Uniform Tenders
Uniform Tenders
Bureau Of Corrections Muntinlupa City Metro Manila Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (procurement/contract No. 009) Sixth Edition July 2020 Bids And Awards Committee 202 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 59 Section Viii. Bill Of Quantities 60 Section Ix. Checklist Of Technical And Financial Documents 61 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) 1. The Bureau Of Corrections, Through The National Expenditure Program (nep) Of 2025 Capital Outlay, Intends To Apply The Sum Of Three Hundred Million Pesos Only (₱300,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) With Identification Number _epa-009__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections Super Maximum Security Facility, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _december 28, 2024 (08:00am To 05:00pm) To January 20, 2025 (01:29 Pm)_____ From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On _january 06, 2025 (01:30pm)__ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before __january 20, 2025 (01:30pm)_____. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)____ At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf), With Project Identification Number__________________. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Million Pesos Only (₱300,000,000.00). 2.2. The Source Of Funding Is: Nga, The National Expenditure Program 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is One Tenth Of One Percent Of The Total Contract Price. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Terms Of Reference Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Sablayan Prison And Penal Farm, Occidental Mindoro 1. Project Information 1.1 Project Description The Mission Of The Bucor Is To Protect Society By Confining Offenders In The Controlled Environments Of Prisons And Community-based Facilities That Are Safe, Humane, Cost-efficient, And Appropriately Secure, And That Provide Self-improvement Opportunities To Assist Offenders In Becoming Law-abiding Citizens. The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Shall Be Conducive To The Reformation And Rehabilitation Of Inmates That Will Bring Them Back Into The Mainstream Of Society As Useful Citizens Of The Country. The Contract Will Involve The Design And Build Scheme Leading To The Construction Of The Bureau Of Corrections Super Maximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm, Sablayan, Occidental Mindoro. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Bucor Planning And Design Division Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bureau Of Corrections Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Bucor Super Maximum Prison Facility (phase 2) Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. This Project Aims To Be Completed Within A Year, Aligning With Our Decongestion Program. This Expedited Timeline Underscores Our Commitment To Addressing Urgent Needs Within The Correctional System And Providing Timely Solutions For The High Risk Committed Pdl. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Division (pdd) Under. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Construction Of Super Maximum-security Facility Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdd. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Director Of Directorate For Engineering Services (des). B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdd Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: I. One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Oncomposed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. Ii. 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); Iii. Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); Iv. Road Networks And Culverts • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts." 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdd For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdd. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A. Render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical. All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdd Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate, When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdd Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The Engineering Services (es) Of The Sppf On Behalf Of The Bucor Pdd • Sppf-es To Impose To Contractor Testing Of All Items After Installation And/or Application. Es To Send Pdd Copy Of The Test Report/s. • Sppf-es To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Sppf- Es To Inform Pdd Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdd) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdd Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Sppf Es Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Ippf Es Will Be Reviewed And Approved By Pdd - Nhq Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdd. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdd And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply And Distribution System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Sewage Treatment Plant • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Electrical System Layout 4. Mechanical System Layout 5. Instrumentation And Control System Diagrams 6. Piping And Instrumentation Diagrams (p&ids) 7. Equipment Details And Specifications 8. Electrical Power Distribution 9. Emergency Power Systems 10. Grounding And Lightning Protection 11. Control And Monitoring Systems, If Applicable 12. Safety Systems 13. Miscellaneous Details B. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Backup Power Generator With Capacity Not Less Than Total Computed Kva Load Without Demand Factor. D. 3-phase Electrical Supply Shall Be Sourced From The Local Electrical Utility. E. Power Line Connection From Main Source To The Facility Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements Technical Specifications Boring Test Structural Design And Analysis And Computation Final Design And Construction Plans Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdd Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bureau Of Corrections. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184 V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 5. Minimum Heavy Equipment Requirement (as Needed) For Site Development Such As: No. Item Specification 1. Backhoe 0.8 Cu. M. 2. Backhoe Wheel Mounted With Breaker 0.90 Cu. M. 3. Cargo/service Truck 2-5 Mt., 160 Hp 4. Dump Truck 12 Cu. Yd. 5. Motorized Road Grader G710a, 140hp 6. Payloader 1.5 Cu. M. 7. Vibrator Roller 10 Mt 8. Bulldozer 170 Hp 9. Scraper 515 Hp 10. Truck Mounted Crane, Hydraulic Telescopic Bommer Capacity: 41 – 45 Mt. 11. Crawler Crane 41-45 Mt 12. Generator Set 300 Kw/375 Kva 13. Water Pump 100mm Suction Dia. 14. One Bagger Mixer 4-6 Ft3/min 15. Concrete Vibrator Ey20, 5hp, 32-70mm 16. Vibro Hammer 45000 Kg-m 17. Excavator 17.5 Kw Or Any Specify Types Of Heavy Equipment Needed For A Site Development Will Be Determined By The Winning Bidder. 6. Environmental Compliance 7. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 8. Billboard 9. Traffic Management (if Applicable). Vii. Building Construction 1 Lot One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Composed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. 1 Lot 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); 1 Lot Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); 1 Lot Road Networks And Culverts • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts. A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finished - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. (at Elevated Water Tank Area) J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Contractor Encouraged To Adapt: Lpf Flush Valve For Water Closet Or Stainless Toilet-lavatory Combination. Waterless Urinals N. Sprinkler System To All Prison Dormitories In Accordance With The Provisions Of Revised Plumbing Code Of The Philippines. O. Contractor To Provide A Water System To Supply The Facility 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 300,000,000. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php300,000,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D. Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criteria That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Safety And Security: Excellent (100%): The Design Features Robust Perimeter Walls, Guard Towers, And Security Features Ensuring Optimal Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Highly Reliable, With Comprehensive Safety Measures For Both Psdl And Staff. Good (80%): The Design Incorporates Effective Perimeter Walls, Guard Towers, And Security Features, With Minor Areas For Enhancement. Fire Protection And Detection Systems Are Reliable, With Adequate Safety Measures For Psdl And Staff. Acceptable (70%) The Design Includes Satisfactory Perimeter Walls, Guard Towers, And Security Features, Meeting Basic Requirements For Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Functional, With Sufficient Safety Measures For Psdl And Staff. Some Reservations (50%): The Design Features Partially Effective Perimeter Walls, Guard Towers, And Security Features, With Notable Deficiencies In Pdl Containment And Facility Security. Fire Protection And Detection Systems Lack Reliability, With Limited Safety Measures For Psdl And Staff. Serious Reservations (20%): The Design Lacks Effective Perimeter Walls, Guard Towers, And Security Features, Compromising Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Inadequate, Posing Significant Risks To Psdl And Staff Safety. Unacceptable (0%): The Design Neglects Perimeter Walls, Guard Towers, And Security Features, Failing To Ensure Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Absent Or Non-functional, Posing Severe Risks To Psdl And Staff Safety. D. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. E. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Ninety (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued Doc. No. _____ Page No. _____ Book No. _____ Series Of ____ Company Letterhead Omnibus Sworn Statement Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________
Closing Date20 Jan 2025
Tender AmountPHP 300 Million (USD 5.1 Million)
Bureau Of Corrections Muntinlupa City Metro Manila Tender
Automobiles and Auto Parts
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Supply And Delivery Of Various Bucor Vehicles 2025 (procurement/contract No. 010) Sixth Edition July 2020 Bids And Awards Committee 2024 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 16 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 22 Section Vi. Schedule Of Requirements 27 Section Vii. Technical Specifications 29 Section Viii. Bidding Forms 34 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid For Supply And Delivery Of Various Bucor Vehicles 2025 1. The Bureau Of Corrections, Through The National Expenditure Program Fy 2025 (capital Outlay) Intends To Apply The Sum Of Seventeen Million Three Hundred Thousand Pesos Only (₱17,300,000.00) Being The Abc To Payments Under The Contract For Supply And Delivery Of Various Bucor Vehicles 2025 With Identification Number __epa-010__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Within Thirty (30) Calendar Days. Bidders Should Have Completed, Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below During Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On __december 29, 2024 (08:00am To 05:00pm) To January 20, 2025 (08:00am To 01:29pm)___ From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty-five (₱25,000.00) Thousand Pesos Only. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees And Presented In Person. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On __january 06, 2025 (01:30pm)____ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before __january 20, 2025 (01:29pm)__. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)__ At The Given Address Below Bac Conference Room Nbp Reservation Muntinlupa City, Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Schedule Of Bidding Activities Shall Be As Follows: Activites Date/time Venue 1. Sale And Issuance Of Bid Documents December 29, 2024 (08:00am To 05:00pm) To January 20, 2025 (08:00am To 01:29pm)_ Supply Division Bureau Of Corrections Muntinlupa City 2. Pre-bid Conference January 06, 2025 (01:30pm Bac Conference Room Bureau Of Corrections Muntinlupa City 3. Submission And Opening Of Bid Documents January 20, 2025 (01:30pm) Bac Conference Room Bureau Of Corrections Muntinlupa City 11. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Maria Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt. Celso S. Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Wishes To Receive Bids For The Supply And Delivery Of Various Bucor Vehicles 2025 {[insert, If Applicable:] Under A Framework Agreement}, With Identification Number [indicate Number]. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Supply And Delivery Of Various Bucor Vehicles 2025 Is Composed Of One (1) Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For National Expenditure Program Fy 2025 (capital Outlay) In The Amount Of Seventeen Million Three Hundred Thousand Pesos Only (₱17,300,000.00). 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. [select One, Delete Other/s] A. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I. When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii. Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv. When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. B. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.2. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.3. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.4. Subcontracting Of Any Portion Of The Project Does Not Relieve The Supplier Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Supplier’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address Bac Conference Room Nbp Reservation, Poblacion, Muntinlupa, City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within The Last Four (4) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.5. [include If Framework Agreement Will Be Used:] Financial Proposals For Single Or Multi-year Framework Agreement Shall Be Submitted Before The Deadline Of Submission Of Bids As Prescribed In The Ib. For Multi-year Framework Agreement, Evaluation Of The Financial Proposal During This Stage Is For Purposes Of Determining Eligibility And Whether Or Not Such Financial Proposal Is Within The Abc. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 12.2. [include If Framework Agreement Will Be Used:] For Framework Agreement, The Following Should Also Apply In Addition To Clause 12.1: A. For A Single Year Framework Agreement, The Prices Quoted By The Bidder Shall Be Fixed During The Bidder’s Performance Of The Contract And Not Subject To Variation Or Escalation On Any Account. Price Schedules Required Under Clause 12.1 Shall Be Submitted With The Bidding Documents. B. For A Multi-year Framework Agreement, The Prices Quoted By The Bidder During Submission Of Eligibility Documents Shall Be The Ceiling And The Price Quoted During Mini-competition Must Not Exceed The Initial Price Offer. The Price Quoted During Call For Mini-competition Shall Be Fixed During The Bidder’s Performance Of That Call-off And Not Subject To Variation Or Escalation On Any Account. Price Schedules Required Under Clause 12.1 Shall Be Submitted With The Bidding Documents. 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14.3. [include If Framework Agreement Will Be Used:] In The Case Of Framework Agreement, Other Than The Grounds For Forfeiture Under The 2016 Revised Irr, The Bid Security May Also Be Forfeited If The Successful Bidder Fails To Sign The Framework Agreement, Or Fails To Furnish The Performance Security Or Performance Securing Declaration. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Posting Of Performance Security Or Performance Securing Declaration, As The Case May Be, By The Winning Bidder Or Compliant Bidders And The Signing Of The Framework Agreement. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 16.2. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, The Submission Of Bids Shall Be For The Initial Evaluation Of Their Technical And Financial Eligibility. Thereafter, Those Declared Eligible During The Said Initial Eligibility Evaluation And Entered Into A Framework Agreement With The Procuring Entity Shall Submit Anew Their Best Financial Offer At The Address And On Or Before The Date And Time Indicated In The Call For Each Mini-competition. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, Determination Of Margin Of Preference Shall Be Conducted Every Call For Mini-competition. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. [include The Following Options If Framework Agreement Will Be Used:] A. In The Case Of Single-year Framework Agreement, The Lowest Calculated Bid Shall Be Determined Outright After The Detailed Evaluation; B. For Multi-year Framework Agreement, The Determination Of The Eligibility And The Compliance Of Bidders With The Technical And Financial Aspects Of The Projects Shall Be Initially Made By The Bac, In Accordance With Item 7.4.2 Of The Guidelines On The Use Of Framework Agreement. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Option 1 – One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.1. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, All Bidders Initially Determined To Be Eligible And Financially Compliant Shall Be Subject To Initial Post-qualification. The Bac Shall Then Recommend The Execution Of A Framework Agreement Among All Eligible, Technically And Financially Compliant Bidders And The Procuring Entity And Shall Be Issued By Hope A Notice To Execute Framework Agreement. The Determination Of The Lowest Calculated Bid (lcb) Shall Not Be Performed By The Bac Until A Mini-competition Is Conducted Among The Bidders Who Executed A Framework Agreement. When A Call For Mini-competition Is Made, The Bac Shall Allow The Bidders To Submit Their Best Financial Proposals On Such Pre-scheduled Date, Time And Place To Determine The Bidder With The Lcb. 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, {[include If Framework Agreement Will Be Used:] Or In The Case Of Multi-year Framework Agreement, That It Is One Of The Eligible Bidders Who Have Submitted Bids That Are Found To Be Technically And Financially Compliant,}the Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. {[include If Framework Agreement Will Be Used:] For Every Mini-competition In Framework Agreement, The Lcb Shall Likewise Submit The Required Documents For Final Post Qualification.} 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. [include The Following Clauses If Framework Agreement Will Be Used:] 21.2. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Framework Agreement Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 21.3. Within Ten (10) Calendar Days From Receipt Of The Notice To Execute Framework Agreement With The Procuring Entity, The Successful Bidder Or Its Duly Authorized Representative Shall Formally Enter Into A Framework Agreement With The Procuring Entity For An Amount Of One Peso To Be Paid To The Procuring Entity As A Consideration For The Option Granted By The Procuring Entity To Procure The Items In The Framework Agreement List When The Need Arises. 21.4. The Procuring Entity Shall Enter Into A Framework Agreement With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 21.5. The Following Documents Shall Form Part Of The Framework Agreement: A. Framework Agreement Form; B. Bidding Documents; C. Call-offs; D. Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; E. Performance Security Or Performance Securing Declaration, As The Case May Be; F. Notice To Execute Framework Agreement; And G. Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Motor Vehicle. B. Completed Within The Last Four (4) Years Equivalent To At Least Fifty Percent (50%) Of The Abc, Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 The Price Of The Goods Shall Be Quoted Ddp Bureau Of Corrections Iwahig Prison And Penal Farm (ippf) Puerto Prinsesa City, Palawan Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Two Percent (2%) Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 19.3 One Project Having Several Items That Shall Be Awarded As One Contract. 20.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (sales Invoice Or Official Receipt Or End-users Acceptance) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Audited Financial Statement 7. 2 Sets Photo Copy Of Eligibility And Financial Envelope Marked As “copy 1” And “copy 2” 21.2 No Additional Contract Documents. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. [include The Following Clauses If Framework Agreement Will Be Used:] 2.3. For A Single-year Framework Agreement, Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under A Call-off Shall Not Vary From The Prices Quoted By The Supplier In Its Bid. 2.4. For Multi-year Framework Agreement, Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under A Call-off Shall Not Vary From The Prices Quoted By The Supplier During Conduct Of Mini-competition. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184.{[include If Framework Agreement Will Be Used:] In The Case Of Framework Agreement, The Bidder May Opt To Furnish The Performance Security Or A Performance Securing Declaration As Defined Under The Guidelines On The Use Of Framework Agreement.} 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project {[include If Framework Agreement Will Be Used:] Or Framework Agreement} Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 1 [list Here Any Additional Requirements For The Completion Of This Contract. The Following Requirements And The Corresponding Provisions May Be Deleted, Amended, Or Retained Depending On Its Applicability To This Contract:] Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: The Delivery Terms Applicable To This Contract Are Delivered To Bureau Of Corrections Iwahig Prison And Penal Farm (ippf) Puerto Prinsesa City, Palawan. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is The Acting Director, Directorate For Engineering Services. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B. In The Event Of Termination Of Production Of The Spare Parts: I. Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii. Following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Are Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of [indicate Here The Time Period Specified. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 Not Applicable 4 The Inspections And Tests That Will Be Conducted Are: Partial/complete Goods Shall Be Inspected By The Tiac Technical Inspection And Acceptance Committee. Representative From Supply Division To Be Witnessed By: Coa Representative The Goods Shall Be Accepted By The End User After Passing The Inspection Of The Tiac (technical Inspection And Acceptance Committee). 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. Section Vi. Schedule Of Requirements Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Section Vi. Schedule Of Requirements Supply And Delivery Of Various Bucor Vehicles 2025 The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Delivered, Weeks/months 1 Prison Van 6 30 Calendar Days 2 Staff Car 2 30 Calendar Days 3 Staff Car 4 30 Calendar Days I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vii. Technical Specifications Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 1 Prison Van Overall Dimensions L X W X H (mm): 4,600 X 1,695 X 1,955 Wheelbase: 2400 Seating Capacity: 3 Engine Type Type: 4ja1 Direct Injection Common Rail Displacement (cc):2499 Maximum Output (ps/rpm): 78 Hp @3900 Rpm Maximum Torque (nm/rpm): 176.5 Nm @ 1800 Rpm Fuel Type: Diesel Fuel Tank Capacity: 50 Liters Transmission: 5-speed Manual Brakes: Front: Ventilated Discs Rear: Drum. Leading & Trailing Tires: 195r 14c 8pr Wheels (size): 14 X 5.5jj (6 Studs) Color: Camouflage Safety And Security Blinker And Siren Comm. Sys. Basic Tools, Jack And Manual Others: Bucor Logo Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 2 Staff Car Overall Dimensions L X W X H (mm): 4,735 X 1,830 X 1,795 Seating Capacity:8 Engine Type Type: 4-cylinder, In-line, 16-valve Double Overhead Camshaft (variable Nozzleturbo Charger W/ Intercooler) Engine Displacement (cc): 2755 Maximum Output (ps/rpm) 174 / 3,400 Maximum Torque (nm/rpm): 360 / 1,200 - 3,400 Fuel Type: Diesel 1 Gd - Ftv 6 - Speed At Multi - Reflector Halogen Black+silver Front Grille Function Fabric (black)* With Keyless Entry Eco+power Apple Carplay + Android Auto Safety And Security Driver + Front Passenger + Knee (d) With + Brake Assist + Ebd With Vehicle Stability Control ( Vsc) With Hill-start Assist Control (hsa) With Reverse Camera Other Modification: Color- Black Blinker And Siren Com. Sys. Basic Tools, Jack And Manual Others: Bucor Logo- Magnetic Type Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance _________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 3 Staff Car Overall Dimensions L X W X H (mm): 4,395 X 1,730 X 1,690 Wheelbase(mm): 2750 Seating Capacity: 7 Engine Type Type: 4-cylinder, In-line, 16-valve Dohc With Duel Vvt-idisplacement (cc):1329 Maximum Output (ps/rpm) 98/6000 Maximum Torque (nm/rpm): 122/4200 Fuel Type: Gasoline Fuel Tank Capacity: 43l Chassis Drivetrain: Front Wheel Drive Cvt Transmission 1nr-ve Brakes: Front: Disc Rear: Drum Tires: 185/ 65 R15 Alloy 15" Alloy Wheels __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 3 Continuation: Exterior Segment Lcd Mid Headlamps: Split Type Led Rear Combination: Led Lamp 2-tone Interior Function Key Start Digital Aircon Control Back Camera & Sensor 8" Audio Display With Apple Carplay And Android Auto Safety And Security Driver And Front Passenger Airbags Alarm+immobilizer+indicator Back Camera Color: Black Metallic 1 Blinker And Siren Comm. Sys. Basic Tools, Jack And Manual Others: Bucor Logo- Magnetic Type Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Viii. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Eligibility Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (f) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Bidders Should Have Completed, Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (g) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (h) Conformity With The Schedule Of Requirements; And ⬜ (i) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And A. Certificate Of Dealership B. List Of Service Centers Nationwide C. Certificate Of Availability Of Spare Parts D. Brochure And ⬜ (j) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate/board Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (k) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc; Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation At Least Equal To Ten Percent (10%) Of The Abc. Class “b” Documents ⬜ (l) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements Ii. Financial Component Envelope ⬜ (m) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (n) Original Of Duly Signed And Accomplished Price Schedule(s). Bidding Forms Company Letterhead Statement Of Ongoing Government & Private Contracts Supply And Delivery Of Various Bucor Vehicles 2025 Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Value Of Outstanding Contract Total Value Of Outstanding Contract: Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Supply And Delivery Of Various Bucor Vehicles 2025 Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Delivery Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Certificate Of Net Financial Contracting Capacity (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2025 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Ten (10) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1 Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: A) If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; B) If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting ; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The Supply And Delivery Of Various Bucor Vehicles 2025. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Bid Form Date: Invitation To Bid No: [insert Reference Number] To: Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply And Delivery Of Various Bucor Vehicles 2025 In Conformity With The Said Bidding Documents For The Sum Of ________________________________________₱_________________ Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. We Agree To Abide By This Bid For The Bid Validity Period Specified In Bds Provision For Itb Clause 17.1 And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period. Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Of Agent Amount And Currency Purpose Of Commission Or Gratuity (if None, State “none”) Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And You’re Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements As Per Itb Clause 5 Of The Bidding Documents. We Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections. [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract On The Latter’s Behalf For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 2025. [signature Over Printed Name] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of __________________________ Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Schedule Of Prices Supply And Delivery Of Various Bucor Vehicles 2025 Quantity Units Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat 6 Units Prison Van ₱8,700,000.00 2 Units Staff Car ₱3,600,000.00 4 Units Staff Car ₱5,000,000.00 Total: ₱17,300,000.00 Total Bid Price Inclusive Of Vat In Words [signature Over Printed Name] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of _______________________________ Sixth Edition July 2020 Bids And Awards Committee 2024
Closing Date20 Jan 2025
Tender AmountPHP 17.3 Million (USD 295.3 K)
Western Visayas Sanitarium Doh Tender
Healthcare and Medicine
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Department Of Health Western Visayas Sanitarium And General Hospital Santa Barbara, Iloilo Invitation To Bid For Supply, Delivery And Installation Of Various Hospital Equipment Ib No. 2024-12-018-g The Western Visayas Sanitarium, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors To Apply For Eligibility And To Bid For The Hereunder Project: Name Of Project : Supply, Delivery And Installation Of Various Hospital Equipment Location : Western Visayas Sanitarium And General Hospital, Inangayan, Santa Barbara, Iloilo Approved Budget For : Php 34,665,000.00 The Contract (abc) Fund Source : Caf No. 2024-133-gf Delivery Period : Within Ninety (90) Working Days After Receipt Of The Notice To Proceed Line Items Abc: Php 34,665,000.00 Lot 1 No. Description Unit Of Measure Quantity Approved Budget Cost (php) 1 Electrical Machine. Brand New. Product Specifications: Combination Of Electrotherapy And Ultrasound; With 3 Independent Channels And Body Diagram Installed; Power Supply: Ac 100- 240 V, Number Of Channels: 3 Independent (2 For Electrotherapy, 1 For Ultrasound) Electrotherapy; Ten& Ems, Ultrasound Functions; Electrode Pads For Tens & Ems; Us Probe Head: Large And Small. Warranty -1 Year From Delivery And Installation. Unit 1 290,000.00 2 Hand Dynanometer. Brand New. Product Specifications: Hydraulic Adjustable Handle. Strength Can Be Viewed In Pounds Or Kilogram. Can Measure Up To 90kg (200lbs.). Durable Metal Gauge. Warranty –at Least 6 Months Upon Delivery And Installation. Unit 1 55,000.00 3 Parallel Bars. Brand New. Product Specifications: Adjustable And Foldable. Stainless Steel Bars And Steel Base. Height Adjust Within 26''-40''. Width -24''-36". Length Ranges: 7-10 Feet. Warranty -at Least 6 Months Upon Delivery And Installation Unit 1 50,000.00 4 Pulley System. Brand New. Product Specifications: Single Handle/dual Tower. Chest And Floor Height Mounted Handle. Easily Adjustable Handles. Wheelchair Accessible. Warranty –at Least 1 Year Upon Delivery And Installation. Unit 1 150,000.00 5 Pbx, Smart Hybrid. Brand New. Product Specifications: Designed For Telemedicine Use. Genuine And High Quality Brand. Pabx Built-in Extensions 16 Analog. At Least 2 Card Slots And 2 Slots Trunk Extension Card Switch System. Ability To Equip Sub-frame Ns-320; 12-32 Trunk Extensions. Sub-frame To Extend Pbx Ns300. Port Connected To The Main Frame. Dimensions: 40-45 X 35-36 X 86-90 Cms. Warranty –at Least 6 Months From Delivery And Installation * Unit 1 100,000.00 6 Uninterrupted Power Supply. Brand New. Products Specifications: Designed For Telemedicine Operation. 3000va. Output Power Capacity-3000va, Mount: 3u Rack Mountable. Nominal Output Voltage -230v. Dimensions: 20-22 X 19-20 X 5-6 Inches. Warranty –at Least 6 Months Upon Delivery And Installation. * Unit 1 400,000.00 7 Medical Waste Shredder. Brand New. Product Specifications: 20hp Motor Slow-speed And High Torque Dual Shaft Shredders, 5/16″ Wide Cutters, With Bearing Protection And Cleaning Fitters. Features: Efficiently Shred Syringes, Face Masks, Boxed Medical Waste, Pill Bottles, Etc., Available With A Split Cutting Chamber That Allows For Two Different Shred Widths Within One Shredder, The Manner Of In Feed And Output Are Also Divided. Includes Training And Certification, Warranty 1 Year Upon Installation Unit 1 350,000.00 8 Portable Multi-parameter Analyzer Flow Water Quality Testing. Brand New. Product Specifications: Measures Water Quality Parameter For Ph/ec/ise/do/temp. Mv/orp/px/resistivity/tds/sal./do Saturation. Features: Portable Device, Color High Contrast Lcd Touchscreen, Data Storage1000 Sets For Each Parameter, Support For Usb Communication, Ip65 Waterproof, Includes All Necessary Accessories And Consumables, Includes Training And Certification For Use, Warranty For 1 Year Upon Installation Unit 1 200,000.00 9 Water Purification System. Brand New. Product Specifications: 6000 Gdp Reverse Osmosis Machine. Up To 1200 Containers Per Day. Double U.s. Membrane. 2 Tanks 1000ltrs. For Raw & Product Water. At Least 28 Stages Of Water Filtration. To Include Piping Line From Water Station To Specified Areas Within The Health Facility. To Include Necessary. Building/structure For The Water Station. Service Warranty 1 Year After Delivery And Installation. To Include Service And User Training. Including Consumables: 50 Gallons Round Containers, 50 Gallons Slim Containers, 1 Sack Industrial Salt. * Unit 1 350,000.00 10 Anesthesia Machine With Cardiac Monitor. Brand New. Product Specifications: Main Gas Supply -oxygen, Air. Pin Index Supply System: Oxygen, Air. Ventilatior: With At Least Six (6) Ventilation Modes. Machine Must Be Able To Ventilate Patient Using The Preset Settings Provided By The End-user Even Presence Of Driving Gas Is Temporarily Unavailable. Ventilator Must Be Enclosed With Metal Casing To Prevent Entry Of Foreign Items Including Fluid. Ceramic Type Of Inspiratory And Expiratory Valve. Ventilator Must Have High Pressure Valve That Ensures Release Of Excess Pressure When Required. Ventilator Must Be Functional When Machine Is Connected Either Through Direct Power Supply Or Back Up Battery. Breathing System: The Volume Of The Compact Breathing System And Co2 Absorber Must Be 1.7l Excluding Hoses And Breathing Bag. Volume Of Co2 Absorber Reusable Canister Must Be 1.5l. With Bypass Valve Located In Breathing System Allowing Continuous Machine Operation While Changing Co2 Absorber. With Fresh-gas Decoupling Valve That Prevents Direct Entry Of Pressure In The Patient Airway When Pressing The O2 Flush Button, Peep And Pressure Limitation. With Breathing System That Can Be Detached From The Main Unit Without Tools Required. Breathing System Should Be Separated From The Main Unit With Mounting That Can Be Positioned From Any Direction Without Moving The Entire Anesthesia Machine. With Ceramic Type Of Inspiratory And Expiratory Valve. With Sample Gas Return Port. With Pup Off Pressure Release Valve Located At The Apl Valve. With Moisture Reduction System. Hot Steam Sterilization Can Be Carried Out At 134 ° C (273.2 ° F). With Heated Breathing System. Anesthesia Gas Supply Module: Range Of Fresh Gas Flow Indicators: 0.0 To 12.0 L/min. O2 Flush (bypass): At 87 Psi (6 Kpa X 100): Max. 75 L/min At 41 Psi (2.8 Kpa X 100): Min. 25 L/min. With Metering Valve And Dual Flow Tubes For Fresh-gas. With Integrated O2 Monitoring Located In The Screen. Vaporizer: With Two (2) Selectatec Vaporizer Mounting. With One (1) Unit Sevoflurane And One (1) Unit Isoflurane Vaporizer. Vaporizer Must Have No Cloth Component Which Allows Item To Be Functional Immediately Even Transporting It In An Upside Down Position. Oxygen Sensor: With Oxygen Sensor That Measures Percentage Of Oxygen. Flow Sensor: With Constant Temperature Hot-wire Anemometer Flow Sensor. Must Be Located Within The Anesthesia Unit Distal To The Patient Area. Flow Sensor Must Be Reusable. Auxillary Low Flow Oxygen: With Integrated Low Flow Oxygen Supply For Mask And Nasal Cannula Application. Writing Table/drawers/mounting: With At Least 3 Drawers As Storage For Other Accessories. With A Retractable Writing Table That Can Hold At Least 10kgs. Advanced And Safety Features: Functional Even The Battery Is Completely Discharged, All Pneumatic Functions Continue To Be Available (apl Valve, Breathing Pressure Gauge, Cylinder And Pipeline Gauges, Fresh Gas And Agent Delivery, And O2, Air, Flow Meters).manual Or Spontaneous Ventilation Can Be Maintained During Power Failure And Discharged Of Battery. In Case Of No Power And Totally Discharged Battery, Machine Must Be Shifted Automatically From Ventilator Mode To Manual Mode Without Any Switch Or Button Required. Start-up Time Must Be Less Than 15 Seconds. Power Input Data: Power Supply: Rating Non-configurable 100 To 240 Vac, 50/60 Hz, 145 Va. Battery Operation Time: Up To 2 Hours, Minimum Of 45 Minutes. Parameters: Minimum Tidal Volume (vt) Required: 20 Ml. Breathing Frequency (rate): 4 To 60 Bpm (1/min). Inspiratory Pressure: Peep + 5 To 65 Cmh2o. Inspiratory Flow (inspflow): 10 To 75 L/min In Volume And Pressure Control Modes, 10 To 85 L/min In Pressure Support And Simv/ps Modes. Inspiration Pause: 0 To 50 %. Simv Inspiratory Time: 0.3 - 4.0 Sec. Positive End Expiratory Pressure: (peep) 0 To 20 Cmh2o. Inspiration/expiration Ratio: (ti:te) 4:1 To 1:4. Pressure Limiting: 70 Cmh2o. Range Of Fresh Gas Flow Indicators: 0.0 To 12.0 L/min. Pressure Support Level: Peep + 3 To 20 Cmh2o. Min. Frequency For Apnoe-ventilation: (freq. Min.) 3 To 20 Bpm And “off”. Trigger Level: 2 To 15 L/min. Standard Accessories: One (1) Unit O2 Regulator, One (1) Unit Air Regulator, O2, Air Fittings And Hose Clamps, One (1) Unit Adult Anesthesia Circuit With 2l Bag. Biolight M12 Patient Monitor (basic Configuration). Technical Specification: Display/waveforms: Screen Size Display: Not Less Than 12" Color Tft Screen. Screen Navigation: Touch Screen With Quick Volume And Brightness Adjustment. Support Quick Key, Able To Access Specific Functions Or Perform Operations Easily And Quickly. No. Of Waveforms: At Least 7 Waveforms (using Standard Screen Display). Battery: Internal Battery Duration Must Be: ≥ At Least 240 (built In Battery). Can Upgrade Lithium Battery, Battery Power Supply ≥480 Min. Ecg: Ecg Leads: 3/5 Leads, Display Sensitivity: ×0.25, ×0.5, ×1, ×2, ×4,auto Gain, Must Have A Smart Lead Off Feature, Must Have An Ecg Calibration Feature, Must Have An St Segment Analysis And Monitoring. Heart Rate Range Must Be: Adu: 10 To 300 Bpm, Ped/neo: 10 To 350 Bpm, Must Have Two (2) Hr Averaging Method. With Ecg Multi-lead Synchronous Analysis Function, Analysis Of Multiple Cardiac Leads At The Same Time, Can Be Accurately Monitored In The Case Of Individual Lead Interference, With Intelligent Lead Fall Monitoring Function. St-segment Analysis Can Show The St Graphic, Which Help Indicates The St Alarm Status More Faster. Nibp: Nibp Measurements Must Comply With The American National Standard For Electronic Or Automated Sphygmomanometers: - (ansi/aami/iso 81060-2:2009, Ansi/aami Sp10:2002) In Relation To Mean Error And Standard Deviation. Measurement Mode: Manual, Auto, Stat, And Sequence. Sequence Mode Could Support 5 Different Modes. Maximum Measuring Interval In Auto Mode Must. Must Have An Overpressure Protection For Nibp. Temperature: Must Have Dual-channel Body Temperature Monitoring With Difference Display Measurements. Must Support Skin And/or Oral/rectal. If More Than One Temperature Probe Is Used, The Monitor Will Be Capable Of Calculating And Displaying A Delta Reading. Measuring Range: 0~50 ℃. Spo2: Must Be Used In Low Pi (perfusion Index). Resp: Detection Method: Respiratory Rate And Respiratory Waveform Must Be Monitored By Pulse Wave. Trends: Trend Data For All Parameters In Tabular And Graphic Formats Must Be: 180h. Stored Nibp Measurements Must Be: Up To 2400 Groups. Stored Alarm Events Must Be: 3000 Groups And Associated Waveform. Holographic Waveform Must Be 72 Hours. Printer/recorder: Must Support 3-channel Recorder To Realize Thermal Printing; Support Network Printing Function. Network Capability: The Ip Address Of Each Patient Monitor Shall Be User Configurable. Features: -the Monitor Must Provide Electronic Early Warning Scor (ews, Glasgow Coma Scale (gcs), And Oxycrg Screen. -oxycrg Screen Shows Two Trend Curves And A Compression Waveform, Support To Review 48 Hours Trend Curve And Compression Waveform On The Oxycrg Review Screen. -accessories Storage Box, Help Manage Accessories And Prevent Accessories Missing Or Broken Problem. -user Shall Be Able To Freeze The Waveforms On The Screen And Then Review It To Carefully Observe The Patient During This Time. -up To 4 Timers Shall Be Able To Be Configured On Monitor Display To Count Up Or Down The Required Time In Minute And Second With Audio Alarm To Alert User. - The Monitor Shall Provide Following Specific Working Modes: Standby, Intubation, Night, Privacy, And Demo Modes. Accessories Included: 3/5 Lead Ecg Cable, 3/5 Lead Ecg Lead Wires, Adult Spo2 Sensor, Pediatric Spo2 Sensor, Temperature Probe Skin, Temperature Probe Oral/rectal, Nibp Cuff Adult, Nibp Cuff Pedia, Wall Mount / Trolley, One (1) Unit Pediatric Anesthesia Circuit With 1l Bag, Two (2) Units Power Adapter. Includes Avr Machine For Anesthesia Machine. Warranty -2 Years From Delivery, Installation, And Training/orientation. Unit 1 3,300,000.00 11 Cardiac Monitor With Capnograph. Brand New. Product Specifications: Display/waveforms: Screen Size Display: Not Less Than 12" Color Tft Screen. Screen Navigation: Touch Screen With Quickly Volume And Brightness Adjustment By Gestures Operate. Support Quick Key, Can Easily And Quickly Access Some Functions Or Perform Operations. No. Of Waveforms: At Least 7 Waveforms (using Standard Screen Display). Size Must Be: At Least 175mm X 320mm X262mm. With Auto Speech Recognition Module Implements The Voice Interaction With The Patient Monitor. Battery: Internal Battery Duration Must Be: ≥ At Least 240 (built In Battery). Can Up-grade Lithium Battery Power Supply ≥480min. Ecg: 5 Leads Display Sensitivity: ×0.25, ×0.5, ×1, ×2, ×4, Auto Gain. Must Have A Smart Lead Off Feature, Must Have An Ecg Calibration Feature, Must Have An St Segment Analysis And Monitoring. Heart Rate Range Must Be: Adu: 15 To 300 Bpm, Ped/neo: 10 To 350 Bpm. Must Have Two (2) Hr Averaging Method. With Ecg Multi-lead Synchronous Analysis Function, Analysis Of Multiple Cardiac Leads At The Same Time, Can Be Accurately Monitored In The Case Of Individual Lead Interference, With Intelligent Lead Fall Monitoring Function. St-segment Analysis Can Show The St Graphic, Which Help Indicates The St Alarm Status More Faster. Nibp: Nibp Measurements Must Comply With The American. National Standard For Electronic Or Automated. Sphygmomanometers: - (ansi/aami/iso 81060-2:2009, Ansi/aami. Sp10:2002) In Relation To Mean Error And Standard Deviation. Measurement Mode: Manual,auto, Stat, And Sequence,sequence Mode Could Support 5 Different Modes. Maximum Measuring Interval In Auto Mode Must. Must Have A Dual Overpressure Protection For Nibp. Temperature: Must Have Dual-channel Body Temperature Monitoring With Difference Display Measurements. Must Support Skin Or Oral If More Than One Temperature Probe Is Used, The Monitor Will Be Capable Of Calculating And Displaying A Delta Reading. Measuring Range: 0~50 ℃. Spo2: Must Be Used In Low Pi (perfusion Index). Resp: Detection Method: Respiratory Rate And Respiratory Waveform Must Be Monitored By Pulse Wave. Ibp: Support 2-channel Ibp Measurement Range: -50mmhg~+350mmhg. Types Of Measuring Blood Vessels: Arterial Pressure (art), Pulmonary Artery Pressure (pa), Central Venous Pressure (cvp), Right Atrial Pressure (rap), Left Atrial Pressure (lap), Intracranial Pressure (icp); Pulmonary Artery Wedge Pressure (pawp); Cerebral Perfusion Pressure (cpp). The Monitor Will Calculate The Ppv Based On Any Arterial Pressure Value Between Heartbeats. Etco2: Measuring Range: Etco 2 0 To 150 Mmhg. Fico: 3 To 50 Mmhg. Awrr: 0 To 150 Rpm (mainstream). Trends: Trend Data For All Parameters In Tabular And Graphic Formats Must Be: 180h. Stored Nibp Measurements Must Be: Up To 2400 Groups. Stored Alarm Events Must Be: 3000 Groups And Associated Waveform. Holographic Waveform Must Be 72 Hours Printer/recorder: Must Support 3-channel Recorder To Realize Thermal Printing; Support Network Printing Function Network Capability: The Ip Address Of Each Patient Monitor Shall Be User Configurable. The Upper/lower Limits Of Alarms Can Be Configured Via Networking From The Central. The Alarms At Bedside Can Be Paused Or Muted Via Networking From The Central. Features: -the Monitor Must Provide Electronic Early Warning Scor (ews), Glasgow Coma Scale (gcs ), And Oxycrg Screen. -oxycrg Screen Shows Two Trend Curves And A Compression Waveform, Support To Review 48 Hours Trend Curve And Compression Waveform On The Oxycrg Review Screen -accessories Storage Box, Help Manage Accessories And Prevent Accessories Missing Or Broken Problem -all-in-one Monitoring Adult, Children, And Newborn Patients. -user Shall Be Able To Freeze The Waveforms On The Screen And Then Review It To Carefully Observe The Patient During This Time. -up To 4 Timers Shall Be Able To Be Configured On Monitor Display To Count Up Or Down The Required Time In Minute And Second With Audio Alarm To Alert User. - The Monitor Shall Provide Following Specific Working Modes: Standby, Intubation, Night, Privacy, And Demo Modes. Warranty -1 Year From Delivery And Installation. Unit 2 500,000.00 12 Ceasarian Instrument Set. Brand New. Product Specifications: Made Of Heavy Duty Stainless Steel. Includes The Following Items: 1 Pc. Scalpel Handle #3 With Measure 125mm, 1 Pc. Scalpel Handle #4 135mm, 1 Pc. Tc Metzenbaum Scissors Cvd 180mm, 1 Pc. Lexer Scissors Narr Str 165mm, 1 Pc. Mayo-lexer Scissors Cvd 165mm, 1 Pc. Lister Bandage Scissors Hvy 180mm, 1 Pc. Standard Forceps Serr 160mm, 1 Pc. Standard Tissue Forceps 1x2 160mm, 5 Pcs. Lorna Towel Clamp Non-perf 130mm, 6 Pcs. Halsted-mosquito Forceps Delstr125mm, 6 Pcs. Halsted-mosquito Forceps Del Cvd125mm, 2 Pcs. Kelly Forceps Del Str 140mm, 6 Pcs Moynihan Hemostatic Forceps, Crv, 150mm, 1 Pc. Tc Mayo-hegar Ndlholderhvyserr150mm, 1 Pc. Tc Hegar Needle Holder Hvy-serr 205mm, 1 Pc. Us-army Retrac.26x15/43x15-23x15/40x15, 1 Pc. Richardson-eastman Bt471rbt472r, 6 Pcs. Boys-allis Forceps 5x6 155mm, 2 Pcs. Kidney Tray Stainless Steel 250mm, 1 Pc. Bottom For 3/4 Container Height:135 Mm, 1 Pc. Primeline Pro 3/4 Lid Red, 1 Pc. 3/4 Size Perf Basket 406x253x76mm, 1 Pc. Silicone Basket Liner 3/4 Size, 1 Pc.mayo Safety Pin F/ring-hdl Inst 140mm, 1 Pc. Ident. Label Up To 13 Letters Red. Warranty –at Least Eat 1 Year From Delivery. Set 2 1,520,000.00 13 Chemical Analyzer. Brand New. Product Specifications: Combined Instrument With Two Complementary Technologies: Raman Spectroscopy And Colorimetric Detection Confirmatory Testing: One Instrument Capable Of Confirmatory Testing Using Two Technologies Including 1) Swgdrug Category A Technique For Presumptive Testing, And 2) Swgdrug Category C Technique For Confirmatory Testing Safety Of Features For Measuring Energetic Samples: Trace Detection Testing For Energetics Without Need For Opening The Container Nor Inducing Laser Light To The Sample, Scan Delay Timer: 15 Sec – 10 Min Sample Size: Able To Detect / Identify Samples From 1 Microgram Traces To Large Bulk Samples Materials Covered: Common Raman Substances, Explosives, Narcotics, Cwas, Tics, Tims, Precursors, Common Chemicals, Fluorescent Materials Not Covered By 785nm Raman: E.g. Colored Materials, Heroin, Colored Mdma Pills, Oils, Npss, Etc., Low Concentration Materials Not Covered By Any Raman Instruments: Lsd, Thc, Magic Mushrooms, Gunpowder, Etc. Raman Excitation Wavelength: 1064nm Minimizes Fluorescence Effects: Allows For Direct Analysis Of Colored/impure Chemicals Through Colored Packaging. Spectral Wavelength Range 200 – 2500 Cm-1 Portability Power: Small Handheld Device, Optimized For One Handed Operation. , 18.5cm-20cm (l) X 15cm-20cm (w) X 7.9cm-10cm (h), 3.65lbs-5lbs (1.65 Kg-2.27kg)., Quantity 2 Lithium Ion Rechargeable Batteries With Battery Life Of More Than 6 Hours Per Charge Per Battery. Cr123a Rechargable Batteries Can Be Used. Including Spare 2 Lithium-ion Battery. Ruggedness Decontamination: Us Mil-std 810g Designed Rugged., Ip 68 Rated For Use In Varying Environmental Conditions And For Complete Decontamination. Operational Temperature Range: Unit Can Be Operated In -20°c To +50°c Temperatures., Withstands Temperature Fluctuations And Humidity Fluctuations. Rapid Start-up Rapid Results: 60 Seconds From Power On To Analysis., Analysis Results In Less Than One Minute. Operational Mode Options: Raman Analysis And Colorimetric Analysis Oraman: • Auto-collect Adjusts Raman Settings Automatically Optimizes Use For Routine Operations • Advanced User Adjustable Raman Settings For Advanced Operators And Custom Library Build: • Laser Power Level 30-490 Mw Adjustable In 5 Mw Increments Exposure Time 5ms To 30s In Increments • Custom Applications Optimize Raman Analysis Parameters Specific To Material Type Ocolorimetrics: • Pouches Including Both Swipes And Colorimetric Chemicals In One Pouch • Pouches For Explosives And Narcotics • General Pouches For Detecting A Wide Range Of Explosives Or Narcotics • Specific Pouches For One Explosive/narcotic Substance Or Substance Group Easy Raman Operation: • Scans In Direct Contact And Through Translucent Plastic Or Glass Containers. • Universal Sample Holder For Analysis Of Samples In Varying Forms And Packaging. • Smartphone Like Touch-screen Interface Or Large Button Activation. • User Prompted Step-by-step Onscreen Analysis Activation. • Typically, 4 Button Presses To Receive Analysis Result. • Onboard System Status Monitoring And Calibration. Reduces Down-time And Necessity For Re-calibration At A Service Depot Analytical Performance: • Liquids, Solids, Powders, Pastes, Gels, Invisible Traces. • Colored Substances And Substances Found In Colored Translucent Packaging. These Types Of Substances Are Most Often Encountered In Real-world Samples. • Comparative Spectral Analysis Overlay Easily Performed Onboard. • User Adjustable Focus Ensures Analysis Of Material And Not The Packaging. • 4c Software Automatically Monitors Results For Combinations Of Precursors Used In Threat, Drug Manufacturing, And Other Recipes. Users Receive Onscreen Alert To Potential Threat Or Clandestine Drug Manufacturing Activity. Library: Raman: • Over 12,000 Substances. • Resq Library Includes The Latest Explosives, Precursors, Cwas, Tics/tims, Narcotics And Psychotropic Drugs, Steroids, Cutting Agents, Pharmaceuticals, Diluents And Pesticides. • Easily Expandable To Add Emerging Threats And Other Substances. • Fleet Management And Library Transfer To Units In The Field. • 4c Library With Explosive, Drug Manufacturing And Other Types Of Threat Manufacturing Recipes. • Library Updates Provided More Than Once A Year Colorimetrics: • General Narcotics Pouches: Multi Drug Test Incl. Fentanyl, Special Opiate Pouch, Cannabinoids • General Explosives Pouches: Chlorates/perchlorates, General Explosives • Specific Pouches: Cocaine, Ephedrine, Heroin, Ketamine, Lsd, Meth/mdma, Mushrooms, Opiates, Pcp, Thc, Ghb Evidence Documentation Traceability: • Onboard 5mp Camera Captures Image Of Sample And Surroundings, As Well As Colorimetric Swab. • Image(s) Stored Along With Analysis Results In Tamper-resistant File. All Analysis Results Are Traceable And Include Unique Date, Time And Serial Number Stamp. • Ability To Activate Password Protect Operator Log-in. Record Of User Associated Activity Stored Onboard And Cannot Be Deleted. Data Access And Transfer Reporting: • View Results In Real Time On Cell Phone Or Tablet, Computer Or Laptop (pc, Ios, Android, Linux) Via Wifi (can Be Disabled). • Exportable Data In Numerous File Formats. • Data Access And Transfer On Computer Or Laptop Via Usb And Wifi (can Be Disabled). • Easy Report Generation. Customer Support Package: • 24/7/ 365 Days Reachback Service For The Life Of The Unit. • Library Updates Provided For The Life Of The Unit. • Software Updates Provided For The Life Of The Unit. • Support: Online, Phone, Email, And In Some Cases Text Message For The Life Of The Unit Cql Complete Package: • Rugged Shipping Case With Custom Foam Insert. • Qty 2 Rechargeable Lithium-ion Batteries. • Cr123a Battery Cartridge (does Not Include Cr123a Batteries). • External Battery Charger. • Ac Power Supply. • Adjustable Base Adaptor. • Universal Sample Holder. • Certified Benzonitrile Performance Verification And Calibration Standard. • Flash Drive Containing User Manual And Supporting Documentation. • Quick Start Guide. • Usb-c To Usb-a Data Transfer Cable. • 1064nm Laser Test Card. • Including Hand Strap And Wrist Strap. . Training: • Comprehensive Onsite Training For An Unlimited Number Of Users. Add-on Accessories And Software: • Periscope Adaptor. • Vial Holder. • Bottle Adaptor. • Integrated Quickdetect Automated Colorimetrics • Detect Trace Quantities Of Non-visible Residues Left On Surfaces: • Explosives And Explosive Precursors • Narcotics Standard Requirements: • Bidder’s Certificate That Will Provide Manual In English Language (2 Copies Of Operator's/user's Manual And 2 Copies Of Service/technical And Maintenance Manual) Upon Delivery. • Brochure/sales Literature. Training Requirements: • Bidder’s Certificate That Will Conduct Free Technical Training And Product Demo For The End-user/s And In-house Biomed On Equipment Operation And On Maintenance Of Equipment. • After Sales Service: Bidder’s Certificate That Parts Shall Be Available At The Authorized Philippine Service Center/s For A Period Of Five (5) Years After The Warranty Period. • Certification From Local Distributor On The Availability Of Service Technicians And/or Biomedical Engineers In Case Of Equipment Breakdown. Preventive Maintenance - • Bidder’s Certificate Free Quarterly Preventive Maintenance During The Warranty Period With Preventive Maintenance Plan. Warranty Certificate: • Warranty Certificate Minimum Of Five (5) Years For Service And Three (3) Years For Parts. The Warranty Period Shall Commence From The Date Of Acceptance By The End-user After Testing And Commissioning. • Calibration: With Certificate Of Calibration Upon Delivery. The Bidder Must Be Iso 9001 And The Manufacturer Should Be Iso 13485 Certified Unit 1 6,900,000.00 14 Common Bile Duct Exploration Supplement Set. Brand New. Product Specifications: Made Of Heavy Duty Stainless Steel. Includes The Following Items: 1 Pc. Randall Kidney-stone Frcpsslt-cvd225mm, 1 Pc. Randall Kidney-stone Forceps Cvd225mm, 1 Pc. Randall Kidney-stone Frcpshvy-cvd225mm, 1 Pc. Randall Kidney-stone Frcps U-cvd225mm, 1 Pc. Bakes Bile-duct Dilator 1mm, Bakes Bile-duct Dilator 2mm, 1 Pc. Bakes Bile-duct Dilator 3mm, 1 Pc. Bakes Bile-duct Dilator 4mm, 1 Pc. Bakes Bile-duct Dilator 5mm, 1 Pc. Bakes Bile-duct Dilator 6mm, 1 Pc. Bakes Bile-duct Dilator 7mm, 1 Pc. Bakes Bile-duct Dilator 8mm, 1 Pc. Bakes Bile-duct Dilator 9mm, 1 Pc. Bakes Bile-duct Dilator 1mm, 1 Pc. Randall Kidney-stone Forcepscvd190mm, 1 Pc. Randall Kidney-stone Fcpshvy-cvd190mm, 1 Pc. Bottom For 1/2 Container Height:135mm, 1 Pc. Prime Line Pro 1/2 Lid Green, 1 Pc. 1/2 Size Perf Basket 243x253x76mm, 1 Pc. Identification Label Green. Set 1 590,000.00 15 Defibrillator. Brand New. Product Specifications: General Features: 7-10 Inch Lcd Display, Maximum Of 3 Waveforms. High Contrast Display Mode For Bright Environments. Ambulance-ready, Rugged Casting: Ip44, Impact Test Of 0.75m. Output Energy: 1-360j. Charge Times Of <3s T O200j, <7s To 360j. Auto-volt With Smart Charging. Lithium-ion Battery Supports To 6 Hours Monitoring/200 Shocks @360j/ 4.5 Hours Pacing, With Built-in Led Power Level Indicator. Lightweight At 4-5kg., Full Configuration, Main Unit. Automatically Switch Defibrillator Energy, Cpr Prompts, And Alarm Limits Depending On Patient Type. Display Ecg During Aed Mode. Ecg Recovery Within 2.5s Or Less. Contact Status Can Be Checked Through Paddle And Monitor, Impedance Value Can Be Checked In Monitor. Auto-testing Includes Maximum Energy Discharge Test. Parameters: 3/5 Lead Ecg, Pacer. Includes: Thermal Recorder, External Paddle Kits, Ecg Cable And Lead Wires, Ecg Electrode, Multifunction Electrode Pad. Printer Paper, Electrode Gel, Power Cord, Lithium-ion Battery. Unit 5 1,500,000.00 16 Dish Sterilizer. Brand New. Product Specifications: − High Light Led Display, − With Special Boiler Temperature Drainage Settings, − Washing (non-recycling) Parameters Can Be Set Free And With Control Memory Function, − Can Meet Different Washing Demand, − Self - Research Internal Water Softener, − Double Construction Design For Top Cover, − Power: 380v/50hz, − Basket Dimension : 500x500mm, − Washing Ability : At Least 60 Basket / H, − Rinse Water Quantity : 3 L/h, − Inlet Height :400-430mm, − Machine Dimension : 800-850x800-820x1450-1500mm, − Rated Power : 14.75kw, − Gross Weight : 140-150, − Net Weight : 100-110, − Packing Size : 890-900x900-910x1630-1700mm. Warranty Period- Within 1 Year Upon Delivery And Installation To Cover Parts (excluding Wearable Parts) And Service With Preventive Maintenance Every 6 Months Within 2 Years Period. Provides Orientation And Training To End-user Representative.* Unit 1 500,000.00 17 Electrocardiography Machine (ecg) Brand New. Product Specifications. High Resolution Lcd Touch Screen, 320-330x240-250vivid Waveform Display. 12 Leads Ecg Resolution Thermal Printer. Built-in Rechargeable Li-ion Battery, Ac/dc Power Supply. Anti-defibrillator And Pace Maker Detection. Complete Digital Filtering, Resisting Baseline Drift, Automatic Baseline Adjustment. Automatic Ecg Measurement And Interpretation. Large Patient Data Storage; 150 Cases, Equipped With Usb Port For Data Transfer. Three (30 Printing Formats (auto, Manual And Rhythm) Selectable. 1/2/3 Channel Ecg Waveform And Rhythm Leads Record Out. Lead Status Diagram Display. Unit 4 200,000.00 18 Electrosurgical Dessicator Machine. Brand New. Product Specifications: Use For Removal Of Lesions, Warts, Skin Tags, And Other Blemishes Easily With Minimally-invasive Treatment. For Superficial Treatments, Safe To Use Around The Eye And Nose Area. Includes Re-usable Pen And Tips. Unit Specifications: Depth:4-5 Inches, Width:8-9 Inches, Height:7-8 Inches, Weight:6-8 Pounds, Output Power -low At 0-20watts (1/10 Watt Increments Up To 10 Watts), High At 0-35 Watts, Bipolar: 0-35 Watts. Offers Hand-or-foot Activated Operation. Autoclavable, Reusable Hand Control Pencil With Power Adjustment Buttons. Pencils Are Designed With Non-spinning Hex Collar For Multi-positional Fall-safe Blade Locking. Equipped With Mobile Stand. Includes Consumables.warranty-6 Months From Delivery And Installation. Set 1 100,000.00 19 Fetal Maternal Monitoring System: Brand New. Product Specifications: Foldable Screen. Probe Rack And Wall Mounting Rack. Handle For Easy Carrying. User-friendly Gui With 3 Display Modes. Four (4) Optional Color Background. Capable Of 24 Hours Ctg Storage. Fast Print For Store Traces. "smart Notes" Annotation. Signals Overlap Verification. Real-time And Offline Data Transmission To Pc. 10-12 Inch Color Touch Screen. Excellent Algorithm. 12-crystal And 1 Mhz Water-proof Transducer For Accurate Detection. Configuration: Dual-fhr, Toco, Fm, Afm, Mecg, Nibp, Mspo2, Temp. Includes: 3 Each Belt, 1 Each Event Marker, 1 Bottle Ultrasound Gel, 1 Ea. Fhr Transducer, Purple, 1 Each Transducer, Yellow, 1 Each Spo2 Sensor, Adult, 1 Each Temperature Probe, Skin, 1 Each Toco Probe, 1 Each Nibp Cuff, Adult, 1 Each Nibp Tube, Adult. Unit 3 1,110,000.00 20 Infusion Pump. Brand New. Product Specifications: Mechanism: Peristaltic Pump, Operating Mode: Flow Rate Mode, Drip Rate Mode(optional), Preset Volume: 1-9999 Ml, Flow Rate Range: 1 – 600 Ml/h, Increment: 1, 10, 100 (ml/h), Accuracy: ± 5%, Kvo Rate: 1 Ml/h, Bolus Rate: 600 Ml/h, Drop Rate Range: 1 – 400 Drop/min With Optional Drip Sensor, Screen: 2.7 Inches B/w Lcd, Information: Flow Rate, Preset Volume, Accumulated Infusion Volume, Completion, Occlusion, Air Bubble, Bed No, Ac Power Indicator, Battery Capacity, Battery Charge Indicator, Iv Set, Etc., Status Indicator: Stop, Run, Bolus, Kvo, Alarm Type: Air Bubble, Finish, Occlusion, No Ac Power, Low Battery, Battery Empty, Reminder To Operate, Communication Error (err1), Operation Error (err2), Drops Error (err3), Handle Open (err4), Air Bubble Level: 1-3 Levels Adjustable, Universal Compatibility, Turn On/off, Occlusion Alarm Pressure Range: 3 Levels: 60kpa, 100kpa, 140kpa (±20kpa), Battery Type: Lithium Polymer, Battery Life: Up To 4 Hours Continuous Operation 25 Ml/h Flow Rate, With Delivery And Installation, Provision Of Trainings Of Staff With Certificates, And Manual. Unit 4 320,000.00 21 Laboratory Oven. Brand New. Product Specifications: Working Temperature Range At Least 5 Above Ambient Temperature To +300 °c; Setting Accuracy Temperature Up To 99.9 °c: 0.1 / From 100 °c: 0.5; Setting Temperature Range +20 To +300°c; Temperature Sensor 1 Pt100 Sensor Din Class A In 4-wire-circuit. Control Cockpit Single Display. Adaptive Multifunctional Digital Pid-microprocessor Controller With High-definition Tft-colour Display; Timer Digital Backwards Counter With Target Time Setting, Adjustable From 1 Minute To 99 Days; Adjustable Parameters: Temperature (celsius Or Fahrenheit), Air Flap Position, Programme Time; Ventilation: Natural Convection, Vent Connection With Restrictor Flap; Works Calibration Certificate : Calibration At +160°c; Door Fully Insulated Stainless Steel Door With 2-point Locking (compression Door Lock); Internals 1 Stainless Steel Grid(s), Electro Polished; Stainless Steel Interior; Interior Easy-to-clean Interior, Made Of Stainless Steel, Reinforced By Deep Drawn Ribbing With Integrated And Protected Large-area Heating On Four Sides; Volume 32 L; Dimensions W(a) X H(b) X D(c): 400 X 320 X 250 Mm; Max. Number Of Internals: 3; Max. Loading Of Chamber 60 Kg; Max. Loading Per Internal 20 Kg; With Free Power Back-up System, With Free Installation And Demonstration. Unit 1 130,000.00 22 Newborn Hearing Screening Test Equipment. Brand New. Product Specifications: • Capable Of Screening And Diagnostic Testing With Te And / Or Dpoae. • Fast Automatic Test With Pass / Refer And Graphical Test Result Display. • Direct Evaluation Via Value And Bar Diagram. • Up To 12 Frequencies Displayed Within The Device, Dp Up To 12 Khz. • 5 Dp / 2 Te Protocols With User Customizable Parameters (diagnostic Version). • High Noise Immunity For Operation In Normal Clinical Environment. • Lightweight, Small Ear Probe. • Environmentally Friendly Due To Long Life, Rechargeable Battery. • Bluetooth Communication To Optional Printer And Pc • Evaluation Of Results In Pc. Screener With At Least 4 Frequency Dpoae Testing Protocols. • Qualified Protocols Built Into The Device. • 4 Dpoae Test Frequencies Reported. • Integration To State Tracking Systems, Hi-track Or Oz. Diagnostic With Up To 12 Frequency Dpoae Testing Protocols. • 1.5 To 12 Khz Frequency Range With Up To 12 Test Frequencies Reported. • Customizable Test Protocols Teoae Available As An Upgradeable Option. Measurement Type: Distortion Product Otoacoustic Emissions (dpoae) Transient Evoked Otoacoustic Emissions (teoae). Frequency Range: Screener Version: Dpoae: 2.0 Khz To 5.0 Khz Teoae: 1.5 Khz To 4.0 Khz. Diagnostic Version: Dpoae: 1.5 Khz To 12.0 Khz Teoae: 0.7 Khz To 4.0 Khz. Stimulus Intensity Range: Dpoae: 40 Db Spl To 70 Db Spl Teoae: 83 Db Spl Peak Equivalent (±3 Db). Microphone System Noise: -20 Db Spl @ 2 Khz (1 Hz Bandwidth)/ -13 Db Spl @ 1 Khz (1 Hz Bandwidth). Dimensions And Weight (unit): 2.5 To 3” W X 1.2 To 1.8” D X 5.5 To 6.5” H 6.2 To 6.8 Oz. Power Supply: Lithium-ion Rechargeable. Battery Life: 1000 Tests Per Charge, Minimum 15 Hours On-time. Connectors/ Communications: Integrated Usb Communication Capability For Battery Charging And Communication With Pc-based Database Programs Or An Optional Printer. Hdmi Connector For Connection To The Micro-probe. Integrated Bluetooth Class 2 + Edr With Spp. Protocol For Communication With Optional Printer. Standard Accessories: Micro-probe, Box Of Single Use Ear Tip And Ear Tip Remover, Package Of Probe Tubes, Micro-usb Power Supply For Charging Lithium Ion-battery, Pc Database Software With Manual, Micro B To A Usb Cable For Pc Communicator/charging, Protective Carrying Case, Data Management Tool That Provides The Ability To Transfer Patient. Oae Test Data From The Testing Device To A Pc For The Purposes Of Viewing, Archiving, Managing And Printing Oae Reports. Using The Database Also Gives You The Means To Create Letter Sized, Detailed Reports That Can Be Easily Filed Or Faxed. You Can Also Create A “paperless” Office By Saving The Test Results As A Pdf For Electronic Filing Or Email. Dpoae: 40 Db Spl To 70 Db Spl Teoae: 83 Db Spl Peak Equivalent (±3 Db). Includes Ups. Warranty –at Least 1 Year After Delivery And Installation. Unit 1 1,000,000.00 23 Operating Room Lights. Brand New. Product Specifications: Dual Head- Ceiling Type. Major Operating Room Light Multi-color. Merging Of Light Fields, Light Intensity Control. Comfortable Display Of Key-pad On Major Lighting Head. Back Light Key Pad Display. Depth And Merging Light Field Should Be Operated At The Sterilizable Handle. Cool Light Temperature Increasing In Head Area: 0.5 ºc. 360° Continuous Rotation Around All Major Joints. Anti-bacterial Coating Head. - Light Head Diameter: 66cm. Ideal Laminar Flow Ceiling System. With Endo Mode: Must Be Color Green Light. Main Light Head. Electronic Light Intensity Control At Lamp Head. - Light Intensity At 1 Meter Distance: 160,000 Lux. Colour Rendering Index Ra At Kelvin: 98 (for Better Quality Image Of Skin, Blood And Tissues). Colour Rendering Index R9 At Kelvin: 99 (for Better Quality Image Of Skin, Blood And Tissues). Focusable Light Field Size: 19-30 Cm. Colour Temperature: 3,750, 4,000, 4,250, 4,500, 4,750 K. - Adjusting The Shadow Activating Via The Touch Panel. - Maximum Of Four Groups Of Lenses Are Dimmed Simultaneously. Shadow Management System. Number Of Led’s: 99 On Lamp Head. Life Span Of Leds: > 60,000 H. Working Distance: 70-160 Cm. Light Intensity Control (standard): 5% - 100%. Outstanding Depth Illumination: 70, 100, 130 Cm. Laser Pointer On Head (main Light Head Only). Lf-index Leenemann: 26. Lf-index Oostlander: 28. Input Voltage: Single Phase 110 ~ 230 Vac Free Volt. Total Power Consumption: 82 - 92watts. Adjustable Brakes At The Horizontal Arm. Light Head Weights: 18.5 Kg. Protection Type Lamp Head: Iec60529. - Aluminum Housing. Satellite Head. Electronic Light Intensity Control At Lamp Head. - Light Intensity At 1 Meter Distance: 140,000 Lux. Colour Rendering Index Ra At Kelvin: 98 (for Better Quality Image Of Skin, Blood And Tissues). Colour Rendering Index R9 At Kelvin: 99 (for Better Quality Image Of Skin, Blood And Tissues). Focusable Light Field Size: 18-30 Cm. Colour Temperature: 3,750, 4,000, 4,250, 4,500, 4,750 K. Number Of Led’s: 69 On Lamp Head. Life Span Of Leds: > 60,000 H. Working Distance: 70-160 Cm. Light Intensity Control (standard): 5% - 100%. Outstanding Depth Illumination: 70, 100, 130 Cm. Input Voltage: Single Phase 110 ~ 230 Vac Free Volt. Total Power Consumption: 82-92 Watts. Adjustable Brakes At The Horizontal Arm. Light Head Weights: 17.9 Kg Minimum. - Aluminum Housing. Protection Type Lamp Head: Iec60529. Standard Accessories: - Sterilized Handle: 2 Pcs/ Lamp Head, - Ceiling Anchorage Ring With Screws, - Spring Arm, - Ceiling Cover, Including Installation Of Brackets To Embed Overhead Ceiling- User Manual, - Ups. Warranty Of Two (2) Years For Parts And Labor With Free Preventive Maintenance Every Quarter Within Warranty Period Five (5) Years Warranty For Led Bulb Only. Unit 1 2,500,000.00 24 Operating Room Table (motorized). Brand New. Product Specifications: Total Length: 2000-2100 Mm. Width Including Side Rails: 600-630 Mm. Mattress Width: 550-570 Mm. Total Weight: 200-210 Kg. Safe Working Load (swl): Up To 250 Kg. Height Adjustment Range: From 595 Up To 1005 Mm. Castors: Four Ø 120-125 Mm Central Locking Twin Castors. Head Section: -58° ... +37°, 135 Mm. Back Section: -10° ... +70°. Leg Section: -80° ... +10°. Lateral Tilt: 20° / 20°. Trendelenburg/anti-trendelenburg: 30° / 20°. Sliding Tabletop For C-arm Function: 300-320 Mm. Flex / Reflex: 220° / 120°. Electrical System: 24 Vdc, Battery Operated, 100 - 240 Vac, 50/60 Hz. Controls: Hand Control And Integrated Control Panel On The Column. Memory Positions: Four Programmable Positions. Visco-elastic Mattresses. Radio Lucent Tabletop For X-ray. Accessories For General Surgery: 1. Arm Rest, 2. Anesthesia Frame With Clamp And, 3. Attachment Clamp. Transport And Storage Conditions: Temperature 7 10° C + 50° C. Relative Humidity 10 %, 85 %. Air Pressure 700 Hpa, 1060 Hpa. Operating Condition: Temperature +10° C, + 40° C. Relative Humidity 30 %, 75 %. Air Pressure 700 Hpa 1060 Hpa. Side Rail Accessories: 25 X 10mm. Warranty-1 Year From Delivery And Installation. Certificate Of Parts Available In The Next 5 Years. Includes Training To End-user. Includes Product Manual. Unit 2 5,500,000.00 25 Radiant Warmer With Phototherapy Units. Brand New. Product Specifications: Fixed Height Radiant Warmer, Mounted On A Column. The Unit Is Supported By A T-shaped Sturdy And Stable Wheeled Base. Bases Is Provided With A Minimum Three (3) Anti-static Swivel Casters. At Least Two (2) Of The Casters Are Equipped With Brakes. The Base Is Equipped With A Side Handle/rail For Easy Positioning. The Design Of The Base Is Suitable To Be Fitted Over Standard Cradles, Cribs, And Bassinets. Overhead Radiant Heater At A Fixed Height Of 1.80-2.0m. Radiant Heating Is Achieved By Quartz/ceramic Elements, Placed In A Parabolic Reflector. The Radiator Is Equipped With A Safety Grid. The Unit Support Three (3) Modes: Pre-heating, Manual And Servo Mode. The Unit Allows For Instant Switching Been The Different Operating Modes. The Minimum Skin Temperature Setting Range Is 32°c To 37°c. The Resolution Of The Temperature Is: ± 0.5°c Or Better. In Manual And Pre-heating Modes Heating Settings Allow For A Range Of 0 – 100%. Led Spotlight(s) For Examination Are Integrated In The Overhead Radiant Heater, The Angle Of The Overhead Light Is Adjustable. Warm-up Time < 30 Min To 25°c. Power Requirements: 1 Ph, 100 - 240 Volts - 50/60 Hz 900 To 1300va (with Ups And Avr). Display Features: The Display Panel Is Integrated In The Column For Visualizing Working Parameters And Alarms. The Display Indicates: - The Current Active Mode: Pre-heating, Manual Or Servo, - The Current Heating Power In Percentages, - The Current Pre-set Temperature, - The Current Actual Skin Temperature, - The Current Air Temperature. The Unit Is Equipped With A Self-check Feature. Alarm And Safety Features: Alarms Are Audible And Visible. Alarms Indicating: - Sensor Disconnection Or Malfunction. - Power Failure. - Skin Temperature, After Stabilizing, Varying Beyond 0.5° To 1°c From Set-point. - 10 To 15 Minutes After Manual Mode Has Been Engaged An Audible Alarm Will Sound. In Addition, The Unit Will Either Reduce Or Cut The Power To The Heater. In Skin Mode, When The Temperature Exceeds 39°c, The Unit Will Cut The Power To The Heater. Supplied With: Instructions For Assembly, Use And Maintenance In English: 1 X Installed And 2 X Spare Reusable Skin Temperature Sensors, Including Connection Cable And Plug. 1 X Spare Quartz/ceramic Heating Element Or The Same With Installed Heating Element. 2 X Spare Examination Light Bulbs. 1 X Set Of Spare Fuses, If Applicable. Accessories: A Durable Light Weight Cradle/crib And Mattress. Oxygen Regulator Including A Pressure Gauge, Flow Meter, Humidifier Bottle And All Required Tubing. Integrated Weighing Scale. Electrically Operated, Slow Suction Unit Including A Vacuum Regulator, Vacuum Gauge And Autoclavable Collection Jar. Electrical Height Adjustment. T-piece Resuscitator. Integrated Phototherapy Unit. Led Phototherapy Unit 36cm: 620-2800μw/c㎡. Led Phototherapy Unit 50cm: 400-1620μw/c㎡. Estimated Life Span: Eight Years. Includes Avr. Unit 3 600,000.00 26 Refrigerator (biological). Brand New. Product Specifications: External Dimension: W = 700-750 Mm D = 730-750 Mm H = 2000-2100 Mm. Inside Dimension: Useful Space On Top W = 600-620 Mm D = 550-570 Mm H = 500-550 Mm. Useful Space At The Bottom W = 590-610 Mm D = 540-560 Mm H = 500-550 Mm. Capacity: 600 L Temperature Range: Top 2°c To 20°c Bottom 2°c To 20°c. Optional: Other Temperature Ranges. Housing Galvanized Sheet Steel With High Quality White Coating, Antibacterial Coated. With 4 Feet, Height Adjustable. Optional: Set Of 4 Casters, 2 With Brakes. Interior Space Inner Case Of Galvanized Sheet Steel With High Quality White Coating, Antibacterial Coated. Cleaning Friendly By Rounded Corners, Slippery Surface In The Interior, Meets Highest Hygiene Requirements Insulation High Density Foamed-in-place Polyurethane, With A Thickness Of 60 Mm. Cfc-free. Circulation Air Cooling For Rapid And Uniform Temperature Control, Reducing Temperature Gradients To A Minimum. When The Door Is ""open"" The Circulating Fan Is Switched Off Automatically By A Micro Switch In Order To Prevent Warmer Ambient Air Being Drawn In. Door 2 Pcs. Three-layer Thermally Insulating Glass Door (arranged On Above The Other), Supplied As Standard With Right Hand Hinge, Also Available With Left Hand Hinge At No Extra Cost. Grease Resistant Magnetic Seal. Optional: With Door Lock. Interior Fittings 4 Pcs. Grating-type Shelves (dim.: 530x550 Mm), White Coated. Interior Lighting With Automatic On/off Micro Switch. Optional: Stainless Steel Shelves Or Stainless-steel Drawer Compartments, With 3 Lengthwise Dividers With Telescopic-type Guides On Rollers With Stops, Drawer Dimensions: 500x480x77 Mm (wxdxh) Usable With Between The Lengthwise Dividers: 106 Mm (lengthwise Dividers Easily Removable). Working Range 1 From 2°c To 20°c (assuming The Ambient Temperature Is Approximately 4°c Above The Set Point). Temperature Accuracy +/- 1,8°c After Stabilization (with 50% Of Loading). Acoustics Signal When The Set Value Is Undercut Or Exceeded Potential-free Connection Socket For Extern Alarm Refrigerating Unit 2 Pcs. Fully Hermetically Sealed, Forced Ventilation, Fitted On Vibration – Absorbing Mounts (ambient Temperature Max. 32°c), Low Noise (48dba/1m), Energy Saving Compressor With High Quality Vaporization System. Refrigerant: R 290 Or Equivalent Defrost Automatically With Thermal And Time Limit. Condensate Evaporation In Heated Tray. During The Defrost Period, The Temperature Inside The Cabinet (only The Air Temperature – Not The Stored Goods) Will Arise For A Short Time. Electrical Date: Power Supply220-230 V/50 Hz/single Phase Optional: 60 Hz. Power Input 2x 0,20 Kw. Fuse 16a. Power Cable: 2x 1,5 M. Packing Details (palletized) Dimensions: Approx. 85x98x224 Cm. Net Weight: 150-170 Kg. Gross Weight: 180-200 Kg. Include Avr. Unit 1 100,000.00 27 Rigid Video Procto-sigmoidoscope. Brand New. Product Specifications: Plastic Obturator. Video Camera. Stainless Steel Tube. Handle Of Polyacetal (delrin), Usb Male Connector. Analogue To Digital Converter Nozzle For Gas. Instrumentation Channel. Silicone Washer. Includes Universal Fiber Optic Light Source Machine And Tube Connector From The Proctoscope To The Light Source Machine. Warranty -6 Months From Delivery And Installation. Set 1 50,000.00 28 Stretcher, Transport Type. Brand New. Product Specifications: Hydraulic Stretcher. Numbers Of Function: Five-function. Certification: Ce, Fda, Iso13485. Size: 2000-2100 Mm (l)*770-800mm (w)*600-610/900-920mm (h). Height:600mm-930mm. Lowest Position-floor To Platform-580mm. Highest Position-floor To Platform-905mm. Side Rail Height Above Mattress Platform-340 To 360mm. Maximum Back Rest-0-80 Degrees. Maximum Knee Rest-0-30 Degrees. Maximum Trendelenburg Reverse Tr-0-16 Degrees. Mattress Size -1850-1880 X 650-670 X 80-90mm. Loading Capacity -up To 200 Kg. Side Rails: Collapsible Aluminum Alloy Side Rails. Bed Platform: X-ray Transparent. Specification: Ce, Fda, Iso. Other Features: 1. Central Brake System: Equipped With Four Brake Pedals On All Sides Of The Bed Make The Brakes At The Optimal Position Effectively. 2. Multi-function Instrument Support: The Instrument Support Can Put The Monitor And Can Also Be Used As A Headboard To Prevent Accidental Slippage Of The Patient. 3. Push Handle: Reducing The Workload And Preventing The Injuries. 4. High Quality Mattress: The European Standard Waterproof Cloth With The Smooth Surface Of The Mattress, Easy To Clean And Not Misplaced. 5. Large Diameter Wheel: Using The Imported 8-inch Silent Caster Make It Flexible And Durable. 6. The Fifth Wheel: The Fifth Wheel Can Provide A Smaller Radius Of Gyration. The Telescopic Collapse Design Can Slide Smoothly Even On The Rough Surface Or Obstacles Such As The Elevator Sill, Reducing Effectively The Damage Caused By Transport To Patients. 7. Plastic Coated Side Rails: The Side Rails With Stainless Steel Column Guardrail Covers Almost Entire Length Of Bed. 8. High-strength Carbon Steel Structure And Spray Procedure: The High Quality Carbon Steel And Robot Welding Guarantee The Mechanical Strength. The Spray Surface Treatment Is Easy To Clean And Guarantees A Longer Life. 9. Rapid Lifting Hydraulics: The Imported Dual-pressure Lifting System Can Be Used To Quickly Lift The Bed Or The Push Handle For 2 Seconds In An Emergency, And The Bed Will Automatically Locate The Height To Form A Special Body Position Of The Patient. 10. X-ray Imaging: Equipped With X-ray Material Bed Surface And X Ray Cassette Holder, The Whole Body Can Be X-rayed. 11. With Oxygen Cylinder Holder. Warranty -1 Year From Delivery And Installation. Unit 18 5,400,000.00 29 Suction Machine. (heavy Duty). Brand New. Product Specifications: Floor, Standing Type. Oil-less Piston Suction Motor. Double Anti-overflow Protection (mechanical Float And Electronic Sensor). Flow Rate: 40-50 Liter Per Minute. Water Displacement. Vacuum -700-800mmhg. Includes 2x3 Liters Polycarbonate Collection Jar. Attach/detach Abs Plastic Cover Jar. Anti-bacterial And Hydrophobic Filter. Patented Anti-vibration System. Dimensions: 300-400mm X 380-420mm X 800-850mm (lxwxh). Weight -15-25 Kg. Equipped With Foot Switch. Power -250w. Power Requirement -ac 200, 50-60hz. Silicone Hose. Operation And Service Manual Included. Warranty Of 6 Months From Delivery And Installation. Includes Orientation And Training Of End-user Staff. Unit 2 600,000.00 30 Syringe Pump. Brand New. Product Specifications: With Delivery And Installation, Provision Of Trainings Of Staff With Certificates, And Manual. Applicable Syringes (universal Compatibility To Various Brands): 10ml, 20ml, 30ml, 50ml/60ml, Accuracy: ±2% (mechanical ±1%). Flow Rate: 10ml: 0.1 Ml/h -300ml/h, 20ml: 0.1 Ml/h -600ml/h, 30ml: 0.1 Ml/h -900ml/h, 50ml: 0.1 Ml/h -1500ml/h. Bolus Rate: 10ml: 100-300ml/h (default 300ml), 20ml: 100-600ml/h (default 600ml), 30ml: 100-900ml/h (default 900ml), 50ml: 100-1500ml/h (default 1500ml). Purge Rate: 10ml: 300ml, 20ml: 600ml, 30ml: 900ml, 50 Ml: 1500ml. Volume To Be Infused: 0.1ml~1000ml. Injection Increment: 0.1ml. Infusion Mode: Rate Mode, Time Mode. Time Mode: Volume Limit: 0.1~999.9ml. Pre-set Time: 1min To 99h99min. Remaining Time: **h **min. Occlusion Pressure: 3 Adjustable Occlusion Pressure Settings: Low, Middle And High. Alarm Function: Infusion Completion, Near Completion, Empty, Occlusion, Low Battery, Syringe Disengaged, Incorrect Installation Of Syringe Plunger, No Ac Power Supply, Low Battery, Battery Exhausted, Malfunction Etc. Battery: Rechargeable Lithium Polymer Battery, 7.4v, 2100mah, Can Operate For More Than 3 Hours After Fully Charged At 25ml/h. Unit 5 300,000.00 Total 34,665,000.00 Note: Winning Bidder Shall Conduct Product Demonstration/end-user’s Training Of The Actual Unit And Issue Training Certificate To The End-user And Medical Equipment Technician Of Wvsgh. The Bidder’s Single Largest Completed Contract Similar To The Contract To Be Bid Should Have Been Completed Within 3 Years From The Date Of The Deadline Of Submission And Receipt Of Bids, Award For This Contract Should Have Been Awarded By A Hospital Or Health Facility And Not By Another Supplier, Except For Line Items With Asterisk (*) Which Have Been Awarded By A Non-health Facility. Likewise, The Contract Price Of The Slcc Should Be At Least 50% Of The Sum Of The Abc Of The Line Items Joined. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. The Complete Schedule Of Activities Is As Follows: Bac Activities Schedule Availability Of Bidding Documents December 12, 2024 At 8:00 Am To 4:00 Pm And Up To Before 9:00 Am Of January 7, 2025, At The Procurement/bac Office, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Pre Bid Conference December 20, 2024 (thursday), 9:00 Am At The 3rd Floor, Im Conference Room, New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Opening Of Bids January 7, 2025 (tuesday), 9:00 Am At The 3rd Floor, Im Conference Room, New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Bid Documents May Be Acquired By Interested Bidders On The Dates And Address Above And Upon Payment Of Applicable Fee For The Bidding Documents In The Amount Of: Php 25,000.00 Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac/procurement Office On Or Before 9:00 Am Of January 7, 2025. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Wvs.doh.gov.ph , Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Western Visayas Sanitarium And General Hospital Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Mr. Jasond Rex A. Huyaban/jessie H. Jarbadan Bac Secretariat Western Visayas Sanitarium And General Hospital Sta. Barbara, Iloilo Tel. No.: (033) 332-4778 Loc. 119 Email: Wvsbac.procurement@gmail.com Website: Wvs.doh.gov.ph Renia Grace G. Salapare, Md, Fpafp, Mpa Bac Chairperson
Closing Date17 Jan 2025
Tender AmountPHP 36.6 Million (USD 627.7 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Healthcare and Medicine
United States
Details: Sources Sought Notice
this Is A Sources Sought Notice (ssn) Only. The U.s. Government Is Conducting Market Research Only To Determine The Availability Of Qualified Sources Capable Of Providing Scriptpro Preventative Maintenance And Repair Services. Potential Contractors Are Invited To Provide A Response Via E-mail To Contract Specialist At Tracy.heath@va.gov By January 24, 2025, 15:00 (pt). Responses Will Be Used To Determine The Appropriate Strategy For A Potential Acquisition. Please Clearly Identify Any Information Your Company Considers Sensitive Or Proprietary. This Notice Is Issued Solely For Information And Planning Purposes - It Does Not Constitute A Request For Quotation (rfq), Or A Promise To Issue An Rfq In The Future. This Notice Does Not Commit The U.s. Government To Contract For Any Supply Or Service. Further, The U.s. Government Is Not Seeking Quotes, Or Proposals At This Time And Will Not Accept Unsolicited Quotes In Response To This Sources Sought Synopsis. The U.s. Government Will Not Pay For Any Information Or Administrative Costs Incurred In Response To This Notice. Submittals Will Not Be Returned To The Responder. Not Responding To This Notice Does Not Preclude Participation In Any Future Rfq, If Any Is Issued.
background: The Visn 20 Network Is Responsible For Providing Health Care To Veterans In The States Of Alaska, Washington, Oregon, Most Of The State Of Idaho, And One County Each In Montana And California, All Of Which Includes Eight (8) Health Care Facilities Comprised Of (7) Medical Centers And One (1) Rehabilitation Center. Two Of The Health Care Facilities Are Three (3) Two-division Campuses. These Ten (10) Health Care Sites Support Thirty-six (36) Community Based Outpatient Clinics.
visn 20 Outpatient Pharmacies Currently Utilize Scriptpro S Central Pharmacy Workflow System And Robotics. The Scriptpro System Consists Of Hardware To Include Robotic Prescription Dispensing System, Datapoint Workstations, Printers, Scanners, Servers, Workstations, Signature Pads, Displays, Keyboards/mouse Terminals, Audio Components And Speakers, Keyboards, Mouse, And Kiosks. In Addition, There Is Software And Interfaces That Support Electronic Health Record (ehr), Vetext Communication, Scriptpro Workflow, And Shipping.
naics: 811210, Electronic And Precision Equipment Repair And Maintenance
interested Potential Contractors Please Provide The Following.
1) Company Name, Address, Point Of Contact, Phone Number, Email Address, And Duns
please Indicate Business Size:
small Disadvantage Business (sdb)____
8(a)____
historically Underutilized Business Zone (hubzone)____
service-disabled Veteran-owned Small Business (sdvosb)____
veteran-owned Small Business (vosb)_____
economically Disadvantaged Women-owned Small Business (edwosb)_____
women-owned Small Business Concerns (wosb)_____
small Business_____
large Business_____
please State If You Possess A Federal Supply Schedule (fss)______. Please State If Your Fss Schedule Is Under Group 66 Iii Cat 605-2a________
2) Please Submit A Brief Capability Statement (maximum Three Pages) With Enough Information To Demonstrate To The Veterans Affairs That You Have The Enough Resources, Personnel, And Experience To Perform Preventative Maintenance And Repairs As Required In The Attached Draft Statement Of Work.
**draft Statement Of Work
the Va Northwest Health Network, Veterans Integrated Service Network (visn) 20, Is Responsible For Providing Health Care To Veterans In The States Of Alaska, Washington, Oregon, Most Of The State Of Idaho, And One County Each In Montana And California.â Visn 20 Encompasses 135 Counties Which Cover Approximately 23% Of The United States Land Mass; 17% Of Which Are Classified As Health Professional Shortage Areas. 67% Of These Same Counties Had A 2001 Per Capita Income Below $25,000. There Are Approximately 1.2 Million Veterans Living In The Pacific Northwest And Alaska, 18% Of Whom Received Va Services.â
the Visn 20 Network Of Eight (8) Health Care Facilities Is Comprised Of (7) Medical Centers And One (1) Rehabilitation Center (table 1). Two Of The Health Care Facilities Are Three (3) Two-division Campuses. These Ten (10) Health Care Sites Support Thirty-six (36) Community Based Outpatient Clinics.
visn 20 Outpatient Pharmacies Currently Utilize Scriptpro S Central Pharmacy Workflow System And Robotics. The Scriptpro System Consists Of Hardware To Include Robotic Prescription Dispensing System, Datapoint Workstations, Printers, Scanners, Servers, Workstations, Signature Pads, Displays, Keyboards/mouse Terminals, Audio Components And Speakers, Keyboards, Mouse, And Kiosks. In Addition, There Is Software And Interfaces That Support Electronic Health Record (ehr), Vetext Communication, Scriptpro Workflow, And Shipping.
the Proposed Action Is To Provide All Support Services For Hardware, Software, And Interfaces. This Includes Professional Services To Troubleshoot System Issues, Software And Operating System Updates To Address Cybersecurity Vulnerabilities, Corrective Maintenance, Preventative Maintenance And Replacement Parts.
1. Applicable Documents. In Performance Of The Tasks Associated With This Performance Work Statement, The Contractor Shall Comply With The Following:
44 U.s.c. § 3541,â Federal Information Security Management Act (fisma) Of 2002
fips Pub 201 Personal Identity Verification Of Federal Employees & Contractors, 3/2006
5 U.s.c. § 552a, As Amended, The Privacy Act Of 1974
42 U.s.c. § 2000d Title Vi Of The Civil Rights Act Of 1964
va Directive 0710, Personnel Suitability And Security Program, September 10, 2004
va Directive 6102, Internet/intranet Services, July 15, 2008
36 Cfr Part 1194 Electronic And Information Technology Accessibility Standards 7/1/2003
office Of Management & Budget (omb) Circular A-130, Management Of Federal Information Resources, November 28, 2000
32 Cfr Part 199 Civilian Health And Medical Program Of The Uniformed Services (champus)
an Introductory Resource Guide For Implementing The Health Insurance Portability And Accountability Act (hipaa) Security Rule, October 2008
sections 504 And 508 Of The Rehabilitation Act (29 U.s.c. § 794d), As Amended By The Workforce Investment Act Of 1998 (p.l. 105-220), August 7, 1998
homeland Security Presidential Directive (12) (hspd-12)
va Directive 6500, Information Security Program, August 4, 2006
va Handbook 6500.6, Contract Security, March 12, 2010
program Management Accountability System (pmas) Portal (reference Pws References Technical Library At Https://www.voa.va.gov/)
national Institute Standards And Technology (nist) Special Publications
2. Scope.
the Contractor Shall Provide Remote And Onsite Support Services For The 11 Medical Centers Listed In Table 1.
on-site Field Service Repair
remote Technical And Application Support
preventive Maintenance
software And Operating System (os) Updates
server And Workstation (os) Patching
drug Database Updates
interface Maintenance And Testing To Resolve Issues.
see Appendix A For All Equipment, Software, And Interfaces To Be Supported.
scriptpro Shall Provide 24/7 Remote Technical Support.
table 1: Visn 20 Sites
station
address
463-va Anchorage Health Care System
1201 North Muldoon Road
anchorage, Ak 99504
531-va Boise Medical Center
500 W. Fort Street
boise, Id 83702
648-va Portland Medical Center Portland Campus
3710 Sw Us Veterans Hospital Road
portland, Or 97239-2999
648a-va Portland Medical Center Vancouver Campus
1601 E Fourth Plain Boulevard
vancouver, Wa 98661
653-va Roseburg Health Care System Roseburg Campus
913 Garden Valley Boulevard
roseburg, Or 97470
653-va Roseburg Health Care System Eugene Cboc
3355 Chad Drive
Eugene, Or 97408
663-va Puget Sound Health Care System Seattle Division
1660 South Columbian Way
seattle, Wa 98108-1597
663-va Puget Sound Health Care System American Lake Division
9600 Veterans Drive
Tacoma, Wa 98493
668-va Spokane Medical Center
n. 4815 Assembly Street
spokane, Wa 99205
687-jonathan M. Wainwright Memorial Va Medical Center
77 Wainwright Drive
walla Walla, Wa 99362
692-va Southern Oregon Rehabilitation Center And Clinics
8495 Crater Lake Highway
white City, Or 97503
performance Period. The Period Of Performance For This Action Shall Be 12 Months And Three Option Years.
place Of Performance. Contract Performance Shall Take Place At The Contractor S Location(s) And At All Visn 20 Outpatient Pharmacies Listed In Table 1.
travel For On-site Repairs And Preventative Maintenance. The Government Anticipates Contractor Travel Under This Contract. All Travel Shall Be Incorporated Into The Price Schedule For The Contract. No Travel Costs Will Be Reimbursed By Va.
government Furnished Equipment/information. The Contractor Shall Be Allowed Access To Government Equipment Including Servers And Network Infrastructure. Information On Government Equipment And Systems Shall Be Provided As Necessary. No Government-owned Property Will Be Transferred Into The Contractor S Control. Additional Software Products May Be Provided By The Government As Identified To Facilitate Contractor Access, E.g., Microsoft Terminal Services.
hours Of Coverage & Federal Holidays. Normal Business Hours Are 8:00am To 5:00pm, Monday Through Friday, Excluding Federal Holidays. The Contractor Shall Contact The Poc Or His/her Designee Prior To Commencing Any Work On The Premises.
new Years' Dayâ
martin Luther King Dayâ
presidents' Dayâ
memorial Dayâ
juneteenth Dayâ
independence Dayâ
labor Dayâ
columbus Dayâ
veterans Dayâ
thanksgiving Dayâ
christmas Dayâ
â
invoicing. Invoices Shall Be Submitted Electronically Via The Financial Services Center Mandatory Electronic Invoice System, On A Monthly Basis. Invoices Must Include, At A Minimum, The Following Information: Contractor Name, Purchase Order Number, Period Of Service The Billing Covers, And A List Of Equipment Items Covered During The Stated Period Of Performance.
this Requirement Is In Accordance With Varr Clause 852.232-72 Electronic Submission Of Payment Requests: Http://www.fsc.va.gov/einvoice.asp. Electronic Payments Are Net 30 Days.
security Requirements. All Contractor Employees Are Subject To The Same Level Of Investigation As Va Employees Who Have Access To Va Sensitive Information Or Access To Va Facilities. The Background Investigation Includes The Following Requirements: 1) Completed Documentation 2) Fingerprints 3) Completion Of Opm S E-qip Questionnaire. The Contractor Is Required To Fulfill All Of The Security Requirements. The Contractor, Upon Completion Of Fingerprinting, And An Initial Suitability Determination, May Be Authorized Tentative Access To Start The Performance Period Of The Contract, But Only On Condition Of Completion Of All Security Requirements. This Requirement Is Applicable To All Subcontractor Personnel Requiring The Same Access.
option To Extend Services. In Accordance With Far Clause 52.217-8, Option To Extend Services, The Contract May Be Extended, At The Government S Sole Discretion, For A Period Of Up To Six (6) Months, Exercisable In Increments Of Not Less Than One (1) Month. If The Contract Contains An Unexercised Option Period, The Government May Elect To Exercise The Option Pursuant To Far Clause 52.217-9, Option To Extend The Term Of The Contract, During Any Short-term Extension. The Short-term Extension(s) Shall Be Subtracted From The Total Duration Of The Immediately Succeeding Option Period That May Follow As A Result Of The Exercise Of The Option Pursuant To Far Clause 52.217-9 So That The Combination Of The Short-term Extension(s) And The Option Will Not Exceed 12 Months Duration. If The Government Exercises One Or More Short Term Extensions In Accordance With Far Clause 52.217-8 And This Instruction Or An Option Period Pursuant To Far Clause 52.217-9, Or Any Combination Thereof, The Contract As Extended Shall Be Deemed To Include This Extension Instruction And Far Clause 52.217-8; Thus, The Authority To Extend Services Pursuant To Far Clause 52.217-8 And This Instruction May Be Exercised At The End Of The Base Period And At The End Of Each Option Period.
the Prices Applicable During The Short-term Extension(s) Shall Be The Price(s) Applicable During The Immediately Succeeding Option Period If There Is One (for Example, Clin 1001 Subject Only To Any Adjustment Required By The Service Contract Act). If There Is No Immediately Succeeding Option Period, The Price(s) Shall Be The Price(s) Applicable During The Immediately Preceding Contract Period, Subject Only To Any Adjustment Required By The Service Contract Act.
the Extension(s) May Be Exercised By The Government Iaw Far Clause 52.217-8, Provided That The Co Has Given Notice Of The Government S Intent To Exercise The Extension At Least 7 Calendar Days Before This Contract Is To Expire. A Notice Will Be Provided For Each Separate Extension.
for Requirements Items, The Prices Applicable During The Short-term Extension(s) Shall Be The Prices Applicable During The Immediately Succeeding Option Period, If There Is One. If There Is No Succeeding Option Period, The Prices Shall Be The Prices Applicable During The Immediately Preceding Contract Period.
the Cost Ceiling(s), Base Fee(s), And Award Fee(s) During The Short-term Option(s) Shall Be The Pro Rata Portion Of The Costs And Fees Applicable To The Immediately Succeeding Option Period, If There Is One. If There Is No Succeeding Option Period, The Cost Ceiling(s) And Fee(s) Shall Be The Pro Rata Portion Of The Costs And Fees For The Immediately Preceding Contract Period.
security Clause
the C&a Requirements Do Not Apply, And A Security Accreditation Package Is Not Required.
va Acquisition Regulation Solicitation Provision And Contract Clause (vaar)
the Contractor, Their Personnel, And Their Subcontractors Shall Be Subject To The Federal Laws, Regulations, Standards, And Va Directives And Handbooks Regarding Information And Information System Security As Delineated In This Contract.
va Information And Information System Security/privacy Language For
inclusion Into Contracts, As Appropriate
general
contractors, Contractor Personnel, Subcontractors, And Subcontractor Personnel Shall Be Subject To The Same Federal Laws, Regulations, Standards, And Va Directives And Handbooks As Va And Va Personnel Regarding Information And Information System Security.
access To Va Information And Va Information Systems
a Contractor/subcontrator Shall Request Logical (technical) Or Physical Access To Va Information And Va Information Systems For Their Employees, Subcontractors, And Affiliates Only To The Extent Necessary To Perform The Services Specified In The Contract, Agreement, Or Task Order.
all Contractors, Subcontractors, And Third-party Servicers And Associates Working With Va Information Are Subject To The Same Investigative Requirements As Those Of Va Appointees Or Employees Who Have Access To The Same Types Of Information. The Level And Process Of Background Security Investigations For Contractors Must Be In Accordance With Va Directive And Handbook 0710, Personnel Suitability And Security Program. The Office For Operations, Security, And Preparedness Is Responsible For These Policies And Procedures.
contract Personnel Who Require Access To National Security Programs Must Have A Valid Security Clearance. National Industrial Security Program (nisp) Was Established By Executive Order 12829 To Ensure That Cleared U.s. Defense Industry Contract Personnel Safeguard The Classified Information In Their Possession While Performing Work On Contracts, Programs, Bids, Or Research And Development Efforts. The Department Of Veterans Affairs Does Not Have A Memorandum Of Agreement With Defense Security Service (dss). Verification Of A Security Clearance Must Be Processed Through The Special Security Officer Located In The Planning And National Security Service Within The Office Of Operations, Security, And Preparedness.
custom Software Development And Outsourced Operations Must Be Located In The U.s. To The Maximum Extent Practical. If Such Services Are Proposed To Be Performed Abroad And Are Not Disallowed By Other Va Policy Or Mandates, The Contractor/subcontractor Must State Where All Non-u.s. Services Are Provided And Detail A Security Plan, Deemed To Be Acceptable By Va, Specifically To Address Mitigation Of The Resulting Problems Of Communication, Control, Data Protection, And So Forth. Location Within The U.s. May Be An Evaluation Factor.
the Contractor Or Subcontractor Must Notify The Contracting Officer Immediately When An Employee Working On A Va System Or With Access To Va Information Is Reassigned Or Leaves The Contractor Or Subcontractor S Employ. The Contracting Officer Must Also Be Notified Immediately By The Contractor Or Subcontractor Prior To An Unfriendly Termination.
3. Va Information Custodial Language
information Made Available To The Contractor Or Subcontractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor/subcontractor In Performance Or Administration Of The Contract Shall Be Used Only For Those Purposes And Shall Not Be Used In Any Other Way Without The Prior Written Agreement Of The Va. This Clause Expressly Limits The Contractor/subcontractor's Rights To Use Data As Described In Rights In Data - General, Far 52.227-14(d) (1).
va Information Should Not Be Co-mingled, If Possible, With Any Other Data On The Contractors/subcontractor S Information Systems Or Media Storage Systems To Ensure Va Requirements Related To Data Protection And Media Sanitization Can Be Met. If Co-mingling Must Be Allowed To Meet The Requirements Of The Business Need, The Contractor Must Ensure That Va S Information Is Returned To The Va Or Destroyed In Accordance With Va S Sanitization Requirements. Va Reserves The Right To Conduct On-site Inspections Of Contractor And Subcontractor It Resources To Ensure Data Security Controls, Separation Of Data And Job Duties, And Destruction/media Sanitization Procedures Are In Compliance With Va Directive Requirements.
prior To Termination Or Completion Of This Contract, Contractor/subcontractor Must Not Destroy Information Received From Va, Or Gathered/created By The Contractor In The Course Of Performing This Contract Without Prior Written Approval By The Va. Any Data Destruction Done On Behalf Of Va By A Contractor/subcontractor Must Be Done In Accordance With National Archives And Records Administration (nara) Requirements As Outlined In Va Directive 6300, Records And Information Management And Its Handbook 6300.1 Records Management Procedures, Applicable Va Records Control Schedules, And Va Handbook 6500.1, Electronic Media Sanitization. Self-certification By The Contractor That The Data Destruction Requirements Above Have Been Met Must Be Sent To The Va Contracting Officer Within 30 Days Of Termination Of The Contract.
the Contractor/subcontractor Must Receive, Gather, Store, Back Up, Maintain, Use, Disclose And Dispose Of Va Information Only In Compliance With The Terms Of The Contract And Applicable Federal And Va Information Confidentiality And Security Laws, Regulations And Policies. If Federal Or Va Information Confidentiality And Security Laws, Regulations And Policies Become Applicable To The Va Information Or Information Systems After Execution Of The Contract, Or If Nist Issues Or Updates Applicable Fips Or Special Publications (sp) After Execution Of This Contract, The Parties Agree To Negotiate In Good Faith To Implement The Information Confidentiality And Security Laws, Regulations And Policies In This Contract.
the Contractor/subcontractor Shall Not Make Copies Of Va Information Except As Authorized And Necessary To Perform The Terms Of The Agreement Or To Preserve Electronic Information Stored On Contractor/subcontractor Electronic Storage Media For Restoration In Case Any Electronic Equipment Or Data Used By The Contractor/subcontractor Needs To Be Restored To An Operating State. If Copies Are Made For Restoration Purposes, After The Restoration Is Complete, The Copies Must Be Appropriately Destroyed.
f. If Va Determines That The Contractor Has Violated Any Of The Information Confidentiality,
privacy, And Security Provisions Of The Contract, It Shall Be Sufficient Grounds For Va To Withhold Payment To The Contractor Or Third Party Or Terminate The Contract For Default Or Terminate For Cause Under Federal Acquisition Regulation (far) Part 12.
if A Vha Contract Is Terminated For Cause, The Associated Baa Must Also Be Terminated And Appropriate Actions Taken In Accordance With Vha Handbook 1600.01, Business Associate Agreements. Absent An Agreement To Use Or Disclose Protected Health Information, There Is No Business Associate Relationship.
the Contractor/subcontractor Must Store, Transport, Or Transmit Va Sensitive Information In An Encrypted Form, Using Va-approved Encryption Tools That Are, At A Minimum, Fips 140-2 Validated.
the Contractor/subcontractor S Firewall And Web Services Security Controls, If Applicable, Shall Meet Or Exceed Va S Minimum Requirements. Va Configuration Guidelines Are Available Upon Request.
except For Uses And Disclosures Of Va Information Authorized By This Contract For Performance Of The Contract, The Contractor/subcontractor May Use And Disclose Va Information Only In Two Other Situations: (i) In Response To A Qualifying Order Of A Court Of Competent Jurisdiction, Or (ii) With Va S Prior Written Approval. The Contractor/subcontractor Must Refer All Requests For, Demands For Production Of, Or Inquiries About, Va Information And Information Systems To The Va Contracting Officer For Response.
notwithstanding The Provision Above, The Contractor/subcontractor Shall Not Release Va Records Protected By Title 38 U.s.c. 5705, Confidentiality Of Medical Quality Assurance Records And/or Title 38 U.s.c. 7332, Confidentiality Of Certain Health Records Pertaining To Drug Addiction, Sickle Cell Anemia, Alcoholism Or Alcohol Abuse, Or Infection With Human Immunodeficiency Virus. If The Contractor/subcontractor Is In Receipt Of A Court Order Or Other Requests For The Above Mentioned Information, That Contractor/subcontractor Shall Immediately Refer Such Court Orders Or Other Requests To The Va Contracting Officer For Response.
for Service That Involves The Storage, Generating, Transmitting, Or Exchanging Of Va Sensitive Information But Does Not Require C&a Or An Mou-isa For System Interconnection, The Contractor/subcontractor Must Complete A Contractor Security Control Assessment (csca) On A Yearly Basis And Provide It To The Cotr.
5. Information System Hosting, Operation, Maintenance, Or Use
va Prohibits The Installation And Use Of Personally-owned Or Contractor/subcontractor Owned Equipment Or Software On Va S Network. If Non-va Owned Equipment Must Be Used To Fulfill The Requirements Of A Contract, It Must Be Stated In The Service Agreement, Sow Or Contract. All Of The Security Controls Required For Government Furnished Equipment (gfe) Must Be Utilized In Approved Other Equipment (oe) And Must Be Funded By The Owner Of The Equipment. All Remote Systems Must Be Equipped With, And Use, A Va-approved Antivirus (av) Software And A Personal (host-based Or Enclave Based) Firewall That Is Configured With A Va- Approved Configuration. Software Must Be Kept Current, Including All Critical Updates And Patches. Owners Of Approved Oe Are Responsible For Providing And Maintaining The Anti-viral Software And The Firewall On The Non-va Owned Oe.
all Electronic Storage Media Used On Non-va Leased Or Non-va Owned It Equipment That Is Used To Store, Process, Or Access Va Information Must Be Handled In Adherence With Va Handbook 6500.1, Electronic Media Sanitization Upon: (i) Completion Or Termination Of The Contract Or (ii) Disposal Or Return Of The It Equipment By The Contractor/subcontractor Or Any Person Acting On Behalf Of The Contractor/subcontractor, Whichever Is Earlier. Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) Used By The Contractors/subcontractors That Contain Va Information Must Be Returned To The Va For Sanitization Or Destruction Or The Contractor/subcontractor Must Self-certify That The Media Has Been Disposed Of Per 6500.1 Requirements. This Must Be Completed Within 30 Days Of Termination Of The Contract.
bio-medical Devices And Other Equipment Or Systems Containing Media (hard Drives, Optical Disks, Etc.) With Va Sensitive Information Must Not Be Returned To The Vendor At The End Of Lease, For Trade-in, Or Other Purposes. The Options Are:
vendor Must Accept The System Without The Drive;
va S Initial Medical Device Purchase Includes A Spare Drive Which Must Be Installed In Place Of The Original Drive At Time Of Turn-in; Or
va Must Reimburse The Company For Media At A Reasonable Open Market Replacement Cost At Time Of Purchase.
(4) Due To The Highly Specialized And Sometimes Proprietary Hardware And Software Associated With Medical Equipment/systems, If It Is Not Possible For The Va To Retain The Hard Drive, Then;
the Equipment Vendor Must Have An Existing Baa If The Device Being Traded In Has Sensitive Information Stored On It And Hard Drive(s) From The System Are Being Returned Physically Intact; And
any Fixed Hard Drive On The Device Must Be Non-destructively Sanitized To The Greatest Extent Possible Without Negatively Impacting System Operation. Selective Clearing Down To Patient Data Folder Level Is Recommended Using Va Approved And Validated Overwriting Technologies/methods/tools. Applicable Media Sanitization Specifications Need To Be Pre- Approved And Described In The Purchase Order Or Contract.
a Statement Needs To Be Signed By The Director (system Owner) That States That The Drive Could Not Be Removed And That (a) And (b) Controls Above Are In Place And Completed. The Iso Needs To Maintain The Documentation.
6. Security Incident Investigation
the Term Security Incident Means An Event That Has, Or Could Have, Resulted In Unauthorized Access To, Loss Or Damage To Va Assets, Or Sensitive Information, Or An Action That Breaches Va Security Procedures. The Contractor/subcontractor Shall Immediately Notify The Cotr And Simultaneously, The Designated Iso And Privacy Officer For The Contract Of Any Known Or Suspected Security/privacy Incidents, Or Any Unauthorized Disclosure Of Sensitive Information, Including That Contained In System(s) To Which The Contractor/subcontractor Has Access.
to The Extent Known By The Contractor/subcontractor, The Contractor/subcontractor S
notice To Va Shall Identify The Information Involved, The Circumstances Surrounding The Incident
(including To Whom, How, When, And Where The Va Information Or Assets Were Placed At Risk Or
compromised), And Any Other Information That The Contractor/subcontractor Considers Relevant.
with Respect To Unsecured Protected Health Information, The Business Associate Is Deemed To Have Discovered A Data Breach When The Business Associate Knew Or Should Have Known Of A Breach Of Such Information. Upon Discovery, The Business Associate Must Notify The Covered Entity Of The Breach. Notifications Need To Be Made In Accordance With The Executed Business Associate Agreement.
in Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig And Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va Information, Obtain Monetary Or Other
compensation From A Third Party For Damages Arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From, Or Related To, The Incident.
7. Liquidated Damages For Data Breach
consistent With The Requirements Of 38 U.s.c. §5725, A Contract May Require Access To Sensitive Personal Information. If So, The Contractor Is Liable To Va For Liquidated Damages In The Event Of A Data Breach Or Privacy Incident Involving Any Spi The Contractor/subcontractor Processes Or Maintains Under This Contract.
the Contractor/subcontractor Shall Provide Notice To Va Of A Security Incident As Set Forth In The Security Incident Investigation Section Above. Upon Such Notification, Va Must Secure From A Non-department Entity Or The Va Office Of Inspector General An Independent Risk Analysis Of The Data Breach To Determine The Level Of Risk Associated With The Data Breach For The Potential Misuse Of Any Sensitive Personal Information Involved In The Data Breach. The Term 'data Breach' Means The Loss, Theft, Or Other Unauthorized Access, Or Any Access Other Than That Incidental To The Scope Of Employment, To Data Containing Sensitive Personal Information, In Electronic Or Printed Form, That Results In The Potential Compromise Of The Confidentiality Or Integrity Of The Data. Contractor Shall Fully Cooperate With The Entity Performing The Risk Analysis. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination.
each Risk Analysis Shall Address All Relevant Information Concerning The Data Breach, Including The Following:
(1) Nature Of The Event (loss, Theft, Unauthorized Access);
(2) Description Of The Event, Including:
date Of Occurrence;
data Elements Involved, Including Any Pii, Such As Full Name, Social Security Number, Date Of Birth, Home Address, Account Number, Disability Code;
(3) Number Of Individuals Affected Or Potentially Affected;
(4) Names Of Individuals Or Groups Affected Or Potentially Affected;
(5) Ease Of Logical Data Access To The Lost, Stolen Or Improperly Accessed Data In Light Of The Degree Of Protection For The Data, E.g., Unencrypted, Plain Text;
(6) Amount Of Time The Data Has Been Out Of Va Control;
(7) The Likelihood That The Sensitive Personal Information Will Or Has Been Compromised (made Accessible To And Usable By Unauthorized Persons);
known Misuses Of Data Containing Sensitive Personal Information, If Any;
assessment Of The Potential Harm To The Affected Individuals;
data Breach Analysis As Outlined In 6500.2 Handbook, Management Of Security And Privacy Incidents, As Appropriate; And
whether Credit Protection Services May Assist Record Subjects In Avoiding Or Mitigating The Results Of Identity Theft Based On The Sensitive Personal Information That May Have Been Compromised.
d. Based On The Determinations Of The Independent Risk Analysis, The Contractor Shall Be Responsible For Paying To The Va Liquidated Damages In The Amount Of $37.50 Per Affected
individual To Cover The Cost Of Providing Credit Protection Services To Affected Individuals Consisting Of The Following:
notification;
one Year Of Credit Monitoring Services Consisting Of Automatic Daily Monitoring Of At Least 3 Relevant Credit Bureau Reports;
data Breach Analysis;
fraud Resolution Services, Including Writing Dispute Letters, Initiating Fraud Alerts And Credit Freezes, To Assist Affected Individuals To Bring Matters To Resolution;
one Year Of Identity Theft Insurance With $20,000.00 Coverage At $0 Deductible; And
necessary Legal Expenses The Subjects May Incur To Repair Falsified Or Damaged Credit Records, Histories, Or Financial Affairs.
8. Security Controls Compliance Testing
on A Periodic Basis, Va, Including The Office Of Inspector General, Reserves The Right To Evaluate Any Or All Of The Security Controls And Privacy Practices Implemented By The Contractor Under The Clauses Contained Within The Contract. With 10 Working-day S Notice, At The Request Of The Government, The Contractor Must Fully Cooperate And Assist In A Government-sponsored Security Controls Assessment At Each Location Wherein Va Information Is Processed Or Stored, Or Information Systems Are Developed, Operated, Maintained, Or Used On Behalf Of Va, Including Those Initiated By The Office Of Inspector General. The Government May Conduct A Security Control Assessment On Shorter Notice (to Include Unannounced Assessments) As Determined By Va In The Event Of A Security Incident Or At Any Other Time.
appendix A List Of Equipment To Be Supported Per Site
location
description
quantity
boise
sp 200/ccc (6 Slot) Service
1
boise
sp 50/occ
1
boise
sp Data Point
12
boise
sp Printer
10
boise
notice Board 32
1
boise
notice Board 40
1
boise
scanner
1
boise
e Signature Device
2
boise
kvm Setup/service
1
boise
kvm Device
2
boise
rx Paperwork Printer
3
boise
smart Card Scanner
16
boise
robotic Cell Multiplexor For Robots
4
boise
interface
3
boise
interface - Pitney Bowes
1
boise
full Disk Encryption
2
boise
sp Ce Platform
1
boise
remote Access Server For Up To 5 Sessions
1
boise
sp Communications Module
1
boise
ras Device License
1
boise
vetext Integration Support
1
boise
customer Hard Drive Retention Per Server
1
boise
customer Hard Drive Retention Per Robot
2
boise
endpoint Security Management (per Pharmacy)
1
boise
endpoint Security Management (per Server)
20
â
â
â
walla Walla
sp 200/ccc (6 Slot) Service
1
walla Walla
sp 50/occ
1
walla Walla
sp Data Point
12
walla Walla
sp Printer
6
walla Walla
notice Board 40
3
walla Walla
sp Kiosk
2
walla Walla
scanner
4
walla Walla
e Signature Device
1
walla Walla
eyecon Model 9420
2
walla Walla
rx Paperwork Printer
4
walla Walla
smart Card Scanner
16
walla Walla
ticket Window Display
2
walla Walla
sp Kiosk Display
2
walla Walla
audio Package System/integration With Notice Board
1
walla Walla
robotic Cell Multiplexor For Robots
2
walla Walla
interface
3
walla Walla
eyecon Interface Controller
1
walla Walla
full Disk Encryption
2
walla Walla
clean Room Inspection Camera
1
walla Walla
client Video Package
2
walla Walla
sp Ce Platform
1
walla Walla
pharmacy Services Portal
1
walla Walla
remote Access Server For Up To 5 Sessions
1
walla Walla
sp Communications Module
1
walla Walla
ras Device License
1
walla Walla
vetext Integration Support
1
walla Walla
customer Hard Drive Retention Per Server
1
walla Walla
customer Hard Drive Retention Per Robot
2
walla Walla
endpoint Security Management (per Pharmacy)
1
walla Walla
endpoint Security Management (per Server)
22
â
â
â
roseburg
sp 200/ccc (6 Slot) Service
1
roseburg
crs 75
1
roseburg
sp Data Point
14
roseburg
sp Printer
12
roseburg
notice Board 40
2
roseburg
e Signature Device
4
roseburg
eyecon 9420
1
roseburg
kvm Setup/service
1
roseburg
kvm Device
8
roseburg
rx Paperwork Printer
5
roseburg
smart Card Scanner
17
roseburg
robotic Cell Multiplexor For Robots
4
roseburg
interface
3
roseburg
full Disk Encryption
2
roseburg
sp Ce Platform
1
roseburg
remote Access Server For Up To 5 Sessions
1
roseburg
sp Communications Module
1
roseburg
ras Device License
1
roseburg
vetext Integration Support
1
roseburg
customer Hard Drive Retention Per Server
1
roseburg
customer Hard Drive Retention Per Robot
2
roseburg
endpoint Security Management (per Pharmacy)
1
roseburg
endpoint Security Management (per Server)
22
â
â
â
eugene
sp 200/ccc (6 Slot) Service
1
eugene
crs 75
1
eugene
sp Data Point
12
eugene
sp Printer
11
eugene
notice Board 40
1
eugene
sp Kiosk
1
eugene
e Signature Device
2
eugene
eyecon 9420
1
eugene
kvm Setup/service
1
eugene
kvm Device
11
eugene
rx Paperwork Printer
3
eugene
smart Card Scanner
16
eugene
ticket Window Display
1
eugene
sp Kiosk Stand
1
eugene
audio Speaker
1
eugene
audio Package System/integration With Notice Board
1
eugene
interface
4
eugene
full Disk Encryption
2
eugene
sp Ce Platform
1
eugene
pharmacy Services Portal
1
eugene
remote Access Server For Up To 5 Sessions
1
eugene
sp Communications Module
1
eugene
ras Device License
1
eugene
vetext Integration Support
1
eugene
customer Hard Drive Retention Per Server
1
eugene
customer Hard Drive Retention Per Robot
2
eugene
endpoint Security Management (per Pharmacy)
1
eugene
endpoint Security Management (per Server)
20
â
â
â
vancouver
sp 200/ccc (12 Slot) Service
1
vancouver
sp Data Point
15
vancouver
sp Printer
11
vancouver
notice Board 32
2
vancouver
notice Board 40
1
vancouver
sp Kiosk
2
vancouver
scanner
1
vancouver
e Signature Device
2
vancouver
eyecon Model 9420
2
vancouver
kvm Setup/service
1
vancouver
kvm Device
14
vancouver
smart Card Scanner
18
vancouver
ticket Window Display
3
vancouver
sp Kiosk Stand
2
vancouver
audio Speaker Pkg
3
vancouver
audio Package System/integration With Notice Board
1
vancouver
robotic Cell Multiplexor For Robots
4
vancouver
interface
3
vancouver
eyecon Interface Controller
1
vancouver
full Disk Encryption
2
vancouver
sp Ce Platform
1
vancouver
remote Access Server For Up To 5 Sessions
1
vancouver
sp Communications Module
1
vancouver
ras Device License
1
vancouver
vetext Integration Support
1
vancouver
customer Hard Drive Retention Per Server
1
vancouver
customer Hard Drive Retention Per Robot
1
vancouver
endpoint Security Management (per Pharmacy)
1
vancouver
endpoint Security Management (per Server)
25
â
â
â
portland
sp 200/ccc (6 Slot) Service
1
portland
sp 50/occ
1
portland
sp Data Point
22
portland
sp Printer
16
portland
notice Board 32
3
portland
notice Board 40
1
portland
sp Kiosk
2
portland
scanner
1
portland
e Signature Device
7
portland
eyecon Model 9400
2
portland
kvm Setup/service
1
portland
kvm Device
20
portland
smart Card Scanner
26
portland
ticket Window Display
5
portland
sp Kiosk Stand
2
portland
audio Speaker Pkg
3
portland
audio Package System/integration With Notice Board
1
portland
robotic Cell Multiplexor For Robots
4
portland
interface
3
portland
eyecon Interface Controller
1
portland
full Disk Encryption
2
portland
sp Ce Platform
1
portland
pharmacy Services Portal
1
portland
remote Access Server For Up To 5 Sessions
1
portland
sp Communications Module
1
portland
ras Device License
1
portland
vetext Integration Support
1
portland
customer Hard Drive Retention Per Server
1
portland
customer Hard Drive Retention Per Robot
2
portland
endpoint Security Management (per Pharmacy)
1
portland
endpoint Security Management (per Server)
35
â
â
â
white City
sp 200/ccc (6 Slot) Service
1
white City
sp 50/occ
1
white City
sp Ce Platform
1
white City
sp Data Point
12
white City
sp Printer
6
white City
notice Board 40
2
white City
sp Kiosk
1
white City
scanner
6
white City
e Signature Device
2
white City
rx Paperwork Printer
1
white City
smart Card Scanner
16
white City
ticket Window Display
3
white City
sp Kiosk Stand
1
white City
audio Speaker Pkg
1
white City
audio Package System/integration With Notice Board
1
white City
robotic Cell Multiplexor For Robots
2
white City
interface
2
white City
full Disk Encryption
2
white City
pharmacy Services Portal
1
white City
remote Access Server For Up To 5 Sessions
1
white City
sp Communications Module
1
white City
ras Device License
1
white City
vetext Integration Support
1
white City
customer Hard Drive Retention Per Server
1
white City
customer Hard Drive Retention Per Robot
2
white City
endpoint Security Management (per Pharmacy)
1
white City
endpoint Security Management (per Server)
22
â
â
â
spokane
sp 200/ccc (6 Slot) Service
1
spokane
crs 75
1
spokane
sp Ce Platform
1
spokane
sp Ce Platform
1
spokane
sp Data Point
13
spokane
sp Printer
8
spokane
sp Printer
1
spokane
scanner
3
spokane
e Signature Device
3
spokane
eyecon Model 9400
2
spokane
kvm Setup/service
2
spokane
kvm Device
4
spokane
rx Paperwork Printer
2
spokane
smart Card Scanner
3
spokane
robotic Cell Multiplexor For Robots
4
spokane
standard Interface
3
spokane
custom Interface
1
spokane
eyecon Interface Controller
1
spokane
full Disk Encryption
2
spokane
remote Access Server For Up To 5 Sessions
1
spokane
sp Communications Module
1
spokane
ras Device License
1
spokane
vetext Integration Support
1
spokane
customer Hard Drive Retention Per Server
1
spokane
customer Hard Drive Retention Per Robot
2
spokane
endpoint Security Management (per Pharmacy)
1
spokane
endpoint Security Management (per Server)
24
â
â
â
puget Sound - Seattle - Inpatient
crs 75
1
puget Sound - Seattle
sp 200/ccc (6 Slot) Service
1
puget Sound - Seattle
sp 50/occ
1
puget Sound - Seattle
sp Data Point
15
puget Sound - Seattle
sp Printer
12
puget Sound - Seattle
notice Board 40
1
puget Sound - Seattle
scanner
4
puget Sound - Seattle
e Signature Device
3
puget Sound - Seattle
rx Paperwork Printer
7
puget Sound - Seattle
smart Card Scanner
20
puget Sound - Seattle
robotic Cell Multiplexor For Robots
4
puget Sound - Seattle
interface
2
puget Sound - Seattle
full Disk Encryption
2
puget Sound - Seattle
scanner
3
puget Sound - Seattle
sp Ce Platform
1
puget Sound - Seattle
remote Access Server For Up To 5 Sessions
1
puget Sound - Seattle
sp Communications Module
1
puget Sound - Seattle
ras Device License
1
puget Sound - Seattle
vetext Integration Support
1
puget Sound - Seattle
customer Hard Drive Retention Per Server
1
puget Sound - Seattle
customer Hard Drive Retention Per Robot
2
puget Sound - Seattle
endpoint Security Management (per Pharmacy)
1
puget Sound - Seattle
endpoint Security Management (per Server)
22
â
â
â
puget Sound - Aml
sp 200/ccc (6 Slot) Service
1
puget Sound - Aml
sp 50/occ
1
puget Sound - Aml
sp Data Point
12
puget Sound - Aml
sp Printer
9
puget Sound - Aml
notice Board 40
1
puget Sound - Aml
scanner
2
puget Sound - Aml
e Signature Device
4
puget Sound - Aml
rx Paperwork Printer
4
puget Sound - Aml
smart Card Scanner
15
puget Sound - Aml
robotic Cell Multiplexor For Robots
4
puget Sound - Aml
interface
2
puget Sound - Aml
full Disk Encryption
2
puget Sound - Aml
sp Ce Platform
1
puget Sound - Aml
remote Access Server For Up To 5 Sessions
1
puget Sound - Aml
sp Communications Module
1
puget Sound - Aml
ras Device License
1
puget Sound - Aml
vetext Integration Support
1
puget Sound - Aml
customer Hard Drive Retention Per Server
1
puget Sound - Aml
customer Hard Drive Retention Per Robot
2
puget Sound - Aml
endpoint Security Management (per Pharmacy)
1
puget Sound - Aml
endpoint Security Management (per Server)
19
â
â
â
alaska
sp 200/occ Service
1
alaska
sp Central Platform
1
alaska
sp Data Point
8
alaska
sp Printer
8
alaska
notice Board 40
1
alaska
pharmacy Image Server
2
alaska
paper Prescription Input Scanner
5
alaska
wireless Scanner
1
alaska
e Signature Device
2
alaska
eyecon Model 9420
1
alaska
eyecon Model 9400
1
alaska
rx Paperwork Printer
1
alaska
smart Card Scanner
1
alaska
interface
3
alaska
eyecon Interface Controller
1
alaska
full Disk Encryption
2
alaska
remote Access Server For Up To 5 Sessions
1
alaska
sp Communications Module
1
alaska
ras Device License
1
alaska
vetext Integration Support
1
alaska
customer Hard Drive Retention Per Server
1
alaska
customer Hard Drive Retention Per Robot
1
alaska
endpoint Security Management (per Pharmacy)
1
alaska
endpoint Security Management (per Server)
13
Closing Date24 Jan 2025
Tender AmountRefer Documents
Municipality Of Irosin, Sorsogon Tender
Others
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Supply & Delivery Of Various Supplies & Materials For Dole Integrated Livelihood Program And Sustainable Industry Project 1. The Local Government Unit Of Irosin, Through The Trust Fund(dole) Intends To Apply The Sum Of Three Million Four Hundred Twenty Six Thousand One Hundred Thirty Six Pesos (p 3,426,136.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Supply & Delivery Of Various Supplies And Materials For Dole Integrated Livelihood Program And Sustainable Industry Project, Good-01-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Supply & Delivery Of Various Supplies & Materials For Dole Integrated Livelihood Program And Sustainable Industry Project Brief Description: 4 Pcs Barber Brush: 23.3cmx7cm, Soft Fiber Material And Wooden Handle/4 Pcs Hair Clipper: Electric, 110v-240v, 50-60hz,all Metal Machine,led Light Display Stainless Steel Blade, Blade Width 45mm,low Noise High Power, 2000 Ma Lithium Battery, 210 Minutes Working Time,4pcs Comb Guide 3/6/10/13mm,body Size: 17x4cm, Body Weight: 371g,with Complete Accessories - Fiber Comb, Cleaning Brush, Lubricant, Charger/4 Pcs Paddle Brush:body Material: Wood, Dimensions: (lxwxh) 25x8x3cm, Brown/8pcs Spray Bottle: 250ml Plastic Hairdressing Spray Bottle/4pcs Hair Blower: 4000w Accurate Power,2-speed Settings (high & Low), 3 Temperature (cold, Hot & Hotter), Glossy, Thick Long Wires, With Light And Perfume Button/4pcs Hair Blower: 4000w Accurate Power,2-speed Settings (high & Low), 3 Temperature (cold, Hot & Hotter), Glossy, Thick Long Wires,with Light And Perfume Button/4pcs Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm,length: 20.9"/52cm,width: 14"/36cm,4 Drawers, Blower Holder/4pcs Talcum Powder: 200g, Hypo-allergenic, Dermatologist Tested/4 Pcs Cordless Clipper: Body Material: Aluminum,motor: Rotary,power/source Battery: Lithium-ion Battery (90+ Minutes Of Runtime), Blades: Titanium Blades, 3 Guide Combs Plastic Material (#1/2, #1, And #1½),cutting Lengths: 0.4-25mm,inclusions: A Blade Guard, 1 Recharging Transformer (charger), 1 Cleaning Brush, With Lubricating Oil Of At Least 5 Ml And English User Manual,product Dimension: Approximately 6.5-7" (l) X 2-3" (w),weight: Maximum Of 400g, Input: Can Be Used For 110-240 Voltage/4pcs Hair Trimmer: Running Time 120 Minutes Battery Powered, Rechargeable Li-ion Battery 1500 Mah, Dimension: Approximately 6-7" (l) X 1.5-2.5 (w), Material: Stainless,accessories: 4 Plastic Combs In Different Sizes 3mm, 6mm, 9mm, 12mm, Inclusions: 1 Recharging Transformer (charger) And 1 English User Manual, Input: Can Be Used For 110-240 Voltage/4pcs Electric Shaver: With 3d Floating Cutter Head, 40mins. Running Time For 8hrs Fully Charged, Material: Stainless Steel,product Dimension: Approximately 6.5-7" (l) X 2-3" (w),automatic Voltage 100-240v,battery: 2 Cell Nickel-metal Hydride Cylindrical Battery Pack, 4000mah,power Type: Rechargeable/4pcs Hair Shear: Material: Stainless Steel,1 Precision Scissor Approximately 6-7",1 Thinning Scissor Atleast 6",accesories: Scissors Oil Atleast 5ml/4 Pcs Razor Blades: 10pcs/box (double Edge Stainless)/4 Pcs Shaving Razor/labaha: Dimensions: Approximately 5-6" (l) X 3/4-1" (w), Material: Carbon Steel, Color: Black/ 4 Pcs Barber Skin Fade Brush: Handle: Wood, With Soft Bristles 1" (l),dimensions: Atleast 5.5" (l) X 1" (w)/4pcs Comb Set: (4pcs/set), Material: High Quality Plastic, Inclusions: #1-approx. Size: 4.88" (l) X 1.02" (w), #2-approx. Size: 7.09" (l) X 1.46" (w), #3-approx. Size: 7.87" (l) X 1.18" (w), #4-6.10" (l) X 0.20" (w)/4pcs Shaving Gel: (foam), 195g/4pcs Barber's Cape: Color: Black,about 140cm (l) X 110cm (w), Cloth: Polyester/4pcs 360 Degree Swivel Barber Chair: Classic Back Seat With Chrome Steel Base, Premium Steel Frame And High Class Foot Pump, Heavy Duty Leather Cover; Lower Height - At Least 51cm, Top Height - At Least 61cm, Sandles Height - At Least 40cm/8pcs Barber Apron: With Two Pockets, Waterproof, Material: Cotton And Acrylic, Item Size: Approx. 38-38.19" (l) X 27-27.36" (w)/ 4pcs Pomade: 80g, Water-based/26pcs Speed Square: Material: Cast Aluminum, Size: About 18x18x2cm/7.09x7.09x0.79", Weight: About 130g, Triangle-shaped/26pcs Meter Tape With Magnetic Hook: Blade Material, Nylon Coated Blade,dimensions: 16ft (l) X 25mm (w)/26pcs Circular Saw: Voltage: 220-240v, Frequency: 50-60hz, Input Power: 1400w, No-load Speed: Atleast 4800rpm, Blade Diameter: 185mm, Cutting Capacity: 45degree,44mm, 90 Degree: 65mm,maximum Cutting Depth: Atleast 90°62mm, Weight: Maximum Of 5.2kg,item Approximate Dimension: 15-17cm (h), 25-28cm (w), 30-35cm (l)/26pcs Angle Grinder: Rated Input Power: 730w, Wheel Diameter: 4", Rated Voltage: 220v,frequency: 60hz, No Load Speed: 12,000 Rpm, Weight: Approximately 1.6kg, Grinding Spindle Thread: M10, Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h )/26pcs Angle Grinder Cutting Disk: 10 Pcs. Per Set, Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8")/26 Pcs Portable Hand Drill: Power Sourced: Battery Powered - 2pc 21 Volt 1500mah Lithium-ion Batteries, Maximum Rotational Speed: 1500 Rpm, Voltage: 210v,amperage: 1.5 Amps, Chuck Size: 0.38",bit Heads Diameters: From 0.8mm-10mm,product Dimensions: 9.6" (l) X 2.1" (w) X 7.5" (h), Material: plastic, Rubber, Metal, Item Dimensions: Approx. 9.6" (l) X 2.1" (w) X 7.5" (h),item Weight: Atleast 2.5 Pounds,item Torque: 330 Inch Pounds; Inclusions: 1x21 Volt Inspiritech Cordless Power Drill, 2x Rechargeable Battery, 1x English User Manual, 10x Self-drilling Drywall Anchors,10x Screwdriver Bits, 2x Double Ended Bits, 3x Drilling Bits, 1x Magnetic Extension Socket Bit Holder, 10x Anchors With Screws,1x One-hour Fast Charger, 1x Flexible Extension Shaft, 1x Carrying Bag/26pcs Wood Planer: Rated Voltage: 220v, Rated Input Power: 600w, Cutting Width: 82mm, Load Speed: 15,000rpm, Frequency: 60hz, Weight: 3kg./26 Pcs Framing Hammer: Handle Material: Alloy Steel, Item Dimensions: Approximately 16-17" (l) X 5.75-6" (w) X 1.5-2" (h), Item Weight: Atleast 1.4 Pounds/26 Pcs Trim Hammer: Handle Material: Wood, Head Material: Alloy Steel; Item Dimensions Approximately: 14-15" (l) X 5-6"(w) X 1-2" (h),item Weight: Atleast 594 Grams/26pcs Roofing Hammer: Item Weight: 1.25 Pounds, Product Dimensions: Approx. 13.7" (l) X 6.75" (w) X 1.5" (h)/26 Pcs Chalk Line: Item Weight: 10.6 Ounces, Product Dimensions: approx. 1200" (l) X 4.72" (w) X 5.91" (h) Inches, Color: blue, Material Type: Alloy Steel, Rubber/26 Pcs Utility Knife: Handle Material: Aluminum, Material: Aluminum Alloy, Weight: 120g/pcs, Blade Size: 19mm (w) X 61mm (h) X 0.6mm (t),blade Material: Steel, Thickness: Atleast 0.6mm/26 Pcs Tin Snips: Item Weight: atleast 1 Pound, Package Dimensions: Approx. 12.36" (l) X 3.7" (w) X 1.3" (h),size: long Straight, 12 Inches Long, Blade Length: 3.20",material: Steel, Cutting Thickness Range Up To 1.2mm Carbon Steel And 0.7mm/26 Pcs Framing Square: Shorter Leg Measures At 8 Inch Outside And 6.5 Inch Inside, Longer Leg Measures At 12 Inch Outside And 11 Inch Inside,material: Carbon Steel/26 Pcs Level: Box Beam Style, Material: Aluminum,dimension: Approximately 24-24.5" (l) X 2-2.6" (w) X 1.2-1.5" (h), Weight: Atleast 0.8 Pounds/26 Pcs Electric Planer: Voltage: 220-240v,input Power: 1050w, No Load Speed: 1600rpm, Planing Width And Depth,82x3mm,heavy Duty Aluminum Base/1 Pc Meter Tape With Magnetic Hook: Blade Material: Nylon Coated Blade, Dimensions: 16ft (l) X 25mm (w)/1 Pc Air Compressor Machine: Motor Power: 1hp, Size: Approx. 935x385x800mm,voltage: 220-240v, 60hz, Speed: 3400 Rpm, Tank Capacity: 24l , Operating Pressure: Max 8 Bar, Air Displacement: 93l/min, Pump Lubricated With Oil/1 Pc Blue Painters Tape, Color: Blue, Size: Atleast 1.41" X 20m,thickness: 0.13mm, Item Weight: 1.92 Pounds, Material: Paper/2pcs Electric Spray Gun: Voltage: 220-240v~50/60hz,spraying Pressure: 0.1-0.2 Bar, Max Flow: 850ml/min, Max Viscosity: 50din-s, Container Capacity: Atleast 800ml,power Cord Length: 2m, Rated Power 500w, Spraying Pressure: Atleast 0.1-0.2bar, Item Dimensions: Approximately 13" (l) X 5" (w) X 11" (h)/1 Pc Extension Pole, (3 Stage Extender) Reach: 1.5-to-3ft,weight: Maximum Of 0.5 Pounds, Max. Standing Reach: 10ft, Material : Aluminum/2 Pcs Paint Brush Set, 5 Pcs/set, Material: Synthetic Bristle, Wood Handle, Overall Length: Atleast 11", Bristles Length: Atleast 3", Brush Width: 1", 1-1/2" 2", 2-2.5", 3"and 4"/ 5 Pcs Paint Roller, Material: Plastic,package Dimensions: Approximately 15.16" (l) X 11.22" (w) X 3.15" (h),item Weight: Atleast 1.06 Pounds, Inclusion: Roller, Atleast 7" In Length, Material: Polyester/2 Pcs Painters Gloves, 12 Pcs/pack, Material: Cotton, Color: Red/1 Pc Putty Knife/paint Scraper Set (4pcs), Stainless Steel Blade With Rubberized Handle, Blade Width: 1", 2" And 3", Length Including Handle: Approximately 8-9"/1 Pc Steel Float/plastering Trowel: Thickness: Atleast 0.7 Mm, Surface Measurement, Length: 12", Width: 4", Material: High Carbon Steel With Wood Handle/2 Pcs Lpg Tank With Gas Regulator And Accessories, Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/2 Pcs Kawali: Aluminum, (diameter X Height) 28cmx8cm With Double Handle/2 Pcs Food Warmer/chafing Dish: Rectangular, 2l Capacity, 6 Pcs In 1 Set Stainless Steel, No Side Handle, Glass Lid Cover With Handle, Dimensions: Same Sizes - 32cm (l) X 26cm (w) X 8cm (h)/2 Pcs Gas Range: Approx. 55-70cm (l) X 50-60cm (w) X 86-93cm (h), 4-gas Burner, 62l Gas Oven, Button Ignition, Top Glass Lid, Net Weight: Maximum Of 28kg, Pan Support: Light Cast Iron Pan Support/2 Pcs Baking Sheet: Aluminum, 12x16 Inches/2 Pcs Digital Kitchen Scale: Accurate Measurement; Weigh Up To 5 Kg / 11 Lb Precisely In 1 G / 0.05 Oz Increments, Quality Material: Measure Food, Small Items, And Liquids With Confidence On The 304 Food-grade, Stainless Steel Platform, Approx. Dimension 7.3-7.5" (l) X 5.7-5.90" (w) X 0.6-08" (h), 2 X 1.5v Aaa Batteries/2 Pcs Measuring Cup (for Liquid Ingredients): 1 Measuring Cup With Red Graphics, Made Of Non-porous Glass That Won't Warp, Stain, Or Absorb Odors, Glass Is Preheated Oven, Microwave, Fridge, Freezer & Dishwasher Safe, Dimension: Approx. 7.13" (l) X 6.75" (w) X 4.38" (h), Measuring Capacity: 500ml/2 Pcs Measuring Cups (for Dry Ingredients): Material: Stainless Steel, 5 Pieces Per Set (1 Cup, 1/2 Cup, 1/3 Cup, 1/4 Cup, 1/8 Cup)/2 Pcs Measuring Spoons (set): 7pcs Stainless Measuring Spoon Kit, The Kit Includes: 1/8 Tsp (0.63ml), 1/4 Tsp (1.25ml), 1/2 Tsp (2.5ml), 3/4 Tsp (3.75ml), 1 Tsp (5ml), 1/2 Tbsp (7.5ml), 1 Tbsp (15ml)/2 Pcs Mixing Bowl: Medium, Approx. Diameter: 28cm, Height:11.2cm, Material: Stainless; Capacity: At Least 4l/2 Pcs Standmixer: 2-in-1 360 Automatic Rotating Bowl Electric Stand & Hand Mixer, 4.5l W/ 5-speed Turbo Function,color: Black/1 Pc Double Burner Gas Stove: Stainless Top And Front, Automatic Ignition ,reversible Trivet, Double Detachable Top Burner, Removable Drip Pan, Dimension: 730mm(l) X 395mm(w) X 105mm(h)/1 Pc Lpg Tank With Gas Regulator And Accessories: Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/1 Pc Caldero: Aluminum, #2, Diameter Height 28cmx16cm With Double Handle/2 Pcs Kawali: Aluminum, (diameter X Height) 28cmx8cm With Double Handle/1 Pc Kawa: 19.5" Cast Iron With Double Handle Depth/height: 21cm (medium)/1 Pc Food Warmer/chafing Dish: Rectangular, 2l Capacity, 6 Pcs In 1 Set Stainless Steel, No Side Handle, Glass Lid Cover With Handle, Dimensions: Same Sizes - 32cm (l) X 26cm (w) X 8cm (h)1 Pc Food Glass Display (estante): 3 Layers; 20(h)x18(w)x36(l)", Aluminum Base, Glass With Screen Door/1 Pc Casserole With Double Handle: Material: Aluminum, Size: 26cm Dimension: 36(l) X 28.5(w) X 21(h)cm/2 Pcs Frying Tongs: Materials: Stainless Steel With Rubber Or Plastic Coated Handles, 12 Inch Long/1 Pc Chopping Board: Material: Polypropylene/1 Pc Chopping Knife: 10” Stainless,wood Handle/1 Pc Butcher's Knife: Materials: Stainless, Wood Handle, Size: About 10"/1 Pc Plastic Table: 4 Seaters, Square Type With Umbrella Hole At The Center, Table Dimension: 36" (length) X 36" (width) X 30" (height), Thickness: Approximately 1.5in To 2in; Color: Beige2 Pcs Monoblock Chairs: With Backrest, Seat 375mmxdepth 330mm, 2.25 Kg, Class B Plastic, Thickness: Approximately 1.5in, Color: Beige/1 Pc Beach Umbrella: 90" Diameter X 8 Ft. Height, 8 Rib Round Metal Pole, Polyester Multi-coloured Umbrella Canopy/2 Pcs Cooler Container: Chest Insulated Cooler, Materials: Polystyrene, Sizes And Capacities: 30 Liters - 45.5cm(l) X 39cm(w) X 31cm(h),color: Blue Or Red/1 Pc Grill/ Ihawan With Stand,material Of Body And Stand: Stainless , 24x12x33inches (lxwxh), Depth: 5inches/2 Pcs Bicycle With Sidecar: Bicycle Specifications: Bmx Type Bike (frame 1//2 Gi Hd, Rim Set Front X 10 G Wide Jap Hub, Rim Set Rear X 10g Wide Jap Hub, Tire 20 X 2.125 Jumbo, Tube 20 X 2.125, Handle Bar Painted Black, Fork Ex-900 Landing Gear Cp, Head Parts Nikyo/whw, H-post Bmx Ord.m, H-grip Ord. Opc Parts Neco Bearing Type, Opc Plate 36t, Chain Cp Bmx, Freewheel 24t, Pedal Opc Bearing Type, Seat Clamp/s-pin/ S-post P, Saddle With Spring, Footbreak With Spring "full Size" Frame, 175-180mm Cranks Side Car With Umbrella Holder And 2 Chest Coolers Carrier (52l Capacity) - Dimensions: 25.8" (l) X 16.2" (w) X 15.7" (h) Materials: 1/2 J1 Pipe 540, 316 X 1 Flat Square Bar, J1 Pipe De Una 520, 1/4 X 2 Flat Bar, 6203 Gi Set, Tire 20 X 2.125 Jumbo/2 Pcs Weighing Scale: 10kg Capacity, Colored Body / Stainless Pan, Graduation: 50g, Powder Coated Body, Pan Size: 255mm Ø X 55mm Deep, Dial Face: 185mm Ø, 4 Units/master Carton/4 Pcs Plastic Fruit Crate 21 X 15 X 12 Inches/1 Pc Hair Dryer, With 3 Temperature Setting (from High To Low): Size: Atleast 200mm (h), 74mm (w), Weight: Minimum Of 315g, Wattage: 2200w, Voltage: 120-240v, Body Material: Plastic/1 Pc 2 In 1 Steam Pro Hair Straightener (straightener & Curler): Tourmaline Ceramic Wide Plates - 1.25" Wide Heating Plate, Adjustable Temperature Display - 150-235◦c, 360◦, Swivel Cord - Tangle-free, Hanger Design, Ptc Heater - Instant Heat-up/1 Pc Hair Combs: Material: Plastic, Inclusions: Flat Comb Size - 21.5cm (l) X 4.2cm (w), Massage Comb Size: 22cm (l) X 8.5cm (w), Ribs Comb Size: 21.5cm (l) X 4cm (w), Curling Comb Size: 20.2cm (l) X 2.5cm (w), Mirror Size: Atleast 22cm (l) X 10cm (w); Storage Base Size: Atleast 10cm (l) X 15cm (w), Package Size: Approx. 22-23cm (l) X 16cm (w) X 11cm (h), Package Weight: Approx. 305g/1 Pc Hair Clips: Plastic, Product Size: Approx. 4.5", Color: Black (12pcs)/1 Pc 7pcs Face Brush Set, Inclusion: Powder Brush, Size: 17cm, Bristle Length: 3.2cm, Ferrule Width:1.9cm, Powder Buffer Brush, Size: 19cm, Bristle Length: 5cm, Ferrule Width: 2.1cm,foundation Brush, Size: 17cm, Bristle Length: 3.3cm, Ferrule Width: 2.2cm, Flat Foundation Brush, Size: 17cm,bristle Length: 3.2cm; Ferrule Width:1.2cm, Highlight Brush, Size: 16.5cm,bristle Length: 2.7cm, Ferrule Width: 2.3cm,angle Cheek Brush, Size: 17cm, Bristle Length: 3.1-2.3cm,ferrule Width: 2.4cm, Highlighting Fan Brush, Size: 16.5cm, Bristle Length: 4cm, Ferrule Width: 2.5cm, With Brush Bag/1 Pc Eyelash Curler: Material: Carbon Steel, Size: Approx. 5.91 X 3.94 X 1.97"/1 Pc Eyebrow Razor: Handle Material: Plastic, Size: Approx. 6.8(l) X 2(w) X 0.1"(h), 6pcs/pack/1 Pc Makeup Sponge Set Blender: Material: Sponge, Size: Approx. 4.02 (l) X 3.94(w) X 2.52"(h), 4pcs/set/1 Pc False Eyelashes, Product Dimensions: Approx. 0.75(l) X 3.88(w) X 5.38"(h), 5pairs/pack/1 Pc Eye Shadow Pallete: 12 Curated Peach-inspired Shades, Finish Type: Metallic, Matte, Product Dimension: Approx. 0.08 (l) X 0.04 (w) X 0.06" (h)/1 Pc Contour Palette: Multi-colored, Finish Type: Matte, Package Dimension: Approx. 5.75 (l) X 4.25 (w) X 0.5" (h)/1 Pc Hypercurl Waterproof Mascara Make Up Set: Product Dimensions: Approx. 0.85 (l) X 2.75 (w) X 5.63" (h), Color: Black/1 Pc Waterproof Matte Gel Eyeliner Pencil: Item Form: Pencil, Powder, Creamy, Finish Type: Matte, Product Dimensions: About 5.77 X 1.97 X 0.81", Color: Black/1 Pc Eyebrow Gel, Waterproof: Weight: About 0.16 Oz, Product Dimension: Approx. 0.75 (l) X 1.9 (w) X 5.65 (h) Inches, Color Black, Brown/1 Pc Blush On, 3 Complimentary Skin-flushed Shades, Product Dimensions: Approx. 2.89 (l) X 0.43 (w) X 2.33" (h)/1 Pc Powder Blush Makeup Palette, Product Dimensions: approx. 2.43 (l) X 2.43 (w) X 0.66" (h)/1 Pc Eye Shadow Palette; 12 Curated Peach-inspired Shades, Finished Type:metallic,matte, Product Dimensions:approx 0.08(l)x0.04(w) X0.06”(h)/ 1 Pc Applicator Brush And Plastic Comb: 13cm Black, Double-sided Comb, Pointed Handle For Sectioning Hair/1 Pc Hair Clipper: Electric; 110v-240v, 50-60hz,all Metal Machine, Led Light Display Stainless Steel Blade, Blade Width 45mm,low Noise High Power, 2000 Ma Lithium Battery, 210 Minutes Working Time, 4pcs Comb Guide 3/6/10/13mm, Body Size: 17x4cm, Body Weight: 371g, With Complete Accessories - Fiber Comb: Cleaning Brush, Lubricant, Charger/1 Pc Spray Bottle: 250ml Plastic Hairdressing Spray Bottle/1 Pc Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm, Length: 20.9"/52cm, Width: 14"/36cm, 4 Drawers, Blower Holder/1 Pc Curling Iron: 220v Power, 4gen; White, 32x25x13mm, Energy Efficient-48w,360degree Rotating Tail, Automatic Hair Curler, Iron Ceramic, Adjustable Size/1 Pc Apron: Length: 76cm, Width: 59cm, Color: Black, Material: Nylon, Waterproof/1 Pc Curling Rod: Small, 2cm, Cylindrical, Plastic Resin With Rubber Band Kits,multi-color/1 Pc Curling Rod: Medium, 2.5cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/1 Pc Curling Rod: Large, 3cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/1 Pc Spray Net: 600ml, 27.5cm, Hard Hold/1 Pc Hair Spray Aerosol Extra Hold: Weight: About 7ounces /198g, Scented, Package Dimensions: 7.83 X 6.69 X 2.17"/1 Pc Hair Trimmer: Running Time 120 Minutes Battery Powered,rechargeable Li-ion Battery 1500 Mah, Dimension: Approximately 6-7" (l) X 1.5-2.5 (w), Material: Stainless; Accessories: 4 Plastic Combs In Different Sizes 3mm, 6mm, 9mm, 12mm, Inclusions: 1 Recharging Transformer (charger), And 1 English User Manual, Input: Can Be Used For 110-240 Voltage/3 Pcs Hair Dryer, With 3 Temperature Setting (from High To Low): Size: Atleast 200mm (h), 74mm (w), Weight: Minimum Of 315g, Wattage: 2200w, Voltage: 120-240v,body Material: Plastic/3 Pcs 2 In 1 Steam Pro Hair Straightener (straightener & Curler): Tourmaline Ceramic Wide Plates - 1.25" Wide Heating Plate, Adjustable Temperature Display - 150-235◦c, 360◦, Swivel Cord - Tangle-free; Hanger Design, Ptc Heater - Instant Heat-up/3 Pcs Hair Combs: Material: Plastic, Inclusions: Flat Comb Size - 21.5cm (l) X 4.2cm (w), Massage Comb Size: 22cm (l) X 8.5cm (w), Ribs Comb Size: 21.5cm (l) X 4cm (w),curling Comb Size: 20.2cm (l) X 2.5cm (w), Mirror Size: Atleast 22cm (l) X 10cm (w), Storage Base Size: Atleast 10cm (l) X 15cm (w),package Size: Approx. 22-23cm (l) X 16cm (w) X 11cm (h), Package Weight: Approx. 305g/3 Pcs Hair Clips: Plastic, Product Size: Approx. 4.5",color: Black (12pcs)/3 Pcs Disposable Latex Free Gloves: Non-sterile, 100 Pcs Per Pack, Product Dimensions: Approx. 8.6" (l) X 4.9" (w) X 3" (h), Weight: 1.25 Pounds, Material: Synthetic Pvc/3 Pcs Cutting Scissors: 6" Stainless Steel, 65g/3 Pcs Thinning Scissors: 17.5x5cm Stainless Steel/3 Pcs Drip Pan: 32cmx35cm Plastic, Black/3 Pcs Hair Clipper: Electric,110v-240v, 50-60hz,all Metal Machine,led Light Display Stainless Steel Blade, Blade Width 45mm, Low Noise High Power, 2000 Ma Lithium Battery, 210 Minutes Working Time, 4pcs Comb Guide 3/6/10/13mm, Body Size: 17x4cm, Body Weight: 371g,with Complete Accessories - Fiber Comb, Cleaning Brush, Lubricant, Charger/3 Pcs Nail Tool Set: Material: Stainless Steel, Case: Leather, Package Size: Approximately 15-15.5cm (l) X 8cm (w) X 2cm (h),inclusions: Cuticle Trimmer (95mm), Blackhead Needle And Loop Remover (83mm), Eyebrow Tweezer (86mm) Peeling Knife (90mm), Nail File (75mm), Ear Pick (78mm), Double Pick (75mm), Dead Skin Fork (86mm), Small Pedicure Plier (95mm), Acne Needle (83mm), Small Nail Clipper (62mm) Bevel Nail Clipper (61mm), Large Nail Clipper (82mm), Beauty Tip Scissor (89mm), Pusher/3 Pcs Cotton Balls: 300g (100 Pcs Large Cotton Balls)/3 Pcs Nail Polish: Volume: 15ml, With 24 Colors Inclusions: 14k Gold, 18k Gold, 24k Gold, African Plum, Baby Pink, Black Velvet, Carolina Peach, Cashmere, Emerald Shimmer, Golden Bronze, Italian Nude, Platinum Special, Pussy Red, Red Pearl, Saphire Glow, Silver Platinum, Simply Red, Tahiti Brown, White Satin, White Rose, Platinum Silver, Touch Of Tan, Touch Of Beige, Colorless/3 Pcs Foot Spa Soaker: With Pumice Stone, Package Dimensions: Approximately 16.42" X 13.58" X 7.91", Weight: About 4.63 Pounds, Rated Power: 500 Watts, Rated Voltage: 110~120v, Rated Frequency: 50hz, Temperature Adjustable Range: 35℃ To 48℃/3 Pcs Astringent Foot Soaker: 128oz/3 Pcs Cooling Foot Soak: Product Dimensions: approximately 6.5-7" X 2.38-2.50" X 9.259.50", Weight: Atleast 900g/3 Pcs Exfoliating Foot Scrub: Package Dimensions: Approximately 7.05-7.50" X 2.32-3" X 1.97-2", Weight: Atleast 6oz/3 Pcs Foot File And Callus Remover: Material: Metal, Steel, Item Dimensions: Approx. 10-10.78" X 2.7" X 0.29", Item Weight: 3.2 Pounds/3 Pcs Foot Scrub/3 Pcs Manicurist Bag: Made Of Heavy Duty Nylon, Large Capacity: Enough Room To Hold Up To 42 Bottles Of 15ml Nail Polish, Size: Approx. 8-9" (l) X 6-7" (w) X 4-5" (h)/3 Pcs Spray Bottle: 250ml Plastic Hairdressing Spray Bottle/3 Pcs Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm, Length: 20.9"/52cm, Width: 14"/36cm, 4 Drawers, Blower Holder/3 Pcs Apron: Length: 76cm, Width: 59cm,color: Black,material: Nylon, Waterproof/3 Pcs Alcohol: 70% Ethyl Alcohol With Moisturizer,500ml/3 Pcs Shampoo: 1000ml, Green Apple And Citrus Lemon Variant/3 Pcs Hair Spa: 1000ml, Lavender And Strawberry Variant/3 Pcs Hot Oil: Keratin Organic Hot Oil, 1000ml, Aloe Vera Variant/3 Pcs Hair Cellophane: 500ml, Natural, Brown,burgundy And Ash Blonde Variant/3 Pcs Hair Rebonding Set: 1000ml Hair Straightening And Hair Neutralizing (ion Perm)/3 Pcs Hair Color Dye:100 Ml, 2pcs Each (black, Dark Brown, Medium Brown, Light Brown, Blonde, Light Blond, Lighter Blonde, Lightest Blonde, Dust)/3 Pcs Hair Color Developer: 100ml 2pcs Each 6%, 9%, 12% Oxidizer/3 Pcs Hair Bleaching Powder: 500g/3 Pcs Brazilian Blowout: 120ml, 3-in-1 Set (clarifying Shampoo, Brazilian Blowout, After Treatment Conditioner)/24 Pcs Hair Dryer, With 3 Temperature Setting (from High To Low): Size: Atleast 200mm (h), 74mm (w), Weight: Minimum Of 315g, Wattage: 2200w, Voltage: 120-240v, Body Material: Plastic/24 Pcs 2 In 1 Steam Pro Hair Straightener (straightener & Curler): Tourmaline Ceramic Wide Plates - 1.25" Wide Heating Plate, Adjustable Temperature Display - 150-235◦c, 360◦,swivel Cord - Tangle-free, Hanger Design, Ptc Heater - Instant Heat-up/24 Pcs Hair Combs: Material: Plastic, Inclusions: Flat Comb Size - 21.5cm (l) X 4.2cm (w), Massage Comb Size: 22cm (l) X 8.5cm (w), Ribs Comb Size: 21.5cm (l) X 4cm (w), Curling Comb Size: 20.2cm (l) X 2.5cm (w), Mirror Size: Atleast 22cm (l) X 10cm (w), Storage Base Size: Atleast 10cm (l) X 15cm (w), Package Size: Approx. 22-23cm (l) X 16cm (w) X 11cm (h), Package Weight: Approx. 305g/24 Pcs Hair Clips: Plastic, Product Size: Approx. 4.5", Color: Black (12pcs)/24 Pcs Disposable Latex Free Gloves: Non-sterile, 100 Pcs Per Pack, Product Dimensions: Approx. 8.6" (l) X 4.9" (w) X 3" (h), Weight: 1.25 Pounds, Material: Synthetic Pvc/24 Pcs Drip Pan: 32cmx35cm Plastic, Black/24 Pcs Shower Caps: 32cm, Thick Plastic, Elastic, Washable/24 Pcs Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm, Length: 20.9"/52cm, Width: 14"/36cm, 4 Drawers, Blower Holder/24 Pcs Curling Iron: 220v Power, 4gen, White, 32x25x13mm, Energy Efficient-48w, 360degree Rotating Tail, Automatic Hair Curler, Iron Ceramic, Adjustable Size/24 Pcs Hair Steamer: With 4 Wheels, 360degrees Movable, Gray Color, Adjustable Height With Timer And Control/120 Pcs Cape: 140x110cm, Satin, Nylon, Waterproof, Black/72 Pcs Microfiber Towel: 25x65cm, 135g, Microfiber, Dark Colors/24 Pcs Curling Rod:small, 2cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/24 Pcs Curling Rod: Medium, 2.5cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/24 Pcs Curling Rod: Large, 3cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/120 Pcs Ear Caps: (l X W X T): 8cm X 4.5cm X 2.1cm/3.15" X 1.77" X 0.83", Black,plastic/24 Pcs Shampoo: 1000ml, Green Apple And Citrus Lemon Variant/24 Pcs Hair Spa: 1000ml, Lavender And Strawberry Variant/24 Pcs Hot Oil: Keratin Organic Hot Oil, 1000ml, Aloe Vera Variant/24 Pcs Hair Cellophane: 500ml, Natural, Brown, Burgundy And Ash Blonde Variant/24 Pcs Hair Rebonding Set: 1000ml Hair Straightening And Hair Neutralizing (ion Perm)/24 Pc Hair Color Dye:100 Ml, 2pcs Each (black, Dark Brown, Medium Brown, Light Brown, Blonde, Light Blond, Lighter Blonde, Lightest Blonde, Dust)/24 Pcs Hair Color Developer: 100ml 2pcs Each 6%, 9%, 12% Oxidizer/24 Pcs Hair Bleaching Powder: 500g/24 Pcs Brazilian Blowout: 120ml, 3-in-1 Set (clarifying Shampoo, Brazilian Blowout, After Treatment Conditioner)/24 Pcs Hair Shear: Material: Stainless Steel, 1 Precision Scissor Approximately 6-7",1 Thinning Scissor Atleast 6", Accesories: Scissors Oil Atleast 5ml/34 Pcs Angle Grinder Cutting Disk: 10 Pcs. Per Set, Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8")/34 Pcs Crow Bar: At Least 36" Long,length Tolerance: +- 1/8, Material: Forged Steel Carbon/34 Pcs Claw Hammer: Round Head, Head Weight: At Least 16oz, Overall Weight: Approximately 17oz-23oz, Head Material: Forged Steel, Handle Material: Fiberglass Handle With Rubber Cushion, Overall Length: Approximately 12-14"/34 Pcs Hacksaw With Blade: Material: Aluminum Alloy Frame With Soft-grip Handle, At Least 12"-15" Long Including Handle, With Soft-grip Rubber Handle, Bi-metal, Blade Length: About 30cm, Width: 3cm/34 Pcs Meter Tape With Magnetic Hook: Blade Material: Nylon Coated Blade, Dimensions: 16ft (l) X 25mm (w)/34 Pcs Handsaw: Blade Length: About 15",blade Material: Carbon Steel, Handle Length: 5", Handle Material: Plastic/rubber, Color: Gray,8 Teeth Per Inch/34 Pcs Shovel: Round End, Tempered Steel Blade: 17-23 Cm, Blade Tip Width, 22-28cm Blade Tip Length, All Metal Handle, Overall Length: 100cm-115 Cm, Capacity: 350-400 Lbs/34 Pcs Shovel: Rectangular End, Tempered Steel Blade: 22-26 Cm, Blade Tip Width, 22-28cm Blade Tip Length, All Metal Handle, Overall Length: 100cm-115 Cm/34 Pcs Level Bar: Aluminum Frame, Length: At Least 24"/60cm, Aluminum Thickness: 1.5mm, Double Side Milles, 0.5mm/m Accurate Vials/34 Pcs Steel Float/plastering Trowel: Thickness: At Least 0.7 Mm, Surface Measurement, Length: 12", Width: 4", Mmaterial: High Carbon Steel With Wood Handle/34 Pcs Steel Square: Carpenter's Framing Square, Blade Width: 2" Scale: At Least 16" (l) X 24" (w), Material: Steel/34 Pcs Masonry Trowel: Length: At Least 12"long, Width: 6", Material: Flat Steel, With Wood Handle/34 Pcs Circular Saw: Voltage: 220-240v, Frequency: 50-60hz, Input Power: 1400w, No-load Speed: Atleast 4800rpm, Blade Diameter: 185mm, Cutting Capacity: 45degree: 44mm, 90 Degree: 65mm, Maximum Cutting Depth: Atleast 90°62mm, Weight: Maximum Of 5.2kg, Item Approximate Dimension: 15-17cm (h), 25-28cm (w), 30-35cm (l)/34 Pcs Masonry Square/metric Square: Material: Aluminum, Length: Approx. 24", Width: 16", 1/8 '' Thickness/34 Pcs Mason's Level: At Least 48'' Long, Aluminum Reinforced Frame, 60cm Only/34 Pcs Sledgehammer: Weight: At Least 3 Lbs With Fiberglass Handle, Forged Steel Round Head, Length: Approximately 25-27"/34 Pcs Concrete Chisel: Pointed Sharp End, Material: Forged Steel Chisel, With Rubberized Handle, Length: Approximately 10''/34 Pcs Putty Knife/paint Scraper Set (4pcs): Stainless Steel Blade With Rubberized Handle, Blade Width: 1", 2" And 3", Length Including Handle: Approximately 8-9"/34 Pcs Mason's Line: #18 Braided Nylon, 500 Ft/roll, Color Orange/34 Pcs Hammer Drill: Electric, 1980w 220v, Rated Frequency: 50/60hz, Load Speed: 0-3800rpm (revolutions Per Minute), Chuck: 13mm With Ergonomic Anti-slip Handle/34 Pcs Angle Grinder: Rated Input Power: 730w, Wheel Diameter: 4",rated Voltage: 220v, Frequency: 60hz, No Load Speed: 12,000 Rpm, Weight: Approximately 1.6kg, Grinding Spindle Thread: M10, Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h )/34 Pcs Wooden Float: Size: At Least 12x4", Has 5/8" Thick Rubber Pad, With Wooden Handle/4 Pcs Nail Tool Set: Material: Stainless Steel, Case: Leather, Package Size: Approximately 15-15.5cm (l) X 8cm (w) X 2cm (h), Inclusions: Cuticle Trimmer (95mm), Blackhead Needle And Loop Remover (83mm), Eyebrow Tweezer (86mm) Peeling Knife (90mm), Nail File (75mm), Ear Pick (78mm), Double Pick (75mm), Dead Skin Fork (86mm), Small Pedicure Plier (95mm), Acne Needle (83mm), Small Nail Clipper (62mm) Bevel Nail Clipper (61mm), Large Nail Clipper (82mm), Beauty Tip Scissor (89mm), Pusher/4 Pcs Cotton Balls: 300g (100 Pcs Large Cotton Balls)/4 Pcs Nail Polish: Volume: 15ml, With 24 Colors Inclusions: 14k Gold, 18k Gold, 24k Gold, African Plum, Baby Pink, Black Velvet, Carolina Peach, Cashmere, Emerald Shimmer, Golden Bronze, Italian Nude, Platinum Special, Pussy Red, Red Pearl, Sapphire Glow, Silver Platinum, Simply Red, Tahiti Brown, White Satin, White Rose, Platinum Silver, Touch Of Tan, Touch Of Beige, Colorless/4 Pcs Foot Spa Soaker: With Pumice Stone, Package Dimensions: Approximately 16.42" X 13.58" X 7.91", Weight: About 4.63 Pounds, Rated Power: 500 Watts, Rated Voltage: 110~120v, Rated Frequency: 50hz, Temperature Adjustable Range: 35℃ To 48℃/2 Pcs Astringent Foot Soaker: 128oz/2 Pcs Cooling Foot Soak: Product Dimensions: approximately 6.5-7" X 2.38-2.50" X 9.259.50", Weight: Atleast 900g/2 Pcs Exfoliating Foot Scrub: Package Dimensions: Approximately 7.05-7.50" X 2.32-3" X 1.97-2", Weight: Atleast 6oz/4 Pcs Foot File And Callus Remover: Material: Metal, Steel, Item Dimensions: Approx. 10-10.78" X 2.7" X 0.29", Item Weight: 3.2 Pounds/2 Pcs Foot Scrub/2 Pcs Manicurist Bag: Made Of Heavy Duty Nylon, Large Capacity: Enough Room To Hold Up To 42 Bottles Of 15ml Nail Polish, Size: Approx. 8-9" (l) X 6-7" (w) X 4-5" (h)/6 Pcs Microfiber Towel: 25x65cm, 135g, Microfiber,dark Colors/2 Pcs Alcohol: 70% Ethyl Alcohol With Moisturizer, 500ml/1 Pc Double Burner Gas Stove: Stainless Top And Front, Automatic Ignition ,reversible Trivet, Double Detachable Top Burner, Removable Drip Pan, Dimension: 730mm(l) X 395mm(w) X 105mm(h)/1 Pc Lpg Tank With Gas Regulator And Accessories: Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/2 Pcs Kawa: 19.5" Cast Iron With Double Handle Depth/height: 21cm (medium)/1 Pc Plastic Table: 4 Seaters, Square Type With Umbrella Hole At The Center, Table Dimension: 36" (length) X 36" (width) X 30" (height), Thickness: Approximately 1.5in To 2in, Color: Beige/1 Pc Monoblock Chairs: With Backrest, Seat 375mmxdepth 330mm, 2.25 Kg, Class B Plastic, Thickness: Approximately 1.5in, Color: Beige/1 Pc Peanut Grinding Machine: Electric, 220v, 300w, 50-60hz,material: High Quality Stainless Steel Body And Base, Color: Black, Dimension: Approx. Length: 43.5cm, Width: 23cm, Height: 13.5cm/1 Pc Hand Cobbler Shoe Repair Machine Dual Cotton Nylon Line Sewing Machine Manual Leather Machine Shoe Sewing Machine Color Silver: Product Dimensions 14.4"d X 20.5"w X 5.5"h, Material: Cast Iron Item Weight: 22 Pounds, Power Source: Crank/5 Pcs Wooden Handle Shoes Repairing Awl Shoe Sewing Tool Diy Craft Repair Hand Straight Hook Shoes Sewing Awl Type: Shoes Sewing Awl Material: Wood+metal, Features: Shoes Sewing Awl, Repair Hand , Crochet Needle Tool Dimension: 1: App.2x13.5x6cm/0.79x5.31x2.36in 2: App.2x13x5.5cm/0.79x5.12x2.17in 3: App.2x13x5.5cm/0.79x5.12x2.17in, Color: Wood Color + Silver/5 Pcs Upholstery Stitching Thread Black 100 Mtr. 1 Pc Upholstery Hand Stitching Tools For Belts, Saddles, Shoes, Fabric Household Use Handwork Sewing Leather Craft Shoes Repairing/5 Pcs Upholstery Stitching Thread Brown 100 Mtr 1 Pc Upholstery Hand Stitching Tools For Belts, Saddles, Shoes, Fabric Household Use Handwork Sewing Leather Craft Shoes Repairing/5 Pcs Upholstery Stitching Thread White 100 Mtr. 1 Pc Upholstery Hand Stitching Tools For Belts, Saddles, Shoes, Fabric Household Use Handwork Sewing Leather Craft Shoes Repairing/2 Pcs Angle Grinder Cutting Disk: 10 Pcs. Per Set, Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8")/2 Pcs Angle Grinder: Rated Input Power: 730w, Wheel Diameter: 4", Rated Voltage: 220v,frequency: 60hz, No Load Speed: 12,000 Rpm, Weight: Approximately 1.6kg, Grinding Spindle Thread: M10, Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h)/2 Pcs Chipping Hammer: Item Weight: at Least 13.8 Ounces, Product Dimensions: 11" (l) X 1" (w) X 7.5" (h), Material: Genuine Leather Grip And Forged Steel/2 Pcs Heavy Duty Corded Drill: Rated Input Power: 750w, Chuck Capacity: Up To 13mm, Drill Capacity: Metal (16mm), Wood (25mm), Masonry (12mm), Dimension: 268mm (l) X 69mm (w) X 192mm (h), Weight W/out Cable: Approximately 1.6-1.8 Kg, Spindle Collar Diameter Of 43 Mm/2 Pcs Metal Drill Bit Set: Material: High Speed Steel, 19pcs Per Set(1mm,1.5mm,2mm,2.5mm,3mm,3.5mm,4mm,4.5mm,5mm,5.5mm,6mm,6.5mm,7mm,7.5mm,8mm,8.5mm,9mm,9.5mm,10mm), Point Angle: 118degree C, Standards: Din 338, Bit Geometry: Standard Twist Bit/2 Pcs Mig Welding Pliers: Overall Length: Atleast 210mm, Material: High Carbon Steel, Handle Material: Thermoplastic Rubber/2 Pcs Needle File Set: (6 Pieces Hand Metal Files, Hardened Alloy, Strength Steel Set Includes Flat, Flat Warding, Square, Triangular, Round, And Half-round File), Color Black, Metal Type: Carbon Steel, Handle Material: Wood, Alloy Steel, Item Dimensions: Approximately 6.1" (l) X 3" (w) X 0.5" (h)/2 Pcs Portable Welding Machine: Input Voltage: 220-240, Frequency: 50-60hz, Output Current: 10-220a, Led Display, No-load Voltage: 85v, Max. Output Current: 220a, Diameter Of Electrode: 1.6-3.2mm, Inclusions: 1 Pc Electrode Holder, 1 Pc Earth Clamp With Cable/2 Pcs Speed Square: Material: Cast Aluminum, Size: About 18x18x2cm/7.09x7.09x0.79", Weight: About 130g,triangle-shaped/2 Pcs Welding Helmet: Auto Darkening Helmet: Power Supply: Battery And Solar Powered, Light Shade: Din9-1, Dark Shade: Din4, Switching Time: 1/25000s, Delay Time: 0.1-0.8s, Sensitivity Adjustment: Stepless Control, Operation Temperature: -5 Degrees- 55 Degrees, Active Viewing Area: 93mmx43mm, Active Viewing Area Size: (+/- 10mm), Item Weight: At Least 1.85 Pounds, Package Dimensions: approximately 12-12.4" (l) X 9-9.61" (w) X 7-7.68" (h)/2 Pcs Welding Magnets: 6 Pcs/set, Overall Length: At Least (3"), Hold Capacity: Up To 25lbs, Arrow Design Supports Angle: 45°, 90°, And 135°, Item Weight: 295g, Package Dimensions: 4.88 X 4.72 X 3.98 Inches, material: Steel, Magnets Size: Approximately - Top (1-1.4cm), Bottom (6.5-7cm), Side (7-7.5cm) Thickness (1-1.3cm)/2 Pcs Welding Suit: 100% Cotton With Pyrovatex, 2 Back Pockets And Rule Pocket With Safety Gusset Feature, High Quality And Long Lasting, Two Way Zipper, Approximate Cloth Size: Large/10 Pcs Camping Dome Tent: Product Dimensions: 82.7"l X 55"w X 43.5"h, Item Weight: 4 Pounds Shape: D Shape Occupancy: 2 Person Included Components: Carry Bag, Stakes, Rainfly Water Resistance Technology 1000 Millimeters, Special Feature: Windproof, Sun Protection/outdoor Mat (banig):size (48" X 75") Material: Palm Leaves (buri)/10 Pcs Double Burner Gas Stove: Stainless Top And Front, Automatic Ignition ,reversible Trivet, Double Detachable Top Burner, Removable Drip Pan, Dimension: 730mm(l) X 395mm(w) X 105mm(h)/2 Unit Lpg Tank With Gas Regulator And Accessories: Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/1 Unit Gas Range: Approx. 55-70cm (l) X 50-60cm (w) X 86-93cm (h), 4-gas Burner, 62l Gas Oven, Button Ignition, Top Glass Lid, Net Weight: Maximum Of 28kg, Pan Support: Light Cast Iron Pan Support/5 Pcs Kawali: Aluminum, (diameter X Height) 28cmx8cm With Double Handle/2 Pc S Kawa: 19.5" Cast Iron With Double Handle Depth/height: 21cm (medium)/5 Pcs Wok Ladle: Material: Stainless Steel With Wooden Handle: Total Length Of Item: 24 Inches/5 Pcs Wok Spatula: Material: Stainless Steel With Wooden Handle, Total Length Of Item:24 Inches/5 Pcs Stainless Steel Long Wooden Handle Skimmer Strainer: Material: Stainless Steel, Size: 32.3*11.5cm/5 Pcs Casserole With Double Handle: Material: Aluminum, Size: 26cm, Dimension: 36(l) X 28.5(w) X 21(h)cm/5 Pcs Frying Tongs: Materials: Stainless Steel With Rubber Or Plastic Coated Handles, 12 Inch Long/5 Pcs Chopping Board: Material: Polypropylene Plastic: 8"(w) X 10"(l), 1cm (thickness)/5 Pcs Chopping Knife: 10" Stainless; Wood Handle/5 Pcs Grill/ Ihawan With Stand, Material Of Body And Stand: Stainless, 24x12x33inches (lxwxh), Depth: 5inches/1 Unit Heavy Duty Commercial Micromatic Big 7.8l Mrc-50 Rice Cooker 45cups (white)/10 Dz Melamine Round Dinner Plate: 9" Diameter, Color; White/10dz Platito (saucer): Material: Melamine Plastic, Standard Size: 6 Inch (diameter) X ¾ Inch Height/10 Pcs Serving Tray Bamboo - Wooden Tray With Handles, Color Brown Material Wood, Product Dimensions 17"l X 11"w X 2"h/10dz Drinking Glass: 8 Oz, Glass, Product Size: Base Diameter-7cm, Top Diameter: 7cm, H-11.4cm, Heat Resistant, Dishwasher Safe/10dz Spoon: Stainless, 12pcs/per Pack, Size: 8"/10dz Fork: Stainless, 12 Pcs/per Pack, Size 8"/5dz Mangkok (round Shape Bowl), Materials: Ceramic, Size: 6inch (diameter) X 5cm (height)/5 Pcs Storage Box With Wheels For Easy Transport, Measurements: L72 X W52 X H44cm, Food Grade Material, 120l Capacity, Stackable; With Lid And Handle, Color: White/2 Pcs Butcher's Knife: Materials: Stainless, Wood Handle, Size: About 10"/5 Pcs Gallon Acrylic Juice Dispenser Type: Type: Water/juice Dispensers, Overall Dimensions: Height:32 1/2 Inches, Top Diameter: 6 11/16 Inches, Capacity:1.1 Gallons, Base Material: Stainless Steel, Container Material: Acrylic, Style: Single/5 Pcs Chafing Dish Food Warmer Buffet Set: Size: 1/1pan*3, Color: Silver, Material: Stainless Steel, Product Dimensions: 13.39"l X 15.35"w X 23.62"h, Capacity: 8 Quarts/5 Pcs Chest Cooler: Item Package Dimensions: 25.8" (l) X 16.2" (w) X 15.7" (h), Package Weight: 5.76kg, Inside Dimensions: 24.95" (l) X 14.58" (w) X 14.77" (h), Material: plastic, Chamber Depth: 24.95", Capacity: 52l , Color: Blue Or Red/5 Pcs Matress: Size: Semi Double (48" X 75"), Thickness: 4"/15 Pcs Matress Size: Queen (60" X 75") Thickness: 4"/15 Pcs Pillow: Size: Standard (20" X 26")/10 Sets Bed Linen Set Of 3pcs, 1-bed Sheet Size (48" X 75"), 2-pillow Case (20" X 26")/2 Sets Bed Linen Set Of 3pcs: 1-bed Sheet Size (60" X 75"), 2-pillow Case (20" X 26")/6 Unit Electric Fan: Color: Black, Electric Fan Design: Floor Fan, Power Source: Corded Electric Style: 3-speed Ac Motor Fan, Product Dimensions: 15.75"d X 17.72"w X 53.15"h, Room Type: Bedroom, Special Feature: Oscillating, Adjustable Height, Adjustable Tilt,wattage: 60 Watt/4 Unit Industrial Ceiling Fan: Product Material: Cast Aluminum Casing, Product Specifications: 2000mm, Operating Voltage: 220v, Wind Speed: 5th Gear, Number Of Fan Product Color: Black, White, Product Power: 165w, Blades: 6 Blades/150 Pcs Monoblock Chairs: With Backrest, Seat 375mmxdepth 330mm, 2.25 Kg, Class B Plastic, Thickness: Approximately 1.5in, Color: White/15 Pcs Solid Top Round Table: Material: Plastic, Color: White, Size(cm): 115 X 74 X 4.5, Foldable Legs,diameter: 45″, 6 To 8 Seater Capacity Approved Budget For The Contract : P 3,426,136.00 Contract Duration : 30 Calendar Days Delivery Period : 7 Calendar Days After The Issuance Of Notice To Proceed Source Of Fund : Trust Fund((dole) 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Seven(7) Calendar Days. Bidders Should Have Completed For The Last Two(2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent(60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 8, 2025 Until January 30, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On January 15, 2025, 9:00am At The Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon Which Shall Be Open To All Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before January 30, 2025, 8:59 Am At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On January 30, 2025, 9:00 Am At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Judith O. Baeza Peso Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Publication: January 8, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Supply & Delivery Of Various Supplies And Materials For Dole Integrated Livelihood Program And Sustainable Industry Project, With Project Identification Number Good-01-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website. The Procurement Project (referred To Herein As “project”) Is Composed Of 1 Lot Various Supplies And Materials For Livelihood Program, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Trust Fund(dole) In The Amount Of 2.2. The Source Of Funding Is: Three Million Four Hundred Twenty Six Thousand One Hundred Thirty Six Pesos (p 3,426,136.00) Trust Fund(dole) 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. A.foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or B. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No. 9184, The Bidder Shall Have An Slcc That Is At Least One(1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must At Least Equivalent To: A. For The Procurement Of Expandable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty Five Percent (25%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.2 Subcontracting Is Not Allowed During The Bidding. 7.3 Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.4 Subcontracting Of Any Portion Of The Project Does Not Relieve The Supplier Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On January 15, 2025, 9:00am At The Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii( Checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicted In Itb Clause 5.3 Should Have Completed Within The Last Two(2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostile Convention, Only The Translated Documents Shall Be Authenticated Through The Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii( Checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification From Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 3184. 12. Bid Prices 12.1 Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A.for Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw(ex-works,ex-factory,ex-warehouse,ex-showroom, Or Off The Shelf, As Applicable); Ii. The Cost Of All Custom Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other(incidental) Services, If Any, Listed In The Bds. 13. Bid And Payment Currencies 14.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Adopted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreigh Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 14. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1 The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii(technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Option 1- One Project Having Several Items That Shall Be Awarded As One Contract. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply & Delivery Of Various Supplies And Materials For Dole Integrated Livelihood Program And Sustainable Industry Project Brief Description: 4 Pcs Barber Brush: 23.3cmx7cm, Soft Fiber Material And Wooden Handle/4 Pcs Hair Clipper: Electric, 110v-240v, 50-60hz,all Metal Machine,led Light Display Stainless Steel Blade, Blade Width 45mm,low Noise High Power, 2000 Ma Lithium Battery, 210 Minutes Working Time,4pcs Comb Guide 3/6/10/13mm,body Size: 17x4cm, Body Weight: 371g,with Complete Accessories - Fiber Comb, Cleaning Brush, Lubricant, Charger/4 Pcs Paddle Brush:body Material: Wood, Dimensions: (lxwxh) 25x8x3cm, Brown/8pcs Spray Bottle: 250ml Plastic Hairdressing Spray Bottle/4pcs Hair Blower: 4000w Accurate Power,2-speed Settings (high & Low), 3 Temperature (cold, Hot & Hotter), Glossy, Thick Long Wires, With Light And Perfume Button/4pcs Hair Blower: 4000w Accurate Power,2-speed Settings (high & Low), 3 Temperature (cold, Hot & Hotter), Glossy, Thick Long Wires,with Light And Perfume Button/4pcs Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm,length: 20.9"/52cm,width: 14"/36cm,4 Drawers, Blower Holder/4pcs Talcum Powder: 200g, Hypo-allergenic, Dermatologist Tested/4 Pcs Cordless Clipper: Body Material: Aluminum,motor: Rotary,power/source Battery: Lithium-ion Battery (90+ Minutes Of Runtime), Blades: Titanium Blades, 3 Guide Combs Plastic Material (#1/2, #1, And #1½),cutting Lengths: 0.4-25mm,inclusions: A Blade Guard, 1 Recharging Transformer (charger), 1 Cleaning Brush, With Lubricating Oil Of At Least 5 Ml And English User Manual,product Dimension: Approximately 6.5-7" (l) X 2-3" (w),weight: Maximum Of 400g, Input: Can Be Used For 110-240 Voltage/4pcs Hair Trimmer: Running Time 120 Minutes Battery Powered, Rechargeable Li-ion Battery 1500 Mah, Dimension: Approximately 6-7" (l) X 1.5-2.5 (w), Material: Stainless,accessories: 4 Plastic Combs In Different Sizes 3mm, 6mm, 9mm, 12mm, Inclusions: 1 Recharging Transformer (charger) And 1 English User Manual, Input: Can Be Used For 110-240 Voltage/4pcs Electric Shaver: With 3d Floating Cutter Head, 40mins. Running Time For 8hrs Fully Charged, Material: Stainless Steel,product Dimension: Approximately 6.5-7" (l) X 2-3" (w),automatic Voltage 100-240v,battery: 2 Cell Nickel-metal Hydride Cylindrical Battery Pack, 4000mah,power Type: Rechargeable/4pcs Hair Shear: Material: Stainless Steel,1 Precision Scissor Approximately 6-7",1 Thinning Scissor Atleast 6",accesories: Scissors Oil Atleast 5ml/4 Pcs Razor Blades: 10pcs/box (double Edge Stainless)/4 Pcs Shaving Razor/labaha: Dimensions: Approximately 5-6" (l) X 3/4-1" (w), Material: Carbon Steel, Color: Black/ 4 Pcs Barber Skin Fade Brush: Handle: Wood, With Soft Bristles 1" (l),dimensions: Atleast 5.5" (l) X 1" (w)/4pcs Comb Set: (4pcs/set), Material: High Quality Plastic, Inclusions: #1-approx. Size: 4.88" (l) X 1.02" (w), #2-approx. Size: 7.09" (l) X 1.46" (w), #3-approx. Size: 7.87" (l) X 1.18" (w), #4-6.10" (l) X 0.20" (w)/4pcs Shaving Gel: (foam), 195g/4pcs Barber's Cape: Color: Black,about 140cm (l) X 110cm (w), Cloth: Polyester/4pcs 360 Degree Swivel Barber Chair: Classic Back Seat With Chrome Steel Base, Premium Steel Frame And High Class Foot Pump, Heavy Duty Leather Cover; Lower Height - At Least 51cm, Top Height - At Least 61cm, Sandles Height - At Least 40cm/8pcs Barber Apron: With Two Pockets, Waterproof, Material: Cotton And Acrylic, Item Size: Approx. 38-38.19" (l) X 27-27.36" (w)/ 4pcs Pomade: 80g, Water-based/26pcs Speed Square: Material: Cast Aluminum, Size: About 18x18x2cm/7.09x7.09x0.79", Weight: About 130g, Triangle-shaped/26pcs Meter Tape With Magnetic Hook: Blade Material, Nylon Coated Blade,dimensions: 16ft (l) X 25mm (w)/26pcs Circular Saw: Voltage: 220-240v, Frequency: 50-60hz, Input Power: 1400w, No-load Speed: Atleast 4800rpm, Blade Diameter: 185mm, Cutting Capacity: 45degree,44mm, 90 Degree: 65mm,maximum Cutting Depth: Atleast 90°62mm, Weight: Maximum Of 5.2kg,item Approximate Dimension: 15-17cm (h), 25-28cm (w), 30-35cm (l)/26pcs Angle Grinder: Rated Input Power: 730w, Wheel Diameter: 4", Rated Voltage: 220v,frequency: 60hz, No Load Speed: 12,000 Rpm, Weight: Approximately 1.6kg, Grinding Spindle Thread: M10, Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h )/26pcs Angle Grinder Cutting Disk: 10 Pcs. Per Set, Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8")/26 Pcs Portable Hand Drill: Power Sourced: Battery Powered - 2pc 21 Volt 1500mah Lithium-ion Batteries, Maximum Rotational Speed: 1500 Rpm, Voltage: 210v,amperage: 1.5 Amps, Chuck Size: 0.38",bit Heads Diameters: From 0.8mm-10mm,product Dimensions: 9.6" (l) X 2.1" (w) X 7.5" (h), Material: plastic, Rubber, Metal, Item Dimensions: Approx. 9.6" (l) X 2.1" (w) X 7.5" (h),item Weight: Atleast 2.5 Pounds,item Torque: 330 Inch Pounds; Inclusions: 1x21 Volt Inspiritech Cordless Power Drill, 2x Rechargeable Battery, 1x English User Manual, 10x Self-drilling Drywall Anchors,10x Screwdriver Bits, 2x Double Ended Bits, 3x Drilling Bits, 1x Magnetic Extension Socket Bit Holder, 10x Anchors With Screws,1x One-hour Fast Charger, 1x Flexible Extension Shaft, 1x Carrying Bag/26pcs Wood Planer: Rated Voltage: 220v, Rated Input Power: 600w, Cutting Width: 82mm, Load Speed: 15,000rpm, Frequency: 60hz, Weight: 3kg./26 Pcs Framing Hammer: Handle Material: Alloy Steel, Item Dimensions: Approximately 16-17" (l) X 5.75-6" (w) X 1.5-2" (h), Item Weight: Atleast 1.4 Pounds/26 Pcs Trim Hammer: Handle Material: Wood, Head Material: Alloy Steel; Item Dimensions Approximately: 14-15" (l) X 5-6"(w) X 1-2" (h),item Weight: Atleast 594 Grams/26pcs Roofing Hammer: Item Weight: 1.25 Pounds, Product Dimensions: Approx. 13.7" (l) X 6.75" (w) X 1.5" (h)/26 Pcs Chalk Line: Item Weight: 10.6 Ounces, Product Dimensions: approx. 1200" (l) X 4.72" (w) X 5.91" (h) Inches, Color: blue, Material Type: Alloy Steel, Rubber/26 Pcs Utility Knife: Handle Material: Aluminum, Material: Aluminum Alloy, Weight: 120g/pcs, Blade Size: 19mm (w) X 61mm (h) X 0.6mm (t),blade Material: Steel, Thickness: Atleast 0.6mm/26 Pcs Tin Snips: Item Weight: atleast 1 Pound, Package Dimensions: Approx. 12.36" (l) X 3.7" (w) X 1.3" (h),size: long Straight, 12 Inches Long, Blade Length: 3.20",material: Steel, Cutting Thickness Range Up To 1.2mm Carbon Steel And 0.7mm/26 Pcs Framing Square: Shorter Leg Measures At 8 Inch Outside And 6.5 Inch Inside, Longer Leg Measures At 12 Inch Outside And 11 Inch Inside,material: Carbon Steel/26 Pcs Level: Box Beam Style, Material: Aluminum,dimension: Approximately 24-24.5" (l) X 2-2.6" (w) X 1.2-1.5" (h), Weight: Atleast 0.8 Pounds/26 Pcs Electric Planer: Voltage: 220-240v,input Power: 1050w, No Load Speed: 1600rpm, Planing Width And Depth,82x3mm,heavy Duty Aluminum Base/1 Pc Meter Tape With Magnetic Hook: Blade Material: Nylon Coated Blade, Dimensions: 16ft (l) X 25mm (w)/1 Pc Air Compressor Machine: Motor Power: 1hp, Size: Approx. 935x385x800mm,voltage: 220-240v, 60hz, Speed: 3400 Rpm, Tank Capacity: 24l , Operating Pressure: Max 8 Bar, Air Displacement: 93l/min, Pump Lubricated With Oil/1 Pc Blue Painters Tape, Color: Blue, Size: Atleast 1.41" X 20m,thickness: 0.13mm, Item Weight: 1.92 Pounds, Material: Paper/2pcs Electric Spray Gun: Voltage: 220-240v~50/60hz,spraying Pressure: 0.1-0.2 Bar, Max Flow: 850ml/min, Max Viscosity: 50din-s, Container Capacity: Atleast 800ml,power Cord Length: 2m, Rated Power 500w, Spraying Pressure: Atleast 0.1-0.2bar, Item Dimensions: Approximately 13" (l) X 5" (w) X 11" (h)/1 Pc Extension Pole, (3 Stage Extender) Reach: 1.5-to-3ft,weight: Maximum Of 0.5 Pounds, Max. Standing Reach: 10ft, Material : Aluminum/2 Pcs Paint Brush Set, 5 Pcs/set, Material: Synthetic Bristle, Wood Handle, Overall Length: Atleast 11", Bristles Length: Atleast 3", Brush Width: 1", 1-1/2" 2", 2-2.5", 3"and 4"/ 5 Pcs Paint Roller, Material: Plastic,package Dimensions: Approximately 15.16" (l) X 11.22" (w) X 3.15" (h),item Weight: Atleast 1.06 Pounds, Inclusion: Roller, Atleast 7" In Length, Material: Polyester/2 Pcs Painters Gloves, 12 Pcs/pack, Material: Cotton, Color: Red/1 Pc Putty Knife/paint Scraper Set (4pcs), Stainless Steel Blade With Rubberized Handle, Blade Width: 1", 2" And 3", Length Including Handle: Approximately 8-9"/1 Pc Steel Float/plastering Trowel: Thickness: Atleast 0.7 Mm, Surface Measurement, Length: 12", Width: 4", Material: High Carbon Steel With Wood Handle/2 Pcs Lpg Tank With Gas Regulator And Accessories, Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/2 Pcs Kawali: Aluminum, (diameter X Height) 28cmx8cm With Double Handle/2 Pcs Food Warmer/chafing Dish: Rectangular, 2l Capacity, 6 Pcs In 1 Set Stainless Steel, No Side Handle, Glass Lid Cover With Handle, Dimensions: Same Sizes - 32cm (l) X 26cm (w) X 8cm (h)/2 Pcs Gas Range: Approx. 55-70cm (l) X 50-60cm (w) X 86-93cm (h), 4-gas Burner, 62l Gas Oven, Button Ignition, Top Glass Lid, Net Weight: Maximum Of 28kg, Pan Support: Light Cast Iron Pan Support/2 Pcs Baking Sheet: Aluminum, 12x16 Inches/2 Pcs Digital Kitchen Scale: Accurate Measurement; Weigh Up To 5 Kg / 11 Lb Precisely In 1 G / 0.05 Oz Increments, Quality Material: Measure Food, Small Items, And Liquids With Confidence On The 304 Food-grade, Stainless Steel Platform, Approx. Dimension 7.3-7.5" (l) X 5.7-5.90" (w) X 0.6-08" (h), 2 X 1.5v Aaa Batteries/2 Pcs Measuring Cup (for Liquid Ingredients): 1 Measuring Cup With Red Graphics, Made Of Non-porous Glass That Won't Warp, Stain, Or Absorb Odors, Glass Is Preheated Oven, Microwave, Fridge, Freezer & Dishwasher Safe, Dimension: Approx. 7.13" (l) X 6.75" (w) X 4.38" (h), Measuring Capacity: 500ml/2 Pcs Measuring Cups (for Dry Ingredients): Material: Stainless Steel, 5 Pieces Per Set (1 Cup, 1/2 Cup, 1/3 Cup, 1/4 Cup, 1/8 Cup)/2 Pcs Measuring Spoons (set): 7pcs Stainless Measuring Spoon Kit, The Kit Includes: 1/8 Tsp (0.63ml), 1/4 Tsp (1.25ml), 1/2 Tsp (2.5ml), 3/4 Tsp (3.75ml), 1 Tsp (5ml), 1/2 Tbsp (7.5ml), 1 Tbsp (15ml)/2 Pcs Mixing Bowl: Medium, Approx. Diameter: 28cm, Height:11.2cm, Material: Stainless; Capacity: At Least 4l/2 Pcs Standmixer: 2-in-1 360 Automatic Rotating Bowl Electric Stand & Hand Mixer, 4.5l W/ 5-speed Turbo Function,color: Black/1 Pc Double Burner Gas Stove: Stainless Top And Front, Automatic Ignition ,reversible Trivet, Double Detachable Top Burner, Removable Drip Pan, Dimension: 730mm(l) X 395mm(w) X 105mm(h)/1 Pc Lpg Tank With Gas Regulator And Accessories: Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/1 Pc Caldero: Aluminum, #2, Diameter Height 28cmx16cm With Double Handle/2 Pcs Kawali: Aluminum, (diameter X Height) 28cmx8cm With Double Handle/1 Pc Kawa: 19.5" Cast Iron With Double Handle Depth/height: 21cm (medium)/1 Pc Food Warmer/chafing Dish: Rectangular, 2l Capacity, 6 Pcs In 1 Set Stainless Steel, No Side Handle, Glass Lid Cover With Handle, Dimensions: Same Sizes - 32cm (l) X 26cm (w) X 8cm (h)1 Pc Food Glass Display (estante): 3 Layers; 20(h)x18(w)x36(l)", Aluminum Base, Glass With Screen Door/1 Pc Casserole With Double Handle: Material: Aluminum, Size: 26cm Dimension: 36(l) X 28.5(w) X 21(h)cm/2 Pcs Frying Tongs: Materials: Stainless Steel With Rubber Or Plastic Coated Handles, 12 Inch Long/1 Pc Chopping Board: Material: Polypropylene/1 Pc Chopping Knife: 10” Stainless,wood Handle/1 Pc Butcher's Knife: Materials: Stainless, Wood Handle, Size: About 10"/1 Pc Plastic Table: 4 Seaters, Square Type With Umbrella Hole At The Center, Table Dimension: 36" (length) X 36" (width) X 30" (height), Thickness: Approximately 1.5in To 2in; Color: Beige2 Pcs Monoblock Chairs: With Backrest, Seat 375mmxdepth 330mm, 2.25 Kg, Class B Plastic, Thickness: Approximately 1.5in, Color: Beige/1 Pc Beach Umbrella: 90" Diameter X 8 Ft. Height, 8 Rib Round Metal Pole, Polyester Multi-coloured Umbrella Canopy/2 Pcs Cooler Container: Chest Insulated Cooler, Materials: Polystyrene, Sizes And Capacities: 30 Liters - 45.5cm(l) X 39cm(w) X 31cm(h),color: Blue Or Red/1 Pc Grill/ Ihawan With Stand,material Of Body And Stand: Stainless , 24x12x33inches (lxwxh), Depth: 5inches/2 Pcs Bicycle With Sidecar: Bicycle Specifications: Bmx Type Bike (frame 1//2 Gi Hd, Rim Set Front X 10 G Wide Jap Hub, Rim Set Rear X 10g Wide Jap Hub, Tire 20 X 2.125 Jumbo, Tube 20 X 2.125, Handle Bar Painted Black, Fork Ex-900 Landing Gear Cp, Head Parts Nikyo/whw, H-post Bmx Ord.m, H-grip Ord. Opc Parts Neco Bearing Type, Opc Plate 36t, Chain Cp Bmx, Freewheel 24t, Pedal Opc Bearing Type, Seat Clamp/s-pin/ S-post P, Saddle With Spring, Footbreak With Spring "full Size" Frame, 175-180mm Cranks Side Car With Umbrella Holder And 2 Chest Coolers Carrier (52l Capacity) - Dimensions: 25.8" (l) X 16.2" (w) X 15.7" (h) Materials: 1/2 J1 Pipe 540, 316 X 1 Flat Square Bar, J1 Pipe De Una 520, 1/4 X 2 Flat Bar, 6203 Gi Set, Tire 20 X 2.125 Jumbo/2 Pcs Weighing Scale: 10kg Capacity, Colored Body / Stainless Pan, Graduation: 50g, Powder Coated Body, Pan Size: 255mm Ø X 55mm Deep, Dial Face: 185mm Ø, 4 Units/master Carton/4 Pcs Plastic Fruit Crate 21 X 15 X 12 Inches/1 Pc Hair Dryer, With 3 Temperature Setting (from High To Low): Size: Atleast 200mm (h), 74mm (w), Weight: Minimum Of 315g, Wattage: 2200w, Voltage: 120-240v, Body Material: Plastic/1 Pc 2 In 1 Steam Pro Hair Straightener (straightener & Curler): Tourmaline Ceramic Wide Plates - 1.25" Wide Heating Plate, Adjustable Temperature Display - 150-235◦c, 360◦, Swivel Cord - Tangle-free, Hanger Design, Ptc Heater - Instant Heat-up/1 Pc Hair Combs: Material: Plastic, Inclusions: Flat Comb Size - 21.5cm (l) X 4.2cm (w), Massage Comb Size: 22cm (l) X 8.5cm (w), Ribs Comb Size: 21.5cm (l) X 4cm (w), Curling Comb Size: 20.2cm (l) X 2.5cm (w), Mirror Size: Atleast 22cm (l) X 10cm (w); Storage Base Size: Atleast 10cm (l) X 15cm (w), Package Size: Approx. 22-23cm (l) X 16cm (w) X 11cm (h), Package Weight: Approx. 305g/1 Pc Hair Clips: Plastic, Product Size: Approx. 4.5", Color: Black (12pcs)/1 Pc 7pcs Face Brush Set, Inclusion: Powder Brush, Size: 17cm, Bristle Length: 3.2cm, Ferrule Width:1.9cm, Powder Buffer Brush, Size: 19cm, Bristle Length: 5cm, Ferrule Width: 2.1cm,foundation Brush, Size: 17cm, Bristle Length: 3.3cm, Ferrule Width: 2.2cm, Flat Foundation Brush, Size: 17cm,bristle Length: 3.2cm; Ferrule Width:1.2cm, Highlight Brush, Size: 16.5cm,bristle Length: 2.7cm, Ferrule Width: 2.3cm,angle Cheek Brush, Size: 17cm, Bristle Length: 3.1-2.3cm,ferrule Width: 2.4cm, Highlighting Fan Brush, Size: 16.5cm, Bristle Length: 4cm, Ferrule Width: 2.5cm, With Brush Bag/1 Pc Eyelash Curler: Material: Carbon Steel, Size: Approx. 5.91 X 3.94 X 1.97"/1 Pc Eyebrow Razor: Handle Material: Plastic, Size: Approx. 6.8(l) X 2(w) X 0.1"(h), 6pcs/pack/1 Pc Makeup Sponge Set Blender: Material: Sponge, Size: Approx. 4.02 (l) X 3.94(w) X 2.52"(h), 4pcs/set/1 Pc False Eyelashes, Product Dimensions: Approx. 0.75(l) X 3.88(w) X 5.38"(h), 5pairs/pack/1 Pc Eye Shadow Pallete: 12 Curated Peach-inspired Shades, Finish Type: Metallic, Matte, Product Dimension: Approx. 0.08 (l) X 0.04 (w) X 0.06" (h)/1 Pc Contour Palette: Multi-colored, Finish Type: Matte, Package Dimension: Approx. 5.75 (l) X 4.25 (w) X 0.5" (h)/1 Pc Hypercurl Waterproof Mascara Make Up Set: Product Dimensions: Approx. 0.85 (l) X 2.75 (w) X 5.63" (h), Color: Black/1 Pc Waterproof Matte Gel Eyeliner Pencil: Item Form: Pencil, Powder, Creamy, Finish Type: Matte, Product Dimensions: About 5.77 X 1.97 X 0.81", Color: Black/1 Pc Eyebrow Gel, Waterproof: Weight: About 0.16 Oz, Product Dimension: Approx. 0.75 (l) X 1.9 (w) X 5.65 (h) Inches, Color Black, Brown/1 Pc Blush On, 3 Complimentary Skin-flushed Shades, Product Dimensions: Approx. 2.89 (l) X 0.43 (w) X 2.33" (h)/1 Pc Powder Blush Makeup Palette, Product Dimensions: approx. 2.43 (l) X 2.43 (w) X 0.66" (h)/1 Pc Eye Shadow Palette; 12 Curated Peach-inspired Shades, Finished Type:metallic,matte, Product Dimensions:approx 0.08(l)x0.04(w) X0.06”(h)/ 1 Pc Applicator Brush And Plastic Comb: 13cm Black, Double-sided Comb, Pointed Handle For Sectioning Hair/1 Pc Hair Clipper: Electric; 110v-240v, 50-60hz,all Metal Machine, Led Light Display Stainless Steel Blade, Blade Width 45mm,low Noise High Power, 2000 Ma Lithium Battery, 210 Minutes Working Time, 4pcs Comb Guide 3/6/10/13mm, Body Size: 17x4cm, Body Weight: 371g, With Complete Accessories - Fiber Comb: Cleaning Brush, Lubricant, Charger/1 Pc Spray Bottle: 250ml Plastic Hairdressing Spray Bottle/1 Pc Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm, Length: 20.9"/52cm, Width: 14"/36cm, 4 Drawers, Blower Holder/1 Pc Curling Iron: 220v Power, 4gen; White, 32x25x13mm, Energy Efficient-48w,360degree Rotating Tail, Automatic Hair Curler, Iron Ceramic, Adjustable Size/1 Pc Apron: Length: 76cm, Width: 59cm, Color: Black, Material: Nylon, Waterproof/1 Pc Curling Rod: Small, 2cm, Cylindrical, Plastic Resin With Rubber Band Kits,multi-color/1 Pc Curling Rod: Medium, 2.5cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/1 Pc Curling Rod: Large, 3cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/1 Pc Spray Net: 600ml, 27.5cm, Hard Hold/1 Pc Hair Spray Aerosol Extra Hold: Weight: About 7ounces /198g, Scented, Package Dimensions: 7.83 X 6.69 X 2.17"/1 Pc Hair Trimmer: Running Time 120 Minutes Battery Powered,rechargeable Li-ion Battery 1500 Mah, Dimension: Approximately 6-7" (l) X 1.5-2.5 (w), Material: Stainless; Accessories: 4 Plastic Combs In Different Sizes 3mm, 6mm, 9mm, 12mm, Inclusions: 1 Recharging Transformer (charger), And 1 English User Manual, Input: Can Be Used For 110-240 Voltage/3 Pcs Hair Dryer, With 3 Temperature Setting (from High To Low): Size: Atleast 200mm (h), 74mm (w), Weight: Minimum Of 315g, Wattage: 2200w, Voltage: 120-240v,body Material: Plastic/3 Pcs 2 In 1 Steam Pro Hair Straightener (straightener & Curler): Tourmaline Ceramic Wide Plates - 1.25" Wide Heating Plate, Adjustable Temperature Display - 150-235◦c, 360◦, Swivel Cord - Tangle-free; Hanger Design, Ptc Heater - Instant Heat-up/3 Pcs Hair Combs: Material: Plastic, Inclusions: Flat Comb Size - 21.5cm (l) X 4.2cm (w), Massage Comb Size: 22cm (l) X 8.5cm (w), Ribs Comb Size: 21.5cm (l) X 4cm (w),curling Comb Size: 20.2cm (l) X 2.5cm (w), Mirror Size: Atleast 22cm (l) X 10cm (w), Storage Base Size: Atleast 10cm (l) X 15cm (w),package Size: Approx. 22-23cm (l) X 16cm (w) X 11cm (h), Package Weight: Approx. 305g/3 Pcs Hair Clips: Plastic, Product Size: Approx. 4.5",color: Black (12pcs)/3 Pcs Disposable Latex Free Gloves: Non-sterile, 100 Pcs Per Pack, Product Dimensions: Approx. 8.6" (l) X 4.9" (w) X 3" (h), Weight: 1.25 Pounds, Material: Synthetic Pvc/3 Pcs Cutting Scissors: 6" Stainless Steel, 65g/3 Pcs Thinning Scissors: 17.5x5cm Stainless Steel/3 Pcs Drip Pan: 32cmx35cm Plastic, Black/3 Pcs Hair Clipper: Electric,110v-240v, 50-60hz,all Metal Machine,led Light Display Stainless Steel Blade, Blade Width 45mm, Low Noise High Power, 2000 Ma Lithium Battery, 210 Minutes Working Time, 4pcs Comb Guide 3/6/10/13mm, Body Size: 17x4cm, Body Weight: 371g,with Complete Accessories - Fiber Comb, Cleaning Brush, Lubricant, Charger/3 Pcs Nail Tool Set: Material: Stainless Steel, Case: Leather, Package Size: Approximately 15-15.5cm (l) X 8cm (w) X 2cm (h),inclusions: Cuticle Trimmer (95mm), Blackhead Needle And Loop Remover (83mm), Eyebrow Tweezer (86mm) Peeling Knife (90mm), Nail File (75mm), Ear Pick (78mm), Double Pick (75mm), Dead Skin Fork (86mm), Small Pedicure Plier (95mm), Acne Needle (83mm), Small Nail Clipper (62mm) Bevel Nail Clipper (61mm), Large Nail Clipper (82mm), Beauty Tip Scissor (89mm), Pusher/3 Pcs Cotton Balls: 300g (100 Pcs Large Cotton Balls)/3 Pcs Nail Polish: Volume: 15ml, With 24 Colors Inclusions: 14k Gold, 18k Gold, 24k Gold, African Plum, Baby Pink, Black Velvet, Carolina Peach, Cashmere, Emerald Shimmer, Golden Bronze, Italian Nude, Platinum Special, Pussy Red, Red Pearl, Saphire Glow, Silver Platinum, Simply Red, Tahiti Brown, White Satin, White Rose, Platinum Silver, Touch Of Tan, Touch Of Beige, Colorless/3 Pcs Foot Spa Soaker: With Pumice Stone, Package Dimensions: Approximately 16.42" X 13.58" X 7.91", Weight: About 4.63 Pounds, Rated Power: 500 Watts, Rated Voltage: 110~120v, Rated Frequency: 50hz, Temperature Adjustable Range: 35℃ To 48℃/3 Pcs Astringent Foot Soaker: 128oz/3 Pcs Cooling Foot Soak: Product Dimensions: approximately 6.5-7" X 2.38-2.50" X 9.259.50", Weight: Atleast 900g/3 Pcs Exfoliating Foot Scrub: Package Dimensions: Approximately 7.05-7.50" X 2.32-3" X 1.97-2", Weight: Atleast 6oz/3 Pcs Foot File And Callus Remover: Material: Metal, Steel, Item Dimensions: Approx. 10-10.78" X 2.7" X 0.29", Item Weight: 3.2 Pounds/3 Pcs Foot Scrub/3 Pcs Manicurist Bag: Made Of Heavy Duty Nylon, Large Capacity: Enough Room To Hold Up To 42 Bottles Of 15ml Nail Polish, Size: Approx. 8-9" (l) X 6-7" (w) X 4-5" (h)/3 Pcs Spray Bottle: 250ml Plastic Hairdressing Spray Bottle/3 Pcs Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm, Length: 20.9"/52cm, Width: 14"/36cm, 4 Drawers, Blower Holder/3 Pcs Apron: Length: 76cm, Width: 59cm,color: Black,material: Nylon, Waterproof/3 Pcs Alcohol: 70% Ethyl Alcohol With Moisturizer,500ml/3 Pcs Shampoo: 1000ml, Green Apple And Citrus Lemon Variant/3 Pcs Hair Spa: 1000ml, Lavender And Strawberry Variant/3 Pcs Hot Oil: Keratin Organic Hot Oil, 1000ml, Aloe Vera Variant/3 Pcs Hair Cellophane: 500ml, Natural, Brown,burgundy And Ash Blonde Variant/3 Pcs Hair Rebonding Set: 1000ml Hair Straightening And Hair Neutralizing (ion Perm)/3 Pcs Hair Color Dye:100 Ml, 2pcs Each (black, Dark Brown, Medium Brown, Light Brown, Blonde, Light Blond, Lighter Blonde, Lightest Blonde, Dust)/3 Pcs Hair Color Developer: 100ml 2pcs Each 6%, 9%, 12% Oxidizer/3 Pcs Hair Bleaching Powder: 500g/3 Pcs Brazilian Blowout: 120ml, 3-in-1 Set (clarifying Shampoo, Brazilian Blowout, After Treatment Conditioner)/24 Pcs Hair Dryer, With 3 Temperature Setting (from High To Low): Size: Atleast 200mm (h), 74mm (w), Weight: Minimum Of 315g, Wattage: 2200w, Voltage: 120-240v, Body Material: Plastic/24 Pcs 2 In 1 Steam Pro Hair Straightener (straightener & Curler): Tourmaline Ceramic Wide Plates - 1.25" Wide Heating Plate, Adjustable Temperature Display - 150-235◦c, 360◦,swivel Cord - Tangle-free, Hanger Design, Ptc Heater - Instant Heat-up/24 Pcs Hair Combs: Material: Plastic, Inclusions: Flat Comb Size - 21.5cm (l) X 4.2cm (w), Massage Comb Size: 22cm (l) X 8.5cm (w), Ribs Comb Size: 21.5cm (l) X 4cm (w), Curling Comb Size: 20.2cm (l) X 2.5cm (w), Mirror Size: Atleast 22cm (l) X 10cm (w), Storage Base Size: Atleast 10cm (l) X 15cm (w), Package Size: Approx. 22-23cm (l) X 16cm (w) X 11cm (h), Package Weight: Approx. 305g/24 Pcs Hair Clips: Plastic, Product Size: Approx. 4.5", Color: Black (12pcs)/24 Pcs Disposable Latex Free Gloves: Non-sterile, 100 Pcs Per Pack, Product Dimensions: Approx. 8.6" (l) X 4.9" (w) X 3" (h), Weight: 1.25 Pounds, Material: Synthetic Pvc/24 Pcs Drip Pan: 32cmx35cm Plastic, Black/24 Pcs Shower Caps: 32cm, Thick Plastic, Elastic, Washable/24 Pcs Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm, Length: 20.9"/52cm, Width: 14"/36cm, 4 Drawers, Blower Holder/24 Pcs Curling Iron: 220v Power, 4gen, White, 32x25x13mm, Energy Efficient-48w, 360degree Rotating Tail, Automatic Hair Curler, Iron Ceramic, Adjustable Size/24 Pcs Hair Steamer: With 4 Wheels, 360degrees Movable, Gray Color, Adjustable Height With Timer And Control/120 Pcs Cape: 140x110cm, Satin, Nylon, Waterproof, Black/72 Pcs Microfiber Towel: 25x65cm, 135g, Microfiber, Dark Colors/24 Pcs Curling Rod:small, 2cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/24 Pcs Curling Rod: Medium, 2.5cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/24 Pcs Curling Rod: Large, 3cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/120 Pcs Ear Caps: (l X W X T): 8cm X 4.5cm X 2.1cm/3.15" X 1.77" X 0.83", Black,plastic/24 Pcs Shampoo: 1000ml, Green Apple And Citrus Lemon Variant/24 Pcs Hair Spa: 1000ml, Lavender And Strawberry Variant/24 Pcs Hot Oil: Keratin Organic Hot Oil, 1000ml, Aloe Vera Variant/24 Pcs Hair Cellophane: 500ml, Natural, Brown, Burgundy And Ash Blonde Variant/24 Pcs Hair Rebonding Set: 1000ml Hair Straightening And Hair Neutralizing (ion Perm)/24 Pc Hair Color Dye:100 Ml, 2pcs Each (black, Dark Brown, Medium Brown, Light Brown, Blonde, Light Blond, Lighter Blonde, Lightest Blonde, Dust)/24 Pcs Hair Color Developer: 100ml 2pcs Each 6%, 9%, 12% Oxidizer/24 Pcs Hair Bleaching Powder: 500g/24 Pcs Brazilian Blowout: 120ml, 3-in-1 Set (clarifying Shampoo, Brazilian Blowout, After Treatment Conditioner)/24 Pcs Hair Shear: Material: Stainless Steel, 1 Precision Scissor Approximately 6-7",1 Thinning Scissor Atleast 6", Accesories: Scissors Oil Atleast 5ml/34 Pcs Angle Grinder Cutting Disk: 10 Pcs. Per Set, Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8")/34 Pcs Crow Bar: At Least 36" Long,length Tolerance: +- 1/8, Material: Forged Steel Carbon/34 Pcs Claw Hammer: Round Head, Head Weight: At Least 16oz, Overall Weight: Approximately 17oz-23oz, Head Material: Forged Steel, Handle Material: Fiberglass Handle With Rubber Cushion, Overall Length: Approximately 12-14"/34 Pcs Hacksaw With Blade: Material: Aluminum Alloy Frame With Soft-grip Handle, At Least 12"-15" Long Including Handle, With Soft-grip Rubber Handle, Bi-metal, Blade Length: About 30cm, Width: 3cm/34 Pcs Meter Tape With Magnetic Hook: Blade Material: Nylon Coated Blade, Dimensions: 16ft (l) X 25mm (w)/34 Pcs Handsaw: Blade Length: About 15",blade Material: Carbon Steel, Handle Length: 5", Handle Material: Plastic/rubber, Color: Gray,8 Teeth Per Inch/34 Pcs Shovel: Round End, Tempered Steel Blade: 17-23 Cm, Blade Tip Width, 22-28cm Blade Tip Length, All Metal Handle, Overall Length: 100cm-115 Cm, Capacity: 350-400 Lbs/34 Pcs Shovel: Rectangular End, Tempered Steel Blade: 22-26 Cm, Blade Tip Width, 22-28cm Blade Tip Length, All Metal Handle, Overall Length: 100cm-115 Cm/34 Pcs Level Bar: Aluminum Frame, Length: At Least 24"/60cm, Aluminum Thickness: 1.5mm, Double Side Milles, 0.5mm/m Accurate Vials/34 Pcs Steel Float/plastering Trowel: Thickness: At Least 0.7 Mm, Surface Measurement, Length: 12", Width: 4", Mmaterial: High Carbon Steel With Wood Handle/34 Pcs Steel Square: Carpenter's Framing Square, Blade Width: 2" Scale: At Least 16" (l) X 24" (w), Material: Steel/34 Pcs Masonry Trowel: Length: At Least 12"long, Width: 6", Material: Flat Steel, With Wood Handle/34 Pcs Circular Saw: Voltage: 220-240v, Frequency: 50-60hz, Input Power: 1400w, No-load Speed: Atleast 4800rpm, Blade Diameter: 185mm, Cutting Capacity: 45degree: 44mm, 90 Degree: 65mm, Maximum Cutting Depth: Atleast 90°62mm, Weight: Maximum Of 5.2kg, Item Approximate Dimension: 15-17cm (h), 25-28cm (w), 30-35cm (l)/34 Pcs Masonry Square/metric Square: Material: Aluminum, Length: Approx. 24", Width: 16", 1/8 '' Thickness/34 Pcs Mason's Level: At Least 48'' Long, Aluminum Reinforced Frame, 60cm Only/34 Pcs Sledgehammer: Weight: At Least 3 Lbs With Fiberglass Handle, Forged Steel Round Head, Length: Approximately 25-27"/34 Pcs Concrete Chisel: Pointed Sharp End, Material: Forged Steel Chisel, With Rubberized Handle, Length: Approximately 10''/34 Pcs Putty Knife/paint Scraper Set (4pcs): Stainless Steel Blade With Rubberized Handle, Blade Width: 1", 2" And 3", Length Including Handle: Approximately 8-9"/34 Pcs Mason's Line: #18 Braided Nylon, 500 Ft/roll, Color Orange/34 Pcs Hammer Drill: Electric, 1980w 220v, Rated Frequency: 50/60hz, Load Speed: 0-3800rpm (revolutions Per Minute), Chuck: 13mm With Ergonomic Anti-slip Handle/34 Pcs Angle Grinder: Rated Input Power: 730w, Wheel Diameter: 4",rated Voltage: 220v, Frequency: 60hz, No Load Speed: 12,000 Rpm, Weight: Approximately 1.6kg, Grinding Spindle Thread: M10, Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h )/34 Pcs Wooden Float: Size: At Least 12x4", Has 5/8" Thick Rubber Pad, With Wooden Handle/4 Pcs Nail Tool Set: Material: Stainless Steel, Case: Leather, Package Size: Approximately 15-15.5cm (l) X 8cm (w) X 2cm (h), Inclusions: Cuticle Trimmer (95mm), Blackhead Needle And Loop Remover (83mm), Eyebrow Tweezer (86mm) Peeling Knife (90mm), Nail File (75mm), Ear Pick (78mm), Double Pick (75mm), Dead Skin Fork (86mm), Small Pedicure Plier (95mm), Acne Needle (83mm), Small Nail Clipper (62mm) Bevel Nail Clipper (61mm), Large Nail Clipper (82mm), Beauty Tip Scissor (89mm), Pusher/4 Pcs Cotton Balls: 300g (100 Pcs Large Cotton Balls)/4 Pcs Nail Polish: Volume: 15ml, With 24 Colors Inclusions: 14k Gold, 18k Gold, 24k Gold, African Plum, Baby Pink, Black Velvet, Carolina Peach, Cashmere, Emerald Shimmer, Golden Bronze, Italian Nude, Platinum Special, Pussy Red, Red Pearl, Sapphire Glow, Silver Platinum, Simply Red, Tahiti Brown, White Satin, White Rose, Platinum Silver, Touch Of Tan, Touch Of Beige, Colorless/4 Pcs Foot Spa Soaker: With Pumice Stone, Package Dimensions: Approximately 16.42" X 13.58" X 7.91", Weight: About 4.63 Pounds, Rated Power: 500 Watts, Rated Voltage: 110~120v, Rated Frequency: 50hz, Temperature Adjustable Range: 35℃ To 48℃/2 Pcs Astringent Foot Soaker: 128oz/2 Pcs Cooling Foot Soak: Product Dimensions: approximately 6.5-7" X 2.38-2.50" X 9.259.50", Weight: Atleast 900g/2 Pcs Exfoliating Foot Scrub: Package Dimensions: Approximately 7.05-7.50" X 2.32-3" X 1.97-2", Weight: Atleast 6oz/4 Pcs Foot File And Callus Remover: Material: Metal, Steel, Item Dimensions: Approx. 10-10.78" X 2.7" X 0.29", Item Weight: 3.2 Pounds/2 Pcs Foot Scrub/2 Pcs Manicurist Bag: Made Of Heavy Duty Nylon, Large Capacity: Enough Room To Hold Up To 42 Bottles Of 15ml Nail Polish, Size: Approx. 8-9" (l) X 6-7" (w) X 4-5" (h)/6 Pcs Microfiber Towel: 25x65cm, 135g, Microfiber,dark Colors/2 Pcs Alcohol: 70% Ethyl Alcohol With Moisturizer, 500ml/1 Pc Double Burner Gas Stove: Stainless Top And Front, Automatic Ignition ,reversible Trivet, Double Detachable Top Burner, Removable Drip Pan, Dimension: 730mm(l) X 395mm(w) X 105mm(h)/1 Pc Lpg Tank With Gas Regulator And Accessories: Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/2 Pcs Kawa: 19.5" Cast Iron With Double Handle Depth/height: 21cm (medium)/1 Pc Plastic Table: 4 Seaters, Square Type With Umbrella Hole At The Center, Table Dimension: 36" (length) X 36" (width) X 30" (height), Thickness: Approximately 1.5in To 2in, Color: Beige/1 Pc Monoblock Chairs: With Backrest, Seat 375mmxdepth 330mm, 2.25 Kg, Class B Plastic, Thickness: Approximately 1.5in, Color: Beige/1 Pc Peanut Grinding Machine: Electric, 220v, 300w, 50-60hz,material: High Quality Stainless Steel Body And Base, Color: Black, Dimension: Approx. Length: 43.5cm, Width: 23cm, Height: 13.5cm/1 Pc Hand Cobbler Shoe Repair Machine Dual Cotton Nylon Line Sewing Machine Manual Leather Machine Shoe Sewing Machine Color Silver: Product Dimensions 14.4"d X 20.5"w X 5.5"h, Material: Cast Iron Item Weight: 22 Pounds, Power Source: Crank/5 Pcs Wooden Handle Shoes Repairing Awl Shoe Sewing Tool Diy Craft Repair Hand Straight Hook Shoes Sewing Awl Type: Shoes Sewing Awl Material: Wood+metal, Features: Shoes Sewing Awl, Repair Hand , Crochet Needle Tool Dimension: 1: App.2x13.5x6cm/0.79x5.31x2.36in 2: App.2x13x5.5cm/0.79x5.12x2.17in 3: App.2x13x5.5cm/0.79x5.12x2.17in, Color: Wood Color + Silver/5 Pcs Upholstery Stitching Thread Black 100 Mtr. 1 Pc Upholstery Hand Stitching Tools For Belts, Saddles, Shoes, Fabric Household Use Handwork Sewing Leather Craft Shoes Repairing/5 Pcs Upholstery Stitching Thread Brown 100 Mtr 1 Pc Upholstery Hand Stitching Tools For Belts, Saddles, Shoes, Fabric Household Use Handwork Sewing Leather Craft Shoes Repairing/5 Pcs Upholstery Stitching Thread White 100 Mtr. 1 Pc Upholstery Hand Stitching Tools For Belts, Saddles, Shoes, Fabric Household Use Handwork Sewing Leather Craft Shoes Repairing/2 Pcs Angle Grinder Cutting Disk: 10 Pcs. Per Set, Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8")/2 Pcs Angle Grinder: Rated Input Power: 730w, Wheel Diameter: 4", Rated Voltage: 220v,frequency: 60hz, No Load Speed: 12,000 Rpm, Weight: Approximately 1.6kg, Grinding Spindle Thread: M10, Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h)/2 Pcs Chipping Hammer: Item Weight: at Least 13.8 Ounces, Product Dimensions: 11" (l) X 1" (w) X 7.5" (h), Material: Genuine Leather Grip And Forged Steel/2 Pcs Heavy Duty Corded Drill: Rated Input Power: 750w, Chuck Capacity: Up To 13mm, Drill Capacity: Metal (16mm), Wood (25mm), Masonry (12mm), Dimension: 268mm (l) X 69mm (w) X 192mm (h), Weight W/out Cable: Approximately 1.6-1.8 Kg, Spindle Collar Diameter Of 43 Mm/2 Pcs Metal Drill Bit Set: Material: High Speed Steel, 19pcs Per Set(1mm,1.5mm,2mm,2.5mm,3mm,3.5mm,4mm,4.5mm,5mm,5.5mm,6mm,6.5mm,7mm,7.5mm,8mm,8.5mm,9mm,9.5mm,10mm), Point Angle: 118degree C, Standards: Din 338, Bit Geometry: Standard Twist Bit/2 Pcs Mig Welding Pliers: Overall Length: Atleast 210mm, Material: High Carbon Steel, Handle Material: Thermoplastic Rubber/2 Pcs Needle File Set: (6 Pieces Hand Metal Files, Hardened Alloy, Strength Steel Set Includes Flat, Flat Warding, Square, Triangular, Round, And Half-round File), Color Black, Metal Type: Carbon Steel, Handle Material: Wood, Alloy Steel, Item Dimensions: Approximately 6.1" (l) X 3" (w) X 0.5" (h)/2 Pcs Portable Welding Machine: Input Voltage: 220-240, Frequency: 50-60hz, Output Current: 10-220a, Led Display, No-load Voltage: 85v, Max. Output Current: 220a, Diameter Of Electrode: 1.6-3.2mm, Inclusions: 1 Pc Electrode Holder, 1 Pc Earth Clamp With Cable/2 Pcs Speed Square: Material: Cast Aluminum, Size: About 18x18x2cm/7.09x7.09x0.79", Weight: About 130g,triangle-shaped/2 Pcs Welding Helmet: Auto Darkening Helmet: Power Supply: Battery And Solar Powered, Light Shade: Din9-1, Dark Shade: Din4, Switching Time: 1/25000s, Delay Time: 0.1-0.8s, Sensitivity Adjustment: Stepless Control, Operation Temperature: -5 Degrees- 55 Degrees, Active Viewing Area: 93mmx43mm, Active Viewing Area Size: (+/- 10mm), Item Weight: At Least 1.85 Pounds, Package Dimensions: approximately 12-12.4" (l) X 9-9.61" (w) X 7-7.68" (h)/2 Pcs Welding Magnets: 6 Pcs/set, Overall Length: At Least (3"), Hold Capacity: Up To 25lbs, Arrow Design Supports Angle: 45°, 90°, And 135°, Item Weight: 295g, Package Dimensions: 4.88 X 4.72 X 3.98 Inches, material: Steel, Magnets Size: Approximately - Top (1-1.4cm), Bottom (6.5-7cm), Side (7-7.5cm) Thickness (1-1.3cm)/2 Pcs Welding Suit: 100% Cotton With Pyrovatex, 2 Back Pockets And Rule Pocket With Safety Gusset Feature, High Quality And Long Lasting, Two Way Zipper, Approximate Cloth Size: Large/10 Pcs Camping Dome Tent: Product Dimensions: 82.7"l X 55"w X 43.5"h, Item Weight: 4 Pounds Shape: D Shape Occupancy: 2 Person Included Components: Carry Bag, Stakes, Rainfly Water Resistance Technology 1000 Millimeters, Special Feature: Windproof, Sun Protection/outdoor Mat (banig):size (48" X 75") Material: Palm Leaves (buri)/10 Pcs Double Burner Gas Stove: Stainless Top And Front, Automatic Ignition ,reversible Trivet, Double Detachable Top Burner, Removable Drip Pan, Dimension: 730mm(l) X 395mm(w) X 105mm(h)/2 Unit Lpg Tank With Gas Regulator And Accessories: Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/1 Unit Gas Range: Approx. 55-70cm (l) X 50-60cm (w) X 86-93cm (h), 4-gas Burner, 62l Gas Oven, Button Ignition, Top Glass Lid, Net Weight: Maximum Of 28kg, Pan Support: Light Cast Iron Pan Support/5 Pcs Kawali: Aluminum, (diameter X Height) 28cmx8cm With Double Handle/2 Pc S Kawa: 19.5" Cast Iron With Double Handle Depth/height: 21cm (medium)/5 Pcs Wok Ladle: Material: Stainless Steel With Wooden Handle: Total Length Of Item: 24 Inches/5 Pcs Wok Spatula: Material: Stainless Steel With Wooden Handle, Total Length Of Item:24 Inches/5 Pcs Stainless Steel Long Wooden Handle Skimmer Strainer: Material: Stainless Steel, Size: 32.3*11.5cm/5 Pcs Casserole With Double Handle: Material: Aluminum, Size: 26cm, Dimension: 36(l) X 28.5(w) X 21(h)cm/5 Pcs Frying Tongs: Materials: Stainless Steel With Rubber Or Plastic Coated Handles, 12 Inch Long/5 Pcs Chopping Board: Material: Polypropylene Plastic: 8"(w) X 10"(l), 1cm (thickness)/5 Pcs Chopping Knife: 10" Stainless; Wood Handle/5 Pcs Grill/ Ihawan With Stand, Material Of Body And Stand: Stainless, 24x12x33inches (lxwxh), Depth: 5inches/1 Unit Heavy Duty Commercial Micromatic Big 7.8l Mrc-50 Rice Cooker 45cups (white)/10 Dz Melamine Round Dinner Plate: 9" Diameter, Color; White/10dz Platito (saucer): Material: Melamine Plastic, Standard Size: 6 Inch (diameter) X ¾ Inch Height/10 Pcs Serving Tray Bamboo - Wooden Tray With Handles, Color Brown Material Wood, Product Dimensions 17"l X 11"w X 2"h/10dz Drinking Glass: 8 Oz, Glass, Product Size: Base Diameter-7cm, Top Diameter: 7cm, H-11.4cm, Heat Resistant, Dishwasher Safe/10dz Spoon: Stainless, 12pcs/per Pack, Size: 8"/10dz Fork: Stainless, 12 Pcs/per Pack, Size 8"/5dz Mangkok (round Shape Bowl), Materials: Ceramic, Size: 6inch (diameter) X 5cm (height)/5 Pcs Storage Box With Wheels For Easy Transport, Measurements: L72 X W52 X H44cm, Food Grade Material, 120l Capacity, Stackable; With Lid And Handle, Color: White/2 Pcs Butcher's Knife: Materials: Stainless, Wood Handle, Size: About 10"/5 Pcs Gallon Acrylic Juice Dispenser Type: Type: Water/juice Dispensers, Overall Dimensions: Height:32 1/2 Inches, Top Diameter: 6 11/16 Inches, Capacity:1.1 Gallons, Base Material: Stainless Steel, Container Material: Acrylic, Style: Single/5 Pcs Chafing Dish Food Warmer Buffet Set: Size: 1/1pan*3, Color: Silver, Material: Stainless Steel, Product Dimensions: 13.39"l X 15.35"w X 23.62"h, Capacity: 8 Quarts/5 Pcs Chest Cooler: Item Package Dimensions: 25.8" (l) X 16.2" (w) X 15.7" (h), Package Weight: 5.76kg, Inside Dimensions: 24.95" (l) X 14.58" (w) X 14.77" (h), Material: plastic, Chamber Depth: 24.95", Capacity: 52l , Color: Blue Or Red/5 Pcs Matress: Size: Semi Double (48" X 75"), Thickness: 4"/15 Pcs Matress Size: Queen (60" X 75") Thickness: 4"/15 Pcs Pillow: Size: Standard (20" X 26")/10 Sets Bed Linen Set Of 3pcs, 1-bed Sheet Size (48" X 75"), 2-pillow Case (20" X 26")/2 Sets Bed Linen Set Of 3pcs: 1-bed Sheet Size (60" X 75"), 2-pillow Case (20" X 26")/6 Unit Electric Fan: Color: Black, Electric Fan Design: Floor Fan, Power Source: Corded Electric Style: 3-speed Ac Motor Fan, Product Dimensions: 15.75"d X 17.72"w X 53.15"h, Room Type: Bedroom, Special Feature: Oscillating, Adjustable Height, Adjustable Tilt,wattage: 60 Watt/4 Unit Industrial Ceiling Fan: Product Material: Cast Aluminum Casing, Product Specifications: 2000mm, Operating Voltage: 220v, Wind Speed: 5th Gear, Number Of Fan Product Color: Black, White, Product Power: 165w, Blades: 6 Blades/150 Pcs Monoblock Chairs: With Backrest, Seat 375mmxdepth 330mm, 2.25 Kg, Class B Plastic, Thickness: Approximately 1.5in, Color: White/15 Pcs Solid Top Round Table: Material: Plastic, Color: White, Size(cm): 115 X 74 X 4.5, Foldable Legs,diameter: 45″, 6 To 8 Seater Capacity B. Completed Within The Last Two(2) Years From The Date Of The Submission Of Bids 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 12 The Price Of Goods Shall Be Quoted Ddp Lgu-irosin, Irosin, Sorsogon. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.3 Various Supplies And Materials For Dole Integrated Livelihood Program And Sustainable Industry Project 4 Pcs Barber Brush: 23.3cmx7cm, Soft Fiber Material And Wooden Handle/4 Pcs Hair Clipper: Electric, 110v-240v, 50-60hz,all Metal Machine,led Light Display Stainless Steel Blade, Blade Width 45mm,low Noise High Power, 2000 Ma Lithium Battery, 210 Minutes Working Time,4pcs Comb Guide 3/6/10/13mm,body Size: 17x4cm, Body Weight: 371g,with Complete Accessories - Fiber Comb, Cleaning Brush, Lubricant, Charger/4 Pcs Paddle Brush:body Material: Wood, Dimensions: (lxwxh) 25x8x3cm, Brown/8pcs Spray Bottle: 250ml Plastic Hairdressing Spray Bottle/4pcs Hair Blower: 4000w Accurate Power,2-speed Settings (high & Low), 3 Temperature (cold, Hot & Hotter), Glossy, Thick Long Wires, With Light And Perfume Button/4pcs Hair Blower: 4000w Accurate Power,2-speed Settings (high & Low), 3 Temperature (cold, Hot & Hotter), Glossy, Thick Long Wires,with Light And Perfume Button/4pcs Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm,length: 20.9"/52cm,width: 14"/36cm,4 Drawers, Blower Holder/4pcs Talcum Powder: 200g, Hypo-allergenic, Dermatologist Tested/4 Pcs Cordless Clipper: Body Material: Aluminum,motor: Rotary,power/source Battery: Lithium-ion Battery (90+ Minutes Of Runtime), Blades: Titanium Blades, 3 Guide Combs Plastic Material (#1/2, #1, And #1½),cutting Lengths: 0.4-25mm,inclusions: A Blade Guard, 1 Recharging Transformer (charger), 1 Cleaning Brush, With Lubricating Oil Of At Least 5 Ml And English User Manual,product Dimension: Approximately 6.5-7" (l) X 2-3" (w),weight: Maximum Of 400g, Input: Can Be Used For 110-240 Voltage/4pcs Hair Trimmer: Running Time 120 Minutes Battery Powered, Rechargeable Li-ion Battery 1500 Mah, Dimension: Approximately 6-7" (l) X 1.5-2.5 (w), Material: Stainless,accessories: 4 Plastic Combs In Different Sizes 3mm, 6mm, 9mm, 12mm, Inclusions: 1 Recharging Transformer (charger) And 1 English User Manual, Input: Can Be Used For 110-240 Voltage/4pcs Electric Shaver: With 3d Floating Cutter Head, 40mins. Running Time For 8hrs Fully Charged, Material: Stainless Steel,product Dimension: Approximately 6.5-7" (l) X 2-3" (w),automatic Voltage 100-240v,battery: 2 Cell Nickel-metal Hydride Cylindrical Battery Pack, 4000mah,power Type: Rechargeable/4pcs Hair Shear: Material: Stainless Steel,1 Precision Scissor Approximately 6-7",1 Thinning Scissor Atleast 6",accesories: Scissors Oil Atleast 5ml/4 Pcs Razor Blades: 10pcs/box (double Edge Stainless)/4 Pcs Shaving Razor/labaha: Dimensions: Approximately 5-6" (l) X 3/4-1" (w), Material: Carbon Steel, Color: Black/ 4 Pcs Barber Skin Fade Brush: Handle: Wood, With Soft Bristles 1" (l),dimensions: Atleast 5.5" (l) X 1" (w)/4pcs Comb Set: (4pcs/set), Material: High Quality Plastic, Inclusions: #1-approx. Size: 4.88" (l) X 1.02" (w), #2-approx. Size: 7.09" (l) X 1.46" (w), #3-approx. Size: 7.87" (l) X 1.18" (w), #4-6.10" (l) X 0.20" (w)/4pcs Shaving Gel: (foam), 195g/4pcs Barber's Cape: Color: Black,about 140cm (l) X 110cm (w), Cloth: Polyester/4pcs 360 Degree Swivel Barber Chair: Classic Back Seat With Chrome Steel Base, Premium Steel Frame And High Class Foot Pump, Heavy Duty Leather Cover; Lower Height - At Least 51cm, Top Height - At Least 61cm, Sandles Height - At Least 40cm/8pcs Barber Apron: With Two Pockets, Waterproof, Material: Cotton And Acrylic, Item Size: Approx. 38-38.19" (l) X 27-27.36" (w)/ 4pcs Pomade: 80g, Water-based/26pcs Speed Square: Material: Cast Aluminum, Size: About 18x18x2cm/7.09x7.09x0.79", Weight: About 130g, Triangle-shaped/26pcs Meter Tape With Magnetic Hook: Blade Material, Nylon Coated Blade,dimensions: 16ft (l) X 25mm (w)/26pcs Circular Saw: Voltage: 220-240v, Frequency: 50-60hz, Input Power: 1400w, No-load Speed: Atleast 4800rpm, Blade Diameter: 185mm, Cutting Capacity: 45degree,44mm, 90 Degree: 65mm,maximum Cutting Depth: Atleast 90°62mm, Weight: Maximum Of 5.2kg,item Approximate Dimension: 15-17cm (h), 25-28cm (w), 30-35cm (l)/26pcs Angle Grinder: Rated Input Power: 730w, Wheel Diameter: 4", Rated Voltage: 220v,frequency: 60hz, No Load Speed: 12,000 Rpm, Weight: Approximately 1.6kg, Grinding Spindle Thread: M10, Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h )/26pcs Angle Grinder Cutting Disk: 10 Pcs. Per Set, Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8")/26 Pcs Portable Hand Drill: Power Sourced: Battery Powered - 2pc 21 Volt 1500mah Lithium-ion Batteries, Maximum Rotational Speed: 1500 Rpm, Voltage: 210v,amperage: 1.5 Amps, Chuck Size: 0.38",bit Heads Diameters: From 0.8mm-10mm,product Dimensions: 9.6" (l) X 2.1" (w) X 7.5" (h), Material: plastic, Rubber, Metal, Item Dimensions: Approx. 9.6" (l) X 2.1" (w) X 7.5" (h),item Weight: Atleast 2.5 Pounds,item Torque: 330 Inch Pounds; Inclusions: 1x21 Volt Inspiritech Cordless Power Drill, 2x Rechargeable Battery, 1x English User Manual, 10x Self-drilling Drywall Anchors,10x Screwdriver Bits, 2x Double Ended Bits, 3x Drilling Bits, 1x Magnetic Extension Socket Bit Holder, 10x Anchors With Screws,1x One-hour Fast Charger, 1x Flexible Extension Shaft, 1x Carrying Bag/26pcs Wood Planer: Rated Voltage: 220v, Rated Input Power: 600w, Cutting Width: 82mm, Load Speed: 15,000rpm, Frequency: 60hz, Weight: 3kg./26 Pcs Framing Hammer: Handle Material: Alloy Steel, Item Dimensions: Approximately 16-17" (l) X 5.75-6" (w) X 1.5-2" (h), Item Weight: Atleast 1.4 Pounds/26 Pcs Trim Hammer: Handle Material: Wood, Head Material: Alloy Steel; Item Dimensions Approximately: 14-15" (l) X 5-6"(w) X 1-2" (h),item Weight: Atleast 594 Grams/26pcs Roofing Hammer: Item Weight: 1.25 Pounds, Product Dimensions: Approx. 13.7" (l) X 6.75" (w) X 1.5" (h)/26 Pcs Chalk Line: Item Weight: 10.6 Ounces, Product Dimensions: approx. 1200" (l) X 4.72" (w) X 5.91" (h) Inches, Color: blue, Material Type: Alloy Steel, Rubber/26 Pcs Utility Knife: Handle Material: Aluminum, Material: Aluminum Alloy, Weight: 120g/pcs, Blade Size: 19mm (w) X 61mm (h) X 0.6mm (t),blade Material: Steel, Thickness: Atleast 0.6mm/26 Pcs Tin Snips: Item Weight: atleast 1 Pound, Package Dimensions: Approx. 12.36" (l) X 3.7" (w) X 1.3" (h),size: long Straight, 12 Inches Long, Blade Length: 3.20",material: Steel, Cutting Thickness Range Up To 1.2mm Carbon Steel And 0.7mm/26 Pcs Framing Square: Shorter Leg Measures At 8 Inch Outside And 6.5 Inch Inside, Longer Leg Measures At 12 Inch Outside And 11 Inch Inside,material: Carbon Steel/26 Pcs Level: Box Beam Style, Material: Aluminum,dimension: Approximately 24-24.5" (l) X 2-2.6" (w) X 1.2-1.5" (h), Weight: Atleast 0.8 Pounds/26 Pcs Electric Planer: Voltage: 220-240v,input Power: 1050w, No Load Speed: 1600rpm, Planing Width And Depth,82x3mm,heavy Duty Aluminum Base/1 Pc Meter Tape With Magnetic Hook: Blade Material: Nylon Coated Blade, Dimensions: 16ft (l) X 25mm (w)/1 Pc Air Compressor Machine: Motor Power: 1hp, Size: Approx. 935x385x800mm,voltage: 220-240v, 60hz, Speed: 3400 Rpm, Tank Capacity: 24l , Operating Pressure: Max 8 Bar, Air Displacement: 93l/min, Pump Lubricated With Oil/1 Pc Blue Painters Tape, Color: Blue, Size: Atleast 1.41" X 20m,thickness: 0.13mm, Item Weight: 1.92 Pounds, Material: Paper/2pcs Electric Spray Gun: Voltage: 220-240v~50/60hz,spraying Pressure: 0.1-0.2 Bar, Max Flow: 850ml/min, Max Viscosity: 50din-s, Container Capacity: Atleast 800ml,power Cord Length: 2m, Rated Power 500w, Spraying Pressure: Atleast 0.1-0.2bar, Item Dimensions: Approximately 13" (l) X 5" (w) X 11" (h)/1 Pc Extension Pole, (3 Stage Extender) Reach: 1.5-to-3ft,weight: Maximum Of 0.5 Pounds, Max. Standing Reach: 10ft, Material : Aluminum/2 Pcs Paint Brush Set, 5 Pcs/set, Material: Synthetic Bristle, Wood Handle, Overall Length: Atleast 11", Bristles Length: Atleast 3", Brush Width: 1", 1-1/2" 2", 2-2.5", 3"and 4"/ 5 Pcs Paint Roller, Material: Plastic,package Dimensions: Approximately 15.16" (l) X 11.22" (w) X 3.15" (h),item Weight: Atleast 1.06 Pounds, Inclusion: Roller, Atleast 7" In Length, Material: Polyester/2 Pcs Painters Gloves, 12 Pcs/pack, Material: Cotton, Color: Red/1 Pc Putty Knife/paint Scraper Set (4pcs), Stainless Steel Blade With Rubberized Handle, Blade Width: 1", 2" And 3", Length Including Handle: Approximately 8-9"/1 Pc Steel Float/plastering Trowel: Thickness: Atleast 0.7 Mm, Surface Measurement, Length: 12", Width: 4", Material: High Carbon Steel With Wood Handle/2 Pcs Lpg Tank With Gas Regulator And Accessories, Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/2 Pcs Kawali: Aluminum, (diameter X Height) 28cmx8cm With Double Handle/2 Pcs Food Warmer/chafing Dish: Rectangular, 2l Capacity, 6 Pcs In 1 Set Stainless Steel, No Side Handle, Glass Lid Cover With Handle, Dimensions: Same Sizes - 32cm (l) X 26cm (w) X 8cm (h)/2 Pcs Gas Range: Approx. 55-70cm (l) X 50-60cm (w) X 86-93cm (h), 4-gas Burner, 62l Gas Oven, Button Ignition, Top Glass Lid, Net Weight: Maximum Of 28kg, Pan Support: Light Cast Iron Pan Support/2 Pcs Baking Sheet: Aluminum, 12x16 Inches/2 Pcs Digital Kitchen Scale: Accurate Measurement; Weigh Up To 5 Kg / 11 Lb Precisely In 1 G / 0.05 Oz Increments, Quality Material: Measure Food, Small Items, And Liquids With Confidence On The 304 Food-grade, Stainless Steel Platform, Approx. Dimension 7.3-7.5" (l) X 5.7-5.90" (w) X 0.6-08" (h), 2 X 1.5v Aaa Batteries/2 Pcs Measuring Cup (for Liquid Ingredients): 1 Measuring Cup With Red Graphics, Made Of Non-porous Glass That Won't Warp, Stain, Or Absorb Odors, Glass Is Preheated Oven, Microwave, Fridge, Freezer & Dishwasher Safe, Dimension: Approx. 7.13" (l) X 6.75" (w) X 4.38" (h), Measuring Capacity: 500ml/2 Pcs Measuring Cups (for Dry Ingredients): Material: Stainless Steel, 5 Pieces Per Set (1 Cup, 1/2 Cup, 1/3 Cup, 1/4 Cup, 1/8 Cup)/2 Pcs Measuring Spoons (set): 7pcs Stainless Measuring Spoon Kit, The Kit Includes: 1/8 Tsp (0.63ml), 1/4 Tsp (1.25ml), 1/2 Tsp (2.5ml), 3/4 Tsp (3.75ml), 1 Tsp (5ml), 1/2 Tbsp (7.5ml), 1 Tbsp (15ml)/2 Pcs Mixing Bowl: Medium, Approx. Diameter: 28cm, Height:11.2cm, Material: Stainless; Capacity: At Least 4l/2 Pcs Standmixer: 2-in-1 360 Automatic Rotating Bowl Electric Stand & Hand Mixer, 4.5l W/ 5-speed Turbo Function,color: Black/1 Pc Double Burner Gas Stove: Stainless Top And Front, Automatic Ignition ,reversible Trivet, Double Detachable Top Burner, Removable Drip Pan, Dimension: 730mm(l) X 395mm(w) X 105mm(h)/1 Pc Lpg Tank With Gas Regulator And Accessories: Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/1 Pc Caldero: Aluminum, #2, Diameter Height 28cmx16cm With Double Handle/2 Pcs Kawali: Aluminum, (diameter X Height) 28cmx8cm With Double Handle/1 Pc Kawa: 19.5" Cast Iron With Double Handle Depth/height: 21cm (medium)/1 Pc Food Warmer/chafing Dish: Rectangular, 2l Capacity, 6 Pcs In 1 Set Stainless Steel, No Side Handle, Glass Lid Cover With Handle, Dimensions: Same Sizes - 32cm (l) X 26cm (w) X 8cm (h)1 Pc Food Glass Display (estante): 3 Layers; 20(h)x18(w)x36(l)", Aluminum Base, Glass With Screen Door/1 Pc Casserole With Double Handle: Material: Aluminum, Size: 26cm Dimension: 36(l) X 28.5(w) X 21(h)cm/2 Pcs Frying Tongs: Materials: Stainless Steel With Rubber Or Plastic Coated Handles, 12 Inch Long/1 Pc Chopping Board: Material: Polypropylene/1 Pc Chopping Knife: 10” Stainless,wood Handle/1 Pc Butcher's Knife: Materials: Stainless, Wood Handle, Size: About 10"/1 Pc Plastic Table: 4 Seaters, Square Type With Umbrella Hole At The Center, Table Dimension: 36" (length) X 36" (width) X 30" (height), Thickness: Approximately 1.5in To 2in; Color: Beige2 Pcs Monoblock Chairs: With Backrest, Seat 375mmxdepth 330mm, 2.25 Kg, Class B Plastic, Thickness: Approximately 1.5in, Color: Beige/1 Pc Beach Umbrella: 90" Diameter X 8 Ft. Height, 8 Rib Round Metal Pole, Polyester Multi-coloured Umbrella Canopy/2 Pcs Cooler Container: Chest Insulated Cooler, Materials: Polystyrene, Sizes And Capacities: 30 Liters - 45.5cm(l) X 39cm(w) X 31cm(h),color: Blue Or Red/1 Pc Grill/ Ihawan With Stand,material Of Body And Stand: Stainless , 24x12x33inches (lxwxh), Depth: 5inches/2 Pcs Bicycle With Sidecar: Bicycle Specifications: Bmx Type Bike (frame 1//2 Gi Hd, Rim Set Front X 10 G Wide Jap Hub, Rim Set Rear X 10g Wide Jap Hub, Tire 20 X 2.125 Jumbo, Tube 20 X 2.125, Handle Bar Painted Black, Fork Ex-900 Landing Gear Cp, Head Parts Nikyo/whw, H-post Bmx Ord.m, H-grip Ord. Opc Parts Neco Bearing Type, Opc Plate 36t, Chain Cp Bmx, Freewheel 24t, Pedal Opc Bearing Type, Seat Clamp/s-pin/ S-post P, Saddle With Spring, Footbreak With Spring "full Size" Frame, 175-180mm Cranks Side Car With Umbrella Holder And 2 Chest Coolers Carrier (52l Capacity) - Dimensions: 25.8" (l) X 16.2" (w) X 15.7" (h) Materials: 1/2 J1 Pipe 540, 316 X 1 Flat Square Bar, J1 Pipe De Una 520, 1/4 X 2 Flat Bar, 6203 Gi Set, Tire 20 X 2.125 Jumbo/2 Pcs Weighing Scale: 10kg Capacity, Colored Body / Stainless Pan, Graduation: 50g, Powder Coated Body, Pan Size: 255mm Ø X 55mm Deep, Dial Face: 185mm Ø, 4 Units/master Carton/4 Pcs Plastic Fruit Crate 21 X 15 X 12 Inches/1 Pc Hair Dryer, With 3 Temperature Setting (from High To Low): Size: Atleast 200mm (h), 74mm (w), Weight: Minimum Of 315g, Wattage: 2200w, Voltage: 120-240v, Body Material: Plastic/1 Pc 2 In 1 Steam Pro Hair Straightener (straightener & Curler): Tourmaline Ceramic Wide Plates - 1.25" Wide Heating Plate, Adjustable Temperature Display - 150-235◦c, 360◦, Swivel Cord - Tangle-free, Hanger Design, Ptc Heater - Instant Heat-up/1 Pc Hair Combs: Material: Plastic, Inclusions: Flat Comb Size - 21.5cm (l) X 4.2cm (w), Massage Comb Size: 22cm (l) X 8.5cm (w), Ribs Comb Size: 21.5cm (l) X 4cm (w), Curling Comb Size: 20.2cm (l) X 2.5cm (w), Mirror Size: Atleast 22cm (l) X 10cm (w); Storage Base Size: Atleast 10cm (l) X 15cm (w), Package Size: Approx. 22-23cm (l) X 16cm (w) X 11cm (h), Package Weight: Approx. 305g/1 Pc Hair Clips: Plastic, Product Size: Approx. 4.5", Color: Black (12pcs)/1 Pc 7pcs Face Brush Set, Inclusion: Powder Brush, Size: 17cm, Bristle Length: 3.2cm, Ferrule Width:1.9cm, Powder Buffer Brush, Size: 19cm, Bristle Length: 5cm, Ferrule Width: 2.1cm,foundation Brush, Size: 17cm, Bristle Length: 3.3cm, Ferrule Width: 2.2cm, Flat Foundation Brush, Size: 17cm,bristle Length: 3.2cm; Ferrule Width:1.2cm, Highlight Brush, Size: 16.5cm,bristle Length: 2.7cm, Ferrule Width: 2.3cm,angle Cheek Brush, Size: 17cm, Bristle Length: 3.1-2.3cm,ferrule Width: 2.4cm, Highlighting Fan Brush, Size: 16.5cm, Bristle Length: 4cm, Ferrule Width: 2.5cm, With Brush Bag/1 Pc Eyelash Curler: Material: Carbon Steel, Size: Approx. 5.91 X 3.94 X 1.97"/1 Pc Eyebrow Razor: Handle Material: Plastic, Size: Approx. 6.8(l) X 2(w) X 0.1"(h), 6pcs/pack/1 Pc Makeup Sponge Set Blender: Material: Sponge, Size: Approx. 4.02 (l) X 3.94(w) X 2.52"(h), 4pcs/set/1 Pc False Eyelashes, Product Dimensions: Approx. 0.75(l) X 3.88(w) X 5.38"(h), 5pairs/pack/1 Pc Eye Shadow Pallete: 12 Curated Peach-inspired Shades, Finish Type: Metallic, Matte, Product Dimension: Approx. 0.08 (l) X 0.04 (w) X 0.06" (h)/1 Pc Contour Palette: Multi-colored, Finish Type: Matte, Package Dimension: Approx. 5.75 (l) X 4.25 (w) X 0.5" (h)/1 Pc Hypercurl Waterproof Mascara Make Up Set: Product Dimensions: Approx. 0.85 (l) X 2.75 (w) X 5.63" (h), Color: Black/1 Pc Waterproof Matte Gel Eyeliner Pencil: Item Form: Pencil, Powder, Creamy, Finish Type: Matte, Product Dimensions: About 5.77 X 1.97 X 0.81", Color: Black/1 Pc Eyebrow Gel, Waterproof: Weight: About 0.16 Oz, Product Dimension: Approx. 0.75 (l) X 1.9 (w) X 5.65 (h) Inches, Color Black, Brown/1 Pc Blush On, 3 Complimentary Skin-flushed Shades, Product Dimensions: Approx. 2.89 (l) X 0.43 (w) X 2.33" (h)/1 Pc Powder Blush Makeup Palette, Product Dimensions: approx. 2.43 (l) X 2.43 (w) X 0.66" (h)/1 Pc Eye Shadow Palette; 12 Curated Peach-inspired Shades, Finished Type:metallic,matte, Product Dimensions:approx 0.08(l)x0.04(w) X0.06”(h)/ 1 Pc Applicator Brush And Plastic Comb: 13cm Black, Double-sided Comb, Pointed Handle For Sectioning Hair/1 Pc Hair Clipper: Electric; 110v-240v, 50-60hz,all Metal Machine, Led Light Display Stainless Steel Blade, Blade Width 45mm,low Noise High Power, 2000 Ma Lithium Battery, 210 Minutes Working Time, 4pcs Comb Guide 3/6/10/13mm, Body Size: 17x4cm, Body Weight: 371g, With Complete Accessories - Fiber Comb: Cleaning Brush, Lubricant, Charger/1 Pc Spray Bottle: 250ml Plastic Hairdressing Spray Bottle/1 Pc Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm, Length: 20.9"/52cm, Width: 14"/36cm, 4 Drawers, Blower Holder/1 Pc Curling Iron: 220v Power, 4gen; White, 32x25x13mm, Energy Efficient-48w,360degree Rotating Tail, Automatic Hair Curler, Iron Ceramic, Adjustable Size/1 Pc Apron: Length: 76cm, Width: 59cm, Color: Black, Material: Nylon, Waterproof/1 Pc Curling Rod: Small, 2cm, Cylindrical, Plastic Resin With Rubber Band Kits,multi-color/1 Pc Curling Rod: Medium, 2.5cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/1 Pc Curling Rod: Large, 3cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/1 Pc Spray Net: 600ml, 27.5cm, Hard Hold/1 Pc Hair Spray Aerosol Extra Hold: Weight: About 7ounces /198g, Scented, Package Dimensions: 7.83 X 6.69 X 2.17"/1 Pc Hair Trimmer: Running Time 120 Minutes Battery Powered,rechargeable Li-ion Battery 1500 Mah, Dimension: Approximately 6-7" (l) X 1.5-2.5 (w), Material: Stainless; Accessories: 4 Plastic Combs In Different Sizes 3mm, 6mm, 9mm, 12mm, Inclusions: 1 Recharging Transformer (charger), And 1 English User Manual, Input: Can Be Used For 110-240 Voltage/3 Pcs Hair Dryer, With 3 Temperature Setting (from High To Low): Size: Atleast 200mm (h), 74mm (w), Weight: Minimum Of 315g, Wattage: 2200w, Voltage: 120-240v,body Material: Plastic/3 Pcs 2 In 1 Steam Pro Hair Straightener (straightener & Curler): Tourmaline Ceramic Wide Plates - 1.25" Wide Heating Plate, Adjustable Temperature Display - 150-235◦c, 360◦, Swivel Cord - Tangle-free; Hanger Design, Ptc Heater - Instant Heat-up/3 Pcs Hair Combs: Material: Plastic, Inclusions: Flat Comb Size - 21.5cm (l) X 4.2cm (w), Massage Comb Size: 22cm (l) X 8.5cm (w), Ribs Comb Size: 21.5cm (l) X 4cm (w),curling Comb Size: 20.2cm (l) X 2.5cm (w), Mirror Size: Atleast 22cm (l) X 10cm (w), Storage Base Size: Atleast 10cm (l) X 15cm (w),package Size: Approx. 22-23cm (l) X 16cm (w) X 11cm (h), Package Weight: Approx. 305g/3 Pcs Hair Clips: Plastic, Product Size: Approx. 4.5",color: Black (12pcs)/3 Pcs Disposable Latex Free Gloves: Non-sterile, 100 Pcs Per Pack, Product Dimensions: Approx. 8.6" (l) X 4.9" (w) X 3" (h), Weight: 1.25 Pounds, Material: Synthetic Pvc/3 Pcs Cutting Scissors: 6" Stainless Steel, 65g/3 Pcs Thinning Scissors: 17.5x5cm Stainless Steel/3 Pcs Drip Pan: 32cmx35cm Plastic, Black/3 Pcs Hair Clipper: Electric,110v-240v, 50-60hz,all Metal Machine,led Light Display Stainless Steel Blade, Blade Width 45mm, Low Noise High Power, 2000 Ma Lithium Battery, 210 Minutes Working Time, 4pcs Comb Guide 3/6/10/13mm, Body Size: 17x4cm, Body Weight: 371g,with Complete Accessories - Fiber Comb, Cleaning Brush, Lubricant, Charger/3 Pcs Nail Tool Set: Material: Stainless Steel, Case: Leather, Package Size: Approximately 15-15.5cm (l) X 8cm (w) X 2cm (h),inclusions: Cuticle Trimmer (95mm), Blackhead Needle And Loop Remover (83mm), Eyebrow Tweezer (86mm) Peeling Knife (90mm), Nail File (75mm), Ear Pick (78mm), Double Pick (75mm), Dead Skin Fork (86mm), Small Pedicure Plier (95mm), Acne Needle (83mm), Small Nail Clipper (62mm) Bevel Nail Clipper (61mm), Large Nail Clipper (82mm), Beauty Tip Scissor (89mm), Pusher/3 Pcs Cotton Balls: 300g (100 Pcs Large Cotton Balls)/3 Pcs Nail Polish: Volume: 15ml, With 24 Colors Inclusions: 14k Gold, 18k Gold, 24k Gold, African Plum, Baby Pink, Black Velvet, Carolina Peach, Cashmere, Emerald Shimmer, Golden Bronze, Italian Nude, Platinum Special, Pussy Red, Red Pearl, Saphire Glow, Silver Platinum, Simply Red, Tahiti Brown, White Satin, White Rose, Platinum Silver, Touch Of Tan, Touch Of Beige, Colorless/3 Pcs Foot Spa Soaker: With Pumice Stone, Package Dimensions: Approximately 16.42" X 13.58" X 7.91", Weight: About 4.63 Pounds, Rated Power: 500 Watts, Rated Voltage: 110~120v, Rated Frequency: 50hz, Temperature Adjustable Range: 35℃ To 48℃/3 Pcs Astringent Foot Soaker: 128oz/3 Pcs Cooling Foot Soak: Product Dimensions: approximately 6.5-7" X 2.38-2.50" X 9.259.50", Weight: Atleast 900g/3 Pcs Exfoliating Foot Scrub: Package Dimensions: Approximately 7.05-7.50" X 2.32-3" X 1.97-2", Weight: Atleast 6oz/3 Pcs Foot File And Callus Remover: Material: Metal, Steel, Item Dimensions: Approx. 10-10.78" X 2.7" X 0.29", Item Weight: 3.2 Pounds/3 Pcs Foot Scrub/3 Pcs Manicurist Bag: Made Of Heavy Duty Nylon, Large Capacity: Enough Room To Hold Up To 42 Bottles Of 15ml Nail Polish, Size: Approx. 8-9" (l) X 6-7" (w) X 4-5" (h)/3 Pcs Spray Bottle: 250ml Plastic Hairdressing Spray Bottle/3 Pcs Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm, Length: 20.9"/52cm, Width: 14"/36cm, 4 Drawers, Blower Holder/3 Pcs Apron: Length: 76cm, Width: 59cm,color: Black,material: Nylon, Waterproof/3 Pcs Alcohol: 70% Ethyl Alcohol With Moisturizer,500ml/3 Pcs Shampoo: 1000ml, Green Apple And Citrus Lemon Variant/3 Pcs Hair Spa: 1000ml, Lavender And Strawberry Variant/3 Pcs Hot Oil: Keratin Organic Hot Oil, 1000ml, Aloe Vera Variant/3 Pcs Hair Cellophane: 500ml, Natural, Brown,burgundy And Ash Blonde Variant/3 Pcs Hair Rebonding Set: 1000ml Hair Straightening And Hair Neutralizing (ion Perm)/3 Pcs Hair Color Dye:100 Ml, 2pcs Each (black, Dark Brown, Medium Brown, Light Brown, Blonde, Light Blond, Lighter Blonde, Lightest Blonde, Dust)/3 Pcs Hair Color Developer: 100ml 2pcs Each 6%, 9%, 12% Oxidizer/3 Pcs Hair Bleaching Powder: 500g/3 Pcs Brazilian Blowout: 120ml, 3-in-1 Set (clarifying Shampoo, Brazilian Blowout, After Treatment Conditioner)/24 Pcs Hair Dryer, With 3 Temperature Setting (from High To Low): Size: Atleast 200mm (h), 74mm (w), Weight: Minimum Of 315g, Wattage: 2200w, Voltage: 120-240v, Body Material: Plastic/24 Pcs 2 In 1 Steam Pro Hair Straightener (straightener & Curler): Tourmaline Ceramic Wide Plates - 1.25" Wide Heating Plate, Adjustable Temperature Display - 150-235◦c, 360◦,swivel Cord - Tangle-free, Hanger Design, Ptc Heater - Instant Heat-up/24 Pcs Hair Combs: Material: Plastic, Inclusions: Flat Comb Size - 21.5cm (l) X 4.2cm (w), Massage Comb Size: 22cm (l) X 8.5cm (w), Ribs Comb Size: 21.5cm (l) X 4cm (w), Curling Comb Size: 20.2cm (l) X 2.5cm (w), Mirror Size: Atleast 22cm (l) X 10cm (w), Storage Base Size: Atleast 10cm (l) X 15cm (w), Package Size: Approx. 22-23cm (l) X 16cm (w) X 11cm (h), Package Weight: Approx. 305g/24 Pcs Hair Clips: Plastic, Product Size: Approx. 4.5", Color: Black (12pcs)/24 Pcs Disposable Latex Free Gloves: Non-sterile, 100 Pcs Per Pack, Product Dimensions: Approx. 8.6" (l) X 4.9" (w) X 3" (h), Weight: 1.25 Pounds, Material: Synthetic Pvc/24 Pcs Drip Pan: 32cmx35cm Plastic, Black/24 Pcs Shower Caps: 32cm, Thick Plastic, Elastic, Washable/24 Pcs Trolley With Blower Holder: 5-layered Wheeled Trolley Cart, Height: 35"/89cm, Length: 20.9"/52cm, Width: 14"/36cm, 4 Drawers, Blower Holder/24 Pcs Curling Iron: 220v Power, 4gen, White, 32x25x13mm, Energy Efficient-48w, 360degree Rotating Tail, Automatic Hair Curler, Iron Ceramic, Adjustable Size/24 Pcs Hair Steamer: With 4 Wheels, 360degrees Movable, Gray Color, Adjustable Height With Timer And Control/120 Pcs Cape: 140x110cm, Satin, Nylon, Waterproof, Black/72 Pcs Microfiber Towel: 25x65cm, 135g, Microfiber, Dark Colors/24 Pcs Curling Rod:small, 2cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/24 Pcs Curling Rod: Medium, 2.5cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/24 Pcs Curling Rod: Large, 3cm, Cylindrical, Plastic Resin With Rubber Band Kits, Multi-color/120 Pcs Ear Caps: (l X W X T): 8cm X 4.5cm X 2.1cm/3.15" X 1.77" X 0.83", Black,plastic/24 Pcs Shampoo: 1000ml, Green Apple And Citrus Lemon Variant/24 Pcs Hair Spa: 1000ml, Lavender And Strawberry Variant/24 Pcs Hot Oil: Keratin Organic Hot Oil, 1000ml, Aloe Vera Variant/24 Pcs Hair Cellophane: 500ml, Natural, Brown, Burgundy And Ash Blonde Variant/24 Pcs Hair Rebonding Set: 1000ml Hair Straightening And Hair Neutralizing (ion Perm)/24 Pc Hair Color Dye:100 Ml, 2pcs Each (black, Dark Brown, Medium Brown, Light Brown, Blonde, Light Blond, Lighter Blonde, Lightest Blonde, Dust)/24 Pcs Hair Color Developer: 100ml 2pcs Each 6%, 9%, 12% Oxidizer/24 Pcs Hair Bleaching Powder: 500g/24 Pcs Brazilian Blowout: 120ml, 3-in-1 Set (clarifying Shampoo, Brazilian Blowout, After Treatment Conditioner)/24 Pcs Hair Shear: Material: Stainless Steel, 1 Precision Scissor Approximately 6-7",1 Thinning Scissor Atleast 6", Accesories: Scissors Oil Atleast 5ml/34 Pcs Angle Grinder Cutting Disk: 10 Pcs. Per Set, Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8")/34 Pcs Crow Bar: At Least 36" Long,length Tolerance: +- 1/8, Material: Forged Steel Carbon/34 Pcs Claw Hammer: Round Head, Head Weight: At Least 16oz, Overall Weight: Approximately 17oz-23oz, Head Material: Forged Steel, Handle Material: Fiberglass Handle With Rubber Cushion, Overall Length: Approximately 12-14"/34 Pcs Hacksaw With Blade: Material: Aluminum Alloy Frame With Soft-grip Handle, At Least 12"-15" Long Including Handle, With Soft-grip Rubber Handle, Bi-metal, Blade Length: About 30cm, Width: 3cm/34 Pcs Meter Tape With Magnetic Hook: Blade Material: Nylon Coated Blade, Dimensions: 16ft (l) X 25mm (w)/34 Pcs Handsaw: Blade Length: About 15",blade Material: Carbon Steel, Handle Length: 5", Handle Material: Plastic/rubber, Color: Gray,8 Teeth Per Inch/34 Pcs Shovel: Round End, Tempered Steel Blade: 17-23 Cm, Blade Tip Width, 22-28cm Blade Tip Length, All Metal Handle, Overall Length: 100cm-115 Cm, Capacity: 350-400 Lbs/34 Pcs Shovel: Rectangular End, Tempered Steel Blade: 22-26 Cm, Blade Tip Width, 22-28cm Blade Tip Length, All Metal Handle, Overall Length: 100cm-115 Cm/34 Pcs Level Bar: Aluminum Frame, Length: At Least 24"/60cm, Aluminum Thickness: 1.5mm, Double Side Milles, 0.5mm/m Accurate Vials/34 Pcs Steel Float/plastering Trowel: Thickness: At Least 0.7 Mm, Surface Measurement, Length: 12", Width: 4", Mmaterial: High Carbon Steel With Wood Handle/34 Pcs Steel Square: Carpenter's Framing Square, Blade Width: 2" Scale: At Least 16" (l) X 24" (w), Material: Steel/34 Pcs Masonry Trowel: Length: At Least 12"long, Width: 6", Material: Flat Steel, With Wood Handle/34 Pcs Circular Saw: Voltage: 220-240v, Frequency: 50-60hz, Input Power: 1400w, No-load Speed: Atleast 4800rpm, Blade Diameter: 185mm, Cutting Capacity: 45degree: 44mm, 90 Degree: 65mm, Maximum Cutting Depth: Atleast 90°62mm, Weight: Maximum Of 5.2kg, Item Approximate Dimension: 15-17cm (h), 25-28cm (w), 30-35cm (l)/34 Pcs Masonry Square/metric Square: Material: Aluminum, Length: Approx. 24", Width: 16", 1/8 '' Thickness/34 Pcs Mason's Level: At Least 48'' Long, Aluminum Reinforced Frame, 60cm Only/34 Pcs Sledgehammer: Weight: At Least 3 Lbs With Fiberglass Handle, Forged Steel Round Head, Length: Approximately 25-27"/34 Pcs Concrete Chisel: Pointed Sharp End, Material: Forged Steel Chisel, With Rubberized Handle, Length: Approximately 10''/34 Pcs Putty Knife/paint Scraper Set (4pcs): Stainless Steel Blade With Rubberized Handle, Blade Width: 1", 2" And 3", Length Including Handle: Approximately 8-9"/34 Pcs Mason's Line: #18 Braided Nylon, 500 Ft/roll, Color Orange/34 Pcs Hammer Drill: Electric, 1980w 220v, Rated Frequency: 50/60hz, Load Speed: 0-3800rpm (revolutions Per Minute), Chuck: 13mm With Ergonomic Anti-slip Handle/34 Pcs Angle Grinder: Rated Input Power: 730w, Wheel Diameter: 4",rated Voltage: 220v, Frequency: 60hz, No Load Speed: 12,000 Rpm, Weight: Approximately 1.6kg, Grinding Spindle Thread: M10, Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h )/34 Pcs Wooden Float: Size: At Least 12x4", Has 5/8" Thick Rubber Pad, With Wooden Handle/4 Pcs Nail Tool Set: Material: Stainless Steel, Case: Leather, Package Size: Approximately 15-15.5cm (l) X 8cm (w) X 2cm (h), Inclusions: Cuticle Trimmer (95mm), Blackhead Needle And Loop Remover (83mm), Eyebrow Tweezer (86mm) Peeling Knife (90mm), Nail File (75mm), Ear Pick (78mm), Double Pick (75mm), Dead Skin Fork (86mm), Small Pedicure Plier (95mm), Acne Needle (83mm), Small Nail Clipper (62mm) Bevel Nail Clipper (61mm), Large Nail Clipper (82mm), Beauty Tip Scissor (89mm), Pusher/4 Pcs Cotton Balls: 300g (100 Pcs Large Cotton Balls)/4 Pcs Nail Polish: Volume: 15ml, With 24 Colors Inclusions: 14k Gold, 18k Gold, 24k Gold, African Plum, Baby Pink, Black Velvet, Carolina Peach, Cashmere, Emerald Shimmer, Golden Bronze, Italian Nude, Platinum Special, Pussy Red, Red Pearl, Sapphire Glow, Silver Platinum, Simply Red, Tahiti Brown, White Satin, White Rose, Platinum Silver, Touch Of Tan, Touch Of Beige, Colorless/4 Pcs Foot Spa Soaker: With Pumice Stone, Package Dimensions: Approximately 16.42" X 13.58" X 7.91", Weight: About 4.63 Pounds, Rated Power: 500 Watts, Rated Voltage: 110~120v, Rated Frequency: 50hz, Temperature Adjustable Range: 35℃ To 48℃/2 Pcs Astringent Foot Soaker: 128oz/2 Pcs Cooling Foot Soak: Product Dimensions: approximately 6.5-7" X 2.38-2.50" X 9.259.50", Weight: Atleast 900g/2 Pcs Exfoliating Foot Scrub: Package Dimensions: Approximately 7.05-7.50" X 2.32-3" X 1.97-2", Weight: Atleast 6oz/4 Pcs Foot File And Callus Remover: Material: Metal, Steel, Item Dimensions: Approx. 10-10.78" X 2.7" X 0.29", Item Weight: 3.2 Pounds/2 Pcs Foot Scrub/2 Pcs Manicurist Bag: Made Of Heavy Duty Nylon, Large Capacity: Enough Room To Hold Up To 42 Bottles Of 15ml Nail Polish, Size: Approx. 8-9" (l) X 6-7" (w) X 4-5" (h)/6 Pcs Microfiber Towel: 25x65cm, 135g, Microfiber,dark Colors/2 Pcs Alcohol: 70% Ethyl Alcohol With Moisturizer, 500ml/1 Pc Double Burner Gas Stove: Stainless Top And Front, Automatic Ignition ,reversible Trivet, Double Detachable Top Burner, Removable Drip Pan, Dimension: 730mm(l) X 395mm(w) X 105mm(h)/1 Pc Lpg Tank With Gas Regulator And Accessories: Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/2 Pcs Kawa: 19.5" Cast Iron With Double Handle Depth/height: 21cm (medium)/1 Pc Plastic Table: 4 Seaters, Square Type With Umbrella Hole At The Center, Table Dimension: 36" (length) X 36" (width) X 30" (height), Thickness: Approximately 1.5in To 2in, Color: Beige/1 Pc Monoblock Chairs: With Backrest, Seat 375mmxdepth 330mm, 2.25 Kg, Class B Plastic, Thickness: Approximately 1.5in, Color: Beige/1 Pc Peanut Grinding Machine: Electric, 220v, 300w, 50-60hz,material: High Quality Stainless Steel Body And Base, Color: Black, Dimension: Approx. Length: 43.5cm, Width: 23cm, Height: 13.5cm/1 Pc Hand Cobbler Shoe Repair Machine Dual Cotton Nylon Line Sewing Machine Manual Leather Machine Shoe Sewing Machine Color Silver: Product Dimensions 14.4"d X 20.5"w X 5.5"h, Material: Cast Iron Item Weight: 22 Pounds, Power Source: Crank/5 Pcs Wooden Handle Shoes Repairing Awl Shoe Sewing Tool Diy Craft Repair Hand Straight Hook Shoes Sewing Awl Type: Shoes Sewing Awl Material: Wood+metal, Features: Shoes Sewing Awl, Repair Hand , Crochet Needle Tool Dimension: 1: App.2x13.5x6cm/0.79x5.31x2.36in 2: App.2x13x5.5cm/0.79x5.12x2.17in 3: App.2x13x5.5cm/0.79x5.12x2.17in, Color: Wood Color + Silver/5 Pcs Upholstery Stitching Thread Black 100 Mtr. 1 Pc Upholstery Hand Stitching Tools For Belts, Saddles, Shoes, Fabric Household Use Handwork Sewing Leather Craft Shoes Repairing/5 Pcs Upholstery Stitching Thread Brown 100 Mtr 1 Pc Upholstery Hand Stitching Tools For Belts, Saddles, Shoes, Fabric Household Use Handwork Sewing Leather Craft Shoes Repairing/5 Pcs Upholstery Stitching Thread White 100 Mtr. 1 Pc Upholstery Hand Stitching Tools For Belts, Saddles, Shoes, Fabric Household Use Handwork Sewing Leather Craft Shoes Repairing/2 Pcs Angle Grinder Cutting Disk: 10 Pcs. Per Set, Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8")/2 Pcs Angle Grinder: Rated Input Power: 730w, Wheel Diameter: 4", Rated Voltage: 220v,frequency: 60hz, No Load Speed: 12,000 Rpm, Weight: Approximately 1.6kg, Grinding Spindle Thread: M10, Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h)/2 Pcs Chipping Hammer: Item Weight: at Least 13.8 Ounces, Product Dimensions: 11" (l) X 1" (w) X 7.5" (h), Material: Genuine Leather Grip And Forged Steel/2 Pcs Heavy Duty Corded Drill: Rated Input Power: 750w, Chuck Capacity: Up To 13mm, Drill Capacity: Metal (16mm), Wood (25mm), Masonry (12mm), Dimension: 268mm (l) X 69mm (w) X 192mm (h), Weight W/out Cable: Approximately 1.6-1.8 Kg, Spindle Collar Diameter Of 43 Mm/2 Pcs Metal Drill Bit Set: Material: High Speed Steel, 19pcs Per Set(1mm,1.5mm,2mm,2.5mm,3mm,3.5mm,4mm,4.5mm,5mm,5.5mm,6mm,6.5mm,7mm,7.5mm,8mm,8.5mm,9mm,9.5mm,10mm), Point Angle: 118degree C, Standards: Din 338, Bit Geometry: Standard Twist Bit/2 Pcs Mig Welding Pliers: Overall Length: Atleast 210mm, Material: High Carbon Steel, Handle Material: Thermoplastic Rubber/2 Pcs Needle File Set: (6 Pieces Hand Metal Files, Hardened Alloy, Strength Steel Set Includes Flat, Flat Warding, Square, Triangular, Round, And Half-round File), Color Black, Metal Type: Carbon Steel, Handle Material: Wood, Alloy Steel, Item Dimensions: Approximately 6.1" (l) X 3" (w) X 0.5" (h)/2 Pcs Portable Welding Machine: Input Voltage: 220-240, Frequency: 50-60hz, Output Current: 10-220a, Led Display, No-load Voltage: 85v, Max. Output Current: 220a, Diameter Of Electrode: 1.6-3.2mm, Inclusions: 1 Pc Electrode Holder, 1 Pc Earth Clamp With Cable/2 Pcs Speed Square: Material: Cast Aluminum, Size: About 18x18x2cm/7.09x7.09x0.79", Weight: About 130g,triangle-shaped/2 Pcs Welding Helmet: Auto Darkening Helmet: Power Supply: Battery And Solar Powered, Light Shade: Din9-1, Dark Shade: Din4, Switching Time: 1/25000s, Delay Time: 0.1-0.8s, Sensitivity Adjustment: Stepless Control, Operation Temperature: -5 Degrees- 55 Degrees, Active Viewing Area: 93mmx43mm, Active Viewing Area Size: (+/- 10mm), Item Weight: At Least 1.85 Pounds, Package Dimensions: approximately 12-12.4" (l) X 9-9.61" (w) X 7-7.68" (h)/2 Pcs Welding Magnets: 6 Pcs/set, Overall Length: At Least (3"), Hold Capacity: Up To 25lbs, Arrow Design Supports Angle: 45°, 90°, And 135°, Item Weight: 295g, Package Dimensions: 4.88 X 4.72 X 3.98 Inches, material: Steel, Magnets Size: Approximately - Top (1-1.4cm), Bottom (6.5-7cm), Side (7-7.5cm) Thickness (1-1.3cm)/2 Pcs Welding Suit: 100% Cotton With Pyrovatex, 2 Back Pockets And Rule Pocket With Safety Gusset Feature, High Quality And Long Lasting, Two Way Zipper, Approximate Cloth Size: Large/10 Pcs Camping Dome Tent: Product Dimensions: 82.7"l X 55"w X 43.5"h, Item Weight: 4 Pounds Shape: D Shape Occupancy: 2 Person Included Components: Carry Bag, Stakes, Rainfly Water Resistance Technology 1000 Millimeters, Special Feature: Windproof, Sun Protection/outdoor Mat (banig):size (48" X 75") Material: Palm Leaves (buri)/10 Pcs Double Burner Gas Stove: Stainless Top And Front, Automatic Ignition ,reversible Trivet, Double Detachable Top Burner, Removable Drip Pan, Dimension: 730mm(l) X 395mm(w) X 105mm(h)/2 Unit Lpg Tank With Gas Regulator And Accessories: Capacity: 11kg Cylinder With Gauge And Safety Device, Safety Push Protection For Leakage, Gas Auto Safe Controller, Rubber Gasket, Steel Belted, About 1.8m Hose, With Clamp/1 Unit Gas Range: Approx. 55-70cm (l) X 50-60cm (w) X 86-93cm (h), 4-gas Burner, 62l Gas Oven, Button Ignition, Top Glass Lid, Net Weight: Maximum Of 28kg, Pan Support: Light Cast Iron Pan Support/5 Pcs Kawali: Aluminum, (diameter X Height) 28cmx8cm With Double Handle/2 Pc S Kawa: 19.5" Cast Iron With Double Handle Depth/height: 21cm (medium)/5 Pcs Wok Ladle: Material: Stainless Steel With Wooden Handle: Total Length Of Item: 24 Inches/5 Pcs Wok Spatula: Material: Stainless Steel With Wooden Handle, Total Length Of Item:24 Inches/5 Pcs Stainless Steel Long Wooden Handle Skimmer Strainer: Material: Stainless Steel, Size: 32.3*11.5cm/5 Pcs Casserole With Double Handle: Material: Aluminum, Size: 26cm, Dimension: 36(l) X 28.5(w) X 21(h)cm/5 Pcs Frying Tongs: Materials: Stainless Steel With Rubber Or Plastic Coated Handles, 12 Inch Long/5 Pcs Chopping Board: Material: Polypropylene Plastic: 8"(w) X 10"(l), 1cm (thickness)/5 Pcs Chopping Knife: 10" Stainless; Wood Handle/5 Pcs Grill/ Ihawan With Stand, Material Of Body And Stand: Stainless, 24x12x33inches (lxwxh), Depth: 5inches/1 Unit Heavy Duty Commercial Micromatic Big 7.8l Mrc-50 Rice Cooker 45cups (white)/10 Dz Melamine Round Dinner Plate: 9" Diameter, Color; White/10dz Platito (saucer): Material: Melamine Plastic, Standard Size: 6 Inch (diameter) X ¾ Inch Height/10 Pcs Serving Tray Bamboo - Wooden Tray With Handles, Color Brown Material Wood, Product Dimensions 17"l X 11"w X 2"h/10dz Drinking Glass: 8 Oz, Glass, Product Size: Base Diameter-7cm, Top Diameter: 7cm, H-11.4cm, Heat Resistant, Dishwasher Safe/10dz Spoon: Stainless, 12pcs/per Pack, Size: 8"/10dz Fork: Stainless, 12 Pcs/per Pack, Size 8"/5dz Mangkok (round Shape Bowl), Materials: Ceramic, Size: 6inch (diameter) X 5cm (height)/5 Pcs Storage Box With Wheels For Easy Transport, Measurements: L72 X W52 X H44cm, Food Grade Material, 120l Capacity, Stackable; With Lid And Handle, Color: White/2 Pcs Butcher's Knife: Materials: Stainless, Wood Handle, Size: About 10"/5 Pcs Gallon Acrylic Juice Dispenser Type: Type: Water/juice Dispensers, Overall Dimensions: Height:32 1/2 Inches, Top Diameter: 6 11/16 Inches, Capacity:1.1 Gallons, Base Material: Stainless Steel, Container Material: Acrylic, Style: Single/5 Pcs Chafing Dish Food Warmer Buffet Set: Size: 1/1pan*3, Color: Silver, Material: Stainless Steel, Product Dimensions: 13.39"l X 15.35"w X 23.62"h, Capacity: 8 Quarts/5 Pcs Chest Cooler: Item Package Dimensions: 25.8" (l) X 16.2" (w) X 15.7" (h), Package Weight: 5.76kg, Inside Dimensions: 24.95" (l) X 14.58" (w) X 14.77" (h), Material: plastic, Chamber Depth: 24.95", Capacity: 52l , Color: Blue Or Red/5 Pcs Matress: Size: Semi Double (48" X 75"), Thickness: 4"/15 Pcs Matress Size: Queen (60" X 75") Thickness: 4"/15 Pcs Pillow: Size: Standard (20" X 26")/10 Sets Bed Linen Set Of 3pcs, 1-bed Sheet Size (48" X 75"), 2-pillow Case (20" X 26")/2 Sets Bed Linen Set Of 3pcs: 1-bed Sheet Size (60" X 75"), 2-pillow Case (20" X 26")/6 Unit Electric Fan: Color: Black, Electric Fan Design: Floor Fan, Power Source: Corded Electric Style: 3-speed Ac Motor Fan, Product Dimensions: 15.75"d X 17.72"w X 53.15"h, Room Type: Bedroom, Special Feature: Oscillating, Adjustable Height, Adjustable Tilt,wattage: 60 Watt/4 Unit Industrial Ceiling Fan: Product Material: Cast Aluminum Casing, Product Specifications: 2000mm, Operating Voltage: 220v, Wind Speed: 5th Gear, Number Of Fan Product Color: Black, White, Product Power: 165w, Blades: 6 Blades/150 Pcs Monoblock Chairs: With Backrest, Seat 375mmxdepth 330mm, 2.25 Kg, Class B Plastic, Thickness: Approximately 1.5in, Color: White/15 Pcs Solid Top Round Table: Material: Plastic, Color: White, Size(cm): 115 X 74 X 4.5, Foldable Legs,diameter: 45″, 6 To 8 Seater Capacity 20.2 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21.2 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: None General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract(scc). 2. Advance Payment 2.1 Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2 The Procuring Entity Is Allowed To Determine The Terms Of The Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 4. Inspection And Tests The Procuring Entity Or Its Representatives Shall Have The Right To Inspect And/or The Test The Goods To Confirm Their Conformity To The Project. In Addition To Tests In The Scc, Section Vii(technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identify Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 7.1. In Order To Assure The Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 7.2. The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: [for Goods Supplied From Within The Philippines] “the Delivery Terms Applicable To This Contract Are Delivered [indicate Place Of Destination]. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is Wilson G. Baliwas. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E. Training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. F. No Additional Incidental Service Requirements. The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: 1. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And 2. In The Event Of Termination Of Production Of The Spare Parts: I. Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii. Following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Costs Thereof Are Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of Three(3) Months. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within Three(3) Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 Partial Payment Is Not Applicable. 4 The Inspections And Tests That Will Be Conducted Are: Inspection Of The Livelihood Supplies And Materials If It Follows The Technical Specification Set By The End-user Unit. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item No. Quantity Item Description Total Delivered, Weeks/months Remarks Indicate Here Any Other Appropriate Information As May Be Necessary. Signature Over Printed Name Position Department/division Technical Specifications Technical Specifications Item / Service Maximum Quantity Technical Specifications / Scope Of Work Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution.] Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; (b) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives (c) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located (d) Tax Clearance Per Eo 398 Technical Documents ⬜ (e) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (f) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (g) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (h) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (i) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (k) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (m) Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (n) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (o) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me A Notary Public For And Within The Province/city Pf __________________, On This ________ Day Of _______________, 2024 At __________________________ By The Above Named Affiant With His/her __________________ As The Competent Evidence Of His/her Identity And Avows Under Penalty Of Law That All The Statements Contained On This Instrument Are True And Correct. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2024. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. ______ To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2024 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me A Notary Public For And Within The Province/city Pf __________________, On This ________ Day Of _______________, 2024 At __________________________ By The Above Named Affiant With His/her __________________ As The Competent Evidence Of His/her Identity And Avows Under Penalty Of Law That All The Statements Contained On This Instrument Are True And Correct. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2024. Bid Form For The Procurement Of Goods (shall Be Submitted With The Bid) Bid Form Date: _____________________________ Project Identification No.: _____________ To: [name And Address Of Procuring Entity] Having Examined The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers_____, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To (supply/deliver/perform) (description Of The Goods) In Conformity With The Said Pbds For The Sum Of (total Bid Amount In Words And Figures) Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors , And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To (specify The Applicable Taxes, E.g. (i) Value Added Tax, (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties), Which Are Itemized Herein Or In The Price Schedules. If Our Bid Is Accepted, We Undertake: A.to Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements Of The Philippine Bidding Documents(pbds); B. To Provide A Performance Security In The Form, Amounts, And Within The Times Prescribed In The Pbds; C. To Abide By The Bid Validity Specified In The Pbds And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period. Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/conform That We Comply With The Eligibility Requirements Pursuant To The Pbds. The Undersigned Is Authorized To Submit The Bid On Behalf Of (name Of The Bidder) As Evidenced By The Attached (state The Written Authority). We Acknowledge That Failure To Sugn Each And Every Page Of This Bid Form, Including, The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Goods(revised) __________________________________________________________________________ This Agreement, Made The _________ Day Of _______________, ________ Between [name And Address Of Procuring Entity] Of The Philippines (hereinafter Called The“entity”) Of The One Part And [name Of Supplier] (hereinafter Called The “supplier”) Of The Other Part. Whereas, The Entity Invited Bids For Certain Goods And Ancillary Services, Particularly (brief Description Of Goods And Services) And Has Accepted A Bid By The Supplier For The Supply Of Those Goods And Services In The Sum Of (contract Price In Words And Figures In Specified Currency) (hereinafter Called The “contract Price”). Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: I. Philippine Bidding Documents(pbds) I. Schedule Of Requirements; Ii.technical Specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins, If Any Ii. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Supplier: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2024.
Closing Date30 Jan 2025
Tender AmountPHP 3.4 Million (USD 58.4 K)
1081-1090 of 1085 archived Tenders