Vehicle Tenders
Vehicle Tenders
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n744.10|cfb|please Use Email|sherry.l.kaylor.civ@us.navy.mil |
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001|
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|see Schedule|tbd|see Schedule||tdb||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg |
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|335311|800 Emp|x|x||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
this Solicitation Is Issued Pursuant To Emergency Acquisition Flexibilities (eaf).
a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Sherry.l.kaylor.civ@us.navy.mil
b. General Requirements: Mil-std Packaging, Government Source Inspection Required.
c. All Freight Is Fob Origin.
d. This Rfq Is For A Buy/procurement. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor?s Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
e. Only A Firm-fixed Price (ffp) Will Be Accepted.
f. Must Adhere To Iuid Requirements Of Dfars 252.211-7003
g. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization.
h. Your Quote Should Include The Following Information For Justification Purposes:
- New Procurement Unit Price____________________
- Total Price _____________________
- Procurement Delivery Lead Time (ptat) _________________ Days
- Award To Cage _______________
- Inspection & Acceptance Cage, If Not At Award To Cage _____________
- Cost Breakdown Requested, Including Profit Rate (if Feasible).
- Quote Expiration Date _______________ (90 Days Minimum Is Requested).
- Delivery Vehicle (if Delivery Order Requested)(e.g. If Your Cage Has A Current Boa/idiq)
i. Important Traceability Notice:
if You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide An Official Letter And/or Email From The Oem Confirming That Your Company Is An Authorized Distributor Of Their Items.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cable Assembly,spec .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
drawing Data=ws6536 |30003| E| |d|0000 | E|49998|0010771
drawing Data=ws6536 |30003| E| |d|0001 | E|49998|0016415
drawing Data=ws6536 |30003| E| |d|0002 | E|49998|0017688
drawing Data=ws6536 |30003| E| |d|0003 | E|49998|0016334
drawing Data=ws6536 |30003| E| |d|0004 | E|49998|0027866
drawing Data=ws6536 |30003| E| |d|0005 | E|49998|0037260
drawing Data=ws6536 |30003| E| |d|0006 | E|49998|0037319
drawing Data=ws6536 |30003| E| |d|0007 | E|49998|0030189
drawing Data=ws6536 |30003| E| |d|0008 | E|49998|0033697
drawing Data=ws6536 |30003| E| |d|0009 | E|49998|0026793
drawing Data=ws6536 |30003| E| |d|0010 | E|49998|0022456
drawing Data=ws6536 |30003| E| |d|0011 | E|49998|0037153
drawing Data=ws6536 |30003| E| |d|0012 | E|49998|0024691
drawing Data=ws6536 |30003| E| |d|0013 | E|49998|0029589
drawing Data=ws6536 |30003| E| |d|0014 | E|49998|0015408
drawing Data=ws6536 |30003| E| |d|0015 | E|49998|0030197
drawing Data=ws6536 |30003| E| |d|0016 | E|49998|0032233
drawing Data=ws6536 |30003| E| |d|0017 | E|49998|0020760
drawing Data=ws6536 |30003| E| |d|0018 | E|49998|0013096
drawing Data=ws6536 |30003| E| |d|0019 | E|49998|0022933
drawing Data=ws6536 |30003| E| |d|0020 | E|49998|0032844
drawing Data=ws6536 |30003| E| |d|0021 | E|49998|0033000
drawing Data=ws6536 |30003| E| |d|0022 | E|49998|0015290
drawing Data=ws6536 |30003| E| |d|0023 | E|49998|0026111
drawing Data=ws6536 |30003| E| |d|0024 | E|49998|0018045
drawing Data=ws6536 |30003| E| |d|0025 | E|49998|0021755
drawing Data=ws6536 |30003| E| |d|0026 | E|49998|0011244
drawing Data=ws6536 |30003| E| |d|0027 | E|49998|0013588
drawing Data=ws6536 |30003| E| |d|0028 | E|49998|0019738
drawing Data=ws6536 |30003| E| |d|0029 | E|49998|0027640
drawing Data=ws6536 |30003| E| |d|0030 | E|49998|0010265
drawing Data=ws6536 |30003| E| |d|0031 | E|49998|0012222
drawing Data=ws6536 |30003| E| |d|0032 | E|49998|0021773
drawing Data=ws6536 |30003| E| |d|0033 | E|49998|0030134
drawing Data=ws6536 |30003| E| |d|0034 | E|49998|0027158
drawing Data=ws6536 |30003| E| |d|0035 | E|49998|0020239
drawing Data=ws6536 |30003| E| |d|0036 | E|49998|0026199
drawing Data=ws6536 |30003| E| |d|0037 | E|49998|0032083
drawing Data=ws6536 |30003| E| |d|0038 | E|49998|0013756
drawing Data=ws6536 |30003| E| |d|0039 | E|49998|0013406
drawing Data=ws6536 |30003| E| |d|0040 | E|49998|0014670
drawing Data=ws6536 |30003| E| |d|0041 | E|49998|0033474
drawing Data=ws6536 |30003| E| |d|0042 | E|49998|0016731
drawing Data=ws6536 |30003| E| |d|0043 | E|49998|0024937
drawing Data=ws6536 |30003| E| |d|0044 | E|49998|0016252
drawing Data=ws6536 |30003| E| |d|0045 | E|49998|0013265
drawing Data=ws6536 |30003| E| |d|0046 | E|49998|0022394
drawing Data=ws6536 |30003| E| |d|0047 | E|49998|0034868
drawing Data=ws6536 |30003| E| |d|0048 | E|49998|0034481
drawing Data=ws6536 |30003| E| |d|0049 | E|49998|0035941
drawing Data=ws6536 |30003| E| |d|005a | E|49998|0008378
drawing Data=ws6536 |30003| E| |d|0050 | E|49998|0010992
drawing Data=ws6536 |30003| E| |d|0051 | E|49998|0022778
drawing Data=ws6536 |30003| E| |d|0052 | E|49998|0018825
drawing Data=ws6536 |30003| E| |d|0053 | E|49998|0028727
drawing Data=ws6536 |30003| E| |d|0054 | E|49998|0035301
drawing Data=ws6536 |30003| E| |d|0055 | E|49998|0027590
drawing Data=ws6536 |30003| E| |d|0056 | E|49998|0025291
drawing Data=ws6536 |30003| E| |d|0057 | E|49998|0031367
drawing Data=ws6536 |30003| E| |d|0058 | E|49998|0037530
drawing Data=ws6536 |30003| E| |d|0059 | E|49998|0030892
drawing Data=ws6536 |30003| E| |d|0060 | E|49998|0040516
drawing Data=ws6536 |30003| E| |d|0061 | E|49998|0022115
drawing Data=ws6536 |30003| E| |d|0062 | E|49998|0028870
drawing Data=ws6536 |30003| E| |d|0063 | E|49998|0033641
drawing Data=ws6536 |30003| E| |d|0064 | E|49998|0035819
drawing Data=ws6536 |30003| E| |d|0065 | E|49998|0032881
drawing Data=ws6536 |30003| E| |d|0066 | E|49998|0031633
drawing Data=ws6536 |30003| E| |d|0067 | E|49998|0032841
drawing Data=ws6536 |30003| E| |d|0068 | E|49998|0036091
drawing Data=ws6536 |30003| E| |d|0069 | E|49998|0027637
drawing Data=ws6536 |30003| E| |d|007a | E|49998|0018311
drawing Data=ws6536 |30003| E| |d|0070 | E|49998|0030743
drawing Data=ws6536 |30003| E| |d|0071 | E|49998|0026680
drawing Data=ws6536 |30003| E| |d|0072 | E|49998|0036976
drawing Data=ws6536 |30003| E| |d|0073 | E|49998|0030400
drawing Data=ws6536 |30003| E| |d|0074 | E|49998|0027829
drawing Data=ws6536 |30003| E| |d|0075 | E|49998|0025967
drawing Data=ws6536 |30003| E| |d|0076 | E|49998|0021372
drawing Data=ws6536 |30003| E| |d|0077 | E|49998|0024032
drawing Data=ws6536 |30003| E| |d|0078 | E|49998|0025722
drawing Data=ws6536 |30003| E| |d|0079 | E|49998|0021230
drawing Data=ws6536 |30003| E| |d|0080 | E|49998|0021969
drawing Data=ws6536 |30003| E| |d|0081 | E|49998|0021491
drawing Data=ws6536 |30003| E| |d|0082 | E|49998|0031375
drawing Data=ws6536 |30003| E| |d|0083 | E|49998|0027202
drawing Data=ws6536 |30003| E| |d|0084 | E|49998|0008512
drawing Data=ws6536 |30003| E| |d|0085 | E|49998|0004926
drawing Data=ws6536 |30003| E| |d|0086 | E|49998|0074745
drawing Data=ws6536 |30003| E| |d|0087 | E|49998|0030595
drawing Data=ws6536 |30003| E| |d|0088 | E|49998|0030881
drawing Data=ws6536 |30003| E| |d|0089 | E|49998|0058392
drawing Data=ws6536 |30003| E| |d|0090 | E|49998|0065801
drawing Data=ws6536 |30003| E| |d|0091 | E|49998|0052362
drawing Data=ws6536 |30003| E| |d|0092 | E|49998|0065627
drawing Data=ws6536 |30003| E| |d|0093 | E|49998|0103313
drawing Data=ws6536 |30003| E| |d|0094 | E|49998|0100745
drawing Data=ws6536 |30003| E| |d|0095 | E|49998|0054231
drawing Data=ws6536 |30003| E| |d|0096 | E|49998|0063738
drawing Data=ws6536 |30003| E| |d|0097 | E|49998|0110005
drawing Data=ws6536 |30003| E| |d|0098 | E|49998|0105315
drawing Data=ws6536 |30003| E| |d|0099 | E|49998|0062527
drawing Data=ws6536 |30003| E| |d|0100 | E|49998|0041252
drawing Data=ws6536 |30003| E| |d|0101 | E|49998|0011024
drawing Data=ws6536 |30003| E| |d|0102 | E|49998|0022481
drawing Data=ws6536 |30003| E| |d|0103 | E|49998|0012965
drawing Data=ws6536 |30003| E| |d|0104 | E|49998|0015719
drawing Data=ws6536 |30003| E| |d|0105 | E|49998|0020372
drawing Data=ws6536 |30003| E| |d|0106 | E|49998|0010848
drawing Data=ws6536 |30003| E| |d|0107 | E|49998|0024405
drawing Data=ws6536 |30003| E| |d|0108 | E|49998|0030975
drawing Data=ws6536 |30003| E| |d|0109 | E|49998|0027138
drawing Data=ws6536 |30003| E| |d|011a | E|49998|0027764
drawing Data=ws6536 |30003| E| |d|0110 | E|49998|0029391
drawing Data=ws6536 |30003| E| |d|0111 | E|49998|0027850
drawing Data=ws6536 |30003| E| |d|0112 | E|49998|0027355
drawing Data=ws6536 |30003| E| |d|0113 | E|49998|0024498
drawing Data=ws6536 |30003| E| |d|0114 | E|49998|0015049
drawing Data=ws6536 |30003| E| |d|0115 | E|49998|0026461
drawing Data=ws6536 |30003| E| |d|0116 | E|49998|0028845
drawing Data=ws6536 |30003| E| |d|0117 | E|49998|0026155
drawing Data=ws6536 |30003| E| |d|0118 | E|49998|0025885
drawing Data=ws6536 |30003| E| |d|0119 | E|49998|0027184
drawing Data=ws6536 |30003| E| |d|012a | E|49998|0009929
drawing Data=ws6536 |30003| E| |d|0120 | E|49998|0028317
drawing Data=ws6536 |30003| E| |d|0121 | E|49998|0019263
drawing Data=ws6536 |30003| E| |d|0122 | E|49998|0029208
drawing Data=ws6536 |30003| E| |d|015a | E|49998|0014954
drawing Data=ws6536 |30003| E| |d|048a | E|49998|0015985
drawing Data=ws6536 |30003| E| |d|051a | E|49998|0010734
drawing Data=ws6536 |30003| E| |d|054a | E|49998|0006844
drawing Data=ws6536 |30003| E| |d|068a | E|49998|0007854
drawing Data=5528078 |53711| -| |d|0001 | -|49998|0065063
drawing Data=5528078 |53711| -| |d|0002 | -|49998|0073431
drawing Data=5528078 |53711| -| |d|0003 | -|49998|0078148
drawing Data=5528078 |53711| -| |d|0004 | -|49998|0080725
drawing Data=5528078 |53711| -| |d|0005 | -|49998|0068108
drawing Data=5528078 |53711| -| |d|0006 | -|49998|0071819
drawing Data=5727573 |53711| C| |d|0001 | C|49998|0081448
drawing Data=5727573 |53711| C| |d|0002 | C|49998|0072228
drawing Data=5727573 |53711| C| |d|0003 | C|49998|0056328
drawing Data=5727573 |53711| C| |d|0004 | C|49998|0082674
drawing Data=5727573 |53711| C| |d|0005 | C|49998|0068071
drawing Data=5727573 |53711| C| |d|0006 | C|49998|0067326
drawing Data=5727573 |53711| C| |d|0007 | C|49998|0039199
drawing Data=5727573 |53711| C| |d|0008 | C|49998|0032135
drawing Data=5727573 |53711| C| |d|0009 | C|49998|0047193
drawing Data=5727573 |53711| C| |d|0010 | C|49998|0109287
drawing Data=5727573 |53711| C| |d|0011 | C|49998|0031263
drawing Data=5727573 |53711| C| |d|0012 | C|49998|0037875
drawing Data=5727573 |53711| C| |d|0013 | C|49998|0035904
drawing Data=5727573 |53711| C| |d|0014 | C|49998|0029194
drawing Data=5727573 |53711| C| |d|0015 | C|49998|0033416
drawing Data=5727573 |53711| C| |d|0016 | C|49998|0036036
drawing Data=5727573 |53711| C| |d|0017 | C|49998|0041405
drawing Data=5727573 |53711| C| |d|0018 | C|49998|0030864
drawing Data=5727573 |53711| C| |d|0019 | C|49998|0046536
drawing Data=5727573 |53711| C| |d|0020 | C|49998|0034148
drawing Data=5727573 |53711| C| |d|0021 | C|49998|0068847
drawing Data=5727573 |53711| C| |d|0022 | C|49998|0053652
drawing Data=5727573 |53711| C| |d|0023 | C|49998|0044018
drawing Data=5727573 |53711| C| |d|0024 | C|49998|0062166
drawing Data=5727573 |53711| C| |d|0025 | C|49998|0064146
drawing Data=5727573 |53711| C| |d|0026 | C|49998|0044757
drawing Data=5727573 |53711| C| |d|0027 | C|49998|0051027
drawing Data=5727573 |53711| C| |d|0028 | C|49998|0080805
drawing Data=5727573 |53711| C| |d|0029 | C|49998|0068028
drawing Data=5727573 |53711| C| |d|0030 | C|49998|0068980
drawing Data=5727573 |53711| C| |d|0031 | C|49998|0097232
drawing Data=5727596 |53711| B|fn |d|0001 | B|49998|0307060
drawing Data=5727670 |53711| A| |d|0001 | A|49998|0052596
drawing Data=5727670 |53711| A| |d|0002 | A|49998|0041867
drawing Data=5727670 |53711| A| |d|0003 | A|49998|0031465
drawing Data=5729277 |53711| M|fn |d|0001 | M|49998|0079488
drawing Data=5729277 |53711| M|pl |d|0001 | M|49998|0025368
drawing Data=5729277 |53711| M|pl |d|0002 | M|49998|0037670
drawing Data=5729277 |53711| M|pl |d|0003 | M|49998|0010565
drawing Data=5729368 |53711| A|fn |d|0001 | A|49998|1062944
drawing Data=5729374 |53711| -| |d|0001 | -|49998|0052363
drawing Data=5729374 |53711| -| |d|0002 | -|49998|0059005
drawing Data=5729374 |53711| -| |d|0003 | -|49998|0047272
drawing Data=5729374 |53711| -| |d|0004 | -|49998|0050506
drawing Data=5729374 |53711| -| |d|0005 | -|49998|0052728
drawing Data=5729382 |53711| A|fn |d|0001 | A|49998|0382277
drawing Data=5729428 |53711| A| |d|0001 | A|49998|0058563
drawing Data=5729428 |53711| A| |d|0002 | A|49998|0084786
drawing Data=5729428 |53711| A| |d|0003 | A|49998|0084041
drawing Data=5729428 |53711| A| |d|0004 | A|49998|0078077
drawing Data=5729428 |53711| A|pl |d|0001 | A|49998|0015384
drawing Data=5729428 |53711| A|pl |d|0002 | A|49998|0037266
drawing Data=5729445 |53711| E|fn |d|0001 | E|49998|9999999
drawing Data=5729941 |53711| A| |d|0001 | A|49998|0141085
drawing Data=5729941-7 |53711| A|pl |d|0001 | A|49998|0027691
drawing Data=6239880 |53711| C|fn |d|0001 | C|49998|0181784
drawing Data=6558346 |53711| A| |d|0000.c0v | A|49998|0020797
drawing Data=6558346 |53711| A| |d|0000.i | A|49998|0017283
drawing Data=6558346 |53711| A| |d|0000.ii | A|49998|0016020
drawing Data=6558346 |53711| A| |d|0000.iii | A|49998|0040970
drawing Data=6558346 |53711| A| |d|0000.iv | A|49998|0037760
drawing Data=6558346 |53711| A| |d|0000.v | A|49998|0018755
drawing Data=6558346 |53711| A| |d|0001 | A|49998|0044386
drawing Data=6558346 |53711| A| |d|0002 | A|49998|0035575
drawing Data=6558346 |53711| A| |d|0003 | A|49998|0052310
drawing Data=6558346 |53711| A| |d|0004 | A|49998|0063782
drawing Data=6558346 |53711| A| |d|0005 | A|49998|0066192
drawing Data=6558346 |53711| A| |d|0006 | A|49998|0058663
drawing Data=6558346 |53711| A| |d|0007 | A|49998|0073076
drawing Data=6558346 |53711| A| |d|0008 | A|49998|0018726
drawing Data=6558346 |53711| A| |d|0009 | A|49998|0015898
drawing Data=6558346 |53711| A| |d|0010 | A|49998|0020259
drawing Data=6558346 |53711| A| |d|0011 | A|49998|0055953
drawing Data=6558346 |53711| A| |d|0012 | A|49998|0019773
drawing Data=6558346 |53711| A| |d|0013 | A|49998|0042533
drawing Data=6558346 |53711| A| |d|0014 | A|49998|0069692
drawing Data=6558346 |53711| A| |d|0015 | A|49998|0067183
drawing Data=6558346 |53711| A| |d|0016 | A|49998|0040306
drawing Data=6558346 |53711| A| |d|0017 | A|49998|0043966
drawing Data=6558346 |53711| A|1n |d|0001 | A|49998|0055725
drawing Data=6558346 |53711| A|1n |d|0002 | A|49998|0020551
drawing Data=6558346 |53711| A|1n |d|0003 | A|49998|0027304
drawing Data=6558346 |53711| A|1n |d|0004 | A|49998|0023509
drawing Data=6558346 |53711| A|1n |d|0005 | A|49998|0019763
drawing Data=6558346 |53711| A|1n |d|0006 | A|49998|0025462
drawing Data=6558346 |53711| A|1n |d|0007 | A|49998|0022227
document Ref Data=mil-std-129 | | |p |041029|a| |03|
document Ref Data=iso9001 | | | |010417|a| | |
document Ref Data=mil-std-973 | | | |950113|a| |03|
3. Requirements
3.1 Design, Manufacture, And Performance - Except As Modified Herein,
the Cable Assembly,spec Furnished Under This Contract/purchase Order Shall Meet The
design, Manufacture, And Performance Requirements Specified On Drawing ;53711 5729277;
cage ; .
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-129; .
3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority.
Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below.
The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788.
Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001.
4.2.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To
mil-i-45208 Are Granted Permission To Utilize This If Desired.;
4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
Closing Date21 Jan 2025
Tender AmountRefer Documents
Moravskoslezsky Region Road Administration, Contribution Organization Tender
Civil And Construction...+1Civil Works Others
Czech Republic
Details: The Subject of the Public Procurement is the Conclusion of a Contract for Works with a Single Supplier for the Construction of a Temporary Roundabout of Mostní X Frýdecká Streets in the Area of Existing Paved Areas Managed by the Contracting Authority. A Combination of Horizontal and Vertical Markings Together with Traffic Equipment is Used for the Design. Technical Specification: Within the Existing Area, It Is Possible to Place a Mesh with a Max. External Diameter of 19.50 M in Place. The Middle Island Is Designed from Concrete City Block Elements of 1.0 M Length, Which Will Be Placed According to the Trajectories of the Passage of the Longest Vehicle Considered in the Place, Which May Be a Bus of 15.00 M Length or a Semi-trailer. The classic concrete ring road is proposed to be replaced by installing short transverse speed bumps, which will direct passing vehicles (especially passenger and delivery vehicles) to the proposed ring road. The islands at the entrance to the intersection are proposed to be made from a combination of Vdz V4 0.25 and V13, in which a plastic beacon Honor will be placed. The minimum width of the entrance lane to the intersection is designed to be 4.05 m. In the direction of travel from Ul. Mostní to Ul. Pulnicíté, a modification is then designed from City Block elements with a length of 2.0 m, limiting the tangential passage of vehicles in this direction. The proposed solution is graphically shown in drawing number 1. The trajectories of the selected vehicles are shown in drawing number 2. The marking of the traffic signs is shown in drawing number 3. All these drawings are part of the processed project documentation.
Closing Date13 Jan 2025
Tender AmountCZK 430 K (USD 17.6 K)
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Contact Information|4|n792.14|ja1|see Email|helen.i.carmelo.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00383|tbd|tbd|see Schedule|see Schedule|see Schedule||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|1 Year After Date Of Delivery|45 Days From Discovery Of Defect|||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|335314|750 Emp|||||||||||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^
all Freight Is Fob Origin.
this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
the Government Is Seeking A Repair Turnaround Time (rtat) Of: 152 Days
government Source Inspection (gsi) Is Required.
please Note Freight Is Handled By The Navy As Per The Commercial Asset Visibility (cav) Statement Of Work.
your Quote Should Include The Following Information:
Quote Amount And Rtat
- Unit Price:__________
- Total Price:__________
- Repair Turnaround Time (rtat): _______ Days
if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This
contract.
Check One: Firm-fixed-price ___ Estimated ___ Not-to Exceed (nte): ___
Return Material Authorization # (rma), If Applicable:__________
Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________
Testing And Evaluation If Beyond Repair
T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to
exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment.
The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________.
Awardee Info & Performance Location
- Awardee Cage: __________
Inspection & Acceptance Cage, If Not Same As "awardee Cage": __________
Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As "awardee Cage":__________
Iot Compare Repair Price To Price To Buy New
New Unit Price:__________
New Unit Delivery Lead-time:__________
important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A
price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section
shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default.
in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
relay,electromagnet ;b-461g; P/n, ;014755859; Nsn, ;iaw Applicable Manuals; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
relay,electromagnet ;te Connectivity Corporation; Company Name , ;175 N Diamond St Mansfield Oh 44902 ; Address , ;74063; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent.
responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified
herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein.
procedures:the Contractor Shall Prepare And Maintain Quality Control
documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The
performance Spcifications To Perform The Procedures.
quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which
compliance With Contractual Requirements
will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request.
purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub
contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil
either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002).
receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For
government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material,
finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings.
failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government.
nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition.
contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or
specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification.
material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer.
responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection
requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective
items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items.
repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And
quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing.
records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's
and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records:
receipt Inspection Documentation.
repair Shop Travelers Or Repair Cards.
parts Replacement Records.
parts Inspection Data Before And After Repair As Applicable.
acceptance Test Data.
qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair
re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date14 Jan 2025
Tender AmountRefer Documents
Amt Joachimsthal Schorfheide Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Germany
Details: The Joachimsthal (Schorfheide) office is advertising the planning services in accordance with Hoai for the construction of a new fire station including multifunctional rooms in the municipality of Althüttendorf with object planning, outdoor facilities, structural planning, technical equipment and special services in the form of a negotiated award with participation competition. The new station is to have three parking spaces for emergency vehicles. In the future, it is to serve as a new home for 20 male and 10 female comrades. 1. Content of the room concept: The fire station is to meet the requirements of DIN 14092 and correspond to at least the following room program: - Three vehicle parking spaces - Equipment room - Storage room - Changing rooms separated by gender - An office - A tea kitchen - A multifunctional and training room A detailed room concept has already been drawn up as part of the preliminary planning and will be made available as an appendix as part of the award procedure. 2. Current planning status: Planning services for service phases 1 to 4 were provided by a commissioned architectural firm. Planning documents prepared will be made available as part of the tendering process. They will be handed over in DXF format when the order is placed. 3. Approval status: The building permit for the originally planned building with two parking spaces was issued by the lower building supervisory authority on January 22, 2024. When the planning was expanded to include the third parking space, a corresponding addendum was applied for on November 5, 2024. An approval notice has been available for this since December 13, 2024. All application and approval documents will be handed over after the order has been placed.
Closing Date15 Jan 2025
Tender AmountRefer Documents
POLREGIO S A Tender
Others...+1Electrical and Electronics
Poland
Details: Polregio SA Małopolski Plant In Krakow Invites Contractors With Knowledge And Experience In The Subject Of The Order To Submit Price Information For The Supply Of: 1. Cd5 Camera - 2 Pieces Per Vehicle En63a Place of Delivery: Polregio SA Małopolski Plant In Krakow Rolling Stock Maintenance Section - Hall Ul. Kolejowa 4 30-805 Krakow Conditions: - Delivery Cost On The Contractor's Side, - Payment 30 Days From The Date Of Receipt Of A Correctly Prepared Invoice - Brand New Product Please Also Specify The Deadline For Order Completion. We hereby inform you that in accordance with: A) Art. 7 Sec. 1 of the Act of 13 April 2022 on Specific Solutions for Counteracting Support for Aggression Against Ukraine and Protecting National Security (Journal of Laws of 2022, item 835), B) Art. 5k of Council Regulation (EU) No. 833/2014 of 31 July 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (Journal of Laws of the EU No. L 229 of 31.7.2014, p. 1). The Contractor Selected to Perform the Order Will Be Obliged to Submit a Declaration on the Lack of Grounds for Exclusion - a template of the Declaration is located in the Attachments folder. The Ordering Party reserves: - The right to cancel the procedure at any stage (without selecting the offers) without giving a reason, - The possibility of changing the terms of the conducted inquiry for price information before the deadline for submitting offers. This inquiry does not constitute an offer within the meaning of the Civil Code. In the "attachments" tab you will find: - GDPR information clause - Contractor's declaration template - Illustrative photos of the camera and nameplate The procedure is multi-stage and includes submitting an offer and conducting negotiations.
Closing Date22 Jan 2025
Tender AmountNA
Landkreis Ravensburg Tender
Germany
Details: The Ravensburg District Intends To Act As The Responsible Authority And Responsible Authority In Accordance With Section 6 Paragraph 1 Of The Act On The Planning, Organization And Design Of Local Public Transport (öpnvg) I.v.m. § 8a Passenger Transport Act (pbefg) And Art. 2 Lit. The Subject Of The Intended Öda Are Public Passenger Transport Services (öpnv) On The R60 Line. The Transport Services Included At The Start Of Operations (see Section Ii.2.7) Are Described In The Supplementary Document (see Section Vi.1, D.). The Intended Award Concerns The Service Area In The Ravensburg District Covered By The Aforementioned Transport Services. In Total, According To The Current Planning Status, The Transport Services To Be Awarded Amount To Around 125,376 Commercial Vehicle Kilometers Per Year. The Öda Refers Here To Local Public Transport Services (öpnv) Within The Meaning Of § 8 Pbefg, Regardless Of The Design Of The Operating Form In Detail (in Particular Regular Service I. S. V. §§ 42, 43 Pbefg And Flexible Operating Forms, If Necessary Also Within The Meaning Of § 46 I. V. M. § 2 Paragraph 6 Or 7 Pbefg). The Operator Is Granted An Exclusive Right For Transport Within The Limits Of Section 8a Paragraph 8 Pbefg. The Öda Will Contain Regulations According To Which The Transport Offer Within The Framework Specified In The Öda Is Adapted To Changing Transport Needs Or Financial Conditions And To The Local Transport Plan For The Ravensburg District In Its Current Version As Well As To Other Changing Circumstances (such As Technical Developments, Concerns Of The Environmental And Climate Protection, Introduction Of Additional Public Transport) Needs To Be Adapted. The Possible Changes Relate To The Type And Scope As Well As The Quality Of The Transport Services And The Transport Tariffs. This Can Result In Changes Both In Terms Of The Inventory And Availability Of The Above-mentioned Line As Well As In Terms Of The Timetable And Fares Offered, In Terms Of The Form Of Service (regular Line Operation Or Flexible Forms Of Operation) Or In Terms Of Other Aspects Such As: Vehicle And Other Quality Standards. As A Result, The Above-mentioned Line May Change, New Lines May Be Added Or Current Lines May Be Eliminated. The Amount Of Traffic Recorded By The Öda Can Be Reduced Or Increased. With This Information, The Ravensburg District Complies With The Publication Obligation In Accordance With Section 8a Paragraph 2 Pbefg I.v.m. Art. 7 Para. 2 Regulation (ec) No. 1370/2007 After. For Further Details And With Regard To The Deadline According To Section 12 Paragraph 6 Sentence 1 Pbefg, Please Refer To The Statements Under Section Vi.1). This Advance Notice Also Represents A Notice In Accordance With Section 135 Paragraph 3 Sentence 1 No. 2 Gwb. The Reason For The Client's Decision To Award The Contract Without Prior Publication Of A Notice In The Eu Official Journal Is That There Is A Permissible Minor Award In Accordance With Article 5 Paragraph 4 Of Regulation (ec) No. 1370/2007. The Öda Will Contain Regulations That Ensure That The Award Requirements Of Art. 5 Para. 4 Vo (ec) No. 1370/2007 Are Met For The Entire Period Of The Öda. An Application For Review Against The Planned Direct Award Can Be Submitted To The Baden-württemberg Public Procurement Chamber (karlsruhe Regional Council, Durlacher Allee 100, 76137 Karlsruhe, Tel: +49 721 / 926-8730, Fax: +49 721 / 926-3985) Until The Contract Is Awarded Become. The Öda Can Be Awarded After One Year (art. 7 Para. 2 Vo (ec) No. 1370/2007).
Closing Date8 Jan 2025
Tender AmountRefer Documents
POLREGIO S A Tender
Others
Poland
Details: Polregio SA Małopolski Plant In Krakow Invites Contractors With Knowledge And Experience In The Subject Of The Order To Submit Price Information For The Supply Of: 1. Hose 25x820 36-36 With Spiral - 1 Piece On Vehicle En63a Place of Delivery: Polregio SA Małopolski Plant In Krakow Rolling Stock Maintenance Section - Hall Ul. Kolejowa 4 30-805 Krakow Conditions: - Delivery Cost On The Contractor's Side, - Payment 30 Days From The Date Of Receipt Of A Correctly Prepared Invoice - Brand New Product Please Also Specify The Deadline For Order Completion. We hereby inform you that in accordance with: A) Art. 7 Sec. 1 of the Act of 13 April 2022 on Specific Solutions for Counteracting Support for Aggression Against Ukraine and Protecting National Security (Journal of Laws of 2022, item 835), B) Art. 5k of Council Regulation (EU) No. 833/2014 of 31 July 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (Journal of Laws of the EU No. L 229 of 31.7.2014, p. 1). The Contractor Selected to Perform the Order Will Be Obliged to Submit a Declaration on the Lack of Grounds for Exclusion - a template of the Declaration is located in the Attachments folder. The Ordering Party reserves: - The right to cancel the procedure at any stage (without selecting the offers) without giving a reason, - The possibility of changing the terms of the conducted inquiry for price information before the deadline for submitting offers. This inquiry does not constitute an offer within the meaning of the Civil Code. In the "attachments" tab you will find: - GDPR Information Clause - Contractor's Declaration Template - Illustrative photos of the snake The procedure is multi-stage and includes submitting an offer and conducting negotiations.
Closing Date14 Jan 2025
Tender AmountNA
POLREGIO S A Tender
Others
Poland
Details: Polregio SA Małopolski Plant In Krakow Invites Contractors With Knowledge And Experience In The Subject Of The Order To Submit Price Information For The Supply Of: 1. Spring Shock Absorber Lift-o_mat 2362li by Stabilus - 1 Piece Necessary To Repair The Lift For Disabled People On The En63a Vehicle Place of Delivery: Polregio SA Małopolski Plant In Krakow Rolling Stock Maintenance Section - Hall Ul. Kolejowa 4 30-805 Krakow Conditions: - Delivery Cost On The Contractor's Side, - Payment 30 Days From The Date Of Receipt Of A Correctly Prepared Invoice - Brand New Product Please Also Specify The Deadline For Order Completion. We hereby inform you that in accordance with: A) Art. 7 Sec. 1 of the Act of 13 April 2022 on Specific Solutions for Counteracting Support for Aggression Against Ukraine and Protecting National Security (Journal of Laws of 2022, item 835), B) Art. 5k of Council Regulation (EU) No. 833/2014 of 31 July 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (Journal of Laws of the EU No. L 229 of 31.7.2014, p. 1). The Contractor Selected to Perform the Order Will Be Obliged to Submit a Declaration on the Lack of Grounds for Exclusion - a template of the Declaration is located in the Attachments folder. The Ordering Party reserves: - The right to cancel the procedure at any stage (without selecting the offers) without giving a reason, - The possibility of changing the terms of the conducted inquiry for price information before the deadline for submitting offers. This inquiry does not constitute an offer within the meaning of the Civil Code. In the "attachments" tab you will find: - GDPR information clause - Contractor's declaration template The procedure is multi-stage and includes submitting an offer and conducting negotiations.
Closing Date13 Jan 2025
Tender AmountNA
POLREGIO S A Tender
Electrical and Electronics...+1Electrical Works
Poland
Details: Polregio SA Małopolski Plant In Krakow Invites Contractors With Knowledge And Experience In The Subject Of The Order To Submit Price Information For The Supply Of: 1. Pressure switches 7.7 Bar Knorr Bremse Ii80876/09077 - 2 Pieces Responsible For Controlling The Main Compressor On The Vehicle En63a Place of Delivery: Polregio SA Małopolski Plant In Krakow Rolling Stock Maintenance Section - Hall Ul. Kolejowa 4 30-805 Krakow Conditions: - Delivery Cost On The Contractor's Side, - Payment 30 Days From The Date Of Receipt Of A Correctly Prepared Invoice - Factory New Product Please Also Specify The Deadline For Order Completion. We hereby inform you that in accordance with: A) Art. 7 Sec. 1 of the Act of 13 April 2022 on Specific Solutions for Counteracting Support for Aggression Against Ukraine and Protecting National Security (Journal of Laws of 2022, item 835), B) Art. 5k of Council Regulation (EU) No. 833/2014 of 31 July 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (Journal of Laws of the EU No. L 229 of 31.7.2014, p. 1). The Contractor Selected to Perform the Order Will Be Obliged to Submit a Declaration on the Lack of Grounds for Exclusion - a template of the Declaration is located in the Attachments folder. The Ordering Party reserves: - The right to cancel the procedure at any stage (without selecting the offers) without giving a reason, - The possibility of changing the terms of the conducted inquiry for price information before the deadline for submitting offers. This inquiry does not constitute an offer within the meaning of the Civil Code. In the "attachments" tab you will find: - GDPR information clause - Contractor's declaration template - Illustrative photo The procedure is multi-stage and includes submitting an offer and conducting negotiations.
Closing Date3 Jan 2025
Tender AmountNA
Brandenburgischer Landesbetrieb F r Liegenschaften Und Bauen Zentrale Vergabestelle Tender
Civil And Construction...+1Civil Works Others
Germany
Details: General contractor service for the planning and construction of a laboratory building for the Hne Eberswalde Planning (from service phase 5) and construction of a new laboratory building on the forest campus for the Eberswalde University for Sustainable Development, funded with ERDF funds, with the following key features: - Building with basement and three upper floors, with laboratories, workshops, technical test areas and office and meeting rooms - BGF 6,560 m², Bri 37,485 m³, 2,700 m² laboratory and office space - Challenging subsoil situation with groundwater lowering and infiltration in the forest - Load-bearing external walls (ug) made of reinforced concrete D = 35 cm in accordance with statics including formwork and reinforcement. Timber frame construction on the upper floors (standard grid 3.60m x 6.00m) with load-bearing timber supports (bsh) and some reinforced concrete supports (each 35x35cm) in the external wall area (eg). The stiffening stairwell cores and shafts are built in reinforced concrete D = 25cm, as are parts of the hall's external wall - Sophisticated technology, particularly ventilation systems, laboratory systems and building automation - Construction according to BNB criteria, silver standard certification - Extensive outdoor facilities including rainwater infiltration, local heating pipes, sewage and rainwater pipes, accessible by vehicle - With accessible hall - Photovoltaics on the roof - Refrigeration machine and heat pumps on the roof If you are interested in the above service, please send your expression of interest by email, stating the award number 2025 Hne, to Info.vergabe-bld@blb.brandenburg.de. This voluntary ex-ante transparency notice does not serve to initiate a formal procurement procedure. It merely serves to explore a possible group of bidders.
Closing Date18 Jan 2025
Tender AmountRefer Documents
7461-7470 of 7483 archived Tenders