Transportation Tenders
Transportation Tenders
Bureau Of Customs Tender
Others
Philippines
Details: Description Procurement Of Stanchion Belts, Stands, Sign Holder For Fy 2026 (early Procurement Activity) Proposal-001mtn (series No) Government Of The Republic Of The Philippines Section I. Invitation To Bid Invitation To Bid For The Provision Of Stanchion Belts, Stands And Sign Holder 1. The Bureau Of Customs Sub-port Of Mactan, Through The National Expenditure Program (nep) Of Fy 2026 Intends To Apply The Sum Of Six Hundred Thousand Pesos (₱600,000.00) Being The Abc To Payments Under The Contract For The Procurement Of Stanchion Belts, Stands And Sign Holder For Fy 2026 With Project Identification Number Proposal-001mtn. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Customs Sub-port Of Mactan Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required For The Period July 1, 2025 To July 31, 2026. Bidders Should Have Completed, Within Two (2 Years) From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 9:00 Am On February 10, 2025. Late Bids Shall Not Be Accepted. The Bidders Shall Drop Their Duly Accomplished Technical Proposal Including The Eligibility Requirements And Financial Proposals In Two Separate Sealed Envelopes In The Bid Box Located At The Address Indicated Below. Late Bids Shall Not Be Accepted. 5. Bid Opening Shall Be On February 11, 2025, 1:00 Pm At The Given Address Below. 6. The Bureau Of Customs Sub-port Of Mactan Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. Further, Please Be Informed That This Is An Early Procurement Activity Of The Fy 2026 Program/activity/project To Ensure Efficient And Full Implementation Of Program/activity/project Within The Validity Period Of The Fy 2026 National Budget Per Gppb Circular No. 06-2019. The Appropriation For This Expense Is Included The Fy 2026 National Expenditure Program Submitted To Congress For Enactment. The Notice Of Award Shall Be Issued Upon Approval Of The Fy 2026 General Appropriations Act (gaa) By Congress And Signed By The President Into Law. 8. For Further Information, Please Refer To: Jennifer A. Duyogan (coo I, Acting Procurement Officer) Or Victoria C. Arandillo (coo Iii, Acting Accountant) Bureau Of Customs Sub-port Of Mactan Mcia Cargo Access Road, Barangay Ibo, Lapu-lapu City Jennifer.duyogan@customs.gov.ph /victoria.arandillo@customs.gov.ph +639171649903 Section Ii. Instructions To Bidders 1. Scope Of Bid The Bureau Of Customs Sub-port Of Mactan Wishes To Receive Bids For The Procurement Of Stanchion Belts, Stands And Sign Holder For Fy 2026 With Identification Number Proposal-001mtn. The Procurement Project (referred To Herein As “project”) Is Composed Of 1 Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1 The Gop Through The Source Of Funding As Indicated Below For Fy 2026 In The Amount Of Six Hundred Thousand Pesos (₱600,000.00). 2.2 The Source Of Funding Is Fy 2026 National Expenditure Program- Semi Expendable Office Equipment. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3 Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4 The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1 The Procuring Entity Has Prescribed That Subcontracting Is Not Allowed. 8. Pre-bid Conference Non-applicable. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: 10.1 Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents) 10.2 The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3 Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents) 11. Bid Prices 11.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex- Warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In The Bds. V. Price Validity Shall Be For A Period Of Ninety (90) Calendar Days. 12. Bid And Payment Currencies 12.1 For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 12.2 Payment Of The Contract Price Shall Be Made In Philippine Pesos. 13. Bid Security 13.1 The Bidder Shall Submit A Bid Securing Declaration2 Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 13.2 The Bid And Bid Security Shall Be Valid Until February 23, 2026. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14. Sealing And Marking Of Bids 14.1 Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. 14.2 The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 15. Deadline For Submission Of Bids 15.1 The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 16. Opening And Preliminary Examination Of Bids 16.1 The Bac Shall Open The Bids At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 16.2 The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 17. Domestic Preference 17.1 The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18. Detailed Evaluation And Comparison Of Bids 18.1 The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 18.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 18.4. The Project Shall Be Awarded As Follows: One Project Having Several Items That Shall Be Awarded As One Contract. 18.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19. Post-qualification 19.1 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20. Signing Of The Contract 20.1 The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be A. The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed. 11.1 In The Event That The Bidder Is A Corporation, A Secretary Certificate, Spa Or Any Other Document Showing The Authority Of The Signatory On The Bid Form And Other Documents Should Also Be Attached. 15 Bidders Are Encouraged To Submit Their Bids Through Their Duly Authorized Representative Using The Forms Specified In The Bidding Documents. Bidders Shall Enclose Their Original And Copy 1 Of Eligibility And Technical Documents And Financial Documents In One (1) Sealed Envelope. The Single Envelope Will Be Marked "the Bid" And Address All Bids To The Bac Chairperson: Cornelia B. Wilwayco Chief, Assessment Bac Chairperson 18.3 One (1) Lot, Procurement Of Stanchion Belts, Stands And Sign Holder For Fy 2026, With Abc Of ₱ 600,000.00. Partial Bid Is Not Allowed. The Goods Are Grouped In A Single Lot And The Lot Shall Not Be Divided Into Sub-lots For The Purpose Of Bidding, Evaluation, And Contract Award. In All Cases, The Nfcc Computation, If Applicable, Must Be Sufficient For All The Lots Or Contracts To Be Awarded To The Bidder. 20.1 No Further Instructions. Section Iv. General Conditions Of Contract General Conditions Of The Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All He Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1 Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2 The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184. 4. Inspection And Test The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Specific Scope Of Service Supplier’s Must State Here Either “comply” Or Any Equivalent Term In The Column “supplier’s Statement Of Compliance” Against Each Of The Individual Parameters Of Each Specification. Please Quote Your Best Offer For The Item/s Below. Please Do Not Leave Any Blank Items. Indicate “0” If Item Being Offered Is For Free. After Having Carefully Read And Accepted The Terms And Conditions In The Request For Quotation, Hereunder Is Our Quotation For The Item/s As Follows: Specific Scope Of Service Procurement Of Customized Stanchion, Belt And Holder Scope Of Service Description Supplier’s Statement Of Compliance Unit Cost (vat Incl) Total Cost (vat Incl) 1. Silver Stanchion Post With Retractable Black Belt, • (tentative Markings: Customs Restricted Area) • 4-way Belt Post Connection • With 1 Color Brand Print On 2 Side • Compatible To Universal Metal Adapter Attached To Sign Frames 2. Sign Holder For Retractable Belt Barrier / Queuing (stanchion) Pole • A4 Dual-sided Sign Display • Black / Silver • Portrait Or Landscape Orientation 3. Sign Holder For Retractable Belt Barrier / Queuing (stanchion) Pole • A4 Dual-sided Sign Display • Black / Silver Portrait Or Landscape Orientation 150 20 20 *the Above Quoted Prices Are Inclusive Of All Costs And Applicable Taxes. __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Section Vi Confidentiality Agreement Procurement Of Courier Service Description Confidentiality Of Agreement Bidders Statement Of Compliance In Delivery Date Procurement Of Stanchion Belts, Stands And Sign Holder The Winning Bidder Shall Execute And Sign A Confidentiality And Non-disclosure Undertaking Upon Receipt Of Notice Of Award __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Section Vii Financial Offer Procurement Of Customized Stanchion, Belt And Holder Approved Budget For The Contract (abc) (2026) Product Offered Quotation Six Hundred Thousand Pesos (₱600,000.00) Silver Stanchion Post With Retractable Black Belt, • (tentative Markings: Customs Restricted Area) • 4-way Belt Post Connection • With 1 Color Brand Print On 2 Side • Compatible To Universal Metal Adapter Attached To Sign Frames Sign Holder For Retractable Belt Barrier / Queuing (stanchion) Pole • A4 Dual-sided Sign Display • Black / Silver Portrait Or Landscape Orientation Sign Holder For Retractable Belt Barrier / Queuing (stanchion) Pole • A4 Dual-sided Sign Display • Black / Silver Portrait Or Landscape Orientation __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents A) ⬜ Valid Philgeps Registration Certificate (platinum Membership If Public Bidding) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) ☐ Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And C) ☐ Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And D) ☐ Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents E) ⬜ Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And F) ☐ Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And G) ☐ Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And H) ☐ Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After- Sales/parts, If Applicable; And I) ☐ Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents J) ☐ The Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And K) ☐ The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents L) ☐ If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope M) ☐ Original Of Duly Signed And Accomplished Financial Bid Form; And N) ☐ Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) O) ⬜ [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. P) ⬜ Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.
Closing Date10 Feb 2025
Tender AmountPHP 600 K (USD 10.3 K)
DEPT OF THE NAVY USA Tender
Others
United States
Details: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
higher-level Contract Quality Requirement|8|||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
small Business Subcontracting Plan (sep 2023)|4|||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data --modifications (nov 2021))|7||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|334511|1350|||||||||||
cost Accounting Standard Notices And Certification (deviation 2018-o0015)(may 2018))|1||
requirements For Submission Of Proposals Via Electronic Media (jan 2018)|1|via Email|
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|||
requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data (may 2024))|1||
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein.
early And Incremental Deliveries Accepted.
all Terms And Conditions Are In Accordance With Boa:n00383-21-g-ym01required Mandatory Government Sources Of Supply Have Been Reviewed Inaccordance With Far 8.002 And Dfars 208.002. None Of The Required None Of Therequired Sources Are Able To Provide The Required
item(s).
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
recorder,flight Dat ;s800-3500-11; P/n, ;014968799; Nsn, ;iaw Applicable Manuals; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
recorder,flight Dat ;l-3 Communications Avionics Sys; Company Name , ;5353 52nd Street Se, Grand Rapids Mi 49512-9704; Address , ;25583; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent.
responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified
herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein.
procedures:the Contractor Shall Prepare And Maintain Quality Control
documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The
performance Spcifications To Perform The Procedures.
quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which
compliance With Contractual Requirements
will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request.
purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub
contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil
either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002).
receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For
government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material,
finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings.
failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government.
nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition.
contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or
specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification.
material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer.
responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection
requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective
items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items.
repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And
quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing.
records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's
and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records:
receipt Inspection Documentation.
repair Shop Travelers Or Repair Cards.
parts Replacement Records.
parts Inspection Data Before And After Repair As Applicable.
acceptance Test Data.
qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair
re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date17 Jan 2025
Tender AmountRefer Documents
Bureau Of Customs Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Procurement Of Renovation/repair Of Lbu Office (early Procurement Activity) Proposal-003mtn (series No) Government Of The Republic Of The Philippines Section I. Invitation To Bid Invitation To Bid For The Procurement Of Renovation/repair Of Lbu Office 1. The Bureau Of Customs Sub-port Of Mactan, Through The National Expenditure Program (nep) Of Fy 2026 Intends To Apply The Sum Of Nine Hundred Thousand Pesos (₱900,000.00) Being The Abc To Payments Under The Contract For The Procurement Of Renovation/repair Of Lbu Office For Fy 2025-2026 With Project Identification Number Proposal-003mtn. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Customs Sub-port Of Mactan Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required For The Period July 1, 2025 To July 31, 2026. Bidders Should Have Completed, Within Two (2 Years) From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 9:00 Am On February 10, 2025. Late Bids Shall Not Be Accepted. The Bidders Shall Drop Their Duly Accomplished Technical Proposal Including The Eligibility Requirements And Financial Proposals In Two Separate Sealed Envelopes In The Bid Box Located At The Address Indicated Below. Late Bids Shall Not Be Accepted. 5. Bid Opening Shall Be On February 11, 2025, 1:00 Pm At The Given Address Below. 6. The Bureau Of Customs Sub-port Of Mactan Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. Further, Please Be Informed That This Is An Early Procurement Activity Of The Fy 2026 Program/activity/project To Ensure Efficient And Full Implementation Of Program/activity/project Within The Validity Period Of The Fy 2026 National Budget Per Gppb Circular No. 06-2019. The Appropriation For This Expense Is Included The Fy 2026 National Expenditure Program Submitted To Congress For Enactment. The Notice Of Award Shall Be Issued Upon Approval Of The Fy 2026 General Appropriations Act (gaa) By Congress And Signed By The President Into Law. 8. For Further Information, Please Refer To: Jennifer A. Duyogan (coo I, Acting Procurement Officer) Or Victoria C. Arandillo (coo Iii, Acting Accountant) Bureau Of Customs Sub-port Of Mactan Mcia Cargo Access Road, Barangay Ibo, Lapu-lapu City Jennifer.duyogan@customs.gov.ph /victoria.arandillo@customs.gov.ph +639171649903 Section Ii. Instructions To Bidders 1. Scope Of Bid The Bureau Of Customs Sub-port Of Mactan Wishes To Receive Bids For The Procurement Of Renovation/repair Of Lbu Office For Fy 2025-2026 With Identification Number Proposal-003mtn. The Procurement Project (referred To Herein As “project”) Is Composed Of 1 Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1 The Gop Through The Source Of Funding As Indicated Below For Fy 2026 In The Amount Of Nine Hundred Thousand Pesos (₱900,000.00). 2.2 The Source Of Funding Is Fy 2025 Repairs And Maintenance- Building And Other Structure. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3 Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4 The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1 The Procuring Entity Has Prescribed That Subcontracting Is Not Allowed. 8. Pre-bid Conference Non-applicable. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: 10.1 Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents) 10.2 The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3 Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents) 11. Bid Prices A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex- Warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In The Bds. V. Price Validity Shall Be For A Period Of Ninety (90) Calendar Days. 12. Bid And Payment Currencies 12.1 For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 12.2 Payment Of The Contract Price Shall Be Made In Philippine Pesos. 13. Bid Security 13.1 The Bidder Shall Submit A Bid Securing Declaration2 Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 13.2 The Bid And Bid Security Shall Be Valid Until February 23, 2026. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14. Sealing And Marking Of Bids 14.1 Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. 14.2 The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 15. Deadline For Submission Of Bids 15.1 The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 16. Opening And Preliminary Examination Of Bids 16.1 The Bac Shall Open The Bids At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 16.2 The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 17. Domestic Preference 17.1 The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18. Detailed Evaluation And Comparison Of Bids 18.1 The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 18.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 18.4. The Project Shall Be Awarded As Follows: One Project Having Several Items That Shall Be Awarded As One Contract. 18.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19. Post-qualification 19.1 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20. Signing Of The Contract 20.1 The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be A. The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed. 11.1 In The Event That The Bidder Is A Corporation, A Secretary Certificate, Spa Or Any Other Document Showing The Authority Of The Signatory On The Bid Form And Other Documents Should Also Be Attached. 15 Bidders Are Encouraged To Submit Their Bids Through Their Duly Authorized Representative Using The Forms Specified In The Bidding Documents. Bidders Shall Enclose Their Original And Copy 1 Of Eligibility And Technical Documents And Financial Documents In One (1) Sealed Envelope. The Single Envelope Will Be Marked "the Bid" And Address All Bids To The Bac Chairperson: Cornelia B. Wilwayco Chief, Assessment Bac Chairperson 18.3 One (1) Lot, Procurement Of Renovation/repair Of Lbu Office For Fy 2026, With Abc Of ₱ 900,000.00. Partial Bid Is Not Allowed. The Goods Are Grouped In A Single Lot And The Lot Shall Not Be Divided Into Sub-lots For The Purpose Of Bidding, Evaluation, And Contract Award. In All Cases, The Nfcc Computation, If Applicable, Must Be Sufficient For All The Lots Or Contracts To Be Awarded To The Bidder. 20.1 No Further Instructions. Section Iv. General Conditions Of Contract General Conditions Of The Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All He Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1 Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2 The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184. 4. Inspection And Test The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Specific Scope Of Service Supplier’s Must State Here Either “comply” Or Any Equivalent Term In The Column “supplier’s Statement Of Compliance” Against Each Of The Individual Parameters Of Each Specification. Please Quote Your Best Offer For The Item/s Below. Please Do Not Leave Any Blank Items. Indicate “0” If Item Being Offered Is For Free. After Having Carefully Read And Accepted The Terms And Conditions In The Request For Quotation, Hereunder Is Our Quotation For The Item/s As Follows: Specific Scope Of Service Procurement Of Renovation/repair Of Lbu Office Scope Of Service Description Supplier’s Statement Of Compliance Unit Cost (vat Incl) Total Cost (vat Incl) 1. Preliminaries/general Requirements • Mobilization/demobilization • Safety Requirements • Power And Water Supply 2. Floor Tiling Works Including Flooring Surface Preparation • Labor And Materials For The Demolition Of Existing Flooring, Surface Preparation And Hauling 3. Masonry Works And Floor Tiles Installation • Labor And Materials For The Installation Of Tiles 4. Carpentry Works For The Office Dry Wall Partitioning With Electrical Works For Lighting • Labor And Materials For The Construction Of Dry Wall Partition With Painting Works • Labor And Materials For Installation Of Standard And Swing Door For The Lbu Office And Storage Rooms • Labor And Materials For The Installation Of Ceiling Downlights • Allocation Of Space For Wall Type Acu 5. Plumbing And Sanitary Works Of Comport Rooms Including Exhaust Fan Installation, Door Replacement And Repair, Toilet Fixtures And Accessories, Tiles. *the Above Quoted Prices Are Inclusive Of All Costs And Applicable Taxes. __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Section Vi Confidentiality Agreement Procurement Of Courier Service Description Confidentiality Of Agreement Bidders Statement Of Compliance In Delivery Date Procurement Of Renovation/repair Of Lbu Office The Winning Bidder Shall Execute And Sign A Confidentiality And Non-disclosure Undertaking Upon Receipt Of Notice Of Award __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Section Vii Financial Offer Procurement Of Renovation/repair Of Lbu Office Approved Budget For The Contract (abc) (2026) Product Offered Quotation Nine Hundred Thousand Pesos (₱900,000.00) Preliminaries/general Requirements • Mobilization/demobilization • Safety Requirements • Power And Water Supply Floor Tiling Works Including Flooring Surface Preparation • Labor And Materials For The Demolition Of Existing Flooring, Surface Preparation And Hauling Masonry Works And Floor Tiles Installation • Labor And Materials For The Installation Of Tiles Carpentry Works For The Office Dry Wall Partitioning With Electrical Works For Lighting • Labor And Materials For The Construction Of Dry Wall Partition With Painting Works • Labor And Materials For Installation Of Standard And Swing Door For The Lbu Office And Storage Rooms • Labor And Materials For The Installation Of Ceiling Downlights • Allocation Of Space For Wall Type Acu Plumbing And Sanitary Works Of Comport Rooms Including Exhaust Fan Installation, Door Replacement And Repair, Toilet Fixtures And Accessories, Tiles. __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents A) ⬜ Valid Philgeps Registration Certificate (platinum Membership If Public Bidding) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) ☐ Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And C) ☐ Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And D) ☐ Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents E) ⬜ Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And F) ☐ Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And G) ☐ Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And H) ☐ Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After- Sales/parts, If Applicable; And I) ☐ Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents J) ☐ The Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And K) ☐ The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents L) ☐ If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope M) ☐ Original Of Duly Signed And Accomplished Financial Bid Form; And N) ☐ Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) O) ⬜ [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. P) ⬜ Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.
Closing Date10 Feb 2025
Tender AmountPHP 900 K (USD 15.5 K)
Bureau Of Customs Tender
Furnitures and Fixtures
Philippines
Details: Description Procurement Of Portable Office/table Partition (early Procurement Activity) Proposal-002mtn (series No) Government Of The Republic Of The Philippines Section I. Invitation To Bid Invitation To Bid For The Procurement Of Portable Office/table Partition 1. The Bureau Of Customs Sub-port Of Mactan, Through The National Expenditure Program (nep) Of Fy 2026 Intends To Apply The Sum Of Four Hundred Thousand Pesos (₱400,000.00) Being The Abc To Payments Under The Contract For The Procurement Of Movable Office Partition For Fy 2025-2026 With Project Identification Number Proposal-002mtn. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Customs Sub-port Of Mactan Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required For The Period July 1, 2025 To July 31, 2026. Bidders Should Have Completed, Within Two (2 Years) From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 9:00 Am On February 10, 2025. Late Bids Shall Not Be Accepted. The Bidders Shall Drop Their Duly Accomplished Technical Proposal Including The Eligibility Requirements And Financial Proposals In Two Separate Sealed Envelopes In The Bid Box Located At The Address Indicated Below. Late Bids Shall Not Be Accepted. 5. Bid Opening Shall Be On February 11, 2025, 1:00 Pm At The Given Address Below. 6. The Bureau Of Customs Sub-port Of Mactan Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. Further, Please Be Informed That This Is An Early Procurement Activity Of The Fy 2026 Program/activity/project To Ensure Efficient And Full Implementation Of Program/activity/project Within The Validity Period Of The Fy 2026 National Budget Per Gppb Circular No. 06-2019. The Appropriation For This Expense Is Included The Fy 2026 National Expenditure Program Submitted To Congress For Enactment. The Notice Of Award Shall Be Issued Upon Approval Of The Fy 2026 General Appropriations Act (gaa) By Congress And Signed By The President Into Law. 8. For Further Information, Please Refer To: Jennifer A. Duyogan (coo I, Acting Procurement Officer) Or Victoria C. Arandillo (coo Iii, Acting Accountant) Bureau Of Customs Sub-port Of Mactan Mcia Cargo Access Road, Barangay Ibo, Lapu-lapu City Jennifer.duyogan@customs.gov.ph /victoria.arandillo@customs.gov.ph +639171649903 Section Ii. Instructions To Bidders 1. Scope Of Bid The Bureau Of Customs Sub-port Of Mactan Wishes To Receive Bids For The Procurement Of Movable Office Partition For Fy 2025-2026 With Identification Number Proposal-002mtn. The Procurement Project (referred To Herein As “project”) Is Composed Of 1 Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1 The Gop Through The Source Of Funding As Indicated Below For Fy 2026 In The Amount Of Four Hundred Thousand Pesos (₱400,000.00). 2.2 The Source Of Funding Is Fy 2025 National Expenditure Program- Semi Expendable Furniture And Equipment. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3 Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4 The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1 The Procuring Entity Has Prescribed That Subcontracting Is Not Allowed. 8. Pre-bid Conference Non-applicable. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: 10.1 Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents) 10.2 The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3 Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents) 11. Bid Prices A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex- Warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In The Bds. V. Price Validity Shall Be For A Period Of Ninety (90) Calendar Days. 12. Bid And Payment Currencies 12.1 For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 12.2 Payment Of The Contract Price Shall Be Made In Philippine Pesos. 13. Bid Security 13.1 The Bidder Shall Submit A Bid Securing Declaration2 Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 13.2 The Bid And Bid Security Shall Be Valid Until February 23, 2026. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14. Sealing And Marking Of Bids 14.1 Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. 14.2 The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 15. Deadline For Submission Of Bids 15.1 The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 16. Opening And Preliminary Examination Of Bids 16.1 The Bac Shall Open The Bids At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 16.2 The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 17. Domestic Preference 17.1 The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18. Detailed Evaluation And Comparison Of Bids 18.1 The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 18.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 18.4. The Project Shall Be Awarded As Follows: One Project Having Several Items That Shall Be Awarded As One Contract. 18.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19. Post-qualification 19.1 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20. Signing Of The Contract 20.1 The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be A. The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed. 11.1 In The Event That The Bidder Is A Corporation, A Secretary Certificate, Spa Or Any Other Document Showing The Authority Of The Signatory On The Bid Form And Other Documents Should Also Be Attached. 15 Bidders Are Encouraged To Submit Their Bids Through Their Duly Authorized Representative Using The Forms Specified In The Bidding Documents. Bidders Shall Enclose Their Original And Copy 1 Of Eligibility And Technical Documents And Financial Documents In One (1) Sealed Envelope. The Single Envelope Will Be Marked "the Bid" And Address All Bids To The Bac Chairperson: Cornelia B. Wilwayco Chief, Assessment Bac Chairperson 18.3 One (1) Lot, Procurement Of Movable Office Partition For Fy 2026, With Abc Of ₱ 400,000.00. Partial Bid Is Not Allowed. The Goods Are Grouped In A Single Lot And The Lot Shall Not Be Divided Into Sub-lots For The Purpose Of Bidding, Evaluation, And Contract Award. In All Cases, The Nfcc Computation, If Applicable, Must Be Sufficient For All The Lots Or Contracts To Be Awarded To The Bidder. 20.1 No Further Instructions. Section Iv. General Conditions Of Contract General Conditions Of The Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All He Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1 Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2 The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184. 4. Inspection And Test The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Specific Scope Of Service Supplier’s Must State Here Either “comply” Or Any Equivalent Term In The Column “supplier’s Statement Of Compliance” Against Each Of The Individual Parameters Of Each Specification. Please Quote Your Best Offer For The Item/s Below. Please Do Not Leave Any Blank Items. Indicate “0” If Item Being Offered Is For Free. After Having Carefully Read And Accepted The Terms And Conditions In The Request For Quotation, Hereunder Is Our Quotation For The Item/s As Follows: Specific Scope Of Service Procurement Of Portable Office Partition Scope Of Service Description Supplier’s Statement Of Compliance Unit Cost (vat Incl) Total Cost (vat Incl) 1. Portable/movable Office Partition • Full Laminated/end Trims • 2-piece Fold • Light Gray/white Matte Color • Custom-sized According To Passenger Service Specific 2. Portable/movable Office Partition • Full Laminated/end Trims • 3-piece Fold • Light Gray/white Matte Color • Custom-sized According To Passenger Service Specific 5 4 *the Above Quoted Prices Are Inclusive Of All Costs And Applicable Taxes. __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Section Vi Confidentiality Agreement Procurement Of Courier Service Description Confidentiality Of Agreement Bidders Statement Of Compliance In Delivery Date Procurement Of Portable Office Partition The Winning Bidder Shall Execute And Sign A Confidentiality And Non-disclosure Undertaking Upon Receipt Of Notice Of Award __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Section Vii Financial Offer Procurement Of Portable Office Partition Approved Budget For The Contract (abc) (2026) Product Offered Quotation Four Hundred Thousand Pesos (₱400,000.00) Portable/movable Office Partition • Full Laminated/end Trims • 2-piece Fold • Light Gray/white Matte Color • Custom-sized According To Passenger Service Specific Portable/movable Office Partition • Full Laminated/end Trims • 3-piece Fold • Light Gray/white Matte Color • Custom-sized According To Passenger Service Specific __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents A) ⬜ Valid Philgeps Registration Certificate (platinum Membership If Public Bidding) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) ☐ Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And C) ☐ Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And D) ☐ Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents E) ⬜ Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And F) ☐ Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And G) ☐ Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And H) ☐ Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After- Sales/parts, If Applicable; And I) ☐ Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents J) ☐ The Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And K) ☐ The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents L) ☐ If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope M) ☐ Original Of Duly Signed And Accomplished Financial Bid Form; And N) ☐ Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) O) ⬜ [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. P) ⬜ Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.
Closing Date10 Feb 2025
Tender AmountPHP 400 K (USD 6.8 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Details: This Is A Combined Synopsis/solicitation For Commercial Products And Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued.
this Solicitation Is Issued As An Rfq. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-01.
this Solicitation Is Set-aside For 100% For Small Business Concerns Iaw Far 19.502-2, Total Small Business Set-asides.
the Associated North American Industrial Classification System (naics) Code For This Procurement Is 541380, With A Small Business Size Standard Of $19.0 Million. The Fsc/psc Is Q301.
va Loma Linda Healthcare System (vallhcs) Located At 11201 Benton St, Loma Linda, Ca 92357 Is Seeking A Potential Qualified Contractor That Can Provide Inspection & Certification Of Fume Hoods, Ventilators, Biological Safety Cabinets, And Isolators.
all Interested Entities Shall Provide Quotations For The Following:
title:
va Loma Linda Healthcare System (vallhcs) Inspection & Certification Of Fume Hoods, Ventilators, Biological Safety Cabinets, And Isolators.
background Information:
vallhcs Provides High Quality Care While Ensuring The Safety Of Its Staff, Patients, And Visitors. A Critical Component Of This Commitment Involves Ensuring That All Fume Hoods, Ventilators, Biological Safety Cabinets, And Isolators Within The Va Facilities Are Functioning Optimally And Meet Applicable Regulatory Standards. Regular Inspection And Certification Of This Equipment Are Essential For Supporting Clinical, Research, And Pharmaceutical Operations While Protecting Personnel And The Environment From Hazardous Materials.
objectives:
the Objective Of This Contract Is To Engage A Certified Contractor With Proven Expertise To Provide Monthly, Bi-annual Inspections, Certification, Testing And Maintenance Services For All Fume Hoods, Ventilators, Biological Safety Cabinets, Viable Particle Surface And Air Sampling And Analysis For Medium Risk Facilities And Isolators Within The Vallhs Facilities. The Contractor Will Ensure All Equipment Meets Or Exceeds Current Regulatory And Safety Standards, Including But Not Limited To Those Set By The National Fire Protection Association (nfpa), Occupational Safety And Health Administration (osha), And U.s Pharmacopeia (usp)
scope:
the Contractor Shall Provide All Parts Labor, Transportation, Equipment, Supervision, And Certified Personnel To Perform On-site Bi-annual And Monthly Inspections And Certifications Of Government-owned Fume Hoods, Ventilation Devices, Biological Safety Cabinets (bsc), Laminar Flow Devices, Isolators, Biosafety Hazard Hoods, Sterile Workbenches, Radiation
safety Hoods, Buffer, Ante Spaces, And Pharmacy Clean Rooms (see Section 6.1). The Contractors Shall Be Responsible For Removing Or Disposing Of Hazmat.
the Contractor Shall Provide Bi-annual Or Monthly Inspections, Certifications And Testing On The Equipment Listed Below:
manufacturer
type
s/n
item Number
location
labonco
3620904
020119684e
26754
2c05
lab Equip Co
h7-48
h7-48h
40092
2c05
lab Equip Co
h7-48g
h7-48g
unk
2c07
labonco
36209-00
247536
40138
2c07
fisher
fb-pcr2
1591080398158
41427
2c22
lab Equip Co
h7-48d
h7-48d
40096
2c24
lab Equip Co
h7-48e
h7-48e
40094
2c22
lab Equip Co
h7-48c
h7-48c
40095
2c25
lab Equip Co
h7-48b
h7-48b
40097
2c26
labonco
premier
160729357b
unk
2c27
labonco
premier
160729358b
unk
2c28
labonco
3440000
070976549
39977
2c29
labonco
premier
160729356b
unk
2c30
lab Equip Co
h7-48s
h7-48s
40112
3c28
lab Equip Co
h7-48r
h7-48r
40111
3c27
labonco
h7-48cc
h7-48cc
40122
4c22b
forma Scientific
1284
18565-370
45031
4c22b
labonco
36209-08
257688
16334
4c22b
lab Equip Co
h7-48aa
h7-48aa
40124
4c25
lab Equip Co
h7-48v
h7-48v
unk
4c02
labonco
36209-00
214517
9615
4c02
lab Equip Co
h7-48u
h7-48u
40118
4c03
lab Equip Co
h7-48y
h7-48y
unk
4c04
labonco
3620904
010916879e
45029
4c04
lab Equip Co
h7-48w
h7-48w
unk
4c05
usa Scientific
ac648lfuvc
42337
44237
4c05
lab Equip Co
h7-48x
h7-48x
40121
4c06
fisher Scientific
pcr
-
unk
4c06
mopec
-
me400l09002
45782
1b25
lab Equip Co
h7-48z
h7-48z
6946
4c07
labonco
3440000
070976500
39976
4c07
bmc
6315-08
1dla-26
45027
1b28
labonco
3440809
080891842b
45030
4c07
lab Equip Co
h3-72
143-72
45022
1b49
labonco
36209-01
192918
8742
4c07
labgard
nv-629-600
12697011108
43090
1b28c
bmc
6315-08
1llb-38
45018
1b51a
bmc
6315-08
1llb-28
45019
1b51a
bmc
6315-08
1llc-2
45020
1b51h
bmc
6315-08
1llb-15
45017
1b50a
bmc
6315-08
1llb-9
45016
1b50
bmc
6315-08
1lla-21
45015
1b50
labgard
nv-629-600
126966111008
43091
1b30
labgard
nv-629-600
126965111008
43092
1b21
labgard
nv-629-600
126971111008
43090
1b22
labgard
nv-629-600
126967111008
43093
1b22
nuaire
nv-612-spec
80565103002
45023
1b23
nuaire
nv-602-400
11674091301
40299
1b22
labonco
36209-04
990906254
28319
1b25
germfree
lfgi-6usp
65-15-lug-16441
pharmacy-67087
2c-125 Cancer Center
germfree
lfgi-6usp
65-15-lug-1644o
pharmacy-67088
2c-125 Cancer Center
baker Company
egb-6252
67642
pharmacy-40255
1c-27 Main
baker Company
egb-6252
67643
pharmacy-40168
1c-27 Main
germfree
lfgi-6usp
6s-15-lgu-13405
pharmacy-41505
4c-31 Main
germfree
lfgi-4usp
4s-15-lgu-13340
pharmacy-41506
4c-31 Main
hazardous-
bbf-3ssrx
3s-15-br-16215
pharmacy-trailer
iv-trailer
hazardous-
bbf-3ssrx
3s-15-br-16216
pharmacy-trailer
iv-trailer
non-hazardous
bvbi-3ssrx
3s-15-bvbi-16217
pharmacy-trailer
iv-trailer
non-hazardous
bvbi-3ssrx
3s-15-bvbi-16218
pharmacy-trailer
iv-trailer
contractor Shall Perform The Following Testing:
bi-annual
down Flow Velocity
inflow Velocity
airflow Smoke Pattern Test
hepa Filter Leakage
static Pressure Reading (unit & Duct)
site Assessment
environmental Conditions For Temperature, Humidity, And Pressure
smoke Test Pattern.
airborne Non-viable Particle Counting
Monthly
viable Particle Surface And Air Sampling And Analysis For Medium Risk Facilities
contractor Shall Provide A Field Service Report (fsr) Via Email To The Contracting Officer Representative (cor Within Ten (10) Days Of Completed Service. Contractor Shall Provide The Fallowing Information:
type Of Equipment (i.e. Fume Hood)
manufacture
model Number
class (i.e. Aii)
serial Number
va Equipment Entry (ee) Number
building And Room The Equipment Is Located In.
test Date.
pass Or Fail
date Of Next Inspection
the Contractor Shall Revalidate The Data If Any Equipment Is Added Or Removed.
the Contractor Shall Affix Label To Each Unit That Passes Certification. The Contractor Shall Affix Labels On The Day The Inspection Was Passed Or The Certification Date. The Contractor Shall Provide Label That Includes:
company Name
mailing Address
telephone Number.
certificate Name ( Certificate Of Environmental Compliance To Cal Or Osha And Nfs Standard No.49 )
equipment Manufacture
equipment Name
inspection Date
date Of Next Inspection
signature Of Inspector
full Printed Name Of Inspector
status: Certified
unit Id Number From Contract
the Contractor Shall Affix Label To Each Unit That Fails Certification. The Contractor Shall Affix Labels On The Day Od The Failed Inspection Or Certification. The Contractor Shall Provide Label That Includes:
company Name
mailing Address
telephone Number.
equipment Manufacture
equipment Name
inspection Date
signature Of Inspector
full Printed Name Of Inspector
status: Failed
unit Id Number From Contract
contractor Shall Submit A Written Statement Of Repairs Needed (to Be Referred To As Failed Inspection Report), Including An Itemized Listing Of Parts Deemed Necessary To Certify The Unit. This Must Be Submitted To The Cor Prior To Leaving The Facility On The Day Of Attempted Certification. This Information Must Be Written In Detail So That The Cor May Pass It To A Repair Contractor (if Selected To Be Different From The Certification Contractor) Thus Enabling This Other Contractor To Bring All Materials And Parts Needed At The Time Of Service To Effect Repairs Rendering The Unit Certifiable.
if A Hood Is Deemed Non-repairable, Not Meeting Industry Standards, And Failing The Test Requirements, The Contractor Shall Provide The Cor With The Failed Inspection Report Outlining Specific Non-repairable/replaceable Parts That Prevents Certification On The Same Day Of The Inspection. The Contractor Shall Notify The Cor Verbally And Through A Written Report Of Any Equipment Not Being Repaired To The Cor Prior To Leaving The Government Premises.
emergency Line Item - Over And Above Repairs.
over And Above Repairs - For The Emergency Services, Repairs And Maintenance That Are Over And Above The Sow, If Quote Pricing Is Within The Cor S Government Purchase Card (gpc) Threshold, The Cor Will Authorize Payment. For Emergencies Over The Cor S Gpc Threshold, Only The Contracting Officer (co) Is Authorized To Approve Contract Modifications. Additional Services Shall Be Approved By The Contracting Officer Prior To The Contractor Initiating Any Work. The Contractor Shall Provide An On Schedule- Quote To Both The Co And Cor For Review And Consideration. Additional Funding Will Be Provided By The Facility As Needed For Payment.
training
the Contractor Personnel Performing Inspection And Certification Services Shall Be Fully Accredited And Certified To Conduct Test, Evaluations And Certification Of The Equipment Assigned.
the Contractor Personnel Shall Have Validated Certification Of Accreditation From National Sanitation Foundation (nsf) International: Biohazard Cabinet Field Certifier Accreditation Program. The Certificate Of Accreditation Shall Specify The Initial And Expiration Dates And This Certification Shall Be Verifiable On The Nsf Website And Shall Be Provided To The Cor Ten (10) Days Fallowing Award.
the Contractor Shall Be Required To Update Accredited Contractor Personnel Certifications Throughout The Life Of The Contract As Changes Occur To Staff. New Employee Credentials Of Accreditation For Equipment On Contract And Training Certificates Must Be Submitted And Approved By The Cor Prior To The Employee Commencing Any Work On This Contract.
inspections
the Contractor Shall Perform Inspections Bi-annually. Inspections, Certifications, And Testing Are To Be Completed Within The First Fifteen (15) Working Days Of Each Scheduled Service.
inspections Shall Be Mutually Agreed Upon By The Cor And Contractor Thirty (30) Days Prior To The Inspection.
the Contractor Is Responsible For Complying With The Inspection Schedules.
period Of Performance:
30 Days From Performance Start Date. Work May Be Scheduled During The Day Or Night (depending On Load Demand), Monday Thru Friday And/or Saturday Thru Sunday.
daytime Hours: 6 Am To 4 Pm
evening Hours: 4 Pm To 4 Am
contractor Shall Initiate Work Within 2 Weeks Of Being Contacted By The Designated Contracting Officer S Point Of Contact (poc) Or Designee. Work Shall Be Scheduled Through The Poc Or Designee, Who Will Coordinate With Vallhcs Staff. Timelines Are Subject To Change Due To Vallhcs Operational Requirements.
place Of Performance:
Main Hospital
Va Loma Linda
11201 Benton St.
Loma Linda, Ca 92357
licensing Requirements:
offeror Must Possess A 30-hour Occupational Safety And Health Administration (osha) Safety Card.
ansi Certification Of Accreditation
iso/iec 17025:2017 Calibration And Testing
specific Requirements:
contractor Shall Schedule Start Date With Poc Or Designee Five (5) Business Days In Advance.
the Contractor Shall Provide Bi-annual Or Monthly Inspection, Certifications, And Testing On The Equipment Listed.
contactor Personnel Shall Have Valid Loma Linda Piv Badges Before Starting Work.
contractor Shall Coordinate Energy Source Lock Out /tag Out Procedures With Vallhcs Hvac Supervisor Before Starting Work. When Work Is Complete, Contractor Shall Notify The Vallhcs Hvac Supervisor That Energy Sources Will Be Restored And Require Verification.
contractor S Supervisor Or Lead Technician Are To Check In With Vallhcs Hvac Supervisor, Or In Their Absence, With Graphics Control Prior To Work Each Day.
contractor Shall Conform To The Following Standards, Policies, Regulations, Governing Agency, And Any Other Local, State, Or Federal Guidelines That Are Not Listed Here.
osha 29cfr Regulations, Www.osha.gov
nfpa 99, Www.nfpa.org
california Administration Code. Title 8
nsf/ansi 49
cdc/nih Biosafety In Microbiological And Biomedical Laboratories,4th Ed, May 1999
nih Guidelines For Research Involving Recombinant Dna Molecules, January 2001
american Society Of Hospital Pharmacists Technical Bulletin On Handling Cytotoxic Drug In Hospital
food And Drug Administration
joint Commission
cal/osha 5154
international Organization For Standardization (iso0 Class5,7, And 8 Criteria)
iso 17025 And 14644
cag-003 And Cag-009
iest-rp-cc002
united States Pharmacopeias (usp) 797, (usp) 800 And 116
authorized Services:
only Those Services Specified Herein Are Authorized Under This Contract. Before Permitting And/or Performing Any Service Of A Non-contract Nature, The Contractor Shall Advise The Co Of The Reason (s) For The Additional Work And/or Service. The Contractor Is Cautioned That Only The Co Or His/her Designee May Authorize Additional Service That Are Within The Scope Of This Contract And That Reimbursement Shall Not Be Made Unless Prior Authorization Is Obtained From The Co. All Changes To The Contract Shall Be Issued Through A Contract Modification In Writing From The Co To The Contractor.
delegation Of Authority:
no Additional Service Shall Be Provided Without The Approval From The Contracting Officer (co) Or His/her Designee Of This Contract. The Contractor Shall Not Accept Any Instructions Issued By Any Other Person(s) Other Than The Co Or His/her Delegated Representative Acting Within The Limits Of His/her Authority.
government-furnished Equipment (gfe) Government Furnished Information (gfi):
No Government Equipment Will Be Used By The Vendor.
recognized Holidays:
the Following Is A List Of All Government Recognized Holidays:
in Accordance With 5 U.s.c. 6103, Executive Order 11582 And Public Law 94-97 The Following National Holidays Are Observed And For The Purpose Of This Contract Are Defined As Legal Federal Official Holidays :
new Year S Day: January 1
martin Luther King S Birthday: Third Monday In January
president S Day: Third Monday In February
memorial Day: Last Monday In May
juneteenth Independence Day: June 19
independence Day: July 4
labor Day: First Monday In September
columbus Day: Second Monday In October
veterans Day: November 11
thanksgiving Day: Fourth Thursday In November
christmas Day: December 25
If A Holiday Falls On Sunday, The Following Monday Shall Be Observed As The Legal Holiday. When A Holiday Falls On A Saturday, The Preceding Friday Is Observed As A Legal Holiday By U.s. Government Agencies. Also Included, Would Be Any Other Day Specifically Declared By The President Of The United States Of America To Be A National Holiday.
contractor Employees And Badges:
Contractor Personnel Shall Present A Neat Appearance And Be Easily Recognized As Contractor Employees. Examples: Wearing Of Distinctive Clothing Such As Uniform, Badges, Patches, Etc.
all Contractor Personnel Shall Be Required To Wear Va Always Provided Identification (i.d.) Badges Above The Waist While On The Va Grounds. Contractor Shall Be Required To Coordinate With The Cor To Obtain The Va Provided I.d. Badges For All Staff. All Va Provided I.d. Badges Shall Be Returned At The End Of The Contract Or Upon Completion Of Service. Failure To Wear Id Badges May Result In Removal From Any Of The Va Facilities And/or Otherwise Referred To Government Property.
safety And Ppe Equipment:
Personal Protective Equipment Shall Be Provided For Each Contractor Employee By The Contractor. Possession Of Weapons Are Prohibited.
smoking And Vaping Policies:
Smoking And Vaping Are Prohibited On Government Property.
parking:
it Is The Responsibility Of Contractor Personnel To Park Only In Designated Parking Areas. Parking Information Is Available From The Va Security Service. The Va Shall Not Invalidate Or Make Reimbursement For Parking Violations Of The Contractor's Personnel Under Any Circumstances.
complaints:
contractor Shall Promptly And Courteously Respond To Complaints Within Three (3) Working Days To The Cor. Including Complaints Brought To The Contractor S Attention By The Co. Contractor Shall Maintain A Written Record Of All Complaints, Both Written And Oral Showing The Identity Of The Individual, The Nature Of The Complaint, And Contractor S Response. Contractor Shall Permit The Government To Inspect The Written Records Of Complaints Upon Reasonable Notice From The Co.
required Submittals With Quotes Shall Include Following:
proof Of:
offeror Must Possess A 30-hour Occupational Safety And Health Administration (osha) Safety Card.
ansi Certification Of Accreditation
iso/iec 17025:2017 Calibration And Testing
the Contract Period Of Performance Is 2-5-2025 1-31-2030, With An Fop Of Destination.
place Of Performance/place Of Delivery:
va Loma Linda Healthcare System
11201 Benton St
loma Linda, Ca 92357
the Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html.
the Following Solicitation Provisions Apply To This Acquisition:
far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services
far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services
offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required.
the Following Contract Clauses Apply To This Acquisition:
far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services (dec 2022).
addendum To Far 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services Applies To And Is Included With This Acquisition.
far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products And Commercial Services (sep 2023).
the Following Subparagraphs Of Far 52.212-5 Are Applicable: (b)(4), (5), (9), (11), (12), (18), (26), (31), (33), (34), (35), (36), (37), (39), (40), (55), (63), (c)(1), (2), (7), (8).
all Invoices From The Contractor Shall Be Submitted Electronically In Accordance With Vaar Clause 852.232-72 Electronic Submission Of Payment Requests. This Is Accomplished Through The Tungsten Network Located At: Http://www.fsc.va.gov/einvoice.asp. This Is Mandatory And The Sole Method For Submitting Invoices.
all Quoters Shall Submit The Following: All Information Required By Far 52.212-1(b) Submission Of Offers.
all Quotes Shall Be Sent To The Network Contracting Office (nco): Koby.thiel@va.gov.
award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13. Comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Most Favorable To The Government.
the Following Are The Decision Factors: Price, And Past Performance, With Price More Important.
past Performance Will Be Based On Cpars And Fapiis Ratings. No Rating In Cpars Is Equal To A Neutral Rating.
the Award Will Be Made To The Response Most Advantageous To The Government.
responses Should Contain Your Best Terms, Conditions.
to Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows:
"the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition."
or
"the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:"
quoters Shall List Exception(s) And Rationale For The Exception(s), If Any.
questions Shall Be Received Not Later Than 01-29-2025, 8:00 Am Mst At Koby.thiel@va.gov Only. Subject Line Should Include Response To Rfq 36c26225q0366.
final Submission Of Your Response Shall Be Received Not Later Than 02-03-2025, 8:00 Am Mst At Koby.thiel@va.gov Only. Subject Line Should Include Response To Rfq 36c26225q0366.
submissions Shall Include Your Quote As Well As A Capabilities Statement With Qualifications Proving All Certifications And Education Required For The Work Being Conducted In The Sow. Submissions Not Meeting All Requirements Of The Sow Will Be Considered Ineligible For Award.
late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f).
all Quotes Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The Point Of Contact Listed Below.
koby.thiel@va.gov
Closing Date3 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||x|mil-i-45208 Or Its Equivalent Or Higher|||||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) Type|n/a|tbd|n00383|tbd|tbd|see Schedule |tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months |60 Days After Discovery Of Defect|||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|do-a1a |tbd|
the Terms And Conditions Of Boa N0038322gs501 Hereby Applies To This Order.
this Is A Firm-fixed Price Order For Repair/spares On A Non-commercial Item Pursuant To Far 15 And N0038322gs501.
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document.
1.2.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements.
repair Of:
computer,special Pu ;computer,special Pu 1680-01-706-3126; Nsn , ;123scav9534-15; Part Number, Shall Be Performed Iaw: Computer,special Pu ;n/a; Publication (s).
1.2.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And
recommendations Via Form 1998.
1.3 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.4 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.5 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
1.7 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;northrop Grumman Systems Corp; Drawing Number ( ;70974; ) ;123scav9534-15; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.8 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.9 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents - Not Applicable
3. Requirements
the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent.
responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified
herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein.
procedures:the Contractor Shall Prepare And Maintain Quality Control
documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The
performance Spcifications To Perform The Procedures.
quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which
compliance With Contractual Requirements
will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request.
purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub
contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil
either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002).
receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For
government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material,
finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings.
failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government.
nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition.
contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or
specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification.
material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer.
responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection
requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective
items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items.
repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And
quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing.
records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's
and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records:
receipt Inspection Documentation.
repair Shop Travelers Or Repair Cards.
parts Replacement Records.
parts Inspection Data Before And After Repair As Applicable.
acceptance Test Data.
qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair
re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request.
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
computer,special Pu ;123scav9534-15; P/n, ;1680-01-689-8047; Nsn, ;all Repair Manuals, Drawings And Specifications; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
computer,special Pu ;northrop Grumman Systems Corp; Company Name , ;2000 W Nasa Blvd Melbourne, Fl 32904-2322; Address , ;70974; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date6 Feb 2025
Tender AmountUSD 599.8 K
This is an estimated amount, exact amount may vary.
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Contact Information|4|n731.44|n00383|215-697-5970|danielle.diciacco.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)||n/a|n00383|n/a|n/a|n/a|n/a|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|1 Year After Date Of Delivery|45 Days After Discovery Of Defect|||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|334220|1250|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
this Amendmended Is Hereby Issued To Incorporate The Following Changes:
the Qty Is Increased By 3 Units, From 3 Ea To 6 Ea.
\
the Small Business Administration Representative At Navsup Wss Has Reviewed This Requirement And Determined That A Set-aside Recommendation Was Not Applicable For This Procurement.
this Rfp Is For Repair. Navsup Wss Requests That Contractors Submit A Quote That Includes Either A Firm-fixed Price Or Estimate Costs To Repair This Item.
this Contract/delivery Order/purchase Order/modification Is Issued By The Government When Deposited In The Mail, Transmitted By Facsimile Or Sent By Any Electronic Commerce Method, Including Email. The Government's Acceptance Of The Contractor's Proposal
constitutes Bilateral Agreement To Issue This Contract/delivery Order/purchase Order/modification.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document.
1.2.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements.
repair Of:
rotary Coupler Asse ;5985-01-660-0367; Nsn , ;59300-3; Part Number, Shall Be Performed Iaw: Rotary Coupler Asse ;latest Applicable Repair; Publication (s).
1.2.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And
recommendations Via Form 1998.
1.3 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.4 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.5 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
rotary Coupler Asse ;59300-3; P/n, ;5985-01-660-0367; Nsn, ;latest Applicable Repair; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
rotary Coupler Asse ;l-3 Communications Corp.; Company Name , ;120 Constitution Drive, Menlo Park, Ca 94025-1141; Address , ;(50643); Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent.
responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified
herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein.
procedures:the Contractor Shall Prepare And Maintain Quality Control
documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The
performance Spcifications To Perform The Procedures.
quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which
compliance With Contractual Requirements
will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request.
purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub
contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil
either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002).
receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For
government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material,
finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings.
failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government.
nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition.
contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or
specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification.
material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer.
responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection
requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective
items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items.
repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And
quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing.
records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's
and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records:
receipt Inspection Documentation.
repair Shop Travelers Or Repair Cards.
parts Replacement Records.
parts Inspection Data Before And After Repair As Applicable.
acceptance Test Data.
qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair
re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date21 Jan 2025
Tender AmountRefer Documents
Bureau Of Customs Tender
Furnitures and Fixtures
Philippines
Details: Description Procurement Of Furniture And Other Office Fixtures (early Procurement Activity) Proposal-005mtn (series No) Government Of The Republic Of The Philippines Section I. Invitation To Bid Invitation To Bid For The Procurement Of Furniture And Other Office Fixtures 1. The Bureau Of Customs Sub-port Of Mactan, Through The National Expenditure Program (nep) Of Fy 2026 Intends To Apply The Sum Of Nine Hundred Forty-five Thousand Pesos (₱945,000.00) Being The Abc To Payments Under The Contract For The Procurement Of Furniture And Other Office Fixtures For Fy 2025-2026 With Project Identification Number Proposal-005mtn. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Customs Sub-port Of Mactan Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required For The Period July 1, 2025 To July 31, 2026. Bidders Should Have Completed, Within Two (2 Years) From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 9:00 Am On February 12, 2025. Late Bids Shall Not Be Accepted. The Bidders Shall Drop Their Duly Accomplished Technical Proposal Including The Eligibility Requirements And Financial Proposals In Two Separate Sealed Envelopes In The Bid Box Located At The Address Indicated Below. Late Bids Shall Not Be Accepted. 5. Bid Opening Shall Be On February 12, 2025, 1:00 Pm At The Given Address Below. 6. The Bureau Of Customs Sub-port Of Mactan Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. Further, Please Be Informed That This Is An Early Procurement Activity Of The Fy 2026 Program/activity/project To Ensure Efficient And Full Implementation Of Program/activity/project Within The Validity Period Of The Fy 2026 National Budget Per Gppb Circular No. 06-2019. The Appropriation For This Expense Is Included The Fy 2026 National Expenditure Program Submitted To Congress For Enactment. The Notice Of Award Shall Be Issued Upon Approval Of The Fy 2026 General Appropriations Act (gaa) By Congress And Signed By The President Into Law. 8. For Further Information, Please Refer To: Jennifer A. Duyogan (coo I, Acting Procurement Officer) Or Victoria C. Arandillo (coo Iii, Acting Accountant) Bureau Of Customs Sub-port Of Mactan Mcia Cargo Access Road, Barangay Ibo, Lapu-lapu City Jennifer.duyogan@customs.gov.ph /victoria.arandillo@customs.gov.ph +639171649903 Section Ii. Instructions To Bidders 1. Scope Of Bid The Bureau Of Customs Sub-port Of Mactan Wishes To Receive Bids For The Procurement Of Furniture And Other Office Fixtures For Fy 2025-2026 With Identification Number Proposal-005mtn. The Procurement Project (referred To Herein As “project”) Is Composed Of 1 Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1 The Gop Through The Source Of Funding As Indicated Below For Fy 2026 In The Amount Of Nine Hundred Forty-five Thousand Pesos (₱945,000.00). 2.2 The Source Of Funding Is Fy 2026 Semi Expendable Furniture And Fixture. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3 Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4 The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1 The Procuring Entity Has Prescribed That Subcontracting Is Not Allowed. 8. Pre-bid Conference Non-applicable. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: 10.1 Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents) 10.2 The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3 Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents) 11. Bid Prices A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex- Warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In The Bds. V. Price Validity Shall Be For A Period Of Ninety (90) Calendar Days. 12. Bid And Payment Currencies 12.1 For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 12.2 Payment Of The Contract Price Shall Be Made In Philippine Pesos. 13. Bid Security 13.1 The Bidder Shall Submit A Bid Securing Declaration2 Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 13.2 The Bid And Bid Security Shall Be Valid Until February 23, 2026. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14. Sealing And Marking Of Bids 14.1 Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. 14.2 The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 15. Deadline For Submission Of Bids 15.1 The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 16. Opening And Preliminary Examination Of Bids 16.1 The Bac Shall Open The Bids At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 16.2 The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 17. Domestic Preference 17.1 The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18. Detailed Evaluation And Comparison Of Bids 18.1 The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 18.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 18.4. The Project Shall Be Awarded As Follows: One Project Having Several Items That Shall Be Awarded As One Contract. 18.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19. Post-qualification 19.1 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20. Signing Of The Contract 20.1 The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be A. The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed. 11.1 In The Event That The Bidder Is A Corporation, A Secretary Certificate, Spa Or Any Other Document Showing The Authority Of The Signatory On The Bid Form And Other Documents Should Also Be Attached. 15 Bidders Are Encouraged To Submit Their Bids Through Their Duly Authorized Representative Using The Forms Specified In The Bidding Documents. Bidders Shall Enclose Their Original And Copy 1 Of Eligibility And Technical Documents And Financial Documents In One (1) Sealed Envelope. The Single Envelope Will Be Marked "the Bid" And Address All Bids To The Bac Chairperson: Cornelia B. Wilwayco Chief, Assessment Bac Chairperson 18.3 One (1) Lot, Procurement Of Furniture And Other Office Fixtures For Fy 2026, With Abc Of ₱ 945,000.00. Partial Bid Is Not Allowed. The Goods Are Grouped In A Single Lot And The Lot Shall Not Be Divided Into Sub-lots For The Purpose Of Bidding, Evaluation, And Contract Award. In All Cases, The Nfcc Computation, If Applicable, Must Be Sufficient For All The Lots Or Contracts To Be Awarded To The Bidder. 20.1 No Further Instructions. Section Iv. General Conditions Of Contract General Conditions Of The Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All He Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1 Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2 The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184. 4. Inspection And Test The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Specific Scope Of Service Supplier’s Must State Here Either “comply” Or Any Equivalent Term In The Column “supplier’s Statement Of Compliance” Against Each Of The Individual Parameters Of Each Specification. Please Quote Your Best Offer For The Item/s Below. Please Do Not Leave Any Blank Items. Indicate “0” If Item Being Offered Is For Free. After Having Carefully Read And Accepted The Terms And Conditions In The Request For Quotation, Hereunder Is Our Quotation For The Item/s As Follows: Specific Scope Of Service Procurement Of Furniture And Other Office Fixtures Qty Item Description Supplier’s Statement Of Compliance Unit Cost (vat Incl) Total Cost (vat Incl) 1 Display Cabinet, Mahogany, With Glass Sliding Door 2 Lateral Filing Cabinet, 4 Layers 10 Computer Table, Powder Coated, Light Gray, With Drawer, Lock And Keys 30 High-back Office Chair, With Headrest 20 Office Visitor Chair, Pu Leather Upholstered 4 Lounge Chair, 3-seater 1 Open Cabinet, 5-layers, Powder Coated Gray, Heavy Duty, Commercial Grade 1 Sliding Cabinet, Color: Gray, Dimensions: 185(h)x90(w)x40(d)cm, Sliding Door Feature For Easy Handling Of Books, Files And Other Paraphernalia 10 Boltless Steel Cabinet, 5-6 Layers, Adjustable Rack With Slotted Posts & Metal Shelving 36″ 2 "conference Table Laminated Wood, Brown Estimated Length: 95 Inches Width: 47 Inches" 15 Trash Box With Cover, Xl 2 Dish Cabinet, 3 Layers 30 Monobloc Chair 5 Laminated Wood Brown Office Table *the Above Quoted Prices Are Inclusive Of All Costs And Applicable Taxes. __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Section Vi Confidentiality Agreement Procurement Of Furniture And Other Office Fixtures Description Confidentiality Of Agreement Bidders Statement Of Compliance In Delivery Date Procurement Of Furniture And Other Office Fixtures The Winning Bidder Shall Execute And Sign A Confidentiality And Non-disclosure Undertaking Upon Receipt Of Notice Of Award __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Section Vii Financial Offer Procurement Of Furniture And Other Office Fixtures Qty Product Offered Quotation 1 Display Cabinet, Mahogany, With Glass Sliding Door 2 Lateral Filing Cabinet, 4 Layers 10 Computer Table, Powder Coated, Light Gray, With Drawer, Lock And Keys 30 High-back Office Chair, With Headrest 20 Office Visitor Chair, Pu Leather Upholstered 4 Lounge Chair, 3-seater 1 Open Cabinet, 5-layers, Powder Coated Gray, Heavy Duty, Commercial Grade 1 Sliding Cabinet, Color: Gray, Dimensions: 185(h)x90(w)x40(d)cm, Sliding Door Feature For Easy Handling Of Books, Files And Other Paraphernalia 10 Boltless Steel Cabinet, 5-6 Layers, Adjustable Rack With Slotted Posts & Metal Shelving 36″ 2 "conference Table Laminated Wood, Brown Estimated Length: 95 Inches Width: 47 Inches" 15 Trash Box With Cover, Xl 2 Dish Cabinet, 3 Layers 30 Monobloc Chair , Beige 5 Laminated Wood Brown Office Table __________________________ Signature Over Printed Name __________________________ Position/designation __________________________ Office Telephone No. __________________________ Email Address/es Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents A) ⬜ Valid Philgeps Registration Certificate (platinum Membership If Public Bidding) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) ☐ Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And C) ☐ Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And D) ☐ Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents E) ☐ Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After- Sales/parts, If Applicable; And F) ☐ Original Duly Signed Omnibus Sworn Statement (oss) For Above ₱50000.00; And If Applicable/unless Needed, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Ii. Financial Component Envelope G) ☐ Original Of Duly Signed And Accomplished Financial Bid Form; And H) ☐ Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) I) ⬜ [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. J) ⬜ Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity. Unless Otherwise Needed (format) Unless Otherwise Needed (format)
Closing Date12 Feb 2025
Tender AmountPHP 945 K (USD 16.2 K)
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Item Unique Identification And Valuation (jan 2023)|19|n723.15|b5p|215-697-2782|meghan.e.gubicza.civ@us.navy.mil||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) Type||cognizant Dfas|n00383|cognizant Dcma|cognizant Dcma|see Schedule|source|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (jan 2025)|12|334511|1350|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
this Requirement Is For The Repair Of The Items Herein This Solicitation.
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor?s Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt.
The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In The Subsequent Contract.
required Rtat: 198.623 Days After Receipt Of Asset.
throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of 0000 Per Month Reflects No Throughput Constraint.
induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
reconciliation: A Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such
prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
early And Incremental Deliveries Accepted And Preferred.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
computer,flight Con ;105e7320g11; P/n, ;7rh 6615 015486318 V2; Nsn, ;no Government Technical Manuals Exist At This Time, So All Repairs Will Be In Accordance With Technical Drawings, Specifications And Engineering Orders.; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
computer,flight Con ;bae Systems Controls Inc.; Company Name , ;1098 Clark Street, Endicott, Ny. 13760-5333; Address , ;89954; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent.
responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified
herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein.
procedures:the Contractor Shall Prepare And Maintain Quality Control
documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The
performance Spcifications To Perform The Procedures.
quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which
compliance With Contractual Requirements
will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request.
purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub
contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil
either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002).
receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For
government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material,
finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings.
failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government.
nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition.
contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or
specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification.
material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer.
responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection
requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective
items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items.
repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And
quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing.
records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's
and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records:
receipt Inspection Documentation.
repair Shop Travelers Or Repair Cards.
parts Replacement Records.
parts Inspection Data Before And After Repair As Applicable.
acceptance Test Data.
qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair
re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date18 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Contact Information|4|n723.14|ja4|215-697-2782|kathryn.elechko.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days After Delivery Of Unit|45 Days After The Defect |||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
buy American-free Trade Agreements-balance Of Payments Program - Basic (feb 2024))|11||||||||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (feb 2024)|13|334511|1350||||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
the Purpose Of This Amendment Is To Decrease Item Quantity From 12 To 11 Units.
the Purpose Of This Amendment Is To Increase Item Quantity From 10 To 12.
this Requirement Is For The Repair Of The Items Herein This Solicitation.
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractors Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth Regular
Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt.
The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In The Subsequent Contract.
required Rtat: ## ____ Days After Receipt Of Asset.
Throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Deliverycommences X/month (contractor Fill In #). A Throughput Of 0000/ Per Monthreflects No Throughput Constraint.
Induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
early And Incremental Deliveries Accepted And Preferred.
reconciliation:a Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such
prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent.
responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified
herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein.
procedures:the Contractor Shall Prepare And Maintain Quality Control
documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The
performance Spcifications To Perform The Procedures.
quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which
compliance With Contractual Requirements
will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request.
purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub
contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil
either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002).
receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For
government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material,
finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings.
failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government.
nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition.
contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or
specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification.
material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer.
responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection
requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective
items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items.
repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And
quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing.
records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's
and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records:
receipt Inspection Documentation.
repair Shop Travelers Or Repair Cards.
parts Replacement Records.
parts Inspection Data Before And After Repair As Applicable.
acceptance Test Data.
qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair
re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request.
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
computer Subassembl ;698092-1; P/n, ;014755786; Nsn, ;iaw Current Pub; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
computer Subassembl ;lockheed Martin Corp; Company Name , ;86 S Cobb Dr Se,marietta,ga,30063; Address , ;98897; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date23 Jan 2025
Tender AmountRefer Documents
9161-9170 of 9229 archived Tenders