VETERANS AFFAIRS, DEPARTMENT OF USA Tender
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Costs
Summary
C1da--459-310 Expand Renovate Center Recovery Program - Honolulu Vamroc- Design Services (va-24-00006942) Correct/clarify Submission Time To 1:00 Pm Hst On 1/11/2024.
Description
This Amendment No. 01 Corrects/clarifies The Submission Deadline Time On January 11, 2024 By 1:00 Pm Hst. this Is Not A Request For Proposal. This Is A Request For Standard Form (sf) 330 Architect-engineer Qualifications Packages Only. All Information Needed To Submit Sf 330 Documents Is Contained Herein. No Solicitation Package, Technical Information, Or Bidder/plan Holder List Will Be Issued. The Government Will Not Pay, Nor Reimburse, Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. 1. General Information veterans Health Administration (vha) Program Contracting Activity Central (pcac) Is Seeking Sources And Intends To Award A Firm Fixed Price Design Contract For Architect-engineering (a-e) Services For The Development Of Complete Construction Documents, Which Include Working Drawings, Specifications, Reports, And Construction Period Services For Project #459-310 Expand And Renovate Center For Aging To Support The Psychiatric Residential Recovery Program At The Spark M. Matsunaga Department Of Veteran's Affairs Medical Center In Honolulu, Hawaii. The A-e Services Contract That Is Anticipated To Be Awarded Will Be Procured In Accordance With The Selection Of Architects And Engineers Statute [formerly Known As The Brooks Architect Engineer Act], Federal Acquisition Regulation (far) Subpart 36.6 Architectural And Engineering Services, Va Acquisition Regulation (vaar) 836.6, And Va Acquisition Manual (vaam) M836.6 Architect-engineer Services. In Accordance With Far 36.209, Construction Contracts With Architect-engineer Firms, No Contract For The Construction Of A Project Shall Be Awarded To The Firm That Designed The Project Or Its Subsidiaries Or Affiliates, Except With The Approval Of The Head Of The Agency Or Authorized Representative. 2. Project Information this Project Is A 100% Set-aside For Service-disabled Veteran-owned Small Business (sdvosb) Concerns. The Naics Code For This Procurement Is 541310 Architectural Services And The Annual Small Business Size Standard Is $12.5 Million. A Full Design Team Is Required To Complete This Project. The Va Expects To Award The Anticipated A-e Contract In Early Calendar Year 2024. the Anticipated Period Of Performance For Completion Of Design Is 301 Calendar Days After Notice Of Award (noa). The Vaar Magnitude Of Construction Is Between $10,000,000 And $20,000,000. Please Note That The 301-calendar-day Period Of Performance For The Design Completion Begins With The Issuance Of The Noa And That A Notice To Proceed (ntp) Will Not Be Issued For The Completion Of A Design Project. 3. A-e Selection Process firms Submitting Sf 330s In Response To This Announcement, Not Later Than The Closing Date And Time Specified Herein And In Accordance With Submission Requirements, Will Be Considered For Evaluation. The Selection Will Be Made As Follows: sf 330s Will Be Evaluated In Accordance With The Primary Selection Criteria As Stated In This Pre-solicitation Notice. These Evaluations Will Determine The Most Highly Qualified Firms For This Particular Requirement. In Accordance With Far 36.602-3(c), At Least Three Of The Most Highly Qualified Firms Will Then Be Notified Of The Government S Intent To Hold Discussions. All Firms Not Invited To Participate In Discussions Will Be Notified At This Time. In Accordance With Far 36.607(b), Any Requested Debriefings Of Successful And Unsuccessful Firms Will Be Held After Final Selection Has Taken Place And Will Be Conducted, To The Extent Practicable, In Accordance With 15.503, 15.506(b) Through (f), And 15.507(c). Note That 15.506(d)(2) Through (d)(5) Do Not Apply To Architect-engineer Contracts. discussions Will Be Held With The Most Highly Qualified Firms In The Form Of Interviews. The Firms Invited To Participate In Discussions Will Be Notified By Email And Provided Further Instructions, Including Any Questions Or Topics To Address. Following The Completion Of Discussions, The Firms Will Be Evaluated And Ranked Based On The Primary And (if Necessary) Secondary Selection Criteria. The Final Evaluation And Ranking Will Consider The Sf 330 Submission For Each Firm, As Well As Additional Information Obtained Via Discussions. The Highest Rated Firm Will Be Selected To Receive The Solicitation And Engage In Negotiations. the Solicitation Will Be Issued To The Highest Rated Firm As A Request For Fee Proposal (rfp). All Sow Attachments And Site-specific Documentation Will Be Provided To The Highest Rated Firm With The Rfp. A Site Visit Will Be Authorized During The Negotiation Process. An Award Will Then Be Made As Long As The Negotiation Of Rates And Hours Leads To A Fair And Reasonable Determination Of The Final Contract Price. If Negotiations With The Highest Rated Firm Are Unsuccessful, The Firm Will Be Notified That Negotiations Have Been Terminated. Negotiations Will Then Be Initiated With The Next Highest Rated Firm, And So On Until Award Can Be Made. 4. Selection Criteria: firms Responding To This Notice Will Be Evaluated And Ranked Using The Primary And Secondary Selection Criteria Listed Below. The Factors Are Listed In Descending Order Of Importance. The Evaluation Will Consider How Each Factor Is Addressed And How It Is Formatted To Coincide With The Selection Criteria. primary Selection Criteria: professional Qualifications Necessary For Satisfactory Performance Of Required Service. The Design Firm And A-e On Staff Representing The Project Or Signing Drawings In Each Discipline Must Be Licensed To Practice In Any One Of The United States Of America. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Spec. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. key Positions And Disciplines Required For This Project Include, But Are Not Limited To: Architect (leed Certified), Registered Communications Distribution Designer (rcdd), Estimator, Civil Engineer, Electrical Engineer, Environmental Engineer, Fire Protection Engineer, Mechanical Engineer, Plumbing Engineer, Quality Assurance, Structural Engineer, And Physical Security Specialists. offer Must Include The Following Statement Of Sdvosb Compliance When Submitting The Personnel Proposed To Perform The Work Under This Requirement: I [signatory Authority] ___________________, [company] __________________, Certify That The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Vip-listed Sdvosbs In Compliance Of 48 Cfr 852.219-73. the Information Provided In Sections C Through E Of Sf 330 Will Be Used To Evaluate This Evaluation Factor. Do Not Include This Information In Section H, Unless It Is Pertinent To Support The Information Listed In The Other Sections. specialized Experience: Specialized Experience And Technical Competence In The Design And Construction Period Services Shall Be Provided For Network Infrastructure Installation, Renovations, Or Upgrades. Projects Experience Should Include Upgrading Large Scale (multi-building With Multiple Generational Oit Systems) Fiber Optics, Data Cable, Structured Cabling, Electrical Distribution Design, Electrical Upgrades, Uninterruptable Power Systems (ups), Electrical Bonding, Building Management Systems/building Automation Systems (bms/bas), Hvac, It Room Renovations/expansion/relocations, Data Centers/server Rooms Reconfiguration, And Physical Security Upgrades, Duct Bank And Direct Boring Operations. other Specialized Experience Includes Experience In Critical Path Scheduling, Fire Protection, Construction Infection Control Protocols, Energy Conservation, Transition, And Sustainable Design Practices. Include No More Than Six (6) Government And Private Experience Projects Similar In Size, Scope And Complexity, And Experience With The Types Of Projects Above. The Evaluation Will Consider The Management Approach, Coordination Of Disciplines And Subcontractors, Quality Control Procedures, Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On Relevant Projects And Familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. The Information Provided In Sections F And G Of The Sf 330 Will Be Used To Evaluate This Evaluation Factor. Do Not Include This Information In Section H, Unless It Is Pertinent To Support The Information Listed In The Other Sections. capacity: The Evaluation Will Consider The Firm S Ability To Meet The Compressed Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. Provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded By The Va During The Previous 12 Months And The Full Potential Value Of Any Current Indefinite Delivery Contracts. Offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Completion Percentages And Expected Completion Date For The Va Projects Awarded In The Previous 12 Months. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Team/personnel Provided In The Sf 330. past Performance: Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. The Past Performance Will Be Evaluated For All Projects Provided In Section F To Include A Review Of Contractor Performance Assessment Rating System (cpars). The Following Information Is Required For All Projects Noted In Section F: Contract/task Order Number, Project Title, Prime Firm, Start Date, And Completion Date. Evaluations May Also Include Additional Performance Related From The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. Evaluations Will Consider Superior Performance Ratings On Recently Completed Projects As Well As The Reputation And Standing Of The Firm And Its Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness. also, Consider, As Appropriate, The Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf 330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. If There Is No Cpars Data Available, Past Performance Questionnaires (ppqs) Will Be Accepted. Please Utilize The Attached Ppq Document. *completed Ppqs Should Be Incorporated Into The Sf330 Directly. Ppqs Should Not Be Submitted To Vha Pcac Directly. The Ppqs Will Not Be Counted Towards The Page Limitations For This Submission. knowledge Of Locality: Knowledge Of The Locality, To Include Specific Knowledge Of Certain Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. Note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Site And Locality, And Not Where The Firm Is Located And How They Would Travel To The Site. Information Related To The Firm S Location, Shall Be Provided In Section H, Under Secondary Selection Criterion, Geographic Location. experience In Construction Period Services Experience In Construction Period Services To Include Solicitation Support Services, Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, Support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates, Attendance At Weekly Conference Calls, Providing Minutes Of Meetings Between The Ae, Va, And Contractors, Pre-final Inspection Site Visits, Generation Of Punch-list Reports, Commissioning Services And Production Of As-built Documentation. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. secondary Selection Criterion*: geographic Location. Location Of The Firm, As Measured By The Distance (miles) Between The Offeror S Principal Business Location And The Spark M. Matsunaga Veteran S Affairs Medical Center, 459 Patterson Rd., Honolulu, Hi 96819. Determination Of The Mileage Will Be Based On Google Maps (https://www.google.com/maps/dir/). * The Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Discussions. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf 330 Submission Highly Qualified Or Not Highly Qualified. 5. Submission Requirements: the Below Information Contains The Instructions And Format That Must Be Followed For The Submission Of The Sf 330 Statement Of Qualifications: submit One (1) Sf 330 Statement Of Qualifications To Contract Specialist, Joelle Mascarenas, At Joelle.mascarenas@va.gov. This Must Include Parts I And Ii And Any Applicable Attachments. the Submission Must Include The Sf 330, Architect-engineer Qualifications (form Is Available Online At Https://www.gsa.gov/reference/forms/architectengineer-qualifications). the Sf 330 Submission Is Due By 1:00 Pm Hst On January 11, 2024. the Sf 330 Must Be Submitted In One Email And Have A File Size No Larger Than 5 Mb. No Hard Copies Will Be Accepted. the Subject Line Of The Email Must Read: Sf 330 Submission - 36c77624r0017 Honolulu Expand Renovate Center Recovery Program Design Project. the Sf 330 Submission Must Not Exceed A Total Of 50 Pages. This Includes Title Page, Table Of Contents, And Any Other Relevant Information. Any Pages Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. Each Page Must Be In Arial Size 12 Font, Single Spaced. Part Ii Of The Sf 330 And Any Cpars Or Ppqs Will Not Count Toward The Page Limitation. a Ppq Obtained For Another Sf 330 Submission May Be Submitted For This Project. However, If Significant Portions Of The Project Have Been Completed Since The Ppq Was Filled Out, A New Ppq Should Be Submitted To Accurately Assess The Project. firms Must Include The Following Information In Section B Of The Sf 330 Submission: 1) Sam Unique Entity Identifier 2) Tax Id Number 3) Cage Code 4) Primary Point Of Contact S Email Address And Phone Number all Questions Must Be Submitted To Joelle.mascarenas@va.gov With The Subject Line Sf 330 Questions - 36c77624r0017 Honolulu Expand Renovate Center Recovery Program Design Project. The Cutoff For Question Submission Is 1:00 Pm Hst On December 28, 2023. Questions Will Be Answered Through Amendment To The Pre-sol Notice Posted To Contract Opportunities At Sam.gov. this Procurement Is A 100% Set-aside For Sdvosb Concerns. Offers Received From Other Than Sdvosbs Will Not Be Considered. Offerors Must Be Certified As Sdvosbs By The U.s. Small Business Administration (sba) And Visible In The Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov/) At The Time Of Sf 330 Submission, Interview/discussions, And Award. Failure To Be Certified In The Vetcert Database At These Times Will Result In The Offeror Being Deemed Ineligible For Award. all Joint Ventures Must Be Sba-certified At The Time Of Sf 330 Submission, Interview/discussions, And Award And Must Submit Agreements That Comply With 13 Cfr 128.402 Prior To Contract Award. all Prime Firms Must Meet The Naics Code Requirement Specified In This Notice. The Contracting Officer Will Verify The Naics Code In Vetcert. Failure To Meet The Naics Code Requirement May Result In The Rejection Of The Sf 330 Submission. sf 330 Submissions Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. Firms Not Providing The Required Information May Not Be Evaluated. All Information Must Be Included In The Sf 330 Submission Package. it Is The Offeror S Responsibility To Check The Contract Opportunities Website At Sam.gov For Any Revisions To This Announcement Prior To Submitting Their Sf 330. end Of Document
Contact
Tender Id
36C77624R0017Bid Award Id
ViewTender No
36C77624R0017Tender Authority
VETERANS AFFAIRS, DEPARTMENT OF USA ViewPurchaser Address
-Website
http://beta.sam.gov