Vehicle Tenders
Vehicle Tenders
Brandenburgischer Landesbetrieb F r Liegenschaften Und Bauen Zentrale Vergabestelle Tender
Civil And Construction...+1Civil Works Others
Germany
Details: General contractor service for the planning and construction of a laboratory building for the Hne Eberswalde Planning (from service phase 5) and construction of a new laboratory building on the forest campus for the Eberswalde University for Sustainable Development, funded with ERDF funds, with the following key features: - Building with basement and three upper floors, with laboratories, workshops, technical test areas and office and meeting rooms - BGF 6,560 m², Bri 37,485 m³, 2,700 m² laboratory and office space - Challenging subsoil situation with groundwater lowering and infiltration in the forest - Load-bearing external walls (ug) made of reinforced concrete D = 35 cm in accordance with statics including formwork and reinforcement. Timber frame construction on the upper floors (standard grid 3.60m x 6.00m) with load-bearing timber supports (bsh) and some reinforced concrete supports (each 35x35cm) in the external wall area (eg). The stiffening stairwell cores and shafts are built in reinforced concrete D = 25cm, as are parts of the hall's external wall - Sophisticated technology, particularly ventilation systems, laboratory systems and building automation - Construction according to BNB criteria, silver standard certification - Extensive outdoor facilities including rainwater infiltration, local heating pipes, sewage and rainwater pipes, accessible by vehicle - With accessible hall - Photovoltaics on the roof - Refrigeration machine and heat pumps on the roof If you are interested in the above service, please send your expression of interest by email, stating the award number 2025 Hne, to Info.vergabe-bld@blb.brandenburg.de. This voluntary ex-ante transparency notice does not serve to initiate a formal procurement procedure. It merely serves to explore a possible group of bidders.
Closing Soon18 Jan 2025
Tender AmountRefer Documents
DEPT OF THE AIR FORCE USA Tender
Software and IT Solutions
Corrigendum : Closing Date Modified
United States
Details: Aflcmc Data Operations Cso
1.0 Overview
this Commercial Solutions Opening (cso) Is Intended To Be A Streamlined Vehicle To Allow For The Establishment Of A Modern Data Operations (dataops) Solution Supporting A Variety Of Critical National Security Systems. This Cso Authority Is Established Under Section 803 Of The National Defense Authorization Act (ndaa) For Fiscal Year (fy) 2022 (pub. L. 117-81) And Class Deviation 2022-o0007. The Air Force Life Cycle Management Center (aflcmc) Programs Require The Utilization And Leveraging Of The Latest Technology Advances From A Large Variety Of Prospective Contractors. Aflcmc Invites Innovating Technical Approach Proposals Addressing All Aspects Of Dataops Focusing On The Below Objective Areas. However, These Enumerated Focus Areas Are Minimum Requirements, And Aflcmc Is Open To The Identification Of Technologies Useful For Modernizing Dataops For Sophisticated Security And Weapon Systems. This Requires Delivering An Enduring, Secure, Robust, Efficient, Responsive, Agile, Elastic, And Extensible Classified Dataops Solution. This Cso Will Focus On Existing And Emerging Technologies And Platforms Across Aflcmc, Department Of The Air Force (daf), Department Of Defense (dod) And The Intelligence Community, As Well As Leveraging Commercial Markets To Perform An Integrated Analysis Of The Capabilities Of Varying Technologies That Support Our Critical National Security Systems And Prioritize Investments Over Time.
the Cso May Result In The Award Of Far Part 12 Contracts Or Other Transaction Agreements (otas) Under 10 Usc 4022, Through Calls Via Amendments To The Cso. The Government Anticipates Future Calls To Be Competitively Solicited. These Calls Will Contain Specific Areas Of Interest, User Stories And/or Problem Statements Related To Program Specific Dataops Focus Areas. These Specific Areas Of Interest Are What Prospective Contractors Shall Focus Their Solutions Towards. The Government Reserves The Right To Issue Separate Calls For Each Dataops Focus Area Or Combine Several Focus Areas Under An Individual Call.
disclaimer: No Proposals Or White Papers Are Being Requested At This Time. Those Will Be Requested Via Calls Published Under The Cso Solicitation.
aflcmc Is Not Obligated To Make Any Awards From Any Publicized Call, And All Awards Under This Cso Are Explicitly Subject To The Availability Of Funds And Successful Negotiations. The Government Is Not Responsible For Any Monies Expended By Any Vendor Prior To The Issuance Of Any Awarded Contract/agreement. Aflcmc Reserves The Right To Modify The Solicitation Requirements Of This Cso And Each Subsequent Call At Its Sole Discretion.
this Cso Seeks To Fund Innovative Technologies That Propose New Solutions To Expand Aflcmc’s Capabilities As It Relates To Modern Dataops Focus Areas. Aflcmc Is Interested In Capabilities From All Interested Vendors To Include, But Not Limited To, Traditional Defense Contractors, Nontraditional Defense Contractors, Large Businesses, Small Businesses, And Research Institutions (collectively Referred As Vendors). It Should Be Noted, Many Of The Critical National Security Systems Operate In Varying Classification Environments, Including Highly Classified Environments – Such As Collateral, Sensitive Compartmentalized Information, And Special Access Program. Though Some Dataops Focus Areas May Require Unclassified Work, Respondents Should Be Aware That Vendors Cleared To Work, Or The Ability To Be Cleared To Work, In Highly Classified Environments Will Be Necessary For Any Award. The Cso Is A Streamlined Acquisition Process That Seeks To Reduce Acquisition Timelines And Acquire New, Innovative Solutions That Vendors Can Bring Forth To Meet The Stated Areas Of Interest Detailed In Each Call.
2.0 Dataops Technology Focus Areas
aflcmc Is Seeking Capabilities To Prove Out End-to-end Dataops For Representative Modern Embedded Weapon Systems. The Desired End-state Is A Dataops Capability/prototype That Enables A Weapon System To Exploit Data Across The Full Lifecycle Of An Embedded Weapon System (development, Integration, Test, Deployment, Operations And Sustainment) Across All Classification Levels. An Ideal Partner Has First-party Ability To Directly Modify Underlying Commercial Hyperscale And Edge Cloud Fabric To Meet The Project’s Requirements Across All Classification Levels And Supporting Partners Would Be Considered As Enabling Providers Supporting Specific Aspects Of The Potential Solution.
each Technology Focus Area Identifies An Area Where Prospective Vendors Can Bring Substantial Value To Meet The Dataops Mission. These Focus Areas Are Meant To Be Read Expansively And Are Not Limited To The Enumerated Focus Areas. Additional Focus Areas May Be Included Via Amendments To This Cso. Aflcmc Prefers To Bucket Several Focus Areas Into Singular Calls, Which Means Vendors That Can Optimize Several Focus Areas Will Be Preferred. Aflcmc Requires Provider(s) To Deliver An Innovative State-of-the-art Commercial Solution That Innovates All Or Some Of The Following Capability Areas.
whether Using A Single Vendor Or Using Multiple Vendors, Aflcmc’s Intended Minimum Viable Product (mvp) Should Contain The Following Six Foundational Attributes:
1. Hybrid Cloud Iaas, Paas, Saas:
aflcmc Seeks Solutions For Infrastructure As A Service (iaas), Platform As A Service (paas), And Software As A Service (saas) That Can Be Hosted In A Hybrid Cloud Architecture. For The Purposes Of This Cso, “hybrid Cloud” Is Defined As: A Virtual Environment Provided To A Single Customer That Combines Private Cloud Compute, Storage, And Services Running On-premises With Compute, Storage, And Services Running In A Public Cloud Along With The Ability To Move Information Seamlessly And Transparently Between Them. All Offerings Will Be Templated, Extensible, And Elastically Scalable On Converged And/or Hyperconverged Infrastructure. All Offerings Will Support “bring Your Own ‘x’,” Such That Aflcmc Can Re-host Existing Workloads Without Interruption. All Offerings Will Comply With Relevant Department Of Defense Instructions, Regulations, And Policies Such That They Will Be Readily Accreditable And Interoperable With Existing Dod Networks And Information Systems At The Unclassified, Secret, And Top-secret Classification Levels. Additionally, All Offerings Will Be Accredited Or Readily Accreditable To Handle Special Access Program (sap) And Sensitive Compartmented Information (sci) Handling Caveats At The Secret And Top-secret Classification Levels.
2. Information Transport
aflcmc Is Seeking Solutions For Information Transport That Complies With Relevant Department Of Defense Instructions, Regulations, And Policies Such That Any Transport Solution Offering Will Be Readily Accreditable And Interoperable With Existing Department Of Defense Information Networks (dodin). Information Transport Offerings Will Also Be Required To Interoperate With The Hybrid Iaas, Paas, And Saas Solutions Offered Under Technology Focus Area (1). All Information Transport Offerings Must Operate In Multi-level Classification Environments, Enabling Multi-modal Connectivity From Anywhere In The Continental United States (conus) Via A High-bandwidth/low-latency Transport Solution. Cryptographic Transport Shall Meet National Security Agency (nsa) Type 1 Encryption Products Or Equivalent Cryptographic Solutions. Further, Aflcmc Requires Capability To Support Edge Resources To Operate In Disconnected, Intermittently Connected Or Low-bandwidth (dil) Environments. Initial Connectivity Shall Encompass Wright-patterson Air Force Base (afb), Edwards Afb, Tinker Afb And An Off-base Facility In The Dayton, Ohio Greater Metropolitan Area.
3. Fielding Operations
aflcmc Is Seeking Solutions To Rapidly Deploy The Solutions Acquired Under Focus Areas (1) And (2). To Support Our System Program Offices, Aflcmc Desires Rapid “full Network/crypto” Deployability To New Locations Within 30 Days From Award. Connections Should Include All Enterprise Capabilities Such As Nipr, Sipr, Jwics, Existing Classified, Sap Capable, Hyper-elastic Cloud Regions And Other Program Networks. Moreover, Aflcmc Seeks Automated Disaster Recovery Functionality To Support Continuity Of Operations (coops).
4. Crypto-net Managements/commercial Solutions For Classified
aflcmc Requires Innovative Commercial Products To Be Used To Protect Classified Data, Including Both Data-in-transit (dit) And Data-at-rest (dar). To The Maximum Extent Practicable, Technologies For Aflcmc Shall Be Procured In Accordance With Requests Commercial Solutions For Classified (csfc) Services To Comply With The Committee On National Security Systems Policy (cnssp) No. 11, National Policy Governing The Acquisition Of Information Assurance And Ia-enabled Information Technology Products.”
5. Network Operations Center (noc) / Security Operations Center (soc)
aflcmc Is Seeking Solutions To Support, Enable, And Augment Network Administration And Cybersecurity Operations For Solutions Acquired Under Focus Areas (1) And (2). Solutions Will Include Services That Enable Real-time And Near Real-time Metering, Auditing, Logging, Monitoring, And Status Reporting Of The Entire Virtual Environment.
6. Help Desk
aflcmc Requires A Customer Support Help Desk To Assist End-users In Navigating, Utilizing And Accessing Data Within The Cloud Environments. Aflcmc Envisions A Software-as-a-service That Can Manage All Communication And Network Channels, Establish Performance Metrics And Monitoring, And Is Maximally Available To Meet Mission Requirements.
aflcmc Is Interested In Additional Focus Areas Beyond The Above Six (6) Foundational Dataops Focus Areas. Aflcmc May Issue Calls Against The Below Supplemental Focus Areas. These Supplemental Focus Areas Are Meant To Be Read Expansively And Not Limited To The Enumerated Areas. Additional Focus Areas Beyond Those Enumerated Below May Be Included Via An Individual Call Against This Cso. Vendors That Meet Some Or All The Above Focus Areas May Also Identify Capabilities For The Additional Focus Areas.
i. Secure Access Service Edge
aflcmc Has A Requirement To Provide Consistent, Fast And Secure Access To Dispersed End Users Operating In Permanent Military Installations As Well As Forward Operating Base. Services Should Establish Identity-driven Security Compliant With Us Government Security Parameters For All Classification Levels (unclassified, Secret, Top Secret And Sap Programs).
ii. Software-defined Networking (sdn)
aflcmc Has A Requirement To Explore Implementing Sdn For Fully Networked Command, Control And Communications (c3) Functionality, Particularly In Day-to-day Military Operating Base (mob) And Sustainment Missions. Sdn Should Contain A High Degree Of Network Programmability And Reconfigurability To Meet The Needs Of Different Government Systems And Emphasize Advantageous Situational Awareness For Faster Response Times. Further, Aflcmc Is Interested In Other Ways Sdn Can Be Applied To Military Environments While Preserving Data Security.
iii. Edge Hyper-converged Infrastructure
aflcmc Anticipates Migrating Away From Discrete, Hardware-defined Systems Toward Software-defined Environments Permitting All Functionality Through Commercial Service Platforms While Protecting Data At All Classification Levels (unclassified, Secret, Top Secret, Sap).
iv. Zero Trust Architecture
given The Security Posture Of Many Programs, Aflcmc Requires Zero Trust Security Architecture By “never Trusting, Always Verifying” Network Security. Aflcmc Desires Strong Identity Verification, Validation Of Device Compliance Before Granting Access And Ensuring Least Privilege Access.
v. Infrastructure As Code (iac)
infrastructure As Code Is The Process Of Managing And Provisioning Computer Data Centers Through Machine-readable Definition Files, Rather Than Physical Hardware Configuration Or Interactive Configuration Tools. Aflcmc Seeks Partners Who Would Be Able To Expedite The Onboarding Process For New Players By Inflating An Iac Instance Within A Cloud Environment, Enabling Immediate Executability Of Licenses, Cloud Resource Management, And Other Capabilities.
vi. Cloud Native Design
on-premises (on-prem) Infrastructure Comes With An Immense Number Of Limitations As Well As A High Threshold For Entry For New Players In Terms Of Hardware Investments And Schedule Lead Times. Utilization Of Cloud Native Designs For All Network Mapping, Tooling, Iaas, Etc. Is Of Extreme Interest To Aflcmc.
vii. Software Defined Perimeter Enabling Classified Data Processing
aflcmc Participates In Work Ranging From Cui All The Way Up To Ts/sar/sci. Having Cloud Native, Logically Defined Perimeters Around Separate Enclaves That Exist At Various Classification Levels Is Critical To Mission Success. Organizations Should Be Prepared To Provide A Body Of Evidence To Demonstrate Logical Controls That Safeguard Information At Different Impact Levels (ils).
viii. Augmented And Virtual Reality Capabilities (e.g., Training, Maintenance, Etc.)
aflcmc Requires Commercial Augmented And Virtual Reality Capabilities To Assist Usaf Maintenance And Service Technicians To Interface With Usaf Systems. Applications Should Have Practical Maintenance Applications As Well As Training Capabilities.
ix. Data Encryption (at Rest, In Motion, Fips 140-3)
experience With Encrypting And Safeguarding Data Is Critical To Dod Success And Cybersecurity. Fips 140.3 Is The Standard That Shall Be Used In Designing And Implementing Cryptographic Modules That Federal Departments And Agencies Operate Or Are Operated For Them Under Contract. The Standard Provides Four Increasing, Qualitative Levels Of Security Intended To Cover A Wide Range Of Potential Applications And Environments. The Security Requirements Cover Areas Related To The Secure Design, Implementation, And Operation Of A Cryptographic Module. These Areas Include Cryptographic Module Specification; Cryptographic Module Interfaces; Roles, Services, And Authentication; Software/firmware Security; Operating Environment; Physical Security; Non-invasive Security; Sensitive Security Parameter Management; Self-tests; Life-cycle Assurance; And Mitigation Of Other Attacks. Organizations With Familiarization And Expertise With Establishing And Maintaining Compliant Data Encryption Could Be Of Use To The Dod.
x. Cyber, Secure Processing
due To The Sensitive Nature Of The Usaf Mission, The Ability To Leverage Cyber Secure Processing, Compliant With Dod Standards For All Impact Levels Is Required.
xi. Machine Learning (ml) And Artificial Intelligence (ai) Data Factories
aflcmc Seeks To Find New And Innovative Ways To Deploy And Enable Ai/ml To Identify Areas Of Interest Within Large Data Sets. These Data Factories Should Be Able To Pinpoint Concerns, Operational Or Safety Threats, And Shall Help Alleviate Human In The Loop (hitl) Man Hours Currently Required To Analyze Data Sets.
xii. Big Data Capability (data Warehousing, Data Lakes, Restructured Data Engineering)
test Sets Drive A Requirement To Capture, Transport, And Analyze Massive Amounts Of Data In Near-real-time, As Well As A Requirement To Host Portions Of That Data For An Indefinite Amount Of Time. Aflcmc Has Interest In Organizations That Have Experience With Long-term Data Lakes, And Data Storage With The Ability To Enable Petabyte And Exabyte Transport At High Speeds Between Various Conus And Oconus Locations.
xiii. Continuous Integration (ci)/continuous Development (cd) Software Pipeline
aflcmc Utilizes A Devsecops Framework For Many Of Its Projects. Ci/cd Pipelines Enable Alfcmc To Adapt To Emerging Threats. Entities With Experience In Optimization And Automation Of Ci/cd Pipelines Would Be Of Particular Use To The Dod.
xiv. Application Development + Application Refactoring For Cloud Deployment
aflcmc Sees A Future Use Case Of Being Able To Pull Data Developed From Another Dod Organization To Be Easily Digested And Absorbed From A Cloud Environment And Then Re-tooled To Meet Mission Requirements. Aflcmc Requires A Cloud-based Platform To Host Both The Outputs Of Application Development (ie App Store) As Well As A Toolkit To Refactor An Applications Targeted Use.
xv. Existing Capability Refactoring/integration For Application Programming Interface (api) Microservice Architecture
aflcmc Has A Potential Future Requirement To Establish A Microservice Architecture To Iteratively Build New Applications/capability Without Impacting Availability Of Systems. Aflcmc Requires Microservice Refactoring Within Designated Cloud-based Platforms.
xvi. Reverse Engineering
aflcmc Has A Potential Future Requirement For Reverse Engineering Services. In Instances Where Aflcmc Lacks Sufficient Engineering Data For Varying Aircraft Or Supporting System Parts, Aflcmc Desires The Ability To Conduct Reverse Engineering Services To Produce Underlying Engineering Data Necessary For Alternate Sourcing Of Parts Or Manufacturing Of The Parts.
xvii. Additive Manufacturing
aflcmc Desires Additive Manufacturing Services With The Capacity For Potential On-premises Manufacture Of Varying Parts. Aflcmc Seeks Commercial Application Of 3d Printers And Other Technologies That Permit Immediate Production Of Parts To Reduce Mission Incapable Awaiting Parts (micap) Status Of Critical Systems/assets.
3.0 Cso With Calls
this Cso Is A Hybrid Solicitation Against Which Both Closed Calls And/or Open Period Calls Can Be Published Via Amendments To The Cso. All Calls Issued Under This Cso Will Include Specific Instructions Including Dates, Areas Of Interest/focus Areas, Evaluation Criteria And Proposal Instructions To Offerors. While Each Offer Shall Adhere To This Cso, The Calls May Contain Other Information Of Which The Proposing Vendors Should Also Strictly Adhere. Each Call Will Be Announced On The Government Point Of Entry (beta.sam.gov), Which May Result In The Award Of A Far Part 12 Contract Or An Other Transaction Agreement (ota) Under 10 Usc 4022.
3.1 Closed Calls (one-step Or Two-step)
over The Period Of This Cso, Calls May Be Issued To Request White Papers And/or Proposals For Specific Areas Of Interest/focus Areas. It Will Be Determined On A Call-by-call Basis Whether The Announcement Is For A One-step (proposals Only) Or A Two-step Process (white Paper First, Then Proposals By Invite-only). The Submission For White Papers And Proposals Shall Be Submitted At A Specific Date And Time As Set For In Each Particular Call. White Papers And/or Proposals May Not Be Reviewed If Submitted After The Stated Date And Time.
3.1.1 One-step Calls
step 1: Proposal Due Date And Time Will Be Provided In Calls Issued Against This Cso. Aflcmc Will Make Selections From Vendor Proposals Only In Accordance With The Evaluation Criteria Contained In The Call.
3.1.2 Two-step Calls
step 1: White Paper Due Date And Time Will Be Provided In Calls Issued Against This Cso. Aflcmc, At Its Sole Discretion, May Or May Not Request A Presentation Or Discussion With Government Personnel About The White Paper.
step 2: Proposal Due Date And Time Will Be Provided In Requests For Proposal (rfps) Sent To Offers That Submit White Papers Who Are Evaluated Favorably In Accordance With The Evaluation Criteria Contained In Each Call.
3.2 Open Period Calls (two-step)
this Cso May Also Have Open Period Calls. Open Period Calls Will Only Be Issued Under A Two-step Process (see 3.1.2 Above). After An Open Call Is Published, White Papers May Be Submitted At Any Time During An Open Period For The Areas Of Interest/focus Areas Detailed Within The Call. It Is Important To Note That Only White Papers Submitted In Response To Specific Areas Of Interest/focus Areas Detailed In The Call Will Be Considered.
step 1: White Paper Due Date And Time Will Be Provided In Calls Issued Against This Cso. Aflcmc, At Its Sole Discretion, May Or May Not Request A Presentation Or Discussion With Government Personnel About The White Paper.
step 2: Proposal Due Date And Time Will Be Provided In Requests For Proposal (rfps) Sent To Offers That Submit White Papers Who Are Evaluated Favorably In Accordance With The Evaluation Criteria Contained In Each Call.
4.0 Definitions
cso With Calls: This Allows For The Publication Of An Umbrella Cso Solicitation That Contains Overarching Information But Does Not Request White Papers Or Proposals. The Cso Functions As A Framework Identifying The Technical Areas And Giving The Basic Terms And Administrative Information Of The Cso. The Requests For White Papers And/or Proposals Are Done By Issuing Calls That Are Published Via Amendments To The Cso. Calls Can Be Issued At Any Time During The Period Of Performance Of The Cso. Each Call Will Be Tailored To Best Fit The Acquisition Approached Identified By The Government. The Calls May Also Include Specific Terms And/or Conditions That Apply To That Particular Call Such As Technical Details, Security Requirements And/or Other Pertinent Clauses. Proposals Or White Papers Are Submitted Only When Calls Under This Cso Are Published.
open Period Calls: This Type Of Call Allows For White Paper And Proposal Submittals At Any Time Within A Specified Period As Set Forth In The Subsequent Call.
closed Calls: This Type Of Call Allows For White Paper And/or Proposal Submittals At A Specified Date And Time As Set Forth In The Subsequent Call. This Process And The Dates Associated With It Are More Structured Than Open Period Calls.
areas Of Interest/ Focus Areas: These Are Specific Requests For Innovative Solutions That Aflcmc Will Detail In Each Subsequent Call And Will Derive From The Technology Focus Areas (2.0 Above). Vendor’s Innovative Solutions Should Focus On Addressing The Specific Technology Focus Areas Contained Within A Specific Call.
white Paper: A Brief (usually 2-5 Pages) Summary Of The Proposed Technical Approach With An Accompanying Rough Order Of Magnitude (rom) Price.
pitch Day: Pitch Day Is A Tool That Can Be Used As Part Of The Call Process. When Used, Pitch Day Gives Vendors An Opportunity To Meet Aflcmc Personnel In-person And Provide A Pitch Of Their Proposed Technology. If A Pitch Day Is Utilized, Specific Details Explaining The Process And Evaluation Methods Will Be Contained Within A Specific Call.
other Transaction: Refers To The Type Of Other Transaction Agreement (ota) That May Be Placed As A Result Of This Cso And Associated Calls. This Type Of Ot Is Authorized By 10 Usc 4022 For Prototype Projects Directly Relevant To Enhancing The Mission Effectiveness Of Military Personnel And The Supporting Platforms, Systems, Components, Or Materials Proposed To Be Acquired Or Developed By The Department Of Defense (dod), Or For The Improvement Of Platforms, Systems, Components, Or Materials In Use By The Armed Forces. This Type Of Ota Is Treated By Dod As An Acquisition Instrument, Commonly Referred To As An “other Transaction” For A Prototype Project Or A Section 4022 “other Transaction.”
prototype Project: Can Generally Be Described As A Proof Of Concept, Model, Reverse Engineering To Address Obsolescence, Pilot, Novel Application Of Commercial Technologies For Defense Purposes, Agile Development Activity, Creation, Design, Development, Demonstration Of Technical Or Operational Utility, Or Combinations Of The Foregoing. A Process, Including A Business Process, May Also Be The Subject Of A Prototype Project. Although Assistance Terms Are Generally Not Appropriate In Ot Agreements In 10 U.s.c. 4022, Ancillary Work Efforts That Are Necessary For Completion Of The Prototype Project, Such As Test Site Training Or Limited Logistics Support, May Be Included In Prototype Projects. A Prototype May Be Physical, Virtual, Or Conceptual In Nature. The Quantity Of Prototypes/commercial Solutions Should Generally Be Limited To That Needed To Prove Technical Or Manufacturing Feasibility Or Evaluate Military Utility.
innovative: This Refers To Any Technology, Process, Or Method, Including Research And Development That Is New As Of The Date Of Proposal Submission; Or Any New Application Of An Existing Technology, Process Or Method As Of The Proposal Date.
nontraditional Defense Contractor: As Defined In 10 U.s.c. 2302(9) As An Entity That Is Not Currently Performing And Has Not Performed, For At Least The One-year Period Preceding The Solicitation Of Sources By The Dod For The Procurement Or Transaction, Any Contract Or Subcontract For The Dod That Is The Subject For Full Coverage Under The Cost Accounting Standards Prescribed Pursuant To 41 U.s.c. 1502 And The Regulations Implementing Such Section. This Includes All Small Business Concerns Under The Criteria And Size Standards In 13 C.f.r. Part 121.
small Business Concern: Defined In The Small Business Act (15 U.s.c. 632) And 13 C.f.r. Part 121.
5.0 Contract/agreement Details
as Stated In The Overview Section, Calls Issued Under This Cso Can Result In The Award Of Either A Far Part 12 Contract Or An Other Transaction Agreement (ota) Under 10 U.s.c. 4022. Regardless Of The Contract Instrument, Aflcmc Chooses To Pursue The Contract/agreement Type For All As Fixed Price, Which Includes Firm Fixed Price (ffp) And Fixed Price Incentive (fpi). Future Solicitations Are Not Accepting Offers For Grants Or Cooperative Agreements As The Purpose Of This Cso Is To Transfer Something Of Value Directly To The Government.
the Government Will Be The Sole Decision Authority On Whether To Pursue A Far Part 12 Contract, An Ota Or No Award At All. The Government Reserves The Right To Award Some, All Or None Of The Proposal From The Responses To Each Call. The Contracting/agreements Officer Reserves The Right To Negotiate Directly With The Offeror On The Terms And Conditions Prior To Execution Of The Resulting Contract/agreement On Behalf Of The Government. Be Advised That Only A Contracting/agreements Officer Has The Authority To Enter Into, Or Modify, A Binding Contract/agreement On Behalf Of The United States Government.
5.1 Prototyping
this Cso May Result In The Award Of Prototype Projects, Which Include Not Only Commercially Available Technologies Fueled By Commercial Or Strategic Investment, But Also Concept Demonstrations, Pilots, And Agile Development Activities That Can Incrementally Improve Commercial Technologies, Existing Government-owned Capabilities, And/or Concepts For Broad Defense And/or Public Application. The Government Reserves The Right To Award A Far Part 12 Contract Or An Other Transaction (ot) Under 10 U.s.c. 4022 Agreement (including An Ot For A Prototype Project And A Follow-on Ot Or Contract For Production), Or A No Award At All. Calls Issued Under This Cso Constitute Competitive Procedures. Aflcmc May Competitively Award Ots For Prototype Projects That Provide For The Award Or A Follow-on Production Contract Or Ot For Production To Participants In The Ot For Prototype Projects Without The Use Of Further Competitive Procedures, If The Participant In The Ot For Prototype Projects Successfully Completes The Prototype Project, As Permitted By 10 Usc 4022(f).
5.1.1 Iterative Prototyping
a Contract Or Ot For A Prototype Awarded Under This Cso Shall Allow For An Iterative Prototyping Process. An Iterative Prototyping Process Will Allow The Government To Modify, By Mutual Agreement, The Scope Of A Prototype Contract Or Ot To Allow For The Adaptation And Modification Of The Technology Being Prototyped To Meet Additional Unique And Discrete Purposes/mission Sets. The Sequential Prototype Iterations May Result In A Separate Prototype Project Rather Than A Modification Of The Original Prototype Contract Or Ot. These Additional Unique And Discrete Purposes/mission Sets Can Be Generated By Aflcmc Or Originate Within Any Organization That Aflcmc Supports.
5.1.2 Successful Completion Of A Prototype
a Prototype Project Is Complete Upon The Written Determination Of The Appropriate Approving Official (program Manager And Contracting/agreements Officer) For The Matter In Question That The Efforts Conducted Under A Prototype Contract Or Ot: (1) Met The Key Technical Goals Of A Project; (2) Met The Metrics Incorporated Into The Prototype Contract Or Ot; Or (3) Accomplished A Particularly Favorable Or Unexpected Result That Justifies The Transition To A Production Contract Or Ot. Furthermore, Prior To Successful Completion Of A Prototype Project Under This Cso, The Government Can Transition Any Aspect Of The Prototype Project Determined To Provide Utility Into Production While Other Aspects Of The Prototype Project Have Yet To Be Completed.
5.1.3 Follow-on Production Of A Prototype
after Award Of A Prototype Using Ot Authority, The Government And Vendor May Negotiate A Follow-on Contract Or Ot For Production Or Solution Integration With Or Without Further Competition. Any Concept/technology/solution Successfully Proven Through A Prototype Ot Can Be Transitioned To A Production Contract. The Government Reserves The Right To Award A Follow-on Contract Or Ot Before The Prototype Is Compete, Under Competitive Procedures As Provided In 10 U.s.c. 4022.
any Call Posted By The Government Under This Cso Could Result In The Potential Award Of A Follow-on Production Or Solution Integration Contract Or Ot.
the Government Reserves The Right To Extend The Performance To All, Some Or None Of The Selected Solutions And Decisions Will Be Made Based On The Availability Of Government Funds.
5.2 Other Transaction Agreements (otas) Specifics
in Accordance With 10 U.s.c. 4022(c), If An Agreement For A Prototype Is Utilized And If That Agreement Provides For Payments In A Total Amount In Excess Of $5m, The Agreement Will Include A Mandatory Clause That Provides For The Comptroller General The Ability To Examine The Records Of Any Party To The Agreement Or Any Entity That Participates In The Performance Of The Agreement. The $5m Amount Includes The Base Agreement Plus Any Options.
additionally, To Enter Into An Ot For A Prototype Agreement Under 10 U.s.c. 4022, One Of The Following Conditions Must Be Met:
there Is At Least One Nontraditional Defense Contractor Or Nonprofit Research Institution Participating To A Significant Extent In The Prototype Project.
all Significant Participants Other Than The Federal Government Are Small Business Concerns Or Nontraditional Defense Contractors.
parties To The Transaction Other Than The Federal Government Must Pay At Least One Third Of The Prototype Total Cost.
the Senior Procurement Executive Determines That Exceptional Circumstances Justify The Use Of An Ot To Provide An Innovative Business Arrangement Not Feasible Under A Contract Or To Expand The Defense Supply Base In A Manner Not Practical Under A Contract.
all Otas Awarded Under This Cso Will Contain Prohibitions On The Use Of Certain Telecommunications Devices In Accordance With Dfars 52.204-25. Further Specifics And Requirements As It Relates To Ots May Be Applicable And Included In Subsequent Calls Published Under This Cso.
6.0 Closed Calls
this Cso Will Have Close Calls That Consist Of Either A One-step Or Two-step Process, Which Will Be Specified In Each Individual Call. For A One-step Call, Only Proposals Will Be Solicited. For A Two-step Call, White Papers Will Be Solicited First And Then, Consistent With This Section, Subsequent Requests For Proposals May Follow After The Government Reviews The White Paper.
any Part Of This Process May Be Modified Or Altered By Aflcmc In The Calls Or Through An Amendment To This Cso. It Is Important To Note That At No Stage Is Aflcmc Obligated To Make Any Awards And All Awards Are Subject To The Availability Of Funds And Successful Negotiations. The Government Is Not Responsible For Any Monies Expended By Vendors Prior To The Issuance Of Any Contract/agreement Award.
6.1 One-step Closed Call Process
6.1.1 Call Published
aflcmc Intends On Publishing A Call Via An Amendment To This Cso. The Call Will Specifically State The Cso Call Type (closed, One-step). This Call Will Provide A Required Date And Time For Submission Of The Proposal. The Call Would Also Detail The Specific Areas Of Interest Being Solicited For, Required Proposal Content, Evaluation Criteria And Detailed Requirements Unique To That Particular Call.
6.1.2 Proposals Received
proposals That Are Received On Time Will Be Evaluated Consistent With The Evaluation Criteria Identified Within The Call. After This Technical Review Is Complete, Aflcmc Will Notify Each Prospective Vendor As To Whether Their Proposal Was Selected To Proceed To The Contract Negotiations And Fact-finding Stage.
6.1.3 Contract Negotiations And Fact Finding
if A Vendor Is Notified That It Has Been Selected To Proceed To The Next Stage, Then Contract Negotiations And Fact-finding Will Occur. This Includes Contract Formation, Scope, Cost/price And Any Other Terms And Conditions The Contracting/agreements Officer Requires Discussion. It Is Important To Note That At This Stage Aflcmc Is Not Required To Make An Award, Which Is Expressly Contingent Upon Successful Negotiation Of Cost/price, Terms And Conditions And The Availability Of Funds.
6.1.4 Award Decision
after Contract Negotiations And Fact-finding Are Complete, Aflcmc Will Render A Decision(s) Whether Or Not To Enter Into A Contract/agreement With The Prospective Vendor.
6.2 Two-step Closed Call Process
6.2.1 Call Published
aflcmc Would Publish A Call Via An Amendment To This Cso. The Call Would Specifically State That The Cso Call Type Is A Two-step, Closed Call. This Call Will Provide A Specific State And Time When Prospective Vendors May Submit Their White Papers. The Call Would Also Detail The Specific Areas Of Interest Being Solicited For, Required White Paper Content, Evaluation Criteria And Details Any Other Requirements Unique To That Particular Call.
6.2.2 White Papers Received
aflcmc Will Review Submitted White Papers In Accordance With The Evaluation Criteria Specified In The Call. If A Vendor’s White Paper Is Evaluated Favorably By Aflcmc, The Government Will Send Initially Selected Vendors A Request For Proposal (rfp). Invited Vendors Will Proceed To Preparing And Submitting A Proposal For Evaluation. Additional Details Will Be Included Within The Rfp.
6.2.3 Incorporate Sections 6.1.2-6.1.4
after The Submission Of The White Papers And Issuance Of Rfps To Favorably Evaluated White Papers, The Remaining Process Is The Same As The One-step, Closed Call. Therefore, Sections 6.1.2, 6.1.3 And 6.1.4 Are Hereby Incorporated By Reference.
7.0 Open Period Calls
this Cso May Have Open Period Calls That Consist Only Of A Two-step Process. For This Call Type, The Process Will Mirror The Process Articulated In 6.2 Above; However, With The Important Distinction That White Papers Will Be Accepted At Any Time During The Stated Time Period On The Call. This Is In Contrast To A Closed Call Where All Proposals Are Required To Be Submitted At A Specific Date And Time Together And Follow A Standard Timeline For All Participants. For Open Period Calls, The Timelines Are Usually Less Structured And Broader In Nature. Typical Turn-around Times That Vendors Can Expect Are Usually Stated In The Call. Aflcmc Reserves The Right To Modify Or Alter Any Of These Instructions In Each Individual Call.
8.0 Evaluation Criteria
the Evaluation Criteria For White Papers And Proposals Will Be Explicitly Detailed In Each Individual Call. Solutions Will Be Evaluated On The Basis Of The Merit Of The Proposed Concept In Addressing The Areas Of Interest And Not Against Other Vendor’s Solution Briefs Submitted In Response To The Same Area Of Interest.
disclaimer: No Proposals Or White Papers Are Being Requested At This Time. Those Will Be Requested Via Calls Published Under The Cso Solicitation.
9.0 General Proposal Information
9.1 Proposal Content
below Is The Typical Structure And Required Volumes For Proposal Submission. Aflcmc Reserves The Right To Alter Or Change The Structure And Required Content For Each Proposal Submission As Specified In A Particular Call.
title Page (does Not Count Against Page Limit) Including Company Name, Cage Number (if Applicable), Title, Point Of Contact Name, Date, Email, Address, Phone, Organization/office Symbol (if Applicable). Identify If You Or A Proposed Subcontractor Are A Small Business Such As 8(a), Small, Disadvantaged Business, Woman-owned Business, Hubzoned Small Business, Veteran-owned Business, Service Disabled Veteran Owned Business, Historically Black College Of University And Minority Institution. Identification Of Potential Sponsor(s) Organizations.
volume 1: Technical Volume: This Will Typically Contain A Page Limit And Require Specific Technical Details The Government Requires All Prospective Vendors To Address.
volume 2: Cost Volume: This Section Is Where Vendors Shall Detail The Proposed Cost By Breaking Down The Overall Proposed Price Into Specific Cost Categories (ex. Direct Labor, Overhead, Direct Materials, Other Direct Costs, Profit). The Government Reserves The Right To Specify A Cost Volume Format In Any Particular Call.
9.2 Proprietary Information
information Constituting A Trade Secret, Commercial Or Financial Information, Confidential Personal Information, Or Data Affecting National Security Must Be Clearly Marked. It Shall Be Treated In Confidence To The Extent Permitted By Law. This Restriction Does Not Limit The Government’s Right To Use Information Contained If It Is Obtained From Another Source Without Restriction. Aflcmc Assumes No Liability For Disclosure Or Use Of Unmarked Data And May Use Or Disclose Such Data For Any Purpose. If A Vendor Is Awarded A Contract As A Result Of Or In Connection With The Submission Of Proprietary Data In The Proposal, The Government Shall Have The Right To Duplicate, Use Or Disclose The Data To The Extent Provided In The Resulting Contract/agreement.
proposals Containing Data That Is Not To Be Disclosed To The Public For Any Purpose Or Used By The Government Except For Evaluation Purposes Shall Include The Following Sentences In Accordance With Far 52.215-1(e)(1) And (2) On The Cover Page:
“this Proposal Includes Data That Shall Not Be Disclosed Outside The Government And Shall Not Be Duplicated, Used, Or Disclosed—in Whole Or In Part – For Any Purpose Other Than To Evaluate This Proposal. If, However, A Contract Is Awarded To This Offeror As A Result Of – Or In Connection With – The Submission Of This Data, The Government Shall Have The Right To Duplicate, Use, Or Disclose The Data To The Extend Provided In The Resulting Contract. This Restriction Does Not Limit The Government’s Right To Use Information Contained In This Data If It Is Obtained From Another Source Without Restriction. The Data Subject To This Restriction Are Contain In Sheets [insert Numbers Or Other Identification Of Sheets].”
each Restricted Data Sheet Should Be Marked As Follows:
use Or Disclose Of Data Contained On This Sheet Is Subject To The Restriction On The Title Page Of This Proposal.
9.3 Classified Proposals
classified Whitepapers/proposals Will Not Be Accepted Under This Cso Unless Otherwise Stated In The Call. If Topics Require Classified Work, The Proposing Vendor Must Have A Facility Clearance In Order To Perform The Work.
9.4 Security
security Classification Will Be Determined For Each Call/award. If Classified Data Will Be Accessed Or Generated, A Facility And Storage Clearance, At The Required Classification Level, Will Be Required And The Proposal Will Discuss Appropriate Personnel And Facility Clearances.
if A Vendor Has Any Reason To Believe Their Concept May Reference Ideas Or Operations That Require Special Protection, The Vendor Should Immediately Contact The Contracting/agreements Officer For Further Instruction.
additionally, If A Dd254 Is Applicable For A Call/award, Vendors Must Verify Their Cognizant Security Office Information Is Current With Defense Security Service (dss).
9.5 Promotional Material
promotional And Non-project Related Discussion Is Discouraged, And Additional Information Provided Via Universal Resource Locator (url) Links Or On Computer Disks, Cds, Dvds, Video Tapes Or Any Other Medium Will Not Be Accepted Or Considered In The Proposal Evaluation Unless Otherwise Directed By The Call Or The Contracting/agreements Officer. This Also Means That Unnecessarily Elaborate Brochures Or Proposals Are Not Desired.
9.6 Small Business
far-based Contracts Awarded Pursuant To This Cso Shall Include Far 52.219-8, Utilization Of Small Business Concerns (oct 2018). Far-based Contract Awarded Pursuant To This Cso Which Meet Far Subpart 19.7 Criteria For Small Business Subcontracting Plans Shall Include Far 52.219-9, Small Business Subcontracting Plan (march 2020).
vendors Shall Address Plans To Comply With These Requirements As Part Of Their Proposals If Seeking Ots Which Provide For Follow-on Non-competitive Production Contracts. Vendors Not Seeking Either Instrument In The Preceding Sentence Shall Clearly State So As Part Of Their Proposal And Shall Address These Requirements As Part Of The Competition For Follow-on Production Contracts. In The Event That Any Follow-up Production Contracts Are Required To Have Small Business Subcontracting Plans And Are Negotiated Using Far 15, Dfars 215.304(c) Small Business Participation Plan Shall Be Required.
9.7 Export-controlled Items
depending On The Proposal, It May Be Subject To Export Control (international Traffic In Arms (itar) 22 Cfr 120-131, Or Export Administration Regulations (ear) 15 Cfr 710-774). If The Effort Is Subject To Export Controls, Then A Certified Dd Form 2345, Military Critical Technical Data Agreement, Will Be Required To Be Submitted With Proposals. Dfars 252.225-7048, “export Controlled Item (jun 2013)” Clause Shall Be Contained In All Resulting Contracts.
9.8 Data Rights
all Proposal Submissions Shall Include Data Rights Assertions, If Applicable. This Will Be An Essential Element Of Each Proposal Submission.
aflcmc Reserves The Right To Negotiate Data Rights As Part Of The Contracting/agreement Process. Additionally, Each Call May Have Specific Data Rights Considerations Associated With It. Should This Be The Case, The Specific Rights Aflcmc Is Requesting Will Be Detailed In Each Call. Aflcmc Also Reserves The Right To Tailor The Data Management Approach For Each Individual Effort Based On The Needs For Each Situation.
9.8.1 Far Part 12 Considerations
in Accordance With Dfars 227.7102-1, Aflcmc Seeks To Acquire The Technical Data That Is Customarily Available On A Commercial Basis. As A Result, Dfars Clauses 252.227-7015 And 252.227-7037 Will Be Included On Each Far Part 12 Contract Awarded As A Result Of This Cso Or Any Of Its Calls. If Additional Data Rights Are Considered Warranted, Aflcmc Reserves The Right To Negotiate These With Prospective Vendors As Part Of The Contracting Process.
if The Government Pays For Any Portion Of The Development Costs, Dfars 252.227-7013 Will Be Included To Govern The Associated Technical Data For The Portion Of The Commercial Items That Was Developed Using Government Funds. For The Portion Of Commercial Items That Was Developed Exclusively At Private Expense, Dfars 252.227-7015 Will Still Govern The Technical Data To The Extent Is Commercial.
companies Whose Effort Originated Under The Sbir Program Will Maintain Standard Sbir Data Rights In Accordance With Dfars 252.227-7018 (class Deviation 2020-o0007).
additional Clauses May Be Applicable Depending On The Technology And Requirements Associated With It.
10.0 Other Information
10.1 Unique Item Identification
for Hardware Deliverables, Item Unique Identification In Accordance With Dfars 252.211-7003 May Be Required. Vendors May Contact The Contracting/agreements Officer For Additional Information.
10.2 Foreign-owned Businesses
foreign-owned Businesses May Independently Submit A Solution Or Do So As Part Of A Teaming Agreement With One Or More United States-owned Businesses. However, The Ability To Obtain A Contract/agreement Based Upon A Submission May Depend Upon The Ability For The Foreign-owned Business To Obtain Necessary Clearances And Approvals To Obtain Prescribed Information.
10.3 Within Scope Modifications
potential Vendors Are Advised That Awards Resulting From The Calls Under This Cso May Be Modified During The Performance To Make Within Scope Changes. Only A Contracting/agreements Officer Can Legally Bind A Contract/agreement Modification On Behalf Of The United States Government.
10.4 Non-government Advisors And Source Selection Information
non-government Advisors May Participate In The Evaluation Of All Submissions And Shall Have A Signed Non-disclosure Agreement (nda) With The Government. Non-governmental Advisors May Also Serve In Administrative And Assistance Support Capacities. The Government Understands That Information Provided In Response To This Cso Is Presented In Confidence And May Contain Trade Secrets Or Commercial Or Financial Information, And It Agrees To Protect Such Information From Unauthorized Disclosure To The Maximum Extent Permitted Or Required By Law.
aflcmc Will Treat All Submissions To Calls Published Against This Cso As Source Selection Information. During The Evaluation Process, Submissions May Be Handled By Non-government Advisors For Administrative Purposes And/or Technical Evaluations. All Government Support Contractors Are Bound By Appropriate Ndas. Submissions Will Not Be Returned Unless Otherwise Stated In The Call.
10.5 Multiple White Paper/proposal Submissions
vendors May Submit Multiple Submissions In Response To Any Single Area Of Interest Detailed In Each Call If Each Submission Represents A Separate And Distinct Concept. However, For Each Individual Submission, Prospective Vendors May Only Address One Distinct Technical Solution Per Submission Unless Otherwise Permitted In The Individual Call.
10.6 Fraud And False Statements
knowingly And Willfully Making False, Fictitious, Or Fraudulent Statements Or Representations May Be A Felony Under The Federal Criminal False Statement Act (18 U.s.c. 1001) Punishable By A Fine Or Up To $10,000, Up To Five Years In Prison, Or Both.
10.7 Duns And Sam Registration
vendors Must Have A Unique Entity Identifier (uei) And Must Register In The System For Award Management (sam) Prior To Receiving An Award Or Agreement. Vendors Must Not Be Suspended Or Debarred From Award By The Federal Government Nor Be Prohibited By Presidential Executive Order And/or Law From Receiving An Award.
10.8 Wawf Registration
as Specified In A Particular Call, Vendors May Be Required To Be Registered In The Prescribed Government Invoicing System (wide Area Work Flow). If Not Specified, The Call Will Explain How Invoicing Will Be Handled.
10.9 Supplier Performance Risk System (sprs)
in Order To Receive A Dod Contract, Every Vendor Will Be Required To Perform A Basis Nist Sp 800-171 Dod Assessment. That Process Is Described Here.
once The Basic Nist 800-171 Dod Assessment Is Complete, Each Contractor Will Need To Follow The Instructions Here To Enter The Results In Sprp On The Piee Website.
10.10 Cost Sharing Or Matching
cost Sharing Or Matching Will Be Considered Based On The Solutions Proposed And Details Associated With Each Call. Aflcmc Has Final Decision Authority On Whether To Enter Into A Cost Sharing Or Matching Agreement.
Closing Date8 Feb 2028
Tender AmountRefer Documents
DEPT OF THE AIR FORCE USA Tender
Energy, Oil and Gas...+2Solar Installation and Products, Electrical and Electronics
United States
Details: Advanced Research Announcement (ara)
fa9451-21-s-0001
directed Energy Technology Experimentation Research (deter)
air Force Research Laboratory/directed Energy Directorate
naics Code: The Naics Code For This Acquisition Is 541715 For Research And Development In The Physical, Engineering, And Life Sciences (except Nanotechnology And Biotechnology), And The Small Business Size Standard Is 1,000 Employees
federal Agency Name: Air Force Research Laboratory, Directed Energy, Phillips Research Site, Kirtland Afb Nm (afrl/rd)
ara Title: Directed Energy Technology Experimentation Research Announcement (deter)
ara Type: This Is An Open Ara With Calls; Initial Announcement
ara Number: Fa9451-21-s-0001
program Summary:
this Is An Open Ara Announcement Pursuant To The Authority Of 10 U.s.c. §4023 (formerly 10 U.s.c. §2373). Afrl/rd Is Interested In Receiving White Papers And Proposals Through A Two-step Process To Perform Research And Development (r&d), Modeling And Simulation (m&s), Design, Component/subsystem, Prototype Risk Reduction, Fabrication/purchase, Assembly, Integration, And Testing Of Directed Energy Source Components (to Include Spares And Alternate Component Technologies), And/or Systems And Any Required Accessories, Materials, And Supplies For Laboratory Research And Experimentation And Field Trials In A Relevant Environment To Demonstrate System Capabilities. Dialogue Between Prospective Offerors And Government Representatives Is Strongly Encouraged. *note: Afrl/rd Reserves The Right To Collapse A White Paper/two-step Into A One-step If The Situation Warrants The White Paper Contains Sufficient Technical Detail To Do Full Technical Proposal Evaluation Instead Of White Paper Evaluation.
*please See The Attached Deter Industry User Guide For Guidance On Definitions, Processes, Submission Requirements And Evaluation Criteria.*
background: Afrl/rd Equips The Joint Warfighter With Next-generation Technologies, Advanced Concepts, And Weapon System Options Across All Operational Domains To Become More Agile And Increase The Commercialization Potential Of Directed Energy Investments To Ensure The National Defense.
this Solicitation Intends To Use Acquisition Authorities Provided By 10 U.s.c. §4023 (formerly 10 U.s.c. §2373). This Authority Applies To Acquisition Of Items Related To “…ordnance, Signal, Chemical Activity, Transportation, Energy, Medical, Space-flight, And Aeronautical Supplies, Including Parts And Accessories, And Designs Thereof, That Are Necessary For Experimental Or Test Purposes In The Development Of The Best Supplies That Are Needed For The National Defense.” Consequently, White Papers And Proposals Should Address How The Proposed Effort Provides Benefits To The National Defense And A Strategy For Verifying Those Intended Benefits.
the Proposed Solutions Should Be Innovative And Substantially Improve National Defense Capabilities Across The Domains Of Directed Energy. While The Government Describes Discrete Topic Areas Below, It Also Anticipates That Certain Comprehensive Technology Solutions And Prototypes May Require Multidiscipline Approaches That Address Two Or More Topic Areas. The Topic Areas Are Covered Under This Announcement, Which May Be Used In Any Combination. The Government Reserves The Right To Add, Delete Or Modify The Topic Areas As Necessary.
communication Between Prospective Offerors And Government Representatives: Dialogue Between Prospective Offerors And Government Representatives Is Strongly Encouraged Throughout The Life Of This Ara. However, Communication Will Be Limited Once Full-proposals Are Submitted For Evaluation/review. Prospective Offerors Are Welcome To Request Sit-downs And Provide Demonstrations Of Their Capabilities. Discussions Shall Not Constitute A Commitment By The Government To Subsequently Fund Or Award Any Proposed Effort. No Guidance Related To Technical Approach Will Be Given. However, Questions Related To The Objectives Of The Effort Or Prior Similar Efforts May Be Answered. Offerors Are Advised That Only Contracting Officers Are Legally Authorized To Contractually Bind Or Otherwise Commit The Government.
this Will Be A Hybrid Announcement: This Announcement Has An Open Request For White Papers As Described Below. Calls May Be Issued Under This Announcement For Discrete Requirements. Call Types Can Vary And May Include, But Are Not Limited To, One-step, Two-step, Open, Closed, Staggered, Limited Calls Or Any Combination Therein. Afrl/rd Reserves The Right To Collapse A White Paper/two-step Into A One-step If The Situation Warrants The White Paper Contains Sufficient Technical Detail To Do Full Technical Proposal Evaluation Instead Of White Paper Evaluation.
open Announcement Request: Afrl/rd Kirtland Air Force Base Is Soliciting White Papers On The Research Effort Described In The Below Topic Areas Pursuant To The Authority Of 10 U.s.c. §4023 (formerly 10 U.s.c. §2373), Procurement For Experimental Purposes.
open Announcement Submission: White Papers Must Be Submitted To Https://usg.valideval.com/teams/deter/signup. If It Is Determined That A Classified White Paper Is Required, Please Do Not Deliver Any Classified Portion Of The White Paper, But Rather Contact The Deter Org Mailbox For Specific Delivery Instructions. Further Instructions For White Paper Submission Can Be Found In The Deter Industry User Guide Attached To This Announcement.
call Request: Calls, Other Than Limited Calls, Will Be Issued Under This Announcement Via The Government Point Of Entry (gpe) At Https://beta.sam.gov. Notification Of Calls May Be Announced On Other Platforms (i.e. Www.grants.gov) And Will Direct Offerors To The Gpe For Full Solicitation Details.
call Submission: Submission Requirements For Calls Will Be Specified In The Solicitation Documentation Of Each Call.
call Variations: Variations Of The Ara Call Process Are Available For Use. The Following Types Are Commonly Used, But Are Not Considered All Inclusive.
one-step: The One-step Process Is Used To Request Full Technical And Cost Proposals From Each Offeror. The Proposals Are Reviewed In Accordance With The Solicitation Criteria And Typically All Of A Selected Proposal, Part Of A Selected Proposal, Or None Of The Proposals May Be Selected For Award.
two-step: The Two-step Process Is Sometimes Used When A Large Number Of Proposals Are Anticipated. Potential Offerors Are Invited To Submit Brief Descriptive White Papers In Lieu Of Full Proposals. The Call Must State Whether An Unfavorable White Paper Review Will Bar The Offeror From Further Consideration. The Government May Retain Unselected White Papers For A Specific Period Of Time, Which Will Be Identified In The Solicitation. Full Proposals Are Requested From Those Offerors Selected In The White Paper Review Process. After Proposals Are Received, They Are Reviewed Consistent With The Process For One-step Aras.
open Call: This Approach Allows For White Paper And/or Proposal Submittals At Any Time Within A Specified Period. Open Calls Will Be Updated No Less Frequently Than Annually. White Papers/proposals Are Reviewed When Received During The Period That The Ara Is Open.
closed Call: This Approach Allows For White Paper And/or Proposal Submittals At A Specified Date And Time As Set Forth In The Ara.
staggered-closed Call: The Staggered-closed Call States A Specified Date And Time For Receipt Of Proposals Or White Papers, But Also Allows For Proposals/white Papers After The Date And Time Set For Proposal Receipt. All Offerors Should Be Cautioned, However, That The Likelihood Of Funding Proposals Received After The Specified Date And Time Is Substantially Reduced.
limited Call: This Approach Allows For Solicitation To A Limited Group Of Potential Offerors. Request For Proposals (rfp) Or Requests For White Papers Will Be Issued Directly To Potential Offerors Without A Requirement To Publish To The Gpe.
the Government May Issue Solicitations That Combine One Or More Of The Above Approaches.
open Announcement Modifications: Due To The Dynamically Evolving Nature Of Us Warfighter Directed Energy Needs, This Announcement Is Subject To Updates, Revisions, Or Additional Topic Areas. Therefore, Offerors Are Highly Encouraged To Continually Monitor Https://beta.sam.gov To Ensure They Receive The Latest Guidance For This Announcement. The Government Shall Provide Updates To This Announcement No Less Than Annually. Updates May Include Changes To: Topic Areas, Submission Requirements, Administrative Changes, Evaluation Criteria, Solicitation Methods, Etc. (not An Inclusive List).
type Of Contract/instrument: The Air Force Reserves The Right To Award The Instrument Best Suited To The Nature Of The Research Proposed. Accordingly, The Government May Award Any Appropriate Contract/instrument Type Under The Authorities Below:
federal Acquisition Regulation (far)
10 U.s.c. §4021 (formerly 10 U.s.c. §2371) "other Transaction For Research
10 U.s.c. §4022 (formerly 10 U.s.c. §2371b) "other Transaction For Prototype"
10 U.s.c. §4023 (formerly 10 U.s.c. §2373) "procurement For Experimental Purposes"
10 U.s.c. §4025 (formerly 10 U.s.c. §2374) "prize Competitions"
dod Grant And Agreement Regulation (dodgars)
the Government Anticipates That A Mix Of Contract/instrument Types Will Be Used Throughout The Life Of This Ara. Generally, Awards Under This Announcement Or Any Calls May Be Cost-plus-fixed Fee (completion And Term), Cost Contract, Firm Fixed Price, Other Transaction Authority, Etc.
note: If Proposing A Federal Acquisition Regulation (far) Type Contract, The Far Clauses Will Be Referenced At The Call Level Or Within The Request For Proposal. The Far And Supplement Provisions And Clauses Are Incorporated By Reference. The Full Text Of These Provisions And Clauses Can Be Found At Https://www.acquisition.gov.
if Proposing An Assistance Instrument (grants Or Cooperative Agreements) Then Articles And Guidance Found Under Dodgars, Code Of Federal Regulations (cfr) And Omb/dod Policy Shall Be Used And Followed As Appropriate.
if Proposing An Other Transaction (ot) These Far References And Clauses Would Not Apply. The Terms And Conditions Of An Ot Agreement Should Be Developed And Negotiated On A Case-by-case Basis.
estimated Program Cost: The Overarching Announcement Has An Unrestricted Ceiling. However, Individual Calls May Elect To Provide An Estimated Program Value Or Funding Profile For Planning Purposes.
anticipated Number Of Awards: The Air Force Anticipates Awarding Multiple Awards For This Announcement. However, The Air Force Reserves The Right To Award Zero, One, Or More Agreements, Other Transactions, Or Contracts For All, Some Or None Of The Solicited Effort Based On The Offeror’s Ability To Perform Desired Work And Funding Availability. There Is No Limit On The Number Of Awards That May Be Made To An Individual Offeror.
schedule: The Anticipated Period Of Performance Will Be Determined Through Dialogue Between Prospective Offerors And Government Representatives For Each Topic Area And Specified In Each Individual Award.
deliverables: Hardware And Software Deliverables Will Be Specified Within A Separately Priced Line Items And Data Deliverables Will Be Specified On Individual Cdrl(s) In Any Resultant Contract Or An Ot Article.
within Scope Award Modifications: Offerors Are Advised That Due To The Inherent Uncertainty Of Research And Development Efforts, Awards Resulting From This Announcement May Be Modified During Performance To Make Within Scope Changes, To Include But Not Limited To, Modifications Which Increase Overall Contract/award Ceiling Amount.
system For Award Management (sam) Registration: Before The Government Can Issue An Award, An Offeror Must Be Registered In The System For Award Management (sam). If An Offeror Was Previously Registered In Central Contractor Registration (ccr), The Information Has Been Transferred To Sam. However, It Is In The Offeror’s Interest To Visit Sam And Ensure That All Of Their Data Is Up To Date From Sam And Other Databases To Avoid Delay In Award. Sam Replaced Ccr, Online Representations And Certifications Application (orca), And The Excluded Parties List System (epls). Sam Allows Firms Interested In Conducting Business With The Federal Government To Provide Basic Information On Business Capabilities And Financial Information. To Register, Visit Https://www.sam.gov.
science & Technology (s&t) Program Protection [summary Only -- See Attached Industry Guide For Full Details]:
offerors Are Notified That Completion Of A S&t Program Protection Review With An Acceptable Risk Determination Is Required For All Awards Issued Under This Ara. To Reach An Acceptable Risk Level, Offerors May Be Asked To Provide A Mitigation Plan For Any Identified S&t Protection Risks. Offerors Selected For A Potential Award Will Be Required To Submit: 1.) Sf424 "research And Related Senior And Key Person Profile," 2.) Security Program Questionnaire And 3.) Privacy Act Statement. The (3) Template Documents Are Attached To This Announcement.
the Government Reserves The Right To Determine An Offeror Unawardable Based On An Unacceptable S&t Protection Risk Determination. During The Security Review Process, If It Is Determined That Covered Individuals Are Identified As Potentially Having A Conflict Of Interest/commitment, The Government Will Not Award The Contract/agreement.
announcement Period: The Overarching Announcement Has No End Date And Is Considered To Be In Effect Until Further Closed Or Rescinded.
submit All Questions To The Deter Org Mailbox (afrl.deter.ara@us.af.mil)
note: Call Points Of Contact Will Be Specified At The Call Level.
topic Areas
1. Directed Energy (de) Sources
this Category Of Supplies Covers Research, Development And Testing For All Directed Energy Sources In The Near-term And Far-term In Support Of National Defense. This Area Covers The Design, Component/subsystem, Prototype Risk Reduction, Fabrication/purchase, Assembly, Integration, And Testing Of Directed Energy Source Components (to Include Spares And Alternate Component Technologies), And/or Systems And Any Required Accessories, Materials, And Supplies For Laboratory Research And Experimentation And Field Trials In A Relevant Environment To Demonstrate System Capabilities. Systems May Also Be Hardened To Meet Specific Requirements Imposed For Operations In Any Domain To Include Ground/sea, Airborne, And/or Space. This Area Also Covers The Redesign, Refurbishment, Modification, And/or Upgrade Of Existing Sources, If Required, To Support Laboratory Experimentation, Field Or Flight Trials, And/or Demonstrations.
examples Of Directed Energy Sources Include, But Are Not Limited To:
a. Laser Sources
b. High Power Electromagnetic (hpem) Sources
2. Acquisition Tracking Pointing (atp), Beam Control (bc) And Atmospheric Compensation (ac) Systems
this Area Covers The Design, Component/subsystem Prototype Risk Reduction, Fabrication/purchase, Assembly, Integration, And Testing Of Any Hardware, Sensors, Control Electronics, And Software/firmware Required To Develop Atp, Bc And Ac Systems To Control The Propagation Of Directed Energy So As To Maximize Energy/irradiance On Target. This Area Also Includes Any Required Accessories, Materials, Supplies, And/or Services Necessary To Conduct Laboratory Experimentation And Field Trials In A Relevant Environment To Demonstrate System Capabilities. Systems May Also Be Hardened To Meet Specific Requirements Imposed For Operations In Any Domain To Include Ground/sea, Airborne, And/or Space.
3. De Weapon Systems
this Area Covers The Design, Component/subsystem Prototype Risk Reduction, Fabrication/purchase, Assembly, Integration, And Testing Of De Weapon Components And Systems, Diagnostics, Accessories, Materials, Supplies, And Services Necessary To Build/integrate Complete Weapon Systems For Laboratory Research, Experimentation And Field Trials In A Relevant Environment To Demonstrate System Capabilities. Systems May Also Be Hardened To Meet Specific Requirements Imposed For Operations In Any Domain To Include Ground/sea, Airborne, And/or Space. Systems Engineering Design/analysis And/or Trade Studies Are Relevant In Regards To Size, Weight, And Power (swap).
specific Topics Of Interest Include The Following Areas:
a. Feasibility Studies Of Innovative Hpem Applications
b. Integration Of Disparate Technologies For The Fielding Of New Hpem Systems And Weapons
c. Identification And Quantification Of Useful -hpem Effects
d. Development Of Hpem Sources That Have A Role In Future Applications
e. System Integration And Demonstration Of Future Hpem Capabilities
f. Power Subsystems
g. Thermal Management Subsystems
h. Command And Control Subsystems
i. Platform Integration
j. Detection, Targeting And Tracking Subsystems
k. Dotmlpf-p Studies And Experimentation
l. Conops, Conemps, Ttp Development And Experimentation
m. Performance Enhancement Technologies For Existing Systems
4. De Effects Testing
provide Testing Of Materials, Components, Subsystems, And Systems To Determine The Vulnerability, Susceptibility, And Accessibility Of Potential De Targets To De Exposure. This Includes The Design, Component/subsystem Prototype Risk Reduction, Fabrication/purchase, Assembly, Integration, And Testing Of Unique De Components, Sources, And Systems And Any Required Diagnostic And/or Special Test Equipment/tooling And Materials Necessary To Conduct De-material Interaction Physics Experimentation To Establish The Efficacy Of De Waveforms To Support The Development Of De Weapons System Requirements And/or Assessment Of Proposed De Weapon Systems. Develop Survivability Requirements And Recommendations For Space Systems And Support Vulnerability Predictions.
5. Modeling, Simulation And Analysis (ms&a)
this Area Covers The Development/procurement, Testing, Maintenance, Modification, Upgrade/reuse, And Execution Of Scientific Modeling, Simulation And Analysis Software And Requisite It Hardware Systems Necessary To Efficiently Execute Software To Support De Weapon System Design, Development, Testing, And Data Analysis Of Test Results. This Includes Campaign-level, Engagement-level, System, And Component-level Ms&a Codes To Create Test Scenarios, Assess Design Reference Mission Compliance, Provide Pre-test Predictions, And Conduct Post-test Assessment Of System Performance. In Addition, Sound Principles For Software Engineering And Development Must Be Employed For All Developed Software And Documentation. Robust Software Testing, Validation, And Verification Are Critical To Software Development Efforts. As Appropriate, Software Must Scale To Large Simulation Sizes And Be Portable To Massively Parallel Computer Architecture. Ms&a Software May Include Fast Running Engineering Codes And Detailed Physics Modeling Codes.
examples Of Ms&a Sub-topic Areas Include, But Are Not Limited To:
a. De System Performance Ms&a
b. De System Effects Ms&a
c. De System Target Assessment
d. De System Biosafety And Biological Effects
e. De Source And Component Virtual Design
f. Satellite Signatures And Radiometric/photometric Assessments Of Space Objects.
g. Assess Electro-optical Space Domain Awareness (sda) Systems And Architectures.
h. Space System Functional Modeling And Response
i. Conduct Space Domain Awareness In Non-traditional Orbits
j. Quantify Safe Operating Conditions For Lasers Operating Through The Atmosphere And Space
6. Wargaming
this Area Covers The Development/procurement, Testing, Maintenance, Modification, Upgrade/reuse, And Execution Of Wargaming And Scientific Modeling, Simulation And Analysis Software And Their Requisite It Hardware Systems Necessary To Efficiently Execute This Software To Support De Weapon System Design, Development, Testing, And Data Analysis Of Wargaming Results. This Includes Campaign-level, Engagement-level, System, And Component-level Wargaming Ms&a Codes To Create Test Scenarios, Assess Design Reference Mission Compliance, Provide Pre-test Predictions, And Conduct Post-test Assessment Of System Performance. In Addition, Sound Principles For Software Engineering And Development Must Be Employed For All Developed Software And Documentation. Robust Software Testing, Validation, And Verification Are Critical To Software Development Efforts. As Appropriate, Software Must Scale To Large Wargaming And Simulation Sizes And Be Portable To Massively Parallel Computer Architecture. Wargaming Ms&a Software May Include Fast Running Engineering Codes And Detailed Physics Modeling Codes. Additionally, The Wargaming Area Should Provide General Wargaming Support To Include De Wargame Planning, Table Top, Ms&a, And Field Execution, And Wargame Reporting. In Addition, Provide Required Hardware, Software/firmware, Accessories, Materials, Supplies, Infrastructure, Diagnostics, Targets, Safety Equipment, And Services Necessary To Conduct Wargame Research, Experiments, Field And/or Range Testing Of De Components, Subsystems, Systems And Demonstrations Under Operationally Relevant Conditions.
7. Innovative Space Domain Awareness
provide Basic & Applied Research, Algorithms, Software/firmware, Materials, Supplies, And Services Necessary To Conduct Technology Maturation For Ground-based Surveillance Of Space Objects. Examples Include, But Are Not Limited To:
a. Closely-spaced Object Detection And Characterization.
b. Daytime Detection And Custody Of Satellites.
c. Orbit Determination Techniques And Algorithms For Satellites Significantly Affected By Lunar And Solar Gravity.
d. Rapid, On-demand Orbit Determination.
e. Extremely Wide Field-of-view Image Exploitation For Satellite Discovery And Custody.
f. Multi-phenomenology Sensor Integration (e.g. Optical, Radar, Passive Radiofrequency).
g. Active Optical Techniques For Satellite Ranging And Characterization (e.g. Lidar, Ladar).
h. Sharp Imaging Of Satellites Through The Atmosphere At Low Elevation Angles.
i. Characterization Of Atmospheric Deep Turbulence For Image Restoration.
j. Techniques, Algorithms, Architecture Designs, Etc. For Collaborative Autonomous Telescope Networks.
k. Multispectral, Hyperspectral, And Polarimetric Characterization Of Space Objects.
l. Techniques To Improve And Exploit Short- And Long-wave Infrared Characterization Of Space Objects.
m. Machine Learning Algorithms To Advance The State-of-the-art In Areas Such As:
• Point Spread Function Correction.
• Space Object Image Classification Using Resolved Or Non-resolved Sensor Imagery.
• Uncorrelated Track Association.
• Space Object Feature Identification, Model Inference, And Attitude Regression.
• Space Object Detection In Noisy Image Backgrounds.
• Generation Of Realistic Space Scene Imagery / Discernment Of Real Vs. Synthetic.
• Detection Of Subtle, Unique Image Artefacts Of Interest In A Large Dataset.
8. Experiments, Testing And Demonstrations
provide General And Specialized Test Support To Include De Test Planning, Laboratory And Field Demonstration, And Reporting. Provide Required Hardware, Software/firmware, Accessories, Materials, Supplies, Infrastructure, Diagnostics, Targets, Safety Equipment, And Services Necessary To Conduct Testing Of De Components, Subsystems, Systems, And Demonstrations Under Operationally Relevant Conditions.
9. Laboratory Materials, Supplies And Services In Support Of Experimentation
provide Required Ancillary Support Systems, Equipment, Materials, Supplies, Infrastructure, And Services Necessary To Support The Development, Operation, Maintenance, And Testing Required To Evaluate De Through Experimentation In The Laboratory And Field During Trials Or Flight/range Testing. Examples Include, But Are Not Limited To:
a. Clean Rooms, Anechoic Chambers And Necessary Equipment, Materials, Supplies And/or Services To Support All Aspects Of De Source Development, Laboratory Experimentation, And Field Trials.
b. Diagnostic And/or Special Test Equipment/tooling Required For:
• Quality Assurance Of Components Used In The Fabrication Of De Sources
• Damage Assessments And Root Cause Analysis Of Component, Subsystem And System Failures
• Characterization Of Target Physical, Chemical, And Electromagnetic Properties
• Fabrication, Assembly, Integration, Testing, Operation And Maintenance Of De Sources
• Direct/indirect Measurements Of De Source Performance
c. Power Systems Required To Operate The Source And Any Required Ancillary Equipment Or Services Necessary To Install, Operate And/or Maintain These Systems
d. Unique Chemicals To Operate, Clean, And/or Maintain Direct Energy Systems And/or Laboratory Facilities Used For Directed Energy Experimentation As Well As Any Required Materials, Accessories Or Services Required For Safe Storage, Use, Operations, And Proper Disposal Of Any Hazardous Materials
e. Thermal Management Components And Systems, To Include System-level And Facility-level Systems, Necessary To Support Safe Operations Of De Sources. This Includes Materials, Supplies, Accessories, Services And/or Any Support Required For Safe Operations And Maintenance Of The System As Well As Proper Disposal Of Hazardous Materials/waste.
f. Any Required Safety Related Items Necessary To Fabricate, Assemble, Integrate, Test, Operate And Maintain Directed Energy Sources.
g. Transportation: This Area Covers All Transportation, To And From, Various Research Facilities And Sites To Conduct Field And/or Flight Experimentation, Testing And/or Trials Of Directed Energy Components, Sub-systems And Systems And Demonstrations. This Includes Such Items As Associated Support/handling Equipment, Special Test Equipment/tooling, Spares, And Diagnostic/testing Equipment. Specialized Transportation Requirements May Include: Design, Fabrication And/or Purchase Of Specialized Packaging, Crating, Enclosures, Trailers, And/or Vehicles From Which The Transported Item(s) Will Be Operated/maintained To Conduct Experimentation, Testing And/or Trials Outside Of Traditional Laboratory Spaces. Additionally, This Area Covers Aspects Of Safe Transportation To And From Remote Field Locations, Department Of Defense Test Ranges, And Installations In Support Of Field And/or Flight Experimentation, Testing And/or Trials.
***updates As Of 09 Dec 2021***
a) Deter Industry User Guide, Amendment 02
Updateto Section 2.b., White Papers Shall Be Submitted Using The Following Link Https://usg.valideval.com/teams/deter/signuppapers
Update To Section 2.c.2.
b) Deter White Paper Cover Sheet, Attachment 1, Amendment 1
***updates As Of 06 Jan 2022***
Corrects The Valid Eval Web Address In The Open Announcement Description Above
From: Https://usg.valideval.com/teams/deter/signuppapers
To: Https://usg.valideval.com/teams/deter/signup
***updates As Of 11 Aug 2022***
a.) Update Statute Renumbering Throughout Deter Ara And Industry Guide
10 U.s.c. §4021 (formerly 10 U.s.c. §2371) "other Transaction For Research
10 U.s.c. §4022 (formerly 10 U.s.c. §2371b) "other Transaction For Prototype"
10 U.s.c. §4023 (formerly 10 U.s.c. §2373) "procurement For Experimental Purposes"
10 U.s.c. §4025 (formerly 10 U.s.c. §2374) "prize Competitions"
b.) Update Deter Contracting Points Of Contact
primary: Mr. Bill Sherrod, Afrl/rdk
c.) Include Requirement For Science & Technology (s&t) Program Protection
all Proposal Responses (not Required For White Paper Submission) Are Required To Submit The Following With All Responses:
1.) A Sf424 (research And Related Senior/key Person Profile)(see Attachments), And
2.) Completed Program Security Questionnaire (see Attachments)
3.) Privacy Act Statement (see Attachments)
d.) Request For 500 Word Abstract On White Paper Submissions
offerors Shall Include A Short 500 Word Abstract As A Part Of The White Paper Narrative That Broadly Describes The Fundamental Intent Of The Proposed Effort Along With The Intended Approach.
e.) Duplicate White Paper Submissions
offerors Advised That Duplicate White Paper Submissions Within The Same 12 Month Timeframe Will Not Be Separately Evaluated. Please Do Not Submit Duplicate White Paper Submissions Within The Same 12 Month Period.
***updates As Of 08 Oct 2024***
a.) Summary Of Awards:
below Is A Summary Of All Awards Made From Inception (8 Feb 2021) To Date (08 Oct 2024), Under The Deter Ara:
1.) Calls:
15 Calls Have Been Issued Or Are In Progress
13 Awards Have Been Issued Or Are In Progress, With A Combined Value Of $188m
2.) White Paper Open Announcement:
193 White Papers Have Been Received
32 Awards Have Been Issued Or Are In Progress, With A Combined Value Of $165m
b.) Updated Evaluation Rubric:
slight Changes Have Been Made To The Evaluation Rubric, Which Can Be Found Under The Attached "valid Eval Rubric (version 2.0)". The Updated Evaluation Rubric Will Be Used For All White Paper And Proposal Evaluations Effective Immediately.
c.) Afrl Directed Energy -- Virtual Industry Day:
date: Wednesday, 6 Nov 2024
location: Virtual Only (tentative Platform: Microsoft Teams Conference)
schedule:
0900-1000 Rdl Laser Division Q&a Session
1000-1100 Rds Space Electro-optics Q&a Session
1300-1400 Rdh High Power Electro-magnetics Q&a Session
1400-1500 Rdm Modeling, Simulation & Wargaming Q&a Session
discussion Level: Controlled Unclassified Information (cui). Participants Are Required To Have A Current And Active Dd Form 2345 To Access Or Participate In Any Virtual Q&a Session
registered Participants May Attend One, Some Or All Of The Q&a Sessions
registration Link: Https://forms.osi.apps.mil/r/h8zzpzdnht
registration Closes Wednesday, 30 Oct 24 At 1700 Mt. After The Registration Form Is Submitted, Afrl Will Verify The Status Of The Dd Form 2345 And Will Send A Confirmation Email That The Registration Is Complete. A Subsequent Email Will Be Sent No Later Than 4 Nov 2024 With The Links To The Q&a Session.
***updates As Of 22 Nov 2024***
incorporated Updated Science & Technology (s&t) Program Protection Guidance Above (summary Only) And Under The Attached Industry Guide (full Details).
incorporate "privacy Act Statement" As Additional Attachment.
Closing Date10 Aug 2027
Tender AmountRefer Documents
It Uudenmaan Hyvinvointialue Tender
Others
Finland
Details: The Purchase is based on the Legislation of Social and Health Care, the rules of Indeksident and Group Transportation of Customers and Padents, as well as the Others, particularly associated with the loss of Social and Health Care, the Ne.ary Formal Transportation to Askola, Loviisa, Porvoo and Sipoo Kunn. Loviisa City is responsible for maintaining the service in Lake Lapinjä.. The transport service must include the necessary vehicle and the driver. The Comprehensive Control of Transports, Order Transmission and Trailing Resisds to the Order Control Centre.", "The Personnel Transportation of Social Welfare under the Social Welfare Act, the Disability Service Act and the Development Disability Act. Acquisden targets are health care Personnel transportation is a Munt patient transfer and other health care services. Energy Management Service Related Emergency Transports by Ambulance are Not the Purchase Target.” The purpose of the acquis. is to ensure the continuity, availability and coverage of the Services, as well as the attention of the Users of the Services. “The acquisn is also targeted by the transport of social and health care personnel, and also in a small quantity of other Muscriber’s requirement. The acquisa may be subject to a small amount of goods transport linked to the.scriber’s operations. Goods transportation is, for example, social and health care supplies and materials transportation and similar. Transportation of goods may be carried out separately or mixed into passenger transport. “The City of Porvoo is responsible for maintaining the procurement system on behalf of all subscribers who are engaged in the acquis Han cooperation. The City of Porvoo Publishes the crew of the crew of the injury plug and implements the In. Offer Compet.s of the Purchase System. City of Porvoo Makes a Procurement Procedure Related Solutions and Purchase Decisions on behalf of All Orderers and inform the parties involved. Each Ordering Board makes its own Conkining Agreement and is responsible for complying with the Con Oual Obligations on its own Side.” The acquis Per system is in force four (4) years from its establishment. The subscriber may continue to exist with the New Cont notice."", "the contracting entity will implement in the future the insurance policies of the Personnel Services in the Dynamic Procurement System. In order to participate in the Offer Compet.s, the Service Producer must submit an application for injury by responding to this application. The contracting entity reserves 20 days for the processing of applications received in the past at 27.8.2021. The first Inä Offer Plcs in the Purchase System will be sent once all Applications received within the set deadline have been processed. The terms and conditions of the procurement system are described in the Appendix to the infringement in the Dynamic Procurement System. """
Closing Date29 Jun 2025
Tender AmountNA
Stadt Radolfzell Tender
Civil And Construction...+1Civil Works Others
Germany
Details: The City Of Radolfzell Intends, As The Responsible Authority In Accordance With Section 6 Paragraph 1 Sentence 2 I. V. M. Section 6 Paragraph 3 Sentence 2 Öpnvg Baden-württemberg, To Issue A Public Service Contract (öda) For Public Passenger Transport Services With Motor Vehicles In Accordance With Section 2 Paragraph 1 Of The Passenger Transport Act (pbefg). . The Subject Of The Intended Öda Is All Current And Future Public Passenger Transport Services (öpnv) Of The Radolfzell City Transport (including Regular Scheduled Transport). The Transport Services Included At The Start Of Operations (see Section Ii.2.7) Are Described In The Supplementary Document (see Section Vi.1, C). The Intended Award Affects The Entire Service Area Covered By The Aforementioned Transport Services In The City Of Radolfzell As Well As Areas In The Municipality Of Allensbach (service Of A Stop At The Allensbach Wildlife Park In The Period From May 1st To The Last Sunday Of The Summer Holidays In Baden-württemberg). In Total, According To The Current Planning Status, The Transport Services To Be Awarded Amount To Around 600,000 Scheduled Kilometers Per Year In Regular Service And Around 30,000 Occupied Kilometers Per Year In Scheduled Service. The Öda Refers Here To Public Transport Services I. S. V. § 8 Pbefg Regardless Of The Design Of The Operating Form In Detail (in Particular Regular Service I. S. V. §§ 42, 43, 44 Pbefg And Flexible Operating Forms, If Necessary Also I. S. V. § 46 I.v.m. § 2 Para. 6, Para .7 Pbefg). The Öda Will Contain Regulations According To Which The Transport Offer Within The Framework Determined In The Öda Is Adapted To Changing Transport Needs Or Financial Conditions And To The Local Transport Concept Of The City Of Radolfzell In Its Current Version As Well As To Other Changing Circumstances (such As Technical Developments, Environmental And Environmental Concerns Climate Protection, Introduction Of Additional Public Transport) Needs To Be Adapted. The Possible Changes Relate To The Type And Scope As Well As The Quality Of The Transport Services And The Transport Tariffs. This Can Result In Changes In Terms Of Both The Existence And The Course Of The Above-mentioned Lines As Well As The Timetable And Fares Offered As Well As The Form Of Service (regular Line Operation Or Flexible Forms Of Service) Or Other Aspects Such As: Vehicle And Other Quality Standards. As A Result, The Above-mentioned Lines May Change, New Lines May Be Added Or Current Lines May Be Eliminated. The Amount Of Traffic Recorded By The Öda Can Be Reduced Or Increased. With This Information, The City Of Radolfzell Complies With The Publication Obligation According To Section 8a Paragraph 2 Pbefg I. V. M. Art. 7 Paragraph 2 Vo (eg) No. 1370/2007. For Further Details And Regarding The Deadline According To Section 12 Paragraph 6 Sentence 1 Pbefg, Please Refer To The Statements Under Section Vi.1).
Closing Soon24 Jan 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+2Others, Building Construction
United States
Details: 2
department Of Veterans Affairs
request For Qualifications (rfq)
no. 36c77625q0008
dayton Va Medical Center
redevelopment Opportunity
dayton, Ohio
7 October 2024
date And Time Responses Due: February 7, 2025, At 3pm Est
date And Time Questions Due: October 25, 2024
disclaimer
the Information Presented In This Request For Qualifications And All Supplements, Revisions, Modifications, Updates, And Addenda Thereto (collectively, The Rfq ), Including (without Limitation) Narrative Descriptions And Information, Is Not Represented To Be All Of The Information That May Be Material To An Offeror S Decision To Submit A Response To This Rfq To Finance, Design, Develop, Renovate, Construct, Operate And Maintain The Project (as Defined Below) On A Portion Of The U.s. Department Of Veterans Affairs (va) Campus Named In Attachment A.
neither Va, Nor Any Of Its Contractors, Subcontractors, Officers, Employees, Counsel, Advisors, Or Agents Make Any Representation Or Warranty, Whether Express, Implied, Or Created By Operation Of Law, As To The Accuracy Or Completeness Of This Rfq Or Any Of Its Contents Or Materials Referred To Or Provided Pursuant To Or In Connection With This Rfq, And No Legal Liability With Respect Thereto Is Assumed Or May Be Implied. Any Information Or Site Description Is Merely Provided To Assist Offerors In Their Independent Analysis Of The Decision To Submit A Response. The Transactions Contemplated By This Rfq Involve Significant Risks. Offerors And Their Advisors Should Review Carefully All The Information Set Forth In The Rfq And Any Additional Information Available To Them To Evaluate Such Risks.
no Additional Representation Or Warranty, Whether Express, Implied, Or Created By Operation Of Law, Will Be Made By Va. No Person Has Been Authorized To Make Or Give On Behalf Of Va Any Other Written Or Oral Representation, Warranty Or Assurance With Respect To The Project Or The Accuracy Or Completeness Of The Information Provided In This Rfq Or Otherwise And, If Any Such Representation, Warranty, Or Assurance Is Made Or Given, It May Not Be Relied Upon By Any Offeror As Having Been Made By Or On Behalf Of Va, And Va Shall Not Have Any Liability For Or With Respect To Such Statements.
table Of Contents
1 Executive Summary 1
1.1 Authority To Outlease 1
1.2 Rfq Terms And Condition Acceptance 2
2 Proposed Development Of Site 2
2.1 Overview Of Solicitation Structure 2
2.2 Location, Background And Description Of The Site 3
2.3 Development Considerations 3
2.3.1 National Historic Preservation Act 3
2.3.2 National Environmental Policy Act And Other Environmental Considerations 4
2.3.3 Infrastructure 4
2.3.4 Legal Considerations 4
2.3.5 Prevailing Wages 5
2.3.6 Handicap Accessibility 6
2.3.7 Eul Statutory Requirements 6
2.3.8 Hrp Statutory Requirements 6
2.3.9 Va S Goals And Objectives 6
2.3.10 Other Considerations 7
3 Lease Exhibits 7
4 Submital Requirements 8
4.1 Time And Date Of Submission 8
4.2 Manner Of Submission 8
4.3 Response Content 9
4.3.1 Cover Letter With Background And Administrative Information 10
4.3.2 Legal Requirements 11
4.3.3 Section 1: Development And Operations Concept 12
4.3.4 Section 2: Development Team Qualifications, Experience, And Past Performance 15
4.3.5 Section 3: Property Management (and, If Applicable, Supportive Services) Team Qualifications, Experience, And Past Performance 16
4.3.6 Section 4: Financial Wherewithal And Experience Securing Financing 17
5 Evaluation Criteria 18
5.1 Initial Review 18
5.2 Formal Presentations 18
5.3 Selection Process 18
5.4 Selection Timeline 18
5.5 Evaluation Factors 19
6 Miscellaneous Terms And Conditions Applicable To This Rfq 23
6.1 Authorizations By Submission Of Response 23
6.2 Teaming Arrangements And Special Purpose Entities 23
6.3 Hold Harmless 23
7 Ineligibility 23
8 Additional Information 24
attachment A: Site Information 25
attachment B: Supportive Housing Sample Lease Exhibit Outlines 32
attachment C: Non-supportive Housing Sample Lease Exhibit Outlines 33
department Of Veterans Affairs Rfq #36c77625q0008
26
request For Qualifications
dayton Va Medical Center
redevelopment Opportunity
dayton, Ohio
executive Summary
the United States Department Of Veterans Affairs (va), Under Its Enhanced-use Leasing (eul) Authority (38 United States Code (u.s.c.) §⧠8161 To 8169) And The Historic Reuse Program (hrp) Authority Derived From Title 54 U.s.c. §⧠306121-306122 (formerly Section 111), Is Pleased To Issue This Request For Qualifications (rfq Or Solicitation), Seeking Competitive Responses From Qualified Organizations (offerors) To Serve As Developer(s) In Redeveloping Underutilized Vacant Buildings (described In Attachment A) On The Dayton Va Medical Center Campus In Dayton, Ohio. Redevelopment May Occur Under Va S Eul Authority To Benefit Veterans (directly Or Indirectly) And/or Create Permanent Supportive Housing For Homeless And/or At-risk Veterans And Their Families Or Under Va S Hrp Authority To Reuse And Preserve The Historic Property.
authority To Outlease
va Is Authorized To Outlease Land And Improvements To Non-federal Entities Through The Eul Program Or Hrp. Such Leases Can Have A Term Of Up To Ninety-nine (99) Years.
va S Office Of Asset Enterprise Management (oaem) Administers The Eul Program. The Eul Authority Allows Va To Partner With The Public Or Private Sector To Maximize Returns To Veterans From Underutilized Capital Assets. It Allows Selected Developers To Finance, Design, Develop, Renovate, Construct, Operate And Maintain Supportive Housing And/or Commercial/other Use(s) That Benefit Veterans Directly And/or Indirectly. Va Envisions That Development Of The Eul Site Will Entail Well-planned And Coordinated Endeavor, Which Is Compatible With The Campuses Ongoing Mission-related Activities And The Surrounding Non-va Community. Va S Eul Authority Allows Va To Make Capital Contributions To Eul Projects Using Minor Construction Appropriations Funds.
the Hrp Authority Allows Va To Manage, Outlease, Or Exchange Historic Facilities (available Land, Buildings, And Other Resources) In A Manner Consistent With Va S Obligation To Maintain Historic Assets. An Hrp Agreement Can Be Either A Long-term Outlease (up To 99 Years) Of Facilities Under Va S Jurisdiction Of Control To The Public Or Private Sector Or An Exchange Of Historic Properties. This Program Is Administered By The Office Of Real Property (orp) Within Va S Office Of Construction And Facilities Management (ocfm). Unlike Under Eul Authority, Va Is Not Authorized To Make Capital Contributions To Projects Under Its Hrp Authority.
offeror(s) Under Both Va Authorities Will Be Authorized And Responsible For Financing, Designing, Developing, Renovating, Constructing, Operating, And Maintaining The Development Site In Accordance With Detailed Development Plan Approved By Va ( Development Plan ) And Applicable Federal, State, And Local Laws, Codes, Ordinances, And Regulations.
rfq Terms And Condition Acceptance
va Reserves The Right, At Any Time, Without Notice, At Its Sole And Absolute Discretion, To: (a) Reject Any Or All Responses; (b) Extend Any Deadline Set Forth In This Rfq; And (c) Terminate The Rfq Process, In Whole Or In Part.
proposed Development Of Site
for Offerors Proposing Under Va S Eul Authority, Public Law No. 117-168, The Sergeant First Class Heath Robinson Honoring Our Promise To Address Comprehensive Toxics Act Of 2022 (pact Act) Allows Va To Enter Into Euls That Provide Supportive Housing Or Enhance The Use Of The Leased Property By Directly Or Indirectly Benefitting Veterans.
project Types May Include But Are Not Limited To:
supportive Housing
skilled Nursing Facilities
assisted Living Facilities
technical Job Training Centers
research Facilities
mixed-use, Etc.
projects That Are Unlikely To Meet Statutory Requirements For Euls Include But Are Not Limited To:
commercial Hotels
warehouses, Etc.
pursuant To 38 U.s.c. § 8162(b)(5), A Proposed Eul May Not Provide For Any Acquisition, Contract, Demonstration, Exchange, Grant, Incentive, Procurement, Sale, Other Transaction Authority, Service Agreement, Use Agreement, Lease, Or Lease-back By Va Or Any Other Federal Entity. Va May Only Receive Cash Consideration And No Forms Of In-kind Consideration Can Be Accepted In Lieu Of Cash Consideration. Va May Enter Into An Eul Without Receiving Consideration.
for Offerors Proposing Under Hrp Authority, Va May Lease Or Exchange Its Historic Property So Long As The Lease Or Exchange Will Adequately Ensure The Preservation Of The Historic Property.
overview Of Solicitation Structure
through This Rfq, Va Is Presenting A Site Available For Redevelopment For An Offeror; Offerors May Submit A Single Response To This Rfq To Develop The Site Referenced In Attachment A. See Sections 4 And 5 Of This Rfq For Required Response Content And Evaluation Criteria.
location, Background And Description Of The Site
the Intent Of This Solicitation Is To Outline The Requirements For Selection Of A Developer(s) And Its Team(s) For Purposes Of Redeveloping Underutilized Vacant Buildings. It Is Expected That Any Redevelopment Would Also Enhance The Dayton Va Medical Center Campus.
the Developer Entering Into An Eul Or Hrp Agreement With Va Will Be Responsible For All Financing, Designing, Developing, Renovating, Constructing, Operating, And Maintaining The Facility.
pursuant To 38 U.s.c. §8163, Va Conducted A Public Hearing On The Eul Concept On September 26, 2022, At 6:00 Pm Est; Virtually With The Microsoft Teams Video Conference Application.
attachment A Contains Additional Information Regarding The Location, Background Information, And Description Of The Subject Site.
Development Considerations
in Deciding Whether To Submit A Response To Develop The Proposed Site, The Offeror Should Consider Certain Factors.
national Historic Preservation Act
prior To Entering Into An Eul Or Hrp Agreement With Va, The Offeror Shall Work With Va To Fulfill The Requirements Of The National Historic Preservation Act, 54 U.s.c. §⧠300101, Et Seq. ( Nhpa ) In Conjunction With The Development And Finalization Of The Proposed Development Plans. Section 106 Of Nhpa, 54 U.s.c. §⧠306108, Requires The Consideration Of The Effects Of The Project On Historic Properties Listed Or Eligible For Listing In The National Register Of Historic Places (nrhp) And Provides Representatives Of The State And Local Governments, Tribes And Other Interested Consulting Parties Sufficient Opportunity To Comment On The Development Plan Prior To Execution Of The Eul Or Hrp Agreement. Section 106 Of The Nhpa Also Requires The Developer To Seek Ways To Avoid, Minimize, Or Mitigate Adverse Effects (e.g., Demolition) That The Development Plan Might Have On Any Historic Properties During The Execution Stage Of The Eul Or Hrp Agreement. Consummation Of This Effort Will Be Accomplished By Va. Va Will Act In Concert With The Offeror, When Necessary, In The Accomplishment Of Historical Compliance. For Guidelines Related To Historic Preservation Requirements, Visit Https://www.achp.gov/protecting-historic-properties.
national Environmental Policy Act And Other Environmental Considerations
the Eul Or Hrp Project Will Be Subject To All Applicable Federal, State, And Local Environmental Laws, Codes, Ordinances, And Regulations, Including But Not Limited To, The Comprehensive Environmental Response, Compensation, And Liability Act ( Cercla ), 42 U.s.c. §⧠9601-9675; The Resource Conservation And Recovery Act ( Rcra ), 42 U.s.c. §⧠6901, Et Seq; And The National Environmental Policy Act ( Nepa ), 42 U.s.c. §⧠4321-4347. Nepa Requires That Federal Agencies, Including Va, Identify And Evaluate The Potential Environmental Impacts Of A Major Federal Action (e.g., An Eul) On The Human Environment. Va Will Complete The Nepa Analysis Upon Va S Selection Of The Offeror. The Offeror Will Be Required To Provide Development-specific Information To Support The Analysis. The Nepa Analysis Must Be Completed By Va, Prior To Execution Of The Eul Or Hrp Agreement. The Offeror Will Be Responsible For Complying With Mitigation Requirements Of The Nepa Analysis, If Required. The Offeror Shall Comply With All Applicable Environmental Laws And Will Be Responsible For Any Required Cleanup/remediation Activities. Additionally, The Offeror Will Be Responsible For Any Necessary Environmental Studies, Reports, Site Assessments, Seismic, Etc. That Are Needed By Offeror To Meet Offeror S Obligations. Lastly, The Offeror Will Be Responsible For Complying With Any Regulatory Requirements For The Abatement And Removal Of Any Asbestos And/or Lead-containing Material.
infrastructure
any Available Information About Infrastructure Regarding The Site Is Included In Attachment A. It Is The Responsibility Of The Offeror To Pay Utility Providers For All Utilities Through Separate Metering. It Is The Responsibility Of The Offeror To Bring In The Necessary Utility Lines (water, Sewer, Gas, Electricity, Fiber Optics, Communication, Cable, Etc.) To Operate The Eul Or Hrp Site. Va Is Not Obligated To Provide Selected Offeror Access To Va Owned Utilities Or Resources.
legal Considerations
overview
the Offeror Is Responsible For Conducting Its Own Due Diligence Regarding The Eul Or Hrp Site Including, Without Limitation, Whether (a) The Development Of The Eul Or Hrp Site, As Contemplated By The Response, Can Be Accomplished In Compliance With Applicable Federal, State, And Local Requirements (including Fire, Life Safety, Accessibility, Zoning, State And Local Building Codes, And Other Local Land Use Restrictions); (b) The Condition Of The Eul Or Hrp Site Is Suitable For The Offeror S Contemplated Use; (c) The Necessary Permits, Variances, Special Exceptions And Other Governmental Actions Or Approvals Required For The Contemplated Developments Can Be Reasonably Obtained (at No Cost Or Expense To Va); And (d) The Contemplated Use(s) Is Otherwise Practical And Economically Feasible. Property Is Under Concurrent Jurisdiction. Prior To The Execution Of The Lease Agreement, Offeror Will Need To Have Written Executed Agreements (e.g., Memorandum Of Understanding) Regarding Fire, Police, And Emergency Services In Place, Including Va Concurrence.
taxes
in Accordance With The Pertinent Provisions Of The Eul Statute (i.e., 38 U.s.c. § 8167), The Offeror During The Eul Term Will Be Subject To Any And All Applicable State And Local Taxes, Fees, Assessments, And Special Assessments Legally Chargeable To The Eul, The Offeror S Leasehold Interest, And The Offeror S Underlying Improvements. However, Neither Va S Interest In The Eul Nor The United States Fee Interest In The Underlying Properties Shall Be Subject, Directly Or Indirectly, To Any State Or Local Laws Relative To Taxation, Fees, Assessments Or Special Assessments.
security
offeror Is Responsible For Providing Security On The Site. The Offeror Shall Include In Their Response An Overview Of The Physical Security And Electronic Monitoring That Will Be Provided Based Upon The Individual Space Requirements And Tenant Mix Of The Proposed Eul Or Hrp Project. As Part Of The Response, It Should Be Noted That It Is The Requirement Of The Offeror To Provide Security 24/7 For The Site.
energy Conservation And Sustainable Design Requirements
the Va Sustainable Design Manual () Is The Guidance That Defines The Methodology To Incorporate Sustainable Design, Including Energy Efficiency, In The Eul Or Hrp Project. Va Encourages Offerors To Incorporate Sustainability Over And Above The Standards Found In The Current Va Sustainable Design Manual. In Previous Projects, Some Developers Have Proposed More Aggressive Energy Efficiency And Sustainability Milestones That Made Their Proposals, All Other Elements Considered Equal, More Attractive. To Take Advantage Of Existing Sustainability Work In The Private Sector That Is Well Accepted In The Construction Industry, Va Has Determined That Using A Third-party Rating System Is The Best Method For Fulfilling Va Sustainable Building Requirements In The Eul Or Hrp Project. The Offeror May Propose Using The Leadership In Energy And Environmental Design (leedâ®) Rating System, The Green Globesâ® Rating System, Or An Alternate Rating System. Va Requires That The Project Achieve At Least Leed Silver, Two Green Globes, Or An Equivalent Certification Level By The Alternate Rating Organization. Offerors Proposing To Use An Alternate Rating System Must Submit A Memo To The Va Project Manager Demonstrating That The Alternate Solution Achieves An Equivalent Level Of Certification As Leed Silver, Two Green Globes, Or Both.
prevailing Wages
unless The Offeror Can Demonstrate To The Satisfaction Of Va In The Form Of A Written Determination Or Written Correspondence From The U.s. Department Of Labor That The Offeror Or The Project Are Exempt Therefrom, Offeror Shall Comply With The Requirements Of The Davis-bacon Act, As Amended, 40 U.s.c. § 3141, Et Seq. And The Relevant Rules, Regulations, And Orders Of The Secretary Of Labor Applicable Thereto.
handicap Accessibility
the Offeror Will Be Required To Ensure That Its Design, Development, Construction, Operation, And Maintenance Plan And Activities On The Site Comply In All Respects With The Americans With Disabilities Act Of 1990, 42 U.s.c. §⧠12101, Et Seq., And The Architectural Barriers Act Of 1968, 42 U.s.c. §⧠4151, Et Seq., As Amended.
eul Statutory Requirements
va S Eul And Statutory Requirements Are Codified At 38 U.s.c. §⧠8161-8169 And As Amended.
public Law No. 117-168, The Sergeant First Class Heath Robinson Honoring Our Promise To Address Comprehensive Toxics Act Of 2022 (pact Act). Sec. 705 Of The Pact Act, Modifications To Enhanced-use Lease Authority Of Department Of Veterans Affairs .
hrp Statutory Requirements
va S Hrp Is Authorized By The Nhpa, Specifically Title 54 Of The United States Code Section 306121-306122. This Authority Allows Federal Agencies Such As Va To Outlease Or Exchange Unneeded Historic Properties And Retain Proceeds To Fund Agency Preservation Activities.
va S Goals And Objectives
va Has The Following Goals And Objectives For The Project:
reuse Underutilized Va Properties. This Could Take The Form Of Safe, Affordable, Smoke-free Housing For Veterans And Their Families Who Should Have Priority Placement In Any Housing Project Created On The Site. If Hud-vash Is Used, The Service Provider Must Provide Service Above And Beyond Those Provided By Hud And Va. It Is The Intent That Va Will Provide Case Management Services To Eligible Veterans. This Could Also Take The Form Of Another Use That Benefits Veterans Directly Or Indirectly, Including Commercial Use(s), And/or Reuses And Preserves Historic Property. Note: The Dayton Va Medical Center Will Not Accept Any Uses Of The Site That Are Industrial.
(b) Avoid Ongoing Operating Costs Associated With The Upkeep Of Vacant And/or Underutilized Assets.
(c) Provide An Innovative Solution Within Current Authority To Preserve A Va-owned, Historic Property.
(d) Meet Va S Obligations Under Nhpa To Better Preserve And Protect The Property.
other Considerations
va Will Not Participate In Or Allow Its Or The United States Underlying Fee Interest In The Land To Be Used As Security For Financing For The Project Or Otherwise, Including Without Limitation, Providing Any Kind Of Guaranty Or Act In Any Way As A Beneficiary For A Financing Vehicle.
in Regard To Any Proposed Project-related Financing To Be Obtained By The Offeror, Va As A General Rule Will Not Approve Any Financing That Includes Requirements That Operate To Deny, Restrict, Or Subordinate Va S Right To Terminate The Eul Or Hrp Agreement Upon The Offeror S Failure To Cure An Outstanding Event Of Default Thereunder. This Includes Any Document, To Include The Eul Or Hrp Agreement That Would Prevent Va From Terminating The Eul Or Hrp Agreement Due To Cross Default Arising From One Or More Parcels On The Property. Any Proposed Project Financing That Does Not Comply With This Restriction Must Be Explicitly Identified In The Rfq Response For Va S Unilateral Review And Evaluation. The Successful Offeror Must Establish And Maintain Positive Relations And Communications With State And Local Governmental Authorities And The Local Communities During Negotiations With Va And Any Of Its Representatives.
the Successful Offeror Must Integrate Development Activities With Cultural Resources And Historical And Environmental Policy Management Requirements In Support Of Va S Mission And Operations.
the Offeror Will Be Responsible For Coordinating The Work Schedule(s) With Va In Order To Minimize Disruption To The Campus Activities And Operations. This Coordination Includes The Work Of Any Contractor Or Subcontractor That The Offeror Retains In Connection With The Project.
lease Exhibits
following Its Selection, The Offeror Will Be Responsible For Preparing Detailed Lease Exhibits To Include A Development Plan, Operations And Maintenance Plan, And (if Housing Is Proposed) A Tenant Selection Plan For The Project. Attachment B Contains Sample Outlines For Supportive Housing Lease Exhibits. Attachment C Contains Sample Outlines For Non-supportive Housing Lease Exhibits. In Addition, The Offeror Will Need To Provide Other Lease Exhibits Such As A Site And Design Plans. Following Offeror Selection, Va Will Provide Detailed Lease Exhibit Templates.
va Recognizes That Formulation Of The Lease Exhibits Will Require The Offeror To Work Closely And Cooperatively With Va. Va Will Provide Final Approval And Cooperate With The Offeror During The Drafting Process To Facilitate Preparation Of The Final Development Plan. It Is Anticipated That The Offeror Will Provide Va With Drafts Of The Lease Exhibits Throughout The Drafting Process. The Lease Exhibits Will Be Subject To Va S Review And Approval And May Be Subject To Review And Comment By Local Government And Other Stakeholders.
submital Requirements
time And Date Of Submission
responses Must Be Received By February 7, 2025, At 3:00 Pm Est (the Closing Time ). Responses Received After The Closing Time Will Not Be Considered.
questions Regarding This Rfq May Be Submitted In Writing By Emailing De Carol Smith At Decarol.smith@va.gov And Shahidat Abbas At Shahidat.abbas@va.gov By September 30, 2024. Questions Received After This Date May Not Be Considered. Responses Will Be Provided By An Amendment To The Rfq. All Government Communication Regarding This Rfq Shall Be From The Portfolio Managers, De Carol Smith And Shahidat Abbas.
manner Of Submission
responses Will Be Accepted By Electronic Means And Hard Copy. For Electronic Submission, Please Submit Responses Via Email To De Carol Smith At Decarol.smith@va.gov And Shahidat Abbas At Shahidat.abbas@va.gov. Please Note, Due To The Size Of Response Content, Offeror Will Need To Submit Rfq Response In Multiple Emails (20mb Capacity Per Email To Include Attachments) Labeled By Section Name And Subsection (see Rfq Section 4.3 For Additional Details). The Entire Response Must Be In Pdf Format. In Addition, Any Excel Or Other Spreadsheets That Allow Data To Be Manipulated Must Be Included In Their Native (i.e., Excel), Unprotected And Accessible Format. However, One Hard Copy Must Be Delivered By Mail, Courier, Or Hand Delivery To The Following Address:
attention: C. Brett Simms
designated Va Representative
department Of Veterans Affairs
office Of Asset Enterprise Management (044c)
810 Vermont Avenue, Nw
washington, Dc 20420
each Hard Copy Of The Response Must Be Bound In A Three-ring Binder (to Allow Va To Easily Remove Parts For Copying And/or Circulation).
responses Must Be In A Sealed Envelope Or Package With The Following Information Conspicuously And Legibly Written Or Typed On The Outside:
offeror S Name;
offeror S Complete Mailing Address;
name And Contact Information For Offeror S Contact Person (e.g., Telephone, Email And Facsimile); And
the Following Statement (to Be Completed Upon Delivery To Va):
Response Received By Va As Of _____________(time) On _____________ (date)
response Content
each Response Must Contain The Following Sections Applicable To The Offeror S Proposed Project In The Following Order, With Each Section Clearly Labeled, Beginning On A New Page And Not Exceeding The Applicable Section Page Limit.
section #
section Name And Subsections
(note: Separate Sections And Subsections With Tabs In Hard Copies)
page Limit
na
cover Letter (including Background And Administrative Information)
5 Pages
1
development And Operations Concept
team Composition And Structure
development Concept
alignment Of Development Concept With Va Goals And Objectives
project Financing Plan
project Timeline
management Approach (development, Property Management, Subcontractors, And, If Applicable, Supportive Services)
proposed Veteran Hiring And Community Relations Strategies For Project
25 Pages
(includes Resumes)
2
development Team Qualifications, Experience, And Past Performance
development Qualifications And Experience
development Past Performance
development Team Key Personnel Qualifications
tab 2d: Veteran Hiring And Community Relations Experience
20 Pages
3
property Management (and, If Applicable, Supportive Services) Team Qualifications, Experience, And Past Performance
tab 3a: Property Management (and, If Applicable, Supportive Services) Qualifications And Experience
tab 3b: Property Management (and, If Applicable, Supportive Services) Past Performance
tab 3c: Property Management (and, If Applicable, Supportive Services) Key Personnel Qualifications
20 Pages
4
financial Wherewithal And Experience Securing Financing
tab 4a: Financial Wherewithal
tab 4b: Experience Securing Financing
15 Pages (excludes Financial Statements)
appendix A
financial Statements And Auditor S Opinion Letter
no Limit
appendix B
explanation Of Any Legal Issues (if Any)
no Limit
pages Submitted That Are In Excess Of Any Page Limit (including A Section Page Limit) Will, At Va S Sole Discretion, Be Discarded And Not Reviewed Or Evaluated By Va. Supporting Data, Such As Explanations Of Any Legal Issues, And Auditor S Opinion Letter, Will Not Count Against The Page Limits. Responses Must Be Typewritten In Arial 11-point Font Size Or Greater. For Purposes Of The Response, A Key Team Member Should Be Considered Any Member That Will Be Responsible For Approximately 20% Or More Of The Services Or Fees Under This Proposed Project.
cover Letter With Background And Administrative Information
a Cover Letter (on The Offeror S Letterhead) Must State That The Offeror Has Read And Agrees To Comply With All The Terms, Conditions, And Instructions Provided In This Rfq. Any Requests For Waivers Or Exceptions Must Be Clearly Identified In The Cover Letter And Shall Be Subject To Va S Review And Approval.
the Cover Letter Must Also Contain The Following General Information About The Offeror And The Offeror S Team (if Applicable). (note: In The Case Of An Offeror That Is A Special Purpose Entity, Include Information On Each Partner, Member, Or Shareholder Of The Offeror.)
administrative Information: Company/organization Name; Employer/tax Identification Number; Dunn And Bradstreet (duns) Number; Proof Of Vetbiz Verification (if A Service-disabled Veteran-owned Small Business Or Veteran-owned Small Business); Mailing Address; Main Telephone Number; And Main Facsimile Number.
authorized Representative: Name And Contact Information (mailing Address; Telephone Number; E-mail Address; And Facsimile Number) Of The Representative Authorized To Act On Behalf Of The Offeror.
day-to-day Point Of Contact: Name And Contact Information (mailing Address; Telephone Number; E-mail Address; And Facsimile Number) Of The Individual Designated By The Offeror As The Person To Whom Questions And/or Requests For Information Are To Be Directed.
form Of Business: Description Of The Offeror S Form Of Business (whether A For-profit Corporation, A Nonprofit Or Charitable Institution, A Partnership, A Limited Liability Company, A Business Association Or A Joint Venture), State Of Incorporation, And A Brief History Of The Organization And Its Principals:
articles Of Incorporation, Partnership, Joint Venture, Or Limited Liability Company Agreement (note: For Any Offeror Or Team Member, As Applicable, That Is A Sole Proprietorship, Provide Current Mailing Address And A Summary Of Current Business Activity);
current Certificate Of Good Standing;
by-laws;
copy Of Corporate Resolutions, Certified By A Corporate Officer, Authorizing The Offeror S Submission Of, Or Team Member S Participation With The Offeror In The Submission Of, The Response And The Entity S Authority To Proceed With The Project (assuming An Rfq Award Is Made, And Va S Approval Is Obtained); And
list Of Principals.
legal Requirements
state Whether The Offeror Or Any Offeror S Team Member, As Applicable, Has Ever Been Terminated For Default, Non-compliance, Or Non-performance On A Contract Or Lease, Or Debarred From Any Federal, State, Or Local Government Contracts And, If So, Provide The Date And A Detailed Description Of The Occurrence In An Appendix (note: This Additional Detail Does Not Count Against Page Limits); And
list Each Instance Within The Past Ten (10) Years And Explain In Sufficient Detail In An Appendix As Necessary (detail Does Not Count Against Page Limits) In Which The Offeror, Or Any Offeror S Team Member, Or Any Principal, Partner, Director, Or Officer Of Such Entities Was:
convicted Of Or Pleaded Guilty Or Nolo Contendre To A Crime (other Than A Traffic Offense);
subject To An Order, Judgment, Or Decree (including As A Result Of A Settlement), Whether By A Court, An Administrative Agency, Or Other Governmental Body, Or An Arbitral Or Other Alternative Dispute Resolution Tribunal, In Any Civil Proceeding Or Action In Which Fraud, Gross Negligence, Willful Misconduct, Misrepresentation, Deceit, Dishonesty, Breach Of Any Fiduciary Duty, Embezzlement, Looting, Conflict Of Interest, Or Any Similar Misdeed Was Alleged (regardless Of Whether Any Wrongdoing Was Admitted Or Proven);
subject To An Action Or Other Proceeding, Whether Before A Court, An Administrative Agency, Governmental Body, Or An Arbitral Or Other Alternative Dispute Resolution Tribunal, Which, If Decided In A Manner Adverse To The Offeror, Team Member, Principal, Partner, Director, Or Officer (as Applicable), Would Reasonably Be Expected To Adversely Affect The Ability Of The Offeror Or Team Member To Perform Its Obligations With Respect To The Project (including The Ability To Obtain Or Repay Financing);
debarred, Suspended, Proposed For Debarment, Declared Ineligible Or Voluntarily Excluded From Covered Transactions By Any Federal, State, Or Local Department Or Agency;
notified That It Is In Default Of Any Federal, State, Or Local Contract Or Grant If Yes, Provide The Reason For The Default And Whether The Default Was Cured;
terminated For Cause Or Default On One Or More Public Transactions (federal, State, Or Local); And
party To Litigation Or A Formal Alternative Dispute Resolution (adr) Process (e.g., Binding Arbitration) Involving A Claim In Excess Of $50,000. For Those Matters Involving A Claim Equal To Or In Excess Of $500,000, Describe In Detail The Litigation Or Adr Process
section 1: Development And Operations Concept
in This Section, The Offeror Should Include All Relevant Information Necessary To Allow Va To Assess The Offeror S Overall Development And Operations Concept. Specifically, This Section Must Include The Following:
tab 1a: Team Composition And Structure
provide Brief Descriptions Of Offeror Entity And The Offeror S Team Members (i.e., Organizational Purposes Or Missions, Services Provided, Etc.), Including Key Roles And Responsibilities. The Offeror Should Describe Past Experience Working With The Offeror S Team Members. Provide An Organizational Chart Showing The Relationship Between The Offeror And The Offeror S Team Members, As Appropriate, Along With Their Roles And Responsibilities. Explain The Offeror S Approach To Managing The Team, Including Prior Experience Engaging And Overseeing The Work Of Multiple Team Members And Subcontractors.
tab 1b: Development Concept
state Whether The Offeror S Development Concept Falls Under Va S Eul Or Hrp Authority (see Rfq Sections 1.1 And 2). Provide A Brief Description Of The Offeror Team S Understanding Of Va S Development Objectives (see Rfq Section 2.3.8), The Developer Concept (to Also Include Site Construction And Building Design), And The Developer S Assets And Infrastructure To Be Redeveloped Under Va S Eul Authority Into Supportive Housing Or Commercial/other Use(s) That Benefit Veterans Directly Or Indirectly Or Under Va S Hrp Authority To Reuse And Preserve The Historic Property (see Rfq Section 2). Identify Potential Risks And Challenges Associated With The Project And Related Mitigation Strategies. Describe The Offeror S Plan To Identify And Evaluate Potential Assets For Redevelopment And Undertaking All Necessary Investigation Activities To Produce Development Scenarios. List Any Required Studies To Be Performed. Provide A Timeline For Development Of These Scenarios And Plans, Including Any Required Studies.
tab 1c: Alignment Of Development Concept With Va Goals And Objectives
identify How Proposed Development Will Meet Va S Goals And Objectives As Outlined In Rfq Section 2.3.9. As Applicable, State What Direct Or Indirect Veteran Benefits The Project Will Provide And How Historic Assets Will Be Preserved.
tab 1d: Project Financing Plan
provide A Narrative That Describes The Offeror Team S Strategy To Obtain Financing For This Project, Including Contingency Plan(s) In The Event One Or More Sources Of Funding Are Not Available. The Narrative Should Also Explain Key Assumptions Reflected In The Following Required Budgets To Be Provided In A Working Microsoft Excel Document (excluded From Page Count):
development Budget Sources And Uses: Development Budget Must Show Estimated: (a) Total Development Costs For The Project, Including Hard And Soft Costs; (b) Financing Costs, Including Types And Amounts Of Debt And Equity, And Underlying Amortization Periods; (c) Ownership Structure, Including Percentage Of Ownership By The Offeror (or In The Case Of A Special Purpose Entity, Each Team Member); And, (d) All Capital Funding Sources (e.g., Low Income Housing Tax Credit Equity, Equity Provided By The Lessee, Federal, State And Local Government Funding, Grant Proceeds, Loan Proceeds, Etc.) Used To Finance The Project. Note That Va Is Authorized To Provide Eul Projects With A Capital Contribution, But Va Is Not Authorized To Make Capital Contributions To Projects Under Its Hrp Authority.
annual Operating Budget: List All Estimated Annual Revenues For The Project, Including Expected Monthly Rents By Unit Type And The Basis For /source Of Rent (e.g., Rental Vouchers). In Addition, List All Expected Annual Operating Expenses Associated With The Project. Provide A 30-year Cash Flow Projection In A Working Microsoft Excel Document (excluded From Page Count).
annual Supportive Services Budget (if Applicable): List All Expected Annual Supportive Services Expenses For The Eul Or Hrp Site And Projected Sources Of Funding.
tab 1e: Project Timeline
the Offeror S Response Must Contain A Timetable For The Project Containing The Following Key Dates:
project Financing Sources: Anticipated Application, Award, And Closing Dates For Each Project Phase (as Applicable).
design Milestones: Completion Dates For Each Project Phase (as Applicable).
eul Or Hrp Agreement Execution: Eul Or Hrp Agreement Execution Cannot Occur Until All Financing Commitments Have Been Obtained. For Eul Projects, The Eul Agreement Cannot Be Executed Until The Office Of Management And Budget Has Completed Its Review Of The Eul, And Congress Has Been Provided 45-day Notification Of Va S Intent To Execute The Eul;
construction: Start And Completion Dates For Each Project Phase (as Applicable); And,
occupancy: Date The Facility Is Open For Operation For Each Project Phase (as Applicable).
tab 1f: Management Approach (development, Property Management, Subcontractors, And, If Applicable, Supportive Services)
describe The Offeror Team S Approach To Operation, Management, Security, And Maintenance Of The Project In Accordance With Private Sector Standards. Provide A Staffing Plan (number Of Ftes And Type) For The Ongoing Operation Of The Project. The Response Shall Contain The Physical And Electronic Security Measures That Will Be Provided Based Upon The Individual Space Requirements And Tenant Mix Of The Proposed Eul Or Hrp Project. Include Proposed Approach For Management And Operations Within The Development Team, Property Management, Subcontractors, And Supportive Services (if Applicable).
tab 1g: Proposed Veteran Hiring And Community Relations Strategies For Project
describe The Offeror S Outreach Strategies To Maximize Participation Of Service-disabled Veteran-owned Small Businesses (sdvosbs), Veteran-owned Small Businesses (vosbs), Local Small Businesses, And Other Small Businesses, In All Aspects Of The Evaluation Of Assets And Subsequent Development Processes. Provide A Summary Of The Offeror Team S Plan To Increase Employment Opportunities (to Also Include Internships) For Veterans Associated With This Project. Explain The Offeror Team S Experience And Customized Approach To Managing Community Relations And Interacting With State And Local Government Officials (i.e., Zoning, Environmental, Shpo, Local Community, Stakeholders, Etc.). Describe Any Experience In Managing Relations With The Surrounding Community.
section 2: Development Team Qualifications, Experience, And Past Performance
in This Section, The Response Should Include All Relevant Information Necessary To Allow Va To Assess The Offeror Team S Relevant Experience And Operations Qualifications, Experience, And Past Performance. Specifically, This Section Must Include The Following:
tab 2a: Development Team Qualifications And Experience
list And Explain In Sufficient Detail The Offeror Team S Relevant Development Qualifications And Experience. Identify Any Past Experience Working With Va And Federal, State And Local Governments, If Any.
tab 2b: Development Team Past Performance
describe Three (3) Similar Relevant Development Efforts (past Or Current) Developed By The Offeror Or One Of Its Team Members That Are Comparable To The Subject Project To Be Developed. Each Project Described Should Have Been Completed Within The Past Ten (10) Years. For Each Project Listed, The Following Information Should Be Included:
project Name
location
type Of Project / Use
size Of Project (square Footage, Units, Number Of Buildings, Acreage, Etc.)
amount, Type, And Sources Of Financing
historic Buildings (if Any)
description Of The Associated Infrastructure
date Of Project Completion
number Of Years Involved With The Development
role Of The Offeror Team Member(s)
contact Information For A Reference Who Va Can Contact Regarding Performance And Client Or Stakeholder (as Applicable) Satisfaction. Note: Including A Reference On This List Will Constitute Authorization For Va To Contact And Discuss The Offeror S Or Team Member S Performance.
tab 2c: Development Team Key Personnel Qualifications
identify The Key Personnel Who Will Lead The Developer S Community/neighborhood Planning Tasks, As Well As The Day-to-day Point Of Contact. For Each Key Personnel Named Provide A:
description Of Their Proposed Role;
discussion Of The Extent To Which Key Personnel Have Worked Together On Other Similar Projects; And,
resume That Includes A Description Of The Person S Duties And Responsibilities, Education, Years Of Relevant Experience, Certifications/licenses, Skills, Expertise, Other Relevant Qualifications (note: Resumes Count Against Page Limits).
tab 2d: Veteran Hiring And Community Relations Experience
describe Any Experience Implementing Targeted Veteran Hiring Efforts And The Results Of Those Efforts. Explain The Offeror Team S Experience Managing Community Relations And Interacting With State And Local Government Officials (i.e., Zoning, Environmental, Shpo, Local Community, Stakeholders, Etc.). Describe Any Experience In Managing Relations With The Surrounding Community For Comparable Developments.
section 3: Property Management (and, If Applicable, Supportive Services) Team Qualifications, Experience, And Past Performance
in This Section, The Response Should Include All Relevant Information Necessary To Allow Va To Assess The Offeror Property Management Team S Supportive Housing Or Commercial/other Use(s) Development And Operations Qualifications, Experience, And Past Performance. Specifically, This Section Must Include The Following:
tab 3a: Property Management (and, If Applicable, Supportive Services) Qualifications And Experience
list And Explain In Sufficient Detail The Offeror Team S Relevant Supportive Housing Or Commercial/other Use(s) Property Management Qualifications And Experience. Identify Any Past Experience Working With Va, Federal, State And Local Governments, If Any.
tab 3b: Property Management (and, If Applicable, Supportive Services) Past Performance
describe Three (3) Similar Supportive Housing Or Commercial/other Use(s) Management Efforts (past Or Current) Developed By The Offeror Or One Of Its Team Members That Are Comparable To The Subject Project To Be Developed. Each Project Described Should Have Been Completed Within The Past Ten (10) Years. For Each Project Listed, The Following Information Should Be Included:
project Name
location
type Of Project / Use(s)
size Of Project (square Footage, Units, Number Of Buildings, Acreage, Etc.)
amount, Type, And Sources Of Financing
historic Buildings (if Any)
description Of The Associated Infrastructure
date Of Project Completion
number Of Years Involved With The Development
role Of The Offeror Team Member(s)
contact Information For A Reference Who Va Can Contact Regarding Performance And Client Or Stakeholder (as Applicable) Satisfaction. Note: Including A Reference On This List Will Constitute Authorization For Va To Contact And Discuss The Offeror S Or Team Member S Performance
also, Provide A Summary Of The Proposed Management And Operations Plans Specific To The Proposed Project Site And Use.
Tab 3c: Property Management (and, If Applicable, Supportive Services) Key Personnel
identify The Key Personnel Who Will Lead The Property Management (and, If Applicable, Supportive Services) Planning Tasks, As Well As The Day-to-day Point Of Contact. For Each Key Personnel Named Provide A:
description Of Their Proposed Role;
discussion Of The Extent To Which Key Personnel Have Worked Together On Other Similar Projects; And,
resume That Includes A Description Of The Person S Duties And Responsibilities, Education, Years Of Relevant Experience, Certifications/licenses, Skills, Expertise, Other Relevant Qualifications (note: Resumes Count Against Page Limits).
section 4: Financial Wherewithal And Experience Securing Financing
in This Section, The Response Should Include All Relevant Information Necessary To Allow Va To Assess The Offeror Team S Financial Wherewithal And Ability To Secure Financing For Comparable Development Projects. Specifically, This Section Must Include The Following:
tab 4a: Financial Wherewithal
provide A General Overview Of The Offeror Team S Financial Stability And Evidence Of Their Financial Wherewithal To Develop Supportive Housing Communities And/or Other Relevant Use(s) With Associated Infrastructure, Roads, And Amenities. Please Attach Supporting Documentation To Include An Auditor S Opinion Letter(s) And The Offeror And Its Team Members Most Recent Audited Financial Statements. If Audited Financial Statements Are Not Available, Please Submit Unaudited Financial Statements. (note: Supportive Documentation And Financial Statements Do Not Count Against The Page Limits.)
tab 4b: Experience Securing Financing
summarize The Offeror Team S Experience Directly Securing Financing For Similar Projects To The Proposed Project In The Last 10 Years. Provide Brief Descriptions Of Three (3) Similar Efforts For Which The Offeror S Team Has Directly Secured Financing. For Each Example, Include Project Information, Including:
project Name
location
description Of Project Type / Use(s)
total Development Cost
specific Funding Sources Secured, And
role Of The Offeror Team Member.
evaluation Criteria
Initial Review
following The Rfq Submission Deadline, Va Will Initially Review All Submissions For Completeness And Adherence To The Requirements And Conditions Set Out In This Rfq. Va Reserves The Right To Reject Submissions That Are Incomplete Or Fail To Adhere To The Requirements Set Forth In This Rfq.
Formal Presentations
complete And Acceptable Submissions Will Be Further Reviewed And Evaluated By Va, Ranked In Order, And A Competitive Range Established. Offerors Whose Submissions Are Found To Be Within The Competitive Range May Be Given The Opportunity, At Va S Sole Discretion, To Make A Formal Presentation To Va And Receive Questions Regarding Their Response. If A Presentation Is Required, Notice Will Be Provided To Those Offerors Asked To Make A Presentation And The Details Regarding That Presentation (i.e., Length Of Presentation, Etc.) Will Be Provided In The Notice.
Selection Process
the Government Intends To Review All Factors For Award In Making A Selection. Selection Will Be Based On An Integrated Assessment Of The Factors Set Forth In Section 5.5 Below.
Selection Timeline
va Anticipates Selection Of A Developer By December 2024.
Evaluation Factors
the Responses Will Be Evaluated Based On The Following Four Equally Weighted Factors. Where Factors Include Subfactors, Each Subfactor Will Also Be Equally Weighted. The Evaluation Factors Are As Follows:
5.5.1 Factor 1: Development And Operations Concept
factor 1 Will Consist Of An Assessment Of The Offeror S Team Composition And Structure, Development Concept, Alignment Of Development Concept With Va S Goals And Objectives, Financing Plan, Timeline, Project Management Approach, And Veteran Hiring And Community Relations For This Project. Factor 1 Is Comprised Of The Following Seven (7) Equally Weighted Subfactors:
subfactor 1a: Team Composition And Structure
va Will Assess The Offeror Team S Composition To Assess Capabilities And Skillsets, Including Key Roles And Responsibilities. Va Will Also Assess The Extent To Which The Offeror S Team Has Worked Together Previously On Similar Projects. The Organizational Chart Will Be Reviewed To Understand The Relationships Between The Different Team Members And Establish Whether Clear Lines Of Accountability Are In Place.
subfactor 1b: Development Concept
va Will Review The Offeror Team S Understanding Of The Requirements And Developer Technical Approach (to Include Development Concept And Proposed Site Construction/building Design) To Assess How The Offeror Team Proposes To Effectively Accomplish The Project. The Response Should Identify Whether The Offeror Is Proposing Under Va S Eul Or Hrp Authority, Demonstrate The Offeror Team S Understanding Of The Complexity Of The Project, Potential Risks And Challenges, Proposed Mitigation Strategies, And The Importance Of Close Communication And Collaboration With Va Throughout The Process. Additionally, Va Will Assess The Viability Of The Proposed Timeline For Development Of These Scenarios And Plans, Including Any Required Studies.
subfactor 1c: Alignment Of Development Concept With Va Goals And Objectives
va Will Assess If Offeror(s) Development Plans Include A Clear Concept That Meets Va S Goals And Objectives As Outlined In Rfq Section 2.3.9, Including Whether Project Provides Direct And/or Indirect Benefits To Veterans And/or Provides For Preservation Of The Historic Property.
subfactor 1d: Project Financing Plan
a Realistic And Viable Financing Plan Should Be Provided For The Project. Va Will Review The Anticipated Sources And Uses For The Project For Development, Operations, And Provision Of Services (if Applicable), As Well As The Proposed Operating And Supportive Services (if Applicable) Budgets, To Assess The Offeror Team S Understanding Of The Project And Funding Availability, Including Contingency Plans.
subfactor 1e: Project Timeline
va Will Review The Proposed Project Timeline For Completeness And Inclusion Of All Required Milestones. The Offeror Team Should Provide A Realistic Project Development Timeline For Va S Review.
subfactor 1f: Management Approach (development, Property Management, Subcontractors, And, If Applicable, Supportive Services)
va Will Evaluate The Offeror Team S Approach To Development, Operation, Property Management, Security, And Maintenance Of The Project In Accordance With Private Sector Standards And Ensuring The Long-term Viability And Security Of The Project. The Property Management Plan Should Be Customized To The Proposed Product Type. Va Will Assess The Viability Of The Staffing Plan For The Proposed Operations Of The Project. The Subcontractor Management Approach Should Demonstrate The Offeror S Ability To Manage Multiple Entities Across Disparate Fields And Locations To Achieve A Common Goal.
subfactor 1g: Proposed Veteran Hiring And Community Relations Strategies For Project
va Will Assess The Offeror Team S Community Relations Strategy For The Project And The Extent Of The Offeror Team S Local Knowledge And Understanding. Va Will Also Assess The Extent To Which The Offeror Team S Prior Experience And Proposed Outreach Plan Will Maximize The Participation Of Sdvosbs, Vosbs, Local Small Business, And Other Small Businesses In All Aspects Of The Evaluation Of Assets And Subsequent Development Processes. It Is Also Important That The Offeror Team Provide A Clear And Realistic Plan To Hire Veterans (and Provide Internships For Veterans) In Association With This Project.
5.5.2 Factor 2: Development Team Qualifications, Experience, And Past Performance
the Focus Of Factor 2 Is On The Offeror Team S Relevant Development Team Qualifications, Experience, And Past Performance. Factor 2 Is Comprised Of The Following Four (4) Equally Weighted Subfactors:
subfactor 2a: Development Team Qualifications And Experience
va Will Review The Extent To Which The Offeror S Team Has Demonstrated Expertise And Experience Developing Projects Similar To That Which The Offeror Is Proposing, Including Experience Working With Federal, State, And Local Government Entities. Va Will Also Evaluate The Offeror Team S Track Record Of Working With Qualified Property Management And Supportive Services Providers (as Applicable) And Their Associated Qualifications And Experience.
subfactor 2b: Development Team Past Performance
va Will Assess The Extent To Which The Offeror S Team Has A Proven Track Record Of Successfully Developing Relevant Projects To The Proposed Project. The Projects Identified Should Be Of Similar Size, And Scope To What Is Being Proposed For The Eul Or Hrp Site. The Information Provided For Each Of The Projects Will Be Reviewed For Completeness And Relevancy.
subfactor 2c: Development Team Key Personnel Qualifications
va Will Review The Qualifications Of The Proposed Key Personnel To Assess Their Ability To Successfully Complete The Developer S Responsibilities And Assist Va In Developing And Implementing The Most Viable Development Scenario. The Key Personnel Roles Should Be Clearly Identified, Along With Each Person S Relevant Experience, Skills, Expertise, And Education.
subfactor 2d: Veteran Hiring And Community Relations Experience
offeror Teams Will Be Evaluated On Their Experience And Success In Undertaking Veteran Hiring Efforts For Similar Projects. Va Also Intends To Evaluate The Offeror Team S Experience With Managing Community Relations. Offeror Teams Should Demonstrate Local Market Knowledge And Experience Working With The Stakeholder Community On Similar Projects To The Proposed Project.
5.5.3 Factor 3: Property Management (and, If Applicable, Supportive Services) Team Qualifications, Experience, And Past Performance
the Focus Of Factor 3 Is On The Offeror Team S Relevant Property Management (and, If Applicable, Supportive Services) Team Qualifications, Experience, And Past Performance. Factor 3 Is Comprised Of The Following Three (3) Equally Weighted Subfactors:
subfactor 3a: Property Management (and, If Applicable, Supportive Services) Qualifications And Experience
va Will Review The Extent To Which The Offeror Team Has Demonstrated Expertise And Experience Managing And Operating Comparable Projects To The Proposed Project And Experience Working With Federal, State, And Local Government. Va Will Also Evaluate The Proposed Property Management And Supportive Services Provider S (if Applicable) Associated Qualifications And Experience. Va Will Also Consider The Adequacy Of Safety And Security Measures Implemented Successfully At Other Similar Projects.
subfactor 3b: Property Management (and, If Applicable, Supportive Services) Past Performance
va Will Assess The Extent To Which The Offeror Team Has A Proven Track Record Of Successfully Managing And Operating Comparable Projects To The Proposed Project. The Projects Identified Should Be Of Similar Size, Scope, And Complexity To The Proposed Project. The Information Provided For Each Of The Projects Will Be Reviewed For Completeness And Relevancy.
subfactor 3c: Property Management (and, If Applicable, Supportive Services) Key Personnel
va Will Review The Qualifications Of The Proposed Project Operations Key Personnel To Assess Their Ability To Successfully Manage The Project For The Duration Of The Lease Term. The Key Personnel Roles Should Be Clearly Identified, Along With Each Person S Relevant Experience, Skills, Expertise, And Education.
5.5.4 Factor 4: Financial Wherewithal And Experience Securing Financing
factor 4 Consists Of An Evaluation Of The Offeror Team S Financial Wherewithal And Experience Securing Financing For Comparable Projects. Factor 4 Is Comprised Of Two (2) Equally Weighted Subfactors:
subfactor 4a: Financial Wherewithal
va Will Assess The Financial Wherewithal Of The Offeror S Team To Undertake Their Proposed Development. Va Will Evaluate Whether The Response Has Provided Sufficient Evidence And Documentation, As Required By The Rfq, To Demonstrate The Financial Wherewithal And Current Financial Capacity To Successfully Execute A Project Of This Size, Scope And Complexity.
subfactor 4b: Experience Securing Financing
va Will Review The Offeror Team S Experience Securing Financing Similar To Funding Needed For The Proposed Development On The Site. The Offeror S Team Should Demonstrate A Proven Track Record Of Directly Securing Traditional And Non-traditional Project Financing.
miscellaneous Terms And Conditions Applicable To This Rfq
authorizations By Submission Of Response
any And All Information Provided By An Offeror And Its Team Members May Be Used By Va To Conduct Credit And Background Checks.
teaming Arrangements And Special Purpose Entities
multiple Offerors May Form A Joint Venture For The Purpose Of Submitting A Response To This Rfq. A Special Purpose Entity May Also Be Created For The Purpose Of Submitting A Response. Va May Require That Financial And Performance Guarantees Be Provided By These And Other Offerors As Well As Team Members. Potential Offerors Who Do Not Have Strong Experience Or Skills In All The Required Areas (e.g., Financial Structuring, Development, Property Management, Operations, Services Delivery, Etc.) May Consider Submitting Responses Jointly With Entities Whose Experience Can Complement Their Own. (note: Va Will Not Be Involved In Facilitating Partnering Or Teaming Arrangements.)
hold Harmless
by Participating In The Rfq Process, Each Offeror Agrees To Indemnify And Hold Harmless Va And The United States Government And Each Of Their Respective Officers, Employees, Contractors, And Advisors From And Against Any And All Real Estate And Other Brokerage Fees Or Commissions, Finder S Fees, And Other Forms Of Compensation Related In Any Way To Activities Undertaken By Any Person As A Result Of Such Person S Efforts Towards And/or Participation In This Rfq Process Or The Submission By Such Person Of A Response, And Liabilities, Losses, Costs, And Expenses (including Reasonable Attorney S Fees And Expenses) Incurred By Any Indemnified Party (including Va) As A Result Of, Or In Connection With, Any Claim Asserted Or Arising As A Result Of, Or In Connection With, This Rfq Process.
ineligibility
the Following Persons (including Entities) Are Ineligible To Be An Offeror Or A Team Member Of An Offeror Or Otherwise Participate In The Project (including As A Contractor, Subcontractor, Or Professional): (a) Any Person That Has Been Debarred Or Suspended From Doing Business With Va; (b) Neither Such Person Nor Any Of Its Partners, Members, Or Principal Stockholders Is Listed On Any Non-procurement Or Reciprocal Lists On The Most Current System For Award Management Published By The U.s. General Services Administration Atâ www.sam.gov, As Updated From Time To Time, Or Any Replacement Thereof; (c) Neither Such Person Nor Any Of Its Partners, Members, Or Principal Stockholders Is A Person Who Poses A Security Or Safety Risk As Determined By The Secretary Of State, Including But Not Limited To Any Person Who Either Represents A Country, Or Is A Member Of Or Provides Political, Financial Or Military Support To A Group, That Is Listed In The Most Current Patterns Of Global Terrorism Report, Issued By The Secretary Of State In Compliance With 22 U.s.c. § 2656f(a), Available From The Superintendent Of Documents, U.s. Government Printing Office, Washington, Dc 20402 And Also Available Atâ http://www.state.gov/global/terrorism/annual_reports.html; And (d) Neither Such Person Nor Any Of Its Partners, Members Or Principal Stockholders Is Subject To A Criminal Indictment Or Information For A Felony In Any Court In The United States. For Purposes Of This Solicitation, The Term Principal Stockholder Shall Mean Any Person Who Is A Beneficial Owner (as Defined For Purposes Of Rule 13d-3 Of The Securities And Exchange Act Of 1934, As Amended And Promulgated By The Securities And Exchange Commission) Of Ten Percent (10%) Or More Of The Outstanding Stock Or Other Equity Of The Offeror.
additional Information
all Of The Information Required To Be Provided In Each Response Pursuant To Section 8 Of This Rfq Is Important To Va S Analysis And Evaluation Of Each Response. Va May Utilize Outside Sources In Addition To All Of The Information Provided In A Response In Evaluating Each Offeror S Submission.
neither Va Nor Any Of Its Contractors, Subcontractors, Officers, Employees, Counsel, Advisors, Or Agents, Make Any Representation Or Warranty, Whether Express, Implied, Or Created By Operation Of Law, As To The Accuracy Or Completeness Of This Rfq Or Any Of Its Contents Or Materials Referred To Therein, And No Legal Liability With Respect Thereto Is Assumed Or May Be Implied.
va Reserves The Right To: (a) Make A Selection Under This Rfq As A Result Of Initial Offers Submitted; And (b) Reject Any Or All Offers At Any Time Prior To Award And Cancel This Solicitation. Therefore, All Initial Offers Should Comprehensively Address Each Of The Requirements Set Forth Herein And Contain The Offeror S Best Terms.
by Submitting A Response, Each Offeror Accepts All The Terms And Conditions Set Forth In This Rfq, And Any Updates, Supplements, And Amendments Thereto. Any Conflict (whether Actual Or Perceived) Between Different Parts Of This Rfq, As Between An Offeror And Va, Shall Be Resolved At The Sole And Absolute Discretion Of Va.
in No Event Shall Va Be Liable For Any Fees, Costs, Or Expenses Associated With Any Of The Offeror S (or Their Brokers, If Any) Activities (e.g., Preparation, Discussions, Clarifications, Submissions, Or Negotiations), Relating Directly Or Indirectly To This Solicitation. Accordingly, As A Condition Of Submitting Its Response, Each Offeror Hereby Agrees To Indemnify And Hold Va Harmless For Any And All Such Fees, Claims, Liabilities, And Costs Arising In Connection With This Rfq And Its Underlying Process.
any Relationship Between Va And An Offeror Arising From The Solicitation Is Subject To The Specific Limitations, Terms, Conditions, And Representations Expressed In This Rfq. Any Substantive Questions Or Concerns To Include Conflicts, Apparent Conflicts, Or Any Other Substantive Matters Regarding This Rfq Which May Arise During Preparation Of An Offeror S Response Should Be Addressed, In Writing, To: Decarol.smith@va.gov And Shahidat.abbas@va.gov.
Closing Date7 Feb 2025
Tender AmountRefer Documents
BULACAN AGRICULTURAL STATE COLLEGE Tender
Philippines
Details: Description Bulacan Agricultural State College San Ildefonso, Bulacan 3010 Procurement Of Goods 2025-01g: Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub Fy 2025 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….4 Section I. Invitation To Bid……………………………………………………..7 Section Ii. Instructions To Bidders…………………………………………...10 1. Scope Of Bid ………………………………………………………………………. 11 2. Funding Information………………………………………………………………. 11 3. Bidding Requirements ……………………………………………………………. 11 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 5. Eligible Bidders…………………………………………………………………… 11 6. Origin Of Goods ………………………………………………………………….. 12 7. Subcontracts ……………………………………………………………………… 12 8. Pre-bid Conference ………………………………………………………………. 12 9. Clarification And Amendment Of Bidding Documents …………………………… 12 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 12 11. Documents Comprising The Bid: Financial Component …………………………... 13 12. Bid Prices …………………………………………………………………………. 13 13. Bid And Payment Currencies ……………………………………………………… 14 14. Bid Security ………………………………………………………………………. 14 15. Sealing And Marking Of Bids ……………………………………………………… 14 16. Deadline For Submission Of Bids …………………………………………………. 14 17. Opening And Preliminary Examination Of Bids ………………………………….. 15 18. Domestic Preference ……………………………………………………………… 15 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 15 20. Post-qualification ………………………………………………………………… 16 21. Signing Of The Contract …………………………………………………………… 16 Section Iii. Bid Data Sheet …………………………………………………..17 Section Iv. General Conditions Of Contract ……………………...………..19 1. Scope Of Contract ………………………………………………………………… 20 2. Advance Payment And Terms Of Payment ……………………………………….. 20 3. Performance Security ……………………………………………………………. 20 4. Inspection And Tests ……………………………………………………………… 20 5. Warranty …………………………………………………………………………. 21 6. Liability Of The Supplier ………………………………………………………….. 21 Section V. Special Conditions Of Contract ………………………………….22 Section Vi. Schedule Of Requirements ……………………………………....30 Section Vii. Technical Specifications …………………………………………34 Section Viii. Checklist Of Technical And Financial Documents …………..38 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria (e.g., The Application Of A Margin Of Preference In Bid Evaluation). The Ib Should Be Incorporated In The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Bulacan Agricultural State College San Ildefonso, Bulacan 3010 Invitation To Bid For 2025-01g: Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub 1. The Bulacan Agricultural State College, Through The Gaa Capital Outlay Fy 2025 Intends To Apply The Sum Of One Billion Pesos Pesos (php1,000,000,000.00) Being The Abc To Payments Under The Contract For Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bulacan Agricultural State College Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required With Contract Duration Of 280 Calendar Days. Bidders Should Have Completed, Within The Last Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Bulacan Agricultual State College And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8am To 4:30pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 16, 2025 To February 7, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php75,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting The Receipt Upon Submission Of Their Bid Documents. 6. The Bulacan Agricultural State College Will Hold A Pre-bid Conference On January 24, 2025, 09:00 Am Via Zoom Platform (meeting Id: 853 1254 4715, Passcode: 578270) Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 08:30 Am Of February 7, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On February 7, 2025, 09:00 Am At The Conference Room, Administration Building, Basc, San Ildefonso, Bulacan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Observers Will Be Invited To Attend And Witness The Bid Proceedings. 11. The Bulacan Agricultural State College Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Rona Angela O. Clarin Bac Secretariat Head Bulacan Agricultural State College Brgy. Pinaod, San Ildefonso, Bulacan (044) 697-1240 And 0923-108-1526 Ronaangela_clarin@basc.edu.ph Www.basc.edu.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Http://www.basc.edu.ph January 16, 2025 (sgd) Ronald Reagan T. Alonzo,ph.d. Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Bulacan Agricultural State College Wishes To Receive Bids For The Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub With Identification Number 2025-01g. The Procurement Project (referred To Herein As “project”) Is Composed Of Twenty-eight (28) Components The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Gaa Fy 2025 In The Amount Of Php1,000,000,000.00 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Of 2025. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. Not Applicable. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To At Least Fifty Percent (50%) Of The Abc Or Have Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time At Its Physical Address As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within The Last Five (5) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until 120 Days From The Opening Of Bids. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The Original Of The First And Second Components Of Its Bid And Plus Two (2) Copies Of Each Kind, Labeled As Copy 1 And Copy 2 Duly Signed By The Authorized Representative Of The Bidder. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.1. Not Applicable 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply, Delivery, Installation, Commissioning And Set-up Of Ict Materials And Laboratory Equipment With Any Of The Two (2) Components As Follows: 1. Productivity Software And/or Licenses 2. Hardware Such As Servers, Desktops And/or Laptops 3. Closed-circuit Television (cctv) 4. Smart Solar Lighting Systems 5. Network Infrastructure B. Completed Within Three (3) Years Prior To The Deadline For The Submission And Receipt Of Bids That Is Equivalent To 50% Of Abc Or Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; 7.1 Subcontracting Is Not Allowed. 12 The Bid Prices Of Goods And Services Supplied From Outside Of The Philippines Shall Be Quoted In Philippine Pesos. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Php20,000,000.00 [(2%) Of The Abc] If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Php50,000,000.00[(5%) Of The Abc], If Bid Security Is In Surety Bond. 19.3 The Project Will Be Awarded As A Single Project. 20.2 1. Income Tax Return (form 1701/1702) With Audited Financial Statement., 2. Business Tax Return (forms 2550m And 2550q) Prior To Opening Of Bids Filed Thru Electronic Filing And Payment System (efps). Only Tax Returns Filed And Taxes Paid Through The Bir Electronic Filing And Payment System (efps) Shall Be Accepted. 21.2 Not Applicable Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Supplier, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 6.1. In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 6.2. The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Goods Purchased. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: “the Delivery Terms Applicable To This Contract Are Delivered At Basc, San Ildefonso, Bulacan. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is Dr. Ma. Melanie A. Cruz And Mr. Florentino S. Casuco, Jr. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E. Training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof 2.2 The Terms Of Payment Shall Be As Follows: 15% : Upon Submission Of Signed Contract 25% : Submission And Acceptance Of Detailed Work Plan And Systems Design 1. University Information System 2. Learning Management System 3. Cashiering System 4. Human Resource Management System & Time Keeping System 5. Payroll Management System 6. Assets & Fleet Management System 7. Document Management System 8. Trouble Ticketing System 9. Queuing / Appointment System 10. Executive Information System 11. Campus Portal System 12. University Library System 13. Econference Room W/ Video Conferencing 14. Internet Connectivity 15. Campus Network System 16. Fiber Optics Works 17. Structured Cabling Works 18. It Security Operations Center & Network Operations Center 19. Campus Data Center Upgrade 20. Data Center Network Switches 21. Data Center Compute System & Data Center Block And File Storage System 22. Data Center Backup And Recovery System 23. Cloud Infrastructure 24. Ip-pabx System 25. Software & Networking Laboratories 26. E-classroom, E-room Infrastructure And Smart Led Solar Powered Light 27. E-library Infrastructure 28. Smart Function Hall 26.43% 1st Batch Hardware Completion Of Equipment Deliverables For The Following Components At Basc Facility 1. It Security Operations Center & Network Operations Center 2. Campus Data Center Upgrade 3. Data Center Network Switches 4. Data Center Compute System & Data Center Block And File Storage System 5. Data Center Backup And Recovery System 6. Ip-pabx System 7. Software & Networking Laboratories 8. E-classroom, E-room Infrastructure And Smart Led Solar Powered Light 9. E-library Infrastructure 10. Smart Function Hall 11. Campus Network System 12. Fiber Optics Works 13. Structured Cabling Works 14. Human Resource Management System & Time Keeping System 15. Document Management System 16. Queuing / Appointment System 1st Batch User Acceptance Testing (uat) Completion For The Following System Components At Basc Facility 1. Human Resource Management System & Time Keeping System 2. Payroll Management System 3. Assets & Fleet Management System 4. Document Management System 5. Trouble Ticketing System 6. Queuing / Appointment System 7. Campus Portal System 23.57% 2nd Batch Hardware Completion Of Equipment Deliverables For The Following Components At Basc Facility 1. Internet Connectivity 2. University Library System 3. Econference Room W/ Video Conferencing 2nd Batch User Acceptance Testing (uat) Completion For The Following System Components At Basc Facility 1. Cloud Infrastructure 2. University Information System 3. Learning Management System 4. Executive Information System 5. University Library System Hardware Installation, Configuration And Integration 1. Campus Network System 2. Structured Cabling Works 3. It Security Operations Center & Network Operations Center 4. Data Center Network Switches 5. Data Center Backup And Recovery System 6. Ip-pabx System 7. E-library Infrastructure Acceptance Of Volume Testing 1. University Information System 2. Learning Management System 3. Cashiering System 4. Human Resource Management System & Time Keeping System 5. Payroll Management System 6. Assets & Fleet Management System 7. Document Management System 8. Trouble Ticketing System 9. Queuing / Appointment System 10. Executive Information System 11. Campus Portal System 12. University Library System 13. Econference Room W/ Video Conferencing : Completion Of Training 1. University Information System 2. Learning Management System 3. Cashiering System 4. Human Resource Management System & Time Keeping System 5. Payroll Management System 6. Assets & Fleet Management System 7. Document Management System 8. Trouble Ticketing System 9. Queuing / Appointment System 10. Executive Information System 11. Campus Portal System 12. University Library System 13. Econference Room W/ Video Conferencing 14. Campus Network System 15. It Security Operations Center & Network Operations Center 16. Campus Data Center Upgrade 17. Data Center Backup And Recovery System 18. Smart Function Hall 10% : Project Acceptance And Turnover 1. University Information System 2. Learning Management System 3. Cashiering System 4. Human Resource Management System & Time Keeping System 5. Payroll Management System 6. Assets & Fleet Management System 7. Document Management System 8. Trouble Ticketing System 9. Queuing / Appointment System 10. Executive Information System 11. Campus Portal System 12. University Library System 13. Econference Room W/ Video Conferencing 14. Internet Connectivity 15. Campus Network System 16. Fiber Optics Works 17. Structured Cabling Works 18. It Security Operations Center & Network Operations Center 19. Campus Data Center Upgrade 20. Data Center Network Switches 21. Data Center Compute System & Data Center Block And File Storage System 22. Data Center Backup And Recovery System 23. Cloud Infrastructure 24. Ip-pabx System 25. Software & Networking Laboratories 26. E-classroom And E-room Infrastructure And Smart Led Solar Powered Light 27. E-library Infrastructure 28. Smart Function Hall 4 The Inspections And Tests That Will Be Conducted Are: On Site Testing Of All Items To Be Procured. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Delivered, Weeks/months 1 University Information System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 2 Learning Management System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 3 Innovative Cashiering System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 4 Human Resource Management System & Time Keeping System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 5 Payroll Management System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 6 Assets & Fleet Management System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 7 Document Management System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 8 Trouble Ticketing System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 9 Queuing System / Appointment System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 10 Executive Information System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 11 Campus Portal System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 12 University Library System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 13 Econference Room W/ Video Conferencing 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 14 Internet Connectivity 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 15 Campus Network System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 16 Fiber Optics Works 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 17 Structured Cabling Works 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 18 It Security Operations Center & Network Operations Center 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 19 Campus Data Center Upgrade 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 20 Data Center Network Switches (network Infrastructure) 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 21 Data Center Compute System & Data Center Block & File Storage System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 22 Data Center Backup And Recovery System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 23 Basc Cloud Infrastructure 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 24 Ip-pabx System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 25 Software And Networking Laboratories 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 26 E-classroom And E-room Infrastructure And Smart Led Solar Powered Light 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 27 E-library Infrastructure 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 28 Smart Function Hall 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed For Details See Terms Of Reference [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Section Vii. Technical Specifications Notes For Preparing The Technical Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Their Bids. In The Context Of Competitive Bidding, The Specifications (e.g. Production/delivery Schedule, Manpower Requirements, And After-sales Service/parts, Descriptions Of The Lots Or Items) Must Be Prepared To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Transparency, Equity, Efficiency, Fairness , And Economy In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation And Post-qualification Facilitated. The Specifications Should Require That All Items, Materials And Accessories To Be Included Or Incorporated In The Goods Be New, Unused, And Of The Most Recent Or Current Models, And That They Include Or Incorporate All Recent Improvements In Design And Materials Unless Otherwise Provided In The Contract. Samples Of Specifications From Previous Similar Procurements Are Useful In This Respect. The Use Of Metric Units Is Encouraged. Depending On The Complexity Of The Goods And The Repetitiveness Of The Type Of Procurement, It May Be Advantageous To Standardize The General Technical Specifications And Incorporate Them In A Separate Subsection. The General Technical Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Manufacturing Similar Goods. Deletions Or Addenda Should Then Adapt The General Technical Specifications To The Particular Procurement. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Equipment, Materials, And Workmanship, Recognized Philippine And International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Equipment, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure At Least A Substantially Equal Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Special Conditions Of Contract Or The Technical Specifications. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Technical Specifications To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished Or Tested, The Provisions Of The Latest Edition Or Revision Of The Relevant Standards And Codes Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure Substantial Equivalence To The Standards And Codes Specified Will Be Acceptable. Reference To Brand Name And Catalogue Number Should Be Avoided As Far As Possible; Where Unavoidable They Should Always Be Followed By The Words “or At Least Equivalent.” References To Brand Names Cannot Be Used When The Funding Source Is The Gop. Where Appropriate, Drawings, Including Site Plans As Required, May Be Furnished By The Procuring Entity With The Bidding Documents. Similarly, The Supplier May Be Requested To Provide Drawings Or Samples Either With Its Bid Or For Prior Review By The Procuring Entity During Contract Execution. Bidders Are Also Required, As Part Of The Technical Specifications, To Complete Their Statement Of Compliance Demonstrating How The Items Comply With The Specification. Technical Specifications Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1 University Information System 2 Learning Management System 3 Innovative Cashiering System 4 Human Resource Management System & Time Keeping System 5 Payroll Management System 6 Assets & Fleet Management System 7 Document Management System 8 Trouble Ticketing System 9 Queuing System / Appointment System 10 Executive Information System 11 Campus Portal System 12 University Library System 13 Econference Room W/ Video Conferencing 14 Internet Connectivity 15 Campus Network System 16 Fiber Optics Works 17 Structured Cabling Works 18 It Security Operations Center & Network Operations Center 19 Campus Data Center Upgrade 20 Data Center Network Switches (network Infrastructure) 21 Data Center Compute System & Data Center Block & File Storage System 22 Data Center Backup And Recovery System 23 Basc Cloud Infrastructure 24 Ip-pabx System 25 Software And Networking Laboratories 26 E-classroom And E-room Infrastructure And Smart Led Solar Powered Light 27 E-library Infrastructure 28 Smart Function Hall For Details See Terms Of Reference [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Republic Of The Philippines Bulacan Agricultural State College Address: Pinaod, San Ildefonso, Bulacan Website: Https://basc.edu.ph/ Tel/fax No.: (044) 931 8660 Terms Of Reference Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub Definition Of Terms Key Description Internet-based Application A Client/server Application That Uses Standard Internet Protocols For Connecting The Client To The Server. Acl Access Control List Ap Transmit Power Access Point Transmit Power Aec Acoustic Echo Cancellation Ad Database Active Directory Database Arp Address Resolution Protocol Awg American Wire Gauge Api Application Programming Interface Abc Approved Budget Cost Ai Rf Artificial Intelligence Radio Frequency Afms Assets & Fleet Management System Aes/ebu Audio Engineering Society / European Broadcasting Union Ah Authentication Header Ajb Auto Jitter Buffer Agc Automatic Gain Control Agronomy The Application Of Science And Technology From The Fields Of Biology, Chemistry, Economics, Ecology, Soil Science, Water Science, Pest Management, And Genetics To The Improvement And Management Of The World's Major Food Crops. Animal Husbandry The Branch Of Agriculture Is Concerned With Animals That Are Raised For Meat, Fiber, Milk, Or Other Products. It Includes Day-to-day Care, Management, Production, Nutrition, Selective Breeding, And Livestock Raising. Anpr Camera Automatic Number Plate Recognition Camera Basc Bulacan Agricultural State College Bunas Bulacan National Agricultural School Bi Dashboard Business Intelligence Dashboard Cmmi5 Capability Maturity Model Integration 5 Cpu Central Processing Unit Ca Certificate Authentication Certificate Authority Certificate Authentication Cor Certificate Of Registration Ceh Certification Certified Ethical Hacker Certification Cgeit Certified In The Governance Of Enterprise It Isc Certified Information Systems Security Professional Cpmp Certified Project Management Practitioner Cos Class Of Service Cctv Closed-circuit Television Cng Comfort Noise Generation Dtr Daily Time Record Dpa Data Privacy Act [r.a. No. 10173] Db Decibel Dbm Department Of Budget And Management Dscp Differentiated Services Code Point Dsp Digital Signal Processing Dvi Digital Visual Interface Dss Direct Station Selection Dr Drills Disaster Recovery Drills Dms Document Management System Dns Domain Name System Ddr4 Double Data Rate 4 Dfp Dynamic Fabric Provisioning Dhcp Dynamic Host Configuration Protocol Dps Dynamic Path Selection Ecc Employee Compensation Contribution Esp Encapsulating Security Payload Eis Executive Information System Xlr External Line Return Fpi Fabric Performance Impact Fspf Fabric Shortest Path First Foc Fiber Optic Cable Ftp File Transfer Protocol Fdmi Flat Display Mounting Interface Fhd Ir Full High Definition Infrared Camera Fqdn Fully Qualified Domain Name Fdm Fused Deposition Modeling Gbe Gigabit Ethernet Gb Gigabyte Gbps Gigabyte Per Second Gui Graphical User Interface Gddr5 Graphics Double Data Rate 5 Hdd Hard Disk Drive Hi-fi High Fidelity Hdmi High-definition Multimedia Interface Hf Amplifier High-frequency Amplifier Hris Human Resource Information System Http Hypertext Transfer Protocol Ict Information And Communications Technology Ict Information Communication Technology Itil Certification Information Technology Infrastructure Library Certification Ir Infrared Radiation Ir/rgb Infra-red/red, Green And Blue Ieee Institute Of Electrical And Electronics Engineers Ipmi Intelligent Platform Management Interface Iec Standard International Electrotechnical Commission Standard Iso International Organization For Standardization Igmp Internet Group Management Protocol Ike Internet Key Exchange Ip Internet Protocol Ipofc Internet Protocol Over Fibre Channel Ip-pabx Internet Protocol Private Branch Exchange Ipsec Internet Protocol Security Ipv4 Internet Protocol Version 4 Ipv6 Internet Protocol Version 6 Isp Internet Service Provider Isl Trunking Inter-switch Link Trunking Management Tunnel Encryption It Is A Secure Channel Or Connection Established Between A Management Station And A Network Device To Remotely Manage And Configure The Device. Intelligent Load Balancing It Is The Technique Used In Computer Networking And Server Management To Distribute Incoming Network Traffic Or Workload Across Multiple Servers Or Resources In A Way That Optimizes Resource Utilization, Improves Performance, And Ensures High Availability. Kpi Key Performance Indicator Kvm Keyboard, Video, Mouse Lms Learning Management System Ldap Lightweight Directory Access Protocol Lacp Link Aggregation Control Protocol Lan Local Area Network Lf Amplifier Low-frequency Amplifier Mac Media Access Control Mp Megapixels Ms Milliseconds Mcb Miniature Circuit Breaker Maps Monitoring And Alerting Policy Suite M-lag Multichassis Link Aggregation Group Mimo Multiple-input And Multiple-output Nhmfc National Home Mortgage Finance Corporation Nat Network Address Translation Nat-t Network Address Translation-traversal Ndi Network Device Interface Nic’s Network Interface Cards Nvme Network Address Translation Ops Open Pluggable Specification Ospf Open Shortest Path First Oem Original Equipment Manufacturer Oem Certification Original Equipment Manufacturer Certification Pppoe Point-to-point Protocol Over Ethernet Pptp Point-to-point Tunneling Protocol Pvc Polyvinyl Chloride Pdu Power Distribution Unit Poe Power Over Ethernet Pacu Precision Air-conditioning Units Pc Project Category Psc Project Sub– Category Rfid Radio Frequency Identification Ram Random Access Memory Rdp Read Diagnostics Parameter Rstp Real-time Streaming Protocol Rj Registered Jack Rdbms Relational Database Management System Rh Relative Humidity Rcs Reliable Commit Service Rog Report Of Grades Rotc Reserve Officers' Training Corps Rpm Revolutions Per Minute Rip Routing Information Protocol Srtp Secure Real-time Transport Protocol Ssl Secure Sockets Layer Ssl Vpn Secure Sockets Layer Virtual Private Network Sata Serial Advanced Technology Attachment Sp Service Provider Ssid Service Set Identifier Sip Session Initiation Protocol Stp Shielded Twisted Pair Sms Short Message Service Sns Simple Name Server Sso Single Sign-on Sddq Slow Drain Device Quarantine Sddq Slow Drain Device Quarantine Sfp Small Form-factor Pluggable Cadre A Small Group Of People Specially Trained For A Particular Purpose Or Profession. Ssd Solid State Drive Spl Sound Pressure Level Soa Statement Of Account San Storage Area Network Sqlnet Structured Query Language Network Tb Terabyte Encrypted Communication The Process Of Encoding Information In Such A Way That Only Authorized Parties Can Access And Understand It. Tat Time & Attendance Terminal Tor Transcript Of Records Tcp/ip Transmission Control Protocol/internet Protocol Tls Transport Layer Security Tftp Trivial File Transfer Protocol Uhd Ultra High Definition Ups Uninterruptible Power Supply Usb Universal Serial Bus Uis University Information System Utp Unshielded Twisted Pair Udp User Datagram Protocol Ui User Interface Vga Video Graphics Array Vram Video Random-access Memory Vlan Virtual Local Area Network Vms Virtual Machines Vpn Virtual Private Network Vad Voice Activity Detection Voip Voice Over Internet Protocol Wpa Wi-fi Protected Access Wep Wired Equivalent Privacy Wan Wireless Area Network Wi-fi Wireless Fidelity Wips Wireless Intrusion Prevention System I. Introduction A. Executive Summary The Bulacan Agricultural State College (basc) Was Established In 1952. It Started As The Community Agricultural School In Bintog, Plaridel, Bulacan With About 100 Students. The Succeeding Years Saw An Increase In The Number Of Students. Unlike Before, Students Came Not Only From The Local Community But Also From Elsewhere In The Province. With This, The School Was Aptly Named The Bulacan Provincial High School. In 1955, With A Growing Population And A Need To Accommodate The Same, Presidential Proclamation No. 163 Was Issued Allocating 200 Hectares Of Land For The School In Pinaod, San Ildefonso, Bulacan. Not Long After, Republic Act (r.a.) No. 948 Was Issued Changing The School’s Name To Bulacan National Agricultural School (bunas). In 1960, Tertiary Education Was Offered In Bunas With A Two-year Associate In Agriculture Program, Which Eventually Led To The Offering Of The Bachelor Of Science In Agriculture Degree With Majors In Agronomy And Animal Husbandry. Cognizant Of The Broad-based Agricultural Education And Training Needs Of The Bulakeños, Hon. Ricardo C. Silverio, And Then Representative Of District Ii Of The Province Of Bulacan Authored House Bill No. 2389 Which Moved For An Expanded Educational Program For Bunas. With The Bilateral Approval Of Both Houses, President Fidel V. Ramos Signed R.a. No. 8548, Officially Converting The Bunas Into A Chartered State College Known As The Bulacan National Agricultural State College On February 24, 1998. Its Name Was Changed To Bulacan Agricultural State College By Virtue Of R.a. No. 9249 Signed By Her Excellency Gloria Macapagal Arroyo On February 19, 2004. As Mandated By Its Charter, Basc Shall Provide Higher Professional, Technical, And Special Instructions For Special Purposes And Promote Research And Extension Services And Advanced Studies In Agriculture, Arts And Science Programs, And Other Allied Courses. It Shall Also Offer Short-term Technical And Vocational Non-degree Courses Within Its Area Of Specialization To Meet The Needs Of Its Constituents. Basc Main Campus Is Situated In Pinaod, San Ildefonso, Bulacan. It Has Three Extension Campuses – Doña Remedios Trinidad Campus; Balagtas Technical Vocational School Campus; And Fortunato Halili National Agricultural School. The Basc Board Of Trustees Is The Policy-making Body Of The College Composed Of The Following: Chairperson: Chairperson, Commission On Higher Education Vice-chairperson: President, Bulacan Agricultural State College Members: Chairperson, Senate Committee On Higher And Technical Education Chairperson, House Committee On Higher And Technical Education Director, Neda Region Iii Director, Da Region Iii President, Basc Alumni Association Faculty Trustee Student Trustee Prominent Citizen Resource Person: Director, Dost Region Iii The College Is Headed By Its President, Dr. Jameson H. Tan, And Assisted By Dr. Cecilia S. Santiago, Vice President For Academic Affairs; Dr. Ronald Reagan T. Alonzo, Vice President For Administration, Finance And Business Affairs; And Dr. Honeylet J. Nicolas, Vice President For Research, Extension, Production And Development. The Bulacan Agricultural State College Shall Strive For Excellence In Agriculture And Other Allied Disciplines. It Shall Provide For And Address Ever-changing Educational Needs And Services For Those Seeking To Expand Their Intellectual Horizons. Basc Shall Address National And International Issues And Be Established As A Major Presence And Contributor To The Progress Of The Global Community. To Ensure The Training Of Productive And Competitive Graduates In Agriculture And Other Related Disciplines, Basc Is Keen On Delivering The Following Goals/objectives. 1. Produce Quality Graduates Equipped With Knowledge And Expertise Enough To Meet The Demands And Challenges Of The Fast-changing Society. 2. Develop A Cadre Of Highly Competent Manpower To Implement The Various Academic, Research, Extension, Training, And Production Programs Of The College. 3. Undertake Relevant Research, Extension, And Training Programs To Accelerate Productivity And For Additional Income Of People In Rural And Urban Areas. 4. Promote The General Welfare Of The Faculty And Staff As Well As The Students. 5. Maintain A Wholesome Academic Community Conducive To Learning By Providing A State-of-the-art Laboratory, Information And Communication Equipment, And A Modern Library, Sports, And Other Facilities. 6. Establish Networks, Linkages, Or Collaboration With Other Stakeholders To Take Advantage Of The Synergy For Fund Sourcing. 7. Develop And Implement Resource Generation Projects To Modernize And Sustain The Operation Of The College. 8. Implement An Improved Administrative Efficiency And Financial Management System. Delivering These Goals/objectives Would Require Adding And Improving Systems As Well As Information Communication Technology (ict) Equipment For Basc To Provide Better Management, Process, Technology, And System, Thus, Achieving An Improvement For The Goals Outlined Above. The Agency Aligns Its Support Commitments To Its Core Programs Focused On The Desired Impact Of Improved Ict Equipment And Systems Using The Latest Technology And Developing A Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub. To Address These Services, Systems Are Needed To Properly Put In Place All The Information. These Systems Will Target All The Services Mentioned In Such That Each Service Will Be Dealt With One By One As Follows: 1. University Information System – A Platform That Can Oversee And Streamline All Aspects Of University Operations, From Student Admission, Enrollment, Student And Alumni Services, Faculty And Staff Management, Curriculum Management, Grades, And Academic Progress. 2. Learning Management System – It Should Integrate Course Development, Distribution, Evaluation, And Control Into A Unified, Device-compatible Interface. It Facilitates Personalized Learning Trajectories That Enhance Student Engagement And Achievement By Centralizing Communication, Content, Analytics, And Work Process Automation. 3. Cashiering System – This Is A Cutting-edge And Highly Efficient Solution To Transform Cashiering Operations Within The Basc Setting. 4. Human Resource Management System & Timekeeping System – Integrates All Human Resource (hr) Functions Into A Unified System Designed To Streamline Hr Process Workflow And Improve Data Management, Data Security, Integrity, Onboarding, Benefits Administration, Compliance, Performance Tracking, Development, And Retention. 5. Payroll Management System – This Represents A Cutting-edge Solution To Revolutionize And Simplify Payroll Management. 6. Assets & Fleet Management System – A Comprehensive Platform Designed To Assist The University In Efficiently Monitoring And Administering The University’s Valuable Assets And Fleet Of Vehicles. 7. Document Management System – A Digital Platform Designed To Consolidate And Enhance The Document Management Processes Within Basc. 8. Trouble Ticketing System – Provides Centralized Incident/problem Reporting, Coordinated Troubleshooting, Assignment, Tracking, Knowledge Base Documentation, And Customer Communication Streams To Rapidly Restore Technology Performance And Availability While Optimizing Resource Efficiency And Minimizing Disruptions Across Users And Business Operations. 9. Queueing / Appointment System – A Solution Designed To Streamline And Enhance The Way Universities Handle Queues And Appointments For A Wide Range Of Services. 10. Executive Information System – Selectively Aggregate, Analyze, And Visualize Kpis On Vital Organizational Statistics From Integrated Bi Dashboards Tuned To Strategic Objectives To Reveal Insights Driving Informed Decisions And Management By Exception For Optimized, Data-driven Governance And Outcomes. 11. Campus Portal System - This Should Encompass Intranet Platforms Facilitating Single Sign-on Access For Faculty, Staff, And Administrators. These Portals Practically Incorporate Critical Academic Resources, College Services, And Administrative Systems For Their Respective Roles. 12. University Library System – Consolidates The Management Of Physical And Digital Resources On Campus. These Include Discovery Layers, Circulation, Patron Records, Book/media Cataloging, And User Usage Analytics. 13. Econference Room With Video Conferencing – A Solution Designed To Streamline And Enhance The Institution By Facilitating Seamless Real-time Communication Between Individuals Or Groups In Different Locations. Reporting And Any Associated Sub-modules Thereof May Be Necessary. Ii. Project Objectives A. General Objectives The Main Objective Of Bulacan Agriculture State College (basc) Is To Enhance The Educational Experience, Improve Campus Operations, And Address The Needs Of Students, Faculty, And Staff In An Efficient, Sustainable, And Forward-thinking Way. The System Shall Be Securely Accessible By All Stakeholders Anytime And Anywhere. B. Specific Objectives The Project Aims To Provide A System With The Following Features: • The System Must Promote The Virtue Of Transparency. • The System Runs On An Internet-based Application. • The System Is Available On Both Android And Ios Mobile Devices. • The System Should Record And Track Potential Students From Their First Inquiry To Enrollment. • The System Should Record And Calculate Grades, As Well As Facilitate The Transmission Of Grades To The Dean’s And Registrar’s Office. • The System That Manages Academic Records, Courses, And Academic-related Information For Students. • The System Should Record Each Student's Class Attendance And Allow The Teachers To View It. • The System Should Have A Dashboard For Quickly Identifying The Total Quantity Of Tasks, Assignments, Tests, Quizzes, Finished Projects, And Subjects For Each User. • The System That Handles The Student’s Enrollment Charges, Accounts Receivable, Payment, And Adjustment Of Student’s Fees. • The System Should Have An Online Registration That Automatically Assesses Fees. • The System That Can Manage The Payments Of The Students Includes Printing Official Receipts And Cashier Settings. • The System Can Manage Registrar Department Transactions From The Submission Of Records, Enrollment Up To Graduation, And The Issuance Of Transcript Of Records Of Students. • The System That Can Manage And Monitor Students’ Health And Well-being. • The System Can Display Upcoming Events, Announcements, And News. • The System Handles The Alumni Master File And Enables The User To Create, Edit, And Update The Alumni Profile. • The System Can Enable Parents To Monitor The Activities And Progress Of Their Children. • The System Is Accessible Anywhere, Anytime. • The System That Is User-friendly. The Proposal To Be Submitted Shall Include The Following: • Executive Summary. O Cost Of The System O Advantages Of The Proposal • Company Information • Solution Overview O Solution Architecture O High-level Component Description • Process Flows • Detailed Description Of Sub-system • Technical Specification • Dimensioning • Web-based System • Mobile Web Access (android And Ios) • Project Workshop • Performance Management • Hardware And Site Information • Installation And Trainin Iii. Scope Of Work The Project Comprises Several Phases Of Development And Implementation. It Includes Not Only The Provision Of The Software Development/customization Services, Hardware, And Network With Accessories But Also Support Services, Necessary To Achieve The Project’s Objective. A. Systems Analysis This Phase Covers The Data Collection Process In Order To Improve The Efficiency Of Related Systems In Basc. The Process Includes But Is Not Limited To The Following: 1. Data Gathering, Consultation, And Evaluation Of Existing Systems-related Information Management Systems In Basc. 2. Documentation, Assessment, And Testing Of The Existing Basc Processes. 3. Preparation, Assessment, And Evaluation Of The Current Database Of The Existing Systems. 4. Identification Of Issues, System Requirements, And Development Opportunities Of The Existing Versus The Proposed System. 5. Data Migration Plan, Execution Plan, Reversion Plan, Backup Plan, And Verification Process From Existing Database To New Database. 6. Actual Migration And Verification Of Data. 7. Executions Of Backup Plan. 8. Post-migration Verifications. 9. Capacity Planning. 10. Knowledge Transfer B. Systems Design And Development Supply, Install, And Implement A System Upgrade For Availability To A Web, Desktop, And Mobile Version, Inclusive Of (2) Two Years Of Software And Maintenance Support. The Solution Shall Include The Following Modules And Sub-modules Of The System Software: The Development/customization Of The System Consists Of But Is Not Limited To The Five Functionalities: (a) Information Management; (b) Provision Of Statistical Chart On Dashboard; (c) Service Status Monitoring; (d) Security Management; (e) Reporting And Any Associated Sub-modules Thereof As May Be Necessary. B.1 Pre-requisite Setup Module ● University Information Settings ● Secured Access Management ● Module To Set Organizational Units With The Following Hierarchy ○ University > Campus > College > Department ○ Approval Level Hierarchy ● The Admission Setups Should Have The Following: Document Types, Application Types, Admission Limits, Entrance Exams, Entrance Exam Schedules, Interview Schedules, Medical Schedules. ● Furthermore, Clinic Records Management Setups That Play A Vital Role In University Operations. ● Clearance Management Setups ● Learning Management Settings ● Secured Access Management ● It Should Have A Configuration Grading Parameters, Rubrics Matrix Of The Activities, Major Course Output (mco), Syllabus, And Lesson Plans. ● Cashiering Settings ● Secured Access Management ● Cashiering Setup: Must Allow Setting Up Customer Master Data, Accounts Group, Sub Groups, Discounts, Collection Of Terms Settings, And Interests, Fines, & Penalties Settings. ● Human Resource Management Settings ● Secured Access Management ● Holiday: Holiday Types And Holidays ● People Attributes: Talents, Hobbies, And People Relationships ● Hr Settings: Employment Types, Positions, And Leave Types ● Schedule Settings: Schedule Templates And Schedule Parts ● Government Settings: Withholding Tax, Sss, Philhealth, Pag-ibig, Gsis. ● Salary Grades: Salary Grades And Salary Level ● Default Leave Types: Manage Default Leave Types, Which Are Used For Easy Assignment Of Leaves To Employees (e.g., Regular, Jo, Casual, Oyster, And Part-time Employees) ● Training And Seminar: Manage Training And Seminar; Use For Easy Training, Seminar, Certification, And Workshop Creation. ● Manage Suspension Types ● Manage Termination Types ● Payroll Settings ● Secured Access Management ● Mandatory Deductions: ○ Withholding Tax ○ Philhealth Contribution ○ Pag-ibig Contributions/home Development Mutual Fund (hdmf) ○ Gsis Contribution ● Loans ○ Gsis Mpl (multi-purpose Loan) ○ Gsis Gfal (governmentfinancial Assistance Loans) ○ Gsis Housing Loan ○ Gsis Policy Loan ○ Gsis Computer Loan ○ Gsis Salary Loan ○ Gsis Consolidated Loan ○ Gsis Emergency Loan ○ Gsis Educational Loan ○ Gsis Old Loan ○ Pag-ibig Housing Loan ○ Pag-ibig Multi Purpose Loan ○ Pag-ibig Calamity Loan ○ Grocery Loan ○ Koop ○ Hospital Bills Loan ○ Psmb Fund ○ National Home Mortgage Finance Corporation(nhmfc) ○ Provident Fund ○ Land Bank Of The Philippines(lbp) Salary Loan ○ Unlimited Optional Life Insurance (uoli) ○ Development Bank Of The Philippines (dbp) Loan ● Other Deductions ○ Absences/lates ○ Sss Contribution ○ Gsis Optional Insurance ○ Pag-ibig Mpii ○ Child Support ○ Philhealth Up ○ Additional Tax ○ Basc Personnel Credit Cooperative (pcc) ○ Basc Faculty And Employee Association (fea) ● Other Income ○ Overtime (e.g., Normal O.t., Rest Day O.t., Holiday O.t., Non-working Holiday O.t., And Special Non-working Holiday O.t.) ○ Night Differential ○ Salary Adjustment ○ Pera (personnel Economic Relief Allowance) ○ Meal Allowance ○ Fitness Allowance ○ Transportation Allowance ○ Rice Allowance ○ Uniform Allowance ○ Laundry Allowance ○ Communication ○ Internet Allowance ○ 13th Month ○ Bonus Pay ○ Retirement Pay ● Assets And Fleets Management Settings ● Secured Access Management ● Asset Groups ● Asset Categories ● Asset Types ● Asset Articles ● Annual Procurement Plan (app) / Project Procurement Management Plan (ppmp) ● Document Management Settings ● Secured Access Management ● Delivery Type ● Document Category ● Document Security Level ● Document Type ● Process Flow ● Trouble Ticketing Settings ● Secured Access Management ● The Solution Must Have A Maintenance Module For Category Settings. ● The Solution Must Have A Maintenance Module For System Settings. ● The Solution Must Have A Maintenance Module For Types Settings. ● The Solution Must Have A Maintenance Module For State Settings. ● The Solution Must Have A Maintenance Module For Impact Settings. ● The Solution Must Have A Maintenance Module For Urgency Settings. ● The Solution Must Have A Maintenance Module For Team Settings. ● Executive Information Settings ● Secured Access Management ● Dashboard Configuration And Control ● Campus Portal Settings ● Secured Access Management ● Basc Active Directory W/ Configuration ● Themes Configurations ● University Library Settings ● Secured Access Management ● Access Control ● Library Locations ● Shelves Mapping ● Call Number/book Mapping ● Queueing/appointment Settings ● Secured Access Management ● The Solution Must Have An Office/department Setups To Manage The List Of Office/departments. ● The Solution Must Have A Service Set Up To Handle The List Of Services. ● The Solution Must Have Window Settings To Manage The Window List. ● The Solution Must Have Window-type Setups To Control The Queueing System Window Types. ● The Solution Must Have Marquee Setups To Configure The Footer Data Or Information. ● The Solution Must Have Printer Setups To Manage The List Of Printers. ● The Solution Must Have Advertisement Setups To Manage The List Of Advertisements. B.2 University Information System ● Academics ● The Solution Must Enable The Setup Of Courses, Sections, Course Programs, And Curriculum. ● The Solution Must Include A Course Master List To Manage And View Course Information, Course Program Inclusion, And Section Details. ● The Solution Must Include A Master List Of Course Programs To Streamline The Management And Viewing Of Course Program Information, Curriculum Details, And Curriculum Structure. ● The Solution Must Include A Curriculum List To Easily Manage And View Academic Progression Or Flowchart. ● Enrollment Module ● The System Must Have An Online Registration With Automatic Assessment Of Fees, Interconnected With The Other Modules To Facilitate The Automatic Course Advising. ● The System Must Have A Monitoring Of Section Fill Rates. ● The System Must Have A Post-enrollment (adding/changing/dropping) Module. ● The System Must Support Automatically Generating A “list Of Allowed Subjects And Schedules To Be Taken”. ● The System Must Support The Ability To Prevent Choosing Subjects With Prerequisites Not Yet Taken. ● The System Must Support The Ability To Show The Maximum Number Of Allowed Units A Particular Student Can Enroll In Based On Previous Semester Grades With The Capability To Add And Decrease Units By The Registrar Department. ● The System Must Support Enlistment To Rotc And Pe Subjects. ● The System Must Support The Automatic Generation Of Assessment Slips And Registration Slips. ● The System Must Have A Curriculum Auditing. ● The System Must Support Students' Online Queries Of Available Subjects. ● The System Must Support The Generation Of Reports Such As A Summary Of Enrolled Students. ● Section Management Module ● The Solution Must Be Able To Assist In Creating Multiple Sections For Courses To Accommodate Varying Class Sizes, Instructor Availability, And Scheduling Preferences. ● The System Must Aid In Managing Instructor Workloads To Ensure Equitable Distribution Of Teaching Assignments And Compliance With Contractual Obligations. ● The Solution Must Provide Real-time Updates And Notifications To Students, Faculty, And Staff Regarding Changes To Class Schedules, Room Assignments, Or Instructor Assignments. ● The System Must Be Able To Generate Reports On Room Utilization, Resource Usage, And Scheduling Patterns To Inform Decision-making And Resource Allocation. ● The Solution Must Be Able To Enroll Students In Courses And Sections Using Normal Scheduling Techniques While Supporting Non-standard Term Arrangements. ● The System Must Be Able To Generate Schedules For Both Students And Professors. ● Admission Module ● The Solution Must Allow The Creation Of Applications For Potential Students. ● The Solution Must Contain A List Of Applicants To Easily Manage/view The Applicant’s Complete Information, Attachments, And Progress Status. ● The Solution Must Allow The Setting Of Admission Limits To Know The Number Of Allowed Applicants Quickly. ● The Solution Must Allow Applicant Pooling That Is Printable. ● Must Have A List Of Applicants Scheduled For The Entrance Exam, Interviews, And Medical. ● The Solution Must Be Able To Customize The Requirements Of Students For Admission. ● Must Support The Fast Generation Of Reports For The List Of Applicants. ● Grade Management Module ● The System Maintains Complete Records Of The Academic Grades Of The Students. ● The System Must Facilitate Academic Grade Crediting For Transfer Students. ● The System Must Have A Module To Handle Effortless Reviews Of Grades Submitted By Faculty Members. ● The Students Must Be Able To View Their Historical Grades Anytime Thereby Replacing Class Cards. ● Registrar Module ● Must Have Tools To Monitor And Manage Various Operations Of The Registrar Like Monitoring Screen For Records, Certification, And Documents Requested By Students And Alumni. ● Must Contain Complete Student Information, Academic Data File, And Scanned Submitted Documents Of Students. ● Must Support The Fast Generation Of Tor, Cor, Rog, And Form 9 ● Must Be Capable Of Generating A List Of Candidates For Graduation, Scholarships, And Honors. ● The Solution Must Allow The Generation Of The Following Reports: Academic Evaluation, Official List Of Enrollment, Diploma, Registration, Shiftee, Student Directory, Subject Masterlist, And Summary Of Enrollment Reports. ● Must Be Able To Apply Tags To Documents Being Submitted By New Enrollees And Remind The User Of Documents That Students Need To Submit. ● Must Have The List Of Student Subsidy And Adding Of Students For The Scholarship. ● The System Must Be Capable Of Correcting Student Grades. ■ Students With An 'incomplete' (inc) Grade Will Have One Year To Fulfill Requirements To Update Their Grades; Otherwise, The Grade Will Be Changed To A Failing Grade. ● Student Services ● Must Allow Teachers To Submit Requests For Grade Corrections In Case Of Errors Or Discrepancies In Their Recorded Grades. ● The Solution Must Facilitate Tracking The Progress Of Such Requests And Include Checks To Ensure The Necessary Supporting Documentation Is Provided. ● The Grade Correction Request Must Be Reviewed And Approved By Relevant Faculty Members And The Registrar. ● The Solution Must Allow Students To Request Essential Documents Such As Copies Of Report Cards And Academic Certifications For Various Purposes (e.g., Employment, Further Education, Or Personal Records.) ● The Solution Must Allow Students To Specify The Details Of Their Requests (e.g., Number Of Copies, Type Of Document, Purpose) And Provide Estimated Processing Times. ● The Solution Must Notify The Students About The Status Of Their Requests, From Submission To Approval And Document Issuance. ● The Solution Must Have A Feature That Supports Students To Request For Change Of Their Course Or Program Of Study. ● The Solution Must Have A Process That Involves Submitting A Detailed Request, Including The Reason For The Change And Relevant Supporting Information. ● Alumni Module ● The Solution Must Have An Alumni Module That Can Populate The Alumni Master File. ● The System Must Have A Record That Can Be Utilized To Contact The Alumni. ● The Solution Must Be Able To Update Alumni Information. ● The Solution Must Be Able To Search The Directory Of Alumni. ● The Solution Must Be Able To Update The Alumni Profile. ● Scholarship Management ● The System Must Serve As A Central Repository For All Scholarships. ● The Solution Must Handle Recurring Scholarships, Including Reminders To Renew. ● The Solution Must Provide Tools To Automatically Monitor Compliance With Scholarship Conditions (e.g., Gwa Maintenance). ● The System Must Be Integrated With Academic Records And Financial Systems For Validation. ● The System Must Be Able To Provide Real-time Application Status Tracking For Students. ● Awards And Distinction Management ● The System Must Provide A Streamlined Management Of Awards Through Automation. ● The System Must Be Able To Support Multiple Types Of Awards (e.g., Academic Excellence, Leadership, Research, Sports, And Cultural Activities) ● The System Must Be Able To Select Recipients By Committees. ● The System Must Be Able To Ensure Adherence To University Policies And Regulations Regarding Awards. ● The System Must Provide Fields To Define Award Qualifications (e.g., Gwa Thresholds, Competition Results, Or Nomination-based Recognitions) ● Academe Module ● The System Must Provide An Overview Of The Academic Organizational Chart Of The University's Faculties. ● Curriculum Module ● The System Must Provide Tools For Designing And Structuring Academic Programs, Including Defining Course Sequences, Corequisites, And Prerequisites ● The System Must Allow The User To Maintain A Comprehensive Catalog Of Available Academic Programs, Including Undergraduate Majors, Minors, Graduate Programs, And Certificates. ● Acts As A Map Between Program Learning Goals And Course Learning Objectives To Guarantee Coherence And Alignment Across The Curriculum. ● Block Sections Management Module ● The System Must Be Able To Efficiently Manage Student Groupings (block Sections) For Better Academic And Administrative Coordination. ● This Module Manages Predetermined Groupings Of Students Who Attend Classes Together For The Entirety Of A Course Or Academic Program. ● This Module Must Be Able To Automatically Assign Students To Sections Based On Predefined Rules, Such As Enrollment Data, Course Requirements, And Class Size Limits. ● Short Courses Management Module ● This Module Offers Enrollment Information, Fees, And Course Content For Tesda Courses And Other Modules. ● The System Should Include A Student List, Class Schedules, Faculty Assignments, Assessment Results, And The Issue Of Training Certificates, As Well As Other Data On Short-term Courses. ● Clinic Records Management Module ● The System Must Have A Component Designed To Facilitate The Management Of The Clinical Records Of The Students And The Dispensing Of Clinic Items. B.3 Learning Management System ● Administration Module ● The System Must Show Interactive Analytics ● The System Must Allow The Customization Of The Grading Transmutation. ● The System Must Allow The Customization Of The General Passing Percentage. ● Professor Module ● The System Must Show Interactive Analytics ● The System Must Automatically Retrieve The Classes Assigned To Teachers. ● The System Must Automatically Retrieve The List Of Students Enrolled In Each Class. ● The System Must Allow Teachers To Manage The Student Attendance Records. ● The System Must Support The Creation Of Lessons And The Attachment Of Related Files, Including Modules, Powerpoint Presentations, Excel Spreadsheets, Pdfs, Word Documents, Text Files, Videos, And Images. ● The System Must Permit The Addition Of User Activities, Such As Assignments, Projects, Quizzes, And Exams. ● The System Must Be Capable Of Creating And Generating A Rubric To Provide Clear Expectations For Each Evaluation Criterion. ● The System Must Be Capable Of Generating The Student Portfolio For A Range Of 3 To 5 Years. ● The System Must Be Able To Archive The Students' Assignments, Projects, Quizzes, And Exams. ● The System Must Be Able To Have A Grade Consultation ● The System Must Allow Teachers To Set Time Limits For Activity Questions. ● The System Must Be Capable Of Preventive Measures For Cheating. (e.g. Disabling Screenshots) ● The System Must Enable The Configuration Of Date Ranges For Users To Complete Assigned Activities. ● The System Must Be Able To Set Schedules And Deadlines For Posting The Activities, And Quizzes. ● The System Must Allow The Shuffling Of Quizzes And Exam Item Numbers And Answers. ● The System Must Provide Immediate Visibility Of Scores On Activities Upon Completion. ● The System Must Allow The List Of Created Questions To Be Viewable And Editable By The Activity Creator. ● The System Must Support The Creation Of Lessons And Quizzes One At A Time, All With The Same Subject Description. ● The System Must Allow The Teachers To View The Grades Of His/her Students. ● The System Must Allow The Teachers To Generate Reports For Each Class. ● Student Module ● The System Must Show Interactive Analytics ● The System Must Have A Dashboard To Easily Identify The Total Number Of Completed Activities, Assignments, Quizzes, Exams, Projects, And Subjects Per User. ● The System Must Allow Students To Change Their Passwords And Usernames During Their Initial Login. ● The System Must Provide A Newsfeed Feature To Display Upcoming Events And The School's Mission And Vision. ● The System Must Enable Students To Upload Profile Pictures. ● The System Must Support Live Chat And Messaging Functionality Between Students Of The Class. ● The System Must Automatically Post Classes In Which A Student Is Enrolled To Their User Account. ● The System Must Support User/class Attendance Tracking Within The Learning Management System (lms). ● The System Must Enable File Attachments To Lessons That Are Downloadable To The Users' Devices. ● The System Must Allow Students To View The Results Of Their Activities. ● The System Must Ensure That Detailed Activity Results Are Posted. ● The System Must Include An Activity Stream To Summarize The Recent, Upcoming, Later, And Missed Activities Providing An Overview Of A Student's Activity Status. ● The System Must Include Notifications When There’s New Activity Uploaded, Modifications, And Grade Posting. ● The System Must Provide Visibility Into Student Ranking. ● Parents Module ● The System Must Enable Parents To Monitor The Activities And Progress Of Their Children Within The System. ● The System Must Support The Addition Of Children With No Limitations, With An Auto-identification Feature. ● The System Must Comply With The Data Privacy Act. ● Student Transcript Module ● The System Must Have An Academic Record Or Course Management ● The System Must Play A Crucial Role In Managing And Organizing Academic-related Information For Students. ● The System Must Have A Module That Focuses On Tracking And Displaying Details Related To Individual Courses, Classes, And Academic Progress. B.4 Cashiering System ● Cashier Module ● The System Must Be Capable Of Setting Up The Assessment Fees. ● The System Must Be Able To Keep A Record Of A Student's Soa And Its Current Status Whether It’s An Active Soa Or Inactive. ● The System Must Be Able To Preview Or Print Student’s Soa Based On The Selected Academic Year And Semester. ● The System Must Be Able To Have An Audit Trail For Any Actions Or Activity Made Per Account. ● The System Should Support Walk-in Payments At Physical Locations Whether By Cash Or By Check. It Should Enable The Manual Entry Of Payment Details And Generate Receipts. ● The System Must Be Capable Of Identifying Eligible Students Based On Predefined Criteria And Offer A Range Of Financial Incentives, Including Scholarships, Fee Reductions, And Grants. It Must Also Establish An Efficient Application And Selection Process While Promoting Transparency And Fairness In Awarding Scholarships. B.5 Human Resource Management System And Timekeeping System ● Employee Management Module ● The System Must Be Able To Provide A Single Repository Where All Employee Records Are Stored, Updated, And Maintained. ● The System Must Be Able To Reflect Any Updates Or Changes Made To The Master Database Across All Modules. ● The System Must Be Able To Allow Linkage Of Personnel Files To The University Information System. ● The System Must Be Able To Prepare And Generate An Employee Masterlist. ● The System Must Be Able To Set Up Organizational Units With A Hierarchy. ● The System Must Be Able To Provide A Viewable Organizational Chart Of The University, Which Is Linked To The Employee Plantilla Records. ● The System Must Be Able To Manage Employees Based On Their Plantilla Numbers. ● The System Must Be Able To Organize The Employee Hierarchy By Rearranging The Plantilla Numbers Of Specific Employees Through A Drag-and-drop Interface. ● The System Must Be Able To Provide Employee Self Service For The Following: ■ Request To Update Profile. ■ Receive Notifications, News, And Announcements. ■ View Attendance. ■ View Schedule. ■ View Leave Balances, Benefit Balance, And Ledgers. ■ View Monthly Net Pay Summary/payslip. ■ Request Dtr Correction. ■ Submit Requests For Leave, Overtime, Business Trip, And Six Days Of Work. ● The System Must Be Able To Record And Generate Audit Trail Reports. ● Time-keeping Monitoring Modules ● The System Must Be Able To Link With The Biometrics Attendance System. ● The System Must Be Able To Link With The Payroll Management System. ● The System Must Be Able To Do Auto-tracking Of Sick Leave And Vacation Leave Balances. ● The System Must Be Able To Monitor Regular And Special Holidays With Automated Computation Of Pay Rates. ● The System Must Be Able To Prepare A Summary Of Attendance And Absences. ● The System Must Be Able To Prepare A Summary Of Overtime For Validation And Approval. ● The System Must Be Able To Provide A Calendar Of Approved And Pending Leave Requests. ● The System Must Be Able To Set Up Holidays Such As But Not Limited To Recurring Regular-holidays And Special Non-working Holidays. ● The System Must Be Able To Set Up Template Schedules To Be Assigned To A Bulk/group/ Per Employee. ● The System Must Be Able To Record And Generate Audit Trail Reports. B.6 Payroll Management System ● Automated Payroll System ● The System Must Be Able To Provide The Analytics Of Payroll Reports With Real-time And Accurate Data. ● The System Must Be Able To Display, Create, And Manage Payroll Period/s For Generating Payroll Reports. ● The System Must Be Able To Create And Manage Payroll Groups And Assign Employees To Their Payroll Groups Accordingly. ● The System Must Be Able To Set Bank Details And Salary Pertaining To The Corresponding Employee’s Job Type, Salary Grade, And Step. ● The System Must Have A Feature That Customizes And Manages Employees’ Allowances, Deductions, Loans, And Other Compensation Components. ● The System Must Be Able To Export Files For All Tables/lists Within The Payroll System (e.g., Employee Lists, Payroll Reports For A Certain Period, And Others). ● The System Must Have A User Access Control Wherein The Administrator Can Manage Who Can View, Edit, And Delete The Employee And Payroll Information. ● The System Must Be Able To Track Audit Logs Including Who Accessed The System And Made Changes. ● The System Must Have A Feature For Providing Alerts And Notifications Regarding Updates About Generating Payroll Reports And Releasing Payslips. ● The System Must Be Able To Archive Data With Complete Accessibility For Future Reference. ● The System Must Have A Feature That Allows The User To Have Backup And Recovery To Maintain Historical Payroll Records For Auditing And Compliance Purposes. ● Mandatory Deductions And Contribution Module ● The System Must Be Able To Accurately Calculate And Deduct Mandatory Contributions Such As Gsis Contribution, Philhealth, Pag-ibig, And Withholding Tax. ● The System Must Be Able To Integrate With The Latest Bir Tax Tables To Ensure Compliance With Tax Regulations. ● The System Must Be Able To Automatically Generate Reports For Government Agencies. ● Other Deductions Module ● The System Must Allow Flexible Customization Of Other Deductions. ● The System Must Have A User-friendly Interface For Easy Input And Management Of Deduction Rules. ● Other Income Module ● The System Must Be Able To Accommodate Various Types Of Other Income. ● The System Must Be Able To Calculate The Appropriate Tax. ● Loans Module ● The System Must Be Able To Allow The Creation And Tracking Of Different Loan Types With Varying Interest Rates And Repayment Terms. ● The System Must Be Able To Automatically Compute Loan Amortization And Deduct Payments From Employee Salaries. ● The System Must Be Able To Automatically Update Loan Balances And Remaining Dues. ● Attendance Module ● The System Should Be Able To Record Employee Attendance And Generate Accurate Time And Attendance Reports. ● The System Must Be Able To Calculate Overtime, Night Differential, And Other Time-based Compensations. ● Bank Transmittal ● The System Must Be Able To Generate Accurate Bank Files For Payroll Disbursement. ● The System Must Be Compatible With Various Bank Formats To Ensure Seamless Integration With Banking Systems. ● Integration To Time Keeping Monitoring Module ● The System Must Be Able To Connect And Communicate With The Biometrics Attendance System. ● The System Must Be Able To Provide Automated Tracking Of Sick Leave And Vacation Leave Balances Of Employees. ● The System Must Be Able To Monitor Regular And Special Holidays With The Inclusion Of An Automated Computation Of Pay Rates. ● Integration To Hris System ● The System Must Be Able To Integrate Data With The Human Resources Information System (hris) For The Employees’ Relevant Data Including Basic Information, Job Position, Salary Grade, And Bank Details. ● The System Must Be Able To Integrate Data With Hris To Track Employee Work Hours, Including Regular Hours, Overtime, Absences, And Leave Requests. B.7 Assets & Fleet Management System ● Asset Management System ● The System Must Be Able To Show And Manage The General Information, Vendor Details, Warranty Information, Financial Info, And Depreciation Info. ● The System Must Be Able To Show The Operational Cost And Progress Of The Asset Requests. ● The System Must Be Able To Show Operational Costs And Progress Of The Asset Update. ● The System Must Be Able To Show The Operational Cost And Progress Of The Asset Auction. ● The System Must Be Able To Show Operational Costs And The Progress Of The Repair And Maintenance. ● The System Must Be Able To Show The Operational Cost And Progress Of The Decommissioning. ● The System Must Be Able To Show Operational Cost And Progress Of The Disposal. ● The System Must Be Able To Show The Operational Cost And Progress Of The Asset Issuance. ● The System Must Be Able To Show The Operational Cost And Progress Of The User Transfer. ● The System Must Be Able To Create, Update, And Delete Assets With Their Respective Information. ● The System Must Be Able To Create A Comprehensive Inventory Of All Assets, Including Physical Equipment, Software, Licenses, And Other Resources. Each Asset Is Typically Associated With Relevant Information Such As: ■ Article (laptops, Furniture, Or Journals) ■ Property Number ■ Assigned Number ■ Purchase Date ■ Vendor Name ■ Service Provider (optional If Different As To Vendor Name) ■ Financial Information ■ Required Documents (e.g., Purchase Request) ● The System Must Be Able To Track The Movement And Changes In The Status Of Assets. This Includes: ■ Recording Of Asset Transfers ■ Disposal ● Fleet Management System ● The System Must Be Able To Show And Manage General Information, Vehicle Registration Details, Vendor Details, Warranty Information, Financial Info, And Depreciation Info. ● The System Must Be Able To Show Operational Costs And The Progress Of The Fleet Requests. ● The System Must Be Able To Show Operational Costs And Progress Of The Fleet Update. ● The System Must Be Able To Show The Operational Cost And Progress Of The Fleet Auction. ● The System Must Be Able To Show Operational Costs And Progress Of The Repair And Maintenance. ● The System Must Be Able To Show The Operational Cost And Progress Of The Decommissioning. ● The System Must Be Able To Show Operational Cost, And Progress Of The Disposal. ● The System Must Be Able To Show Operational Cost, And Progress Of The Fleet Issuance. ● The System Must Be Able To Show Operational Cost, And Progress Of The User Transfer. ● The System Must Be Able To Show A Statistical Overview Of Fleets According To Its Categories And Types (e.g., Motorcycles, Service Vehicles, Heavy Equipment). ● The System Must Be Able To Have An Elaborative List Of Records Of All Fleets And Their Corresponding Information. ● The System Must Be Able To Have Integration With The Asset Management System To Be Able To Handle Instances Of Assets Being Carried On A Vehicle, Allowing Easier Management, Monitoring, And Inventory. ● The System Must Be Able To Create A Comprehensive Inventory Of All Fleets. Each Fleet Is Typically Associated With Relevant Information Such As: ■ Article (service Vehicle, Car, Heavy Equipment) ■ Body No./ Plate No./ Conduction Sticker No. ■ Assigned Department ■ Registration Information ■ Vendor Information ■ Insurance Information ■ Financial Information ■ Depreciation Information ■ Attachments ● Requisition And Issuance Slip ● Par ● Purchase Request ● The System Must Be Able To Have A Feature That Schedules And Tracks Vehicle Maintenance, Including Oil Changes, Tire Rotation,s And Physical Inspections. ● Inventory Management Module ● The System Must Be Accountable For Tracking, Managing, And Maintaining Various Assets And Fleets Owned Or Used By The Academic Institution. ● The System Must Be Able To Maintain A Centralized Database Of University-owned Resources, Including Computers, Equipment, Furniture, And Other Tangible Assets. B.8 Document Management System ● Document Management System (dms) ● The System Must Be Able To Track Both Physical And Electronic Documents. ● The System Must Be Able To Store Electronic Documents, Such As Pdfs, Word Processing Files, And Digital Images Of Paper-based Content. ● The System Must Be Able To Be A Centralized Repository Where Documents Can Be Easily Searched, Accessed, And Updated By Authorized Business Users. ● The System Must Be Able To Define The Recipient’s Routes With Information Such As Time & Date Sent, Time & Date Received, And Remarks. ● The System Must Be Able To Save/download Uploaded Attachments. ● The System Must Be Able To Generate Tracking With A Unique Batch Number As A Tracking Reference. ● The System Must Be Able To Provide Easier Identification Of Status For Users By Using Color Codes. ● The System Must Be Able To Send System Notifications On Printing Barcodes, Tracking Status Changes, Receiving Recipients, And Other System Actionable Functionalities. ● Process Flow Management ● The System Must Allow For The Customization Of Workflows To Accommodate Various Document Types And Other Business Processes. ● The System Must Offer A Visual Interface, Such As A Dashboard, To Display And Monitor Process Flows Efficiently. ● Routing Management ● The System Must Be Able To Automate The Routing Of Documents To Appropriate Individuals Or Departments Based On Predefined Rules And Flow. ● The System Must Be Able To Allow For Dynamic Routing, Where Documents Can Be Rerouted As Needed. ● The System Must Be Able To Provide Real-time Notifications To Users Upon Receipt Of A Document. ● The System Must Be Able To Include A History Log To Track The Routing Path For Auditing Purposes. ● Integration To Hris ● The System Must Be Able To Seamlessly Integrate With The Organization's Hris To Access Employee Information, Such As Names, Email Addresses, And Department Affiliations. ● Barcode Printing Module ● The System Must Be Able To Print Barcode Labels In Batches With A Unique Tag/number. ● The System Must Be Able To Provide Accurate Status Of The Document Based On The Printed/attached Barcode. ● Security Module ● The System Must Be Able To Record The Audit Trail For All The User Actions Inside The System. ● The System Must Provide Document Security And Access Control Depending On The Security Level. ● The System Must Be Able To Create/update Accounts And Give Them Access Rights Depending On The Business User's Role. B.9 Trouble Ticketing System ● Incident Ticket Management ● The System Must Be Able To Create A New Incident Ticket. ● The System Must Be Able To Identify Related Incident Tickets Based On Category, Type, System, And Description During Creation. ● The System Must Be Able To Assign The Incident Ticket To The Appropriate Team Based On The System Defined In The Assignment Rules. ● The System Must Be Able To Filter Incident Ticket Lists Based On State (e.g., Open, In Progress, Hold, Resolved, Closed, And All). ● The System Must Be Able To Show An Overview Of Incident Ticket Statistics, I.e.; ■ Open ■ Inprogress ■ Overdue ■ Overview Of Incident Ticket By Severity And State ● The System Must Be Able To Capture The Notes, Attachments, And Resolution Information. ● The System Must Be Able To Notify The Team Member To Whom The Ticket Is Assigned. ● The System Must Be Able To Notify The Team Manager To Whom The Ticket Is Assigned Whenever A Critical Ticket Is Created. ● Problem Ticket Management ● The System Must Be Able To Create A New Problem Ticket. ● The System Must Be Able To Create A New Problem Ticket From An Existing Incident Ticket. ● The System Must Be Able To Identify Related Tickets Or Problem Tickets Based On Category, Type, System, And Description During Creation. ● The System Must Be Able To Assign The Problem Ticket To The Appropriate Team Based On The System Defined In Assignment Rules. ● The System Must Be Able To Filter Problem Ticket Lists Based On Status (e.g., Open, In Progress, Hold, Resolved, Close,d And All). ● The System Must Be Able To Show An Overview Of Problem Ticket Statistics, I.e.; ■ Open ■ Inprogress ■ Overdue ■ Overview Of Incident Ticket By Severity And State ● The System Must Be Able To Capture The Notes, Attachments, Analysis, And Resolution Information. ● The System Must Be Able To Notify The Team Member To Whom The Ticket Is Assigned. ● The System Must Be Able To Notify The Team Manager To Whom The Ticket Is Assigned Whenever A Critical Ticket Is Created. ● Security Module ● The System Must Ensure That Only Authorized Personnel Can Access And Modify Tickets. ● The System Must Maintain A Detailed Audit Trail Of All Actions Taken On A Ticket To Ensure Accountability And Traceability. B.10 Queueing / Appointment System ● Queueing Admin Module ● The System Must Be Able To Allow Administrators To Manage And Monitor The Entire Queueing Process And Appointments. ● The System Must Be Able To Apply The Concept Of Calling Population To Determine And Measure The Arrival Process Of Customers. ● The System Must Be Able To Have Its Service Counters, Its Own Common Queue, And The Probability Distribution Of Customers’ Service Time. ● The System Must Be Able To Have The First-in-first-out (fifo) Approach To Have A Systematic And Consistent Flow To Maximize The Throughput Of The Customer Service Center. ● The System Must Be Able To Measure The Logical Ordering Of Customers In A Queue And Determine Which Customer Will Be Chosen For Service When The Service Counter Becomes Free. ● The System Must Be Able To Measure Performance Based On Steady-state Average Delay And Steady-state Average Waiting Time In The System. ● The System Must Be Able To Measure The Conversation Steady State Time Average Number In The Queue And The Steady State Time Average Number In The System. ● The System Must Be Able To Administer Parallel Management Through Multiple Counters By Navigating The Queue And Finding The Appropriate Counter For Their Needed Service. ● The System Must Be Able To Allow The Customers To Request Services Without Being Physically Present Throughout The Waiting Time Of The Lineup Of Customers. ● The System Must Be Able To Give Freedom To The Customers To Wait Outside The Premises Of The Branch Upon Enabling Virtual Sign-up. ● Admin Appointment Module ● The System Must Be Able To Manage And Oversee The Scheduling, Modification, And Cancellation Of Appointments. ● Local Kiosk Module ● The System Must Be Able To Provide A Self-service Station That Allows Users (clients, Customers, Or Employees) To Interact With The System For Tasks Like Check-ins, Appointment Booking, Ticket Printing, And Managing Their Queue Status. ● Mobile Kiosk Module ● The System Must Be Able To Provide A Mobile-based Self-service Solution That Enables Users To Interact With The System Directly From Their Smartphones Or Tablets. ● Security Module ● The System Must Be Able To Offer Protection For The System And Its Users By Managing Access, Ensuring Data Privacy, And Preventing Unauthorized Actions. ● Appointment System ● The System Must Be Able To Provide Users To Schedule An Appointment According To Their Needs. ● The System Must Gather Needed Information For The Services That The Customer Wants To Avail Or Request. ● The System Must Have The Feature Of Canceling Or Rescheduling A Registered Appointment Within A Specific Period. ● The System Must Have The Feature Of Sending Out A Notification Or Reminder To The Customer Regarding His/her Appointment. ● As An Admin/ Team Member ● The System Must Be Able To Have A Dashboard To Provide An Overview Of Queues And Appointments From The Web And Mobile Web Access Such As: ■ Currently Serving ■ Next Queue Number ■ Next Appointment Number / Priority Lane (pwd, Senior Citizens, Pregnant) ■ Summary ● The System Must Be Able To Provide A Queuing List Including The Queue’s: ■ Status (unserved, Served, Canceled) ■ Queue Date And Time ■ Last Call Date And Time ■ Called By (counter, Name And Position) ■ Actions (view, Recall/call, Start/end, Cancel, Hold) ● The System Must Be Able To Identify Customer Appointment Referrals Including: ■ Id Number ■ First Name ■ Last Name ● The System Must Be Able To Receive Notification/s When A Certain Appointment Needs To Be Accommodated Within A Specific Period. ● The System Must Be Able To Receive Notification/s When An Appointment Has Been Canceled Or Rescheduled. ● The System Must Be Able To Provide Reports And Data Exports In Excel And Pdf Formats. ● The System Must Have Customization Capabilities And A Control Console. ■ Marquee ■ Advertisements On The Tv Screen ● The System Must Be Able To Track The History Of Registered Appointments And Passed Queues. B.11 Executive Information System ● Executive Dashboard Module ● The System Must Be Able To Allow Configurable Layouts, Enabling Users To Choose, Arrange, And Resize Charts To Suit Their Preferences Or Specific Needs. ● The System Must Be Able To Reflect Almost Real-time Information, Ensuring That Executives Are Always Working With The Latest Data. ● Security Module ● The System Should Be Able To Include A Security Module To Ensure Robust Access Control, Data Protection, And Compliance, Safeguarding Sensitive Information And System Integrity Against Unauthorized Access. ● Dashboard Configuration ● This Module Should Allow The Administrators To Create And Configure The Layout And Content Of Dashboards To Reflect Key Business Metrics And Performance Indicators, Ensuring That The Right Data And Accurate Data Are Properly Presented. ● Access Control ● This Module Should Allow The Administrators To Assign Users Or Groups Of Users Who Will Have Access To The Different Dashboards. B.12 Campus Portal System ● Sso-based User Management System ● The System Must Have Sso (single Sign-on) To Enable Users To Authenticate Once And Automatically Gain Access To Multiple Campus Services, Eliminating The Need To Log In To Each Service Separately. This Seamless Authentication Process Must Enhance User Convenience, Improve Security By Reducing The Number Of Passwords Needed, And Streamline Access To Various Tools And Resources, Saving Time, And Effort For Both Students And Staff. ● Basc Active Directory W/ Configuration ● The System Must Allow Centralized User Management Through Active Directory (ad), Which Stores And Organizes Information About Users, Groups, Computers, And Other Network Resources. ● Web Traffic Statistic ● The System Must Allow The Administrators To Monitor Standard Web Traffic Data, Such As Page Views, No. Of Visitors, Geographic Locations, Duration Of Visits, And Referrals, Integrated With Google Analytics (ga4). ● Content Management ● The System Must Allow The Administrators To Manage And Update The Contents Of The School’s Campus Portal Page. Such As Announcements, Blogs, Calendars, Articles, And Activities. B.13 University Library System ● Cataloging And Inventory Management Module ● The System Must Allow The Cataloging And Inventory Management Of The Library's Collection Of Books, Journals, Dissertations, And Other Materials. ● Circulation Module ● The System Must Allow The Librarian To Monitor The Borrowing, Returning, And Renewing Of Library Materials, Ensuring Efficient And Accurate Tracking Of Resources As They Move Between The Library And The Borrowers. ● Acquisition Module ● The System Must Allow The Processing Of Acquiring New Library Resources, Including Books, Journals, E-books, Multimedia Materials, And Other Educational Or Research Content. ● The System Must Allow The Management Of Book Requisitions From Students And/or Teachers. ● Student Module ● The System Must Allow Students To Access New Library Resources, Including Books, Journals, E-books, Multimedia Materials, And Other Educational Or Research Content. ● The System Must Be Able To Provide The Following Information And Services: ■ Book Details (non-dissertation) ■ Book Details (dissertation) ■ My Library Card ■ Request For Purchase/acquisition ■ Reservation ■ Notices Of Due Dates ■ Notices Of Overdue Penalties ● Librarian Module ● The System Must Have A Dashboard That Shows The Librarian’s Crucial Kpis For The Library Such As: ■ Search Word Statistics ■ Tags And Metadata Of The Book Statistics ■ Circulation Statistics ● Student Request List (book Reservation, Purchase Request, Clearance Request, Dissertation Access Request) ■ This Module Must Allow The Students To Submit Various Types Of Requests Related To Their Academic And Campus Activities. ● Book Reservation ■ This Module Must Allow The Students And Faculty To Reserve Library Books Or Materials. ● Purchase Request ■ This Module Must Enable The Students, Faculty, Or Staff To Submit Requests For Purchasing Books, Equipment, Or Other Materials Needed For Academic Or Administrative Purposes. ● Clearance Request ■ This Module Must Enable The Students, Faculty, Or Staff To Submit Requests For Clearance. ● Dissertation Access Request ■ This Module Must Enable The Students, Faculty, Or Researchers To Request Access To Dissertations Or Theses Stored In The Library’s Collection From The Authors. ● Kiosk (self Check-in And Check-out Student) ● The System Allows The Kiosk To Provide Students With A Self-service Station For Managing Their Borrowing And Return Activities. Using Touch-screen Kiosks Or Other Interactive Devices, Students Can Quickly And Efficiently Check Out Library Materials, Return Items, And Access Various Library Services Without Requiring Staff Intervention. ● Integration With Sso Services ● The System Allows Integrating Single Sign-on (sso) Services With An Application Or System, Providing A Unified Authentication Process That Allows Users To Log In Once And Gain Access To Multiple Connected Systems Or Applications Without Needing To Log In Again For Each Service. B.14 Econference Room With Video Conferencing ● Video Conferencing System ● The System Must Be Able To Provide A Seamless And User-friendly Video Conferencing Experience. ● The System Must Enhance Remote Collaboration And Communication. ● The System Must Have Integrated Audio, Video, And Collaboration Tools For Effective Virtual Meetings. ● The System Must Ensure The Scalability And Flexibility To Accommodate Future Needs. B.15 Mobile Version Module ● Mobile Version ● The System Must Have A Mobile Version Of The Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub Subsystems Website Designed For Smartphones And Tablets. It Gives Students, Professors, Staff, And Stakeholders Easy Access To University Information And Services. ● The System Should Promote Accessibility, Convenience, And A Great User Experience By Allowing Users To Communicate With The University Community Anytime. ● The System Should Accommodate Each Module's Specialized Functionalities While Staying Mobile-friendly And Focusing On Users. ● The System Must Be Able To Receive Notifications. C. Report Requirements These Are The Suggested Reports That Ought To Be Produced By The System To Analyze The Information Systems Trends In Bulacan's Colleges. It Is Recommended That The Data Be Automatically Submitted Through An Api In Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub To Give Basc Staff The Information They Need To Enhance The School Community. C.1 University Information System ● Admission Module ● List Of Applicants - The Overall List Of Potential Students With Their Personal Or Application Information. ● Registrar Module ● Academic Evaluation - Assessment Of A Student's Academic Performance, Conducted By The Institution's Instructors. ● Official List Of Enrollment - Document Provided By The Institution That Confirms The Students That Are Registered Or Enrolled For A Specific Academic Year. ● Diploma - Gives Thorough Details Regarding A Student's Academic Accomplishments And The Diploma's Presentation As Evidence Of Completion Of An Academic Program. ● Registration - A Document That Gives Information About A Student's Course Enrollment At The Institution For A Certain Term Or Semester. ● Shiftee - Document Of Proof For Students Who Are Changing Or Shifting Their Academic Programs Or Courses. ● Student Directory - Comprehensive And Manageable List Of Students Enrolled At The Institution. ● Subject Master List - A Thorough List Or Catalog Of Each Field Or Course That The Educational Institution Offers ● Summary Of Enrollment - Overview Of The Current Enrollment Status Of The Students At The Institution For A Specific Semester Or Academic Year. ● Enrollment Module ● Summary Of Enrolled Students - A Summary Of The Current Student Population, Including Enrollment Data And Demographics. ● Summary Of Unpaid School Fees - Gives A Summary Of The Unpaid Fees That Students Owe For The Current Semester Or Academic Term. ● Summary Of Tuition Fees Collected - Gives A Summary Of The Fees Collected/received From The Students For The Current Semester Or Academic Term. ● Clinic Record Management Module ● Health Management Report - A Document That Typically Focuses On The Health And Wellness Of Its Students And Covers Various Aspects Related To Healthcare Services Offered By The University. C.2 Learning Management System ● Professor Module ● Class Report - A Summary Of The Progress, Performance, And Involvement Of The Students In A Particular Course Or Class. ● Student Transcript Module: ● Subject Modules Report - Provides Comprehensive Insights And Summaries Related To The Modules Listed In A Specific Subject. ● Lesson Plan Report - Generates A Summary Lesson Plan That Is Defined By The Institution Or Organization. C.3 Human Resource Management System And Timekeeping System ● Audit Trail Report: ● Gives A Thorough Account Of All The Actions And Modifications Conducted Within The Hr System. Monitoring User Behavior, Protecting Data Integrity, And Upholding Adherence To Hr Rules And Regulations All Depend On This Report. C.4 Payroll Management System ● Payroll Management System ● Daily Time Record (dtr) - An In-depth Record Of Employees' Daily Attendance That Includes The Total Number Of Hours Worked, The Number Of Leaves Taken, And Other Essential Time-related Data. ● Payslip/s - A Detailed Breakdown Of An Employee's Earnings And Deductions For A Specific Pay Period. ● Payroll Report For A Specific Period - A Complete Summary Of Payroll Costs And Associated Information For A Specific Pay Period. C.5 Assets & Fleet Management System ● This Applies To Both Systems ● Assets And Fleets Reporting - A Document Containing Management Insights For Different Vehicles And Assets Used For Administrative And Academic Purposes. ● Depreciation Tracking - A Detailed Overview And Monitoring Of The Decrease In Value Of Such Assets Over Time Over A Specified Period. C.6 Document Management System ● Document Management System (dms) ● List Of On-hand Documents - Displays A List Of All Of The Documents That Are Available Or Accessible At The Moment Within The System. ● List Of Incoming Documents - Provides An Inventory Of Documents That Have Been Recently Received Or Uploaded Into The System. ● List Of Received Documents - Provides A List Of All The Documents The Institution Has Received In A Given Time Frame. ● List Of Finalized Or Kept Documents - Provides An Inventory Of All The Documents That Have Been Approved, Completed, And Archived In The System. ● List Of Archived Documents - Provides Comprehensive Details About The Documents That Have Been Stored In The System's Archive. ● Details Of Document Batch Tracked - Provides Full Details On The Batches Of Documents That The System Is Tracking. Documents Pertaining To Research Projects, Financial Transactions, Student Records, Admissions, And Other Aspects Of University Operations May Be Included In These Sections. ● Audit Logs Of Documents - Detailed Log Of Every Activity And Modification Performed To Any Document In The System. C.7 Trouble Ticketing System ● Reporting And Analytics ● The Solution Must Be Able To Provide Reports In Different Formats I.e., Pie Graph, Line Graph, Or Bar Graph. ● The Solution Must Be Able To Extract The Following Data Groupings: Open Tickets, Open With Critical Severity, In Progress, Overdue, Not Updated For 7 Days And Older Than 30 Days, And Tickets By State. C.8 Queueing / Appointment System ● The Solution Must Be Able To Generate Reports Which Show The Following: ● Queue List - Presents A Summary Of The System's Appointments And Queue Status At The Given Moment. ● Visitors List - Provides A Summary Of The Visitors' List And The Appointments They Have Made Using The Appointment/queuing System. ● Advertisements - Provides An Overview Of Advertisements And The Details That Are Displayed In The System. ● Queue Service - Presents An Overview Of The Queue Service Availability And Performance Within The Queueing/appointment System. ● Audit Trail - List Of Users' Activities On Who Approves, Disapproves, Cancels, And Reschedules Appointments. C.9 Executive Information System ● Reporting And Dashboard ● All-in-one Reporting, Dash Boarding, And Analysis. The Solution Should Support Multiple Use Cases Of Visualization Software Including Reporting, Interactive Analysis, And Business Intelligence. C.10 Campus Portal System ● Web Traffic Report ● The Web Traffic Report Provides Insights Into The Usage Patterns And Trends Within The Campus Portal, Offering Valuable Information About How Users Interact With The Platform. This Report Encompasses Various Metrics And Analytics That Help Administrators And Stakeholders Understand The Effectiveness Of The Portal And Identify Areas For Improvement. Key Components Of The Web Traffic Report Include: ■ Page Views: This Metric Quantifies The Total Number Of Times Each Page Within The Portal Has Been Viewed By Users Over A Specified Period. It Helps Gauge The Popularity And Relevance Of Different Sections Or Features Of The Portal. ● Unique Visitors: Unique Visitors Represent The Number Of Distinct Individuals Who Have Accessed The Portal Within A Given Timeframe. Tracking Unique Visitors Provides A Measure Of The Portal's Reach And User Engagement. ● Traffic Sources: Understanding Where The Traffic Originates From Can Provide Insights Into The Effectiveness Of Marketing Efforts Or The Impact Of External Events. Traffic Sources May Include Direct Visits, Referrals From Other Websites, Search Engines, Or Social Media Platforms. ● Bounce Rate: The Bounce Rate Indicates The Percentage Of Visitors Who Navigate Away From The Portal After Viewing Only One Page. A High Bounce Rate May Suggest Issues With Content Relevance, User Experience, Or Site Performance. ● User Demographics: Analyzing Demographic Data Such As Geographic Location, Device Type, And Browser Preferences Can Help Tailor The Portal's Content And Optimize Its Compatibility Across Different Platforms. ● Session Duration: This Metric Measures The Average Amount Of Time Users Spend On The Portal During Each Visit. Longer Session Durations Generally Indicate Higher User Engagement And Interest In The Provided Content. ● Popular Pages: Identifying The Most Visited Pages Or Sections Of The Portal Can Inform Content Prioritization And Resource Allocation Efforts. It Also Highlights Areas Of Interest Or Importance To The User Community. ● Audit Logs Report ● The Audit Logs Report Offers A Comprehensive Overview Of All Activities And Interactions Within The Campus Portal, Serving As A Vital Tool For Monitoring Compliance, Security, And Accountability. By Maintaining Detailed Records Of User Actions, System Events, And Administrative Changes, The Audit Logs Report Enables Administrators To Track User Behavior, Detect Anomalies, And Investigate Incidents Effectively. Key Features Of The Audit Logs Report Include: ■ User Activity Tracking: Every Action Performed By Users Within The Portal, Such As Login Attempts, File Uploads, Document Downloads, And Profile Modifications, Is Logged And Timestamped For Auditing Purposes. ■ Access Control Monitoring: The Report Monitors Changes To User Permissions, Role Assignments, And Access Privileges, Ensuring That Only Authorized Individuals Can View Or Modify Sensitive Information. ■ System Events Recording: Critical System Events, Including Software Updates, Database Modifications, Error Messages, And Security Alerts, Are Recorded To Facilitate Troubleshooting And Maintain System Integrity. ■ Compliance Verification: By Documenting Compliance-related Activities, Such As Data Access Requests, Consent Agreements, And Policy Acknowledgments, The Audit Logs Report Helps Organizations Demonstrate Adherence To Regulatory Requirements And Internal Policies. C.11 University Library System ● Reporting And Analytics Module ● The System Must Enable The Library To Gather, Analyze, And Present Data Related To Its Operations And Performance. ● The Solution Must Be Able To Generate Reports That Show The List Of Patrons. D. System Requirements • Sso Should Be Able To Manage People's Information And Authentication Of Security. • Hris Should Be Able To Manage The Employee Information • The System Should Be Developed Using The Coreui Framework. • The System Shall Support Connectivity And Access To Data Stored In Relational Ms– -sql Databases. • The System Must Support Interfaces To Common Packaged Applications Via The Standard Application Interface Provided. • The System Shall Support Paperless Reporting. • The System Shall Support Mobile (android & Ios) Devices. • The System Shall Support Web Desktop And Mobile Web Access. • A System With Superior Wide Area Network (wan) Performance, Highly Secured Features/functionalities, And Uses Web–enabled Workflow Systems Available To The Offices. E. Supply, Delivery, And Implementation E.1 University Information System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Server Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration (qa) 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.2 Learning Management System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.3 Cashiering System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.4 Human Resource Information System Infrastructure 1. Twenty (20) Units - Biometric - Time & Attendance A. Must Support Up To 1,500 Fingerprints, Up To 100,000 Records, And Up To 2,000 Cards (optional). B. Must Support Multi-languages. C. Must Have Communication: Tcp/ip, Usb-host, Wi-fi (optional). D. Must Have High Verification Speed. E. Must Have Professional Firmware And Platform. 2. One (1) Unit - Desktop Computer A. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) B. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) C. Operating System (os): Windows 11 Or Higher D. Memory: 16 Gb (or Higher) E. Storage: 500 Gb Ssd (or Higher) F. Display: 14” Display G. Graphic Card: Integrated Graphics H. Camera: 1080p Fhd Ir/rgb Hybrid I. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above J. Ethernet Port Or Usb K. Power Cord: At Least 45w L. Warranty: 1 Year Courier Or Carry-in M. Must Have 1*650va Ups 3. One (1) Service - Vulnerability And Pen-testing 4. One (1) Service - Database Modelling Design Services 5. One (1) Service - Installation And Configuration Services 6. One (1) Service - Application Installation 7. One (1) Service - User Workflow Integration 8. One (1) Service - Ssl And Dns Configuration 9. One (1) Service - Integration To Basc Rdbms Database 10. One (1) Service - Data Migration 11. One (1) Service - Project Management Services 12. One (1) Service - User Acceptance Testing (uat) 13. One (1) Service - User Training Services 14. One (1) Service - Scaling And Optimization 15. One (1) Service - Manpower Cost 16. One (1) Service - Mobilization Cost 17. Two (2) Years - Support 18. One (1) Year - Warranty E.5 Payroll Management System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization Of Payroll Management System 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.6 Assets & Fleet Management System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.7 Document Management System Infrastructure 1. Ten (10) Units - Barcode Printer A. Should Be Capable Of Printing High-quality, Durable Barcodes On Various Label Materials. B. Should Offer Customizable Printing Options, Including Label Size, Orientation, And Font. C. Must Be Easy To Integrate With The Document Management System For Automated Barcode Generation And Printing. 2. One-hundred (100) Rolls - 2 X 1 Risen Label Sticker (2688 Stickers Per Roll) A. Should Be Durable And Resistant To Wear And Tear. B. Must Be Compatible With The Chosen Barcode Printer. 3. One-hundred (100) Rolls - 2 X 1 Ribbon For Risen Label Sticker (4 Rolls Sticker: 1 Ribbon) A. Should Produce Clear And Legible Barcode Prints. B. Must Be Compatible With The Chosen Barcode Printer And Label Stickers. C. Should Provide A Long Print Life And Minimize Ribbon Wastage. 4. Twenty (20) Units - Industrial Doc Imaging Machine A. Should Be Capable Of High-volume, High-speed Scanning Of Various Document Types (e.g., Paper, Plastic Cards). B. Must Offer Advanced Image Processing Features, Such As Automatic Document Feeding, Image Enhancement, And Ocr. C. Should Be Durable And Reliable, Suitable For Heavy-duty Use In Industrial Environments. D. Must Be Easy To Integrate With The Document Management System For Automated Image Capture And Indexing. 5. Three (3) Units -departamental Doc Imaging Machine A. Should Be Suitable For Lower-volume Scanning Needs In Departmental Settings. B. Must Offer Basic Image Processing Features, Such As Automatic Document Feeding And Image Enhancement. C. Should Be Compact And Easy To Use. D. Must Be Compatible With The Document Tracking System For Automated Image Capture And Indexing. 6. Twelve (12) Units -departamental Doc Imaging Machine Peripherals A. Should Include Necessary Accessories For Efficient Document Scanning, Such As Paper Trays, Feeder Units, And Cleaning Kits. B. Must Be Compatible With The Chosen Departmental Doc Imaging Machine. C. Should Be Easy To Install And Maintain. 7. Forty (40) Units -barcode Scanner A. Should Be Capable Of Accurately Scanning Various Barcode Types. B. Must Offer High-speed Scanning And Reliable Performance. C. Should Be Durable And Ergonomic, Suitable For Frequent Use. D. Must Be Easy To Integrate With The Document Management System For Automated Data Entry And Workflow Triggering. 8. One (1) Service - Vulnerability And Pen-testing 9. One (1) Service - Database Modelling Design Services 10. One (1) Service - Installation And Configuration Services 11. One (1) Service - Application Installation 12. One (1) Service - User Workflow Integration 13. One (1) Service - Ssl And Dns Configuration 14. One (1) Service - Integration To Basc Rdbms Database 15. One (1) Service - Data Migration 16. One (1) Service - Project Management Services 17. One (1) Service - User Acceptance Testing (uat) 18. One (1) Service - User Training Services 19. One (1) Service - Scaling And Optimization 20. One (1) Service - Manpower Cost 21. One (1) Service - Mobilization Cost 22. Two (2) Years - Support 23. One (1) Year - Warranty E.8 Trouble Ticketing System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.9 Queueing / Appointment System Infrastructure 1. Six (6) Units - Kiosk Stand With Touch Screen Monitor And Printer 2. Six (6) Units - Kiosk Audio Panel 3. Twelve (12) Units - Kiosk Interactive 65” Smart Tv 4. One Million (1m) Credits - Sms 5. One (1) Service - Vulnerability And Pen-testing 6. One (1) Service - Database Modelling Design Services 7. One (1) Service - Installation And Configuration Services 8. One (1) Service - Application Installation 9. One (1) Service - User Workflow Integration 10. One (1) Service - Ssl And Dns Configuration 11. One (1) Service - Integration To Basc Rdbms Database 12. One (1) Service - Data Migration 13. One (1) Service - Project Management Services 14. One (1) Service -user Acceptance Testing (uat) 15. One (1) Service - User Training Services 16. One (1) Service - Scaling And Optimization 17. One (1) Service - Manpower Cost 18. One (1) Service - Mobilization Cost 19. Two (2) Years - Support 20. One (1) Year - Warranty E.10 Executive Information System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.11 Campus Portal System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service -installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service -project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.12 University Library System Infrastructure 1. One (1) Unit - Kiosk (self Check-in & Self Check-out) With Monitor And Barcode Reader. 2. Fifty Thousand (50,000) Pcs - Rfid Tags For Books 3. Two (2) Units - Rfid Reader 4. One (1) Unit - Barcode Printer 5. Twenty Five (25) Rolls - Barcode Sticker 6. One (1) Unit - Barcode 3d Scanner 7. One (1) Service - Vulnerability And Pen-testing 8. One (1) Service - Database Modelling Design Services 9. One (1) Service - Installation And Configuration Services 10. One (1) Service - Application Installation 11. One (1) Service - User Workflow Integration 12. One (1) Service - Ssl And Dns Configuration 13. One (1) Service - Integration To Basc Rdbms Database 14. One (1) Service - Data Migration 15. One (1) Service - Project Management Services 16. One (1) Service - User Acceptance Testing (uat) 17. One (1) Service - User Training Services 18. One (1) Service - Scaling And Optimization 19. One (1) Service - Manpower Cost 20. One (1) Service - Mobilization Cost 21. Two (2) Years - Support 22. One (1) Year - Warranty E.13 Internet Connectivity 1. Eighteen (18) Months - Speed Requirement: 5 Gbps Bandwidth A. Connection Should Be Of Cable Type, Preferably Fiber-optic; Wireless Solutions May Be Considered. B. No Limitations On Traffic/ports; Bandwidth Capacity Should Be Ensured Through A Direct Ip Connection. C. A Subnet Of At Least 14 Static Publicly Routable Ip Addresses Is Required. D. Service Reliability Must Be Ensured. Overall Uptime Should Not Be Less Than 99%. E. All Necessary Hardware, Cabling, And Software (if Required For Internet Service) Should Be Provided And Set Up By The Provider. F. Support Managed Vpn Services. G. Isp Must Be Able To Manage The Customer Premises Equipment (cpe) To Be Installed In The Bulacan Agricultural State College. H. Traffic Management, Network Monitoring, And Access To Raw Log Files. I. Fiber Optic Connectivity From The Isp To The Internet Backbone. 2. One (1) Unit - Multiple Wan Router 3. One (1) Unit - Core Routing Switch 4. Four (4) Units - Distribution Switch 5. Ten (10) Units - Qsfp+ Module Xq+cm0000-xs+ 6. One (1) Service - Project Management Services Network Configuration Services 7. One (1) Service - Training And Knowledge Transfer 8. One (1) Service - Scaling And Optimization (testing And Analysis By Fluke Systems) 9. One (1) Service - Manpower Cost 10. One (1) Service - Mobilization Cost 11. Two (2) Years - Support 12. One (1) Year - Defect Liability E.14 Campus Network System 1. Ninety-four (94) Units - Indoor Wireless Access Points A. The Proposed Equipment Shall Support 802.11a/b/g/n/ac/ac Wave2/ax Protocol B. Triple-band Design, Support 2*2 Mimo, 2.4g ≥570mbps, 5g ≥3200 Mbps, The Maximum Speed ≥3.8gbps. C. Support Built-in Omnidirectional Antenna D. 1 Gigabit Ethernet Port E. 1*micro-usb Port F. Support 802.3at Standard Poe Power Supply And Power Adaptor G. Ap Full Load Working Power Consumption ≤ 17.5w H. Ap Transmit Power ≤20dbm (smaller Than 100mw), And Power Can Be Adjusted (adjustment Granularity Is 1dbm, Adjustment Range Is 3dbm~27dbm) I. Protection Degree≥41 J. Operating Temperature: -10~50℃, Humidity:5%~95% Non-condensing K. Maximum Concurrent Client ≤ 256 L. Support For Ssid-based Access User Limit M. Support Virtual Ap Technology, The Number Of Ssid Per Rf ≥16, Per Ap ≥32; N. Support Hiding Of Ssid O. Support Multiple Vlans Per Ssid P. Support Standalone Mode And Controller-based Mode, The Controller Must Be On-premise. Q. Ap Supports Tunnel Mode And Bridge Mode. Each Ssid Can Choose Its Own Working Mode. R. Support Ap Zero Configuration, Support Layer 2 And Layer 3 Discovery, Dhcp Option43, Dns Domain Name, And Other Network Access Controller Automatic Discovery Mechanisms S. Supports Ap Deployment Across Layer 3 Network, Wan, And Nat, And Supports Management Tunnel Encryption With Network Access Controller. T. Support The Service Sense Via Ai Rf, Including Connection And Delay For Network Access, Dhcp, Gateway, Dns, Internet And Other Server Address U. Support The Environment Sense Via Ai Rf, Including Channel Utilization, Co-channel Ap, Interference Ssid V. Supports 802.1x, Portal, Mac Address Authentication, Ca Certificate Authentication, Qr Code Approval Authentication, Sms Authentication, App Authentication, Guest Account, Facebook, 802.1x Wep, Wpa, Wpa2, And Other Authentication Methods; W. Support 802.11i, Aes, Tkip, And Other Encryption Methods X. Support Wips/anti-phishing Wifi Via Independent Rf (non-user Connected Radio Frequency) To Conduct Real-time Detection, Alarm, And Countermeasures For Illegal Access Points. Y. Support East-west Traffic Security, By Detecting Abnormal Behavior To Block Viruses Within The Intranet Z. Support Ap Vpn, An Encrypted Communication Tunnel Can Be Established Across The Internet And Remote Wireless Controllers For Encrypted Remote Access, The Ap Vpn Should Also Support Bidirectional Access From Site To Site. Aa. Support Intelligent Load Balancing Based On The Number Of Users, Signal Strength, And Channel Utilization, And Automatically Balance The Access Pressure Between Aps Bb. Support Rf Guiding Function To Guide Wireless Terminals To Preferentially Access 5g Frequency Bands With Low Interference Cc. Supports Fit Ap Switching To Gateway Mode (non-fat Ap Mode), Supports Pppoe Dial-up, Static Ip, And Dhcp. Dd. Support Dhcp Server And Dns Proxy Ee. Support The Wireless Controller Escape Function, When The Wireless Controller Is Down, The Ap Still Can Guarantee The Normal Online Access Of Online Users, And Ensure That New Users Can Also Connect To The Wireless Network Through Authentication; 2. One (1) Lot - Network Access Controller A. The Proposed Controller Shall Support At Least 5 Service Ports, 1 Rj45 Console Port, 1 Rj45 Manage Port, 2 Usb Ports, And 2 Expansion Slots. B. The Proposed Controller Shall Support Up To 1200 Access Points. C. The Proposed Controller Shall Support At Least 8 Built-in Captive Portal Templates. D. The Proposed Controller Shall Support Access Controller And Qos-based Applications And Urls. The Application Fingerprints In The Controller Database Should Be Larger Than 6400 At Least One Year Application And A Url Update License Should Be Included E. The Proposed Controller Shall Support A Questionnaire Survey And The Survey Result Can Be Shown In The Controller F. Web Ui To Show Survey Results In The Controller G. The Proposed Controller Can Configure The Time/data Quota Policy For Wi-fi Users. H. The Proposed Controller Shall Support The Topology Of The Switch. I. The Proposed Controller Shall Support The Big Data Analysis For The Guests, And Staff. The Content Should Include The Favorite Application, Online Duration, Time Starts, And Checkout. J. The Proposed Controller Shall Be Capable Of Identifying Terminal Types And Assigning The Different Policy-based Terminal Types. K. The Proposed Controller Shall Support The Graphical Dhcp Address Pool From The Controller And Switch And Can View The Following Information In Each Address Pool: I. Conflict Ip Address Ii. Terminal Devices Fail To Obtain An Ip Address Iii. Address Pool Utilization Iv. Ip Allocation Times Distribution L. The Proposed Controller Can Be Used As The Gateway, Support Ppoe, Nat, Policy-based Routing, Dhcp Server, Dhcp Replay, Provide Authentication And Access Controller For Both Wired And Wireless Users, M. The Proposed Software Controller Shall Support The Following: I. 802.1x Authentication Ii. Portal Authentication Iii. Mac Address-based Authentication N. Also Need To Support The Integration With Radius, Ldap, Ad, And Other Databases O. The Proposed Controller Shall Support Viewing Of The Following Status Of Ap. I. Power Supply Load Ii. System Resources (memory, Cpu) Iii. Chip Resources (mac Table, Arp Table, Acl Table, Route Table Utilization) Iv. Packet Drop Ratio V. Jumbo/normal Frame Vi. Traffic Load Vii. Packet Analysis (broadcast, Multicast, And Unicast Packets) Viii. Network Protocol Packet Receiving Rate Analysis (dhcp, Icmp, Arp, And Tcp Packet Rate) P. The Proposed Controller Shall Support A Security Log To View Switch Attack Events, Including Event Types, Attacker Mac Address, And Attack Device Types. Q. The Proposed Controller Shall Support The Binding Of Terminals To Ip Based On Switch Port Groups, And The Binding Of Terminals And Ports Based On Switch Port Groups. R. The Proposed Controller Manufacturer Shall Have A Cmmi5 Certificate To Ensure The Maturity Of The Product Software. S. The Proposed Brand Must Be Iso 9001 Certified 3. Forty-seven (47) Units - Access Poe Switch A. The Proposed Equipment Shall Have At Least I. 24 Gigabit Ethernet Poe Ports Ii. 4* Sfp+ Ports B. The Proposed Equipment Shall Support Ieee 802.3af/at Power Supply Standard, Single Port Maximum Output Poe Power 30w, The Whole Machine Maximum Output Poe Power 370w C. The Proposed Equipment Shall Have A Console Port D. The Proposed Equipment Shall Support Standalone Web Gui Management And Controller-based Management. E. The Proposed Equipment Shall Have A Switching Capacity Of At Least 336gbps F. The Proposed Equipment Shall Have Packet Forwarding Of At Least 108mpps G. The Proposed Equipment Shall Support Acl Policies Based On Single-port And Aggregation Of Interfaces. H. The Proposed Equipment Shall Support Acl Policies Based On Source Ip Address And Mac Address. I. The Proposed Equipment Shall Support Acl Policies Based On Protocols (ospf, Udp, Arp) J. The Proposed Equipment Shall Support Time-based Acl Policies K. The Proposed Equipment Shall Support 802.1p, Ip And Service Level, Dscp Priority Settings L. The Proposed Equipment Shall Support Traffic Shaping; And Packet Forwarding Rate Setting Based On The Outbound And Inbound Directions Of Switch Ports. M. The Proposed Equipment Shall Support Cos And Dscp Priority Mapping Based On Switch Groups N. The Proposed Equipment Shall Support Congestion Management That Supports Multiple Scheduling Modes To Implement Traffic Based On Packet Or Port Priority. O. The Proposed Equipment Shall Support Port Mirroring And Redirection. P. The Proposed Equipment Shall Support Dhcp Snooping, Dhcp Server Q. The Proposed Equipment Shall Support The Spanning Tree Protocol (stp, Rstp, Mstp) R. The Proposed Equipment Shall Support Igmp V1/v2/v3 Snooping S. The Proposed Equipment Shall Support 4,000 Vlan T. The Proposed Equipment Shall Support 16,000 Mac Address U. The Proposed Equipment Shall Support Mac Address Dynamic Learning V. The Proposed Equipment Shall Support Mac Address Filtering W. The Proposed Equipment Shall Support Mac Address Learning Limit X. The Proposed Equipment Shall Support Link Aggregation Y. The Proposed Equipment Shall Support M-lag Technology, Cross-device Link Aggregation Z. The Proposed Equipment Shall Have Layer 3 Routing Protocols Such As Static Routing, Rip, Ospf, Vrrp Aa. The Proposed Equipment Shall Support East-west Traffic Security With Policies Based On Area Or User Role, And Prevent The Virus Spread Within The Intranet Bb. The Proposed Equipment Shall Support Topology In The Controller, Configuration And Status Checking Can Be Done By Clicking The Topology. Cc. The Proposed Equipment Shall Support The Replacement By One Click On The Controller Platform To Replace The Defective Device Dd. The Proposed Equipment Manufacturer Shall Have A Cmmi5 Certificate To Ensure The Maturity Of The Product Software Ee. The Proposed Brand Must Be Iso 9001 Certified 4. One (1) Lot - Installation Consumables 5. One (1) Service - Network Design, Consultation (signed By Pece) And Permits 6. One (1) Service - Project Management Services 7. One (1) Service - Switch & Access Point Installation 8. One (1) Service -network Configuration Services 9. One (1) Service - User's Training And Knowledge Transfer 10. One (1) Service - Scaling And Optimization (testing And Analysis By Fluke Systems) 11. One (1) Service - Manpower Cost 12. One (1) Service - Mobilization Cost 13. One (1) Service - Forwarding Cost 14. One (1) Year - Campus Network System Defect Liability (base Bundle Warranty-support) A. 1-year Warranty For All Active Devices B. 1-year Subscription To Licenses C. 1-year Workmanship Warranty And After-sales Support E.15 Fiber Optics Works 1. Fiber Optics Passive Components A. Thirteen Thousand (13,000) Meters - Fiber Optic Cable Single Mode I. 8-core Single-mode 8 Ii. Fiber Type=g.652.d And G.657.a1, Teraspeed, Os2 Iii. Armored-type Corrugated Steel Iv. Stranded Loose-tube Cable-type V. Gel-free Sub-unit Type B. Forty-seven (47) Units - Fms Panel I. 1u Standard Size 19” Ii. Includes 6 X Lc Sm Adaptors (12f) Iii. Includes 12 X Sm Lc Pigtails Iv. Includes 12 X Splice Protectors V. With Splice Tray And Cable Glands (12 Port Loaded) C. One (1) Unit - Epx 4u Sliding Panel Splicing Cassette I. Symmetrical Body Style Ii. Sliding Shelf Iii. Splicing Type = Heat Shrink, Single Fiber Fusion Iv. Dimension: 44.45h X 482.6w X 320d Mm V. Powder Coated Finish D. Sixteen (16) Units - G2 Splice Cassette 24lc/upc With Internal Shutters Os2 With Pigtails I. Lc/upc Interface Ii. Method A Polarity Iii. Shuttered Iv. Maximum Insertion Loss = 0.25db V. Minimum Return Loss = 50db E. One Hundred Eighty-eight (188) Pcs - Fiber Patch Cords I. Lc-lc Patch Cord Ii. 1.6mm Duplex Iii. Riser Single Mode Os2, 0.9m F. Forty-seven (47) Units - Data Cabinet 15u I. Wall-mounted Type Ii. 600 X 600mm X 15u Dimension Iii. Glass Door With Lock With 8-gang Pdu G. One (1) Lot - Handhole Fabrication And Heat Shrinkable Seal Fiber Optic Splice Dome Closure I. With 24-core Pigtail Splicing Plate Termination H. One (1) Lot - Earth Ground Material And Accessories 2. Fiber Optics Active Components A. Two (2) Units - Network Core Switches I. 24-ports 10ge Layer 3 Managed Core And Aggregation Switch Ii. With 4 X 25g Ports Backward Compatible With 10g Iii. With 40g Uplink Capability Iv. With 150w Ac Power Module V. 19” Rack-mountable Vi. Steel Case B. Forty-seven (47) Units - Network Managed Switch I. 24-ports Layer 2 Managed Switch Ii. With 4 X 10g Uplink Ports Iii. 19” Rack-mountable Iv. Steel Case C. Four (4) Units - 40g Transceiver Modules I. 40g Lr Single-mode Fiber Module Ii. Qspf+ Transceiver Iii. Lc (1310nm) D. Ninety-four (94) Units - 10g Transceiver Modules I. 10g Lr Single-mode Fiber Module Ii. Qspf+ Transceiver Iii. Lc (1310nm) 3. One (1) Service - Roughing Ins Cost (piping Of Foc Per Building, Pvc/hdpe Pipes, Pullbox 10" X 10" X 6", Metal Clamps, Tox & Screws, Gi Wire) 4. One (1) Service - Labor Cost: Horizontal Direct Drilling (hdd) Wire Pulling, Roughing Ins For Expose Foc Going To Idf And/mdf 5. One (1) Service - Termination/splicing Of Pigtail Connectors/otdr Testing 6. One (1) Service - Electronic Permit Layout And Design (as-built Plan) 7. One (1) Service - Network Design And Consultation (signed By Pece) 8. One (1) Service - Project Management Services 9. One (1) Service - Switch Installation 10. One (1) Service - Network Configuration Services 11. One (1) Service - Training And Knowledge Transfer 12. One (1) Service - Cable Testing And Analysis By Fluke Systems 13. One (1) Service - Scaling And Optimization Of Network Security 14. One (1) Service - Manpower Cost 15. One (1) Service - Mobilization Cost 16. One (1) Service - Forwarding Cost 17. One (1) Year - Defect Liability 18. One (1) Year - Fiber Optic Passive Components Support Warranty A. 1-year Warranty For All Active Devices B. 1-year Subscription To Licenses C. 1-year Workmanship Warranty And After-sales Support E.16 Structured Cabling Works 1. Structured Cabling Passive Components A. Sixty-seven (67) Units – 24-ports 1u Keystone-type Patch Panel With Io Assembly I. 24-ports 1u Keystone Blank Panel Ii. 24-pcs Cat6+ Modular Jack, Rj45 Keyconnect Style B. One Thousand Four Hundred Thirty-three (1,433) Pcs – Cat6+ Modular Jack I. Cat6+ Modular Jack, Rj45 Keyconnect Style Ii. T568 A/b Wiring Scheme C. One Thousand Four Hundred Thirty-three (1,433) Pcs – 1-meter Cat6 Stranded Patch Cord I. 1-meter Cat6 Stranded Patch Cord Ii. T568b- Standard Machine-made Termination D. One Thousand Four Hundred Thirty-three (1,433) Pcs – 2 Meters Cat6 Stranded Patch Cord I. 2-meter Branded Cat6 Stranded Patch Cord Ii. T568b- Standard Machine-made Termination E. Sixty-seven (67) Units – Cable Organizer 1u I. 24 Slots Plastic With Cover F. Three Hundred Seventy-five (375) Rolls– Utp Cat6 Pure Copper I. Solid Bare-copper 24awg 4-pairs Ii. Pe-polyethylene Insulation Material Iii. 0.97 Mm Insulation Diameter Iv. Outer Jacket = Pvc Polyvinyl Chloride V. Operating Temperature = -20°c To +75°c Vi. Bending Radius = 23.2 Mm (0.913 In) G. Sixty-seven (67) Units – 15u Data Cabinet 600 X 600mm I. Wall-mounted Type Ii. 600 X 600mm Iii. Glass Door With Lock Iv. With 8-gang Pdu H. Sixty-seven (67) Sets – Fabricated Data Cabinet Bracket I. Five Hundred Fifteen (515) Pcs – Simplex Faceplate I. Keyconnect Faceplates, 1-port Ii. Plastic-made J. One Hundred Thirty-three (130) Pcs – Duplex Faceplate I. Keyconnect Faceplates, 2-ports Ii. Plastic-made K. Six Hundred Forty-five (645) Pcs – Faceplate Box I. Standard, Rectangular 2. Structured Cabling Active Components Technical Specification A. Seventy-two (72) Units – 24-ports L2+ Gigabit Switch + 4-sfp Ports Rack-mountable Ii. 24 X Gigabit Rj45 Iii. 4 X 10g Sfp+ Ports Iv. 19” Standard Size Rack-mountable B. Eighty-one (81) Units – 24-ports L2+ High-poe Switch Gigabit, With 4-sfp Module Rack-mountable I. 24 X Gigabit Poe Ports Ii. 4 X Sfp+ Slots Iii. 19” Standards Size Rack-mountable Iv. Poe Budget: At Least 370w C. Six (6) Units – 16-ports Aggregation Switch With 16-ports 10ge Ports I. 16 X 10g Sfp+ Slots Ii. 1u Rack Mountable 19” Iii. 802.3at/af D. Three Hundred Six (306) Units – Sfp+ Module, Single Mode Lc Connector I. 1310nm Single Mode Ii. Lc Duplex Connector Iii. Up To 10km Distance E. Three Hundred Six (306) Pcs – Lc Fiber Patch Cord I. Lc-lc Patch Cord Ii. 1.6mm Duplex Iii. Riser Single Mode Os2 0.9m F. Sixty-seven (67) Units – 1kva Ups, Tower Type I. 1000va/600w Ratings Ii. 1 X 12v/9ah Battery Iii. 4 X Universal Socket Iv. Not More Than 5.3kg G. One (1) Unit – 5kva Ups 4u, Online I. 5000va/5000w Ii. Dimension: Not Bigger Than 420 X 630 X 217mm Iii. Operating Voltage = 176 To 288 Vac Iv. Maximum Allowable Voltage = 288 Vac V. Input Frequency Without Battery Operation = 40 To 70hz Vi. Factory Default Voltage = 230 Vac Vii. Waveform = Pure Sinewave Viii. Backup Time At Full Load = 7 Ix. Backup Time At Half Load = 18.5 X. Audible Noise <55dba H. Sixty-seven (67) Units– Pdu With Reset And Switch, Metal Case I. 8-gang Metal With Reset Button Ii. Standard 19’’ Rack Mountable 3. Structured Cabling Roughing-ins A. One (1) Lot – Conduiting/piping Materials B. One (1) Lot – Cable Tray, Cable Ladder And Support Assembly (noc) C. One (1) Lot – Cable Tray Support & Hangers (distribution Per Building) D. One (1) Lot – Restoration Materials E. One (1) Lot – Cable Distribution Materials F. One (1) Lot – Grounding Materials, Installation And Consumables G. One (1) Lot – External Cabling Materials 4. One (1) Service - Network Design And Consultation (signed By Pece) 5. One (1) Service - Project Management Services 6. One (1) Service- Switch Installation 7. One (1) Service - Network Configuration Services 8. One (1) Service - Training And Knowledge Transfer 9. One (1) Service - External Cabling 10. One (1) Service - Scaling And Optimization (cable Testing And Analysis By Fluke Systems) 11. One (1) Service - Manpower Cost 12. One (1) Service - Mobilization Cost 13. One (1) Service - Forwarding Cost 14. One (1) Year - Service -structured Cabling Works Defect Liability 15. One (1) Year - Structured Cabling Passive Components Support Warranty A. 1-year Warranty For All Active Devices B. 1-year Workmanship Warranty And After-sales Support E.17 It Security Operations Center & Network Operations Center 1. One (1) Lot – Indoor Video Wall A. One (1) Lot – Led Panel I. Must Have 4.2x2.025m P0.9375 Indoor Led Screen Ii. Led Lamp Parameter: Color Configuration: Rgb 3in1, Color: Red, Green, Blue, Luminance: 990-1210 Mcd, 1980-2420 Mcd, 495-605 Mcd, Viewing Angle: 160º/160º, Wavelength: 625-630 Nm, 520-525 Nm, 465-470 Nm Iii. Must Have Led Module Parameter: Pixel Pitch(mm) 0.9375, Iv. Pixel Configuration Cob, Module Size(mm) W 300 H 168.75, Module Resolution(dots) W 320 H 180, Drive Ic Icn1069 V. Must Have Led Cabinet Parameter: Cabinet Size (mm) W 600 H 337.5, Cabinet Resolution (dots) W 640 H 360, Cabinet Pixels (dots) 230400, Cabinet Material Die Casting Aluminum, Cabinet Weight (kg) 4.8 Vi. Must Have Led Screen Parameter: Screen Size(m)w 4.2 W 2.025 H, Screen Resolution(dots)w 4480 W 2160 H, Cabinet Quantity(pc)w 7 W 6 H, Pixel Density(pixel/m2) 1137778, Brightness(cd/m2) 600, Brightness Adjusted 256 Grade By Software Or By Auto-optic Induced, Driving Method 1/46 Scan Display Color 439, 804, 651, 110, Viewing Distance (m) ≥0.9375m, View Angle Horizontal 160°; Vertical 160° Color Contrast Ratio 5000:1, Gray Grade 16bit, Refresh Frequency (hz) 3840, Protective Grade Ip43, Working Temperature(ºc) -30~+70, Stored Temperature (ºc) -40~+80, Operation Humidity(rh) 0-95%, Lifetime 100,000 Hrs Maintenance Front Side Working Voltage Ac110 / Ac220v±10% 47~63hz, Power Consumption Max: 800w/㎡ ; Ave:310w/㎡" B. One (1) Unit – Controller I. Must Have Three Kinds Of Led 4k Sending Cards: (1) − H_20xrj45 Sending Card Loads Up To 13,000,000 Pixels, (2) − H_16xrj45+2xfiber Sending Card Loads Up To 10,400,000 Pixels And Provides Two Opt Ports That Copy The Outputs On Ethernet Ports, (3) − H_4xfiber Sending Card Loads Up To 20,800,000 Pixels And Supports Three Working Modes, Including Independent, Copy And Backup. The Three Cards Mentioned Above Cannot Be Used Together To Load The Same Screen. Ii. Must Have Multi-capacity Configuration On A Single Card Slot: − 4x 2k×1k@60hz, − 2x 4k×1k@60hz, − 1x 4k×2k@60hz Iii. Must Have A Simple Screen Configuration Using A Single Card And Connector Iv. Must Have Online Status Monitoring Of All Input And Output Cards V. Must Have Hot-swappable Input And Output Cards Vi. Must Have An H_2xrj45 Ip Input Card That Supports Up To 512 Ip Camera Inputs And Input Mosaic. Vii. Must Have Auto Decryption Of Hdcp-encrypted Sources Viii. Must Have Decimal Frame Rates Supported Ix. Must Have Hdr10 And Hlg Processing X. Each Screen Can Have Its Output Resolution. Xi. Must-have Output Mosaic: Adopts The Frame Synchronization Technology, Which Ensures All The Output Connectors Output The Image Synchronously, And The Image Is Complete And Played Smoothly, Without Any Stuck, Frame Loss, Tearing, Or Piercing. Xii. Must Support Irregular Screen Configuration: Supports Irregular Rectangle Mosaic Without Any Limitations. Xiii. Must Have Input Source Grouping Management Xiv. Must Have Eye-saver Mode: Display The Image In A Warmer But Less Bright Way To Relieve Eye Strain. Xv. Lcd Bezel Compensation Xvi. Must Have Multi-layer Display: A Single Card Supports 16x 2k Layers, 8x Dl, Layers Or 4x 4k Layers. All Layers Support Cross-connector Output And The Layer Quantity Is Not Reduced For Cross-connector Output. Xvii. Must Have High-definition Scrolling Text, Customize The Scrolling Text Content, Such As Slogans Or Notification Messages, And Set The Text Style, Scrolling Direction, And Speed. Xviii. Must Support Up To 2,000 Presets: Fade Effect And Seamless Switching Supported, Less Than 60ms Preset Switching Duration Xix. Must Have Scheduled Playback Of Preset Playlist, Set Whether To Add The Presets To Playlist, Which Is Ideal For Monitoring, Exhibitions, Presentations, And Other Applications. Xx. Must Have Osd Settings On A Single Screen And Adjustable, Osd Transparency Xxi. Must Have Bkg Settings, Bkg Images Do Not Occupy The Layer Resources. The Max Width And Height Of A Bkg Image Is Up To 15k And 8k Respectively. Xxii. Must Have Channel Logo Management: Set A Text Or Image Logo For Identifying The Input Source. Xxiii. Must Have Input Source Cropping And Renaming After Cropping, Crop Any Input Source Image And Form A New Input Source After Cropping. Xxiv. Must Have Hdr And 10-bit Video Processing, Allowing For A More Exquisite And Clear Image. Xxv. Must Have Color Adjustment: Output Connector Color And Screen Color Adjustable, Including Brightness, Contrast, Saturation, Hue, And Gamma. Xxvi. Must Have Xr Scenario Control Xxvii. Must Have Low Latency: Reduce The Latency From The Input Source To The Receiving Card To As Low As 1 Frame. Xxviii. Must Have Web Control: Real-time Response And 1000m/100m Self-adaptive Network Control, Allowing For Multi-user Collaboration. Xxix. Must Have Monitoring Of Inputs And Outputs On A Web Page Xxx. Must Support Firmware Updates On Web Page Xxxi. Must Have Ark Visualized Management And Control Platform App Control On Pad Device. Xxxii. Must Have Self-test For Fault Detection Xxxiii. Must Have Auto-monitoring And Alarms: Supports Hardware Monitoring, Such As Fan Rotation Speed, Module Temperature And Voltage, And Running Status, And Sends Fault Alarms If Necessary. Xxxiv. Must Support An Optional Power Supply For Higher System Reliability. Xxxv. Must Have Backup Design − Backup Between Devices − Backup Between Led 4k Sending Cards. C. Accessories I. One (1) Unit - Vacuum Suction Ii. One (1) Unit - Structure/bracket 4.2x2.025m Iii. Nine (9) Units - Hdmi Cable (4k) 10 Meters D. Six (6) Units - 1500va/900w Line Interactive Ups E. Three (3) Units – Desktop Computers I. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) Ii. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) Iii. Operating System (os): Windows 11 Or Higher Iv. Memory: 16 Gb (or Higher) V. Storage: 500 Gb Ssd (or Higher) Vi. Display: 14” Display Vii. Graphic Card: Integrated Graphics Viii. Camera: 1080p Fhd Ir/rgb Hybrid Ix. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above X. Ethernet Port Or Usb Xi. Power Cord: At Least 45w Xii. Warranty: 1 Year Courier Or Carry-in 2. Desktop Computers W/ Extended Monitor A. Six (6) Units – Desktop Computer I. Processor: Intel I7 Or Amd Ryzen7 Processor (or Higher) Ii. Memory: 16 Gb Ddr4 Or Higher Iii. Form Factor: Tower Iv. Storage: At Least 500 Gb Ssd (or Higher) V. Graphics Processing Unit (gpu): 4gb Vram, Gddr5 (or Higher) Vi. Display: At Least 23.8” Hd Led Display (or Higher) Vii. Motherboard: B760-g Wifi D5 Micro-atx Motherboard Viii. Power Supply: Modular Power Supply 850w 80+ Gold Argb Modular Psu Ix. Peripherals: Power Cords, Keyboard & Optical Mouse X. Chassis: Usb Ports, Audio Port, Mic Port, Power Switch, Reset Switch Xi. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) Xii. Operating System (os): Windows 11 Pro Or Higher Xiii. Warranty: 1 Year Courier Or Carry-in B. Six (6) Pcs For 6 Units Of Desktop – Extended Monitor I. Display: At Least 23.8” Hd Led Display (or Higher) C. Six (6) Units – Ups For Command Center I. Must Have Capacity 650va 3. Communication Equipment A. Six (6) Units – Desktop Computer Headphone I. Audio Specifications Must Have, Frequency Response: 20 Hz To 20,000 Hz (standard Range For Human Hearing), Impedance: 32 Ohms (standard For Most Headsets; Higher Impedance May Be Better For High-end Audio), Sensitivity: 90-120 Db (decibels) At 1 Mw For Sound Level, Driver Size: 30-50 Mm (larger Drivers Often Provide A Better Bass Response), Sound Output: Stereo Or 7.1 Surround Sound (for Gaming And Multimedia), Total Harmonic Distortion (thd): Less Than 1% (minimizes Audio Distortion), Noise-canceling: Active (anc) Or Passive, Ii. Microphone Specifications Must Have, Type: Omnidirectional Or Unidirectional, Frequency Response: 100 Hz To 10,000 Hz, Sensitivity: -38 Db ± 3 Db, Noise Cancellation: Active Or Passive Noise-canceling Microphone, Mute Function: Usually Included For Easy On/off Control, Iii. Connectivity Wired: 3.5 Mm Audio Jack, Usb (type-a Or Type-c) Iv. Controls Volume Control: On-ear Cup Or Inline Volume Adjustment, Playback Control: Some Models Allow Pause/play/skip For Media. B. Six (6) Units – Ip Phone Handset Note: Covered In Ip-pa System And Ip-pbx System I. Must Have The Following Physical Specifications: 2.3-inch 128x48 Pixel Dot-matrix Display, Graphical Lcd With Backlight, Keypad: 33 Keys, Including: 4soft-keys, 9 Function Keys (hold / Transfer / Voice Message / Conference / Phonebook, Mwi / Headset / Redial / Hands-free) 4 Navigation Keys, 12 Standard Phone Digits Keys, 3 Volume Control Keys (up/down/mute (microphone), Desktop Stand X1 Status Indicator Light X1 (red), Rj9/rj11 Port X2: Handset X1, Headset X1, Rj45 Port X2: Network X1, Pcx1 (bridged To Network), Security Slot X1, Dc Power Input: 5v/0.6a, Power Consumption (adapter): 0.8~1.29w, Power Consumption (poe): 1.25~1.86w, Device Dimensions: Desktop Stand (45°): 169x201.1x177.4 Mm, Desktop Stand (50°): 169x191.9x185.8 Mm, Wall Mountable: 169x120.1x213.7 Mm Ii. Must Have 6-way Audio Conference Iii. Must Have At Least 600 Call Logs Iv. Must Have At Least 1000 Local Phonebook V. Must Have At Least 1000 Remote Phonebook Vi. Must Have G.722, Opus Wideband Codec Vii. Must Have G.711a/u,g.726,g.723.1, G.729a/b, Ilbc Narrowband Codec Viii. Must Have 2 X 10/100/1000 Mbps Network Rate Ix. Must Have Power Supply Poe X. Must Support Ehs Wireless Headset Xi. Must Have Desktop Stand Xii. Must Support Plantronics Wireless Headset (through Plantronics Apd-80 Ehscable) Xiii. Must Support Recording (through Server) Xiv. Must-have Physical: 10/100/1000 Mbps Ethernet, Dual Bridged Port For Pc Bypass Xv. Must Support Ip Configuration: Static Ip / Dhcp / Pppoe Xvi. Must Support The Following Protocols: Sip 2.0 Over Udp/tcp/tls, Rtp/rtcp/srtp, Stun, Dhcp, Ipv6, Lldp, Pppoe, 802.1x, L2tp, Openvpn, Sntp, Ftp/tftp, Http/https, Tr-069, Aes 128 & Aes 256 Xvii. Must-have Generic Ip Phone Features: 2siplines, Hdvoice, Poeenabled, Dot-matrix Display Screen, Handset/hands-free /headset Mode, Desktopstand/ Wall Mountable (optional), Optional External Power Supply Xviii. Must Have The Following Call Functions: Callout/ Answer/ Reject, Mute/unmute(microphone), Callhold / Resume, Callwaiting, Intercom, Caller Id Display, Speeddial, Anonymouscall(hide Caller Id), Callforward(always/busy/no Answer), Calltransfer (attended/unattended), Callparking/pick-up (depending On Server), Redial, Do-not-disturb, Auto-answering, Voicemessage(with Server), 6-wayconference, Hotline, Hot Desking. 4. Two (2) Units – Laptop A. Processor: Intel I7 Or Amd Ryzen7 Processor (or Higher) B. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) C. Operating System (os): Windows 11 Pro Or Higher D. Memory: 16 Gb (or Higher) E. Storage: 500 Gb Ssd (or Higher) F. Display: 14” Display G. Graphic Card: Integrated Graphics H. Camera: 1080p Fhd Ir/rgb Hybrid I. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above J. Ethernet Port Or Usb K. Power Cord: At Least 45w L. Warranty: 1 Year Courier Or Carry-in 5. One (1) Lot - Outdoor Video Wall W/ Smart Led Solar Powered Light A. Led Panel I. Pixel Pitch 3.91mm Ii. Pixel Configuration 1r1g1b Iii. Led Type Smd1921 Iv. Brightness (max) 5000 Nit V. Color Temperature 3500k-10000k(adjustable) Vi. Viewing Angle H140° / V120° Vii. Pixel Density 65,536 Dots/m² Viii. Module Size 500mm×250mm Ix. Module Resolution 128x64 Dots X. Cabinet Size W500mm×h1000mm×d77mm Xi. Cabinet Resolution (w×h) 128×256 Dots Xii. Cabinet Weight 17.0 Kg ± 0.5 Xiii. Cabinet Material Aluminum Xiv. Operating Temperature/ Xv. Humidity -40℃~+60℃/10~80%rh Xvi. Storage Temperature/ Xvii. Humidity -40℃~+60℃/10~80%rh Xviii. Ip Rating Front Ip68/rear Ip66 Xix. Mounting: Ground Structured Support For Outdoor Video Wall Display Unit (181"w X 138"h) B. Four (4) Unit – Smart Led Solar Powered Light I. Independent Distributed Power Supply System Ii. Solar Powered W/ Smart Sensors Iii. High Quality Lithium Battery Iv. Input Voltage Ac 110~220v (+/-10%) V. Pole-mounted Installation Vi. Mounting: Ground Structured Support For Outdoor Smart Led Solar Powered Light C. One (1) Lot - Controller Required: Quantity I. Must Have Sending Box, Receiving Card, And Light Sensor D. Accessories I. One (1) Unit - Vacuum Suction Ii. One (1) Unit - Structure/bracket 4.2x2.025m Iii. Nine (9) Units - Hdmi Cable (4k) 10 Meters Iv. Two (2) Units - 1500va/900w Line Interactive Ups E. One (1) Unit – Desktop Computer I. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) Ii. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) Iii. Operating System (os): Windows 11 Pro Or Higher Iv. Memory: 16 Gb (or Higher) V. Storage: 500 Gb Ssd (or Higher) Vi. Display: 14” Display Vii. Graphic Card: Integrated Graphics Viii. Camera: 1080p Fhd Ir/rgb Hybrid Ix. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above X. Ethernet Port Or Usb Xi. Power Cord: At Least 45w Xii. Warranty: 1 Year Courier Or Carry-in 6. One (1) Lot – Security Software Licenses A. Access Rights Manager B. Patch Manager C. Serv-u File Transfer Protocol Server D. Serv-u Managed File Transfer Server E. Server Configuration Monitor F. Engineer's Toolset G. Ip Address Manager H. Log Analyzer I. Network Performance Monitor J. Security Event Manager K. Network Topology Mapper 7. One (1) Service - Electronic Permit Layout And Design (as-built Plan) 8. One (1) Service - Electronic Permit Layout And Design Signed By Pece 9. One (1) Lot - Security Software Licenses W/ Dashboard 10. One (1) Lot - Structured Cabling (including External Cabling) 11. One (1) Lot - Roughing-in Materials 12. One (1) Service - Network Design And Consultation 13. One (1) Service - Project Management Services 14. One (1) Service - Temporary Facility (temfacil) For 30 Days 15. One (1) Service - Installation & Configuration 16. One (1) Service - Network Configuration Services 17. One (1) Service - User's Training And Knowledge Transfer 18. One (1) Service - Scaling And Optimization 19. One (1) Service - Manpower Cost 20. One (1) Service - Mobilization Cost 21. One (1) Service - Forwarding Cost 22. One (1) Year - Support Warranty E.18 Campus Data Center Upgrade 1. Non-electrical Components A. Seven (7) Units - Data Racks I. 1200mm Deep Static Rack Cabinet. Ii. Rack Capacity Must Be 42u Iii. Must Be Equipped With Casters And Leveling Feet Iv. Front And Back Doors Must Be Perforated V. Must Have A Load-carrying Capacity Of 950 Kg Or Higher Vi. Optional: Front And Side Stabilizers B. Three (3) Units - Gpu Server I. Must Have Warranty Support (4hr Resp) Ii. Gpu Server Add Ons Iii. Management Controller With 3-year Subscription For Server Endpoint Iv. Console Manager With 3-year Software Subscription C. One (1) Unit - Telephone Terminal Cabinet (ttc) I. The Ttc Must Be Made With Stainless Steel (304 Or 316) Gauge 16. Ii. At Least (800mm X 500mm X 200mm), With Canopy And Locking Mechanism. Iii. Water-resistant 2. Electrical Components A. One (1) Lot - Power Management System I. Design And Install Based On The Requirements Of Section 5.b (electrical Works Services) B. Fourteen (14) Lot - Power Distribution Unit I. 2 Units Shall Be Installed Per Data Rack. Ii. Input Voltage (v): 200-230 Iii. Input Plug Type: Iec 60309 32 A 2p + E Iv. Input Current Limit: 32 A V. Load Capacity: 7400 Va Vi. Network Frequency: 47...63 Hz Vii. Outlet Type And Quantity: (20) Iec 60320 C13, (4) Iec 60320 C19 C. One (1) Unit - Uninterruptible Power Supply 20kva (ups) And One (1) Unit - Uninterruptible Power Supply 5kva (ups) I. At Least 20kva/20kw Rackmount And 5kva/5kw Rackmount 1. Input: A) Ac Input Nominal Voltage (single-phase): 220/230/240 Vac, 3 Wire (l + N + G), Connected Via Hardwire. B) Ac Input Nominal Voltage (three-phase): 380/400/415 Vac, 5 Wire (l1 + L2 + L3 + N + G), Connected Via Hardwire. C) Ac Input Voltage Range: 160 – 285 Vac (l-n) At Full Load, While Providing Nominal Charging To The Battery System; Or 100 – 160 Vac (l-n) At 50% Load, While Providing Nominal Charging To The Battery System. D) Input Frequency Range: 40-70 Hz, Auto-selecting. E) Online Input Power Factor: 0.99 For 75% And 100% At 230 Vac. F) Green Mode Input Power Factor: ≥ 0.95 (for Resistive Load ≥ 25%) At 230 Vac.) At 230 Vac G) Input Current Distortion: <4% For 50% Resistive Load, <3% For 100% Resistive Load. H) Surge Protection: 600 Joules 2. Output: A) Ac Nominal Output Voltage: Single-phase B) Single-phase: 220/ 230/ 240 Vac. Models Are Factory Set At 230 Vac. C) 3-phase: 380/400/415 Vac. Models Are Factory Set At 400 Vac. (for 20kva) D) Output Frequency: 50/60 +/- 4 Hz (auto-sense). 3. Battery: A) Battery Type: Maintenance-free Sealed Lead-acid Battery With Suspended Electrolyte, Leakproof. 4. Installation: A) All Materials To Be Used In The Installation Should Be Included. From The Tapping Point To Ups. D. One (1) Unit - Generator With Automatic Transfer Switch (ats) I. 50kva Generator With Built-in Ats Or Ats Ready Ii. Automatic Start, Electric Start Iii. Phase: 3-phase/1-phase Iv. Operating Mode: Silent/soundproof V. Frequency Rating (hz): 50-70 Vi. Voltage Rating (v): 220-240 Vii. Engine Type: Turbo Diesel Viii. Large Capacity Fuel Tank Ix. Cooling System: Water Cooled X. Protection System: Low Oil Alarm, Temperature Sensor Xi. Should Include Installation And Configuration Services E. One (1) Set - Precision Air Conditioning Unit (pacu) I. Cooling Capacity: 7 Tr (20kw Or 75,400 Btu/hr) Ii. Power Supply: 230 Volts/60 Hz./3 Phase/pe Iii. System Type: Air-cooled Non-inverter Compressor Iv. Air Circuit: 1. Air Direction - Downflow Vertical Discharge 2. Air Inlet Into The A/c On A Large Surface From The Top Of The Unit V. Refrigerant Circuit: 1. Equipped With An Open Refrigerant Circuit The Basic Version Consists Of The Following Components: A. Fully Hermetic, Variable-speed Dc Scroll Compressor B. Oil Separator C. High-performance Evaporator With A Large Surface Area D. Liquid Receiver With Rota Lock On-off Valve And Safety Valve E. Dehydrating Filter F. Liquid Sight Glass G. Thermostatic Electronic Expansion Valve H. High-pressure Switches With Manual Resetting I. Needle Valves For The Refrigerant Change For Pressure Control J. External Welded Connections Vi. Standard Functions: Cooling Mode, Humidification & Dehumidification Mode Vii. User Terminal: 1. 64 X 120 Pixel Backlit Lcd Display And 6 Backlit Keys To Move Between And Change Parameters. 2. Set The Operating Parameters, Monitor The Trend Of The Main Working Parameters, And Read Any Alarm Messages. 3. Capable Of Enabling The Following Functions: A. Temperature And Humidity Control B. Setting Double Temperature And Humidity Set Point C. Complete Alarm Detection System D. Alarm Event History Storage E. Automatic Restart When Power Returns After A Cutout F. Remote Switching On/off Of The Unit G. Graphical Display With Icons Displaying The State Of The Unit Components H. Time Bands For Differential Weekly Switching On/off Of The Unit I. Management Of The Local Network With Setting The Rotation Of One Or Two Units In Standby J. Alarm Sequence History With Up To 100 Alarm Events Viii. Fan Section (indoor): 1. Radial Fan With Electronically Commutated (ec) Motor 2. High-efficiency Ec Motor With Wear-resistant And Maintenance-free Ball Bearing 3. Variable Speed Motor Modulating Fan Speed According To Load Density 4. Eurovent Certification 5. Ce Certification Ix. Air Filter: 1. Made From Self-extinguishing, Synthetic Fiber Cellular Material. 2. Large Filter Surface, Small Pressure Loss, Long Service Life, And Easy Replaceability X. Condenser: 1. Connections To The Remote Condenser 2. Witha Kit Of Legs For Vertical Discharge 3. With Rota Lock Shutoff Valves 4. Regulate The Fan Speed To Ensure Trouble-free Operations F. One (1) Unit - Dehumidifier I. At Least 80 Liters Capacity Ii. Adjustable Humidistat Iii. Auto Restart Iv. Automatic Bucket Full Shut-off V. Automatic Humidistat Control Vi. Bucket Full Indicator Light Vii. External Drain Connect Viii. Removable Water Tank Ix. Washable Air Filter 3. Safety Components A. Eight (8) Units - Fire Suppression System I. Hfc236fa (fe36) / /hcfc-123 Ii. At Least 20 Lbs Iii. Non-residual Iv. Non-corrosive V. Lifetime Chemical Efficacy Vi. Built-in Sensor For Automatic Discharge Vii. Should Include Mounting Plates And Installation Service B. Two (2) Units - Metal Door With Panic Lock Mechanism Note: Included In E-classroom, E-conference Room And Smart Led Solar Powered Light I. The Door Jamb Must Be Able To Hold The Weight Of The Metal Door. Ii. The Door Hinge Must Be Able To Contain The Stress Of The Sudden Swing Of The Metal Door Induced By The Panic Lock Mechanism. Iii. Panic Lock Mechanism Has Priority Over Electronic Security Locks For Exit. C. Four (4) Units - Environmental Monitoring System I. Temperature Sensor And Humidity Data Logger. Ii. Logging Capacity: 60000 Readings Or Higher. Iii. Alarm Status Indicator. Iv. Wired Or Wireless Connection Mode. V. Inclusion Of Cloud Access And/or Mobile Application For Data Access. Vi. Optional: Sms And/or Email Capability. 4. Warranty-three (3) Years Warranty A. Non-electrical Components I. Data Racks Ii. Telephone Terminal Cabinet (ttc) B. Electrical Components I. Electrical Management System Ii. Uninterruptible Power Supply 20kva Iii. Uninterruptible Power Supply 5kva Iv. Power Distribution Units V. 100 Kw Generator With Automatic Transfer Switch (ats) Vi. Air Conditioning Units Vii. Dehumidifier C. Safety Components I. Fire Suppression System Ii. Metal Door With Panic Lock Mechanism Iii. Environmental Monitoring System 5. Included Supply, Installation, And Configuration Services A. Civil Works Services I. Supply And Installation Of Telephone Terminal Cabinet (ttc) (800mm X 500mm X 200mm) With Canopy And Locking Mechanism. Ii. Supply And Installation Of 2 Fire Rated Metal Door With Panic Locking Mechanisms 400mm(w) X 900mm(w) X 2100mm(h)(1-unit) Iii. Supply And Installation Of 2hr Fire-rated Wall Partition 4” Thick (40 Sqm.) Iv. Supply And Installation Of Anti-static Raised Flooring (75 Sqm.) V. Supply And Installation Of The Acoustic-type Ceiling (75 Sqm.) Vi. Supply And Installation Of Led Lighting With Complete Wiring Vii. Painting Inside The Data Center Viii. Water Proofing (covering Part Of Data Center) Ix. Supply And Installation Of Emergency Lights X. Installation Of Generator System Housing B. Electrical Works Services I. Creation And Installation Of An Electrical Design Supporting Ups Power, Air-conditioning, Emergency Light And Exhaust Fan System, With The Capability To Switch To A Generator System With Ats And Auto-start Function. Ii. Independent Circuits For Ups And Regular Power Distributed On A Per Rack Basis. Iii. Independent Circuits For Air Conditioning Systems (ahu) On A Per Unit Basis. Iv. Provision Of Ups Circuits For Security And Environment Monitoring Devices. V. Provision Of Circuits For Future Use. Vi. Installation Of Grounding Systems. Vii. Electrical Panel Boxes Should Be Equipped With Surge Suppressors, Low Voltage Detectors And Power Monitoring. C. Mechanical Works Services I. Plumbing Works For Ahu Drain System. Ii. Plumbing Works For The Dehumidifier Drain System. Iii. Supply And Installation Of Electrical Wire Ways From Main Electrical Panel To Generator Location. Iv. Supply And Installation Of Data Wire Ways For Inter-rack Connections. 6. One (1) Service - System Design Services 7. One (1) Service - Cabling Works 8. One (1) Service - Structured Cabling (including External Cabling) 9. One (1) Service - Forwarding Cost 10. One (1) Service - Project Management Services 11. One (1) Service - User Acceptance Testing (uat) 12. One (1) Service - User's Training And Knowledge Transfer 13. One (1) Service - Scaling And Optimization 14. One (1) Service - Manpower Cost 15. One (1) Service - Mobilization Cost E.19 Data Center Network Switches 1. Two (2) Units - Core Switch A. Hot Swap Power Supply B. Open Ports Configuration With At Least 16 100g Qsfp28 Ports C. Open Ports Configuration With At Least 4 25g Qsfp28 Ports D. All Open Ports Enabled E. Zero License Fee For Modules Inserted I. Four (4) 100 Gbit Fiber Module Ii. Four (4) 40 Gbit Fiber Module Iii. Six (6) 10 Gbit Copper Module Iv. Six (6)10 Gbit Fiber Module V. 100 Gbit Dac Cable 2. Two (2) Units - Core Fiber Switch 3. One (1) Unit - Router A. Redundant Power Supply B. Load Balancing/failover Capability For Unequal Bandwidth C. At Least 12 1gbit Ports D. All Open Ports Enabled E. Zero License Fee For Modules Inserted F. One (1) Lot - X 10g Sfp+ Ports G. One (1) Lot - 10gbit Fiber Module (sfp / Sfp+ / Sfp28) H. One (1) Lot - 10gbit Copper Module 4. One (1) Unit- Top Of Rack (tor) Switch Poe A. Redundant Power Supply B. At Least 48 Gbit Ports C. All Open Ports Enabled D. Zero License Fee For Modules Inserted E. Four (4) X 10g Sfp+ F. Two (2) 40g Qsfp+ G. 48 Poe Ports H. Poe Out Standard: 802.3af/at I. Max Power Output Per Port (input 18-30 V): 1000 Ma J. Max Power Output Per Port (input 30-57 V): 570 Ma K. Total Power: 700w L. Six (6) 40gbit Fiber Module 5. One (1) Unit - Top Of Rack (tor) Switch Non-poe A. Redundant Power Supply B. At Least 48 Gbit Ports C. All Open Ports Enabled D. Zero License Fee For Modules Inserted E. Four (4) X 10g Sfp+ F. Two (2) 40g Qsfp+ G. 48 Poe Ports H. Six (6) 40gbit Fiber Module 6. One (1) Unit - Management Switch A. Redundant Power Supply B. At Least 24 Gbit Ports C. 10gbit Fiber Module D. Sfp+ To Sfp+ Connector 7. Two (2) Units - Access Point Cap-ac 8. One (1) Service - Electrical And Racking Design Services 9. One (1) Service - Network Design And Consultation 10. One (1) Service - Project Management Services 11. One (1) Service - Switch Installation 12. One (1) Service - Network Configuration Services Supplier 13. One (1) Service - Training And Knowledge Transfer 14. One (1) Service - Scaling And Optimization Of Data Center Network Switches 15. One (1) Service - Manpower Cost 16. One (1) Service - Mobilization Cost 17. One (1) Service - Forwarding Cost 18. One (1) Year - Support Warranty E.20 Data Center Compute System & Data Center Block And File Storage 1. Eight (8) Lots - Hci Cluster: A. Form Factor: 2u Rack Server B. A Total Of Eight (8) Hci Nodes C. Must Have 2x 6426y 16c 185w 2.5ghz Processor Per Node D. Must Have A Total Of 256gb 2rx8 4800mhz Memory Per Node. Can Support Up To 8tb Of Memory E. Network Interfaces Must Have A 2x 2-ports 10gb Base-t F. Storage Drives Must Have 2.5" Cache Drives And 3.5" For The Capacity Drives G. Must Have 2x M.2 Nvme 960gb Read Intensive Pcie Gen 4 Ssd For The Boot Drive H. Must Have A Total Effective Capacity Of At Least 500 Tb And 700 Tb Raw Capacity On Rf2 With 0% Savings I. Must Have Redundant 1100w Platinum Psu J. 2u Rack Mounted K. Software Inclusion: I. Must Include Rhel For Virtual Datacenters Premium 3 Years. Ii. Must Include Microsoft Center Licenses, Cals, And Sql Server With Software Assurance For The Education Sector. L. Hypervisor Support: I. Supports Industry-standard Hypervisors Like Vmware Esxi, And Native (bundled) M. Hci Features: Ii. Hci Licenses Should Be Oem Iii. Can Support Heterogeneous Clusters And Storage Nodes Only Iv. Must Have Vm-centric Snapshots & Clones V. Must Have Data Tiering Vi. Must Have Online Cluster Grow/shrink Vii. Must Have Data Path Redundancy Viii. Up To 2 Tunable Redundancy Factor Ix. Basic Compression (lz4) - Inline And Post-process X. Deep Compression (lz4hc) - Greater Efficiency For Cold Data Xi. Cache Deduplication Xii. Capacity Deduplication Xiii. Volume Groups - For In-cluster Vms Xiv. Async Replication (rpo = 1 Hr Or Greater) Xv. Application Consistent Snapshots Xvi. Client Authentication Xvii. Centralized Management Can Support Multi-cluster Management Xviii. Infrastructure Management, Monitoring, And Health Xix. Enterprise Authentication And Rbac Xx. Rest Apis Xxi. Comprehensive Search Xxii. Management Can Support The Report Xxiii. Management Has A Customizable Dashboard Xxiv. Management Can Plan And Forecast The Capacity Xxv. Resource Inefficiency Detection And Right-sizing Xxvi. Low-code/no-code Operations Automation Xxvii. Must Have 50tib Licenses For Unified Storage N. Hardware Management Features: I. Configure An Hci Node Ii. Update An Hci Node Iii. Integrate Into External Apps Through Integrators Or Rest Apis Iv. Manage Servers, Network, And Storage V. Auto-discover Systems Vi. Monitor And Track Multiple Systems, And Handle Faults Including Call Home Or Equivalent Vii. Manage Server, Network, And Storage Updates With Policies Viii. Configure Multiple Servers With Software Patterns Ix. Install Operating Systems And Hypervisors X. View The Status Summary Of All Hardware Components Xi. Encapsulation, Which Enables Us To Configure The Management Software To Change The Firewall Rules For The Devices So That Incoming Requests Are Accepted Only From The Management Software Xii. Compliant With Nist Sp 800-131a Or Fips 140-2. Hardware Management Should Support Self-signed Ssl Certificates (issued By An Internal Certificate Authority) Or External Ssl Certificates (private Or Commercial Ca). Xiii. Must Include An Audit Log That Provides A Historical Record Of User Actions, Such As Logging On, Creating Users, Or Changing User Passwords. O. Hardware Management Platform Should Have A Mobile App With The Following Features: I. View The Status Summary Of All Hardware Ii. Monitor The Detailed Status Of Each Device Iii. Monitor Inventory Of Each Device Iv. Monitor Audit Events, Hardware And Management Events, Alerts, And Jobs. V. Performs Power Actions On The Device. Vi. Act On Common System-level Tasks To Minimize The Risk Of Disruptions And Downtime. Vii. Forward Emails To Share Inventory, Alerts, And Event Information. Viii. Perform Initial Configuration Of Servers, Retrieve Diagnostic Information (virtual Lcd) And Perform Actions, Initiate Hardware Management From A Mobile Device. Ix. Monitor Hardware Inventory For Unexpected Component Changes, And Simply Log The Event Or Prevent Booting X. Enforces Cnsa 1.0 Level Security Xi. Enables Administrators To Manage And Synchronize Configurations And Firmware Levels Across Multiple Servers Xii. Should Be Available On Both Ios And Android. Xiii. The Hci Should Provide A Single Unified Management Console For The Management Of The Entire Environment Including Virtualized Environment As Well As Software Defined Storage Environment, Underlying Hardware, And Associated Components. Xiv. The Hci Should Provide Enterprise Data Services Such As Deduplication And Compression With Erasure Coding Completely In Software Without Dependency On Any Proprietary Hardware. Xv. System Management Must Be Able To Provide Proactive Alerts For Processors, Voltage Regulators, Memory, Internal Storage, Fans, Power Supplies, Raid Controllers, And Server Ambient And Sub-component Temperatures. Xvi. Must Be 100% Software-defined Without Dependency On Proprietary Hardware Or Networking Components. Xvii. Supports Differing Cpu & Memory Configurations Of Nodes Within The Same Cluster Xviii. The Hyper-converged Platform Must Have Fips 140-2 Certification Xix. The Hyper-converged Platform Must Have Common Criteria Security Certification. 2. One (1) Lot - Kvm Switch With Lcd Console A. 16-ports Kvm Switch And One (1) Lcd Console. Must Be The Same Brand As The Hci Nodes. B. Must Be Able To Handle 2 Concurrent Users. C. Local User Connection For Kvm: Vga + Usb D. Maximum Number Of Target Systems: 16 E. Maximum Video Resolution: 1600x1200 (4:3),1680x1050 (wide) 3. Thirty-two (32) Roll - Green Cat6 Cable 4. One (1) Service - Storage System Installation 5. One (1) Service - Storage Network Configuration Services 6. One (1) Service - System Design Services 7. One (1) Service - Application Installation 8. One (1) Service - Project Management Services 9. One (1) Service - User Acceptance Testing (uat) 10. One (1) Service - User's Training And Knowledge Transfer 11. One (1) Service - Scaling And Optimization Of Data Center Compute System 12. One (1) Service - Manpower Cost 13. One (1) Service - Mobilization Cost 14. One (1) Service - Forwarding Cost 15. Three (3) Years - Software Warranty 16. Three (3) Years - Support Warranty E.21 Data Center Backup And Recovery System 1. One (1) Lot - Enterprise On-premises Data Backup System - Hardware A. Must Have At Least 4410t 10c 150w 2.7ghz Processor. B. Must Have At Least 32gb 4800mhz Memory With Expansion Of Up To 8tb. C. Must Have 4-ports 10gb Base-t. D. Must Have At Least 22tb Storage Capacity. E. Must Have 2x M.2 480gb Read Intensive Sata Ssd. F. Raid Controller Should Support Raid 0,1,10,5,50,6 Configurations With 4gb Cache. G. Must Include Microsoft Windows Server Standard And Client Access Licenses (cals) For The Education Sector. 2. One (1) Lot - Enterprise On-premises Data Backup System – Software A. The Backup And Recovery Solution Should Work With Virtualized Infrastructure Based On Version 6.x, 7.0, 8.0, Microsoft Hyper V 2022 Or Higher And Later Versions, Nutanix Ahv Version 6.5 And Later, And Red Hat Virtualization Version 4.4 Sp1 (red Hat Virtualization Manager Version 4.5.0 Or Later) In A Single Product B. The Solution Should Provide A Centralized Console To Coordinate Backup, Replication, Recovery Verification And Restore Tasks. It Is Also Used To Set Up And Manage Backup Infrastructure Components. C. The Solution Must Provide Immutability To Prohibit Modification Or Deletion Of Backup Data As A Result Of Malware Activity Or Ransomware Attacks. D. Must Provide Agentless Protection Without The Need To Install Agents Inside Each Vm Running On Vmware, Hyper-v, Nutanix Ahv, And Rhv Platforms E. Must Support Direct Attached Storage, Network Attached Storage, Deduplicating Storage Appliances, And Object Storage As Backup Repositories F. Ability To Utilize Forever Forward Incremental, Forward Incremental & Reverse Incremental Backup Methodology. G. Ability To Perform Agentless Transaction Log Backup And Replay And Database Restore To Original Or New Sql Server H. Ability To Select And Choose Multiple Mssql Databases When Performing A Mass Database Export, Restore, Or Instant Recovery. I. The Solution Must Provide Automated Tests And Verification Of Each Backup Or Replica To Assure Recoverability In Case Of Production Failure. The Verification Must Include Vm Files, Os, And Applications Including Custom Testing Using Scripts J. The Solution Must Provide 105 Options To Perform Recovery. K. The Solution Must Have The Ability To Provide Recovery Delegation For Individual Or Group Vms L. Included Built-in Aes 256-bit Encryption, Compression, And Deduplication In A Single Product Without An Additional Option To Purchase M. The Solution Should Support Direct Backup To Object Storage Such As Amazon S3, Google Cloud Storage, Ibm Cloud Object Storage, Microsoft Azure Blob Storage, And Any S3-compatible Object Storage On-premise And In The Cloud. N. Ability To Combine One Or More Backup Repositories Or Object Storage (aws S3, Azure Blob, Gcp & Any S3 Object Compatible) Repositories And Tier Backup Data From Performance To Capacity And Archive Tier. O. Provide Agent-based Data Protection For Physical Server On Windows Or Linux With Support For Bare Metal Recovery, Export As Virtual Disk & Able To Perform Instant Recovery To Vmware Platform, Microsoft Hyper-v, And Nutanix Ahv P. Able To Provide Secure Access To The Backup Console With Optional Two-factor Authentication (2fa) That Is Based On Time-based One-time Passwords (totp) 3. Twenty-four (24) Months - Cloud-based Disaster Recovery System A. The Solution Must Have The Ability To Provide Recovery Delegation For Individual Or Group Vms B. The Solution Should Support Direct Backup To Object Storage Such As Amazon S3, Google Cloud Storage, Ibm Cloud Object Storage, Microsoft Azure Blob Storage, And Any S3-compatible Object Storage On-premise And In The Cloud. C. Provide Agent-based Data Protection For Physical Server On Windows Or Linux With Support For Bare Metal Recovery, Export As Virtual Disk & Able To Perform Instant Recovery To Vmware Platform, Microsoft Hyper-v, And Nutanix Ahv D. The Billing Of Dr Site Resources Must Only Be In Effect When The Resources Are Used. E. Must Provide For Monitoring And Periodic Conduct Of Dr Drills F. Must Have The Capability To Instantiate Test Instances For Non-disruptive Testing G. Must Be Able To Set Up And Initiate Continuous Data Replication. H. Must Provide Replication For At Least 10 Servers 4. One (1) Service - Electrical And Racking Design Services 5. One (1) Service - Network Design And Consultation 6. One (1) Service - Disaster Recovery Site Provisioning And Testing 7. One (1) Service - Application Installation 8. One (1) Service - Project Management Services 9. One (1) Service - Network Configuration Services 10. One (1) Service - User's Training And Knowledge Transfer 11. One (1) Service - Scaling And Optimization Of Data Center Backup And Recovery System 12. One (1) Service - Forwarding Cost 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Three (3) Years - Support Warranty E.22 Cloud Infrastructure-as-a-service 1. Cloud Infrastructure Subscription A. Payment Terms I. Basc Shall Pay The Vendor A Fixed Monthly Fee For All Cloud-related Services. Ii. The Accumulated Payables Within The Validity Of The Subscription Period Must Not Exceed The Budget Set For This Procurement. Iii. All Activated Additional Resources Must Be Billed Not Less Than 30 Calendar Days From The Date Of Activation, Or 60 Calendar Days Should It Be Activated Beyond The Agreed “cut-off” Period. Iv. All Chargeable Costs Must Be Inclusive Of Vat. V. Basc Shall Reserve The Right To Take Over The Root Account And Pay The Billings Directly. To Avail Of This Prerogative, Basc Must Inform The Vendor In Writing At Least 3 Months Prior To Contract Expiration. B. One (1) Lot – Cloud Management Services I. The Vendor Shall Have Cloud Provider Preference, Provided That The Cloud Provider Adheres To The Standards Stated In Section 2.b. Ii. The Vendor Shall Migrate Agreed-upon Resources From The Current Cloud Computing Service Platform Or Its Current Site To The New Cloud Computing Platform In Coordination/collaboration With Basc’s It Team. Iii. The Vendor Shall Provide Counterpart Technical Support In The Setup, Configuration And Monitoring Of Cloud Infrastructure. 2. Cloud Infrastructure Standards A. Cloud Infrastructure Providers Should Have Global Presence. B. Certified For Information Security Management Systems (iso 27001) C. Certified For Code Of Practice For Information Security Controls Based On Iso/iec 27002 For Cloud Services (iso/iec 27017) D. Certified For Code Of Practice For Protection Of Personally Identifiable Information (pii) In Public Clouds Acting As Pii Processors (iso/iec 27018) 3. Data Center Standards A. Must Have The Capability To Deploy A Highly Available And Multi-zone Disaster Recovery Solution Across Multiple Data Centers Within The Asean Region B. Must Have The Ability To Provide A Managed Relational Database Service That Can Be Integrated With Any Chosen Software Solutions. C. Must Have The Capability To Deploy Standard Virtual Machines And Cloud-native Services. 4. Account Management A. The Account Ownership And Its Related Services Shall Belong To The Vendor. Access Rights Should Be Given To Basc, As Deemed Necessary, To Perform Monitoring Services Related To The Project 5. Warranty A. Cloud Management Services - One (1) Year 6. One (1) Lot - Secure Access Path A. Split Tunneling: Routes Only Specific Traffic Through The Vpn. B. Always-on Vpn: Maintains A Constant Secure Connection. C. Kill Switch: Disconnects If The Vpn Tunnel Fails. D. Dynamic Multipoint Vpn (dmvpn): For Dynamic And Scalable Vpn Networks. 7. One (1) Service - Cloud Infrastructure Design And Consultation Services 8. One (1) Service -vpn Network Design And Consultation 9. One (1) Service - Cloud Resources Provisioning And Testing 10. One (1) Service- Project Management Services 11. One (1) Service - User's Training And Knowledge Transfer 12. One (1) Service - Manpower Cost 13. One (1) Service - Mobilization Cost 14. Three (3) Years - Support Warranty E.23 Ip-pa System And Ip-pabx System 1. Ip-pabx System Components A. One (1) Unit - Ip Phone System I. Base Users / Max Users Up To 300 / 500 Ii. Max Concurrent Calls 60 / 120 Iii. Base / Max Call Center Agents 300 / 500 Iv. Max Fxs Ports 16 V. Max Fxo/bri Ports 16 Vi. Max Gsm/3g/4g Ports 6 Vii. Max E1/t1/j1 Ports 2 Viii. Expandable D30 2 Ix. Nfc Read/write X. Ethernet Interfaces 2 X (10/100/1000 Mbps) Xi. Hard Disk 1 Sata (up To 2tb) Xii. Usb 1 (usb Portable Ssd, Up To 2tb) (usb Flash Drive, Up To 256) Xiii. Power Supply Ac 100-240v 50/60hz Xiv. Form Factor 1u Rackmount Xv. Environment Operation Range: 0°c To 40°c, 32°f To 104°f Storage Range: -20°c To 65°c, -4°f To 149°f Humidity: 10-90% Non-condensing B. One (1) Unit - D30 Expansion Module I. Dsp Module, Used To Expand The Capacity Of Pbx. Ii. Extensions Increase By 100 And Concurrent Calls Increase By 30 Additionally. C. One (1) Unit - Ex 08 Module I. Must Support Up To 4 Modules (8 Rj11 Ports). D. Two (2) Units - O2 Module I. Ports 2 Rj11 Fxo Ports Ii. Supported Model S20, S50, S100, S300 Iii. Ring Frequency Detection 15~50 Hz Iv. Ring Voltage Detection 30+ Vrms (depending On The Fxo Mode) V. Termination Pstn Lines Vi. Echo Cancellation Signaling Modes Foreign Exchange Office: 2-way Connection To Prx Or Key System Trunk. Foreign Exchange Station Defined Network: Provides Access To Major Carrier Services. Private Line Automatic Ringdown (plar)-point-to-point Unswitched Connections. E. One (1) Unit - Voip Gateway I. Rj11 Fxo Ports Ii. Lan 1 10/100mbps Iii. Protocol Sip (rfc3261), Iax2 Iv. Transport Udp, Tcp, Tls, Srtp V. Codec G.711 (alaw/ulaw), G.722, G.723, G.726, G.729a, Gsm, Adpcm Vi. Voice Capability Itu-t G.168 Lec Echo Cancellation, Dynamic Jitter Buffer, Vad, Cng, Plc Vii. Dtmf Mode Rfc2833, Sip Info, In-band Viii. Fax T.30 Ix. Qos Diffserv, Tos, 802.1 P/q Vlan Tagging X. Network Dhcp, Ddns, Openvpn, Pppoe, Static Route, Vlan Xi. Network Protocol Ftp, Tftp, Http, Https, Ssh Xii. Management Protocol Radius Xiii. Signaling Fxs Loop Start, Fxs Kewlstart Xiv. Caller Id: Bell202, Etsi (v23), Ntt (v23-japan), And Dtmf-based Cid Xv. Disconnect Methods: Busy Tone, Polarity Reversal Xvi. Fxo Connectivity: Programmable Ac Impedance, Hangup Detection, Answer Detection, Caller Id Detection Xvii. Power 12v, 1a Xviii. Mounting Desktop, Wall-mount Xix. Compatibility: Interoperable With Asterisk, Lync Server, Freepbx And Certified With Elastix F. Forty-six (46) Units - Ip Phone Handset I. Must Have A Linux Operating System Ii. Must Have 132x64 2.3” Dot-matrix Display Iii. Must Have 6-way Audio Conference Iv. Must Have At Least 600 Call Logs V. Must Have At Least 1000 Local Phonebook Vi. Must Have At Least 1000 Remote Phonebook Vii. Must Have G.722, Opus Wideband Codec Viii. Must Have G.711a/u,g.726,g.723.1, G.729a/b, Ilbc Narrowband Codec Ix. Must Have 2x10/100/1000mbps Network Rate X. Must Have Power Supply Poe Xi. Must Have An Ehs Headset Xii. Must Have Desktop Stand G. Two (2) Units - Enterprise Ip Phone I. Must Have A 3.5-inch Main Color Screen And 2.4-inch Extended Screen For Dss Keys Ii. Hd Audio On Speakerphone And Handset Iii. Support 6-way Audio Conference Iv. Line Keys On The Main Display V. 6 Dss Keys On The Extended Screen, Up To 30 Dss Keys Via 5 Pages Vi. Built-in Bluetooth 4.2, Support Bluetooth Headset; Support Wi-fi Dongle Vii. Support Ehs Wireless Headset Viii. Dual Gigabit Ports, Integrated Poe Ix. Stand With 2 Adjustable Angles Of 45 And 50 Degrees 2. Ip-pa System Components A. One (1) Unit - Digital Ip Network Broadcasting Client Management Software I. Support Each Audio Terminal’s Operation, Audio Streaming Transmission Management, Broadcasting From Each Audio Terminal, And Full Duplex Exchange Of Audio. It Adopts B /s Architecture And Supports Terminal Management, User Management, Program Broadcasting Management, Audio Files Management, Record Storage, And Internal Communication Scheduling Through Web Login. Ii. Support Program Database Sources Management, Timing Broadcast, And Real-time Media Service Vod For All Audio Terminals, Program Broadcasting For Each Terminal, And Data Interface Service For Each Audio Workstation Iii. Support Full-duplex Voice Data Exchange, Paging And Call From Each Intercom Terminal, Various Calling Modes (like One Button To Call, One Button To The Intercom, One Button To Ask For Help, One Button To Alarm, And So On), Automatic Answer, Manual Answer, And Custom Answer Tone. Iv. Support Multiple Calling Strategies, Including Call Waiting, Call Forwarding, No Answer Reminder, And Custom Setting For Time Strategy And Forwarding Strategy. It Supports Setting Up The Call Strategy Of The Intercom Terminal. It Can Customize The Call Time From 0 To 180s Or No Limit. It Can Choose Whether To Answer Automatically Or Not. It Also Supports Customizing The Choice Of Calling Ringtones And Waiting Ringtones. V. Support Terminal Short Circuit Linkage Trigger. Users Can Arbitrarily Set The Trigger Scheme And Trigger Terminal Quantity. The Trigger Scheme Includes Short Circuit Output, Music Playback, And Patrol Alarm. Vi. Support To Program Timing Tasks, Multiple Timing Programs, Support Selecting Any Terminal, And Setting Any Time. Support Timed Task Execution Test, Setting Repetition Period And A Variety Of Audio Source Selections For Timing Tasks (music Playback, Sound Card Acquisition, Terminal Acquisition). Vii. Support Multiple Schemes Of Timed Ringing To Be Enabled At The Same Time. Viii. Support Multiple Tasks To Be Carried Out At The Same Time Ix. Support All Schemes To Be Enabled/ Disabled By One Button. X. Support Bell Scheme Cloning, Task Execution, And Stop Control, Disable And Enable The Function Of A Timing Task. Xi. Support Timing Patrol, Support Execution Time And Repetition Period Of The Custom Patrol Task, 0-30s Customized Interval Of The Indicator Flashing, And External Lock-free Button Short-circuit Switch (with 3.3v Led Indicator Light). Xii. Support Today's Task List View, Which Makes It Easy To Manage All Scheduled Task Information And Execution Status Performed Today. Xiii. Support Terminal Tamper Alarm. Trigger Terminal Alarm When A Terminal Is Demolished Or Trigger Alarm For Other Terminal Linkages. Support Alarm Task To Automatically Cancel The Alarm Function. Xiv. Support External Power Management Of Audio Terminals, Timing Switch O,n And Delay Off. Xv. Support Light Control And The Light Mode Configuration. Xvi. Support All Zones, Part Of The Zones Fire Linkage, N±n Fire Mode, Manual Alarm And Digital Alarm Mixing, Alarm Configuration To Trigger Terminal Collection Tasks Xvii. Support Terminals’ Login Password Central Management, Multiple Priority Management, Easy Automatic Authorization, Task Priority, Terminal Priority, And User Priority Customization. Xviii. Support Sub-control Management Of Multi-users And Arbitrary Degrees To Achieve Remote Program Broadcasting Management. Xix. Support Multi-user, Multi-level, Specified Permissions, Specified Functions, And Specified Terminals To Classify And Manage The Background. Xx. The Terminals Support Three-wire And Four-wire Volume Control Functions; The Four-wire Volume Control Needs An External Power Supply. Xxi. Support To Set The Zones And Control The Power To The 8-channel Terminal Through Web Background Or Sub-control Client Side. Xxii. Support To Set The Time Display In The Terminals Can Set 0 - 6 Level Brightness Value, It Can Realize No Time Display Mode When The Terminal Is Offline. Xxiii. Support Broadcast, Intercom, Real-time Acquisition, Terminal Monitoring ,and Recording. Xxiv. Support Remote On-demand Operation By Remote Controller. Xxv. Support Terminal Audio Acquisition And Broadcast Function. Xxvi. Support Local Audio Collection Function, The Local File Can Be Played To Any Designated Terminal. Xxvii. Support Scheduled Offline Ringing Function, Which Enables The Terminal To Perform Scheduled Ringing Tasks When The Network Is Disconnected Xxviii. Support Offline Downloading Of Ringing Tasks; Xxix. Support To Clear The Offline Tasks On The Terminals. Xxx. Support The Telephone Broadcasting Function, Realize The Function That The Telephone Initiates All Zone Broadcasting Or Part Of The Zones Or Single Zone Broadcasting. Xxxi. Support Remote Firmware Upgrade To The Terminal, No Need To Upgrade Locally, Which Can Reduce The Maintenance Work. Xxxii. Support Background Skin Change Function, You Can Switch Skin Themes Freely According To Your Preference. Xxxiii. Support Terminal Details Exporting Function, Support To Export The Configuration Details Of The Current System Terminal By Table. Xxxiv. Support Batch Modification Of The Time Of Scheduled Tasks And Execution Terminal. Xxxv. Support Sdk Kits, Standard Mfc Dynamic Link Libraries, And Http Protocols To Achieve Integration With Third-party Platforms. Xxxvi. Support The Terminal To Self-define The Area Division, Realizing The Management Of The Terminal’s Real-time Status According To Different Zones. Xxxvii. The Log Records The System Operation Status And Records The System Operation And Terminal Working Status In Real-time. Each Paging, Call, And Broadcast Operation Is Recorded. Xxxviii. The System Is Compatible With Any Network Structure Such As Router, Switch, Bridge Gateway, Modem, Internet, 2g, 3g, And 4g. Xxxix. Windows Service Mode, Support Win7, Server2008, And Higher Systems. Xl. It Uses The Background System Service To Run, Which Is An Enterprise-level Standard Server Working Mode. The System Can Run Automatically When The System Is Turned On. It Has Higher Stability And Reliability Than The Software Running In The Foreground Of The Interface. B. One (1) Unit - Desktop Computer I. Processor: Intel I7 Or Amd Ryzen7 Processor (or Higher) Ii. Memory: 16 Gb Ddr4 Or Higher Iii. Form Factor: Tower Iv. Storage: At Least 500 Gb Ssd (or Higher) V. Graphics Processing Unit (gpu): 4gb Vram, Gddr5 (or Higher) Vi. Display: At Least 23.8” Hd Led Display (or Higher) Vii. Peripherals: Power Cords, Keyboard & Optical Mouse Viii. Chassis: Usb Ports, Audio Port, Mic Port, Power Switch, Reset Switch Ix. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) X. Operating System (os): Windows 11 Pro Or Higher Xi. Warranty: 1 Year Courier Or Carry-in C. One (1) Unit - 2kva Ups I. Must Have Capacity 2000va Ii. Must Support Input Rated Voltage 220vac~240vac 110vac~120vac Iii. Must Support Voltage Range 140vac~290vac 81vac~145vac Iv. Must Have A Rated Frequency Range Of 50hz Or 60hz V. Must Have Output Voltage 220/230/240 Vac 110/120 Vac Vi. Must Have Ac Voltage Regulation (batt. Mode) ±10% Vii. Must Have Frequency Range (batt. Mode) 50hz Or60hz±1hz Viii. Must Transfer Time 2-6ms Ix. Must Support Battery Type & Number 12 V/9 Ah X 2 X. Must Charging Voltage 27.4v±1% Xi. Must Have Indicators: Battery Mode Green Lighting, Ac Mode Green Lighting Xii. Must Have Alarm: Battery Mode Sounding Every 10 Seconds Xiii. Must Have A Low Battery Sounding Every Second Xiv. Must Have Overload Sounding Every 0.5 Second Xv. Must Have Fault Continuously Sounding Xvi. Must Have Protection: Full Protection Overload, Discharge, And Overcharge Protection Xvii. Must Operating Temperature 0°c ~ +40°c (+32°f ~ +104°f) Xviii. Must Operating Humidity 0~90% Rh(non-condensing) D. Two (2) Units - Desktop Intercom Paging Microphone I. With Desktop Design, It’s Built-in 7-inch Resistance Touch Screen By 800 × 480 Dot Matrix K600 + Kernel 65k Color, To Fulfill Clear Display And Sensitive Touch. Ii. With Numeric And Function Keys Interface. Iii. Support Paging To Single Or Multiple Zones, All Zones. Support Direct Paging Or Intercom With Terminal, Support Environmental Monitoring To Any Terminal, With Distance Up To 5 Meters. Iv. With Embedded Computer Technology And Dsp Audio Processing Technology, High-speed Industrial-grade Chips. V. Built-in 1 Channel Network Hardware Audio Decoding Module That Supports Tcp / Ip, Udp, Igmp (multicast) Protocol To Achieve 16-bit Stereo Cd Quality Network Audio Signal Transmission. Vi. It Is Compatible With Routers, Switches, Bridges, Gateways, Modem, Internet, 2g, 3g, 4g, Multicast, Unicast, And Other Arbitrary Network Structures. Vii. Support Full-duplex Two-way Intercom Function, Built-in Network Echo Cancellation Module. Viii. Support Two-way Intercom Between The Terminals, With A Network Delay Of Less Than 100ms, And Suppress The Network Echo Howling Completely. Ix. Support Hints Of Asking For Help Signal Ringing And Flashing Lights, One Key To Accept The Call, Intercom, Hands-free Calls And Receive Broadcast, To Achieve Quick Links. X. Support Multiple Paging Modes, Including Paging Waiting, Paging Forwarding, And Answer Reminding. Xi. Support For Answering Automatically, Manual Answering, And Support For Custom Answer Tone. Xii. Support The User-defined Setting Of Time For Call Forwarding, No Answer, And Call Waiting. Xiii. Built-in 2w Full-frequency Hi-fi Speaker, To Fulfill Two-way Conversation And Network Monitoring. Xiv. One Φ3.5 Headphone Jack And One Φ3.5 Mic Input Socket, Matching 95% Headphones And A Portable Microphone In The Market. Xv. With One Line Output For External Amplifier Expansion, And One Line Input For More Audio Source Transmission. Xvi. One-way Alarm Output For Short Circuit Trigger Can Be Cascaded With An External Alarm Device Or Access Control; One-way Short Circuit Input Can Be Used To Trigger Preset Voice Prompts (or Alarm) And Also Can Be Used To Control The Access Control To Linkage With Input Short-circuit Signal. Xvii. The Digital Products Are More Convenient For Extension, With No Limit By The Geographical Position, No Need To Increase Management Equipment In The Control Center, Sharing Network To Save Cabling And Simple Installation. Xviii. It Supports Remote Updating To The Hardware Terminal, With No Need To Upgrade Locally, To Reduce Maintenance Work And Make Simpler Operation. Xix. With 10 Buttons, Supports Customized One-button Paging And One-button Broadcasting. E. Twenty (20) Units - Wall Mount Speakers 30w I. The Equipment Is Designed With Embedded Computer Technology And Dsp Audio Processing Technology. Ii. Built-in 1-channel Network Hardware Audio Decoding Module, Supports Tcp/ip, Udp Protocol, Realizes The Network Transmission Of 16-bit Cd Audio Signal. Iii. Supporting Poe (ieee 802.3af) Power Supply Mode, Only One Network Cable Is Needed To Connect To The Poe Switch, So The Operation Is Simple And Convenient. Iv. Equipped With A Dc 24v Standby Power Interface, It Is Suitable For Power Supply When Power Demand Is Greater Than 10w Or For Non-poe Networks. V. Digital Power Amplifiers With Intelligent Gain Adjustment, Adaptive Power Supply, And Automatic Power Adjustment Are Always In The State Of Performance Optimization And Efficiency Maximization. Vi. Full-band, High-sensitivity Amplifier Unit With Abundant Power And High Fidelity. Vii. Compatible With Any Network Architecture Such As Router, Switch, Bridge Gateway, Modem, Internet, 2g, 3g, And 4g. Viii. Supporting The Broadcasting System To Upgrade The Terminal Firmware Remotely, Without Upgrading To The Terminal Locally, So As To Reduce The Work Intensity Of Maintenance. F. Forty-six (46) Units - Outdoor Column Speaker 20w I. Outdoor Waterproof Column Speaker, Streamlined Design. Ii. The Shell Is Made Of One-piece Thickened Aluminum Alloy, Which Can Effectively Reduce The Resonance Of The Cabinet When The Sound Pressure Is High, And The Surface Adopts Outdoor Powder Spraying To Prolong The Service Life. Iii. The Mesh Cover Is Made Of Aluminum Alloy, One-piece Stamping, And Covered With A High Acoustic Sponge, Further Improving The Waterproof Performance And Increasing The Service Life. Iv. Using Six 2.5-inch Full-range Speaker Units, Bearing High Power, Low Distortion, And Excellent Vocal Performance. V. Built-in High-performance 100v Audio Transformer, Which Can Reduce The Loss In The Circuit Due To Impedance. Vi. Using High-quality Wires, It Can Be Used At Full Load For A Long Time, With Good Anti-scald And Conductivity Capabilities. Vii. L-shaped Bracket Design, Convenient And Flexible Adjustment Scheduling, User-friendly Operation, And Installation Debugging. 3. One (1) Lot - Roughing-in Materials 4. One (1) Lot - Scope Of Works I. Device Installation And Termination Ii. Cable Testing And Tracing Iii. Technical Configuration, Testing, Commissioning, System Configuration, Training, System Design, And System Management. 5. One (1) Service - Network Design, Consultation (signed By Pece) And Permits 6. One (1) Service - Project Management Services 7. One (1) Service - Switch & Access Point Installation 8. One (1) Service - Network Configuration Services 9. One (1) Service - Training And Knowledge Transfer 10. One (1) Service - Scaling And Optimization (testing And Analysis By Fluke Systems) 11. One (1) Service - Temporary Facility (temfacil), Field Office 12. One (1) Service - Mobilization Cost 13. One (1) Service - Forwarding Cost 14. Two (2) Years - Warranty E.24 E-library Infrastructure 1. Twenty (20) Units – Desktop Computers A. Processor: Intel I5 Or Amd Ryzen 5 Processor (or Higher) B. Memory: 8 Gb Ddr4 Or Higher C. Form Factor: Tower D. Storage: At Least 500 Gb Ssd (or Higher) E. Graphics Processing Unit (gpu): 4g Gddr5 (or Higher) F. Display: At Least 23.8” Hd Led Display (or Higher) G. Peripherals: Power Cords, Keyboard & Optical Mouse H. Chassis: Usb Ports, Audio Port, Mic Port, Power Switch, Reset Switch I. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) J. Operating System (os): Windows 11 Or Higher K. Warranty: 1 Year Courier Or Carry-in L. Must Have 650va Ups 2. Twenty (20) Units – Desktop Computers Headphones A. Audio Specifications Must Have, Frequency Response: 20 Hz To 20,000 Hz (standard Range For Human Hearing), Impedance: 32 Ohms (standard For Most Headsets; Higher Impedance May Be Better For High-end Audio), Sensitivity: 90-120 Db (decibels) At 1 Mw For Sound Level, Driver Size: 30-50 Mm (larger Drivers Often Provide A Better Bass Response), Sound Output: Stereo Or 7.1 Surround Sound (for Gaming And Multimedia), Total Harmonic Distortion (thd): Less Than 1% (minimizes Audio Distortion), Noise-canceling: Active (anc) Or Passive, B. Microphone Specifications Must Have, Type: Omnidirectional Or Unidirectional, Frequency Response: 100 Hz To 10,000 Hz, Sensitivity: -38 Db ± 3 Db, Noise Cancellation: Active Or Passive Noise-canceling Microphone, Mute Function: Usually Included For Easy On/off Control, C. Connectivity Wired: 3.5 Mm Audio Jack, Usb (type-a Or Type-c) D. Controls Volume Control: On-ear Cup Or Inline Volume Adjustment, Playback Control: Some Models Allow Pause/play/skip For Media. 3. One (1) Lot - Roughing-ins Materials 4. One (1) Service - Project Management Services 5. One (1) Service - User's Training & Knowledge Transfer 6. One (1) Service - User Training 7. One (1) Service - Manpower Cost 8. One (1) Service - Mobilization Cost 9. One (1) Service- Forwarding Cost 10. One (1) - Temporary Facility (temfacil) 11. One (1) Service - Desktop Installation/software Setup And Configuration 12. One (1) Year - Support Warranty E.25 E-classroom, E-room Infrastructure And Smart Led Solar Powered Light 1. Twenty (20) Units - Smart Tv A. Screen Size: 65” B. Resolutions: 3840x2160, Picture Quality: 4, Brightness Detection C. Ultimate Dimming, Contrast Enhancer, Adaptive Sound D. Multi-device Experience, Hdmi At Least Two (2) Port, Bluetooth E. Usb At Least One (1) Port, Wireless Lan Built-in, F. Power-supply: Ac100-240v~ 50/60hz 2. Eight (8) Unit – Smart Led Solar Powered Light I. Independent Distributed Power Supply System Ii. Solar Powered W/ Smart Sensors Iii. High Quality Lithium Battery Iv. Input Voltage Ac 110~220v (+/-10%) V. Pole-mounted Installation Vi. Mounting: Ground Structured Support For Outdoor Smart Led Solar Powered Light 3. Eleven (11) Units - Interactive Smart Board A. Screen Size: 75” Or Higher I. Must Have Built-in System 1. Cpu Frequency 2.2 Ghz + 2.0 Ghz 2. Gpu Arm Mali-g52 Mp8 (8ee) 3. Operating System Android 11.0 4. Cpu Quad-core A73 + Quad-core A53 5. Ram 12 Gb (system: 8 Gb, Camera: 4 Gb) 6. Rom 64 Gb Ii. Must Support The Following Function 1. Operating System Of External Module Windows 7/8/10;android 2. Wifi Dual-band 2.4 G/5 G; Supports 802.11 A/b/g/n/ac Wireless Frequency Range 3. Wi-fi Hotspot Dual-band 2.4 G/5 G; Supports Enabling Hotspot And Wi-fi At The Same Time Iii. Lcd Panel Must Have The Following Features 1. Response Time 8ms 2. Panel Dimensions 75-inch To 98-inch 3. Backlight Dled 4. Aspect Ratio 16:9 5. Lifespan At Least 50,000 H 6. Refresh Rate 60 Hz 7. Static Contrast Va: 4000 (typ.); Ips: 1200 (typ.) Iv. Must Have The Camera Features 1. Pixel At Least 48 Mp 2. Auto Control, Auto Flip; Auto White Balance 3. Max. Resolution 3840 × 2160@30 Fps 4. Storage 8 Gb Emmc 5. Face Detection: Yes V. Must Have Device Ports 1. Light Sensor 1 2. Front Button 1 × Power Button (right Side) 3. Front Ports 1 × Usb 3.0 (left Side) 4. Network Port 1 × Rj-45 5. Wi-fi 1 × Wi-fi; 1 × Hotspot Vi. Must Support The Following Power Features 1. Power Requirements: 100v-240v, 50-60 Hz 2. Power Consumption (normal): ≤430w 3. Power Consumption (standby): ≤0.5w 4. Usb 3 × Usb 3.0; 1 × Micro Usb 5. Rs-232 1 × Rs-232 6. Video Input 1 × Hdmi In 7. Video Output 1 × Hdmi Out 8. Audio Output 1 × 3.5 Mm (line Out) Port 9. Irda 1 10. Microphone 8 Array 11. Type-c Port 1 × Type-c Vii. Must Have The Following Touchscreen Features 1. Touch Technology Type Infrared Touch Technology 2. Response Time < 10 Ms 3. Touch Points Supports 20 Touch Points And Drawing Up To 20 Lines 4. Valid Touch 2 Mm 5. Touch Accuracy ± 1 Mm 6. Writing Mode Finger + Pen (attaches Magnetically) 7. Touch Resolution 32767 × 32767 8. Number Of Multi-user Writing Points 10 Viii. Must Have The Following Speaker Features 1. Frequency 150 Hz–20 Khz 2. Power 15 W × 3 (max.) 3. Built-in Speaker 3 Ix. Must Have Fingerprint Features 1. Fingerprint Capacity 100 2. Fingerprint Resolution 160 × 160 3. Far 0.001% X. Microphone Must Have The Following Features 1. Pick-up Distance Far-field Sound Pickup: 6 M–8 M (19.69 Ft–26.25 Ft) 2. Number Of Microphones 8 3. Agc: Yes 4. Echo Cancellation: Yes 5. Polar Pattern: Omnidirectional 6. Intelligent Noise Filtering: Yes Xi. Must Have The Following Features 1. Power Supply 100–240 Vac, 50/60 Hz 2. Product Material Metal Casing 3. Protective Glass Anti-dazzle Tempered Glass With A Hardness Of 7 On The Mohs Scale 4. Installation - Wall Mount; Mobile Bracket 5. Standby Power Consumption ≤ 0.5 W 6. Energy Star (except 98-inch Model); Cb; Ce 4. Eleven (11) Units - Ups A. Must Have Capacity 1500va/900w B. Must Support Input Rated Voltage 220vac~240vac 110vac~120vac C. Must Support Voltage Range 140vac~290vac 81vac~145vac D. Must Have A Rated Frequency Range Of 50hz Or 60hz E. Must Have Output Voltage 220/230/240 Vac 110/120 Vac F. Must Have Ac Voltage Regulation (batt. Mode) ±10% G. Must Have Frequency Range (batt. Mode) 50hz Or60hz±1hz H. Must Transfer Time 2-6ms I. Must Support Battery Type & Number 12 V/9 Ah X 2 J. Must Charging Voltage 27.4v±1% K. Must Have Alarm: Battery Mode Sounding, Low Battery Sounding, Overload Sounding, And Fault Continuously Sounding L. Must Have Protection: Full Protection Overload, Discharge, And Overcharge Protection M. Must Operating Temperature 0°c ~ +40°c (+32°f ~ +104°f) 5. Biometric And Door Access With Connectivity (restricted Rooms And Offices Only) A. Eighty-six (86) Units - Fingerprint And Card Reader I. Must Have Rs-485 Protocol1 Ii. Must Support Mifare 13.56 Mhz Card Or Fingerprint Iii. Must Store Up To 3,000 Fingerprints Iv. Must Have Watchdog Function For Tamper Detection V. Must Have Audible And Visual Indicators Vi. Must Support Surface-mount Installation Vii. Must Support Unlock Mode Ic Card, Fingerprint, Combination Viii. Must Have Card Reader Format 13.56 Mhz Mifare Ix. Must Have Response Time 0.1s B. Eighty-six (86) Units - Access Controller I. Must Have Tcp/ip Communication. Ii. Must Support Communication Protocols Rs-485 And Wiegand. Iii. Must Support Storing 100,000 User And 500,000 Card-swiping Records. Iv. Must Support Multi-door Interlock, Multi-user Unlock, Aand Nti-passback. V. Must Support Remote Unlock. Vi. Must Support Reader Tamper Alarm, Intrusion Alarm, Unlocking Timeout Vii. Must Have An Alarm, Duress Alarm, Invalid Card Exceeding Threshold Alarm, And Incorrect Password Alarm. Viii. Must Support Built-in Rtc, Manual Time Fixing, And Automatic Time Fixing. Ix. Must Support Online Upgrades. X. Must Support A Watchdog Mechanism To Ensure The Operation Stability. C. Eighty-six (86) Units - Ups I. Must Have Capacity 1500va/900w Ii. Must Support Input Rated Voltage 220vac~240vac 110vac~120vac Iii. Must Support Voltage Range 140vac~290vac 81vac~145vac Iv. Must Have A Rated Frequency Range Of 50hz Or 60hz V. Must Have Output Voltage 220/230/240 Vac 110/120 Vac Vi. Must Have Ac Voltage Regulation (batt. Mode) ±10% Vii. Must Have Frequency Range (batt. Mode) 50hz Or60hz±1hz Viii. Must Transfer Time 2-6ms Ix. Must Support Battery Type & Number 12 V/9 Ah X 2 X. Must Charging Voltage 27.4v±1% Xi. Must Have Alarm: Battery Mode Sounding, Low Battery Sounding, Overload Sounding, And Fault Continuously Sounding Xii. Must Have Protection: Full Protection Overload, Discharge And Overcharge Protection Xiii. Must Operating Temperature 0°c ~ +40°c (+32°f ~ +104°f) D. Ninety-eight (98) Units - Electromagnetic Lock I. The Casing Must Made Of Aluminum Alloy Ii. Must Have The Following Functions: Signal Output Com/no/nc, Door Status Detection 1, Relay Iii. Must Have Tension Up To 280 Kg (617.29 Lb), Tensile Force Iv. Must Have Anti-corrosion Level Basic Protection E. Ninety-eight (98) Units - Bracket For Door I. Must Support Up To 280kg Magnetic Lock Ii. Must The Material: High Strength Aluminum Alloy Iii. Must Support Door Type: Wooden, Metal, Fire Door Iv. Must Support Open Way: 90°/180° F. Eight (8) Units - Card Enrollment Reader I. Must Be Equipped With The 32-bit High-speed Processor Ii. Must Have A Built-in Audible Beeper Iii. Must Support Read Format 13.56mhz 125khz Iv. Must Have Read Range 3cm-5cm (max.) V. Must Have Communication Interface Usb To Pc Vi. Must Have Power Supply 5v Dc/100ma Vii. Must Have Ce And Fcc Certificates G. Five Hundred (500) Pcs - Laminated Integrated Circuit (ic) Card I. Must Have Read/write Function Ii. Must Be Made Of Pvc Material Iii. Must Support Standard: Mifare S50, 13.56 Mhz Iv. Must Have Range: Approximately 10 Cm (3.94 In.) H. Accessories I. Eighty-six (86) Units - Infrared Exit Button 1. Must Have Plastic Or Stainless Steel Case 2. Must Support Working Temperature Is -30°c~+60°c Ii. Eighty-six (86) Units - Emergency Break Glass Button 1. Must Have Nc/no/com Ports 2. Must Support Working Temperature Is -20°c~+55°c I. One (1) Lot - Software Note: Stand-alone 1. Must Have Video Surveillance, Access Control, And Various Attendance Functions. 2. Must Built To Be Versatile, Provide Direct Access To The Web Client, And Feature P2p Linking, Real-time Monitoring, Video Playback, Event Center, Access Control And Attendance, 3. Must Have A Monitoring Screen That Can Be Viewed In Real-time On The Platform. Can Also View Snapshots Taken Of The Monitoring Screen, And Play Video Recordings. 4. Built To Work With Access Control Devices, It Can Be Used To Remotely Open And Close Doors, Access Videos From Cameras, And Remotely Configure Alarm Settings. 5. Works Together With Attendance Devices To Allow You To Manage Shifts, Handle Errors, Configure Settings For Business Trips And Leave Of Absence, And Generate Statistics On Attendance. 6. Access Control: Device Type Face Recognition Access Terminal (asi), Access Controller, (asc), Time & Attendance Terminal (asa), Number Of People 1000, Time Template 128, Time Period Up To 4, Holiday Plan Up To 16, Anti-passback Group Max. 2, First Card Unlock Record Max. 64, Multi Card Unlock Record Max. 64, Inter-door Lock Record Max. 64, Real-time Event Display Max. 100 J. One (1) Unit - Desktop Computer 1. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) 2. Memory: 16 Gb Ddr4 Or Higher 3. Form Factor: Tower 4. Storage: At Least 500 Gb Ssd (or Higher) 5. Graphics Processing Unit (gpu): 4g Gddr5 (or Higher) 6. Display: At Least 23.8” Hd Led Display (or Higher) 7. Peripherals: Power Cords, Keyboard & Optical Mouse 8. Chassis: Usb Ports, Audio Port, Mic Port, Power Switch, Reset Switch 9. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) 10. Operating System (os): Windows 11 Pro Or Higher 11. Warranty: 1 Year Courier Or Carry-in 12. Must Have 1*1500va Ups 6. Thirty (30) Units - Biometric For Employees With Connectivity For Time-in And Timeout A. Thirty (30) Units - Biometric - Time & Attendance I. Must Support Up To 1.500 Fingerprints, Up To 100.000 Record,s And Up To 2.000 Cards (optional). Ii. Must Support Multi-languages. Iii. Must Have Communication: Tcp/ip, Usb-host, Wi-fi (optional). Iv. Must Have High Verification Speed. V. Must Have Professional Firmware And Platform. B. One (1) Lot - Management Software Note: Included In Hris And Payroll Management System C. One (1) Unit - Desktop Computer I. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) Ii. Memory: 16 Gb Ddr4 Or Higher Iii. Form Factor: Tower Iv. Storage: At Least 500 Gb Ssd (or Higher) V. Graphics Processing Unit (gpu): 4g Gddr5 (or Higher) Vi. Display: At Least 23.8” Hd Led Display (or Higher) Vii. Peripherals: Power Cords, Keyboard & Optical Mouse Viii. Chassis: Usb Ports, Audio Port, Mic Port, Power Switch, Reset Switch Ix. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) X. Operating System (os): Windows 11 Or Higher Xi. Warranty: 1 Year Courier Or Carry-in Xii. Must Have 1*650va Ups 7. One (1) Site - Electrical Works Temporary Facility (temfacil) 8. One (1) Site - Structured Cabling (including External Cabling) / Roughing - In 9. One (1) Service - Smart Tv Installation 10. One (1) Service - Smartboard Installation, Setup, And Configuration 11. One (1) Site - Installation Components (biometric Installation, Setup, And Configuration) 12. One (1) Service - Project Management Services 13. One (1) Service - User's Training & Knowledge Transfer 14. One (1) Service - Manpower Cost 15. One (1) Service Mobilization Cost 16. One (1) Service - Forwarding Cost 17. One (1) Year - Extended Support Warranty E.26 Software And Network Laboratories 1. Twenty (20) Units - Desktop Computers A. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) B. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) C. Operating System (os): Windows 11 Or Higher D. Memory: 16 Gb (or Higher) E. Storage: 500 Gb Ssd (or Higher) F. Display: 14” Display G. Graphic Card: Integrated Graphics H. Camera: 1080p Fhd Ir/rgb Hybrid I. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above J. Ethernet Port Or Usb K. Power Cord: At Least 45w L. Warranty: 1 Year Courier Or Carry-in 2. Four (4) Units - Interactive Smart Tv ( 65") A. Screen Size: 65” B. Resolutions: 3840x2160 C. Picture Quality: 4 D. Brightness Detection E. Ultimate Dimming F. Contrast Enhancer G. Adaptive Sound H. Multi-device Experience I. Hdmi At Least Two (2) Port J. Usb At Least One (1) Port K. Wireless Lan Built-in L. Bluetooth M. Power-supply: Ac100-240v~ 50/60hz 3. One (1) Unit - Interactive Smart Board A. Screen Size: 75” Or Higher I. Must Have Built-in System 1. Cpu Frequency 2.2 Ghz + 2.0 Ghz 2. Gpu Arm Mali-g52 Mp8 (8ee) 3. Operating System Android 11.0 4. Cpu Quad-core A73 + Quad-core A53 5. Ram 12 Gb (system: 8 Gb, Camera: 4 Gb) 6. Rom 64 Gb Ii. Must Support The Following Function 1. Operating System Of External Module Windows 7/8/10;android 2. Wifi Dual-band 2.4 G/5 G; Supports 802.11 A/b/g/n/ac Wireless Frequency Range 3. Wi-fi Hotspot Dual-band 2.4 G/5 G; Supports Enabling Hotspot And Wi-fi At The Same Time Iii. Lcd Panels Must Have The Following Features 1. Response Time 8ms 2. Panel Dimensions 75-inch To 98-inch 3. Backlight Dled 4. Aspect Ratio 16:9 5. Lifespan At Least 50,000 H 6. Refresh Rate 60 Hz 7. Static Contrast Va: 4000 (typ.); Ips: 1200 (typ.) Iv. Must Have The Camera Features 1. Pixel At Least 48 Mp 2. Auto Control, Auto Flip; Auto White Balance 3. Max. Resolution 3840 × 2160@30 Fps 4. Storage 8 Gb Emmc 5. Face Detection: Yes V. Must Have Device Ports 1. Light Sensor 1 2. Front Button 1 × Power Button (right Side) 3. Front Ports 1 × Usb 3.0 (left Side) 4. Network Port 1 × Rj-45 5. Wi-fi 1 × Wi-fi; 1 × Hotspot Vi. Must Support The Following Power Features 1. Power Requirements: 100v-240v, 50-60 Hz 2. Power Consumption (normal): ≤430w 3. Power Consumption (standby): ≤0.5w 4. Usb 3 × Usb 3.0; 1 × Micro Usb 5. Rs-232 1 × Rs-232 6. Video Input 1 × Hdmi In 7. Video Output 1 × Hdmi Out 8. Audio Output 1 × 3.5 Mm (line Out) Port 9. Irda 1 10. Microphone 8 Array 11. Type-c Port 1 × Type-c Vii. Must Have The Following Touchscreen Features 1. Touch Technology Type Infrared Touch Technology 2. Response Time < 10 Ms 3. Touch Points Supports 20 Touch Points And Drawing Up To 20 Lines 4. Valid Touch 2 Mm 5. Touch Accuracy ± 1 Mm 6. Writing Mode Finger + Pen (attaches Magnetically) 7. Touch Resolution 32767 × 32767 8. Number Of Multi-user Writing Points 10 Viii. Must Have The Following Speaker Features 1. Frequency 150 Hz–20 Khz 2. Power 15 W × 3 (max.) 3. Built-in Speaker 3 Ix. Must Have Fingerprint Features 1. Fingerprint Capacity 100 2. Fingerprint Resolution 160 × 160 3. Far 0.001% X. Microphone Must Have The Following Features 1. Pick-up Distance Far-field Sound Pickup: 6 M–8 M (19.69 Ft–26.25 Ft) 2. Number Of Microphones 8 3. Agc: Yes 4. Echo Cancellation: Yes 5. Polar Pattern: Omnidirectional 6. Intelligent Noise Filtering: Yes Xi. Must Have The Following Features 1. Power Supply 100–240 Vac, 50/60 Hz 2. Product Material Metal Casing 3. Protective Glass Anti-dazzle Tempered Glass With A Hardness Of 7 On The Mohs Scale 4. Installation - Wall Mount; Mobile Bracket 5. Standby Power Consumption ≤ 0.5 W 6. Energy Star (except 98-inch Model); Cb; Ce B. Ops I5 8+256 Win 10 C. Screen Sharingdongle 4. One (1) Unit - 1500va/900w Line-interactive Ups 5. One (1) Lot - Roughing-ins Materials 6. One (1) Service - Project Management 7. One (1) Service - Temporary Facility (temfacil) For 30 Days 8. One (1) Service - Smart Board Installation, Set Up, And Configuration 9. One (1) Service - Training And Knowledge Transfer 10. One (1) Service - Smart Tv Installation 11. One (1) Service - Desktop Installation/software Setup And Configuration 12. One (1) Service - Manpower Cost 13. One (1) Service - Mobilization Cost, Demobilization 14. One (1) Service - Forwarding Cost 15. One (1) Service - Cabling Works 16. One (1) Lot - Structured Cabling (including External Cabling) 17. One (1) Year - Support Warranty E.27 Smart Function Hall 1. Smart Function Hall (audio System) A. Six (6) Units - Active Speakers I. Power: 1300w Peak, 650w Rms Ii. Lf Driver: 12" Ferrite Woofer Iii. Hf Driver: 1" Neodymium Tweeter Iv. Frequency Range: 50hz - 20khz V. Maximum Spl: 127db Vi. Mounting Options: Suspension Points, Pole Socket, Universal Yoke Mount B. One (1) Unit - Digital Mixer With Ipad Controller I. Channels: 32 Input, 40 Mix Channels Ii. Inputs: 8 X Xlr, 8 X Xlr-1/4" Combo, 1 X Dual Rca Stereo Iii. Outputs: 2 X Xlr, 1 X Xlr (mono Sum), 6 X Xlr (mix Out) Iv. Effects: Flex Fx Multi-effects Processor, 4 Effects Slots V. Control: Touch-sensitive Motorized Faders, Daw Control C. One (1) Set - Control Room Monitor Speakers I. Driver: 6.5" Composite Cone Lf, 1.25" Silk Tweeter Hf Ii. Power: 130w Rms Iii. Frequency Response: 42hz - 20khz Iv. Maximum Spl: 104db D. Two (2) Units - Wireless Microphones With Stands I. Frequency Response: 50hz - 20khz Ii. Operating Range: 300 Ft Line-of-sight Iii. Battery Life: Up To 14 Hours E. Four (4) Units - Wired Microphones With Stands I. Frequency Response: 50hz - 15khz Ii. Max Spl: 94db Spl F. One (1) Unit - Rack Mount Server I. Cpu: Intel I7 12th Gen Ii. Ram: 32gb Iii. Storage: 1tb Sata, 500gb Ssd Iv. Graphics Cards: 4 G. One (1) Unit - Ptz Camera Ai Auto Tracking I. Resolution: Uhd 4k, 1080p Signal Format Ii. Zoom: 30x Optical, 16x Digital Iii. Connectivity: Ethernet, Hdmi, 3g-sdi H. One (1) Unit - Ptz Camera Controller With Lcd Screen I. Control: Ndi, Ip, And Serial Control Ii. Protocols: Visca, Pelco-p & D Iii. Compatibility: Sony, Newtek Iv. Display: Lcd Screen For Real-time Status I. One (1) Lot - Cabling And Installation Smart Function Hall 2. Smart Function Hall (indoor Video Wall) A. One (1) Lot - Led Panel I. Must Have 4.2x2.025m P0.9375 Indoor Led Screen Ii. Led Lamp Parameter: Color Configuration: Rgb 3in1, Color: Red, Green, Blue, Luminance: 990-1210 Mcd, 1980-2420 Mcd, 495-605 Mcd, Viewing Angle: 160º/160º, Wavelength: 625-630 Nm, 520-525 Nm, 465-470 Nm Iii. Must Have Led Module Parameter: Pixel Pitch(mm) 0.9375, Iv. Pixel Configuration Cob, Module Size(mm) W 300 H 168.75, Module Resolution(dots) W 320 H 180, Drive Ic Icn1069 V. Must Have Led Cabinet Parameter: Cabinet Size (mm) W 600 H 337.5, Cabinet Resolution (dots) W 640 H 360, Cabinet Pixels (dots) 230400, Cabinet Material Die Casting Aluminum, Cabinet Weight (kg) 4.8 Vi. Must Have Led Screen Parameter: Screen Size(m)w 4.2 W 2.025 H, Screen Resolution(dots)w 4480 W 2160 H, Cabinet Quantity(pc)w 7 W 6 H, Pixel Density(pixel/m2) 1137778, Brightness(cd/m2) 600, Brightness Adjusted 256 Grade By Software Or By Auto-optic Induced, Driving Method 1/46 Scan Display Color 439, 804, 651, 110, Viewing Distance (m) ≥0.9375m, View Angle Horizontal 160°; Vertical 160° Color Contrast Ratio 5000:1, Gray Grade 16bit, Refresh Frequency (hz) 3840, Protective Grade Ip43, Working Temperature(ºc) -30~+70, Stored Temperature (ºc) -40~+80, Operation Humidity(rh) 0-95%, Lifetime 100,000 Hrs Maintenance Front Side Working Voltage Ac110 / Ac220v±10% 47~63hz, Power Consumption Max: 800w/㎡ ; Ave:310w/㎡" B. One (1) Lot - Controller I. Must Have Three Kinds Of Led 4k Sending Cards: (1) − H_20xrj45 Sending Card Loads Up To 13,000,000 Pixels, (2) − H_16xrj45+2xfiber Sending Card Loads Up To 10,400,000 Pixels And Provides Two Opt Ports That Copy The Outputs On Ethernet Ports, (3) − H_4xfiber Sending Card Loads Up To 20,800,000 Pixels And Supports Three Working Modes, Including Independent, Copy And Backup. The Three Cards Mentioned Above Cannot Be Used Together To Load The Same Screen. Ii. Must Have Multi-capacity Configuration On A Single Card Slot: − 4x 2k×1k@60hz, − 2x 4k×1k@60hz, − 1x 4k×2k@60hz Iii. Must Have A Simple Screen Configuration Using A Single Card And Connector Iv. Must Have Online Status Monitoring Of All Input And Output Cards V. Must Have Hot-swappable Input And Output Cards Vi. Must Have An H_2xrj45 Ip Input Card That Supports Up To 512 Ip Camera Inputs And Input Mosaic. Vii. Must Have Auto Decryption Of Hdcp-encrypted Sources Viii. Must Have Decimal Frame Rates Supported Ix. Must Have Hdr10 And Hlg Processing X. Each Screen Can Have Its Own Output Resolution. Xi. Must-have Output Mosaic: Adopts The Frame Synchronization Technology, Which Ensures All The Output Connectors Output The Image Synchronously, And The Image Is Complete And Played Smoothly, Without Any Stuck, Frame Loss, Tearing, Or Piercing. Xii. Must Support Irregular Screen Configuration: Supports Irregular Rectangle Mosaic Without Any Limitations. Xiii. Must Have Input Source Grouping Management Xiv. Must Have Eye-saver Mode: Display The Image In A Warmer But Less Bright Way To Relieve Eye Strain. Xv. Lcd Bezel Compensation Xvi. Must Have Multi-layer Display: A Single Card Supports 16x 2k Layers, 8x Dl, Layers, Or 4x 4k Layers. All Layers Support Cross-connector Output And The Layer Quantity Is Not Reduced For Cross-connector Output. Xvii. Must Have High-definition Scrolling Text, Customize The Scrolling Text Content, Such As Slogans Or Notification Messages, And Set The Text Style, Scrolling Direction, And Speed. Xviii. Must Support Up To 2,000 Presets: Fade Effect And Seamless Switching Supported, Less Than 60ms Preset Switching Duration Xix. Must Have Scheduled Playback Of Preset Playlist, Set Whether To Add The Presets To Playlist, Which Is Ideal For Monitoring, Exhibitions, Presentations, And Other Applications. Xx. Must Have Osd Settings On A Single Screen And Adjustable, Osd Transparency Xxi. Must Have Bkg Settings, Bkg Images Do Not Occupy The Layer Resources. The Max Width And Height Of A Bkg Image Are Up To 15k And 8k Respectively. Xxii. Must Have Channel Logo Management: Set A Text Or Image Logo For Identifying The Input Source. Xxiii. Must Have Input Source Cropping And Renaming After Cropping, Crop Any Input Source Image And Form A New Input Source After Cropping. Xxiv. Must Have Hdr And 10-bit Video Processing, Allowing For A More Exquisite And Clear Image. Xxv. Must Have Color Adjustment: Output Connector Color And Screen Color Adjustable, Including Brightness, Contrast, Saturation, Hue, And Gamma. Xxvi. Must Have Xr Scenario Control Xxvii. Must Have Low Latency: Reduce The Latency From The Input Source To The Receiving Card To As Low As 1 Frame. Xxviii. Must Have Web Control: Real-time Response And 1000m/100m Self-adaptive Network Control, Allowing For Multi-user Collaboration. Xxix. Must Have Monitoring Of Inputs And Outputs On A Web Page Xxx. Must Support Firmware Updates On A Web Page Xxxi. Must Have Ark Visualized Management And Control Platform App Control On Pad Device. Xxxii. Must Have Self-test For Fault Detection Xxxiii. Must Have Auto-monitoring And Alarms: Supports Hardware Monitoring, Such As Fan Rotation Speed, Module Temperature And Voltage, And Running Status, And Sends Fault Alarms If Necessary. Xxxiv. Must Support An Optional Power Supply For Higher System Reliability. Xxxv. Must Have Backup Design − Backup Between Devices − Backup Between Led 4k Sending Cards. C. Accessories I. One (1) Unit - Vacuum Suction Ii. One (1) Unit - Structure/bracket 4.2x2.025m Iii. Nine (9) Units - Hdmi Cable 8k 10 Meters Iv. Six (6) Units - 1500va/900w Line Interactive Ups D. Three (3) Units - Desktop Computer I. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) Ii. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) Iii. Operating System (os): Windows 11 Pro Or Higher Iv. Memory: 16 Gb (or Higher) V. Storage: 500 Gb Ssd (or Higher) Vi. Display: 14” Display Vii. Graphic Card: Integrated Graphics Viii. Camera: 1080p Fhd Ir/rgb Hybrid Ix. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above X. Ethernet Port Or Usb Xi. Power Cord: At Least 45w Xii. Warranty: 1 Year Courier Or Carry-in 3. One (1) Service - Project Management Services 4. One (1) Service - User Acceptance Testing (uat) 5. One (1) Service - User Training And Knowledge Transfer 6. One (1) Service - Manpower Cost 7. One (1) Service - Mobilization Cost 8. One (1) Service - Forwarding Cost 9. One (1) Year- Support Warranty E.28 Econference Room With Video Conferencing 1. Six (6) Units - Interactive Smart Board A. Screen Size: 75” Or Higher I. Must Have Built-in System 1. Cpu Frequency 2.2 Ghz + 2.0 Ghz 2. Gpu Arm Mali-g52 Mp8 (8ee) 3. Operating System Android 11.0 4. Cpu Quad-core A73 + Quad-core A53 5. Ram 12 Gb (system: 8 Gb, Camera: 4 Gb) 6. Rom 64 Gb Ii. Must Support The Following Function 1. Operating System Of External Module Windows 7/8/10; Android 2. Wifi Dual-band 2.4 G/5 G; Supports 802.11 A/b/g/n/ac Wireless Frequency Range 3. Wi-fi Hotspot Dual-band 2.4 G/5 G; Supports Enabling Hotspot And Wi-fi At The Same Time Iii. Lcd Panels Must Have The Following Features 1. Response Time 8ms 2. Panel Dimensions 75-inch To 98-inch 3. Backlight Dled 4. Aspect Ratio 16:9 5. Lifespan At Least 50,000 H 6. Refresh Rate 60 Hz 7. Static Contrast Va: 4000 (typ.); Ips: 1200 (typ.) Iv. Must Have The Camera Features 1. Pixel At Least 48 Mp 2. Auto Control, Auto Flip; Auto White Balance 3. Max. Resolution 3840 × 2160@30 Fps 4. Storage 8 Gb Emmc 5. Face Detection: Yes V. Must Have Device Ports 1. Light Sensor 1 2. Front Button 1 × Power Button (right Side) 3. Front Ports 1 × Usb 3.0 (left Side) 4. Network Port 1 × Rj-45 5. Wi-fi 1 × Wi-fi; 1 × Hotspot Vi. Must Support The Following Power Features 1. Power Requirements: 100v-240v, 50-60 Hz 2. Power Consumption (normal): ≤430w 3. Power Consumption (standby): ≤0.5w 4. Usb 3 × Usb 3.0; 1 × Micro Usb 5. Rs-232 1 × Rs-232 6. Video Input 1 × Hdmi In 7. Video Output 1 × Hdmi Out 8. Audio Output 1 × 3.5 Mm (line Out) Port 9. Irda 1 10. Microphone 8 Array 11. Type-c Port 1 × Type-c Vii. Must Have The Following Touchscreen Features 1. Touch Technology Type Infrared Touch Technology 2. Response Time < 10 Ms 3. Touch Points Supports 20 Touch Points And Drawing Up To 20 Lines 4. Valid Touch 2 Mm 5. Touch Accuracy ± 1 Mm 6. Writing Mode Finger + Pen (attaches Magnetically) 7. Touch Resolution 32767 × 32767 8. Number Of Multi-user Writing Points 10 Viii. Must Have The Following Speaker Features 1. Frequency 150 Hz–20 Khz 2. Power 15 W × 3 (max.) 3. Built-in Speaker 3 Ix. Must Have Fingerprint Features 1. Fingerprint Capacity 100 2. Fingerprint Resolution 160 × 160 3. Far 0.001% X. Microphone Must Have The Following Features 1. Pick-up Distance Far-field Sound Pickup: 6 M–8 M (19.69 Ft–26.25 Ft) 2. Number Of Microphones 8 3. Agc: Yes 4. Echo Cancellation: Yes 5. Polar Pattern: Omnidirectional 6. Intelligent Noise Filtering: Yes Xi. Must Have The Following Features 1. Power Supply 100–240 Vac, 50/60 Hz 2. Product Material Metal Casing 3. Protective Glass Anti-dazzle Tempered Glass With A Hardness Of 7 On The Mohs Scale 4. Installation - Wall Mount; Mobile Bracket 5. Standby Power Consumption ≤ 0.5 W 6. Energy Star (except 98-inch Model); Cb; Ce B. Ops I5 8+256 Win 10 C. Screen Sharingdongle’ D. Must Have 6*1500va/900w Line-interactive Ups 2. Four (4) Lots - Microphones, Speakers And Accessories A. Four (4) Units - Full Digital Conference System Controller I. Microphone Capacity: Wired Microphone≤4096: Wireless Microphone≤300 Ii. Simultaneous Interpretation Channel: 63+1 Channels Iii. Frequency Response: 80~16khz Iv. Main Power: 100-120vac / 200-240vac By Switch V. Audio Input: Linein1: 775mvrms Balanced; 2 Output Phoenix Terminals: 775mvrms Balanced; Linein2: 775mvrms Unbalanced Vi. Audio Output: Lineout1: 1vrms Balanced; 16 Multi-function Output Phoenix Terminals: 1vrms Balanced; Lineout2: 1vrms Unbalanced Vii. Output Load >1kω Viii. Extension Port 1 For Connecting Conference System Extension Equipment Ix. Pc Network Port: 1 For Connect To The Computer X. Delegates Output Interface: 4 For Connecting Conference Speaking Units Xi. Rs-232 Interface: 2 Channels, 1 Channel For Camera Tracking, 1 Channel For Docking External Equipment Xii. Rs-485 Interface: 1 For Camera Tracking Xiii. Wired Microphone Connection Method Special Cable (6 Pins) Xiv. Rack Mountable B. Four (4) Units - Audio Processor, Afc Feedback Suppression Function I. The Panel Is Designed With Afc Touch Keys And Working Indicators. Ii. Equipped With 2 Network Ports For Connecting Wireless Ap And Communicating With The Conference Server; Connect To The Digital Conference Server Through Network Protocol To Realize Audio Data Transmission. Iii. With Automated Functions, Including Gain Sharing Type Auto-mixing And Gate Type Auto-mixing. Iv. Support Afc Feedback Suppression Function, Adopt Dual Notch + Frequency Shift Method, Automatically Grab The Howling Point, And Set The Notch Frequency, The Notch Filter Supports 12 Fixed Points + 12 Dynamic Points To Effectively Eliminate The Howling Function. V. With Automatic Gain Function, It Can Effectively Keep The Microphone Volume Within A Certain Dynamic Range. Vi. With The Microphone Voice Activation Function, Set The Tracking Threshold, And The Camera Tracking Function Can Be Realized When The Microphone Speech Reaches The Threshold. Vii. Working With The Digital Conference Server, With The Auto-mixing Function, It Can Support Up To 16 Wired Microphones And 8 Wireless Microphones At The Same Time. Viii. With 1 Xlr Balanced Output And 1 Rca Unbalanced Output. Ix. With 1 Extension Interface, Used To Connect The Extension Port Of The Digital Conference Server. X. With 1rs-232 Communication Interface (camera Tracking), Connected To The Central Controller Or The Camera Tracking Controller To Realize The Speech Camera Tracking Function. Xi. With 1 Rs-485 Communication Interface, Used To Connect Cameras To Achieve Camera Tracking. Xii. With 1 Rs-232 Communication Interface (speech Transcription), Used To Connect A Speech Transcription Server To Realize The Function Of Speech Transcription. Xiii. Simultaneous Turned-on Microphone: 16 Wired Mics + 8 Wireless Mics Xiv. Main Power Supply: 100-240ac/50-60hz Xv. Audio Output: Line Out 1: 1v Xlr Balanced Output ; Line Out 2: 1v Rca Unbalanced Output Xvi. Output Load: >1kω Xvii. Connection Method: Rj45 Network Port Xviii. Rack Mountable C. Four (4) Units - 5g Wifi Full Digital Conference - Chairman Unit I. Adopt A 48khz Sampling Rate, Clear And Bright Sound. Ii. Using Advanced Processing Chip Architecture And A Unique Processing Algorithm, The Microphone Power-on Connection Time Only Takes 5 Seconds. Iii. Support Intelligent Detection Of Faults, Prompting Users Of Ap Faults, Host Communication Faults, And Low Signal Strength. Iv. Support Charging Through Type-c Port, Support 18w Fast Charging, With Smart Indicator Status. V. Support Setting Ssid Function Through Ui. Vi. Support Multi-language Switching, And Uniformly Set Through Pc Software. Vii. The Chairman Unit Has A Speech Timing Function. When The Timing Speech Function Is Turned On, The Chairman Unit Is Not Restricted. Viii. With A Voice Control Function, The Microphone Can Be Turned On Intelligently. Support Adjusting The Sensitivity Of The Voice Control And Setting The Closing Time Through The Software. Ix. Support Sign-in Function, Set And Initiate Through Pc Software. X. Support Conference Voting Function, Five-key Voting, Three-key Voting Function, Flexible And Convenient. Xi. Adopt 128-bit Aes Encryption Technology, Support Wpa/wpa2 Wireless Security Technology, Prevent Eavesdropping And Unauthorized Access, And Provide Higher Confidentiality Of The Conference System. Xii. Using Wireless Transmission Technology, It Only Takes Very Little Time For The Venue Layout To Carry Out Activities. Xiii. The Chairman Has A Priority Function To Turn Off All Speaking Delegate Microphones. Xiv. Equipped With A 3.5mm Headphone Jack For Connecting An External Microphone. Xv. Built-in Lithium Battery, The Battery Capacity Supports 14 Hours Of Continuous Speech. D. Sixty-eight (68) Units - 5g Wifi Full Digital Conference - Delegate Unit I. Adopt A 48khz Sampling Rate, Clear And Bright Sound. Ii. Using Advanced Processing Chip Architecture And A Unique Processing Algorithm, The Microphone Power-on Connection Time Only Takes 5 Seconds. Iii. Support Intelligent Detection Of Faults, Prompting Users Of Ap Faults, Host Communication Faults, And Low Signal Strength. Iv. Support Charging Through Type-c Port, Support 18w Fast Charging, With Smart Indicator Status. V. Support Setting Ssid Function Through Ui. Vi. Support Multi-language Switching, And Uniformly Set Through Pc Software. Vii. Support Speech Timing And Timing Speech Functions, And The Delegate Unit Has The Function Of Applying For Speech. Viii. With A Voice Control Function, The Microphone Can Be Turned On Intelligently. Ix. Support Adjusting The Sensitivity Of The Voice Control And Setting The Closing Time Through The Software. X. Support Sign-in Function, Set And Initiate Through Pc Software. Xi. Support Conference Voting Function, Five-key Voting, Three-key Voting Function, Flexible And Convenient. Xii. Adopt 128-bit Aes Encryption Technology, Support Wpa/wpa2 Wireless Security Technology, Prevent Eavesdropping And Unauthorized Access, And Provide Higher Confidentiality Of The Conference System. Xiii. Using Wireless Transmission Technology, It Only Takes Very Little Time For The Venue Layout To Carry Out Activities. Xiv. The Delegate Unit Can Apply To Speak With The Approval Of The Chairman. Xv. Equipped With A 3.5mm Headphone Jack For Connecting An External Microphone. Xvi. Built-in Lithium Battery, The Battery Capacity Supports 14 Hours Of Continuous Speech. E. Seven (7) Units - Power Charger, With 10 Usb Charger Interfaces Support 18w Charge I. All Usb Ports Of The Charger Can Be Used Simultaneously For Batch Charging Of Devices. Ii. Use A Usb Cable, Connect One End To The Charger And The Other End To The Conference Unit; Support 18w Fast Charging. Iii. With Auto Circuit Protection, All Usb Ports Support Short-circuit Protection And Self-recovery Functions F. Four (4) Units - Ap Transmitter I. Comply With The Wi-fi 6 Protocol Standard (ieee 802.11ax), Backward Compatibility With 802.11a/b/g/n/ac/wave2, Support Mu-mimo, And Allow The Ap To Receive Data From Multiple Terminals At The Same Time. The Maximum Transmission Rate Of The Whole Machine Can Reach 1.601gbps, Effectively Providing Higher-performance Wireless Access Services In Terms Of Coverage, Access Density, And Traffic Throughput. Ii. Support Ofdma Spatial Multiplexing Technology And 1024 Qam Modulation And Demodulation Algorithm, Which Can Provide Faster Wireless Internet Access And Larger Wireless Coverage. Iii. Through The Virtual Wireless Access Point (virtual Ap) Technology, Up To 32 Essids Can Be Provided. Iv. Layer 2 Isolation Can Be Performed On The Subnets Using The Same Ssid Or Under The Same Vlan To Ensure User Data Security. V. Support Wpa3 Security Protocol. Vi. Support 80/160mhz High Bandwidth Frequency Band. Vii. Support Local Power Supply And Poe Remote Power Supply. Viii. It Is Suitable For Ceiling Mounting, Wall Mounting, And Desktop Installation. G. Eight (8) Units - Speaker I. Adopt 1 Mid-woofer And 2 Cone Tweeters. Ii. 12mm Plywood Housing, Lightweight, Wear-resistant Spray Paint Treatment, And Dust-proof Net Cotton Outside. Iii. The Frequency Divider In Precise Design Optimizes The Vocal Mf Performance H. Four (4) Units - Amplifier I. 1u Cabinet Design, Small In Size And Light In Weight. Ii. Adopt The Latest Class D Digital Amplifier Design, With Low Distortion And High Efficiency. Iii. Adopt Switched Power Supply Technology, With High Efficiency. Iv. Adopt A Smart Peak Clipper To Control The Power Module And Speaker System To Work In A Safe Range. V. Designed With Standard Xlr Input Interface And Link Output Interface. Vi. Support Soft Start To Prevent Absorbing Large Currents From The Power Grid During Startup And Interfering With Other Electrical Equipment. Vii. Smart Control Forced Heat Dissipation Design, Low Fan Noise, And High Heat Dissipation Efficiency. Viii. Support Overvoltage Protection, Undervoltage Protection, Overcurrent Protection, Dc Protection, Output Short Circuit Protection, Temperature Control, Fan, And So On. I. Eight (8) Units - Professional Loudspeaker Wall - Mounted Bracket I. Fixed Panel Size: 34×34mm (length×width) Ii. Cabinet Fixed Panel Size: 110mm Iii. Weight: 0.31kg 3. One (1) Lot - Roughing-ins Materials 4. Six (6) Lots - Cabling Works 5. Six (6) Lots - Structured Cabling (including External Cabling) 6. Three (3) Licenses - Video Conferencing System 7. One (1) Service - Project Management Services 8. One (1) Service - User Acceptance Testing (uat) 9. One (1) Service - User's Training & Knowledge Transfer 10. One (1) Service - Manpower Cost 11. One (1) Service - Mobilization Cost 12. One (1) Service - Forwarding Cost 13. One (1) Year - Warranty Iv. Mandatory Technical Requirements/qualifications A. Statement Of Accumulated Similar Completed Government And Private Contracts Within The Last Five (5) Years With A Total Contract Amount Of At Least Php 500,000,000.00 Or 50% Of The Abc. A. Contract Definition Must Be Supported By The Following Documents: I. Copy Of Contract Or Po; Ii. Certificate Of Completion And Acceptance B. The Software Provider (sp) Should Be In The Business Of Software Development For At Least Five (5) Years With At Least Five (5) Completed And Accepted Combined Network And Software Projects. C. The Sp Shall Have At Least One (1) Software Accredited By The Bureau Of Internal Revenue (bir) Either An Inventory System Or Pos System Or Accounting System. D. The Sp Should Have Delivered At Least (2) Government Projects Within The Past 3 Years. E. The Sp’s Technical Director(s) Such As Senior Project Manager, Senior System Project Manager, Senior Network Project Manager, Senior Infrastructure Project Manager Must Have A Project Management Experience Of At Least Five (5) Years. Attach Curriculum Vitae, Diploma, Any Government Id With Signature, Relevant Certification/s And Relevant Training/s, Seminar. F. The Sp Shall Be A Partner/distributor Of The Oem Of The Devices Which Has Been In The Market For At Least 3 Years. G. The Sp’s Program Director Must Have A Project Management Experience Of At Least Five (5) Years, With Itil Service Management Certification Or Training And Fifteen (15) Years Of Experience In Software Architecture - Development, Service Delivery Management, State-of-the-art Network Infrastructure, And Delivered Project(s) In At Least One Of The 500 Fortune Companies Or At Least One Of The Telecommunication Companies In The Philippines. Attach Curriculum Vitae, Diploma, Any Government Id With Signature, Relevant Certification/s And Relevant Training/s, Seminar. H. The Sp’s Software Architect Must Have A Devops Foundation Certification Of At Least Five (5) Years Of Experience. Attach Curriculum Vitae, Diploma, Any Government Id With Signature, Relevant Certification/s And Relevant Training/s, Seminar. I. The Sp’s Security Lead Must Be A Certified Information Systems Security Professional (isc)2 For At Least Ten (10) Years Of Experience And Certified Ethical Hacker (ceh) For At Least Ten (10) Years Of Experience. Attach Curriculum Vitae, Diploma, Any Government Id With Signature, Relevant Certification/s And Relevant Training/s, Seminar. J. The Delivery Period Of The Project Is Two Hundred Eighty (280) Days. V. Progress Billing The Project Milestones Are Identified And Aimed At Improving The Hard, Soft, And Infrastructure Of The Basc Organization Leading To The Following Output And Outcome: 15% : Upon Submission Of Signed Contract 25% : Submission And Acceptance Of Detailed Work Plan And Systems Design 29. University Information System 30. Learning Management System 31. Cashiering System 32. Human Resource Management System & Time Keeping System 33. Payroll Management System 34. Assets & Fleet Management System 35. Document Management System 36. Trouble Ticketing System 37. Queuing / Appointment System 38. Executive Information System 39. Campus Portal System 40. University Library System 41. Econference Room W/ Video Conferencing 42. Internet Connectivity 43. Campus Network System 44. Fiber Optics Works 45. Structured Cabling Works 46. It Security Operations Center & Network Operations Center 47. Campus Data Center Upgrade 48. Data Center Network Switches 49. Data Center Compute System & Data Center Block And File Storage System 50. Data Center Backup And Recovery System 51. Cloud Infrastructure 52. Ip-pabx System 53. Software & Networking Laboratories 54. E-classroom, E-room Infrastructure And Smart Led Solar Powered Light 55. E-library Infrastructure 56. Smart Function Hall 26.43% 1st Batch Hardware Completion Of Equipment Deliverables For The Following Components At Basc Facility 17. It Security Operations Center & Network Operations Center 18. Campus Data Center Upgrade 19. Data Center Network Switches 20. Data Center Compute System & Data Center Block And File Storage System 21. Data Center Backup And Recovery System 22. Ip-pabx System 23. Software & Networking Laboratories 24. E-classroom, E-room Infrastructure And Smart Led Solar Powered Light 25. E-library Infrastructure 26. Smart Function Hall 27. Campus Network System 28. Fiber Optics Works 29. Structured Cabling Works 30. Human Resource Management System & Time Keeping System 31. Document Management System 32. Queuing / Appointment System 1st Batch User Acceptance Testing (uat) Completion For The Following System Components At Basc Facility 8. Human Resource Management System & Time Keeping System 9. Payroll Management System 10. Assets & Fleet Management System 11. Document Management System 12. Trouble Ticketing System 13. Queuing / Appointment System 14. Campus Portal System 23.57% 2nd Batch Hardware Completion Of Equipment Deliverables For The Following Components At Basc Facility 4. Internet Connectivity 5. University Library System 6. Econference Room W/ Video Conferencing 2nd Batch User Acceptance Testing (uat) Completion For The Following System Components At Basc Facility 6. Cloud Infrastructure 7. University Information System 8. Learning Management System 9. Executive Information System 10. University Library System Hardware Installation, Configuration And Integration 8. Campus Network System 9. Structured Cabling Works 10. It Security Operations Center & Network Operations Center 11. Data Center Network Switches 12. Data Center Backup And Recovery System 13. Ip-pabx System 14. E-library Infrastructure Acceptance Of Volume Testing 14. University Information System 15. Learning Management System 16. Cashiering System 17. Human Resource Management System & Time Keeping System 18. Payroll Management System 19. Assets & Fleet Management System 20. Document Management System 21. Trouble Ticketing System 22. Queuing / Appointment System 23. Executive Information System 24. Campus Portal System 25. University Library System 26. Econference Room W/ Video Conferencing : Completion Of Training 19. University Information System 20. Learning Management System 21. Cashiering System 22. Human Resource Management System & Time Keeping System 23. Payroll Management System 24. Assets & Fleet Management System 25. Document Management System 26. Trouble Ticketing System 27. Queuing / Appointment System 28. Executive Information System 29. Campus Portal System 30. University Library System 31. Econference Room W/ Video Conferencing 32. Campus Network System 33. It Security Operations Center & Network Operations Center 34. Campus Data Center Upgrade 35. Data Center Backup And Recovery System 36. Smart Function Hall 10% : Project Acceptance And Turnover 29. University Information System 30. Learning Management System 31. Cashiering System 32. Human Resource Management System & Time Keeping System 33. Payroll Management System 34. Assets & Fleet Management System 35. Document Management System 36. Trouble Ticketing System 37. Queuing / Appointment System 38. Executive Information System 39. Campus Portal System 40. University Library System 41. Econference Room W/ Video Conferencing 42. Internet Connectivity 43. Campus Network System 44. Fiber Optics Works 45. Structured Cabling Works 46. It Security Operations Center & Network Operations Center 47. Campus Data Center Upgrade 48. Data Center Network Switches 49. Data Center Compute System & Data Center Block And File Storage System 50. Data Center Backup And Recovery System 51. Cloud Infrastructure 52. Ip-pabx System 53. Software & Networking Laboratories 54. E-classroom And E-room Infrastructure And Smart Led Solar Powered Light 55. E-library Infrastructure 56. Smart Function Hall Vi. Warranties And Guarantees A. Software – At Least 1-year License Coverage, Starts Upon The First Day Of Acceptance. B. Network And Hardware Support – At Least 1-year Warranty In Parts And Labor Upon Acceptance, Onsite 24x7x365. C. Db Services – At Least 1-year License Coverage, Starts Upon Delivery And Installation. D. Implementation Services – At Least 1 Year Of License Coverage With 1,000 Users. E. Technical Support – Local 24x7x365 Online/onsite Support For At Least 1 Year. F. Onsite Support – Within 8 Hours From Receipt Of The Notice, Spare Parts Ready If Necessary. G. Supply Of Spare Parts – Availability Of Parts Shall Be Within 72 Hours. H. Provision Of Service Units If The Repair Will Exceed 3 Days. I. Sp Shall Provide A Testing Facility For Functionality Demonstration. Vii. Training The Project Supports The Capacity Building For Top-level Managers, Trainers, Developers, Network/systems/database/security Administrators, Hardware Maintenance And Troubleshooting. Training For A Minimum Of 10 Persons Per Component/system For The Following Categories: A. 3 -top-level Management – Designed For The Basc Executives B. 10 - Trainers – Specifically For The Trainers Of The Basc To Ensure Continuous Training To End-users. C. 10 - Network/systems/database/security Administrators - Training Designed For Administrators To Ensure 24x7x365 Monitoring Of The Services As Well As Prompt Response As Needed. D. 10 - End-user Training Is Designed For The Users Of The System And/or Encoders. Viii. Manpower The Proposed Project Team Shall Be Composed Of Experts And Specialists As Indicated In The Table Below. The Roster Shall Include A Minimum Of 19 Distinct Physical Persons. There Shall Be No Overlapping Of Functions. In This Respect, The Persons’ Names And Functions Shall Be Explicitly Specified. However, The Sp Has The Option To Add More Personnel Depending On His Work Strategy. The Curriculum Vitae Shall Be Signed By The Person. They Will Closely Collaborate And Coordinate With The Project Management Team Of The Basc. Personnel Role / Qualification Min. No. Program Director Point Person For Issues And Concerns About The Contract And Deliverables. With Project Management Experience Of At Least Ten (10) Years, Cs/it/engineering Degree Or Equivalent. 1 Senior Project Manager With Project Management Experience Spanning Seven (7) Years And A Leadership Role, Also Have Experience Managing Teams Of Project Managers And Business Analysts. With Servicenow Certification For Certified System Administrator. 1 Senior System Project Manager With Project Management Experience Spanning Five (5) Years And A Leadership Role, Also Have Experience Managing Teams Of Project Managers And Developers. With A Itil Service Management Certification, Cs/it/engineering Degree Or Equivalent. 1 Senior Network Project Manager With At Least Seven (7) Years Of Experience In Planning, Implementing, And Maintaining It Networks. With A Network Cable Installer Certification And A Jablotron 100+ Alarm System Training Course Certification. With A Cs/it/engineering Degree Or Equivalent. 1 Senior Infrastructure Project Manager With At Least Seven (7) Years Of Experience In Taking Charge Of The Planning, Implementation, And Maintenance Of Infrastructure And Service Delivery Management. With A Microsoft Certified Professional Certification With A Cs/it/engineering Degree Or Equivalent. 1 Senior Project Manager For Peripherals With At Least Seven (7) Years Of Experience In Project Management With A Focus On It Networks, Infrastructure, And Peripherals (biometrics, Cctv, And Alarm Systems). With A Fiber Optic Preparation & Splicing And Jablotron 100+ Alarm System Training Course Certification With A Cs/it/engineering Degree Or Equivalent. 1 Business Analyst Person In Charge Of The Business And System Specifications With Experience In Systems Analysis And Design. With A Cs/it/engineering Degree Or Equivalent. 4 Enterprise/ Software Architect Person In Charge Of System Architecture And Structural Design With At Least Ten (10) Years Of Experience In Software Architecture And Development. Microsoft Office Sharepoint Server 2007, Application Development Certification Of At Least Three (3) Years Or Openspan Certified Developer Certification Of At Least Ten (10) Years. With A Cs/it/engineering Degree Or Equivalent. 2 Systems Analyst/ Developers Person In Charge Of The System Specifications With At Least Three (3) Years Of Experience In Systems Analysis And Design. Basic React Programming Certification Or With A Cs/it/engineering Degree Or Equivalent. 9 Senior Database Administrator Person In Charge Of Installing, Administering, Maintaining, And Performance Tuning Databases With At Least Seven (7) Years Of Experience In Rdbms. With A Cs/it/engineering Degree Or Equivalent. 2 Senior Security Analyst Person In Charge Of Securing And Administering Smart Campus Security System With At Least Seven (7) Years Of Experience In It Security. With A Cs/it/engineering Degree Or Equivalent. Certified Information Systems Security Professional (isc) And Certified Ethical Hacker (ceh). 1 Quality Assurance Manager With Quality Assurance Experience Spanning Three (3) Years And A Leadership Role, Also Have Experience Managing Teams Of Project Managers And Developers. With A Cs/it/engineering Degree Or Equivalent. 4 Operations Support Lead With Operations Support Experience Spanning Three (3) Years Of The Same Role In A Customer Service, Help Desk, Technical Support, And/or Call Center. With A Bachelor's Degree Or Equivalent. 1 Help Desk And Technical Support With Operations Support Experience Spanning Two (2) Years Of The Same Role In A Help Desk, Technical Support, And/or Call Center. With A Bachelor's Degree Or Equivalent. 5 Senior Trainers With Trainer Or Teaching Experience Spanning Five (5) Years Of The Same Role In Education Institutions. With A Bachelor's Degree Or Equivalent. 2 Total (minimum Physical Count) 36 Section Viii. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages);or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (d) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (h) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (i) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (j) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (k) The Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (m) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (n) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (o) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity. 25 Financial Component Envelope ⬜ (a) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (b) Original Of Duly Signed And Accomplished Price Schedule(s). Bid Form Date: ____________ Project Identification No. 2025-01g To: Bulacan Agricultural State College Brgy. Pinaod, San Ildefonso, Bulacan 3010 Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers______ [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hubin Conformity With The Said Bidding Documents For The Sum Of __________________________________________________________(php____________)[total Bid Amount In Words And Figures] Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. We Agree To Abide By This Bid For The Bid Validity Period Specified In The Bidding Documents Provisions And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period. Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Of Agent Amount And Currency Purpose Of Commission Or Gratuity (if None, State “none”) Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements As Per The Bidding Documents. We Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Name Of Project Of The Name Of The Procuring Entity] [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract On The Latter’s Behalf For Name Of Project Of The Name Of The Procuring Entity]. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 2022. [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of _______________________ Price Schedule Name Of Bidder ____. Invitation To Bid Number 2025-01g Page _____ Of______. 1 2 3 4 5 6 7 8 9 10 Item Description Country Of Origin Quantity Unit Price Exw Per Item Transportation And Insurance And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price, Per Unit (col 5+6+7+8) Total Price Delivered Final Destination (col 9) X (col 4) 1 Grand Total (in Words) (in Figures) [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of _________________________ [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2025-01g: Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub Location Of The Project : San Ildefonso, Bulacan List Of All Ongoing Government & Private Contracts Including Contracts Awarded But Not Yet Started Business Name : Business Address :______________________________________________________________________ Name Of Contract/ Project Cost A. Owner’s Name B. Address C. Telephone Nos. Nature Of Work Bidder’s Role A. Date Awarded B. Date Started C. Date Of Completion % Of Accomplishment Value Of Outstanding Works / Undelivered Portion Description % Planned Actual Government Private Note: This Statement Shall Be Supported With: Total Cost 1 Notice Of Award (for Government Projects) 2 Notice To Proceed (for Government Projects) 3 Contract Submitted By : (printed Name & Signature) Designation : Date : [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2025-01g: Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub Statement Of Single Largest Completed Contracts (slcc) In The Last Five (5) Years Business Name : Business Address : Name Of Contract A. Owner Name B. Address C. Telephone Nos. Nature Of Work Bidder’s Role A. Amount At Award B. Amount At Completion C. Duration A. Date Awarded B. Contract Effectivity C. Date Completed Description % Government Private Attached Herewith Are The Following Documents: Contract Agreement, Notice Of Award, Notice To Proceed, Official Receipt/invoice, Certificate Of Final Inspection, Certificate Of Good Performance And Certificate Of Acceptance, As Evidences In Support Of The Foregoing Information. Submitted By : (printed Name & Signature) Designation : ____________________________________________ Contract Agreement Form This Agreement Made The _____ Day Of __________ 20_____ Between [name Of Procuring Entity] Of The Philippines (hereinafter Called “the Entity”) Of The One Part And [name Of Supplier] Of [city And Country Of Supplier] (hereinafter Called “the Supplier”) Of The Other Part: Whereas The Entity Invited Bids For Certain Goods And Ancillary Services, Viz., [brief Description Of Goods And Services] And Has Accepted A Bid By The Supplier For The Supply Of Those Goods And Services In The Sum Of [contract Price In Words And Figures] (hereinafter Called “the Contract Price”). Now This Agreement Witnesseth As Follows: 1. In This Agreement Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Referred To. 2. The Following Documents Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: (a) The Supplier’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g. Bidder’s Response To Clarifications On The Bid), Including Corrections To The Bid Resulting From The Procuring Entity’s Bid Evaluation; (b) The Schedule Of Requirements; (c) The Technical Specifications; (d) The General Conditions Of Contract; (e) The Special Conditions Of Contract; (f) The Performance Security; And (g) The Entity’s Notice Of Award. 3. In Consideration Of The Payments To Be Made By The Entity To The Supplier As Hereinafter Mentioned, The Supplier Hereby Covenants With The Entity To Provide The Goods And Services And To Remedy Defects Therein In Conformity In All Respects With The Provisions Of The Contract 4. The Entity Hereby Covenants To Pay The Supplier In Consideration Of The Provision Of The Goods And Services And The Remedying Of Defects Therein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of The Contract At The Time And In The Manner Prescribed By The Contract. In Witness Whereof The Parties Hereto Have Caused This Agreement To Be Executed In Accordance With The Laws Of The Republic Of The Philippines On The Day And Year First Above Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Supplier) Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ * This Form Will Not Apply For Wb Funded Project Bid Securing Declaration Form Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: [insert Name And Address Of The Procuring Entity] I/we , The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [insert Name Of Bidder’s Authorized Representative] [insert Signatory’s Legal Capacity] Affiant Financial Documents For Eligibility Check Year 20 1 Total Assets 2 Current Assets 3 Total Liabilities 4 Current Liabilities 5 Net Worth (1-3) 6 Net Working Capital (2-4) The Net Financial Contracting Capacity (nfcc) Based On The Above Data Is Computed As Follows: Nfcc = [(current Assets – Current Liabilities) (15)] Minus Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts Including Awarded Contracts Yet To Be Started Coinciding With The Contract To Be Bid. The Values Of The Domestic Bidder’s Current Assets And Current Liabilities Shall Be Based On The Latest Audited Financial Statements Submitted To The Bir. Nfcc = Php Submitted By: Name Of Bidder Signature Of Authorized Representative Over Printed Name Date:
Closing Date7 Feb 2025
Tender AmountPHP 1 Billion (USD 17.1 Million)
Doln Dobrou Village Tender
Electronics Equipment...+1Electrical and Electronics
Czech Republic
Details: The subject of the construction work is the modernization of the existing building of the fire station. The modernization includes the insulation of the entire building, the raising of the roof structure and minor modifications to the internal layout. The building will be used in the existing way, namely as a fire station. The building has a floor plan in the shape of LO with a total area of 519.0 m2 with a hipped roof over the garage part and a gable roof over the administrative part. The building is located on flat terrain. The armory has two floors above ground. This is the administrative part, two-story, where the corridors with a staircase, the warning technology room, SDH warehouses, a gym, a workshop, SDH locker rooms, social facilities and a washroom are located in the I.np. In Ii.np There Is A Corridor, A Commander's Office, A Kitchenette And A Vocational Training Classroom. In The Second One-Story Part Of The Object, There Are Two Built-In Garages For Three And One Parking Spaces For Vehicles Of Group 2 SDH. For Liquid Fuels And A Storage Room For Garden Tools. Garages For SDH Cars Must Correspond With Their Dimensions And Entrance Gates To Čsn 73 5710 According To The Type Of SDH Vehicle. Furthermore, The Entrance Gates To Existing Garages Will Be Replaced, The Internal Installations In The Object Will Be Repaired, The Internal Walls And Plaster Will Be Repaired. The construction is divided into the following construction objects: So-01 – Fire Station So-02 – Gas Pipeline Connection The Client assumes, for operational reasons, the construction will be divided into 2 stages, namely: Stage 1 – Garage Spaces with Facilities Necessary for the Unit's Operational Capability Stage 2 – Main Building However, the construction procedure in relation to maintaining the unit's operational capability and the operation of the fire station building will be discussed and defined in detail with the winning bidder before the start of construction. The Client draws attention to the fact that the construction will be carried out during operation, while complying with the conditions set out below by the user – the Volunteer Fire Department Unit (hereinafter referred to as "JSDH"): The JSDH's operational capability must be maintained (response); For the purposes of preparing the construction site, it is possible to be without electricity and water for a maximum of 2 – 3 days. The selected supplier must contact the Jsdh commander by phone at least 2 days in advance (so that it is possible to arrange services for the preparation of equipment). The object must have: - lighting and electricity connections, - a construction switchboard with a 2x380v socket connection and at least 4x220v, - an air connection for equipment from the garage area must be ensured - for a transitional period and under suitable climatic conditions, it is assumed that emergency vehicles will be parked in a neighboring public area, the construction site equipment must allow for the parking and exit of these vehicles. - in the event of negative outdoor air temperatures, the parking of emergency vehicles in garages must be allowed. The subject of the public contract is described in detail in: - the construction project documentation (constitutes Annex No. 7 to this call); - List of Construction Works, Supplies and Services with Addressed Statement of Measurements (constitutes Annex No. 8 to this Call);
Closing Date30 Jan 2025
Tender AmountCZK 14.7 Million (USD 607.3 K)
Landkreis Wittmund Tender
Germany
Details: I) The District Of Wittmund Intends, As The Responsible Authority, To Establish A Public Service Contract (öda) For Public Passenger Transport Services In Its Area Of Responsibility Under Regulation (ec) No. 1370/2007 Of The European Parliament And Of The Council Of October 23, 2007 On Public Passenger Transport Services (vo 1370/2007). Granted. The Subject Of The Intended Öda Is All Current And Future Public Passenger Transport Services In The Wittmund Süd Line Bundle. The Following Lines Are Included: 311 Wittmund - Leerhafe - Reepsholt - Friedeburg 331 Friedeburg - Etzel - Horsten - Marx - Friedeburg 332 Bentstreek - Marx - Friedeburg 333 Friedeburg - Wiesede - Wiesmoor 334 Collrunge - Wiesedermeer - Upschört - Wiesede - Friedeburg 335 Friedeburg - He Sel – Abickhafe – Dose - Reepsholt 336 Wiesede - Upschört – Wiesedermeer – Müggenkrug - Leerhafe 337 Ardorf - Hovel – Farlage - Leerhafe 340 Esens – Stedesdorf – Burhafe - Wittmund 342 Ardorf – Willen – Angelsburg – Wittmund - Eggelingen 343 Harlesiel – Carolinensiel – Altfunnixsiel/berdum - Funnix - Nenndorf - Wittmund 345 Esens - Dunum - Burhafe - Ardorf/wittmund 346 Westerholt/willmsfeld - Eversmeer - Neuschoo - Blomberg - Negenmeerten - Dunum - Wittmund 347 Berdum - Endzetel - Buttforde - Burhafe - Wittmund 348 Asel - Wittmund - Leerhafe The Supplementary Document (see Vi.1 C) Contains A Detailed Overview Naming The Respective Service Routes. The Öda Refers To Public Transport Services Within The Meaning Of § 8 Pbefg Regardless Of The Design Of The Form Of Operation In Detail (in Particular Regular Services Within The Meaning Of §§ 42, 43 Pbefg And Flexible Forms Of Operation Within The Meaning Of § 44 Pbefg). The Öda Will Contain Regulations According To Which The Transport Offer Within The Framework Determined In The Öda Is Adapted To Changing Transport Needs And To The Local Transport Plan Of The District (nvp) In Its Current Version As Well As To Other Changing Circumstances (such As Technical Developments, Environmental And Climate Protection Concerns ) Is To Be Adjusted. The Rights To Change Relate To The Type And Scope As Well As The Quality Of The Transport Services And Transport Tariffs. This May Result In Changes Both In Terms Of The Existence And Course Of The Lines As Well As In Terms Of The Timetable And Fares Offered, In Terms Of The Form Of Service (regular Line Operation Or Flexible Forms Of Service) Or In Terms Of Other Aspects Such As Vehicle And Other Quality Standards. As A Result, The Lines May Change, Disappear, Or New Lines May Be Added. The Amount Of Traffic Recorded By The Öda Can Be Reduced Or Increased. With This Information, The Responsible Authority Complies With The Publication Obligation According To Section 8a Ii Of The Passenger Transport Act (pbefg) I. V. M. Art. 7 Ii Vo 1370/2007. For Further Details And With Regard To The Deadline For Self-employed Approval Applications According To Section 12 Vi S. 1 Pbefg, Please Refer To The Statements Under Section Vi.1). Ii) [continuation Of Section Vi.1 D]: Furthermore, In Accordance With Section 21 Iv S. 2 Pbefg, A Release From The Operating Obligation Can Only Be Considered For The Entire Service (no Partial Release). If, In Exceptional Circumstances, A Release From The Entire Operating Obligation Is Indicated Due To Unforeseeable Circumstances, In The Opinion Of The Wittmund District As The Responsible Authority/task Carrier, This Can Only Be Considered With Sufficient Time In Advance, Which Is Necessary To Ensure Seamless Continued Service. This Is A Minimum Of 24 Months. Sufficient Provisions Must Therefore Be Created For This Purpose If, In Exceptional Cases, A Release From The Operating Obligation Becomes Necessary.
Closing Soon24 Jan 2025
Tender AmountRefer Documents
9061-9070 of 9072 active Tenders