Details: B.3 Statement Of Work
replacement And Testing Of Backflow Preventers
objective
the Purpose Of This Service Contract Is To Inspect, Test, And Repair Any Failed Backflow Preventers At Veterans Hospital At 10 North Greene St, Baltimore, Maryland, And Va Medical Center At 3901 The Alameda, Baltimore Md 21218 To Ensure Compliance With The Latest Plumbing And Safety Standards. Testing Must Be Conducted By A Certified Backflow Inspector, And All Repairs Or Replacements Must Meet Applicable Codes To Protect Potable Water Systems And Maintain Operational Safety.
applicable Standards
all Work Shall Adhere To The Latest Editions Of The Following:
american Society Of Sanitary Engineering (asse) Standards, Including Asse 1013 And Asse 1024.
uniform Plumbing Code (upc) Or International Plumbing Code (ipc) As Applicable.
environmental Protection Agency (epa) Cross-connection Control Manual.
manufacturer Specifications For All Backflow Preventers.
hospital Infection Control Protocols, Including Infection Control Risk Assessment (icra) Guidelines.
occupational Safety And Health Administration (osha) Standards.
general-duty Valves For Plumbing Piping Https://www.cfm.va.gov/til/spec/220523.docx
scope Of Work
the Contractor Shall Provide Certified Personnel And Follow The Steps Outlined Below:
pre-inspection Activities:
review Existing Plumbing Schematics And Previous Inspection Records To Locate All Backflow Preventers.
collaborate With Hospital Staff To Coordinate Inspection And Repair Schedules, Ensuring Minimal Disruption To Operations And Water Services.
develop And Submit An Infection Control Risk Assessment (icra) Plan To Hospital Management For Approval.
inspection And Testing:
perform A Visual Inspection Of All Backflow Preventers To Assess General Condition, Installation Compliance, And Any Visible Damage Or Corrosion.
before Testing Backflow Preventer, Shut Off The Water Supply To The Plumbing System. Notify Fes (facilities And Engineering) Poc Staff To Conduct A Proper Utility System Shutdown Where Applicable.
certified Backflow Inspector(s) Shall Conduct Functional Testing On Each Device Using Calibrated And Approved Testing Equipment.
verify Proper Pressure, Flow, And Valve Operation.
document Test Results, Noting Any Failures Or Performance Issues.
identify And Tag All Failed Backflow Preventers For Repair Or Replacement:
provide A Detailed Quote For The Necessary Work To Bring Any Non-compliant Backflow Preventers Up To The Compliance.
include A Breakdown Of Labor, Materials, And Any Other Costs Associated With The Repair Work.
repair Or Replacement Of Failed Units:
before Repair Or Replacement Backflow Preventer, Shut Off The Water Supply To The Plumbing System. Notify Fes (facilities And Engineering) Poc Staff To Conduct Utility System Shutdown Where Applicable.
repair Failed Backflow Preventers Using Manufacturer-approved Repair Kits And Materials.
if Repair Is Not Feasible, Replace The Failed Unit With A New Backflow Preventer Of Equivalent Or Superior Specifications.
ensure All Installations Are Properly Secured, Leak-free, And In Compliance With Plumbing Codes.
conduct A Post-repair Performance Test To Confirm Proper Operation And Compliance.
post-repair Activities:
restore All Work Areas To Their Original Condition Or Better, Including Any Necessary Patching Or Painting.
remove And Dispose Of Old Or Defective Parts In Compliance With Local Environmental Regulations.
prepare And Submit A Detailed Report Documenting The Following:
test Results For All Inspected Devices.
description Of Repairs Or Replacements Performed.
certification Details Of The Inspector(s)
certification Requirements
all Testing Must Be Performed By A Certified Backflow Inspector With Current Credentials From An Approved Certifying Organization (e.g., Asse, Abpa, Or Similar).
proof Of Certification For All Inspectors Involved In The Service Contract Must Be Provided To Hospital Management Prior To The Start Of Work.
deliverables
detailed Inspection Report With Test Results For Each Backflow Preventer.
certification Documents For Inspectors Performing The Work.
list Of Backflow Preventers Repaired Or Replaced, Including Specifications, Warranties, And Manufacturer Details.
updated Listed Of:
location
function
required
installed
type
serial Number
size
schedule
the Service Contract Shall Commence On Day Of Award And Be Completed By 60 Days.
a Detailed Timeline, Including Milestones For Inspection, Testing, Repair, And Final Reporting, Shall Be Submitted Prior To Work Commencement.
contractor Responsibilities
provide Certified Personnel, Tools, And Materials Required For The Completion Of The Work.
adhere To Hospital Policies, Infection Control Protocols, And Safety Guidelines.
coordinate With Hospital Staff To Minimize Disruptions To Operations And Patient Care.
submit Daily Progress Reports To The Hospital Project Manager.
quality Assurance And Warranty
provide A Warranty Of 1 Year For All Repairs, Replacements, And Associated Labor. All Work Shall Be Performed To The Highest Professional Standards And In Compliance With Applicable Codes.
safety And Compliance
ensure All Work Complies With Osha Standards And Hospital Safety Protocols.
maintain Containment Measures To Protect Hospital Staff And Patients From Contaminants.
report Any Incidents Or Hazards Immediately To Hospital Authorities.
period Of Performance
hours Of Operation 6:00 Am To 4:30pm.
the Initial Term Of This Agreement Shall Commence After Contract Has Been Awarded Of 1 Year. The Agreement May Be Extended For Up To Four (4) Additional Years Periods Upon The Written Exercise Of An Option By Veterans Affairs Hospital Delivered To The Other Party At Least 30 Days Prior To The Expiration Of The Then-current Term.
points Of Contact
brandon Johnson (cor) Louis Hopson Vincent Butler
10 N. Greene St 3901 The Alameda 10 N.greene St
baltimore Md 21201 Baltimore Md 21218 Baltimore Md 21201
mobile: 443-939-5568 410-605-7000x 5889 410-605-7000x 6044
brandon.johnson8@va.gov Louis.hopson@va.gov Vincent.butler2@va.gov
invoicing And Payment
each Invoice Shall Contain The Documentation Required By Ob10. The Invoices Shall Be Itemized To Contain The Equipment S Identifier. When Parts Are Furnished By The Government, They Shall Be Itemized On Contractor's Invoice At No-cost And Indicated As Government Furnished Parts. Contractor Will Forward Invoices To The Following Address, In Arrears Electronically To:
vendor Electronic Invoice Submission Methods: Invoices Will Be Electronically Submitted To The Tungsten Website At Http://www.tungstennetwork.com/uk/en/ Tungsten Direct Vendor Support Number Is 877-489-6135 For Va Contracts. The Va-fsc Pays All Associated Transaction Fees For Va Orders. During Implementation (technical Set-up) Tungsten Will Confirm Your Taxpayer Id Number With The Va-fsc. This Process Can Take Up To 5 Business Days To Complete To Ensure Your Invoice Is Automatically Routed To Your Certifying Official For Approval And Payment. To Successfully Submit An Invoice To Va-fsc Please Review How To Create An Invoice Within The How To Guides. All Invoices Submitted Through Tungsten To The Va-fsc Should Mirror Your Current Submission Of Invoice, With The Following Items Required. Clarification Of Additional Requirements Should Be Confirmed With Your Certifying Official (your Co Or Buyer). The Va-fsc Requires Specific Information In Compliance With The Prompt Pay Act And Business Requirements. For Additional Information, Please Contact:
department Of Veterans Affairs Financial Service Center: Tungsten Support
phone:
1-877-489-6135
website:
http://www.tungsten-network.com/uk/en/
email:
vafscched@va.gov
loch Raven
building/
location
function
required
installed
type
missing
1
1 G19
main Domestic
yes
yes
dual High Hazard
2
1 G19
main Domestic Secondary
yes
yes
dual High Hazard
3
1 G19
pk Heating Hot Water
yes
yes
single Check
4
1 G19
main Domestic (kitchen)
yes
yes
single Check
5
1 G19
boiler Water Feed
yes
yes
prv
6
i Exp
main Domestic Water
yes
yes
dual High Hazard
7
2
main Domestic
yes
no
none
8
2
heating Hot Water
yes
no
none
9
4
main Domestic
yes
no
none
10
4
main Domestic 4"
yes
yes
single Check
11
4
boiler Water Feed
yes
yes
prv
12
4
heating Hot Water
yes
yes
single Check
13
5
main Domestic
yes
yes
single Check
14
5
heating Hot Water
yes
yes
single Veck
15
6
main Domestic
yes
yes
dual High Hazard
16
6
heating Hot Water
yes
yes
prv
17
7
main Domestic
yes
yes
dual High Hazard
18
14
main Domestic
yes
no
none
baltimore
location
function
required
install
type
missing
1
7d100
main Domestic
yes
yes
reduced Pressure Zone (rpz) High Hazard
2
7d100e
main Domestic Secondary
yes
yes
rpz (high Harzard)
3
7d100e
pk Heating Hot Water
yes
yes
single Check
4
7d100e
main Domestic (kitchen)
yes
yes
rpz (high Harzard)
5
6d158 Service Bay
boiler Water Feed
yes
yes
rpz (high Harzard)
6
6c101 Service Bay
main Domestic Water
yes
yes
single Check (tested) Low Hazard
7
6b129 Service Bay
main Domestic
yes
no
single Check (tested)
8
6a133 Service Bay
heating Hot Water
yes
no
single Check/dual Check Harzard
9
5d130 Single Check
main Domestic
yes
no
single Check Harzard
10
5a127 Service Bay
main Domestic 4"
yes
yes
single Check/dual Check Harzard
11
5b182 Service Bay
boiler Water Feed
yes
yes
single Check/dual Check Harzard
12
5c114 Service Bay
heating Hot Water
yes
yes
single Check/dual Check Harzard
13
5d121 Cystoscopy 1/2
main Domestic
yes
yes
rpz High Harzard
14
5d124 Instrument Decontamination
heating Hot Water
yes
yes
high Harzard
15
5d100b Scrub Area
main Domestic
yes
yes
rpz
16
5d101 Or's 8/7
heating Hot Water
yes
yes
rpz
17
5d101b Or's 3/4 Steris
main Domestic
yes
yes
rpz
18
4d154 Service Bay
main Domestic
yes
no
dual Singles Checks
19
4c120 Service Bay
unknown
double Check/single Ck.
20
4b182 Service Bay
unknown
single Check
21
4a133 Service Bay
unknown
single Check
22
3a133 Service Bay
unknown
zurn Wilkins 3" Dual Check
23
3b182 Service Bay
unknown
zurn Wilkins 3" Dual Check
24
3c100 Service Bay
unknown
nibco 3" Single Check
25
3d119 Service Bay
unknown
nibco 3" Single Check
26
2d126 Service Bay
unknown
single Checks
27
2c124 Service Bay
unknown
single Checks
28
2b118 Service Bay
unknown
single/double Checks
29
2a114 Service Bay
unknown
single Check
30
1c100 Service Bay
unknown
single Checks
31
1b141 Service Bay
unknown
single Checks
32
bb137 Service Bay
unknown
single Checks
33
bb123 Animal Lab.
unknown
34
bd116 Service Bays
unknown
single Checks
35
1pa102 Service Bay
unknown
dual Checks
36
1pa103 Balto. St. Side Domestic Main
unknown
37
1pc103 Service Bay Domestic Water
unknown
dual Check
38
3c-101aâ Washer
unknown
rpz
39
3c-101â Washer
unknown
rpz
40
bb-131 Â washer
unknown
rpz
41
bb-123 Â sterilizer
unknown
rpz
42
bb-123 Â washer
unknown
rpz
43
bb-119 Â sterilizer (not In Use)
unknown
rpz
44
bb-119 Â sterilizer (not In Use)
unknown
rpz
45
bb-109 Â sterilizer (not In Use)
unknown
ppz
46
4c-125 Â water Meter (not In Use)
unknown
rpz
47
2b-119 Â oven
unknown
dcv
48
ba-115 Dialysis 5b-166 Room
unknown
dcv
interested & Capable Responses:â
nco 5 Is Seeking Responses From Entities That Are Interested In This Procurement And Consider Themselves To Have The Resources, Capabilities, And Qualifications Necessary To Provide The Services Required For The Baltimore Va Medical Center.
please Respond To This Rfi/sources Sought 36c24525q0217 With Your:
business Name (including Unique Entity Id (sam.gov)â â
business Type, Socio-economic Status (e.g., Veteran-owned, Woman-owned, Disadvantaged Small Business, 8(a), Etc.), Andâ â
person Of Contact (including Telephone Number & Email Address).â â â
capability Statement And Summary Of Previous Experience Providing These Types Of Services For The Veterans Health Administration Or Other Similar Facilities.â â
available Contract Vehicles (gsa Fss, Etc.) For Use By Department Of Va (include Applicable Naics)â
brief Summary Of Categories Of Services That Your Company Can/cannot Provide.â
certification(s) / Licenses For Meeting The Local Requirements To Provide These Services At The Dc Vamc (if Applicable)â
confirmation That Your Organization Has The Capability & Expertise To Meet The Performance Requirements While Complying With Applicable Limitations In Subcontracting By Responding To The Questions Below With Your Response:â â â
do You Intend To Self-perform This Effort?â
if You Are Located Outside The Immediate Area, How Will You Self-perform?â
or Do You Intend To Subcontract Work Under This Contract?â
if You Intend To Subcontract Work Under This Contract, How Will You Ensure Compliance With The Limitations On Subcontracting?â
â
response Instructions:â
responses Must Be Submitted By 10:00 Am (et) 1/10/2025. Responses To The Information Requested Above Must Be Submitted Via Email To John Ritter At John.ritter2@va.gov.
this Request For Information/sources Sought Notice Is For Planning Purposes Only And Does Not Constitute A Solicitation, Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract.â The Results Of This Market Research Will Assist In The Development Of (1) The Requirement, And (2) The Acquisition Strategy (e.g., Sdvosb/sdvosb Set-aside, Small Business Set-aside, Full And Open Competition, Etc.).â Va Assumes No Responsibility For Any Costs Incurred As A Result Of A Vendor S Attendance To The Site-visit Nor The Preparation Of Responses Submitted As A Result Of This Notice.
john Ritter
contracting Officer
vha-nco 5 John.ritter2@va.gov
Closing Date10 Jan 2025
Tender AmountRefer Documents
Bureau Of The Treasury Tender
Manpower Supply
Philippines
Details: Description Description : Supply Of Security Services Brief Description : Provision Of Personnel To Perform Security Services To Btr Regional Office Located At Pres. Corazon C. Aquino Regional Government Center, Balintawak, Pagadian City, Zamboanga Del Sur And To The Provincial Offices Of Zamboanga City, Zamboanga Del Norte And Basilan No. Of Days Work : 365 Days Duration Of The Contract : January 01, 2025 To September 30, 2025 Approved Budget For The Contract : Regional Office 2 P 40, 870.00 X 9 Months = P 367, 830.00 Po - Zamboanga City/ Sibugay 1 20,336.00 X 9 Months = 183, 024.00 Po - Zamboanga Del Norte 1 20,336.00 X 9 Months = 183, 024.00 Po - Basilan 1 20,336.00 X 9 Months = 183, 024.00 Total P 101,878.00 P 916,902.00 I. Scope Of Work And Services A. The Security Guard/s Shall Perform The Following: Regional Office - Each Of The Two (2) Security Guards Shall Perform Work Of Eight (8) Hours Per Day, Seven (7) Days A Week Inclusive Of Regular And Special Holidays. Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices - Three (3) Security Guards For The Respective Provincial Offices To Perform Work Of (8) Hours Per Day, Seven (7) Days A Week Inclusive Of Regular And Special Holidays. 1. Safeguard The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, Their Attached Structures And Facilities From Fire, Criminal Infiltration, Economic Sabotage, Electronic Attack, Bomb Threats, Flood Damage, Vandalism, And Other Forms Of Physical Destruction. Term Of Reference: Security Agency For Cy 2025 Page 2 Of 9 2. Safeguard The Vehicles, Furniture And Other Materials Against Theft, Robbery, Fire, Arson And Other Form Of Crimes. 3. Safeguard The Btr Personnel, Clients And Visitors Against Harm Or Threats While Within The Offices’ Premises During Official Hours, Including Off-hours Whenever Their Access Are Authorized. 4. Promote And Maintain Peace And Order Within The Premises Of Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, The Assigned Areas Of Responsibility Including, But Not Limited To, The Designated Restricted And High-risk Areas Within The Premises. 5. Expedite Any And All Activities In Support Of The Mission And Objectives Of The Btr Including All Legal And Lawful Instructions Handed Down By The Higher Authority. 6. Record And Document In The Security Guard’s Logbook Or Journal All Significant Events Occurring In His Area Of Responsibility And/or Report In Writing Any Incident Inimical To The Safety And Integrity Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices. 7. Maintain Proper Decorum, Personal Discipline, Grooming, And Decent Uniform While On Duty And Refrain From Reading Newspapers, Using Cellular Phones And Gadgets, Drinking Alcoholic Beverages, Taking Prohibited Drugs, Or Any Other Activities That Will Cause Distraction In The Proper Performance Of His Duty. 8. Comply With Orders, Circulars, And Other Policies Of The Btr, Including Lawful Orders Of The Regional Director, The Heads Of Provincial Offices, Or Their Authorized Representatives. 9. To Strictly Comply With Republic Act No.5487, As Amended By P.d. 1919, Otherwise Known As The Private Security Law, And Its Implementing Rules And Regulations Issued By The Director General Of The Philippine National Police. Ii. Strategic Areas To Be Covered By Security Services A. Perimeter Area(s); B. All Floors From Ground Floor To Rooftop, Including The Garage And Utility Areas Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices; C. All Property Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, Beginning From Ground Floor To Rooftop. Term Of Reference: Security Agency For Cy 2025 Page 3 Of 9 Iii. Schedule Of Requirements The Following Shall Be Provided By The Contractor: Item No. Qty. Description Bidder’s/supplier’s Compliance 1. *5 Sgs Security Guards Must Be: I. Filipino Male Citizen Ii. Preferably Those Who Have Completed 72 Units In College. Iii. Preferably With Experience In Guarding Government Facility Iv. Able To Communicate In Oral And Written English. V. Physical And Mentally Fit To Perform Security Duty. Vi. 25-45 Years Of Age. Vii. Minimum Height: 5 Ft. And 5 Inches Viii. Undergone Pre-licensing Training Administered Or Authorized By Pnpsosia. (provide Proof Of Training) Ix. Able To Prepare Investigation/spot Reports. X. Passed Np Evaluation And Drug Testing With Proof Of Compliance. Xi. Must Have Undergone Special Trainings On Anti-terrorism; Basic Fire Safety/prevention And Suppression; Basic First Aid And Self-defense Xii. Must Possess A Valid Security License As Of Bidding Date And During Tour Of Duty (submit Copy Of License). Xiii. Must Exhibit Good Moral Character, Honesty, Alertness. Xiv. Must Not Have Been Charged Nor Convicted Of Any Offense Involving Moral Turpitude (submit Appropriate Clearance, Barangay, Police And Nbi). 2 Materials/equipment/supplies To Be Provided By The Contractor, Per Sg: I. Prescribed Basic Uniforms Ii. Nightstick/baton Iii. Whistle Iv. Timepiece V. Writing Pen Term Of Reference: Security Agency For Cy 2025 Page 4 Of 9 Vi. Notebook And Duty Checklist (electronic Or Not) Vii. Flashlight Viii. First Aid Kit Ix. Service Firearms With Full Capacity Ammo. Load Plus Spare (subj. To Compliance With Pnp Guidelines On The Carrying Of Firearms And Ammunitions). X. Metal Detector Xi. Communication Radio (optional) Xii. Raincoat/pontio The Contractor Shall Provide The Abovementioned Security Personnel With Equipment That Should Be 100% Operational At All Times For The Duration Of The Contract. As To The Issued Firearms, They Must Be Of Genuine Brand Acquired From A Legitimate Source(s). No Paltiks Guns. Iv. Technical Specifications Technical Parameters Based On Gppb Circular No. 24-2007 Item No. Description Bidder’s/supplier’s Compliance 1. Stability Of The Company (a) Years Of Experience I. Has Been In The Business For At Least (3) Years; Ii. Has Experience In Providing Security Service (s) To Government Offices And Financial Institution; And, Iii. Bidders Shall Submit Certification Under Oath Of List Of Contracts Completed For The Past Three (3) Years. (b) Liquidity Of The Contractor Submit Audited Financial Statement For Cy 2020-2021 Duly Stamped By Bir Or Its Accredited And Authorized Institution. (c) Organizational Set-up Organizational Capability Of Any Agency Shall Be Based On Its Compliance With Organizational Structure Of Private Security Agencies Prescribed Under R.a. 5487 And Recent Irrs Implementing The Same. - Submission Of Organizational Chart Showing Key Management Personnel Are Themselves Term Of Reference: Security Agency For Cy 2025 Page 5 Of 9 Qualified And Licensed To Operate And Manage Security Business. - At Least (10%) Of Its Security Guard Force Are Currently Deployed On Important Posting Areas (e.g. Vital Installation, Airports, Power Plants, Banks And Similar Financial Institution And Government Offices). 2 Number Of Licensed Firearms - Agency Shall Have A Minimum Number Of Licensed And Serviceable Firearms (cal.38 Or 9mm For Handguns And/or 12 Gauge For Shotguns) Equivalent To 1/3 Of Their Total Number Of Security Guards; And, - Submit List Of Licensed Firearms 3 Other Factors (a) Recruitment And Selection Criteria - Show The Hiring Process For Security Guards And The Different Training Interventions Given To Security Personnel (b) Completeness Of Uniforms And Other Paraphernalia The Following Shall Comprise The Basic Equipment Of A Security Guard While On Duty: I. Prescribed Basic Uniform With Authorized Black Shoes Ii. Nightstick Or Baton Iii. Whistle Iv. Timepiece (synchronized To City Hall Time) V. Writing Pen Vi. Notebook And Duty Checklist (logbook Paginated And Smythe Sewn) Vii. List Of Emergency Numbers Viii. Flashlight Ix. First Aid Kit X. Service Firearms With Holster Xi. Handcuffs Xii. Communication Radio (optional) Xiii. Stun Devices (optional) Xiv. Raincoat/pontio Term Of Reference: Security Agency For Cy 2025 Page 6 Of 9 V. Other Responsibilities Of The Supplier/contractor A. The Supplier/contractor Shall Ensure That Their Assigned Security Guards To Btr Offices Are Physically And Mentally Fit For Duty During The Duration Of The Contract. Btr Reserves The Right To Require The Assigned Guards To Undergo Physical Fitness Test Before And During The Start Of The Contract. B. The Discipline And Administration Of The Security Guards Shall Conform To The Rules And Regulations Of The Contractor And The Btr. The Rules To Be Set By The Supplier/contractor Should Be Approved By Btr. C. The Supplier’s/contractor’s Personnel Rendering Unsatisfactory Performance, Questionable Actuations Or Behavior Including Repeated Violation Of Btr’s Internal Rules And Policies Shall Be Immediately Replaced Upon Receipt Of Written Memorandum From The Btr. On The Other Hand, The Supplier/contractor Shall Not Replace Security Guards To The Btr Without The Prior Approval From Its Management. D. The Supplier/contractor Shall Provide Its Security Personnel Stationed At The Client’s Offices With At Least (1) Unit License 9mm Handgun With Basic Ammunition Load Plus Extra Loaded Magazine; A Stand-by (1) Unit License 12 Gauge Shotgun To Be Issued Only During Extra-ordinary Situations, I.e., Like Existence Of Rebellion, Widespread Violence, Terroristic Attacks And Situations Calling For A More Heightened Alert. E. The Security Guards Of The Supplier/contractor Shall Never Be Employees Of The Btr. Hence, The Latter Shall Not Be Held Responsible For Any Claims For Compensation In The Event Of Injuries And Death Sustained By The Security Guards Or By Any Third Persons In The Performance By The Latter Of Its Duty With Btr. F. The Supplier’s/contractor’s Security Guards Shall Not Be Allowed To Stay In The Building Premises When On “off-duty”, Except During Times Of Emergency Situations. G. The Supplier/contractor Shall Require Its Security Guards Assigned To Their Respective Stations To Render Services In Accordance With The Contract And This Terms Of Reference. Security Guards Are Expected To Be On The Regional Office’ And Provincial Offices’ Premises At Least (30) Minutes Before The Start Of Duty. H. The Supplier/contractor Shall Prepare At Least Two (2) Relievers To Immediately Assume The Duty From Regular Guards In Case Of Their Absence. I. The Supplier/contractor Shall Require Its Security Guards To Render Services Exceeding The Scheduled Working Hours In The Exigencies Of The Service And/or As The Need May Arise. Absent Security Guards Shall Immediately Be Replaced By Relievers. Term Of Reference: Security Agency For Cy 2025 Page 7 Of 9 J. The Supplier/contractor Shall Assume Full Responsibility For Any Liabilities, Cause/s Of Action Or Claims Which May Be Filed By Any Of The Security Guards Under Labor Laws, Employees Compensation Laws Or Other Special Laws, Rules And Regulations Currently Mandated/implemented By The Department Of Labor And Employment. By Virtue Thereof, The Supplier/contractor Shall Render Btr, Its Officers And Employees, Free And Harmless From Any Such Liabilities, Cause Of Action Or Claims. K. The Supplier/contractor Shall Be Responsible For The Loss, Damage Or Injury That May Be Suffered By Btr Or Its Clients, Personnel And Properties, During The Tour Of Duty Of The Assigned Security Guards. Btr Shall Inform The Supplier/contractor In Writing Within Twenty Four (24) Hours From Its Occurrence Or Discovery. It Is Understood That The Contractor Shall Not Be Liable For Loss/es Or Damage/s Incurred By Btr Due To Fortuitous Events Or Force Majeure, Unless Accompanied By Negligent Acts By The Security Guards Or Their Failure To Take Positive Measures To Prevent Such Loss/es Or Damage/s In Line With Established Contractor And Btr Rules And Policies. Further, The Supplier/contractor Guarantees The Full Compensation For Whatever Loss/es Or Damage/s Which Btr May Sustain On The Occasion Of The Fault And Negligence Of Its Security Guards After Due Investigation Is Conducted On The Matter. L. The Supplier Or Contractor Is Obligated To Submit Proof Of Remittance In Compliance With Various Statutory Social Legislation Measures, Including But Not Limited To Contributions To Sss, Pag-ibig, Philhealth, And Ecc, Retirement Benefits For The Retirement Plan Established Or Remittance To Any Institution Responsible For The Administration And Maintenance Of Such Fund. The Supplier/contractor Shall Also Submit The Monthly Proof Of Payment Of The Basic Pay And Other Benefits Paid Directly To The Guards. This Documentation Must Be Provided To The Bureau Of The Treasury (btr) Within Fifteen (15) Days Following The Conclusion Of Each Month. Failure To Submit The Required Proof Of Remittance Shall Be A Ground For The Suspension Of Contract Payments Until Compliance Is Achieved. Additionally, Any Infringement Of These Standards Or Labor Laws May Result And Constitute As A Ground For The Blacklisting Of The Supplier Or Contractor. M. The Supplier/contractor Shall Comply With Existing Labor Standard Laws And Regulations, Especially In The Payment Of Minimum Wage And Other Statutory Benefits Implemented By Dole, Padpao, And The Pnp. N. In Addition, The Supplier/contractor Shall Submit To Btr The Following Upon Submission Of Their Rfq/proposal: 1. Certification Of Good Standing From The Pnp-sosia (formerly Pnp-sagds) And The Philippine Association Of Detective And Protective Agency Operators (padpao). 2. A Certified Copy Of The License To Operate As A Security Agency From The Pnp Term Of Reference: Security Agency For Cy 2025 Page 8 Of 9 3. Business Permit, Philgeps Certificate, Certificate Of Registration (bir), Tax Clearance, Itr (income Tax Return) O. The Supplier Shall Submit The Cost Distribution Schedule Of Security Services Following The Herein Format. Any Other Benefits May Be Added As Long As The Required Items Specifically Listed Below Are Adhered And Compliant With The Approved Budget Contract. Agency Estimate For Security Guards Factor Days 1st Shift 2nd Shift 393.4 414 414 Estimated Equivalent Monthry Rate = Eemr Payable Directly To Security Guards 1.1 Basic Salary Rate ( Monthly ) Sub- Total 1.2 Night Shift Differential ( Note :only 1 Hour Is Alloted For Night Shift Since Duty Is Only Until 11:00 Pm 1.3 13th Month Pay- 1/12 Of Basic Pay 1.4 Service Incentive Leave Pay - 5 Days Per Year (sil) 1.5 Uniform Allowance 1.6 Retirement Benefit Per Month (eemr * 22.5/12) Sub-total (a) Government Payment 1.7 Sss Premium Er Share (based On Table) 1.8 Sss Ec Er Share (based On Table) 1.9 Philhealth Er Share (5% Total, Shared 50:50 By Ee And Er) 1.10 Sif- Er Share 1.11 Pag_ibig Er Share Sub-total (b) Total Payment To Guards + Gov't ( C) 0.00 0.00 Admin Fee (d)= C * ___% 0.00 0.00 Vat- 12% Of Admin Fee (e )= D *12% 0.00 0.00 Total Vat And Admin Fee 0.00 0.00 Total Contract Cost- Monthly (f )= C + D + E 0.00 0.00 Annual Cost (f * 12 Months) 0.00 0.00 Total Annual Cost To Guards [1st Shift: (h * 4 Guards)] Ro + Zambo. City + Zambo. Del Norte + Basilan 0.00 Total Annual Cost To Guards 2nd Shift Of Regional Office Guard With Night Salary Differential 0.00 Term Of Reference: Security Agency For Cy 2025 Page 9 Of 9 Total First And Second Shift 0.00 Vi. Reservation Clause The Btr Reserves The Right To: Reject Documents That Do Not Comply With The Requirements; To Waive Any Formalities And Documents Or Consider Any Submission Of Documents As Substantial Compliance; To Reject Any And All Bids; To Declare A Failure Of Bidding; To Annul The Bidding Process; Or Not To Award The Contract, Without Thereby Incurring Any Liability To The Affected Potential Supplier Or Bidder/s. This Also Includes The Changes In The Funds/allotment Releases For The Said Program/project/activity Affecting The Award Of Contract, Which Are Either Withheld Or Reduced, At No Fault Of The Btr. The Btr Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidder/s Or Potential Supplier/s For Any Expenses Incurred In The Preparation Of The Bid/proposal. Prepared By: Cesar M. Canoog Jr. Administrative Assistant Ii Approved: Albert Jonathan B. Paulino Director Ii Conformed: _________________________________ Signature Over Printed Nam
Closing Date3 Jan 2025
Tender AmountPHP 916.9 K (USD 15.8 K)
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n7m2.7|egp|7176052048|andrew.stader@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
liquidated Damages--supplies, Services, Or Research And Development (sep 2000)|1|tbd|
wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00104|tbd|tbd|see Schedule|tbd|see Schedule||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
equal Opportunity For Veterans (jun 2020)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
contractor Purchasing System Administration-basic (may 2014)|1||
authorized Deviations In Clauses (nov 2020)|2|||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
small Business Program Representations (feb 2024)|4|334111|1250|||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
certification Regarding Knowledge Of Child Labor For Listed End Products(feb 2021))|4|||||
annual Representations And Certifications (may 2024)|13|334111|1250||||||||||||
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^
all Freight Is Fob Origin.
this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
the Government Is Seeking A Repair Turnaround Time (rtat) Of: 180 Days
government Source Inspection (gsi) Is Required.
please Note Freight Is Handled By The Navy As Per The Commercial Asset Visibility (cav) Statement Of Work.
your Quote Should Include The Following Information:
Quote Amount And Rtat
Unit Price:__________
Total Price:__________
Repair Turnaround Time (rtat): _______ Days
if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This
contract.
Check One: Firm-fixed-price ___ Estimated ___ Not-to Exceed (nte): ___
Return Material Authorization # (rma), If Applicable:__________
Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________
Testing And Evaluation If Beyond Repair
T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to
exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment.
The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________.
Awardee Info & Performance Location
Awardee Cage: __________
Inspection & Acceptance Cage, If Not Same As ""awardee Cage"": __________
Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As ""awardee Cage"":__________
Iot Compare Repair Price To Price To Buy New
New Unit Price:__________
New Unit Delivery Lead-time:__________
important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A
price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A ""reconciliation Modification"" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section
Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default.
in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Filter Subassembly .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Filter Subassembly Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be
performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor
or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;1vpw8 01-p43011j001 1vpw8 01-p43243j001 ;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Power Supply Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Power Supply Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;1vpw8 01-p42975j001;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; .
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;1vpw8 01-p46160f001 ;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; .
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Power Supply .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Power Supply Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be
performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor
or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;1vpw8 01-p43910j001 Or 01-p43005j001;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Assy,black Io Bridg .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Assy,black Io Bridg Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;1vpw8 01-p46100f001 ;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Receiver Subassembl .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Receiver Subassembl Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;1vpw8 01-p45945f001;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Module,infosec .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Module,infosec Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be
performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor
or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;1vpw8 01-p46920j001
1vpw8 01-p46920j002;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
Closing Date17 Jan 2025
Tender AmountRefer Documents
National Farming Promotion Tender
Others
Corrigendum : Closing Date Modified
Poland
Details: Ag.b.0162.1.2024. 140.pt Kraków 26/07/2024 Price Inquiry Mon. "delivery and installation of an air conditioner in the KPP building in Gorlice at ul. 11. Listopada 56” The proceedings are in accordance with Decision No. 58/2021 of November 4, 2021 of the Provincial Police Commander in Krakow General information: 1. The offer should be sent by: August 2, 2024. Until 10.00. Please submit Offers and All Inquiries via the Purchasing Platform to the following address: https://malopolska-policja.eb2b.com.pl, "proceedings" tab - "list of open procedures". In case of problems with submitting an offer, please contact the Eb2b Helpdesk - Contact in the footer of the website. 2. The Offer should be prepared in accordance with this Request. II. Description of the Subject of the Order: · Delivery of air conditioning (1 Set) Vivax R-design Acp-24ch70aeri+ or Kaisai Pro Heat Krp-24megi/krp-24mego - To be selected by the Contractor and installation in the server room on the ground floor of the building (outdoor unit on the building's facade at height Approx. 2M). · Delivery and installation of new: - Power cable with a length of approx. 10 M, - Trays for a power cable with a length of approx. 3 M - Refrigeration Pipes Length 2 X Approx. 7 M, - Trays for refrigeration pipes with a length of approx. 6 M - Length Condensate Drain Pipe. Approx. 7 M - Gravity Condensate Drainage Outside the Building - Hanger/Fixing of the Outdoor Unit, Power Supply of the Air Conditioner from the T1/1 Distribution Board on the 1st Floor of the Building, (connection through the Shaft), Connection to the Distribution Board and Delivery and Installation of Overcurrent Protection to Power the Air Conditioner After Contractor's side, · Performing a tightness test, creating a vacuum and starting the air conditioning, refilling the refrigerant (if necessary), · Ducts to the outdoor unit on the building facade should be placed in conduits. · The Warranty Card should be handed over to the Representative of the KPP in Gorlice, III. Conditions Relating to the Offer and Order Fulfillment: 1. Payment for the performance of the service within 30 days from the date of receipt of a correctly issued invoice - by transfer to the account indicated by the Contractor. 2. Required Warranty Conditions: In accordance with the Manufacturer's Warranty, 3. The offer must include all necessary materials for the installation and proper functioning of the devices. 4. The basis for issuing a VAT invoice will be the Work Acceptance Protocol, confirmed by the representative of the KPP in Gorlice (the Acceptance Protocol should contain information about the model and serial numbers of the outdoor and indoor units of the air conditioner and the quantity and type of refrigerant in the installation). 5. The Ordering Party reserves the right to refuse to award an order if the price of the most advantageous offer exceeds the amount that the Ordering Party can allocate to finance the order. 6. The condition for the implementation of the service is to send the data of the persons performing the service at least 3 business days before the completion date (name and surname, PESEL number) and the Registration No. Vehicle Used to Conduct the Order. In the absence of a recommendation of a person/persons, the Contractor will provide replacements for other persons. Order Fulfillment Date: Up to 14 Calendar Days from Receiving the Order Place of Order Fulfillment: Kpp W Gorlice Ul. 11. Listopada 56 Contact telephone numbers in the case: - Paweł Trela - 47 83 58 678. Iv. Criteria for Research, Evaluation and Selection of Offers: Lowest Price. V. Attachments: Offer Presentation Template Attachment No. 1
Closing Date10 Jan 2025
Tender AmountRefer Documents
National Road and Highway Directorate Tender
Electronics Equipment...+1Electrical and Electronics
Corrigendum : Closing Date Modified
Poland
Details: I. Subject of the Proceedings: 1. Description of the Subject of the Order: - Cylinder Lock for Emergency Door Opening Flaps for En76 - 20 pcs. The Assortment Must Meet The Following Requirements: Be New And Free From Defects, Original, Not Encumbered With Third Party Rights, 3. Accompanying Documentation: None. Regulations on the Certification System of Entities in Charge of Vehicle Maintenance in accordance with Directive (EU) 2016/798 of the European Parliament and of the Council and repealing Commission Regulation (EU) No. 445/2011 (Journal of Laws of the EU L. Z 2019, p. 139 Z Late Amended; hereinafter "Regulation 2019/779"), the Employer as the Entity Responsible for Vehicle Maintenance within the meaning of Directive (EU) 2016/798 of the European Parliament and of the Council of 11 May 2016 on Railway Safety (Recast) ( Journal of Laws of the European Union, L. Z 2016, No. 138, p. 102, as amended), Considering the impact of proper execution of the Contract on Railway Traffic Safety, requires that the subject of the Contract be implemented by Contractors with an appropriate and documented system Maintenance and Management Within the meaning of point 9.2 lit. B) of Annex Ii to Regulation 2019/779 (e.g. ISO 9001:2015, Iris). To confirm that the Subject of the Order will be implemented by Contractors with an appropriate and documented maintenance and management system, it is necessary to submit a statement referred to in Chapter IV, Item 4. 5. Tender Evaluation Criteria: Price 99%, 1% Completion Time Ii. Terms of Order Execution: 1. Execution Date - Order Execution Date Expected by the Ordering Party 7 Business Days. The Ordering Party indicates that it allows the submission of Tenders with a deadline longer than 7 Business Days. - The unit "days" defined in the Criterion of the Execution Date should be understood as Business Days - Execution Hours - 8:00 am to 2:00 pm 2. Rules for the Delivery and Unloading of Goods - In accordance with the GTC 3. Place of Delivery: Koleje Wielkopolskie Sp. z o. o. Ul. Kolejowa 3, 66-210 Zbąszynek, Rolling Stock Maintenance Point Zbąszynek The Contractor shall, not later than 12 hours before commencement of the Order, be obliged to confirm the date of delivery of the Goods, including the delivery time. 4. Method of Delivery: One-time Delivery, Price Should Include the Cost of Delivery and Unloading. 5. Payment Date - In accordance with the GTD; (payment deadline 30 Days From Invoice Issue) The Buyer accepts the issuance and delivery of electronic invoices by the Seller, in accordance with Art. 931, as amended; hereinafter referred to as "the VAT Act"). When issuing an electronic invoice, the seller is obliged to prepare it in pdf format. In the case of issuing an electronic invoice, the Seller is obliged to deliver it to the Buyer to the following e-mail address: Faktury@koleje-wielkopolskie.com.pl. 6. Guarantee conditions - In accordance with the GTC; 7. Deadline for Removing Defects Under the Guarantee - In accordance with the GTD; 8. Contractual Penalties - Pursuant to § 7 of the GTC (the ordering party informs that the Penalties referred to in § 7 Section 1 Item A) of the GTC will be charged in the event of the Supplier's delay of more than 5 Business Days. Additionally, § 7 Sec. 1 pt. C) Owd). iii. The course of the Proceedings: The Contracting Entity informs that the Proceedings are conducted in two stages: A) Stage I - Bid submission, B) Stage II - Electronic Bidding - Bidding will start automatically after the end of Stage I It will last 15 minutes and Extra Time - Sub-stage of Stage II, which The terms and conditions are described in detail in the Procurement Platform's Proceedings Setting. Each Overtime Lasts 3 Minutes - Starts if Within the Last 3 Minutes of the Proceedings, Another Bid (proceeding) is submitted correctly. Contractors approved by the Employer who fail to submit a Proposal correctly at the Bid Submission Stage (and Stage) will be automatically removed from further stages of the Proceedings. The Ordering Party grants approval for the Order by placing on the Purchasing Platform Information about the Selection of the Most Advantageous Offer. With the moment referred to in the preceding sentence, the Order is awarded. The Ordering Party is entitled to withdraw from awarding the Order at any time. IV. Contractor's declarations: The Contracting Authority informs that participation in the proceedings in question is tantamount to submitting the following declarations: 1. I declare that I have fulfilled the information obligations provided for in Art. In order to apply for the award of a public contract in this procedure. *Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (General Data Protection Regulation ) (OJ L 119 Z 04/05/2016, p. 1). 2. I declare that I consent to the processing of my personal data provided by me voluntarily to the Ordering Party. Information Clause With Art. 13 of the GDPR - Has been posted on the Eb2b Purchasing Platform in the "Information Obligation" tab. 3. I declare that the Price Offer on the Purchasing Platform was submitted by the Person Authorized to Represent the Contractor. 4. I declare that the Contract in question will be implemented by Contractors who have an appropriate and documented maintenance and management system within the meaning of point 9.2 lit. B) Annex Ii to the Commission Implementing Regulation (eu) 2019/779 of 16 May 2019 laying down detailed provisions on the system of certification of entities in charge of vehicle maintenance in accordance with Directive of the European Parliament and of the Council (eu) 2016/798 and repealing Commission Regulation ( ue) No. 445/2011 (Journal of Laws of the EU L. Z 2019, p. 139, as amended) 5. I declare that the Contract in question will be performed by contractors not subject to exclusion under Article 5k of the Council Regulation ( ue) No. 833/2014 of 31 July 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (OJ L. 2014 No. 229, p. 1, as amended) And Pursuant to Art. 7 Para. 1 of the Act of April 13, 2022 on Special Solutions for Counteracting the Support of Aggression against Ukraine and for the Protection of National Security (i.e. Journal of Laws of 2023, item 129, as amended) V. Additional information: Proceedings underway Pursuant to the provisions of § 25 of the Sub-threshold Sectoral Procurement Regulations, available to Contractors on the Contracting Entity's website https://koleje-wielkopolskie.com.pl/. Due to the impact of the execution of the Order on the Safety of Transport, within the Proceedings, the provisions of § 5 Sec. 2 And § 22 of the Regulations. The General Terms and Conditions of Delivery of Koleje Wielkopolskie Sp. Z O.O. Available on the Ordering Party's website https://koleje-wielkopolskie.com.pl/. Including the provisions of § 3 Sec. 7 of the General Delivery Terms of Koleje Wielkopolskie Sp. z o.o. Information Clause With Art. 13 of the GDPR - Has been posted on the Eb2b Purchasing Platform in the "Information Obligation" tab. Please direct any questions regarding the Procedure via the Purchasing Platform. Technical Support can be obtained at the telephone number in the footer at the bottom of the page. Pursuant to Art. 7 Para. 1 of the Act of April 13, 2022 on Special Solutions for Counteracting the Support of Aggression against Ukraine and for the Protection of National Security (i.e. Journal of Laws of 2023, item 129, as amended; hereinafter referred to as the "Sanctions Act"), The Contractor is excluded from this Public Procurement Procedure: 1) Listed in the Council Regulation (EC) No. 765/2006 of 18 May 2006 concerning restrictive measures due to the situation in Belarus (Journal of Laws of the EU L 134 Z 20.05.2006, p. 1, as amended, hereinafter "Regulation 765/2006") and Council Regulation (EU) No. 269/2014 of 17 March 2014 on restrictive measures in relation to activities undermining the integrity Territorial, Sovereignty and Independence of Ukraine or threatening them (Journal of Laws of the EU L 78 Z 17.03.2014, p. 6, as amended; hereinafter referred to as "Regulation 269/2014") Or Entered on the List Based on the Decision on the Entry To the Determining List of the Measures referred to in Art. 1 Item 3 of the Sanctions Act; 2) Whose Beneficial Owner within the meaning of the Act of 1 March 2018 on Counteracting Money Laundering and Terrorist Financing (Journal of Laws of 2022, items 593, 655, 835, 2180 and 2185) is the person listed in the lists specified in Regulation 765/2006 and Regulation 269/2014 or entered on the list or being such a beneficial owner from February 24, 2022, as long as it was entered on the list on the basis of the decision on entry on the list determining the application of the measure referred to in Art. 1 Item 3 of the Sanctions Act; 3) whose Parent Undertaking within the meaning of Art. 3 Sec. 1 Item 37 of the Act of 29 September 1994 on Accounting (Journal of Laws of 2021, items 217, 2105 and 2106 and of 2022, item 1488), is an entity listed in the lists specified in Regulation 765/2006 I Regulation 269/2014 or entered on the list or being such a Parent Company from February 24, 2022, provided that it was entered on the list on the basis of a decision on entry on the list determining the application of the measure referred to in Art. 1 Item 3 Sanctions Act. Pursuant to Article 5k of Council Regulation (EU) No. 833/2014 of 31 July 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (Journal of Laws of the EU L. Z 2014 No. 229, p. 1 As amended; hereinafter "Regulation 833/2014"), The Contractor is excluded from this Public Procurement Proceeding: 1) a Russian citizen, a natural person residing in Russia or a legal person, entity or body with its registered office in Russia; 2) A legal person, entity or body to which ownership rights, directly or indirectly, in more than 50% belong to Russian citizens or natural persons residing in Russia, or legal persons, entities or bodies based in Russia; 3) A natural or legal person, entity or body acting on behalf of or under the direction of the entity referred to in point 1) or 2) of this section, and using subcontractors, suppliers or entities on whose capacity (if applicable), belonging to To one of the above Categories of Entities, in the event that they account for more than 10% of the Order Value.
Closing Date15 Jan 2025
Tender AmountRefer Documents
National Farming Promotion Tender
Software and IT Solutions
Corrigendum : Closing Date Modified
Poland
Details: Ag.b.0162.1.2024.138.pt Kraków 25/07/2024 Price Inquiry Mon. Delivery and installation of air conditioners in the buildings of the Municipal Police Headquarters in Krakow at ul. Mogilska 109” The proceedings are in accordance with Decision No. 58/2021 of November 4, 2021 of the Provincial Police Commander in Krakow General information: 1. The offer should be sent by August 2, 2024. Until 10.00. Please submit Offers and All Inquiries via the Purchasing Platform to the following address: https://malopolska-policja.eb2b.com.pl, "proceedings" tab - "list of open procedures". In case of problems with submitting an offer, please contact the Eb2b Helpdesk - Contact in the footer of the website. 2. The Offer should be prepared in accordance with this Request. II. Description of the Subject of the Order: Task No. 1 · Delivery of 2 pcs. of LG Standard 2 S12et air conditioners or Kaisai Pro Heat Krp-12megi/krp-12mego or Vivax R Acp-12ch35aeri+ - To be selected by the Contractor and installed in rooms No. 317a and 319a (3rd floor) ) (indoor units at a height of approx. 3 m, outdoor units on the building facade (height 12 meters from the ground). · Delivery and installation: O Air conditioner 1 room 317a - Refrigeration pipes 2 x approx. 8 Mb long, - Condensate pipe And signal cables with a length of approx. 8 Mb, - trays for refrigeration cables with a length of approx. 6 Mb, - cable trays for the external unit: approx. - Power cable with a length of approx. 22 Mb, - air conditioner cable trays with a length of 2 x approx. 8 Mb, - condensate cable with a length of approx. 6 Mb, - Power cable tray with a length of approx. 4 Mb (for 1 cable), - Outdoor unit hanger. - Power Cord Length Approx. 17 Mb, · Before installing the cable trays on the 11 Mb section, the current (narrower) cable trays should be dismantled and the cables should be placed in the newly installed cable trays. Task No. 2 · Disassembly of the Aeg Air Conditioner Apr 12 (Indoor unit at a height of approx. 3 meters, Outdoor unit on the façade at a height of approx. 9 meters from the ground) Together with the installation between the outdoor unit and the indoor unit. · Delivery of the LG Standard 2 S12et air conditioner or Kaisai Pro Heat Krp-12megi/krp-12mego or Vivax R Acp-12ch35aeri+ - To be selected by the contractor and installed in place of the dismantled air conditioner. · Delivery and installation of: - Refrigeration pipes with a length of 2 x Approx. 6 Mb, - Condensate and signal cable with a length of approx. 6 Mb, - Power Cable Length Approx. 7 Mb, - Signal Cable and Condensate Drainage, Length Approx. 6 Mb. To mount the air conditioner, use the existing hanger of the outdoor unit (after adapting to the dimensions of the new unit). The installation should be carried out in the currently installed trays. Warranty Cards should be handed over to the Ordering Party's Representative. III. Conditions Relating to the Offer and Order Fulfillment: 1. Payment for the performance of the service within 30 days from the date of receipt of a correctly issued invoice - by transfer to the account indicated by the Contractor. 2. Required Warranty Terms for the air conditioner: 36 or 60 months (according to the Manufacturer's Warranty), 3. The offer must include all necessary materials for the installation and proper functioning of the devices. 4. The basis for issuing a VAT invoice will be the Work Acceptance Protocol, confirmed by the User. 5. The Contractor is responsible for any damage resulting from the work performed during the installation of air conditioning. 6. The Ordering Party reserves the right to award the order only for Task No. 1 or Task No. 2 or to refuse to award the order in the event of failure to obtain appropriate financial resources or when the price of the most advantageous offer exceeds the amount that the Ordering Party can allocate to finance the order. 7. The condition for the implementation of the service is to send the data of the persons performing the service at least 3 business days before the completion date (name and surname, PESEL number) and the Registration No. Vehicle Used for the Order In the event of no recommendation of the person(s), the Contractor will provide a replacement for other persons. Order Completion Deadline: Up to 14 Calendar Days from receipt of the order, within the time agreed with the Ordering Party. Place of Order Fulfillment: Kwp in Krakow at ul. Mogilska 109. Contact numbers in the case: - Paweł Trela - 47 83 58 678, Iv. Criteria for Research, Evaluation and Selection of Offers: Lowest Price for the Implementation of Individual Tasks. V. Attachments: Offer Presentation Template Attachment No. 1
Closing Date13 Jan 2025
Tender AmountRefer Documents
National Road and Highway Directorate Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Poland
Details: I. Subject of the Proceedings: 1. Description of the Subject of the Order: - Metal Cable Seal (for axle boxes) 1.5 Mm, numbered To Sa132/134/139/36wehd - 100 pcs. The assortment must meet the following requirements: Be new and free from defects, Original, Not encumbered by third party rights, 3. Accompanying documentation: None Directive of the European Parliament and of the Council (EU) 2016/798 and repealing Commission Regulation (EU) No. 445/2011 (Journal of Laws of the EU L. of 2019, p. 139, as amended; hereinafter "Regulation 2019/779"), Employer as the Entity Responsible for Vehicle Maintenance within the meaning of the Directive of the European Parliament and of the Council (EU) 20 16/798 of May 11, 2016 on Railway Safety (Recast) (Journal of Laws of the European Union, L. of 2016, No. 138, p. 102, as amended), Considering the impact of proper execution of the Order on Railway Traffic Safety, requires that the Subject of the Order be implemented by Contractors with an appropriate and documented Maintenance and Management System Within the meaning of point 9.2 lit. B) of Annex Ii to Regulation 2019/779 (e.g. ISO 9001:2015, Iris). To confirm that the Subject of the Order will be implemented by Contractors with an appropriate and documented maintenance and management system, it is necessary to submit a statement referred to in Chapter IV, Item 4. 5. Tender Evaluation Criteria: Price 99%, 1% Completion Time Ii. Terms of Order Execution: 1. Execution Date - Order Execution Date Expected by the Ordering Party 7 Working Days. The Ordering Party indicates that it allows the submission of Tenders with a deadline longer than 7 Business Days. - The unit "days" defined in the Criterion of the Execution Date should be understood as Business Days - Execution Hours - 8:00 am to 2:00 pm 2. Rules for the Delivery and Unloading of Goods - In accordance with the GTC 3. Place of Delivery: Koleje Wielkopolskie Sp. z o. o. Ul. Leśna 1d, 62-100 Wągrowiec, Wągrowiec Rolling Stock Maintenance Point. The Contractor, no later than 12 hours before commencing the execution of the order, is obliged to confirm the date of delivery of the goods, including the time of delivery. 4. Method of Delivery: One-time Delivery, Price Should Include the Cost of Delivery and Unloading. 5. Payment Date - In accordance with the GTD; (payment deadline 30 Days From Invoice Issue) The Buyer accepts the issuance and delivery of electronic invoices by the Seller, in accordance with Article 106n of the Act of March 11, 2004 on Goods and Services Tax (i.e. Journal of Laws of 2022, item 931, as amended; hereinafter referred to as the "VAT Act"). When issuing an electronic invoice, the seller is obliged to prepare it in pdf format. In the case of issuing an electronic invoice, the Seller is obliged to deliver it to the Buyer to the following e-mail address: Faktury@koleje-wielkopolskie.com.pl. 6. Guarantee conditions - In accordance with the GTC; 7. Deadline for Removing Defects Under the Guarantee - In accordance with the GTD; 8. Contractual penalties - Pursuant to § 7 of the GTD. iii. The course of the Proceedings: The Ordering Party informs that the Proceedings are conducted in two stages: A) Stage I - Bid submission, B) Stage II - Electronic Bidding - Bidding will start automatically after the end of Stage I and will last 15 minutes, and Extra Time - Sub-stage of Stage II, the conditions of which are precisely described in the Proceeding Settings on the Purchasing Platform. Each Overtime Lasts 3 Minutes - Starts if Within the Last 3 Minutes of the Proceedings, Another Bid (proceeding) is submitted correctly. Contractors approved by the Employer who fail to submit a Proposal correctly at the Bid Submission Stage (and Stage) will be automatically removed from further stages of the Proceedings. The Ordering Party grants approval for the Order by placing on the Purchasing Platform Information about the Selection of the Most Advantageous Offer. With the moment referred to in the preceding sentence, the Order is awarded. The Ordering Party is entitled to withdraw from awarding the Order at any time. IV. Contractor's declarations: The Contracting Entity informs that participation in the said Proceedings is tantamount to submitting the following declarations: 1. I declare that I have fulfilled the information obligations provided for in Article 13 or Article 14 of the GDPR*) towards the Natural Persons from whom I obtained personal data directly or indirectly in order to apply for a public procurement in this Procedure. *Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (General Data Protection Regulation) (OJ L 119 Z 04.05 .2016, p. 1). 2. I declare that I consent to the processing of my personal data provided by me voluntarily to the Ordering Party. Information Clause With Art. 13 of the GDPR - Has been posted on the Eb2b Purchasing Platform in the "Information Obligation" tab. 3. I declare that the Price Offer on the Purchasing Platform was submitted by the Person Authorized to Represent the Contractor. 4. I declare that the Contract in question will be implemented by Contractors who have an appropriate and documented maintenance and management system within the meaning of point 9.2 lit. B) of Annex Ii to the Commission Implementing Regulation (eu) 2019/779 of 16 May 2019 laying down detailed provisions on the Certification System of Entities in Charge of Vehicle Maintenance In accordance with Directive (EU) 2016/798 of the European Parliament and of the Council and repealing Commission Regulation (EU) No. 445/2011 (Journal of Laws e. L. Z 2019 R. P. 139 As amended) 5. I declare that the Contract in question will be performed by Contractors not subject to exclusion under Art. U. Ue. L. Z 2014, No. 229, p. 1, as amended) and on the basis of Art. 1 of the Act of April 13, 2022 on Special Solutions for Counteracting the Support of Aggression against Ukraine and for the Protection of National Security (i.e. Journal of Laws of 2023, item 129, as amended) V. Additional information: Proceedings conducted in accordance with the provisions of § 25 of the Regulations for the award of sub-threshold sectoral contracts, available to Contractors On the Ordering Party's website https://koleje-wielkopolskie.com.pl/. Due to the impact of the execution of the Order on the Safety of Transport, within the Proceedings, the provisions of § 5 Sec. 2 And § 22 of the Regulations. The General Terms and Conditions of Delivery of Koleje Wielkopolskie Sp. Z O.O. Available on the Ordering Party's website https://koleje-wielkopolskie.com.pl/. Including the provisions of § 3 Sec. 7 of the General Delivery Terms of Koleje Wielkopolskie Sp. z o.o. Information Clause With Art. 13 of the GDPR - Has been posted on the Eb2b Purchasing Platform in the "Information Obligation" tab. Please direct any questions regarding the Procedure via the Purchasing Platform. Technical Support can be obtained at the telephone number in the footer at the bottom of the page. Pursuant to Art. 7 Para. 1 of the Act of April 13, 2022 on Special Solutions for Counteracting the Support of Aggression against Ukraine and for the Protection of National Security (i.e. Journal of Laws of 2023, item 129, as amended; hereinafter referred to as the "Sanctions Act"), The Contractor is excluded from this Public Procurement Proceeding: 1) listed in Lists Specified in Council Regulation (EC) No. 765/2006 of 18 May 2006 Concerning Restrictive Measures Due to the Situation in Belarus (OJ L 134, 20.05.2006, p. 1, as amended; hereinafter "Regulation 765/2006") and Council Regulation (EU) No. 2 69/2014 of 17 March 2014 on restrictive measures with regard to actions undermining or threatening the territorial integrity, sovereignty and independence of Ukraine (Journal of Laws EU L 78 Z 17.03.2014, p. 6, as amended; hereinafter "Regulation 269/2014") Or ę On the basis of the decision on the entry on the List determining the application of the measure referred to in Art. 1 Item 3 of the Sanctions Act; 2) whose Ultimate Beneficiary within the meaning of the Act of 1 March 2018 on Counteracting Money Laundering and Terrorist Financing (Journal of Laws of 2022, items 593, 655, 835, 2180 and 2185) is the person listed in the lists specified in Regulation 765/2006 I Regulation 269/2014 or entered on the list or being such a real beneficiary from February 24, 2022, as long as it was entered on the list on the basis of the decision on entry on the list determining the application of the measure referred to in Article 1(3) of the Sanctions Act; 3) whose Parent Undertaking within the meaning of Art. 3 Sec. 1 point 37 of the Act of 29 September 1994 on Accounting (Journal of Laws of 2021, item 217, 2105 and 2106 and of 2022, item 1488), is an entity listed in the lists specified in Regulation 765/2006 and Regulation 269/2014 or in entered on the list or being such a Parent Company from February 24, 2022, provided that it was entered on the list on the basis of a decision on entry on the list determining the application of the measure referred to in Art. 1 Item 3 of the Sanctions Act. Pursuant to Article 5k of Council Regulation (EU) No. 833/2014 of July 31, 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (Journal of Laws of the EU L. Z 2014 No. 229, p. 1, as amended; hereinafter "Regulation 833/2014"), Z The Contractor is excluded from this Public Procurement Procedure: 1) a Russian citizen, a natural person residing in Russia or a legal person, entity or body with its registered office in Russia; 2) a legal person, entity or body whose property rights directly or indirectly belong to Russian citizens or natural persons residing in Russia or legal persons, entities or bodies based in Russia in more than 50%; 3) A natural or legal person, entity or body acting on behalf of or under the direction of the entity referred to in point 1) or 2) of this section, and using subcontractors, suppliers or entities whose abilities it depends on (if applicable), belonging to one of the above categories of entities, in the event that they account for more than 10% of the value of the Order.
Closing Date15 Jan 2025
Tender AmountRefer Documents
National Road and Highway Directorate Tender
Software and IT Solutions
Corrigendum : Closing Date Modified
Poland
Details: I. Subject of the Proceedings: 1. Description of the Subject of the Order: - Roof for A2003a Siroco Fan - Aluminum For En 76 - 4 pcs. (photo attached) 2. The above-mentioned The assortment must meet the following requirements: Be new and free from defects, Original, Not encumbered by third party rights, 3. Accompanying documentation: None Directive of the European Parliament and of the Council (EU) 2016/798 and repealing Commission Regulation (EU) No. 445/2011 (Journal of Laws of the EU L. of 2019, p. 139, as amended; hereinafter "Regulation 2019/779"), Employer as the Entity Responsible for Vehicle Maintenance within the meaning of the Directive of the European Parliament and of the Council (EU) 20 16/798 of May 11, 2016 on Railway Safety (Recast) (Journal of Laws of the European Union, L. of 2016, No. 138, p. 102, as amended), Considering the impact of proper execution of the Order on Railway Traffic Safety, requires that the Subject of the Order be implemented by Contractors with an appropriate and documented Maintenance and Management System Within the meaning of point 9.2 lit. B) of Annex Ii to Regulation 2019/779 (e.g. ISO 9001:2015, Iris). To confirm that the Subject of the Order will be implemented by Contractors with an appropriate and documented maintenance and management system, it is necessary to submit a statement referred to in Chapter IV, Item 4. 5. Tender Evaluation Criteria: Price 99%, 1% Completion Time Ii. Terms of Order Execution: 1. Execution Date - Order Execution Date Expected by the Ordering Party 7 Working Days. The Ordering Party indicates that it allows the submission of Tenders with a deadline longer than 7 Business Days. - The unit "days" defined in the Criterion of the Execution Date should be understood as Business Days - Execution Hours - 8:00 am to 2:00 pm 2. Rules for the Delivery and Unloading of Goods - In accordance with the GTC 3. Place of Delivery: Koleje Wielkopolskie Sp. z o. o. Ul. Kolejowa 3, 66-210 Zbąszynek, Zbąszynek Rolling Stock Maintenance Point. The Contractor, no later than 12 hours before commencing the execution of the order, is obliged to confirm the date of delivery of the goods, including the time of delivery. 4. Method of Delivery: One-time Delivery, Price Should Include the Cost of Delivery and Unloading. 5. Payment Date - In accordance with the GTD; (payment deadline 30 Days From Invoice Issue) The Buyer accepts the issuance and delivery of electronic invoices by the Seller, in accordance with Article 106n of the Act of March 11, 2004 on Goods and Services Tax (i.e. Journal of Laws of 2022, item 931, as amended; hereinafter referred to as the "VAT Act"). When issuing an electronic invoice, the seller is obliged to prepare it in pdf format. In the case of issuing an electronic invoice, the Seller is obliged to deliver it to the Buyer to the following e-mail address: Faktury@koleje-wielkopolskie.com.pl. 6. Guarantee conditions - In accordance with the GTC; 7. Deadline for Removing Defects Under the Guarantee - In accordance with the GTD; 8. Contractual penalties - Pursuant to § 7 of the GTD. iii. The course of the Proceedings: The Ordering Party informs that the Proceedings are conducted in two stages: A) Stage I - Bid submission, B) Stage II - Electronic Bidding - Bidding will start automatically after the end of Stage I and will last 15 minutes, and Extra Time - Sub-stage of Stage II, the conditions of which are precisely described in the Proceeding Settings on the Purchasing Platform. Each Overtime Lasts 3 Minutes - Starts if Within the Last 3 Minutes of the Proceedings, Another Bid (proceeding) is submitted correctly. Contractors approved by the Employer who fail to submit a Proposal correctly at the Bid Submission Stage (and Stage) will be automatically removed from further stages of the Proceedings. The Ordering Party grants approval for the Order by placing on the Purchasing Platform Information about the Selection of the Most Advantageous Offer. With the moment referred to in the preceding sentence, the Order is awarded. The Ordering Party is entitled to withdraw from awarding the Order at any time. IV. Contractor's declarations: The Contracting Entity informs that participation in the said Proceedings is tantamount to submitting the following declarations: 1. I declare that I have fulfilled the information obligations provided for in Article 13 or Article 14 of the GDPR*) towards the Natural Persons from whom I obtained personal data directly or indirectly in order to apply for a public procurement in this Procedure. *Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (General Data Protection Regulation) (OJ L 119 Z 04.05 .2016, p. 1). 2. I declare that I consent to the processing of my personal data provided by me voluntarily to the Ordering Party. Information Clause With Art. 13 of the GDPR - Has been posted on the Eb2b Purchasing Platform in the "Information Obligation" tab. 3. I declare that the Price Offer on the Purchasing Platform was submitted by the Person Authorized to Represent the Contractor. 4. I declare that the Contract in question will be implemented by Contractors who have an appropriate and documented maintenance and management system within the meaning of point 9.2 lit. B) of Annex Ii to the Commission Implementing Regulation (eu) 2019/779 of 16 May 2019 laying down detailed provisions on the Certification System of Entities in Charge of Vehicle Maintenance In accordance with Directive (EU) 2016/798 of the European Parliament and of the Council and repealing Commission Regulation (EU) No. 445/2011 (Journal of Laws e. L. Z 2019 R. P. 139 As amended) 5. I declare that the Contract in question will be performed by Contractors who are not subject to exclusion under Art. U. Ue L. Z 2014, No. 229, p. 1, as amended) and on the basis of Art. 1 of the Act of April 13, 2022 on Special Solutions for Counteracting the Support of Aggression against Ukraine and for the Protection of National Security (i.e. Journal of Laws of 2023, item 129, as amended) V. Additional information: Proceedings conducted in accordance with the provisions of § 25 of the Regulations for the award of sub-threshold sectoral contracts, available to Contractors On the Ordering Party's website https://koleje-wielkopolskie.com.pl/. Due to the impact of the execution of the Order on the Safety of Transport, within the Proceedings, the provisions of § 5 Sec. 2 And § 22 of the Regulations. The General Terms and Conditions of Delivery of Koleje Wielkopolskie Sp. Z O.O. Available on the Ordering Party's website https://koleje-wielkopolskie.com.pl/. Including the provisions of § 3 Sec. 7 of the General Delivery Terms of Koleje Wielkopolskie Sp. z o.o. Information Clause With Art. 13 of the GDPR - Has been posted on the Eb2b Purchasing Platform in the "Information Obligation" tab. Please direct any questions regarding the Procedure via the Purchasing Platform. Technical Support can be obtained at the telephone number in the footer at the bottom of the page. Pursuant to Art. 7 Para. 1 of the Act of April 13, 2022 on Special Solutions for Counteracting the Support of Aggression against Ukraine and for the Protection of National Security (i.e. Journal of Laws of 2023, item 129, as amended; hereinafter referred to as the "Sanctions Act"), The Contractor is excluded from this Public Procurement Proceeding: 1) listed in Lists Specified in Council Regulation (EC) No. 765/2006 of 18 May 2006 Concerning Restrictive Measures Due to the Situation in Belarus (OJ L 134, 20.05.2006, p. 1, as amended; hereinafter "Regulation 765/2006") and Council Regulation (EU) No. 2 69/2014 of 17 March 2014 on restrictive measures with regard to actions undermining or threatening the territorial integrity, sovereignty and independence of Ukraine (Journal of Laws EU L 78 Z 17.03.2014, p. 6, as amended; hereinafter "Regulation 269/2014") Or ę On the basis of the decision on the entry on the List determining the application of the measure referred to in Art. 1 Item 3 of the Sanctions Act; 2) whose Ultimate Beneficiary within the meaning of the Act of 1 March 2018 on Counteracting Money Laundering and Terrorist Financing (Journal of Laws of 2022, items 593, 655, 835, 2180 and 2185) is the person listed in the lists specified in Regulation 765/2006 I Regulation 269/2014 or entered on the list or being such a real beneficiary from February 24, 2022, as long as it was entered on the list on the basis of a decision on entry on the list determining the application of the measure referred to in Article 1(3) of the Sanctions Act; 3) whose Parent Undertaking within the meaning of Art. 3 Sec. 1 point 37 of the Act of 29 September 1994 on Accounting (Journal of Laws of 2021, item 217, 2105 and 2106 and of 2022, item 1488), is an entity listed in the lists specified in Regulation 765/2006 and Regulation 269/2014 or in entered on the list or being such a Parent Company from February 24, 2022, provided that it was entered on the list on the basis of a decision on entry on the list determining the application of the measure referred to in Art. 1 Item 3 of the Sanctions Act. Pursuant to Article 5k of Council Regulation (EU) No. 833/2014 of July 31, 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (Journal of Laws of the EU L. Z 2014 No. 229, p. 1, as amended; hereinafter "Regulation 833/2014"), Z The Contractor is excluded from this Public Procurement Procedure: 1) a Russian citizen, a natural person residing in Russia or a legal person, entity or body with its registered office in Russia; 2) A legal person, entity or body to which ownership rights, directly or indirectly, in more than 50% belong to Russian citizens or natural persons residing in Russia, or legal persons, entities or bodies based in Russia; 3) A natural or legal person, entity or body acting on behalf of or under the direction of the entity referred to in point 1) or 2) of this paragraph, and using Subcontractors, Suppliers or Entities whose abilities it depends on (if applicable), belonging to one of the above Categories of Entities, in the event that they account for more than 10% of the Order Value.
Closing Date10 Jan 2025
Tender AmountRefer Documents
Koleje Wielkopolskie Sp Z O O Tender
Electrical Goods and Equipments...+1Electrical and Electronics
Poland
Details: I. Subject of the Proceedings: 1. Description of the Subject of the Order: 1) Knorr-bremse Pressure Reducer 7.7bar-9bar Dc13:24v/0.8a – Pcs. 2 (photos attached) 2) Sandbox Pipe B79365/2- Pcs. 2 3) Sandbox Disc A90696 – Pcs. 2 4) Sandbox Nut A90695 – Pcs. 2 5) Sandbox Pipe A90694 – Pcs. 2 2. The Above-mentioned Assortment Must Meet the Following Requirements: Be New and Free from Defects, Original, Not Encumbered by the Rights of Third Parties. 3. Accompanying Documentation: With Delivery Required Declaration 2.1 of Conformity of the Goods, Issued by Its Manufacturer Based on the PN En 10204:2006 Standard or Quality Document Issued by Its Manufacturer Based on an Equivalent Standard (COC) - Applies to Items 1, 2, 3, 5, - Marking on the Product: Manufacturer's Name, Product Type/Catalog Number, Ce Mark If Required in the EU Or CoC Certificate of Conformity - Applies to Item 4 4. Having regard to the provisions of Commission Implementing Regulation (EU) 2019/779 of 16 May 2019 Laying Down Detailed Provisions on the Certification System of Entities in Charge of Vehicle Maintenance in Accordance with Directive (EU) 2016/798 of the European Parliament and of the Council And repealing Commission Regulation (EU) No. 445/2011 (Journal of Laws of the EU, 2019, p. 139, as amended; hereinafter "Regulation 2019/779"), the Ordering Party, as the Entity Responsible for Maintenance of Vehicles Within the meaning of Directive (EU) 2016/798 of the European Parliament and of the Council of 11 May 2016 on Railway Safety (recast version) (Journal of Laws of the EU, 2016, No. 138, p. 102, as amended), having regard to the impact of the Correct Execution of the Order on the safety of railway traffic, requires that the Subject Matter of the Order be Executed by Contractors Having an Appropriate and Documented Maintenance and Management System Within the meaning of Point 9.2 Lit. B) Annex Ii To Regulation 2019/779 (e.g. Iso 9001:2015, Iris). Confirmation That the Subject Matter of the Order Will Be Implemented by Contractors Having an Appropriate and Documented Maintenance and Management System Is to Submit the Declaration Referred to in Chapter Iv Point 4. 5. Offer Evaluation Criterion: 99% Price, 1% Completion Date. Ii. Conditions of Order Execution: 1. Completion Date The Ordering Party's expected order completion date is 7 Business Days. The Ordering Party Indicates That It Allows the Submission of Offers With a Deadline Longer Than 7 Business Days. - The Unit of "days" Specified in the Completion Date Criterion Should Be Understood as Business Days. - Execution Hours – 7:00 To 15:00 2. Principles of Delivery and Unloading of Goods – In Accordance with Owd 3. Place of Delivery: - Koleje Wielkopolskie Sp. Z Oo, Ul. Leśna 1d, 62-100 Wągrowiec, Rolling Stock Maintenance Point Wągrowiec - Applies to Item 1, - Koleje Wielkopolskie Sp. Z Oo, Ul. Kolejowa 3 /rolling stock maintenance hall Zbąszynek/, 66-210 Zbąszynek, Rolling Stock Maintenance Point Zbąszynek - Applies to Item 2 - 5. The Contractor, No Later Than 12 Hours Before Starting to Execution of the Order, Is Obliged to Confirm the Date of Delivery of the Goods, Including the Time of Delivery. 4. Delivery Method: One-off Delivery, The Price Should Include the Cost of Delivery and Unloading. 5. Payment Deadline – In Accordance with the T&Cs; (payment deadline 30 days from the date of invoice issuance). The Buyer Accepts the Issuance and Delivery of Electronic Invoices by the Seller, In Accordance with Art. 106n of the Act of 11 March 2004 on Tax on Goods and Services (i.e. Journal of Laws of 2022, item 931, as amended; hereinafter "VAT Act"). When issuing an Electronic Invoice, the Seller is obliged to prepare it in PDF format. - In the case of issuing an Electronic Invoice, the Seller is obliged to deliver it to the Buyer to the e-mail address: Faktury@koleje-wielkopolskie.com.pl. - In the case of issuing invoices in paper form, the Contractor is obliged to deliver them exclusively to the following address: Koleje Wielkopolskie Sp. Z Oo Ul. Składowa 5, 61-897 Poznań In the event of delivering a paper invoice to a different address, the invoice may be deemed as undelivered, which may result in delays in its processing and payment. 6. Warranty Terms – In Accordance with the General Terms and Conditions; 7. Deadline for Removing Defects Under the Warranty – In Accordance with the General Terms and Conditions; 8. Contractual Penalties – In Accordance with § 7 of the General Terms and Conditions. At the same time, the Ordering Party informs that the total value of Contractual Penalties may not exceed 20% of the Remuneration. Iii. The course of the procedure: The Ordering Party informs that the procedure is conducted in two stages: A) Stage I - Submission of offers that will take part in Stage II, B) Stage II - Electronic bidding - the bidding will start automatically after the end of Stage I and will last 15 minutes, as well as the extra time - sub-stage of Stage II, the conditions of which are precisely described in the procedure settings on the Purchasing Platform. Each extra time lasts 3 minutes - it starts if another offer (bid) is submitted correctly within the last 3 minutes of the procedure. Contractors accepted by the Ordering Party, who do not submit their offer correctly at the stage of submitting offers (stage I), will be automatically asked out of the further stages of the procedure. The Ordering Party grants a confirmation of the order by placing information on the selection of the most advantageous offer on the Purchasing Platform. At the time referred to in the preceding sentence, the Order is awarded. The Ordering Party is entitled to withdraw from the Order Award at any time. Iv. Contractor's Declarations: The Ordering Party informs that participation in the subject Proceedings is equivalent to submitting the following Declarations: 1. I declare that I have fulfilled the Information Obligations Provided for in Art. 13 or Art. 14 of the GDPR*) towards Natural Persons from whom I have directly or indirectly obtained Personal Data in order to apply for the award of a public contract in this Proceeding. *Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data and repealing Directive 95/46/EC (General Data Protection Regulation) (OJ EU L. 119 of 04.05.2016, p. 1). 2. I declare that I consent to the processing of my personal data provided by me voluntarily to the Ordering Party. Information Clause from Art. 13 of the GDPR - has been posted on the Eb2b Purchasing Platform in the "information obligation" tab. 3. I declare that the price offer on the Purchasing Platform was submitted by a person authorized to represent the Contractor. 4. I declare that the Subject Order will be Performed by Contractors Having an Appropriate and Documented Maintenance and Management System within the meaning of Point 9.2 Letter B) of Annex Ii to Commission Implementing Regulation (EU) 2019/779 of 16 May 2019 laying down detailed provisions concerning the Certification System of Entities in Charge of Maintenance of Vehicles in Accordance with Directive (EU) 2016/798 of the European Parliament and of the Council and repealing Commission Regulation (EU) No. 445/2011 (Journal of Laws of the EU, 2019, p. 139, as amended). 5. I declare that the Subject Order will be Performed by Contractors Not Subject to Exclusion Under Art. 7 Sec. 1 of the Act of April 13, 2022, on Specific Solutions for Counteracting Support for Aggression Against Ukraine and Serving the Protection of National Security (consolidated text: Journal of Laws of 2023, item 129, as amended) V. Additional Information: The Proceedings Are Conducted in Accordance with the Provisions of § 25 of the Regulations for the Award of Sub-threshold Sectoral Contracts, Available to Contractors on the Ordering Party's Website https://koleje-wielkopolskie.com.pl/. Due to the Impact of the Execution of the Order on Transport Safety, the Provisions of § 5 Section 2 and § 22 of the Regulations Apply to the Proceedings. The General Terms and Conditions of Supply of Koleje Wielkopolskie Sp. Z Oo Available On The Ordering Party's Website Https://bip.koleje-wielkopolskie.com.pl/zamowienia-publiczne/ogolne-warunki-dostaw/ Including the provisions of § 3 Sec. 7 of the General Terms of Supply of Koleje Wielkopolskie Sp. Z Oo Information Clause Under Art. 13 of the GDPR - Has Been Posted On The Eb2b Purchasing Platform In The "Information Obligation" Tab. Please Send Any Questions Regarding The Proceedings Through The Purchasing Platform. Technical Assistance Can Be Obtained At The Telephone Number In The Footer At The Bottom Of The Page. The Contractor is excluded from the Proceedings On The Basis Of The Premises Indicated In § 7 Sec. 1 Points 1-4, 6 Of The Regulations. The Ordering Party Is Entitled To Request The Contractors To Submit An Additional Offer Within The Meaning Of § 2 Sec. 10 Of The Regulations. Pursuant to Art. 7 Para. 1 of the Act of 13 April 2022 on Special Solutions for Counteracting Support for Aggression Against Ukraine and for Protecting National Security (consolidated text: Journal of Laws of 2023, item 129, as amended; hereinafter referred to as the "Sanctions Act"), the following Contractor is excluded from this Public Procurement Procedure: 1) Listed on the Lists Specified in Council Regulation (EC) No 765/2006 of 18 May 2006 concerning restrictive measures in connection with the situation in Belarus (OJ EU L 134 of 20.05.2006, p. 1, as amended; hereinafter referred to as "Regulation 765/2006") and Council Regulation (EU) No. 269/2014 of 17 March 2014 On Restrictive Measures In Respect Of Actions Undermining Or Threatening The Territorial Integrity, Sovereignty And Independence Of Ukraine (EU Official Journal L. 78 of 17 March 2014, p. 6, As Amended; hereinafter referred to as "Regulation 269/2014") Or Inscribed On The Basis Of The Decision On Inclusion On The List Of The Measure Referred To In Art. 1 Item 3 Of The Sanctions Act; 2) Whose Beneficial Owner within the meaning of the Act of 1 March 2018 on Combating Money Laundering and Terrorism Financing (Journal of Laws of 2022, items 593, 655, 835, 2180 and 2185) is a Person included in the lists specified in Regulation 765/2006 and Regulation 269/2014 or entered on the List or being such a Beneficial Owner from 24 February 2022, provided that He or she was entered on the List on the basis of the Decision on Entry on the List Determining the Application of the Measure Referred to in Art. 1 Item 3 of the Sanctions Act; 3) Whose Parent Entity within the meaning of Art. 3 Sec. 1 Point 37 of the Act of 29 September 1994 on Accounting (Journal of Laws of 2021, item 217, 2105 and 2106 and of 2022, item 1488), is an Entity Listed on the Lists Specified in Regulation 765/2006 and Regulation 269/2014 or Entered on the List or Being Such a Parent Entity from 24 February 2022, Provided That It Has Been Entered on the List Based on the Decision on Entry on the List Determining the Application of the Measure Referred to in Art. 1 Point 3 of the Sanctions Act.
Closing Date9 Jan 2025
Tender AmountNA
5681-5690 of 5689 archived Tenders