Uttar Pradesh State Bridge Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Bridge Corporation Limited - UPSBC Tender
Works
Civil And Construction
Eprocure
Opening Date16 May 2025
Closing Date14 Jun 2025
Tender AmountINR 20,83,08,359 (USD 24,22,879)
AI Insights
AI Insights
Technical
Financial
Bid Capacity
The formula for bid capacity is: Assessed Available Bid capacity = (A x N) / (B)
Where:
A = Maximum value of civil engineering works executed in any one year during the last Seven years, updated to the price level of the year indicated in Appendix
N = Number of years prescribed for completion of the works for which bids are invited
B = Value updated to the price level of the year indicated in Appendix of existing commitments and ongoing works to be completed during the next year's period of completion of the works for which bids are invited.
Technical Capacity
The required prior work experience for the bidder is not explicitly mentioned in terms of specific years or amount, but the bidder needs to provide information on their experience in similar work. However, key personnel to be deployed on contract work are required to have specific years of experience:
- Project Manager: 15 years of experience and 5 years as a manager in bridge construction
- Site Engineer: 10 years of experience and 5 years in bridge construction
- Plant Engineer: 10 years of experience or a diploma in mechanical engineering with 15 years of experience
- Quantity Surveyor: 7 years of experience or a diploma in civil engineering with 10 years of experience
- Soil Material Engineer: 10 years of experience
- Survey Engineer: 5 years of experience or a diploma in civil engineering with 8 years of experience
As for the value and percentage of similar works completed, the information provided does not explicitly mention these values for the bidder. However, it does mention that the bidder should have experience in successfully completing or substantially completing at least one project, with a total length of structures (excluding culverts and approaches) of not less than one-third of the total length of the proposed structure (excluding approaches), and the updated completion cost of such a project should not be less than one-third of the Estimated Project Cost in the last 7 financial years preceding the Bid Due Date. Substantially completed works mean those works that are at least 90% completed.
Costs
EMD
INR 41,66,167 (USD 48,458)
Description
Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPSBC_1039643_1Tender No
606/30ET/ROB45/GM(GZB)/2025Tender Authority
Uttar Pradesh State Bridge Corporation Limited ViewPurchaser Address
-Website
https://bridgecorporationltd.com/
Unlock the Tender details for free