP 2.7 Million (USD 46.9 K)

National Farming Promotion Tender

Software and IT Solutions
Corrigendum : Closing Date Modified
Poland
Details: Ag.b.0162.1.2024.133.ak Kraków, Dn.19/07/2024 Price Inquiry Title: "service consisting in the renovation of PDOZ premises in Building No. E at ul. Mogilska 109, 31-571 Kraków” The proceedings are conducted pursuant to Art. 2(1), point 1 of the Act of September 11, 2019 - Public Procurement Law - hereinafter referred to as the Act and in accordance with Decision No. 58/2021 of the Provincial Police Commander in Krakow of November 4, 2021. I. General Information: 1. The offer should be sent by: July 29, 2024 by 12:00. In this way: Offers and all inquiries should be submitted by July 29, 2024 by 12:00. Via the Purchasing Platform to the address: https://malopolska-policja.eb2b.com.pl, "proceedings" tab - "list of open proceedings". In case of problems with submitting an offer, please contact the Eb2b Helpdesk - Contact in the footer of the website. 2. The Offer should be prepared in accordance with this Request. II. Description of the Subject of the Order: 1. The subject of the Order is the provision of a service consisting in the renovation of PDOZ rooms in Building No. E at ul. Mogilska 109, 31-571 Kraków. 2. The scope of the renovation includes: Renovation works in 3 Pdoz rooms, such as: Laying tiles on the walls of one room and painting the walls and ceilings in all 3 Pdoz rooms. The Ordering Party requires subdued colors of the rooms (white, gray, natural shades imitating sandstones found in stoneware tile collections). Under-tile waterproofing of all wall surfaces and wall joints with insulating/sealing tapes, and then vertical waterproofing with liquid foil. Execution of wall cladding - Rectified wall tiles, 9 mm thick, with water absorption not higher than 3%, made of unglazed porcelain stoneware of the "matt Full Body" type, dyed in the mass, arranged on the external corners of semi-circular plastic in a color similar to the color of the tiles. The joints should be filled with epoxy grout in a color similar to the selected porcelain tiles. The cladding materials used must be of quality I. Painting walls and ceilings with acrylic-composite, matte, stain-resistant Latex paint in light colors (acrylic-composite paint, with the highest class of resistance to washing and wet scrubbing, with increased resistance to stains and dust) . Painting metal door frames with oil paint in a color similar to the color of the tiles - 2.0 pcs. 3. Scope of work that needs to be done in connection with the renovation of the room The minimum allowance is: A) Making wall tiles from glazed tiles with a height of 2.0 m - Approx. . 25.0 M2, B) Vertical Waterproofing Coating – Approx. 25.0 M2, C) Laying Wall Tiles Up to a Height of 2.0 M – Approx. 25.0 M2, D) Local filling and painting of walls with washable paint – Approx. 72.0 M2, E) Local filling and painting of ceilings – Approx. 34.0 M2, F) Disassembly and reassembly of the washbasin with the faucet and siphon, and laying silicone around the washbasin - 1.0 pcs., G) Painting metal frames - 2 pcs. H) Removal of debris and dismantling waste. 4. The Works Will Be Performed in an Operating Facility. In connection with this, the Ordering Party requires that the Contractor, before commencing construction works, submit to the Ordering Party a list of persons who will perform the work as part of the Contractor's activities, providing the following data (name and surname, PESEL number) and a list of vehicles necessary to carry out the works (make and type Along with Providing Registration Numbers). The above requirement results from the fact that the works are to be carried out in an active police facility, parts of which can only be accessed by previously agreed persons. In the event of a need for new (additional) people to perform the work, the Contractor is obliged to inform the Ordering Party about this fact in advance, updating the list of people accordingly. In the case of countries other than Poland, please provide the Date of Birth, Father's Name and Passport Series and Number. The Ordering Party reserves the right to refuse to allow persons indicated by the Contractor to carry out the work. III. Conditions Relating to the Offer and Order Fulfillment: 1. The Price for the Service will be a lump sum and will be payable once upon completion of the order. 2. Payment for the execution of the order will be made within 30 days from the date of receipt of a correctly issued invoice - by transfer to the account indicated by the contractor. 3. It is possible (optionally) to carry out an on-site visit to the facility in order for the contractor to precisely determine the lump sum price for the provision of the service. Failure to conduct an on-site visit to the facility will not constitute grounds for rejection of the offer. The on-site visit will take place after prior arrangement with the Ordering Party. Order Completion Date: Order Completion Date Up to one month from the date of receipt of the order. The Date of Commencement of Works is to be agreed with the User of the Facility. In the event of untimely completion of the task by the Contractor, the Contractor will pay the Ordering Party a penalty of 0.5% of the Gross Order Value for each day of delay, but not more than 15% of the Gross Order Remuneration. Place of Order Fulfillment: Building No. E on the premises of the Municipal Police Headquarters in Kraków, ul. Mogilska 109, 31-571 Kraków Contact telephone numbers In the case: Provincial Police Headquarters in Kraków: 47–83–54–917 Iv. Criteria for Research, Evaluation and Selection of Offers: Lowest Price. V. Attachments: Offer template: Attachment No. 1
Closing Date10 Jan 2025
Tender AmountRefer Documents 
401-410 of 417 archived Tenders