United Nations Development Programme Tender
United Nations Development Programme - UNDP Tender
Costs
Summary
Request For Quotation (rfq) For Renovation Works On Undp Premises, Seychelles
Description
Request For Quotation (rfq) For Renovation Works On Undp Premises, Seychelles & Request For Quotation (rfq) For renovation Works On Undp Premises At Bel Air, Seychelles. Section 1: Request For Quotation (rfq) General Together With Section 2 "instructions To Bidders" This Section Directs The Contractor To The Relevant Information Necessary For Pricing The Bills. It Is Therefore Essential That The Text Contained Therein Be Read In Conjunction With The Measured Items Which Shall Be Priced Accordingly. It Is Assumed That The Contractors Supervisory And Estimating Staff Are Fully Conversant With The Normal Standards Of Good Workmanship And Relevant Publications Of Trade And Technical Organizations. 2 project Description A. 2.1 Project Location The Project Is Located Along Liberation Avenue In Bel Eau, bel Air District, Victoria, Mahe B. 2.2 Project Objectives The Objective Is To Renovate An Existing Residential Building, Including Its Garden, Used As A Kinder Garden Onto An Administrative Office Space. 3 scope Of Works The Scope Of The Work Is To Renovate The Existing Building And Premises And Related Site Works. details Below: 1. securing The Site Access: Provide And Install Two Sliding Gates According To Drawings, To The Two-access Entry (provision For A Platform And Conduits For Remote Access Control To Be Made While Anchoring The Bottom Track Rail) 2. demolition Works: Identify Areas For Demolition. Partitions, Furniture, Furniture Bases, New Openings Etc. Removal Of Existing Fixtures, Flooring, And Other Identified Non-structural Elements. Aluminum Windows On Verandah To Be Carefully Removed And Stored- To Be Handed Over To Client or To Be Re-used. Site Preparation For Construction And Fit-out Works. Treating The Cracks -carefully Hack Out All Cracks On Walls And Treat With Stainless Steel Expanded Wire Mesh Holding In Place With Copper Nails To Receive Cement Sand 1:4 Rendering And Remove Debris From Site As Directed By Engineer. Carefully Remove And Store Existing Kitchen Granite Top To Be Re-used In New Kitchen Cabinet. 3. replacement Of Existing Roof: Removal Of Existing Cis (corrugated Iron Roof) And Gutters Together With Rainwater Down Pipes, Barge Boards, Ceiling Soffits. Remove And Replace Any Damaged Frames. All Damaged Frames And Corrugated Iron Sheets To Be Removed Off Site. All Soffit And Barge Boards To Be Removed And Cart-away And Replaced By Fiber Cement Boards Where Indicated. All To Be Properly Plastered And Painted 4. replacement And Reinstating Of Openings – Externals C. external All Access Doors To Be Replaced By Aluminum Ones. Louvered Windows To Be Replace By Glazed Aluminum Windows. Louvered Openings/ Fanlight Above Windows And Doors To Be Closed By Fixed Glazed Aluminum Windows. Garage Door To Be Replaced By Motorized, Remote Controlled Powder Coated Aluminum Roller Shutter. Rehabilitation Of Windows - Carefully Disassemble And Maintain All Windows And Fixed Light; Works To Including Replacing Damaged Aluminum Glazing Neoprene Seal Gasket; Broken Glazing; Locks And All Other Accessories; Including Cleaning Servicing Of All Necessary Parts And All Repairs To Restore The Windows To Afunctional State As To Be Directed By The Engineer. D. flooring All Internal Flooring To Be Removed And Cart-away. Proper Levelled Screed To Be Placed To Receive New Flooring. Provision For Conduits / Sleeves To Be Made For Electrical And Data Installation In Screed. Kitchen And Bathroom - To Be Of Ceramic Or Natural Tiles Finishes. Sample To Be Approved By Designer / Engineer / Project Manager. E. internal Partitions Bathroom Area To Be In Fiber Cement Board (fcb) Fixed And Secured With Related Accessories. F. wall Finishes • painting Works – Painting And Decorating To Walls, Ceilings And The Like Shall Be Done To With Approved Paints Measured In Meter Square. Metal Fixtures Shall Be Painted With Approved Gloss Paint. Color Is As Specified By The Engineer. Site Mixing Shall Not Be Permitted. The Contractors Rates Shall Include Supply Of All Materials, Workmanship, Samples, Surface Preparation By Applying 3mm Thick Of Lightweight Retarded Hemihydrate Gypsum Plaster (ref: Rhinolite) On Walls, Protection Of Painted Surfaces, Application To All Heights As Required Of Works, And All Other requirements As Directed By The Engineer. All Paint Shall Be Washable Of Dulux Or Approved Equivalent. The Price Shall Include All Narrow Widths And Reveals Of Opening, Sides Of Columns And Windowsills. Wall Tiling Works – Kitchen & Bathroom Supply And Fix Tile 300mm X 600mm, Including Supply Of Cement Mortar, Adhesive And Pointing Materials Exceeding 600mm Wide; Porcelain Tiles Laid To Pattern And Surround Fixed To Cement And Sand Bedding (m/s) And Jointing In Cement Mortar (1:3) And With An Approved Floor Tiles Adhesive 5mm Thick Mixed And Applied Strictly In Accordance With Manufacturers Instructions And With All Joints Flush Pointed With An Approved Grout, Colour To Architects Approval And As Described Including All Labours And Cleaning Upon Completion To Walls, Returns, Reveals And The Like. G. electrical Works Supply, Fix, Test, And Commission Distribution Board Including Complete With Earth Leakage Circuit Breakers And Change Over. Including Wiring And Electrical Fittings, Switches, Sockets And Light Fittings And The Likes And Making Good Places Disturbed As Directed By The Engineer. Conduits & Cabling For Data & Fire Services System To Be Installed. Workmanship Should Be According To Bs And Puc Standards H. plumbing Works All Plumbing Works To Be Performed According To Bs And Puc Standards. Supply And Install New Plumbing Network Together With New Water Pressure Pump With Related Fittings Like Non-return Valves, Etc. Supply And Install New Water Tank And Tower Together With Related Concrete Platform Work. Supply And Install For New Toilet/ Bathroom, Showers, And Kitchen, Sanitaries, And Fittings With Related Valves / Stops, Stainless Steel Traps And All Related Accessories. Supply And Install New Hot Water Plumbing System. Supply And Install New Waste And Soil Water System. Reinstating And Commissioning Of Existing Drainage And Sewage System. Provision For New Rainwater Collection Tank To Be Connected With Toilet Water Supply Piping Network. I. fit Out Works: Supply And Install New Vanity Counters In Both Bathrooms. J. site Works Clearing And Carting Away Over-grown Vegetation. Cleaning And Commissioning Of Cut-off Drain. Replacing Missing Or Broken Grating / Drain Cover. Break Down And Remove Block Work And Broken Fencing. Preparing Substructure To Receive New Paving Works. Provision For French Drains, Absorption Pits And Leeching Field. New Light Poles And Flag Poles New Motorized Gate At Rear Exit With Related Fixing And Securing Accessories. All Existing Fittings To Be Inspected Before Reusing. Removed And Replaced The Entrance Gate With Motorized Sliding Gate With Related Accessories. Old Gate To Be Handed Over To Client. Supply And Install New Piquet Fencing On Existing Wall. kindly See Full Tor Attached For Details Pre-bid Conference / Site Visit: site Visit Is Not Mandatory, However The Bidder Or (his/her) Authorized Representative Is Highly Encouraged To Visit And Investigate The Site, To Obtain All Information That May Be Necessary For The Preparation Of The Offer. The Cost Of Visiting The Site Will Be At The Bidder’s Own Expense. Failure To Investigate The Site Shall Not Relieve The Bidder From Responsibility For His/her Estimation Of The Offer Price. Site Visit Details: Date: wednesday 27th December 2023 Time: 11am - 12 Noon Location: bel Eau, Bela Air District Https://maps.app.goo.gl/s73plwfdavxfdtyg7 Focal Person: sarah Chukukere Email: Sarah.chukukere@undp.org Alternate For Site Visit: ndeye Maty Cisse When Preparing Your Quotation, Please Be Guided By The Rfq Instructions And Data. Please Note That Quotations Must Be Submitted Directly In The System Responding To The Questions And Uploading Required Documents. By The Date And Time Indicated In The Online Portal. It Is Your Responsibility To Ensure That Your Quotation Is Submitted Before The Deadline. Quotations Received After The Submission Deadline Outside The Online Portal, For Whatever Reason, Will Not Be Considered For Evaluation. Interested Suppliers Must Submit Their Offer Directly In The System As Instructed In The Solicitation Document, Following The Instructions In The Available User Guide. in Case You Have Never Registered Before, You Can Register A Profile Using The Registration Link Shared Via The Procurement Notice And Following The Instructions In Guides Available In The Undp Website: https://www.undp.org/procurement/business/resources-for-bidders. do Not Create A New Profile If You Already Have One. Use The Forgotten Password Feature In Case You Do Not Remember The Password Or The Username From Previous Registration. Search For The Specific Tender Using Search Filters And Subscribe To The Tender In Order To Get Notifications In Case Of Amendments Of The Tender Document. If You Need Support With The Online System, You Can Contact The Contact Details Of This Tender As Indicated In The Solicitation Document. [undp Office Mauritius Procurement Unit]
Contact
Tender Id
223174Tender No
UNDP-MUS-00082Tender Authority
United Nations Development Programme ViewPurchaser Address
-Website
https://www.undp.org/