Uniform Tenders
Uniform Tenders
Barangay Bagadion, Libmanan, Camarines Sur Tender
Civil And Construction...+2Civil Works Others, Construction Material
Corrigendum : Tender Amount Updated
Philippines
Details: Description Clustered Infrastructure Projects P 426,560.00 1. Construction Of Barangay Out-post Location: Bagadion, Libmanan, Camarines Sur Appreciation: P 326,560.00 Source Of Fund: P 100,000.00 - General Fund C/y 2024 P 226,560.00 - Capital Outlay - Continuing C/y 2023 Description: Earthworks Concrete Works Roofing And Framing Works Masonry Works Door Installation Steel Works Electrical Works I. Earthworks I.a. Excavation Estimated Quantity= 3.42 Cu.m 3.42 Cu.m Soil Excavate I.b. Gravel Bedding Estimated Quantity= 0.29 Cu.m 0.29 Cu.m Soil Excavate Ii. Concrete Works Estimated Quantity= 3.50 Cu.m A. Materials 34 Bags Cement 2 Cu.m Washed Sand 4 Cu.m 3/4" Crushed Gravel 33 Pcs 16mm Rsb 7 Pcs 12mm Rsb 51 Pcs 10mm Rsb 11 Pcs 1/4" Thk Ordinary Plywood 347 Bdft Formlumber 1 Kgs #16 Tie Wire 5 Kgs Assorted Cw Nail B. Labor C. Equipment Rental For 1 Days 1 Unit Concrete Bagger Mixer Iii. Roofing And Framing Works Estimated Quantity= 1 Lot A. Materials 13 Pcs 2" X 2" Angle Bar 2 Pcs 1" X 1" Angle Bar 6 Pcs 2 X 3" C- Purlin 5 Pcs 0.6mm Thk Corrugated Roof Sheet 10ft 3 Pcs 0.6mm Thk Corrugated Roof Sheet 12ft 2 Pcs 0.6mm Thk Pre-painted Ridge Roll 8ft 3 Pcs 0.6mm Thk Pre-painted End Flashing 8ft 3 Pcs 12mm X 12" X 8" Fascia Board 114 Pcs Tekscrew 5 Kgs Welding Rod 5 Pcs Cutting Disc 1 Can Roof Sealant 1/2 Ltr B. Labor C. Equipment Rental For 3 Days 1 Unit Welding Machine W/ Genset Iv. Masonry Works Estimated Quantity= 33.58 Sq.m A. Materials 441 Pcs 6" Chb 75 Bags Cement 5 Cu.m Washed Sand 14 Pcs 10mm Rsb 14 Pcs 8mm Rsb 2 Kgs #16 Tie Wire B. Labor V. Door Installation Estimated Quantity = 1 Lot A. Materials A D Labor (installation) 1 Unit 0.90m X 2.10m Wooden Flush Door With Jamb And Complete Accessories Vi. Steel Works Estimated Quantity= 1 Lot A. Materials 6 Pcs 12mm Square Bar 2 Pcs Cutting Disc 1 Kgs. Welding Rod 1 Lit Metal Promer 1 Pc Paint Brush 2" B Labor C. Equipment Rental For 1 Day 1 Unit Welding Machine W/ Genset Vii. Electrical Works Estimated Quantity= 1 Lot A. Materials 3 Sets 18 Watts E27 Surface Mounted Led Light 1 Set 2 Gang Switch W/ Plate 3 Sets Duplex Convenience Outlet W/ Grounding 8 Pcs Junction Box 8 Pcs Utility Box 15 Pcs 20mm (3/4") Pvc Adapter 5 Pcs 20mm (3/4) Pvc Conduit 2 Pcs 25mm (1") Pvc Conduit ( Feeder) 3 Pcs 25mm (1") Pvc Adapter (feeder) 3 Pcs 25mm (1") Pvc Clamp ( Feeder) 1 Pc 25mm (1")weatherhead Cap 1 Pc Upvc Square Pull Box 4" X 4" 1 Kgs #16 Tie Wire 1 Set Nema 1 Panel Board 4 Branches Plug-in 50 M 3.5mm2 Thhn (#12 Awg) 5 M 8.0mm2 Thhn (#8 Awg ) 10 M 14.0mm2 Thhn ( # 6 Awg ) 2 Pcs Electrical Tape (big) 1 Pc 15 At, 2p,plug-in Type Cb 1 Pc 20at , 2p, Plug -in Type Cb 1 Pc 60 At, 2p, Plug-in Type Cb 30 M Service Drop ( #6 Awg ) B. Labor C. Tapping Fee Spl I Project Billboard 1 Pc Billboard With Frame ( 8ft X 8ft ) Spl Ii Construction Safety & Health 3 Pcs Uniform 3 Pcs Hard Hat 3 Pcs Safety Boots 3 Pcs Gloves Spl Iii - Photographs 1 Lot Photographs ************************************ 2. Concrete Pathway Location: Zone 2, Bagadion, Libmanan Cam. Sur Appropriation: P 100,000.00 Source Of Fund: Gad Fund C/y 2024 Description: Carriageway: L = 24.5 M W= 2.00 M T= 0.15 M I - Item 105 -sub -grade Preparation Estimated Quantity = 49.0 Sq.m 49.0 Sq.m Sub-grade Preparation Ii- Item 200 Aggregate Subbase Coarse Estimated Quantity= 9.00 Cu.m A. Materials ( Delivered To Site ) 9.00 Cu.m Aggregate Subbase Coarse B. Labor 1 Foreman 4 Helper C. Equipment Rental ( For 1 Day ) 1 Unit Plate Compactor D. Hauling Cost 7.92 Cu.m Aggregate Subbase Coarse Iii Item 311- Portland Cement Concrete Pavement Estimated Quantity= 4.80 Cu.m A. Materials 67 Bags Cement 8 Cu.m 3/4 Crushed Gravel 4 Cu.m Washed Sand 177 Bdft 2" X 6" X 12 Ccl 2 Kgs Assorted Cw Nail C. Equipment Rental ( For 1 Day ) 1 Unit Concrete Bagger Mixer Special Item Spl 1 Project Billboard 1 Pc Project Billboard (8'x8') Spl Ii . Construction Safety & Health 1 Lot Const. Safety And Health Spl Iii - Photograph 1 Lot Photograph
Closing Soon2 Jan 2025
Tender AmountPHP 426.5 K (USD 7.2 K)
City Of Baton Rouge Parish Of East Baton Rouge Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
United States
Details: To Be Published Three Times-legal November 1, 8, & 15 2024 The Advocate Baton Rouge, Louisiana Notice To Contractors The City Of Baton Rouge And Parish Of East Baton Rouge Will Receive Electronic Or Paper Bids For The Construction Of The Following Project: Mall Of Louisiana Boulevard (rr Bridge And Pump Station) (city Parish Project No. 12-cs-hc-0043d) Project Description: Earthwork, Drainage Structures, Base Course, Portland Cement Concrete Pavement, Asphalt Pavement, Railroad Bridge, Mse Walls, Pump Station. Electronic Or Sealed Bids Will Be Received Until 2:00 P.m. Local Time, Tuesday, December 10, 2024, By The Purchasing Division, Room 826, City Hall, 222 Saint Louis Street, Baton Rouge, Louisiana 70802. No Bids Will Be Received After 2:00 P.m. On The Same Day And Date. Bid Openings Can Be Observed In Person Or Via Teleconference. Teleconference Call-in Information Join By Phone +1-408-418-9388 United States Toll Access Code: 263 373 080 (followed By The # Button) Alternate Numbers To Call If Number Above Is Not Available, Which May Occur Due To Network Traffic (use The Same Access Code, Followed By The # Button): United States Toll (boston) +1-617-315-0704 United States Toll (chicago) +1-312-535-8110 United States Toll (dallas) +1-469-210-7159 United States Toll (denver) +1-720-650-7664 United States Toll (jacksonville) +1-904-900-2303 United States Toll (los Angeles) +1-213-306-3065 Electronic Bids And Electronic Bid Bonds For The Solicitation Will Be Downloaded By The City Of Baton Rouge And Parish Of East Baton Rouge, Purchasing Division. Beginning As Soon As Feasible After The Bid Closing Time All Electronic Bids Will Be Downloaded And Publicly Read Aloud Along With All Paper Bids Received, If Any, In Room 806 Of City Hall Immediately After The 2:00 P.m. Bid Closing. Bids, Amendments To Bids, Or Request For Withdrawal Of Quotations, Received After Time Specified For Bid Opening Shall Not Be Considered For Any Cause Whatsoever. Bids Shall Be Firm For A Period Of Forty Five (45) Days From The Date Of The Opening Of Bids And No Bid Shall Be Withdrawn For Any Reason During This Period Of Time Except As Allowed Per R.s. 38:2214.c. Official Bid Documents Are Available At Central Bidding (www.centralbidding.com). Electronic Bids May Be Submitted At Central Bidding (www.centralbidding.com). For Questions Related To The Electronic Bidding Process, Please Call Central Bidding At (225) 810-4814. Paper Copies Of The Plans, Specifications And Contract Documents Are On File And May Be Obtained From The Public Works And Planning Center Located At 1100 Laurel St., Engineering Division, Room 137 Or Post Office Box 1471, Baton Rouge, Louisiana 70821, Upon Payment Of $95.00. (make Checks Payable To The City Of Baton Rouge And Parish Of East Baton Rouge.) Fees For Plans, Specifications And Contract Documents Are To Cover The Cost Of Reproduction And Are Non-refundable In Accordance With Louisiana Revised Statutes. A Certified Check Or Cashier's Check, Payable To The Parish Of East Baton Rouge Or A Satisfactory Bid Bond Executed By The Bidder And An Acceptable Surety, In An Amount Equal To Five Percent (5%) Of The Total Bid, Shall Be Submitted With Each Bid. Bids Shall Be Received Electronically Via Www.centralbidding.com Or On Solicitation Bid Forms Furnished By The City Of Baton Rouge And Parish East Baton Rouge, And Only Those Bids Shall Be Received By The City-parish Which Are Submitted By Those Contractors In Whose Names The Solicitation Bid Forms And/or Specifications Were Issued. In No Event Shall Paper Solicitation Forms Be Issued Later Than Twenty-four (24) Hours Prior To The Hour And Date Set For Receiving Proposals. The City Of Baton Rouge And Parish Of East Baton Rouge Has Established A Socially And Economically Disadvantaged Business Enterprise (sedbe) Program In Accordance With Revised Statute Rs 33:2233.4. It Is The Policy Of The Parish To Ensure That Eligible Business Enterprises Ebe’s, Certified In Accordance With The Parish Program, Have An Equal Opportunity To Receive And Participate In Parish Contracts. For This Project The Ebr Parish Purchasing Office Has Directed A Review Of The Scope Of Work And Has Established A Minimum Ebe Goal Of 10% Of The Contract Amount. All Bidders Shall Achieve This Goal Or Demonstrate Good Faith Efforts To Achieve The Goal. Good Faith Efforts Include Meeting This Ebe Goal Or Providing Documentation Demonstrating That The Bidder Made Sufficient Good Faith Efforts In Attempting To Meet This Goal. Only Ebe Firms Certified Under The Parish Sedbe Certification Program At The Time Of Submittal Of The Bid Will Count Toward This Ebe Goal. To Be Considered Responsive, The Apparent Low Bidder Must Submit Ebe Forms 1, 1a, And 2, And Letters Of Ebe Certification, As Appropriate Within 10 Days After Bid Opening. All Contractors Bidding On This Work Shall Comply With All Provisions Of The State Licensing Law For Contractors, R.s. 37:2150-2163, As Amended, For All Public Contracts. It Shall Also Be The Responsibility Of The General Contractor To Assure That All Subcontractors Comply With This Law. If Required For Bidding, Contractors Must Hold An Active License Issued By The Louisiana State Licensing Board For Contractors In The Classification Of Highway, Street, And Bridge Construction And Heavy Constuction, And Must Show Their License Number On The Face Of The Bid Envelope And The Uniform Public Works Bid Form. In Accordance With La. R.s. 38:2214 (b) The City Of Baton Rouge And Parish Of East Baton Rouge Reserves The Right To Reject Any And All Bids For Just Cause. In Accordance With La. R.s. 38:2212 (a)(1)(b), The Provisions And Requirements Of This Section, Those Stated In The Advertisement For Bids, And Those Required On The Bid Form, Shall Not Be Considered As Informalities And Shall Not Be Waived By Any Public Entity. Bidders Must Comply With The Sedbe Program. Copies Of Sedbe Program Documents Are Available Upon Request From City Of Baton Rouge And Parish Of East Baton Rouge (“city-parish”) Purchasing Division, 222 St. Louis Street, 8th Floor, Room 826, Baton Rouge, La 70802. For Questions Or Clarification About The Program, Please Contact The Sedbe Liaison Officer At The Purchasing Division, At (225) 389-3259. There Will Be No Pre-bid Conference. For All Other Questions Of Comments Concerning The Project Plans, Specifications, Or Bidding Documents Please Contact Kate Prejean, Avp, Pe At 1-225-405-5363 Or Kbprejean@hntb.com. Review Additional Notice To Bidder In Part 2 For Information Related To Kansas City Southern Railway Company Requirements Of The Contractor.
Closing Date7 Jan 2025
Tender AmountRefer Documents
National Academy Of Science And Technology Tender
Telecommunication Services
Corrigendum : Closing Date Modified
Philippines
Details: Description Please Quote Your Best Offer/proposal For The Items/ Described Below. Subscription For One (1) Year Dedicated Internet Service For Year 2025 Specifications: Guaranteed Internet Bandwidth Should Be At Least 100mbps With /29 Public Ip Address Provision Of Diagnostic Reports And Updates In Case Of Connection Failure Provision Of Monthly Utilization Graphs And/or Mrtg Tool For Monitoring Of Link Quality And Bandwidth Utilization Provision Of 24x7 Support Services Provide 99.5% Link Uptime In A Month (4 Hours Allowable Monthly Downtime) Submission Of Service Level Agreement Dedicated Account Manager To Provide A Single Point Of Contact Fiber Optic Cable Connection Bidders Must Provide Its Own Fiber Facility And Not Rely On Other Providers To Deliver Its Services Billing Cycle: Monthly Abc: P528,000.00 Sealed Quotation/proposals May Be Delivered To: The Chair, Nast Bids And Awards Committee National Academy Of Science And Technology 3rd Level Science Heritage Building, Dost Compound Bicutan, Taguig City The Deadline For Submission Of Quotation Is On December 27, 2024 At 11:00am. Ms. Virginia Francia O. Gavica Administrative Officer Iii Nast-bac Secretariat Notes: 1. All Entries Must Be Typewritten And Signed By The Company’s Authorized Representative. 2. Price Validity Shall Be For A Period Of Fifteen (15) Calendar Days. 3. Nast Reserves The Right To Accept Or Reject Any Or All Quotations And To Impose Additional Terms And Conditions It May Deem Proper. 4. Suppliers/contractors Must Submit The Eligibility Requirements Listed Below Together With Their Quotation/proposal. 5. This Is A Negotiated Procurement/small Value Procurement Because The Abc Is Less Than P1,000,000.00. List Of Eligibility Requirements (to Be Submitted Together With The Quotation) 1. Mayor’s Permit (latest) 2. Certificate Of Philgeps Registration/philgeps Registration Number. 3. Income/business Tax Return. 4. Bir Certificate Of Registration 5. Notarized Omnibus Sworn Statement Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] ______________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice]
Closing Soon27 Dec 2024
Tender AmountPHP 528 K (USD 8.9 K)
City Of Baton Rouge Parish Of East Baton Rouge Tender
Civil And Construction...+1Others
United States
Details: To Be Published Three Times-legal December 20, 27, 2024, And January 3, 2025 The Advocate Baton Rouge, Louisiana Notice To Contractors The City Of Baton Rouge And Parish Of East Baton Rouge Will Receive Electronic Or Paper Bids For The Construction Of The Following Project: Hundred Oaks Ave. Sidewalks (perkins Rd. - S. Acadian Thwy) Project City Parish Project No. 23-en-hc-0016 Project Description: Portland Cement Concrete Sidewalk, Concrete Curbs, Handicap Ramps, Striping, And Associated Items Of Work. Electronic Or Sealed Bids Will Be Received Until 2:00 P.m. Local Time, Tuesday, January 14, 2025, By The Purchasing Division, Room 826, City Hall, 222 Saint Louis Street, Baton Rouge, Louisiana 70802. No Bids Will Be Received After 2:00 P.m. On The Same Day And Date. Bid Openings Can Be Observed In Person Or Via Teleconference. Teleconference Call-in Information Join By Phone +1-408-418-9388 United States Toll Access Code: 263 373 080 (followed By The # Button) Alternate Numbers To Call If Number Above Is Not Available, Which May Occur Due To Network Traffic (use The Same Access Code, Followed By The # Button): United States Toll (boston) +1-617-315-0704 United States Toll (chicago) +1-312-535-8110 United States Toll (dallas) +1-469-210-7159 United States Toll (denver) +1-720-650-7664 United States Toll (jacksonville) +1-904-900-2303 United States Toll (los Angeles) +1-213-306-3065 Electronic Bids And Electronic Bid Bonds For The Solicitation Will Be Downloaded By The City Of Baton Rouge And Parish Of East Baton Rouge, Purchasing Division. Beginning As Soon As Feasible After The Bid Closing Time All Electronic Bids Will Be Downloaded And Publicly Read Aloud Along With All Paper Bids Received, If Any, In Room 806 Of City Hall Immediately After The 2:00 P.m. Bid Closing. Bids, Amendments To Bids, Or Request For Withdrawal Of Quotations, Received After Time Specified For Bid Opening Shall Not Be Considered For Any Cause Whatsoever. Bids Shall Be Firm For A Period Of Forty Five (45) Days From The Date Of The Opening Of Bids And No Bid Shall Be Withdrawn For Any Reason During This Period Of Time Except As Allowed Per R.s. 38:2214.c. Official Bid Documents Are Available At Central Bidding (www.centralbidding.com). Electronic Bids May Be Submitted At Central Bidding (www.centralbidding.com). For Questions Related To The Electronic Bidding Form Revised To Include Ebe Requirements May 25, 2023 Nc 1 Of 2 Process, Please Call Central Bidding At (225) 810-4814. Paper Copies Of The Plans, Specifications And Contract Documents Are On File And May Be Obtained From The Public Works And Planning Center Located At 1100 Laurel St., Engineering Division, Room 137 Or Post Office Box 1471, Baton Rouge, Louisiana 70821, Upon Payment Of $20.00. (make Checks Payable To The City Of Baton Rouge And Parish Of East Baton Rouge.) Fees For Plans, Specifications And Contract Documents Are To Cover The Cost Of Reproduction And Are Non-refundable In Accordance With Louisiana Revised Statutes. A Certified Check Or Cashier's Check, Payable To The Parish Of East Baton Rouge Or A Satisfactory Bid Bond Executed By The Bidder And An Acceptable Surety, In An Amount Equal To Five Percent (5%) Of The Total Bid, Shall Be Submitted With Each Bid. Bids Shall Be Received Electronically Via Www.centralbidding.com Or On Solicitation Bid Forms Furnished By The City Of Baton Rouge And Parish East Baton Rouge, And Only Those Bids Shall Be Received By The City-parish Which Are Submitted By Those Contractors In Whose Names The Solicitation Bid Forms And/or Specifications Were Issued. In No Event Shall Paper Solicitation Forms Be Issued Later Than Twenty-four (24) Hours Prior To The Hour And Date Set For Receiving Proposals. The City Of Baton Rouge And Parish Of East Baton Rouge Has Established A Socially And Economically Disadvantaged Business Enterprise (sedbe) Program In Accordance With Revised Statute Rs 33:2233.4. It Is The Policy Of The Parish To Ensure That Eligible Business Enterprises Ebe’s, Certified In Accordance With The Parish Program, Have An Equal Opportunity To Receive And Participate In Parish Contracts. For This Project The Ebr Parish Purchasing Office Has Directed A Review Of The Scope Of Work And Has Established A Minimum Ebe Goal Of 17% Of The Contract Amount. All Bidders Shall Achieve This Goal Or Demonstrate Good Faith Efforts To Achieve The Goal. Good Faith Efforts Include Meeting This Ebe Goal Or Providing Documentation Demonstrating That The Bidder Made Sufficient Good Faith Efforts In Attempting To Meet This Goal. Only Ebe Firms Certified Under The Parish Sedbe Certification Program At The Time Of Submittal Of The Bid Will Count Toward This Ebe Goal. To Be Considered Responsive, The Apparent Low Bidder Must Submit Ebe Forms 1, 1a, And 2, And Letters Of Ebe Certification, As Appropriate Within 10 Days After Bid Opening. All Contractors Bidding On This Work Shall Comply With All Provisions Of The State Licensing Law For Contractors, R.s. 37:2150-2163, As Amended, For All Public Contracts. It Shall Also Be The Responsibility Of The General Contractor To Assure That All Subcontractors Comply With This Law. If Required For Bidding, Contractors Must Hold An Active License Issued By The Louisiana State Licensing Board For Contractors In The Classification Of Highway, Street, And Bridge Construction, And Must Show Their License Number On The Face Of The Bid Envelope And The Uniform Public Works Bid Form. In Accordance With La. R.s. 38:2214 (b) The City Of Baton Rouge And Parish Of East Baton Rouge Reserves The Right To Reject Any And All Bids For Just Cause. In Accordance With La. R.s. 38:2212 (a)(1)(b), The Provisions And Requirements Of This Section, Those Stated In The Advertisement For Bids, And Those Required On The Bid Form, Shall Not Be Considered As Informalities And Shall Not Be Waived By Any Public Entity. Bidders Must Comply With The Sedbe Program. Copies Of Sedbe Program Documents Are Available Upon Request From City Of Baton Rouge And Parish Of East Baton Rouge (“city-parish”) Purchasing Division, 222 St. Louis Street, 8th Floor, Room 826, Baton Rouge, La 70802. For Questions Or Clarification About The Program, Please Contact The Sedbe Liaison Officer At The Purchasing Division, At (225) 389-3259. There Will Be No Pre-bid Conference. For Additional Information Please Contact Mr. Alex Farr, P.e, Project Manager At (225) 298-0800 Or Email At Alex.farr@waggonereng.com Or Mr. George Chike, P.e., Project Manager At (225) 389-3186 X5640 Or Email At Gchike@brla.gov.
Closing Date14 Jan 2025
Tender AmountRefer Documents
City Of Baton Rouge Parish Of East Baton Rouge Tender
Civil And Construction...+1Civil Works Others
United States
Details: To Be Published Three Times-legal December 6, 13, And 20, 2024 Baton Rouge, Louisiana Notice To Contractors The City Of Baton Rouge And Parish Of East Baton Rouge Will Receive Electronic Or Paper Bids For The Construction Of The Following Project: Evangeline St. – Alamonster Dr. Area Ada Transition Project (city Parish Project No. 20-en-hc-0063-01) Project Description: Portland Cement Concrete Sidewalks, Driveways, Concrete Curbs, Ada Ramps, Striping, And Related Work. Electronic Or Sealed Bids Will Be Received Until 2:00 P.m. Local Time, Tuesday, January 7, 2025, By The Purchasing Division, Room 826, City Hall, 222 Saint Louis Street, Baton Rouge, Louisiana 70802. No Bids Will Be Received After 2:00 P.m. On The Same Day And Date. Bid Openings Can Be Observed In Person Or Via Teleconference. Teleconference Call-in Information Join By Phone +1-408-418-9388 United States Toll Access Code: 263 373 080 (followed By The # Button) Alternate Numbers To Call If Number Above Is Not Available, Which May Occur Due To Network Traffic (use The Same Access Code, Followed By The # Button): United States Toll (boston) +1-617-315-0704 United States Toll (chicago) +1-312-535-8110 United States Toll (dallas) +1-469-210-7159 United States Toll (denver) +1-720-650-7664 United States Toll (jacksonville) +1-904-900-2303 United States Toll (los Angeles) +1-213-306-3065 Electronic Bids And Electronic Bid Bonds For The Solicitation Will Be Downloaded By The City Of Baton Rouge And Parish Of East Baton Rouge, Purchasing Division. Beginning As Soon As Feasible After The Bid Closing Time All Electronic Bids Will Be Downloaded And Publicly Read Aloud Along With All Paper Bids Received, If Any, In Room 806 Of City Hall Immediately After The 2:00 P.m. Bid Closing. Bids, Amendments To Bids, Or Request For Withdrawal Of Quotations, Received After Time Specified For Bid Opening Shall Not Be Considered For Any Cause Whatsoever. Bids Shall Be Firm For A Period Of Forty Five (45) Days From The Date Of The Opening Of Bids And No Bid Shall Be Withdrawn For Any Reason During This Period Of Time Except As Allowed Per R.s. 38:2214.c. Official Bid Documents Are Available At Central Bidding (www.centralbidding.com). Electronic Bids May Be Submitted At Central Bidding (www.centralbidding.com). For Questions Related To The Electronic Bidding Process, Please Call Central Bidding At (225) 810-4814. Paper Copies Of The Plans, Specifications And Contract Documents Are On File And May Be Obtained From The Public Works And Planning Center Located At 1100 Laurel St., Engineering Division, Room 137 Or Post Office Box 1471, Baton Rouge, Louisiana 70821, Upon Payment Of $20.00. (make Checks Payable To The City Of Baton Rouge And Parish Of East Baton Rouge.) Fees For Plans, Specifications Form Revised Nov 13, 2013 And Contract Documents Are To Cover The Cost Of Reproduction And Are Non-refundable In Accordance With Louisiana Revised Statutes. A Certified Check Or Cashier's Check, Payable To The Parish Of East Baton Rouge Or A Satisfactory Bid Bond Executed By The Bidder And An Acceptable Surety, In An Amount Equal To Five Percent (5%) Of The Total Bid, Shall Be Submitted With Each Bid. Bids Shall Be Received Electronically Via Www.centralbidding.com Or On Solicitation Bid Forms Furnished By The City Of Baton Rouge And Parish East Baton Rouge, And Only Those Bids Shall Be Received By The City-parish Which Are Submitted By Those Contractors In Whose Names The Solicitation Bid Forms And/or Specifications Were Issued. In No Event Shall Paper Solicitation Forms Be Issued Later Than Twenty-four (24) Hours Prior To The Hour And Date Set For Receiving Proposals. The City Of Baton Rouge And Parish Of East Baton Rouge Has Established A Socially And Economically Disadvantaged Business Enterprise (sedbe) Program In Accordance With Revised Statute Rs 33:2233.4. It Is The Policy Of The Parish To Ensure That Eligible Business Enterprises Ebe’s, Certified In Accordance With The Parish Program, Have An Equal Opportunity To Receive And Participate In Parish Contracts. For This Project The Ebr Parish Purchasing Office Has Directed A Review Of The Scope Of Work And Has Established A Minimum Ebe Goal Of 18% Of The Contract Amount. All Bidders Shall Achieve This Goal Or Demonstrate Good Faith Efforts To Achieve The Goal. Good Faith Efforts Include Meeting This Ebe Goal Or Providing Documentation Demonstrating That The Bidder Made Sufficient Good Faith Efforts In Attempting To Meet This Goal. Only Ebe Firms Certified Under The Parish Sedbe Certification Program At The Time Of Submittal Of The Bid Will Count Toward This Ebe Goal. To Be Considered Responsive, The Apparent Low Bidder Must Submit Ebe Forms 1, 1a, And 2, And Letters Of Ebe Certification, As Appropriate Within 10 Days After Bid Opening. All Contractors Bidding On This Work Shall Comply With All Provisions Of The State Licensing Law For Contractors, R.s. 37:2150-2163, As Amended, For All Public Contracts. It Shall Also Be The Responsibility Of The General Contractor To Assure That All Subcontractors Comply With This Law. If Required For Bidding, Contractors Must Hold An Active License Issued By The Louisiana State Licensing Board For Contractors In The Classification Of Highway, Street, And Bridge Construction, And Must Show Their License Number On The Face Of The Bid Envelope And The Uniform Public Works Bid Form. In Accordance With La. R.s. 38:2214 (b) The City Of Baton Rouge And Parish Of East Baton Rouge Reserves The Right To Reject Any And All Bids For Just Cause. In Accordance With La. R.s. 38:2212 (a)(1)(b), The Provisions And Requirements Of This Section, Those Stated In The Advertisement For Bids, And Those Required On The Bid Form, Shall Not Be Considered As Informalities And Shall Not Be Waived By Any Public Entity. Bidders Must Comply With The Sedbe Program. Copies Of Sedbe Program Documents Are Available Upon Request From City Of Baton Rouge And Parish Of East Baton Rouge (“city-parish”) Purchasing Division, 222 St. Louis Street, 8th Floor, Room 826, Baton Rouge, La 70802. For Questions Or Clarification About The Program, Please Contact The Sedbe Liaison Officer At The Purchasing Division, At (225) 389-3259. There Will Be No Pre-bid Conference. For Additional Information Please Contact Mr. Alex Farr, P.e, Project Manager At (225) 298-0800 Or Email At Alex.farr@waggonereng.com Or Mr. George Chike, P.e, Project Manager At (225) 389-3186 X5640 Or Email At Gchike@brla.gov.
Closing Date7 Jan 2025
Tender AmountRefer Documents
City Of Abbeville Tender
Civil And Construction...+2Drainage Work, Water Storage And Supply
United States
Details: Notice To Bidders Notice Is Hereby Given That Sealed Bids Will Be Received By The Mayor And Council Of The City Of Abbeville, Vermilion Parish, Louisiana, On-line With Http://www.centralbidding.com And At 101 North State Street, In The Council Meeting Room, Abbeville, Louisiana, Until 2:00 P.m., Thursday, February 6, 2025, For: Water Treatment Plant Improvements For The City Of Abbeville And The Bids Will Be Opened And Publicly Read Aloud At That Time. Bids Received After The Specified Time Will Not Be Considered. The Project Consists Of Constructing – A New Solids Contact Clarifier, A New Waste Sludge Pump Station, A New Sludge Thickener With A Sludge Withdrawal Pump Station, A New Backwash Transfer Pump Station, A New Backwash Settling Tank, Yard Piping Modifications, Lime Feed System Modifications, Chemical Feed System Modifications, Electrical Work, And Associated Miscellaneous Work. The Project Is Funded By The Doa/ocd – Water Sector Program And By The Ldh Drinking Water Revolving Loan Fund As Well As A Grant From The Delta Regional Authority. Bids Will Be Received For A Single Prime Contract. Bids Shall Be On A Lump Sum And Unit Price Basis, With Additive Alternate Bid Items As Indicated In The Bid Form. A Mandatory Pre-bid Conference Will Be Held At 2:00 P.m. On Wednesday, January 29, 2025, At The City Council Meeting Room, Located At 101 North State Street, Abbeville, La 70511. Only The Bids Of Contractors Licensed Under Louisiana Contractor’s Licensing Law Under Chapter 24 Of Title 37 Of The Louisiana Revised Statutes Will Be Considered For Bids Exceeding $50,000.00. Should The Bid Exceed $50,000.00, Contractors Desiring To Bid Shall Hold License Of Proper Classification Under “municipal And Public Works Construction” And/or “heavy Construction” In Full Force And Effect At The Time Drawings, Specifications, And Forms Are Requested From The Office Of The Engineers. As Evidence Of Good Faith Of The Bidder, A “bid Guarantee” Equivalent To 5% Of The Base Bid Plus Any Additive Alternates, Consisting Of A Firm Commitment, Such As A Bid Bond, Certified Check, Or Cashier’s Check, Shall Accompany Each Bid As Assurance That The Bidder Will, Upon Acceptance Of His Bid, Execute Such Contractual Documents As May Be Required And Within The Time Specified. If A Bid Bond Is Used, It Shall Be Written By A Surety Or Insurance Company Currently On The U.s. Department Of The Treasury Financial Management Service List Of Approved Bonding Companies, Which Is Published Annually In The Federal Register, Or By A Louisiana Domiciled Insurance Company With At Least An “a–” Rating In The Latest Printing Of The A.m. Best’s Key Rating Guide To Write Individual Bonds Up To 10% Of Policyholders’ Surplus, As Shown In The A.m. Best’s Key Rating Guide, Or By An Insurance Company In Good Standing Licensed To Write Bid Bonds Which Is Either Domiciled In Louisiana Or Owned By Louisiana Residents. The Successful Contractor Will Be Required To Execute A Performance Bond And A Payment Bond In The Full Amount Of The Contract As More Fully Defined In The Bidding Documents. Bidding Documents (plans, Specifications, And Any Published Addenda) May Be Examined And Obtained On All Business Days At The Following Location During The Specified Hours: 1. Sellers & Associates, Inc., 148-b Easy Street, Lafayette, La 70506-3095telephone: 337.232.0777 / Fax: 337.232.0851 Monday - Thursday: 7:30 A.m. To 12:00 Noon And 1:00 P.m. To 5:30 P.m. Friday: 8:00 A.m. To 12:00 Noon 2. The City Of Abbeville’s On-line Bid Submittal Service. Contractors, Sub-contractors, And Suppliers May Also View And Download The Plans, Specifications, And Any Published Addenda At Https://www.centralbidding.com. For Assistance On How To Register On-line Or If Encountering Problems With The Web Site, Contact 225.810.4814 Or 866.570.9620. Properly Licensed Contractors Submitting Bids Electronically Are Required To Provide The Same Documents As Contractors Submitting Through The Mail Or By Hand Delivery. These Items Include The Bid Form, Bid Security With Power Of Attorney Certification, And Certificate Of Resolution/authority. Regardless Of The Bid Results, The Contractor Will Have 48-hours From Opening Of Bids To Provide The Owner The Original Documents. If A Certified Check Or Cashier’s Check Is Submitted As The Bid Security, Electronic Copies Of Both The Front And Back Of The Check Shall Be Included With The Electronic Bid. If A Contractor Fails To Provide The Original Hard Copies Of These Documents Within 48-hours Of The Bid Opening, Bid Shall Be Considered Non-responsive. 3. A $201.00 Deposit On A Set Of Paper Documents Shall Be Fully Refunded Upon Return Of The Paper Documents No Later Than 10-days After Receipt Of Bids. On Other Sets Of Documents Furnished, The Deposit Less The Actual Cost Of Reproduction ($196.00), Shall Be Refunded Upon Return Of The Documents No Later Than 10-days After Receipt Of Bids. 4. Complete Bid Documents For This Project Are Also Available In Electronic Form And May Be Obtained Without Charge And Without Deposit From Sellers & Associates, Inc. Plan Holders Are Responsible For Their Own Reproduction Costs. 5. Ordering Plans And Specifications Shall Be Directed To: Adegeyter@sellersandassociates.com Project Questions Shall Be Directed To The Design Engineer: Jak@sellersandassociates.com Ldh-dwrlf Statements: “equal Opportunity In Employment”: All Qualified Applicants Will Receive Consideration For Employment Without Regard For Race, Color, Religion, Sex, Or National Origin. Bidders On This Work Will Be Required To Comply With The President’s Executive Order No. 11246, As Amended. The Requirements For Bidders And Contractors Under This Order Are Explained In The Specifications. “wage Determinations”: “the Bidding Documents Include A Wage Determination For The Project Based On The Current U.s. Department Of Labor Wage Rates Obtained From Wage Determinations Online (http://www.wdol.gov). The Wage Determination Will Be Re-checked Ten Days Before The Bid Opening, And If It Has Been Revised, The Revised Version Will Be Issued To Bidders As An Addendum”. Bidding Documents Shall Be Available Until Twenty-four (24) Hours Before The Bid Opening Date. No Bidder May Withdraw His Bid For At Least 45-days After The Time Scheduled For The Opening Of Bids. Each Bid Shall Be Submitted Only On The Louisiana Uniform Public Work Bid Form Provided In The Specifications. The Owner Reserves The Right To Reject Any And All Bids For Just Cause. In Accordance With R.s. §38:2212, The Provisions And Requirements Of This Section And Those Stated In The Bidding Documents Shall Not Be Waived By Any Public Entity. By Order Of The Aldermen Of The City Of Abbeville, Abbeville, La. S/roslyn White S/kathleen Faulk Mayors City Clerk Publication Dates: Wednesday: December 18, 2024, January 8, 2025, And January 15, 2025 Official Journal: The Abbeville Meridional
Closing Date6 Feb 2025
Tender AmountRefer Documents
National Academy Of Science And Technology Tender
Software and IT Solutions
Corrigendum : Closing Date Modified
Philippines
Details: Description Please Quote Your Best Offer/proposal For The Items/ Described Below. Ten (10) Months Subscription Of Cloud Computing, Collaboration, And Productivity Tools And Software Specifications: Types Of Subscription: Business Standard Number Of Users: Eighty (80) Custom Email With Domain Name (nast.dost.gov.ph) Cloud Based Collaboration And Productivity Tools And Software The Collaboration And Productivity Tools And Software Includes: 1) Web-based Email Service 2) File Storage And Synchronization Service (up To 2tb Disk Space) 3) Video Conferencing Application 4) Online Calendar 5) Survey Application 6) Productivity Applications 7) Communication Software Other Requirements: Twenty-four/seven (24/7) Technical Support (initial Setup, Licensing, Basic Administration) Provide Services For The Data Migration And Renewal Of Existing Account (customer Account Id Will Be Provided) Technical Training: 2 It Admin Only Provision Of Additional Users Supplier Must Be Authorized Supplier/reseller Billing Cycle: One-time Payment Upon Delivery And Activation Activation Date: February 19, 2025 Abc: Php780,063.36 Sealed Quotation/proposals May Be Delivered To: The Chair, Nast Bids And Awards Committee National Academy Of Science And Technology 3rd Level Science Heritage Building, Dost Compound Bicutan, Taguig City The Deadline For Submission Of Quotation Is On January 3, 2025 At 12:00nn. Ms. Virginia Francia O. Gavica Administrative Officer Iii Nast-bac Secretariat Notes: 1. All Entries Must Be Typewritten And Signed By The Company’s Authorized Representative. 2. Price Validity Shall Be For A Period Of Fifteen (15) Calendar Days. 3. Nast Reserves The Right To Accept Or Reject Any Or All Quotations And To Impose Additional Terms And Conditions It May Deem Proper. 4. Suppliers/contractors Must Submit The Eligibility Requirements Listed Below Together With Their Quotation/proposal. 5. This Is A Negotiated Procurement/small Value Procurement Because The Abc Is Less Than P1,000,000.00. List Of Eligibility Requirements (to Be Submitted Together With The Quotation) 1. Mayor’s Permit (latest) 2. Certificate Of Philgeps Registration/philgeps Registration Number. 3. Income/business Tax Return. 4. Bir Certificate Of Registration 5. Notarized Omnibus Sworn Statement Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] ______________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice]
Closing Soon3 Jan 2025
Tender AmountPHP 780 K (USD 13.2 K)
Department Of Agrarian Reform - DAR Tender
Security and Emergency Services...+1Manpower Supply
Corrigendum : Closing Date Modified
Philippines
Details: Description Technical Specifications Terms Of Reference Provision Of Security Services For F.y. 2025 Introduction The Department Of Agrarian Reform Provincial Office (darpo) Of Zamboanga Del Sur Shall Engage The Services Of A Security Agency In Accordance With Republic Act 11917, Also Known As “the Private Security Services Industry Act”, That Will Provide Duly Licensed, Adequately Trained, And Armed Security Guards To Secure And Safeguard The Employees, The Office Building, Equipment, Vehicles And Other Office Properties, Including Its Premises And Immediate Vicinity From Theft, Pilferage, Robbery, Arson, And Other Unlawful Acts Of Strangers, Third Parties And /or Its Employees And Maintain Peace And Order Thereof At All Times For The Year 2025. General Requirements 1. Complete Licenses And Accreditations As Required In The Eligibility Requirements In The Bidding Documents Including The License To Operate From The Supervisory Office For Security And Investigation Agencies Or (pnp-sosia), License To Exercise Security Profession (lesp) Issued By The Chief, Pnp Through Chief, Sosia, And Membership In The Philippine Association Of 2. Department Of Labor And Employment Registration; 3. Agency Experience Of At Least Five (5) Years; 4. Security Guard Must Possess The Following Qualifications: A Filipino Citizen At Least 21 Years Old; Physically And Mentally Fit; Have A Good Moral Character; A Graduate Of High School From Any Deped Recognized Secondary School Whether Public Or Private; Completed The Necessary Pre-licensing Training Program The Pltp/rtc; With Experience Of At Least 1 Year As Security Guard; Secured A Valid License To Exercise Security Profession (lesp) Issued By The Chief, Pnp Through Chief, Sosia, Recognizing Him/her To Be Qualified To Perform The Duties Of A Private Security Professional In Accordance With Section 13 Of Ra 11917; Acquired The Required Number Of Training Hours On Public Safety And Security Set By The Philippine National Police (pnp); Must Undergo And Pass The Required Psycho-neuro Examination And Drug Test Conducted By A Pnp/nbi-accredited Testing Centers Within The Last Six (6) Months; Secured A Valid Firing Certificate 5. Security Guard Must Not Have Committed Any Unlawful Act Nor Shown Misbehavior/unethical Conduct That Can Be Reasonable Grounds For Disqualification Under Section 21 Of Ra 11917. Grounds For Disqualification: Having Been Convicted Of Any Crime Or Offense Involving Moral Turpitude; Having Been Dishonorably Discharged Or Separated From Employment Or Service; Being Mentally Incompetent; Being A User Or Addicted To The Use Of Dangerous Drugs Or Narcotics; Being A Habitual Drunkard; Dummy Of A Foreigner 6. The Security Agency Has Fully Remitted Premium Payments Of Personnel To The Sss, Hdmf, And Phic For The Last Three (3) Months – To Be Checked During The Post-qualification Of The Lowest Calculated Bidder. 7. The Security Agency Has Established An Office In Pagadian City. Logistical Requirements The Security Agency Shall Provide The Following Minimum Logistical Support To The Security Guards: 1. At Least 1 Set Of Proper Agency Uniform With Visible Identification Badges (free Of Charge To The Guard) 2. 1 Unit Of A Licensed .38 Caliber Pistol Or 1 Unit 9mm Pistol With Ammunition 3. 1 Whistle For Each Of The 6 Security Guards 4. 1 Ac-dc Flashlight 5. 1 Unit Metal Detector 6. 1 Unit Handcuffs 7. 2 Units Umbrella 8. 1 Unit Night Stick 9. Timepiece (synchronized) 10. Writing Pen 11. Notebook And Duty Checklist (electronic Or Not) 12. First Aid Kit 13. Electronic And/or Communication Devices The Dar Shall Provide The Following Counterpart Support: 1. 6 Units Of Fire Extinguishers 2. 6 Units Of Emergency Lights 3. 2 Logbooks The Security Guard Shall Provide For Himself/herself An Extra Set Of Uniform Charged To His/her Personal Account As Per Section 204 Of Ra 11917. Total Number Of Guards Total Number Of Security Guards To Be Deployed 24/7 In Three (3) Intervals Is Six (6). Duty Detail And Area Of Coverage A. Security Services Shall Be Performed 24/7 In Three (3) Shifts At The Provincial Office Of The Dar In Acs Building, Barangay Dao, Pagadian City, Following The Duty Detail Indicated Hereunder: Time Schedule Post Two (2) Guards From 0700h To 1500h – Day Shift Main Entrance Two (2) Guards From 1500h To 2300h – Afternoon Shift Main Entrance Two (2) Guards From 2300h To 0700h – Night Shift Main Entrance B. Each Guard Shall Have A Regular 8-hour Tour Of Duty, Unless When Expressly Required In Writing By Darpo Management That An Overtime For A Maximum Of Four (4) Hours (such As During Late Night/extended Office Activities) Shall Be Taken By The Assigned Security Guards On Specific Posts. C. The Darpo Management Shall Inform The Security Agency In Writing In Case Of Changes In The Duty Detail. Manual Of Operations The Engagement Shall Cover The Following: A. Posting Station Shall Be At The Main Entrance Of The Office Building. B. Control Of Ingress And Egress Of Employees, Clients, And Other Visitors By Regular Updating Of The Logbook To Be Provided By The Dar. C. Conduct Of I.d. Verification And Body Search On All Incoming Clients, Guests, And Other Visitors And Require Them To Deposit Their Firearms And Other Deadly Weapons Before They Be Allowed To Enter The Office Building. D. Recording Of The Incoming And Outgoing Of All Vehicles (darpo’s And Others’) Entering The Office Premises. E. Roving/inspection Of The Office Premises Shall Be Done Two (2) Times In Every Duty Shift. F. Strict Observance Of The Eleven (11) General Orders As Mandated By Section 244 Of Ra 11917 And Its Irr. G. In Case Of Emergency/untoward Incidents (fire, Pilferage, Vandalism, Trespass, Robbery, Arson, Sabotage, Attack, Bomb Scare And Other Forms Of Security Threats) The Security Guard Shall First Attend To The Situation, Maintain Peace And Order Of Things, And Facilitate The Preservation Of Proofs/evidence Of Crime. The Security Guard Shall Immediately Notify The Fire And Police Departments For Reinforcement And Make A Spot Report To Aid The Police In The Conduct Of Investigation. H. The Security Guards Shall Be Under The Supervision And Control Of The General Services Officer (gso)/administrative Officer Iv (ao Iv) Of The Darpo; And Shall Facilitate Implementation Of Internal Office Policies, Rules And Regulations Such As The Policy On Austerity (turning Off Of Lights And Office Equipment When Not In Use); The Policy On Security And Safety (require Guests To Present And Deposit Ids, Firearms/weapons); The Policy On Attendance (require All Employees To Log In And Log Out On The Biometrics Machine); And The New Normal Health & Safety Protocol (enforcement Of The Wearing Of Face Mask, Maintenance Of Social Distancing, Sanitizing Of Hands Of Incoming Personnel/guests). I. Weekly Evaluation/surprise Inspection By A Security Agency Officer Shall Be Done To Ensure That Efficiency, Alertness And Discipline Are Instilled And Practiced By The Guards At All Times In The Performance Of Their Duties And Functions; The Security Agency Officer Shall Ensure That There Is Regular Compliance/implementation Of Security Measures, Procedures And Systems Adopted/applied In The Darpo. J. The Security Agency Shall Provide Opportunities For Skills Upgrading For The Security Guards Such As The Latter’s Enrollment To Security Training Courses, Attendance To Seminars On Personal Security Awareness, Disaster-preparedness And Other Significant Seminars That Will Increase The Level Of Knowledge, Skills And Expertise Of The Guards In Their Field Of Work. K. No Replacement/s Of Security Personnel/guards During The Effectivity Of The Contract Shall Be Allowed, Except Of Death, Resignation From Work, Physical Incapability Etc., Of The Guards Assigned. In The Event That Replacement Of The Security Guards Is Needed, A Written Notice Together With A Bio-data And Credentials Of The Replacements Are Required And This Shall Be Subject To The Approval Of The Darpo Management. L. The Darpo Shall Have The Absolute Right To Ask For The Relief And Replacement Of Any Security Guard In Whom The Former Has Lost Its Trust And Confidence And/or Has Been Found To Be Inefficient And Ineffective In The Discharge Of Duties. M. Supervising Personnel From The Security Agency Shall Conduct Regular Monitoring And Surprise Checking Of The Guards And/or As Requested By The Darpo Management To Ensure Consistent And Quality Security Service. N. The Security Agency Shall Ensure Complete And Timely Payment Of Premium Contributions Due To The Sss, Philhealth And Hdmf As Its Faithful Compliance To Its Written Undertaking Submitted As Part Of Its Bid. Proofs Of Payment Of Social Premium Remittances To Sss, Phic, And Hdmf Shall Be Submitted To The Darpo-sto Division On A Quarterly Basis. O. The Security Agency Shall Submit To The Darpo-sto Division On A Monthly Basis, Copy Of The Payroll Of The Assigned Security Guards And The Corresponding Statement Of Account. Such Payroll And Soa Are Pre-requisites To The Processing Of The Monthly Payment To The Security Agency. Inspection And Performance Assessment A. The Darpo Management Or Its Duly Designated General Services Officer (gso)/administrative Officer Iv (ao Iv) Shall Have The Right To Inspect The Guards Assigned By The Security Agency At Any Time; B. The Darpo Management Or Its Duly Designated Gso Or Ao Iv Shall Have The Right To Conduct Inspection And Performance Assessment To Determine The Quality And Acceptability Of The Services Being Performed By The Guards In Accordance With The Contract; C. On The Basis Of The Result Of The Aforementioned Inspection And Performance Assessment And At The Sound Discretion Of The Darpo Management Through Its Provincial Agrarian Reform Program Officer Ii, The Latter Shall Have The Right To Demand For The Temporary/permanent Replacement Of The Security Guards On Detail; D. As Part Of Darpo Management’s Precautionary And Safety Measures In Implementing The Security Services Contract, The Security Guards Shall Undergo Drug Test At Least Once A Year In An Accredited Pnp Drug Testing Center Or When Required By The Darpo Management. Security Plan The Security Agency Shall Submit A Security Plan That Assesses Security Risks, Develops Measures To Minimize The Risks, Formalizes The Procedures That Will Be Followed To Respond To Security Incidents And The Subsequent Procedures To Undertake In Reporting Such Security Incidents. In Addition, The Security Agency Shall Integrate The Herein Prescribed Security Policies, Rules, Regulations And Procedures Of The Dar-zds With Its Existing Security Protocols And Standards Of Practice In Accordance With R.a. 11917, Also Known As “the Private Security Services Industry Act”. Other Conditions A. There Shall Be No Employer-employee Relationship Between The Darpo Management And The Security -agency/guards During The Engagement Of The Latter Service/s Nor The Former Be Held Liable/accountable For Any Accident, Injury Of Any Kind And/or Even Death Of The Security Personnel/guards Assigned Either On-duty Or Off-duty. B. The Darpo Management Shall Not Be Responsible For Any Claim For Personal Injury Or Damage Including Death Caused To Any Security Guard In The Performance Of His Duties Nor Shall The Darpo Management Be Liable For Any Claims Against The Security Agency For Causes As May Be Allowed/determined By Applicable Laws. Responsibility/liability A. The Security Agency Shall Be Fully Responsible For All Work And Services Performed By Its Security Guards, And Shall For This Purpose Employ Qualified, Competent And Well-trained Guards To Perform The Services Under The Contract. B. The Security Agency Shall Take All Reasonable Measures To Ensure That The Security Guards Conform To The Highest Standards Of Moral And Ethical Conduct. C. The Security Agency Shall Ensure Its Security Professionals Adhere To The Professional Conduct And Ethical Standards Set Forth Under Section 235-236 Of Ra 11917 And Its Irr. D. The Security Agency Shall Assume Full Responsibility For Whatever Damages Or Losses On Any Of The Property Of The Darpo During The Watch Hour Or Tour Of Duty Of Its Guard/s After The Same Fact Of Loss Or Damage Has Been Established As A Result Of The Guard’s Omission, Commission, Negligence, Fault, Laxity Or Misconduct, Following Investigation Conducted Jointly By Both Parties; However, The Security Agency Shall Not Be Held Liable Where Such Losses Or Damages Are Due To Fortuitous Event As Defined In The Civil Code Of The Philippines, Or Where Losses Occurred Under Any Of The Following Causes Or Situation: 1. Where The Damage Or Loss Is Inside A Closed Room, Except Otherwise Proven That The Entrance Thereto Was With Force Upon Things Or Person/s As Defined Under The Revised Penal Code Of The Philippines, And That The Loss Or Damage Has Been Reported To The Security Agency Within Forty-eight (48) Hours Upon Discovery Of Occurrence, Whichever Comes First. 2. Any Property Belonging To The Party Of The Darpo And Issued To Or Held In Trust By Its Employees Shall Be The Sole Responsibility Of Said Employees, Unless Said Property Is Endorsed In Writing And Signed By The Guard. 3. Where The Loss Or Damage Of Items Is The Result Of Robbery In Band, Mob, Violence, Tumultuous Affray, Acts Of Dissident, Acts Of War And Revolution. E. In The Event Of Loss Or Damage To The Premises Or Properties Of The Darpo, The Security Agency Shall Only Be Liable For Its Replacement Or Restitution Thereof In The Same Condition As It Was/they Were Immediately Prior To The Loss Or Damage. F. No Assignment Whatsoever Of The Security Services Contract Shall Be Made To Any Third Party. Waiver From Any Liability A. The Security Agency Shall Hold The Darpo Management Free From Any Liability, Courses Of Action Or Claims Which May Be Filed By Its Security Guards By Reason Of Their Employment With The Security Agency Pursuant To The Contract, Or Under The Provision Of The Labor Code, The Social Security Act, And All Other Laws And Regulations Which Are Now In Force Or Which Hereafter Are Enacted; B. In The Event The Darpo Management Is Impleaded In Any Such Action Or Case, The Department Shall Be Authorized To Withhold From The Security Agency’s Collectible Accounts Such Amounts As Would Be Reasonable To Approximate The Claims Of The Security Guards Against The Security Agency In Case The Same Are Levied Or Exerted Against The Darpo Management. Contract Duration The Engagement Shall Be Effective Within A Period Of Twelve (12) Months Beginning January 1, 2025 To December 31, 2025. Terms Of Payment Payment Shall Be Made For The Account Of The Security Agency On A Monthly Basis Upon Submission To The Dar-zds Through The Administrative Officer Iv, General Services Section Of The Following: Statement Of Account/billing Letter Daily Time Record Duly Signed By Assigned Head Guard, As The Case May Be, And Countersigned By The Administrative Officer Iv Payroll Of The Immediately Preceding Month Proof Of Payment Of Remittances For Social Benefit Premiums (sss, Phic, Hdmf)— Submitted On A Quarterly Basis Contract Amount Shall Be Fixed And Shall Not Be Adjusted During Contract Implementation, Except For The Following: • Increase In Minimum Daily Wage And Other Wage-related Benefits Pursuant To Law Or New Wage Order Issued After Date Of Bidding. In This Case, The Prescribed Wage/wage-related Benefit Increase Shall Be Borne By The Darpo And The Security Service Contract Shall Be Deemed Amended Accordingly. In The Event That The Darpo Fails To Pay The Prescribed Increases, The Security Agency Shall Be Jointly And Solidarily Liable With The Former; • Increase In Taxes; • If During The Term Of The Contract The Darpo Sees The Need For An Increase Or Decrease In The Number Of Security Guards, The Resulting Cost Of Said Increase Or Decrease, Provided That The Abc For The Relevant Year Is Not Exceeded. Separability If Any Provision Of This Contract Is Declared Void, Ineffective, Invalid Or Contrary To Law By A Final Judgment Or Decree By Any Court, Commission, Or Other Judicial Or Quasi-judicial Body Of Competent Jurisdiction, The Other Provisions Not Affected By The Said Judgment Or Decree Shall Remain Unimpaired Unless Said Judgment Affects The Contract As A Whole. Exclusivity Of The Venue Of Action/s Actions Arising Out Of This Contract Shall Be Filed With The Court Of Competent Jurisdiction In Pagadian City To The Exclusion Of All Other Courts.
Closing Date16 Jan 2025
Tender AmountPHP 1.6 Million (USD 28.3 K)
Department Of Public Projects Tender
Works
Electrical Cables And Wires...+1Electrical and Electronics
Cyprus
Details: The Project is Located in Nicosia, on a Section of the Nicosia – Anthoupolis Motorway in Lakatamia. The Project Area is Residential with Residential Use Allowed. The Development of the Area is Not Uniform Since Some Sections Show Dense Structure with Full Coverage of the Plots, While in Other Sections There Are Empty Plots. The Area Is Located on a Hill Without Particularly Noisy Activities With Road Traffic Being the Main Source of Noise. The Project Relates to the Continuous Effort of the Department of Public Works to Limit and Reduce Noise Levels, Especially in the Close Distances to the Motorway.
Closing Date7 Feb 2025
Tender AmountEUR 788 K (USD 816.7 K)
Bureau Of Corrections Muntinlupa City Metro Manila Tender
Others
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections City Of Muntinlupa Request For Quotation #2024-153 Supply And Delivery Of Id Lace For Arcc 2025 (nego. Proc.-small Value Procurement Abc ₱ 61,000.00 Date:¬¬¬¬_________________ Name Of Company: _______________________________________________________________ Address: ________________________________________________________________________ Tin No.: ________________________________________________________________________ Please Quote Your Best Offer For The Item/s Described Below, Subject To The Terms And Conditions As Stated Hereunder. A.) Bidders Shall Provide Correct And Accurate Information Required In This Form. B.) Bidders May Quote For All The Items. C.) Price Quotation/s Must Be Valid For A Period Of One Hundred Twenty (120) Calendar Days From The Date Of Submission. D.) Price Quotation/s, To Be Denominated In Philippine Peso Shall Include All Taxes, Duties And/or Levies Payable. E.) Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. F.) Award Of Contract Shall Be Made To The Lowest Quotation (for Goods And Infrastructure) Or, The Highest Rated Offer (for Consulting Services) Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. G.) Any Alterations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initiated By You Or Any Of Your Duly Authorized Representative/s. H.) The Item/s Shall Be Delivered Within Fifteen (15) Calendar Days From Receipt Of Approved Purchase Order. I.) The Bucor Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Technical Specifications. J.) Liquidated Damages Equivalent To One Tenth Of One Percent (0.001%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The Bucor Shall Rescind The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. K.) Bidders Shall Submit The Required Documents Together With Their Bid Price In A Sealed Envelope Indicating Supplier’s Name And Name Of Project. L.) Submission Thru E-mail And Fax Quotation Will Be Allowed/accepted. Requirements To Be Submitted M.) Valid And Current Philgeps Registration Number N.) Valid And Current Mayor’s/business Permit O.) Omnibus Sworn Statement (original Copy) P.) Duly Notarized Authority To Signatory (if Applicable). Note: Allow Pes To Accept The Expired Buisness Or Mayor’s Permit With Official Receipt Of Renewal Application, Subject To Submission Of Business Or Mayor’s Permit After Award Of Contract Under Gppb Resoution No. 05-2020 Approving The Acceptance Of An Expired Mayor’s Permit With Offciial Receipt For Yhe Renewal Application. Note: Bidders Statement Of Compliance On The Terms & Conditions And Requirements As Stated Above _________________________ Signature Over Printed Name Of Sole Proprietor /authorized Representative Submit Your Sealed Quotation Duly Signed By You Or Your Duly Authorized Representative Not Later Than _december 30, 2024___at The Bac Office, Bureau Of Corrections At 9:00am. Late Submission Of Bids Shall Be Rejected. For Further Information, You Can Call The Bac Secretariat C/o Maria Adoracion Viñas At The Supply Office, Bureau Of Corrections, Muntinlupa City At Tel # 8809-8587/8478-0907 From 8:00 Am To 5:00pm Or Email At Bacsec2022@gmail.com, Monday To Friday Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Rfq # 2024-153 Page 2 Of 2 After Having Carefully Read And Accepted The Terms And Conditions, I/we Submit Our Quotation/s For The Item/s As Follows: Request For Quotation Rfq 2024-153 Project: Supply And Delivery Of Id Lace For Arcc 2025 Abc ₱ 61,000.00 Qty Unit Description Compliance To The Technical Specifications (please Check) Unit Price Approved Budget For Contract Offered Quotation Yes No 250 Pc Id Lace (white) – Delegates 100.00 25,000.00 200 Pc Id Lace (red) Security 100.00 20,000.00 50 Pc Id Lace (yellow) – Budget 100.00 5,000.00 110 Pc Id Lace (blue) – Admin 100.00 11,000.00 Total ₱61,000.00 Signature Over Printed Name Of Sole Proprietor Or Representative Telephone No: ____________________ Cellphone No: ____________________ Email: ___________________________ Company Letterhead Supply And Delivery Of Id Lace For Arcc 2025 Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Id Lace For Arcc 2025as Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Id Lace For Arcc 2025 As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting ; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D). Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The Supply And Delivery Of Id Lace For Arcc 2025 9. [ Name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____
Closing Soon30 Dec 2024
Tender AmountPHP 61 K (USD 1 K)
551-560 of 575 active Tenders