Vehicle Tenders

Vehicle Tenders

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Civil Works Others
United States
Description: Sources Sought Response Form ellsworth Afb B-21 60 Rows South Epss sources Sought Notice #w9128f25sm014 anticipated Solicitation #tbd purpose: By Way Of This Sources Sought Notice, The Usace-omaha District Intends To Determine The Extent Of Capable Small Business Or Other Than Small Business Firms That Are Engaged In Providing The Requirement Described Hereunder. The Responses To This Notice Will Be Used For Planning Purposes For Upcoming Procurements. Therefore, This Notice Does Not Constitute A Request For Proposal (rfp), Quotation Or Bid; It Does Not Guarantee The Future Issue Of An Rfq/rfp/ifb; Nor Does It Commit The Government To Contract For Any Supply, Service, Or Construction. There Is No Solicitation Currently Available. further, This Agency Will Not Accept Unsolicited Proposals. Respondents Are Advised That This Agency Will Not Pay For Any Information Or Administrative Cost Incurred In Response To This Notice. All Costs Associated With Responding To This Notice Will Be Solely At The Responding Party's Expense. At This Time, Proprietary Information Is Not Being Requested, And Respondents Shall Refrain From Providing Proprietary Information In Response To This Sources Sought Notice. project Description: this Upcoming Solicitation Will Be Executed Using A Design-bid-build (dbb) Project Delivery Method, Which Will Require The Contractor To Provide The Government With A Complete Facility And Warranty Based On The Request For Proposal (rfp). this Project Will Provide Five (5) New Pre-engineered Metal Environmental Protection Shelters (epss), Approximately 20,000 Sf Each. This Project Is Located Directly Adjacent To And Required To Coordinate With A Variety Of Other B-21 Construction Projects. epss Are Sized To Fit The B-2a “spirit” Aircraft With Space To Perform General Aircraft Maintenance. The Project Also Includes Associated Airfield And Ground Support Equipment (gse) Paving. Supporting Facilities Include Two (3) Maintenance Kiosks, Approximately 160 Sf Each, Providing Electrical And Communication Infrastructure To The Epss. This Project Will Include A Space, Or Spaces Constructed To Afi 16-1404 Requirements. facilities Will Be Designed As Permanent Construction In Accordance With The Dod Unified Facilities Criteria (ufc) 1-200-01, General Building Requirements And Ufc 1-200-02, High Performance And Sustainable Building Requirements. Each Facility Must Be Compatible With Applicable Dod, Air Force, Aircraft, And Base Design Standards. In Addition, Sustainable (green) Construction Materials And Techniques Shall Be Used Where Cost Effective And/or Where Specified. This Project Will Comply With Dod Antiterrorism/force Protection Requirements Per Unified Facilities Criteria. special Construction And Functional Requirements: The Project Will Be Constructed On / Near The Existing 60 Row At Eafb. As Such, The Project Will Be Constructed Adjacent To – And May Be Required To Integrate With Active Airfield Operations. It Will Also Be Constructed Adjacent To Other Active B-21 Facility Construction Sites. Demolition Of Existing Utilities, And Infrastructure – To Include Hazardous Materials Contaminated Apron And Soils May Be Required. New Airfield Apron Will Be Designed In Compliance With Ufc 3-260-02 And Will Be Constructed In Compliance With Ufgs 32 13 14.13. small Businesses Are Reminded Under Far 52.219-14© (1), Limitations On Subcontracting Services. At Least 50 Percent Of The Cost Of Contract Performance Incurred For Personnel Shall Be Expended For Employees Of The Concern. Prior Government Contract Work Is Not Required For Submitting A Response To This Sources Sought Synopsis. (for Construction): Project Period Of Performance: 730 Calendar Days From Construction Ntp. responses: Please Respond To All Information Requested In This Notice Not Later Than (2:00 Pm) 28 Jan 2025). Please Include The Sources Sought Notice Identification Number In The Subject Line Of The Email Submission With Attention To: James.r.willett@usace.army.mil And Cc Brittany.c.gull@usace.army.mil. required Information To Be Submitted In Response To This Notice: company Name, Address, Phone Number, Point Of Contract, Email, Web Address: cage Code And Unique Entity Identifier (uei): north American Industry Classification System Code (naics): state Whether Your Firm Is Classified By The Small Business Administration As Any Of The Following: small Business small Disadvantaged Business service-disabled Veteran Owned Small Business (sdvosb) section 8(a) women Owned Small Business (wosb) hubzone historically Black Colleges And Universities/minority Institutions none Of The Above is Your Company Currently Registered In System For Award Management (sam)? has Your Company Performed Work For The Federal Government Under A Different Name Or Uei/duns #, Or As A Member Of A Joint Venture (jv)? If Yes, Provide An Explanation: capabilities And Submission Requirements: submission Details: all Interested, Capable, Qualified, And Responsive Contractors Under Naics Code 236220 Are Encouraged To Reply To This Request. Interested Prime Contractors Only Should Submit A Narrative Demonstrating Their Experience In Construction Projects Of Similar Nature As Described In The Project Description. Responses Are Requested Only From: Potential Prime Construction Contractors With Company Bonding Capability (single Job) Of At Least $50m. Narratives Shall Be No Longer Than 12 Pages. Email Responses Are Required. please Include The Following Information In Your Response/narrative: •company Name, Address, And Point Of Contact, With Phone Number And Email Address •cage Code And Duns/eid Number •business Size To Include Any Official Teaming Arrangements As A Partnership Or Joint Venture •details Of Similar Projects And State Whether You Were The Prime Or Subcontractor •start And End Dates Of Construction Work •project References (including Owner With Phone Number And Email Address) •project Cost, Term, And Complexity Of Job •information On Your Bonding Capability - Specifically Identify Capacity Of Performance And Payment Bonds in Accordance With Dfars 236.204, The Magnitude Of This Project Is Expected To Range Between $25m And $100m. details On Similar Projects With Scope And Complexity Should Identify Experience With The Following Within The Past 10 Years: •construction Of Similar Clear-span Type Covered Storage Or Maintenance Facility (large Pre-engineered Metal Building Systems, Large Vehicle Storage, Large Bay Facility, Etc.) •construction Of Airfield Paving In Compliance With Ufc 3-260-02 Or Associated Unified Federal Guide Specifications. •construction Of Facilities To The Afi 16-1404 Or Equivalent Standards. •construction Of Facilities Designed To Resist Vibroacoustic Impacts Associated With Aircraft (or Other) Engine Runup And Taxiing. •construction Of Facilities On A Dod Military Installation. •construction Of Facilities On An Active Airfield Flightline. •construction Of Facilities With Shared Access, Laydown, And Limits Of Work To Adjacent Projects Awarded Under Separate Contract. responses Will Be Shared With Government Personnel And The Project Management Team On A Need-to-know Basis, But Otherwise Will Be Held In Strict Confidence. comments: provide Comments Or Identify Any Concerns Your Company Has Regarding The Planned Solicitation. Note That The Government Will Not Be Responding To Inquiries About The Proposed Solicitation At This Time. Your Responses And Comments Will Be Used By Government Personnel To Assess The Viability And Scope Of The Proposed Solicitation And Will Be Kept In Strictest Confidence. Telephone Inquiries Will Not Be Accepted. estimated Construction Contract Award Will Be Second Quarter Of Fiscal Year 2026 (fy26).
Closing Date28 Jan 2025
Tender AmountRefer Documents 

JV North Limited Tender

Services
Finance And Insurance Sectors
United Kingdom
Details: The Main Jv North Framework 2021-2025 Contained A Lot For Valuation Services, However, This Was Under Subscribed. Jv North Is Seeking To Appoint Consultants To This Dps For The Provision Of Valuation Services. Tenderers Will Be Required To Demonstrate A Good Understanding Of The Construction Of Market Such As Housing For Rent, Housing For Sale, Intermediate And Social Housing Together With Associated Community Amenities And Infrastructure And An Ability To Provide Detailed, Accurate Valuation Services On Time And To Budget.jv North Limited Is A Registered Limited Company Comprising 17 Housing Associations, Local Authorities And Numerous Subsidiaries Also Known As Registered Providers. It Should Be Noted That For The Extent Of This Framework Arrangement Exercise Jv North Limited Will Not Be The Party Entering Into The Contracts But It Will Be The Individual Client Members Of Jv North Limited. Members Can Join The Jv North Consortium Throughout The Entirety Of This Contract And So Members Numbers May Differthe "client" Will Comprise The Named Councils, And The Named Registered Providers (rps), Including Any Wholly-owned Subsidiaries Of Any Such Council, Or Rp Within Their Respective Groups, And Any Corporate Entities Such As Joint Venture Vehicles In Which Any Such Rps Or Council Hold A Formal Ownership Interest), And Any Other Council Or Registered Providers Or Affordable Housing Providers, Wholly Owned Subsidiaries Or Any Corporate Entities As Mentioned That Elect To Join The Client In Accordance With Its Membership Rules.bury Metropolitan Borough Council, Cheshire Peaks & Plains Housing Trust Limited, ‘johnnie’ Johnson Developments Limited, ‘johnnie’ Johnson Housing Trust Limited, Muir Group Housing Association Limited, One Manchester Limited, One Vision Housing Limited, Pine Court Housing Association Limited, Plus Dane Housing Limited, Steve Biko Housing Association, Stockport Homes Limited, Torus62, Trafford Housing Trust, The Sovini Group, The Metropolitan Borough Council Of Stockport, Weaver Vale Housing Trust Limited, Wythenshawe Community Housing Group Limited.the Consultancy Work Will Primarily Focus On New Build Housing, However, There May Be Occasions When Valuations For Existing Stock And Land Holdings Are Required. As Above, Tenderers Will Be Required To Demonstrate A Good Understanding Of The Affordable Housing Sector In This Regard.
Closing Date6 Jan 2026
Tender AmountRefer Documents 

National Road and Highway Directorate Tender

Healthcare and Medicine
Corrigendum : Closing Date Modified
Poland
Description: I. Subject of the Proceedings: 1. Description of the Subject of the Order: 1. Fluke Networks Intellitone 200 Pro - Wire Pair Finder and Cable Tester (mt-8200-60-kit) - 1 Piece 2. Compact Usb-to-Can V2 Interface - 1 Piece 3. Lan To 9pin Cable - 1 Piece 4. Mdec Cable (Used For Ecu2, 4 Etc.) - 1 Piece 5. Adec Cable (Used For Ecu 7,8,9) - 1 Piece Products Must Be New, Free From Defects . Price Should Include Shipping Cost. 2. above The Assortment Must Meet The Following Requirements: Be New And Free From Defects, Not Encumbered With Third Party Rights, 3. Accompanying Documentation: Warranty Cards, User Manuals, etc. 4. Tender Evaluation Criterion: Price 100% 5. Considering the provisions of the Commission Implementing Regulation (EU ) 2019/779 of 16 May 2019 Laying down Detailed Regulations Concerning the Certification System of Entities in Charge of Vehicle Maintenance In accordance with Directive (EU) 2016/798 of the European Parliament and of the Council and repealing Commission Regulation (EU) No. 445/2011 (Journal of Laws . UE L. Z 2019, page 139, as amended, hereinafter "Regulation 2019/779"), Employer as the Entity Responsible for Vehicle Maintenance within the meaning of Directive (EU) 2016/798 of the European Parliament and of the Council of 11 of May 2016 on Railway Safety (Recast) (Journal of Laws of the European Union, L. of 2016, No. 138, p. 102, as amended), Considering the impact of the correct execution of the Order on Railway Traffic Safety, Requires that the subject of the contract be carried out by contractors with an appropriate and documented maintenance and management system within the meaning of point 9.2 lit. B) of Annex Ii to Regulation 2019/779 (e.g. ISO 9001:2015, Iris). To confirm that the Subject of the Order will be implemented by Contractors having an appropriate and documented maintenance and management system, it is necessary to submit a statement referred to in Chapter IV, Item 4. II. Terms of Order Execution: 1. Execution Date - Expected Execution Date 14 Business Days. The Ordering Party allows for a longer Completion Period - According to the Tender Evaluation Criterion - Implementation Hours - 8:00 a.m. to 2:00 p.m. Z o. o. Rolling Stock Maintenance Point, Ul. Kolejowa 4, 66-210, Zbąszynek, the Contractor, not later than 12 hours before commencing the execution of the Order, is obliged to confirm the date of delivery of the Goods, including the hour of delivery. 4. Method of Delivery: One-off Delivery, Price Should Include the Cost of Delivery and Unloading at the Place Designated by the Contractor. 5. Payment Date - In accordance with the GTD; (payment deadline 30 Days From Invoice Issue) The Ordering Party accepts the issuance and delivery of electronic invoices by the Seller, in accordance with Art. 931, as amended; hereinafter referred to as "the VAT Act"). When issuing an electronic invoice, the seller is obliged to prepare it in pdf format. In the case of issuing an electronic invoice, the Seller is obliged to deliver it to the Ordering Party to the e-mail address: Faktury@koleje-wielkopolskie.com.pl. 6. Warranty Terms - In accordance with the GTD; 7. Deadline for Removing Defects Under the Guarantee - In accordance with the GTD; 8. Contractual Penalties - Pursuant to § 7 of the GTC, (the ordering party informs that the Penalties referred to in § 7 Section 1 Item A) of the GTC will be charged in the event of the Supplier's delay of more than 5 Business Days. Additionally, § 7 Sec. 1 pt. C) Owd). iii. The course of the Proceedings: The Contracting Entity informs that the Proceedings are conducted in two stages: A) Stage I - Bid submission, B) Stage II - Electronic Bidding - Bidding will start automatically after the end of Stage I It will last 15 minutes and Extra Time - Sub-stage of Stage II, which The terms and conditions are described in detail in the Procurement Platform's Proceedings Setting. Each Overtime Lasts 3 Minutes - Starts if Within the Last 3 Minutes of the Proceedings, Another Bid (proceeding) is submitted correctly. Contractors approved by the Employer who fail to submit a Proposal correctly at the Bid Submission Stage (and Stage) will be automatically removed from further stages of the Proceedings. The Ordering Party grants approval for the Order by placing on the Purchasing Platform Information about the Selection of the Most Advantageous Offer. With the moment referred to in the preceding sentence, the Order is awarded. The Ordering Party is entitled to withdraw from awarding the Order at any time. IV. Contractor's declarations: The Contracting Authority informs that participation in the proceedings in question is tantamount to submitting the following declarations: 1. I declare that I have fulfilled the information obligations provided for in Art. In order to apply for the award of a public contract in this procedure. *Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (General Data Protection Regulation ) (Official Journal of the EU L 119 Z 04.05.2016, p. 1). 2. I declare that I consent to the processing of my personal data provided by me voluntarily to the Ordering Party. Information Clause With Art. 13 of the GDPR - Has been posted on the Eb2b Purchasing Platform in the "Information Obligation" tab. 3. I declare that the Price Offer on the Purchasing Platform was submitted by the Person Authorized to Represent the Contractor. 4. I declare that the Contract in question will be implemented by Contractors who have an appropriate and documented maintenance and management system within the meaning of point 9.2 lit. B) Annex Ii to the Commission Implementing Regulation (eu) 2019/779 of 16 May 2019 laying down detailed provisions on the system of certification of entities in charge of vehicle maintenance in accordance with the Directive of the European Parliament and of the Council (eu) 2016/798 and repealing the Commission Regulation ( ue) No. 445/2011 (Journal of Laws of the EU L. Z 2019, p. 139, as amended) 5. I declare that the Contract in question will be performed by contractors not subject to exclusion under Article 5k of the Council Regulation ( ue) No. 833/2014 of 31 July 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (Journal of Laws of the EU L. Z 2014 No. 229, p. 1, as amended) And Pursuant to Art. 7 Para. 1 of the Act of April 13, 2022 on Special Solutions for Counteracting the Support of Aggression against Ukraine and for the Protection of National Security (i.e. Journal of Laws of 2023, item 129, as amended) V. Additional information: Proceedings underway Pursuant to the provisions of § 25 of the Regulations for the Award of Sub-threshold Sectoral Contracts, Available to Contractors on the Ordering Party's website https://koleje-wielkopolskie.com.pl/. Due to the impact of the execution of the Order on the Safety of Transport, within the Proceedings, the provisions of § 5 Sec. 2 And § 22 of the Regulations. The General Terms and Conditions of Delivery of Koleje Wielkopolskie Sp. Z O.O. Available on the Ordering Party's website https://koleje-wielkopolskie.com.pl/. Including the provisions of § 3 Sec. 7 of the General Delivery Terms of Koleje Wielkopolskie Sp. z o.o. Pursuant to Art. 7 Para. 1 of the Act of April 13, 2022 on Special Solutions for Counteracting the Support of Aggression against Ukraine and for the Protection of National Security (i.e. Journal of Laws of 2023, item 129, as amended; hereinafter referred to as the "Sanctions Act"), The Contractor is excluded from this Public Procurement Procedure: 1) Listed in the Council Regulation (EC) No. 765/2006 of 18 May 2006 concerning restrictive measures due to the situation in Belarus (Journal of Laws of the EU L 134 Z 20.05.2006, p. 1, as amended, hereinafter "Regulation 765/2006") and Council Regulation (EU) No. 269/2014 of 17 March 2014 on restrictive measures in relation to activities undermining the integrity Territorial, Sovereignty and Independence of Ukraine or threatening them (Journal of Laws of the European Union L 78 Z 17.03.2014, p. 6, as amended; hereinafter referred to as "Regulation 269/2014") Or Entered on the List Based on the Decision on the Entry To the Determining List of the Measures referred to in Art. 1 Item 3 of the Sanctions Act; 2) Whose Beneficial Owner within the meaning of the Act of 1 March 2018 on Counteracting Money Laundering and Terrorist Financing (Journal of Laws of 2022, items 593, 655, 835, 2180 and 2185) is the person listed in the lists specified in Regulation 765/2006 and Regulation 269/2014 or entered on the list or being such a beneficial owner from February 24, 2022, as long as it was entered on the list on the basis of the decision on entry on the list determining the application of the measure referred to in Art. 1 Item 3 of the Sanctions Act; 3) whose Parent Undertaking within the meaning of Art. 3 Sec. 1 Item 37 of the Act of 29 September 1994 on Accounting (Journal of Laws of 2021, items 217, 2105 and 2106 and of 2022, item 1488), is an entity listed in the lists specified in Regulation 765/2006 I Regulation 269/2014 or entered on the list or being such a Parent Company from February 24, 2022, provided that it was entered on the list on the basis of a decision on entry on the list determining the application of the measure referred to in Art. 1 Item 3 Sanctions Act. Pursuant to Article 5k of Council Regulation (EU) No. 833/2014 of 31 July 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (Journal of Laws of the EU L. Z 2014 No. 229, p. 1 As amended; hereinafter "Regulation 833/2014"), The Contractor is excluded from this Public Procurement Proceeding: 1) a Russian citizen, a natural person residing in Russia or a legal person, entity or body with its registered office in Russia; 2) A legal person, entity or body to which ownership rights directly or indirectly belong to Russian citizens or natural persons residing in Russia in more than 50% or legal persons, entities or bodies based in Russia; 3) A natural or legal person, entity or body acting on behalf of or under the direction of the entity referred to in point 1) or 2) of this section, and using subcontractors, suppliers or entities on whose capacity (if applicable), belonging to To one of the above Categories of Entities, in the event that they account for more than 10% of the Order Value. Information Clause With Art. 13 of the GDPR - Has been posted on the Eb2b Purchasing Platform in the "Information Obligation" tab. Please direct any questions regarding the Procedure via the Purchasing Platform. Technical Support can be obtained at the telephone number in the footer at the bottom of the page.
Closing Date27 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
United States
Details: This Sources Sought Notice Is For Informational Purposes Only. The Sources Sought Notice Is Not A Request For Proposal, Quotation Or Invitation For Bid. No Reimbursement Will Be Made For Any Costs Associated With Providing Information In Response To This Sources Sought Or Any Follow Up Information Requests. Respondents Will Not Be Notified Of The Results Of The Sources Sought Or Resulting Market Research. the U.s. Army Corps Of Engineers, Honolulu District, Requests Letters Of Interest From Prime Contractors Interested In Performing Work On A Potential Design-bid-build Construction Solicitation For The Spv Rail, Replace Hvac System, Relocate Industrial Wastewater, Schofield Barracks, Oahu, Hawaii. No Solicitation Is Currently Available. project Description: clin 0001 - This Project Will Replace The Existing Corroded Track Rail And Rack That Serves The Rack And Pinion Special Purpose Vehicle (spv) At The Building 1580 Lower Tunnel. The Rail Extends From The Top Of The Tunnel Down To The Lower Pumping Chamber Approximately 600 Feet Below Grade. The Tunnel Is At A 30-degree Incline And Traverses Approximately 1300 Lineal Feet From Top To Bottom. The Entire Rail And Rack Will Be Removed And Replaced In Kind To Be Compatible With The Existing Spv. clin 0002 - This Project Will Replace The Existing Hvac Systems Serving The Potable Pump Well Chambers With An Energy-efficient System. The Fire Alarm System Will Be Modified As Required To Provide Duct Smoke Detectors On The New Air Handling Units. The Existing Non-functional Smoke Control System Is To Be Demolished To The Maximum Extent Feasible. clin 0003 - This Project Will Replace The Existing Sump Pumps And Associated Discharge Piping In The Schofield Barracks Deep Well At B1580 On East Range. The Force Main Piping Currently Discharges To A Dry Well Approximately Half Of The Way Up The Tunnel; However, The Hawaii Department Of Health Has Requested That The Discharge Be Connected To The Sanitary Sewer System Owned By Aqua Engineers. magnitude Is $15m – $25m interested Prime Construction Contractors Should Submit The Following: name Of The Firm, To Include Address, Phone Number And Point Of Contact. firm’s Uei Number And Cage Code, And Expiration Date In Sam.gov. indicate Whether Your Firm Is A Large Business Or Small Business. If Your Firm Is A Small Business Specify All Applicable Socio-economic Categories Per Far Part 19. narrative Demonstrating The Potential Contractor Understands The Challenges Of Working At Building 1580 And Can Provide A Descriptive Plan Including The Means And Methods To Successfully Complete The Project Knowing The Hvac System Is Not Working Properly At The Bottom Of The Building. Identify The Risks Associated With This Project And What Special Conditions Need To Be Addressed Prior To Commencing Work. The Narrative Should Include Demonstrated Experience On Phased Work And Potential Confined Entry Like Situations. bonding Capability For A Single Contract Action Of At Least $15m And Aggregate Of At Least $25m By The Interested Prime Contractor. narratives Shall Be No Longer Than Three (3) Pages. email Responses Are Required. Responses Are To Be Sent Via Email To Christie.s.lee@usace.army.mil And Kent.a.tamai@usace.army.mil No Later Than January 9, 2025, 2:00 P.m. Hawaii Standard Time. potential Contractors Will Not Have An Opportunity To Visit Building 1580. If A Potential Contractor Is Interested In Reviewing Pictures Of The Project Site And Obtaining A Draft Pre-final Copy Of The Plans And Specifications Of The Project Prior To Responding, Please Submit A Request To The Pocs Identified In This Notice And A Copy Will Be Sent Via Dod Safe Separately. If A Video Of The Site Becomes Available, It Will Be Posted By Amendment To This Announcement. responses To This Sources Sought Announcement Will Be Used By The Government To Make Appropriate Acquisition Decisions. No Solicitation Is Currently Available. It Is A Market Research Tool Being Utilized To Determine The Availability Of Potential Qualified Contractors Before Determining The Method Of Acquisition. Please Note That It Is Required That Your Company Be Registered In The System For Award Management (sam), Please See Https://www.sam.gov For Additional Information. In Addition, This Sources Sought Is Not To Be Construed As A Commitment By The Government, Nor Will The Government Pay For Any Information Solicited Or Delivered.
Closing Soon10 Jan 2025
Tender AmountRefer Documents 

Municipality Of Quezon, Nueva Vizcaya Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Item No. Description Quantity Unit Part A - Facilitie For The Engineers A.1.1 (6) Provision Of Combined Field Office, Laboratory And Living Quarters Building For The Engineers (rental Basis) 12.00 Month A.1.1 (11) Provision Of Furnitures/fixtures, Equipment & Appliances For The Field Office For The Engineer 1.00 Lump Sum A.1.2 (2) Provision Of 4x4 Pick Up Type Service Vehicle For The Engineer On Bare Rental Basis 12.00 Month Part B - Other General Requirments B.4 (10) Miscellaneous Survey And Staking 1.00 Lump Sum B.5 Project Billboard 2.00 Each B.7(2) Occupational Safety And Health Program 1.00 Lot B.9 Mobilization/demobilization 1.00 Lump Sum Part C - Earthworks 100(1) Clearing & Grubbing (with Stripping) 13,968.00 Sq.m. 101(2)c Removal Of Rcpc (36"ø) - 910mm 14.00 Ln.m. 101(3)b2 Removal Of Exisiting Concrete Pavement (0.20m Thk) 2,338.80 Sq.m. 102(2) Surplus Common Excavation 51,000.00 Cu.m. 102(3)a Surplus Rock Excavation (soft) 10,000.00 Cu.m. 102(3)b Surplus Rock Excavation (hard) - Blasting 2,227.00 Cu.m. 103(1)a Structure Excavation (common Soil) 429.00 Cu.m. 103(6)a Pipe Culvert And Drain Excavation 90.75 Cu.m. 104(1)a Embankment (from Excavation) 8,032.00 Cu.m. 105(1)a Subgrade Preparation 13,968.00 Sq.m. Part D - Subbase And Base Course 200 Aggregate Subbase Course 4,190.40 Cu.m. Part E - Surface Cources 300(1) Gravel Surface Course 663.48 Cu.m. 311(1)a.2 Pcc Pavement (plain)-conventional Method, 200mm Thk. 10,650.60 Sq.m. Part F - Bridge Construction Spl Single Span Flat Slab Bridge 1.00 Lot Spl(2) Over Flow Bridge 1.00 Lot Part G - Drainage And Slope Protection Structures 500(1)b3 Reinforced Concrete Pipe Culverts, 910mm Dia. 50.00 Ln.m. 502(3)a3 Catch Basins 2.00 Ea. 506 Stone Masonry 1,560.00 Cu.m. Equipment Needed (minimum): 1 Unit Backhoe (0.80 Cu.m.) 4 Units Transit Mixer 1 Unit Air Compressor 1 Unit Backhoe W/ Breaker (0.80 Cu.m.) 1 Unit Backhoe, Wheel Mounted (26 Cu.m.) 1 Unit Concrete Saw, 14''ø Blade 1 Unit Bulldozer W/ Ripper, Dx175 1 Unit Water Truck (16000l) 1 Unit Concrete Screeder (5.5 Hp) 1 Unit Bulldozer, Dx175 1 Unit Boom Truck 1 Unit Concrete Vibrator 1 Unit Motorized Road Grader, G710a 1 Unit One Bagger Mixer 1 Unit Plate Compactor (5 Hp) 1 Unit Vibratory Roller (10m.t.), Sd100dc 1 Unit Pneumatic Drilling Machine 1 Unit Bar Bender, Three Phase 1 Unit Payloder (1.5 Cu.m.), Lx80-2c 1 Unit Welding Machine 1 Unit Bar Cutter, Single Phase 1 Unit Cargo Truck (9-10 Mt.) 2 Units 7.5hp Water Pump, 100mmø Suction 3 Units Dump Truck (12 Cu.yd) 1 Unit Rtk W/ Complete Accessories
Closing Soon13 Jan 2025
Tender AmountPHP 50 Million (USD 861.5 K)

DEPT OF THE AIR FORCE USA Tender

Corrigendum : Tender Amount Updated
United States
Details: **attached Is The Tdp For The Sources Sought Synopsis Fa8212-22-r-9999, Upcoming Contracting Opportunities, Andfa8212-22-r-0025 That Is Specific For The Requirement A-10 Pot Assy Mlg Fairing Lh & Rh 5yr Idiq (full & Open Competition (f&oc) No Set-asides - Open To Large And Small Firms That Are Pre-qualified Through The Source Approval Request (sar) Program And Hence Why The Tdp Is Being Provided Early. Please Submit The Sar Package Early So Your Bid Can Be Considered.** 1. Notice: This Is Not A Solicitation But Rather, For Planning Purposes, A Sources Sought Synopsis (sss) To Seek Qualified Manufacturers By Informing The Public Of Upcoming Contracting Opportunities. Further, This Notice Is Provided To Promote And Encourage Early Submissions Of Source Approval Request (sar) If The Manufacturer Is Not Pre-qualified And Desire To Be. 2. Acquisition Type: Full & Open Competition To Qualified Manufacturers. 3. Requirement Description: a-10 Pod Assy Mlg Fairing Lh&rh 5yr Idiq: Pn: 162j611521-1003a Nsn: 1560-01-592-6923fj (min 4ea; Optional Qty 8ea); And Pn: 162j611521-1015a Nsn: 1560-01-592-2577fj (min 4ea; Optional Qty 8ea). Full & Open Competition. No Set-aside. 4. Responses: Manufacturers Must Be Pre-qualified To Bid On The Requirement. If Interested, Please Submit A Source Approval Request (sar) Iaw The Source Qualification Statement Spares (sqss) That Is Also Posted With This Notice In Reasonable Time To Allow The Government To Process The Sar And The Offeror Can Submit A Full Bid On-time. Please Submit With The Sar A Copy Of The Higher Level Quality Requirement Certification As A Separate Attachment. Please Provide Responses To The Contracting Officer, Leslie Evans, At Leslie.evans.1@us.af.mil. Please Provide The Following Information In The Response; firm’s Name, Cage Code, And Duns Number, And Government Point Of Contact business Type (large Or Type Of Small) For Proposed Or Recommended Naics Code recommended Naics Code are You A Manufacturer Or Authorized Distributor For This Requirement Or Subparts? Please Note Bids From Distributors Will Not Be Considered. The Requirement Is A Production Contract To Manufacture Military Aircraft Parts. If The Requirement Is A Total Small Business Set-aside The More Than 50% Of The Work Must Be Performed By The Prime Qualified Small Business Or Subcontractor That Is A Qualified Small Business Under The Set-aside Naics Code Per The Small Business Non-manufacturer Rules And There Is No Waiver. Thus, Sar Packages And Bids From Distributors That Do Not Meet The Non-manufacturer Rules Will Not Be Considered. have You Manufactured Same Or Similar Parts To Include To Commercial Customers? If So, Please Provide Evidence Of With Point Of Contact(s), Contract Numbers, Results, Etc., To Demonstrate You Are Qualified Manufacturer That Deliver Quality Parts And The Govt Can Validate The Information. provide Any Anticipated Teaming Arrangements. Any Responses Involving Teaming Arrangements Should Delineate Between The Work That Will Be Accomplished By The Prime And The Teaming Partner(s). is There A Different National Stock Number (nsn) Or Suitable Part Number? is There An Existing Contract Vehicle The Usaf Can Order The Parts From? Is There A Dla Contract Or Gsa Schedule For The Parts? what Other Acquisition Strategy And Contract Type Do You Recommend And How Will This Provide The Government The Best Value? discuss Any Concerns That May Prevent Receiving Fair And Reasonable Pricing For The Out –years. 5. Technical Data Package (tdp) Attached: The Tdp Is Attached To The Notice And Is Controlled Data. You Must Request Access And E-mail The Contracting Officer At Leslie.evans.1@us.af.mil To Approve Your Request. Please Provide In The Request The Firm’s Cage Code So The Contracting Officer Can Verify The Firm Has An Active Dd Form 2345, Military Critical Technical Data Agreement.
Closing Date30 May 2026
Tender AmountUSD 8.9 Million 
This is an estimated amount, exact amount may vary.

MISSILE DEFENSE AGENCY MDA USA Tender

Consultancy Services
Corrigendum : Closing Date Modified
United States
Details: Update 16sep24, Rfis For Tranche 1, Tranche 2 And Tranch 6 Have Been Updated. Please See V2 Of The Referenced Documents. Rfi Responses For All Tranches Are Due 3 Oct 2024. This Special Notice Is Open Until 4 Oct 2025 To Allow Us To Continue Posting Updates Under The Original Mapss Announcement. update 13sep24, Rfis For Tranches 1-6 Are Provided. Responses Are Due 12:00p.m. Cst On Thursday, 3 Oct 24.participation Is Voluntary, But Encouraged If Your Company Is Interested In Competing For A Future Mapss Requirements. This Is Initial Market Research To Solicit Industry’s Feedback Which Will Be Used To Form The Basis Of The Overall Mapss Acquisition Strategy. Market Research Will Be Refreshed In Future Years - By Tranche - To Ensure The Acquisition Strategy Remains Relevant. The Final Naics Determination And Contract Vehicle For Each Requirement/capability Area Will Depend On The Group Of Work Solicited At The Time Of Proposal Request. update 1aug 24, Mapss Small Business Conference Powerpoint Presentation Is Now Available. update 3april24 Mapss Industry Day Webinar Questions & Government Responses Have Been Posted. update 2april24. Mapss Industry Day Webinar Presentation Is Now Available. update1march24. 1) Special Notice For Industry Day Webinar Updated. If You Plan To Attend, Please See Updated Attached Notice For More Information. Registration Now Closes Cob 21 March 2024. 2) Please See Attached Updated Mapss Request For Information (rfi) Industry Survey. Response Deadline Extended To Cob 5 April 2024. update 14feb24. Please See Attached Mapss Request For Information (rfi) Industry Survey. Responses Are Due Cob 15 March 2024. update 9feb24, This Special Notice Is To Provide Information On The Industry Day Webinar For The Mda Mapss Acquisition. This Industry Day Webinar Is Scheduled For 22 Mar 2024 And Is Open To All Potential Offers. If You Plan To Attend, Please See The Attached Notice For More Information. Registration Closes 19 Mar 2024. update 29jan24, The Government Is Providing An Informational Paper. Inquiries Regarding Mapss Should Be Submitted By Email To Mapss@mda.mil. update- The Government Is Providing An Update To The Mapss Tranches. this Special Notice Is Intended To Communicate To Industry The Projected General Approach For The Mda Agile Professional Services Solutions (mapss) Procurement Which Is The Follow-on To Teams-next. Mapss Is Mda’s Fourth Generation Professional Services Program Providing Advisory And Assistance Services Support For The Agency. under The Mapss Program, The Government Intends To Conduct Market Research And Acquisition Strategy Development Incrementally In 4 Tranches To Help Ensure Decisions Are Relevant For Requirements That In Some Cases Won’t Begin Until Fy 2029. Requirements Structure, Naics Codes, Small Business Set-aside Decisions, And Other Elements Of The Strategy Informed By Market Conditions Will Be Determined Based On Current Market Research During Planning For Each Tranche. as Part Of The Market Research For The First Tranche, Mda Is Evaluating The Potential Use Of The General Services Administration’s (gsa) Oasis+ Best-in-class (bic) Indefinite Delivery Indefinite Quantity (idiq) Multi-agency Contracts (mac). Industry Is Encouraged To Prepare And Posture Themselves To Compete In This Environment In The Event That Mda Determines That The Oasis+ Contracts Best Accommodate The Government’s Requirements. Vendors Interested In Learning More About Oasis+ Can Find Information On Gsa’s Interact Portal (https://buy.gsa.gov/interact/community/196/activity-feed). this Is Not A Request For Information. The Government Is Not Requesting Responses To This Notice. Further Notifications, Market Research, And Solicitation Activities For Requirements Under The Mapss Program Will Be Posted At A Later Time. approved For Public Release 23-mda-11573 (1 Sep 23)
Closing Date4 Oct 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Civil And Construction...+2Others, Real Estate Service
United States
Details: The Honolulu District, U.s. Army Corps Of Engineers (usace) Is Soliciting Lease Proposals For 1,400 To 2,100 Of Gross Rentable Square Feet Of Commercial Retail Storefront Space In Saipan For Armed Forces Recruiting Office Purposes. The U.s. Government, By And Through Usace, Currently Occupies Retail And Related Space Under A Lease, In The City And State Specified Above. The Lessor Shall Provide Adequate/assigned Parking For Approximately Three (3) Government Vehicles Both During The Day And Overnight. The Lease Term Is Five (5) Years With Government Termination Rights, And Will Be A Full-service Lease (to Include All Utilities And Janitorial Services). delineated Area: the Government Requests Space In Sapan In An Area Bounded As Follows: the Entire Island Of Saipan buildings That Have Frontage On The Boundary Streets Are Deemed To Be Within The Delineated Area. if Awarded To A New Location, This Office Would Be Relocated Immediately Upon Completion Of Construction Of Retail Space To Accommodate All Requirements Pertaining To The Construction Specifications For Production Offices With The Lease Start Date Commencing Upon Acceptance Of Space By The Government (see Attached Construction Specifications). space Minimum Requirements Include: 1. 24-hour Unrestricted Access To Leased Space; 2. Availability Of All Communications Infrastructure For To Include Dsl, T1 Or A Satellite Dish; 3. Direct Access To Secondary Exterior Exit Door From Lease Space; Common Area Exterior Exit Door If Shared With Other Military Services; Or Exterior Exit Door Can, And Will Be Installed Prior To Occupying The Facility; And 4. 24-hour Lighted Parking For Up To Three (3) Government Vehicles And Adequate Parking For Privately Owned Vehicles Onsite Or Within A 4 Block Radius Of The Premises. electronic Offer Submission: offers Must Be Submitted Electronically Via Email To: Amy.capwell@usace.army.mil offers Are Due On Or Before: March 1, 2025. any Questions Regarding This Solicitation May Be Directed To Primary Or Secondary Points Of Contact Listed In The “contact Information” Section Of This Notice. to Be Responsive, Your Offer Should Be Based On All The Terms, Conditions, And Responsibilities Expressed Throughout The Rlp And Lease. Please Review The Rlp And All Attachments Carefully Paying Particular Attention To The Solicitation Requirements. the Requirements For Consideration Of Award Will Entail A Complete Package That Consists Of The Following Criteria At A Minimum (note: There May Be Other Required Forms. Refer To The Enclosed Rlp For Details.): initialed Acceptance And Use Of Government Lease Indicating That You Understand The Government’s Terms And Requirements. (exhibit A Recruiting Form L100) 2. Initialed Acceptance And Use Of Government General Clauses Form 3517b Indicating That You Understand The Government’s Terms And Requirements. (exhibit B Form 3517b General Clauses) 3. Competitive Rates Of Base Cost Per Square Feet For Annual Rent And A Breakout Of Operating Expenses, Real Estate Taxes, And Janitorial Service Costs And Utilities. (completed Exhibit C Proposal To Lease). 4. All Costs And Materials Affiliated To Meet The Requirements Of The Construction Specifications Including All Safety And Security Enhancements Will Be Considered Tenant Improvements With No Reimbursement From The Government Upon Completion Of The Construction Or Through Amortization Within The Lease (completed Exhibit F Construction Bid Worksheet). do Not Attempt To Complete The Lease Form (usace Recruiting Lease Form L100). Neither The Rlp Nor Any Other Part Of An Offeror’s Proposal Shall Be Part Of The Lease Except To The Extent Expressly Incorporated Therein. Please Review All The Documents Thoroughly So That You Have A Complete Understanding Of The Government’s Requirements. after Receipt Of All Proposals, Conclusions Of Any Discussions, And Receipt Of Best And Final Offers, The Government Will Select A Location Based On The Lowest Overall Cost And Technical Requirements Specified In The Enclosed Rlp. Past Performance, If Applicable, Will Also Be Taken Into Consideration. The Selection Is Expected To Occur Approximately Thirty (30) Days Following The Initial Proposal Response Date. A Government Market Survey, Appraisal, Or Value Estimate Will Be Conducted To Determine Fair Market Rental Value. one Item Of Note In The General Clauses, Gsa Form 3517b Document Is The Requirement To Register In The System For Award Management At Www.sam.gov (general Clause 17, Cfr 52.204-7). This Registration Is Mandatory For Any Entity Wishing To Do Business With The Government And Must Be Completed Before Lease Award. notice: The Following Information Is Provided For Situational Awareness And Is Not Required To Respond To This Sources Sought. All Contractors Must Be Registered In The System For Award Management (www.sam.gov) Prior To Award Of A Contract. All Proposed Contractors Are Highly Encouraged To Review Far Clause 52.232-33 Payments By Electronic Funds Transfer – System For Award Management, Which Indicates “all Payments By The Government Under This Contract Shall Be Made By Electronic Funds Transfer (eft).” Those Not Currently Registered Can Obtain Registration By Going To The Website Http://www.sam.gov. The Process Can Usually Be Completed From 24 To 48 Hours After Submission. Contractors Will Need To Obtain A Unique Entity Identifier (formerly Duns Number) For Processing Their Registration. If You Do Not Already Have A Unique Entity Identifier, One Can Be Obtained From Http://www.sam.gov. Refer To Www.sam.gov For Information Formerly Found In Ccr, Epls, Orca And Fedreg. Please Begin The Registration Process Immediately In Order To Avoid Delay Of The Contract Award Should Your Firm Be Selected. alert: You Must Submit A Notarized Letter Appointing The Authorized Entity Administrator Before Your Registration Will Be Activated. This Requirement Now Applies To Both New And Existing Entities. Effective 29 April 2018, The Notarized Letter Process Is Now Mandatory On All Current Registrants At Sam Who Have A Requirement To Update Data On Their Sam Record. The Notarized Letter Is Mandatory And Is Required Before The Gsa Federal Service Desk (fsd) Will Activate The Entity's Registration. Effective 29 June 2018, Vendors Creating Or Updating Their Registration Can Have Their Registration Activated Prior To The Approval Of The Required Notarized Letter. However, The Signed Copy Of The Notarized Letter Must Be Sent To The Gsa Federal Service Desk (fsd) Within 30 Days Of Activation Or The Vendor Risks No Longer Being Active In Sam. Vendors Can Check Whether An Account Is Active By Performing A Query By Their Cage Or Unique Entity Identifier (formerly Duns Number). The New Registration Process May Now Take Several Weeks, So Vendors Are Highly Encouraged To Begin Registering As Soon As Possible To Avoid Any Possible Delays In Future Contract Awards. Remember, There Is No Cost To Use Sam. To Find Out Additional Information About The Changes Of The Sam Registration Process, Contractors Should Visit The Frequently Asked Questions (faq) Link Located At The Top Of The Sam Homepage (www.sam.gov). funds May Or May Not Be Presently Available For This Effort. No Award Will Be Made Under This Solicitation Until Funds Are Available. The Government Reserves The Right To Cancel This Solicitation, Either Before Or After The Closing Date For Receipt Of Proposals. In The Event The Government Cancels This Solicitation, The Government Has No Obligation To Reimburse Offeror(s) For Any Cost.
Closing Date1 Mar 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Real Estate Service
United States
Details: The Jacksonville District, U.s. Army Corps Of Engineers Is Soliciting Lease Proposals For A Minimum Of 5,552 To A Maximum Of 6,940 Gross Rentable Square Feet Of Commercial Storefront Space Within A 1¼ Mile Radius Of 2921 E. Colonial Drive, Orlando, Fl 32803. The Space Shall Contain Adequate/assigned Parking For Approximately Eighteen Vehicles (18) Government Vehicles Both During The Day And Overnight. The Lease Is For A Five-year Term With Government Termination Rights, And A Full-service Lease (to Include All Utilities And Janitorial Services) Is Preferred. Must Use Government Lease. The Government’s Space And Service Requirements Are Described In The Attached Documents Entitled Minimum And Specific Requirements, Construction Specifications And Construction Specifications Bid Proposal Worksheet, And Janitorial Services Specifications - Requirements. additionally, The Following Documents Which Contain Other Government Leasing Requirements Are Also Attached For Your Review: a. U.s. Government Lease For Real Property b. General Clauses; Gsa Form 3517b please Review All The Documents Thoroughly So That You Have A Complete Understanding Of The Government’s Requirements. One Item Of Note In The General Clauses, Gsa Form 3517b Document Is The Requirement To Register In The System For Award Management At Www.sam.gov (general Clause 17, Cfr 52.204-7). This Registration Is Mandatory For Any Entity Wishing To Do Business With The Government And Must Be Completed Before Lease Award. for Your Proposal, Ensure That You Obtain A Contractor’s Bid To Complete The Build-out Based On The Requirements. Once You Have Obtained A Contractor’s Bid, Please Complete And Sign The Attached Proposal To Lease Space Form. additional Information Regarding This Solicitation May Be Obtained From Ana Fraguada At Ana.m.fraguadavializ@usace.army.mil. The Completed Proposal To Lease Space Form And The Documents Listed In Section 5.c Of The Proposal To Lease Space Form Must Be Received In This Office By Email To Ana.m.fraguadavializ@usace.army.mil No Later Than 11:59 Pm On Friday, February 28, 2025. after Receipt Of All Proposals, Conclusion Of Discussions, And Receipt Of Best And Final Offers, The Government Will Select A Location Based On The Lowest Overall Cost To The Government. Past Performance, If Applicable, Will Also Be Taken Into Consideration. The Selection Is Expected To Occur Approximately 30 Days Following The Initial Proposal Cut-off Date Stated Above. A Government Appraisal Or Value Estimate Will Be Conducted To Determine Fair Market Rental Value For The Selected Site. notice: The Following Information Is Provided For Situational Awareness And Is Not Required To Respond To This Sources Sought. All Contractors Must Be Registered In The System For Award Management (www.sam.gov) Prior To Award Of A Contract. All Proposed Contractors Are Highly Encouraged To Review Far Clause 52.232-33 Payments By Electronic Funds Transfer – System For Award Management, Which Indicates “all Payments By The Government Under This Contract Shall Be Made By Electronic Funds Transfer (eft).” Those Not Currently Registered Can Obtain Registration By Going To The Website Http://www.sam.gov. The Process Can Usually Be Completed From 24 To 48 Hours After Submission. Contractors Will Need To Obtain A Unique Entity Identifier (formerly Duns Number) For Processing Their Registration. If You Do Not Already Have A Unique Entity Identifier, One Can Be Obtained From Http://www.sam.gov. Refer To Www.sam.gov For Information Formerly Found In Ccr, Epls, Orca And Fedreg. Please Begin The Registration Process Immediately In Order To Avoid Delay Of The Contract Award Should Your Firm Be Selected. alert: You Must Submit A Notarized Letter Appointing The Authorized Entity Administrator Before Your Registration Will Be Activated. This Requirement Now Applies To Both New And Existing Entities. Effective 29 April 2018, The Notarized Letter Process Is Now Mandatory On All Current Registrants At Sam Who Have A Requirement To Update Data On Their Sam Record. The Notarized Letter Is Mandatory And Is Required Before The Gsa Federal Service Desk (fsd) Will Activate The Entity's Registration. Effective 29 June 2018, Vendors Creating Or Updating Their Registration Can Have Their Registration Activated Prior To The Approval Of The Required Notarized Letter. However, The Signed Copy Of The Notarized Letter Must Be Sent To The Gsa Federal Service Desk (fsd) Within 30 Days Of Activation Or The Vendor Risks No Longer Being Active In Sam. Vendors Can Check Whether An Account Is Active By Performing A Query By Their Cage Or Unique Entity Identifier (formerly Known As The Duns Number). The New Registration Process May Now Take Several Weeks, So Vendors Are Highly Encouraged To Begin Registering As Soon As Possible To Avoid Any Possible Delays In Future Contract Awards. Remember, There Is No Cost To Use Sam. To Find Out Additional Information About The Changes Of The Sam Registration Process, Contractors Should Visit The Frequently Asked Questions (faq) Link Located At The Top Of The Sam Homepage (www.sam.gov).
Closing Date1 Mar 2025
Tender AmountRefer Documents 

FEDERAL EMERGENCY MANAGEMENT AGENCY USA Tender

Software and IT Solutions
United States
Details: The Purpose Of This Rfi Is Inform Both Industry And The Government On The Need To Establish A New O&m Contract That Meets The Federal Emergency Management Agency’s (fema) Hazard Mitigation Directorate (hmd)needs. introduction:the Federal Emergency Management Agency’s (fema) Hazard Mitigation Directorate (hmd) Oversees An Operation And Maintenance (o&m) Contract For The Non-disaster Mitigation Electronic Grants (mt-egrants) Information Technology Financial System And The Disaster Hazard Mitigation Grant Program (hmgp), Fema Chief Financial Officer Designated Financial Systems. Both Systems Are Not Only Legacy In Nature But Also Custom Build. Hmd Is Currently At The End Of A Contract Cycle And Is Interested In Developing A Contract That Provides Comparable O&m Services. background:hmd’s Existing O&m Contract Supports Including But Not Limited To: Disaster Recovery Reform Act Of 2018 (drra) Implementation Requirements, Building Resilient Infrastructure And Communities (bric) Grant Program Implementation Requirements; Engineering, Engineering Testing And Development Lab; Engineering O&m, Production Operations And Maintenance And All It Security Certification And Accreditation Requirements. In Addition, The Interconnectivity To The Fema/dhs Information Technology Network And The System’s Interfaces To The Fema Enterprise Identity Management System (feims), Nemis Enterprise Services (es) And Soa Financial Services (sfs). these Interfaces Are Required To Ensure Proper Financial Processing For The Mt-egrants And Hmgp Systems Non-disaster And Disaster Transactions Between The Fema Integrated Financial Management And Information System (ifmis) And The Mt-egrants/hmgp Systems. The Hmgp System Interfaces With Feims For User Account Management And Routing, And The Document Management & Records Tracking System (dmarts) For The Storage And Retrieval Of Document Attachments. support Fema’s Ocio Mission While Maintaining Current Operations Without Disruption Of Existing Application Functionality And Supporting The Immediate Emergency And Disaster Operations’ Needs. Apply Industry Standard Innovation To Implement A Service Oriented Architecture (soa), Enterprise Architecture (ea) And Cyber Security Directives And Policies. scope:the Scope Of This Effort Includes The Mt-egrants And Hmgp System Development And Applications Integration Throughout Fema. This Effort Encompasses The Full Range Of Application Development And Integration Services And Associated Applications Development Infrastructure Services (as Related To The Mt-egrants And Hmgp Systems). Specifically, This Effort Includes, But Is Not Limited To, Use Of Various Development Approaches For Mission Need Determination, Including Drra And Bric; Requirements Analysis; And Application, Testing, And Implementation; Support Of Non-production Environments; Application Development Organizational Consulting And Related Business Process Reengineering; Configuration Management And Release Management; And Related Project Management As Well As Systems Integration, Performance And Availability Analysis And Improvement, Support Contingency Planning And Execution Capabilities. the Government’s Additional Goal Is To Benefit From Industry Best Practices That Will “extend” The Architecture To Make The Fema Enterprise More Adaptable, Agile, Interoperable And Mission- Responsive. history (why We Want To Recompete This Contract):hmd’s Current Hma O&m Contract Is Coming To The End Of It Cycle. In The 25-year History Of The Mt-egrants And Hmgp Systems They Have Only Had Two (2) Vendors. Therefore, To Obtain The Best Industry Practices And Innovations We Are Expanding Our Search. period Of Performance:the Period Of Performance For A New Contract Would Be A 1-year Base, With An Additional 4 Option Years. option Period 1: 12 Months option Period 2: 12 Months option Period 3: 12 Months option Period 4: 12 Months place Of Performance:the Principal Place Of Work Shall Be The Contractor’s Facility Or Its Designated Alternate Workplace. see Attached Rfi Instructions And Draft Pws. please Submit Answers To The Following Questions In Your Rfi Response: company Name And Unique Entity Identifier, As Registered In Www.sam.gov provide A Point-of-contact Name, Phone, Address, And Email: provide Your Business Size For The Naics Codes Of 541513 And 54151: what Strategic Sourcing Vehicles (ssvs), Government-wide Acquisition Contracts(gwacs), Indefinite-delivery/indefinite-quantity (idiqs) Contracts, Or Othercontract Vehicles Are You A Part Of That Are Relevant To Our Requirement? can Your Company Provide This Solution On Your Own Or Would You Partner/subcontract With Another Company? Do You Have An Existing Relationship In Place, Or Would You Need To Establish This With A Potential Partner/subcontract? have You Provided Similar Services Of Similar Scope With Fema Legacy It Financial Systems? included Above Is The Previous Evaluation Strategy, Our Team Is Planning On Revisiting The Strategy And Changes May Occur Prior To Release Of A Final Solicitation. How Does Your Company Want To Be Evaluated For This Requirement? Do You Have Any Recommendations For Evaluation Criteria We Should Consider Including For The New Solicitation Or Removing From The Previous Process? please Include Anycomments, Questions, Or Suggestions Related To The Above Draft Requirements. do You Have Any Concerns About This Requirement, Which If Not Addressed, May Adversely Impact Your Decision To Bid On This Requirement? provide A Brief Description Of Your Organizations Experience With The National Emergency Management Information System (nemis).
Closing Date22 Jan 2025
Tender AmountRefer Documents 
8371-8380 of 8695 active Tenders