Transportation Tenders
Transportation Tenders
MISSILE DEFENSE AGENCY MDA USA Tender
Aerospace and Defence
United States
Closing Date7 Jan 2025
Tender AmountRefer Documents
Details: Missile Defense Agency (mda) An/tpy-2 Radar Program Request For Information naics: 334511 psc: Ac25 agency: Other Defense Agencies office: Missile Defense Agency location: Mda-sna solicitation Number: N/a reference-number: 24-mda-11952 notice Id: Mda25snrfi02 distribution Statement A. Approved For Public Release; Distribution Is Unlimited. approved For Public Release: 5-nov 2024 i. Description a. An/tpy-2 Description: the Missile Defense Agency’s Ground Sensors Directorate (mda/sn) Is Conducting Market Research To Determine Industry Interest And Capability To Support Future Requirements For Its Army Navy/transportable Radar Surveillance And Control Model-2 (an/tpy-2). the Requirements Include Hardware And Software Development Development (to Include Radar Modeling And Simulation); Production Of Components, Spares, Fleet Refurbishment, And Capability Upgrades; And Operations And Sustainment Of An/tpy-2 Radars. Responses To This Request For Information (rfi) May Address All Or Part Of These Requirements. The Government Invites Industry To Provide Feedback On Contracting Strategy For The Requirements To Include Combination Of Requirements, Contract Type, And Areas That Would Be Accomplished Well Through Small Business Set Aside Versus Full And Open Competition. this Rfi Is Issued Solely For Information And Planning Purposes – It Does Not Constitute A Request For Proposal (rfp) Or Promise To Issue An Rfp In The Future. This Rfi Does Not Commit The Government To Establish A Contract For Any Of The Requirements. Further, Mda Is Not Seeking Proposal Nor Will It Accept Proposals. All Costs Associated With Responding To This Rfi Will Be Solely At The Respondent’s Expense. Participation In Future Agency Transactions And Procurement Opportunities Is Not Contingent On Responding To This Rfi. Mda Will Not Provide Feedback For Any Submission. ii. An/tpy-2 Radar Major Requirement Area Descriptions a. Development 1. Software Maintenance current Software Primarily Developed In Ada Language 2. Software Upgrades open Architecture To Accommodate Integration Of 3rd Part Algorithms modular Design new Capability Development acquisition tracking discrimination debris Mitigation electronic Protection post-intercept Assessment fault Tolerance active Bias Monitoring And Reporting radar Integrated Satellite Monitoring And Calibration space Situational Awareness/space Domain Awareness target Object Map raid Handling long Range High Sensitivity low And High Elevation full Azimuth Coverage 3. Hardware Upgrades digital Receiver/exciter (drex) wideband Digital Signal Processing arbitrary Waveform Generator digital Array Architecture Upgrades To The An/tpy-2 Antenna Equipment Unit additional Distributed, Passive Or Active Phased Array Panels To Support Mission Objectives Against Advanced Threats. Performance Information Is Desired For These Potential Upgrades. 4. Architecture To Optimize Performance On An X86-based Supercomputer And The Implementation Of A Drex performance Improvements, Including, But Not Limited To, Analysis And Implementation Of Parallel Processing, Multicore Computing, Field Programmable Gated Arrays, And Advanced Real-time Processing Capabilities re-architecture Including, But Not Limited To, Analysis And Implementation Of Secure Server Configurations Eliminating, Mitigating, And Limiting Cyber Vulnerabilities 5. System Engineering support Software, Software Databases, And Hardware Upgrades Including New Functionality And Evolving Threats. systems Engineering Includes Configuration Management, Requirements Development And Analysis, Software Capabilities Performance Assessment, Qualification, Formal Test, And Requirements Verification. Systems Engineering Support Is Also Required To: support Radar System Integration And Test With The Terminal High Altitude Area Defense (thaad) Weapon System At The Prime Contractor’s System Integration Laboratory (sil) For Development And Flight Test Activities support Radar System Integration And Test With Command, Control, Battle Management & Communication (c2bmc) Weapon System At The Prime Contractor’s Sil For Development And Flight Test Activities. support United States Government (usg) And Foreign Military Sales (fms) Development And Support Efforts. support Software And Hardware Engineering Technical Reviews Via Incremental Development Such As Agile Methodologies. adhere To Guidance And Develop Program Documentation Including But Not Limited To Management Plans, Quality, Safety, Security, Reliability, Risk, Program Protection, Cybersecurity, Integration, Interoperability, Capability Roadmaps, Concept Of Operations (conops), Trade Studies, Cost, Schedule And Performance, Working Groups, Contract Execution, Development Oversight, And Reporting. develop And Maintain Operation Mission Plans/profiles (omps) Across Several Geographical Locations. flight And Ground Test Planning, Execution, And Analysis. software Engineering Releases (er), Formal Releases (fr), And Maintenance Releases (mr) To Support Material Release Of Capabilities For Technical Capability Declaration (tcd) And Operational Capability Baseline (ocb) Concurrence. support Radar Software Independent Verification And Validation (iv&v) At The Government’s Software Engineering Directorate (sed). 6. Engineering Support facilitate Maintenance Efforts Which May Include But Are Not Limited To: trade Studies hardware Obsolescence Studies hardware Redesign technology Insertion refurbishment Efforts. 7. Modeling And Simulation systems Engineering, Development, Maintenance, Test, Verification And Validation Of Real-time And Non-real-time Digital End-to-end Radar Models And Real-time Hwil Radar Driver For An/tpy-2. digital Radar Models And Hwil Driver Should Accurately Simulate And/or Stimulate Tactical An/tpy-2, While Maintaining The Fidelity Of Complex Radar Scenes Presented To The Model And Simulation. Complex Radar Scenes Typically Include Simple And Advanced Threats Comprised Of Multiple Objects And Scatterers, And The Effects As They Propagate Through An Air Picture. The Air Picture Captures Weather, Environmental, And Other Effects. Examples Include But Are Not Limited To Precipitation, Sky Noise, Tropospheric Effects, And Intercept Debris. Complex Radar Scenes May Also Incorporate Electronic Attack. model Development, Verification, Validation, And Accreditation Must Support Tactical Development, Test And Fielding In Accordance With The Mda Phased Implementation Plan And Integrated Master Test Plan. hwil Radar Drivers, Aligned To Tactical Radar Capabilities, Are Required For Development And Testing Of The Radar Software, And Are Required Early In The Radar Software Development Timeline Due To Increasingly Complex Radar Capabilities. Therefore, Hwil Radar Drivers Must Be Developed As Part Of The Agile Radar Development Cycle To More Closely Coordinate With Radar Development Efforts, And Must Be Integrated With The Hwil Radar Representation As Part Of The Development Cycle. due To Increasing Stakeholder Needs For Digital Radar Models Early In The Radar Software Development Cycle, Digital Radar Models, With Capabilities Aligned To Tactical Radar Software Releases, Are Required Along The Same Timeline As Radar Software Releases, To Include Radar Software Engineering Releases And Formal Releases. Therefore, Digital End-to-end Radar Models Should Utilize Wrapped Tactical Code (wtc) Methodology, As Applicable, Using Radar Software Source Code With Appropriate Interfaces To Operate In Both Real-time And Non-real-time As Either Standalone Models Or As Part Of Integrated System Simulations Such As End-to-end Digital Integrated System Simulation (ediss). models And Simulations Should Implement Tactical Messages And Interfaces That Integrate Into Interoperable Frameworks Such As The Osf For Ground Test Integrated System Simulation (gtiss) And Ediss. integration Of Digital Radar Models And Hwil Radar Drivers With Simulation Frameworks Such As The Osf For Gtiss And Ediss. maintenance And Test Of Cots Hardware Used By Digital Radar Models And Hwil Radar Drivers To Ensure Models Meet Cybersecurity And Performance Requirements Needed To Satisfy Intended Use Cases. development And Maintenance Of Current Applicable Cybersecurity Documentation For Each Radar Model In Order To Support Risk Management Framework (rmf) Authorization. Implement Applicable Cybersecurity Requirements And Solutions Into System Development Life Cycle (sdlc). development Of Rmf Package And Support Cybersecurity And Software Assurance (swa) Requirements And Activities For Each Radar Model. Provide Rmf Continuous Monitoring. development And Maintenance Of Radar Model Training Materials. Conduct As Needed, Hands-on Training To End-users And Stakeholders. support For Use Of Models And Simulations In Events, Including But Not Limited To The Following: performance Assessment warfighter Exercises And Training element Development And Verification tactical Software Verification Testing ground Test (gt) integrated Ground Test (gti) distributed Ground Test (gtd) continuous Digital Assessment (cda) tactical Evaluation tactical Performance Verification test And Operational Mission Plan Analysis & Development pairwise Testing flight Test Pre-mission Testing flight Test Spmt flight Test Element Pre-mission Analysis post-flight Reconstruction (pfr) And Satellite-pass Reconstruction system Post-flight Reconstruction (spfr) For Validation & Anchoring element Post-flight Reconstruction (epfr) For Validation & Anchoring continuous Development And Integration (cdi) And Opportunistic Test system Federated Verification Event (sfve) special Studies live And Hwil Events For Data Collection To Support Radar Fielding Decisions b. Production 1. Production Components hardware Production, Integration, Test, And Delivery Of Components And End Items To Mitigate Obsolescence, Increase End Item Quantities, And Provision Spares. Components And End Items Include, But Are Not Limited To: spares For Radar Components (including Gallium Nitride (gan) Transmit Receive Integrated Microwave Modules (trimms)) digital Receiver/exciter (drex) Upgrade Kits advanced Signal Processing Server/network Kits With Interconnection Kits an/tpy-2 Cooling Equipment Unit (ceu) Upgrade Kits baseline Upgrade: Heat Exchangers, Motor Controllers, And Associated Hardware an/tpy-2 Antenna Equipment Units (aeu) baseline Upgrade: Control Panel, Variable Frequency Drives, And Associated Hardware ac/dc Converters 2. Engineering Support maintenance And Sustainment Efforts Which Include, But Are Not Limited To: trade Studies hardware Obsolescence Studies hardware Redesign technology Insertion refurbishment Efforts 3. Systems Engineering redesign For Out-of-production Mitigation, Fabrication, Integration, Test (design Verification, Qualification, And Acceptance) Evaluation, Documentation, And Delivery Of Radar Hardware. Systems Engineering Includes Cost, Schedule, Technical, Performance, And Reliability Risk Management Processes To Mitigate Program And Schedule Risk. 4. Program Support configuration Management quality Assurance operations And Program Security Requirements missile Defense Agency Assurance Provisions (map) And Parts, Materials, And Processes Mission Assurance Plan (pmap); And Safety manufacturing Qualification Processes 5. Integrated Logistics component, Part, And End Item Marking And Tracking component And End Item Integration, Calibration, And Acceptance Testing sparing Strategy Development, Spare Production, And Spare Delivery management And Tracking Of Government Furnished Equipment/material 6. Program Management integrated Approach To Monitoring And Reporting Cost, Schedule, And Fiscal Status technical Reviews/technical Interchange Meetings integrated Product Team Organization, Inclusive Of Government Participation 7. Test Functions activities Necessary To Confirm Component And End Item Performance In Accordance With Requirements. Tests May Be Conducted At Government Owned Ranges And Test Facilities, In Addition To Contractor Owned Facilities. Tasks Are Conducted In Accordance With Department Of Defense And Other Government Regulatory Guidance. c. Operations And Sustainment 1. Radar Operation And Maintenance Support (at Multiple Sites) diagnose Hardware And Software Failures provide Software And Hardware Maintenance As Primary Maintainer For All Levels Of Maintenance 2. Radar Logistics Support establishment And Maintenance Of Permanently Deployed Site Support Team At Oconus Locations establishment And Maintenance Of Deployable Site Support Team At Conus Locations line Replaceable Unit (lru) Repair And Return provide Subject Matter Expertise (sme) To Depot When Required For Mei Refurbishments inventory Control And Management spares Management logistics Operations training Development And Delivery For Soldiers And Contractor Personnel world-wide Deployment, Transportation Coordination, Set-up, And Tear-down Of The An/tpy-2 Radar Fleet (both Forward-based And Terminal High Altitude Area Defense (thaad) Radars) 3. Sustaining Engineering support For All An/tpy-2 Radars To Facilitate Maintenance Efforts, Which May Include But Are Not Limited To Trade Studies And Analysis, Hardware Obsolescence Studies, Hardware Redesign, Technology Insertion, And Refurbishment Efforts. engineering Analysis And Studies sustainment Of Legacy Software Builds failure Review And Corrective Action System (fracas) mission Assurance/quality Support obsolescence Management obsolescence Forecasting obsolescence Mitigation Recommendations obsolescence Redesigns As Required fleet Retrofits As Required iii. Instructions For Submission a. Deadline respondents To This Rfi Are Invited To Prepare And Submit Responses, No Later Than 60 Calendar Days From The Release Date Of This Rfi. The Government Does Not Intend To Extend This Due Date. b. Required Documents 1. Executive Summary executive Summary (not To Exceed 5 Pages Or Slides, Excluding 1.d. Below) That Includes: a. A Summary Matrix Indicating Interest In Competing For One Or More Requirement Area Listed Above. b. Indication If The Respondent Possesses A Facility Clearance And To What Level. c. Descriptive Data: i. Company Name ii. Specify If Us Or Foreign Owned iii. Point Of Contact (poc) iv. Poc Address v. Poc Telephone And Fax Numbers vi. Poc E-mail Address vii. Duns Number viii. Cage Code And/or Tax Id Number ix. Business Size Standard And Applicable Naics Codes x. Socio-economic Category, If Applicable (e.g. Woman-owned Small Business, Hubzone Small Business; Etc.) d. Indicate Whether Government Furnished Technical Data Would Be Required In Order To Facilitate The Execution Of The Capabilities Identified In Response To This Rfi. List And Describe This Data (does Not Count Toward Page Limit For Executive Summary) e. Indicate Whether The Respondent Is Currently Performing As A Mda Teams Or Teams-next Prime Or Subcontractor (include Contract Name (s) And Number (s)). f. Recommend Break Out Of For Requirement Areas And Areas That Could Be Set-aside For Small Business g. Provide Existing Multiple Award Schedule (mas) Or Other Government-wide Requirement To Be Evaluated As A Possible Acquisition Strategy h. Provide Feedback Regarding Consolidation Or Break-out Of Requirements, Contract Type, And Areas That Would Be Accomplished Well Through Small Business Set Aside Versus Full And Open Competition. 2. White Paper for Each Major Requirement Area Identified Above In Which The Respondent Expresses Capability/interest, Submit A White Paper (not To Exceed 10 Pages) That Discusses Capabilities, Recommended Alternatives, Associated Non-recurring Engineering Costs, And Associated Risks And Mitigation Strategies. Note: Risk Mitigation Strategies Should Address: i. Development Or Improvement Of X-band Radar Capabilities And Hardware Including Experience, Manufacturing Processes, Integration Approaches, And Testing. ii. Production Of An/tpy-2 Radar System Components. Mitigation Of Any Production Learning Curve Impacts (trained Personnel, Maintenance, And Situational Awareness, Etc.). iii. Failure Examination And Root Cause Analysis Of Failed Weapon System Components. iv. Development Of Tactically-aligned An/tpy-2 Models On The Timeline Required v. Mitigation Of Any M&s Learning Curve Impacts 3. Capability Brief for Each Major Requirement Area Identified Above In Which The Respondent Expresses Capability/interest, Submit A Capability Brief Discussing (not To Exceed 30 Slides) The Respondent’s Capabilities To Perform The Requirement Area(s) Identified Above And Relevant Experience. The Brief Should Include: i. A Schedule Estimate Highlighting Initial Capability Delivery/availability. ii. If Your Response Addresses A Subset Of A Requirement Area Identified In The Executive Summary Versus The Entire Requirement, Address How Any Seams/gaps Would Be Mitigated. iii. Description Of Any Experience With Mda Mission Assurance Provisions (map) And Parts, Materials And Processes (pmp) Compliance. iv. Description Of Any Experience With Configuration Management Processes And Tools During Development And Production. v. Identification Of Any Software Capability Maturity Model Integration (cmmi) Designations 4. Data Requirements provide A Detailed List And Description Of Documentation Requirements For A Technical Library To Support Your Development Of A Future Competitive Proposal, Organized By Requirements Area Identified Above, Should Mda Compete Any Or All Of These Requirements. No Government Information Will Be Supplied In Conjunction With This Request For Information. 5. Small Business Considerations because One Objective Of This Rfi Is To Determine The Capability Of Small Business To Meet The Requirements Contained Herein, And To Inform The Acquisition Strategy With Regard To Setting Aside Any Future Acquisition For Small Businesses, Small Businesses Are Encouraged To Respond To This Request For Information For Those Areas Of The Listed Requirement In Which They Have An Interest. Mda Request The Following Information: the Prime Small Business Contractor Responding To This Rfi Must Include Their Past Experience In Managing Subcontractors On Similar Requirements, And If Applicable, Include Subcontractor Or Teaming Partners’ Past Experience Applicable To Requirements Specified In This Rfi. responsible Small Businesses Planning Teaming Arrangements To Meet The Support Requirements Listed Above Are Expected To Articulate The Portions Of Work That The Prime Small Business Intends To Perform As Well As Articulate The Portions That Subcontractors Or Teaming Partners (if Applicable) Will Perform. Responses Must Include Business Size And Business Socio-economic Category Of All Subcontractors Or Teaming Partners Identified To Perform Work Associated With The Naics For This Rfi. c. Additional Information proprietary Information Is Neither Sought Nor Desired By Mda. If Such Information Is Submitted, It Must Clearly Be Marked "proprietary" On Every Sheet Containing Such Information, And The Proprietary Information Must Be Segregated To The Maximum Extent Practicable From Other Portions Of The Response (e.g., Use An Attachment Or Exhibit). Respondents Are Responsible For Adequately Marking Propriety Information Contained In Their Response. The Government Intends To Use Third Party, Non-government (contractor) Support Personnel As Subject Matter Experts In The Review Of Responses Received, Including The Review Of Any Marked Or Unmarked Proprietary Information Provided. Appropriate Non-disclosure Agreements Have Been Executed Between The Third Party, Non-government (contractor) Support Personnel And The Government And Are On File With The Government. A Submission Of A Response To This Rfi Constitutes The Respondent’s Acknowledgement And Agreement That The Information Provided In The Response, Including Any Marked Or Unmarked Proprietary Or Source Selection Information, May Be Disclosed To These Third Party, Non-government (contractor) Support Personnel. d. Point Of Contact For Submissions questions Regarding This Announcement Shall Be Submitted In Writing By E-mail To The Contracting Officer. Submit All Questions No Later Than 30 Calendar Days From The Release Date Of This Rfi. Although The Government Will Attempt To Answer All Questions Submitted, The Government Is Under No Obligation To Answer Any Questions Submitted After 30 Calendar Days From The Release Date Of This Rfi. Verbal Questions Will Not Be Accepted. all Non-proprietary Questions And Answers Will Be Distributed Via E-mail To All Respondents. Validated Proprietary Questions And Answers Will Be Addressed With Individual Companies And Will Not Be Distributed Via E-mail. based On The Responses From Industry, Industry Days And One-on-ones May Be Scheduled In The Future. contracting Office Address: missile Defense Agency, Mda/snk building 5224, Martin Rd, Attn: Vbiii redstone Arsenal, Al, 35898, United States primary Point Of Contact: john Michael, Procuring Contracting Officer, Ground Sensors Contracts email: John.michael@mda.mil secondary Point Of Contact: kimberly Black, Procuring Contracting Officer, Ground Sensors Contracts email: Kimberly.black@mda.mil
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+1Road Construction
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 2 Million (USD 34.5 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Rehabilitation/reconstruction Of Road (bargy. Langla) 1. The Municipality Of Jaen, Through The Other Development Programs And Projects Cy 2025 Intends To Apply The Sum Of Two Million Pesos (2,000,000.00) Being The Abc To Payments Under The Contract For Rehabilitation/reconstruction Of Road (bargy. Langla)/ Itb-2025-odpap-02. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Invitation To Bid For Rehabilitation/reconstruction Of Road (bargy. Langla) Completion Of The Works Required 120 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2025, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2025, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Invitation To Bid For Rehabilitation/reconstruction Of Road (bargy. Langla). With Project Identification Number Itb-2024-odpap-02. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2024 In The Amount Of P 2,000,000.00 2.2.the Source Of Funding Is: Other Development Programs And Projects Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until April 19, 2025, Saturday. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is:rehabilitation/reconstruction Of Road (bargy. Langla) 2.2 The Funding Source Is: The Other Development Programs And Projects Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project: Rehabilitation/reconstruction Of Road (bargy. Langla) 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 40,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 100,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until April 19, 2025, Saturday (210 C.d.) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2025, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2025, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+1Road Construction
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 1.7 Million (USD 29.3 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Concreting Of Road Brgy. Marawa 1. The Municipality Of Jaen, Through The 20% Development Fund Cy 2025 Intends To Apply The Sum Of One Million Seven Hundered Thousand Pesos (1,700,000.00) Being The Abc To Payments Under The Contract For Concreting Of Road Brgy. Marawa/ Itb-2025-20% Df-03. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Invitation To Bid For Concreting Of Road Brgy. Marawa. Completion Of The Works Required 90 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2025, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2025, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 20, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Invitation To Bid For Concreting Of Road Brgy. Marawa. With Project Identification Number Itb-2025-20% Df-03. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2024 In The Amount Of P 1,700,000.00 2.2.the Source Of Funding Is: 20% Development Fund Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until March 20, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is:concreting Of Road Brgy. Marawa. 2.2 The Funding Source Is: The 20% Development Fund Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project Concreting Of Road Brgy. Marawa. 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 34,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 85,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until March 20, 2025 (90 C.d..) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2025, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2025, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+1Building Construction
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 1.4 Million (USD 24.1 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Construction Of Multi-purpose Building (seminar Room/one Stop Shop Phase 3) At Brgy. Sapang 1. The Municipality Of Jaen, Through The Other Development Programs And Projects Cy 2025 Intends To Apply The Sum Of One Million Four Hundered Thousand Pesos (1,400,000.00) Being The Abc To Payments Under The Contract For Construction Of Multi-purpose Building (seminar Room/one Stop Shop Phase 3)at Brgy. Sapang/ Itb-2025-odpap-13. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Construction Of Multi-purpose Building (seminar Room/one Stop Shop Phase 3)at Brgy. Sapang. Completion Of The Works Required 150 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2025, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2025, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Construction Of Multi-purpose Building (seminar Room/one Stop Shop Phase 3)at Brgy. Sapang. With Project Identification Number Itb-2025-odpap-13. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2025 In The Amount Of P1,400,000,000.00 2.2.the Source Of Funding Is: Other Development Programs And Projects Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until May 18, 2025, Sunday. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is: The Procuring Entity, Municipality Of Jaen Invites Bids For The Construction Of Multi-purpose Building (seminar Room/one Stop Shop Phase 3)at Brgy. Sapang 2.2 The Funding Source Is: The Other Development Programs And Projects Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project: The Procuring Entity, Municipality Of Jaen Invites Bids For The Construction Of Multi-purpose Building (seminar Room/one Stop Shop Phase 3)at Brgy. Sapang 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 28,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 70,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until May 18, 2025, Sunday (150 C.d.) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2025, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2025, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+3Civil Works Others, Electrical and Electronics, Electrical Works
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 14.4 Million (USD 248.4 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Construction Of Underground Cabling And Installation Of Street Lights (brgy. Imelda,don Marcos,sapang) 1. The Municipality Of Jaen, Through The Other Development Programs And Projects Cy 2025 Intends To Apply The Sum Of Fourteen Million Four Hundered Thousand Pesos (14,400,000.00) Being The Abc To Payments Under The Contract For Construction Of Underground Cabling And Installation Of Street Lights (brgy. Imelda,don Marcos,sapang)/ Itb-2025-odpap-01. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Invitation To Bid For Construction Of Underground Cabling And Installation Of Street Lights (brgy. Imelda,don Marcos,sapang). Completion Of The Works Required 210 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Twenty Five Thousand Pesos (p 25,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2025, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2025s, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Construction Of Underground Cabling And Installation Of Street Lights (brgy. Imelda,don Marcos,sapang). With Project Identification Number Itb-2025-odpap-01. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2024 In The Amount Of P 14,400,000.00 2.2.the Source Of Funding Is: Other Development Programs And Projects Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until July 18, 2025, Friday. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is:construction Of Underground Cabling And Installation Of Street Lights (brgy. Imelda,don Marcos,sapang) 2.2 The Funding Source Is: The Other Development Programs And Projects Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project: Construction Of Underground Cabling And Installation Of Street Lights (brgy. Imelda,don Marcos,sapang) 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 32,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 80,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until July 18, 2025, Friday (210 C.d..) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2025, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2025, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+1Road Construction
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 4.3 Million (USD 74.2 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Rehabilitation/reconstruction Of Road Brgy. San Pablo 1. The Municipality Of Jaen, Through The 20% Development Fund Cy 2025 Intends To Apply The Sum Of Four Million Three Hundered Thousand Pesos (4,300,000.00) Being The Abc To Payments Under The Contract For Rehabilitation / Reconstruction Of Road Brgy. San Pablo/itb-2025-20% Df-02. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Invitation To Bid For Rehabilitation/reconstruction Of Road Brgy. San Pablo. Completion Of The Works Required 180 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2024, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2024, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Invitation To Bid For Rehabilitation/reconstruction Of Road Brgy. San Pablo. With Project Identification Number Itb-2025-20% Df-02. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2024 In The Amount Of P 4,300,00.00 2.2.the Source Of Funding Is: 20% Development Fund Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until June 18, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is:rehabilitation/reconstruction Of Road Brgy. San Pablo. 2.2 The Funding Source Is: The 20% Development Fund Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project Rehabilitation/reconstruction Of Road Brgy. San Pablo. 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 86,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 215,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until June 18, 2025 (180 C.d..) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2024, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2024, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date30 Jan 2025
Tender AmountRefer Documents
Details: Contact Information|4|n721.10|lpr|609-284-3898|609-284-3898|
commercial Item Procurement Notice - Award|4|||||
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo Type|n/a|tbd|n00383|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect|||||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
contract Terms And Conditions Required To Implement Statutes Or Executiveorders--commercial Products And Commercial Services (nov 2024))|83||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
continued: Contract Terms And Conditions Required To Implement Statutes Or Executive Orders--commercial Products And Commercial Services (nov 2024))|15||||||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|333611|1500|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor?s Facility As Reflected In Theaction Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth Regular Business Day After Receiptand The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance Bythe Government For All Assets Within The Rtats Established In The Subsequent
contract.
required Rtat: 225 Days After Receipt Of Asset.
throughput Constraint: Contractor Must Provide A Throughput Constraint Foreach Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commencx/month. A Throughput Of ##____ Per Month Reflects No Throughput Constraint.
induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
reconciliation:
a Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such Prices Are Based On The Contractor Meeting The Rtatrequirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
early And Incremental Deliveries Accepted And Preferred.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;honeywell Intl; Drawing Number ( ;99193; ) ;3800702-1; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
power Unit,gas Turb ;3800702-1; P/n, ;7rh 2835 015733495 P8; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
power Unit,gas Turb ;honeywell Int.; Company Name , ;phoenix, Az.; Address , ;(99193); Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date6 Feb 2025
Tender AmountRefer Documents
Details: Item Unique Identification And Valuation (jan 2023)|19|n723.15|b5p|215-697-2782|meghan.e.gubicza.civ@us.navy.mil||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) Type||cognizant Dfas|n00383|cognizant Dcma|cognizant Dcma|see Schedule |source|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
this Requirement Is For The Repair Of The Items Herein This Solicitation.
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor?s Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In The Subsequent Contract. Required Rtat: 129.822 Days After Receipt Of Asset.
throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of 0000 Per Month Reflects No Throughput Constraint.
induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
reconciliation: A Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such
prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;bae Systems; Drawing Number ( ;80249; ) ;1072288p-7; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
display Unit ;1072288p-7; P/n, ;7rh 7025 017016736 P8; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
display Unit ;bae Systems; Company Name , ;450 Pulaski Road Greenlawn, Ny 11740-1606; Address , ;80249; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
DEPT OF THE NAVY USA Tender
Aerospace and Defence
United States
Closing Date6 Feb 2025
Tender AmountRefer Documents
Details: Important Information For Interested Parties: this Notice Of Intent Is Not A Request For Competitive Proposals. However, Responsible, Interested Parties May Identify Their Interest And Capability By Responding To This Notice. The Government Will Consider All Information Received Prior To The Closing Date Of This Notice. A Determination By The Government Not To Compete This Proposed Contract Based Upon Responses To This Notice Is Solely Within The Discretion Of The Government. There Are No Commitments By The Government To Issue Any Solicitations, Make An Award Or Awards, Or To Be Responsible For Any Monies Expended By Any Interested Parties Before Award Of A Contract For The Efforts Mentioned Above. Information Provided Herein Is Subject To Change And In No Way Binds The Government To Solicit For Or Award A Contract. No Telephone Responses Will Be Accepted. this Is Not A Request For Proposal. It Does Not Constitute A Solicitation And Shall Not Be Construed As A Commitment By The Government. Responses In Any Form Are Not Offers And The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. No Funds Are Available To Pay For Preparation Of Responses To This Announcement. Any Information Submitted By Respondents To This Technical Description Is Strictly Voluntary. this Request For Information Is A Market Research Tool Being Used In Accordance With Federal Acquisition Regulation (far) Subpart 15.2 To Determine Potential And Eligible Businesses Capable Of Providing The Services Described Herein. 1.0 Introduction the Naval Air Systems Command (navairsyscom) Program Executive Office, Unmanned Aviation And Strike Weapons, Peo(u&w), Pma-263, At Patuxent River, Maryland, Announces Its Intention To Broaden Industry Partnership And To Procure, On A Competitive Basis, Coco Services Necessary To Provide Uas Isr Services For The Navy And Marine Corps Small Tactical Unmanned Aircraft Systems (stuas) Program Office (pma-263) In Support Of The Department Of Defense (dod) And Other Government Agencies (oga).these Services Will Support Domestic And Coalition Military Partners In Combat And Contingency Operations. Currently, These Services Are Being Delivered Under Performance-based Basic Ordering Agreements (boas) Issued In March 2021 To Insitu, Inc. Of Bingen Wa, And Textron Systems Of Hunt Valley Md, For Land-based And Sea-based Isr Services. The Existing Boas, N0001921g0007 And N0001921g0008, Respectively, Are Firm-fixed-price Type And Expire March 2026. Detailed Information On The Existing Boas Can Be Obtained Via The Following Website: Https://www.navair.navy.mil/foia. This Request For Information Is Issued With The Intent To Award Boa(s) To Onboard Additional Qualified Vendor(s) To Compete For Future Isr Coco Services. 2.0 Objective pma-263 Is Seeking To Identify Additional Contractors Capable Of Providing Coco Isr Services In Support Of Dod, Oga, And Combat And Contingency Operational Requirements. This Request For Information Is Related To Support For Land-based And Sea-based Operations To Provide Reliable Delivery Of Sensor Data. Contractors Would Be Responsible For Resources To Produce Sensor Data, Such As Trained Personnel, Non-developmental Uas Equipment, Certifications, Operation And Maintenance, Spares And Product Support. Contracted Services Would Be In Direct Support Of Isr Missions Requiring Around The Clock Imagery And Other Sensor Capability In Support Of Those Missions. Contractors Shall Be Capable Of Providing Isr Services On A Normal And Surge Basis, Day And Night, 24 Hours A Day, Seven Days A Week. Pre-deployment, Deployment, And Post-deployment Support Would Be Required, And Would Entail Execution Of A Variety Of Responsibilities Inherent To Execution Of Such Support, Including But Not Limited To, Equipment Transportation, Export Control Licensing, Insurance, Personnel Travel, Processing For Overseas Movement And Accountability, Visa Coordination, Compliance With Requirements At Dfars 252.225-7040, Compliance With Dodi 3020.41, Etc. 3.0 Requirements pma-263 Is Specifically Interested In Uas Isr Services Capable Of The Following Performance Parameters. The Following Parameters Constitute Mandatory Minimum Requirements: technology Readiness Level (trl): Trl 8 Per Dod Deskbook 5000.2 operational Range: At Least 75 Nautical Miles (nm) From The Ground Control Station Located At The Launch Site, With A Single Air Vehicle, For Both Sea-based And Land-based Uas Operations datalink Range (communications And Full Motion Video (fmv)): Line-of-sight With Type-1 Encryption Utilizing The Bandwidth Efficient Common Data Link (be-cdl) Waveform on Station Time: 10 Hours Time-on-station (tos) At Maximum Range simultaneous, Multi-intelligence (multi-int) Capable With Fmv Sensor(s) And An Electronic Warfare (ew) Type Sensor Or Wide Area Maritime Search (wams) Sensor fmv: Electro Optic (eo)/ Infrared (ir) – National Imagery Interpretability Rating Scale (niirs) Of Level 8.4 Or Above For Eo And 7.2 Or Above For Ir When Taken From The Uav At An Altitude Of 3,000 Feet Above Ground Level (agl) At A 45-degree Slant Range global Positioning System (gps) Precise Positioning Service (pps) Receiver operate In Gps-contested-/degraded Situations (uas Shall Be Capable Of Continued Navigation In A Gps-contested Environment Up To A Minimum 74db For All Phases Of Flight) operate In Adverse Weather Conditions And Austere Environments runway Independent for Land-based Operations, The Air Vehicle (av) Shall Operate On Commonly Available Fuels At Forward-deployed Locations, Such As Mil-dtl-5624, Grade Jp-4/jp-5; Mil-dtl-83133 Grade Jp-8/jp-8+100; Astm D910, Aviation Gasoline Grade 100ll; And Their Equivalent Nato And Commercial Versions. For Ship-based Operations, The Av Shall Operate On Mil-dtl- 5624, Grade Jp-4/jp-5. in Accordance With Dodi 8510.01, Obtain An Authorization To Operate (ato) From The Navair Function Authorization Official (fao) (ato With Provision (ato-p), Or Reciprocity Ato Inherited From Another Dod Service Branch Are Acceptable. meet The Ndaa2023 Section 817 Requirements For Country Of Origin Of Uas And Critical Components. submission Of A Data Package That Contains Engineering Data Necessary To Support A Category 3 Interim Flight Clearance (ifc) In Accordance With Navairinst 13034.1, Airworthiness Policy. sensors Output Stanag 4545, 4607, And 4676 Messages 4.0 Requested Information interested Vendors Should Submit A Brief Capability Statement Package (not To Exceed 15 Pages) Demonstrating Ability To Perform The Services Based On The Parameters In Paragraph 3.0. The Response Shall Contain The Respondent’s Primary Point Of Contact With Phone Number And Email Address. the Capabilities Statement Package Should Include But Not Limited To The Following Information: 4.1 Company Profile/status: 4.1.1 What Is Your Experience And Maturity (a) With Manufacturing And Developing Unmanned Aircraft System Products And (b) With Providing Isr Services? 4.1.2 Provide Your Cage Code, Unique Entity Identifier Number, Current Number Of Employees, Annual Revenue History, Office Location(s), The Respondent’s Web Page Url, And A Statement Regarding Current Small Or Large Business Status Based On The Designated Naics Code. 4.1.3 What Is The Technology Readiness Level (trl) Of Your Candidate Uas As Described In The Dod Technology Readiness Assessment Handbook? 4.1.4 Is The Uas Currently Available On One Or More Gsa Schedules? If So, Which One(s)? 4.1.5 Did You Receive Funding To Develop Your Uas From A Government Agency? 4.2 Uas Operating Parameters/configuration: 4.2.1 Describe How The Uas Satisfies The Minimum Requirements Stated In Paragraph 3.0 Above. In Addition, Describe The Following: 4.2.1.1 System’s Anti-jam Capabilities. 4.2.1.2 System’s Alternative Positioning, Navigation, And Timing (apnt) Solutions Capabilities In A Degraded/contested Gps Environment. 4.2.1.3 System’s Weather Limitations To Include But Not Limited To Ice, Rain, And Wind. 4.2.1.4 System’s Environmental Limitations (altitude, Temperature, Etc). 4.2.1.4.1 System’s Level Of Compliance With Mil-std-461g. 4.2.1.4.2 System’s Level Of Compliance With Mil-dtl-901e (grade B). 4.2.1.4.3 System’s Design Criteria With Respect To Minimizing Radar Cross Section (rcs). 4.2.1.5 System’s Ability To Remain Visually And Audibly Non-detectable At Operating Altitude. 4.2.1.6 Data Link Used Including Waveform, Operational Frequency Band, Analog Or Digital, And Encryption Capabilities. 4.2.1.7 Data Link Range At Different Operating Altitudes. 4.2.1.8 How Ground Control Station Communicates With The Air Vehicle Should The System Be Operating In A Beyond Line Of Sight (blos) Situation. 4.2.1.9 How Is The Air Vehicle Launched And Recovered? 4.2.1.9.1 How Many Launches, Recoveries, And Total Flight Hours Have Been Successfully Accomplished For This Configuration? 4.2.1.10 Describe How Ship-based Operations Would Occur To Include Launch And Recovery Profiles And Ship Infrastructure Requirements. 4.2.1.11 Describe Staffing Requirements At The Organizational Level. 4.2.1.11.1 How Many People Are Required To Operate The Uas? 4.2.1.11.2 How Many People Are Required To Maintain The Uas? 4.2.1.12 A Field Packed System Is Defined As Having All The Required Equipment To Accomplish A Mission And Be In A State Safe To Be Transported. How Long Does It Take To Go From A Field Packed System To Air Vehicle Launch? 4.2.1.13 Provide Data Supporting That The Uas Has Been Tested In A Relevant Operational Environment, Including Day And Night Video, If Available. 4.2.1.14 Has The Uas Conducted Field User Evaluations For The U.s. Government? If So, Please Provide The Following: 4.2.1.14.1 Applicable (unclassified) Results As To What Was Demonstrated 4.2.1.14.2 Any Changes Since The Demonstration, As Relevant To This Rfi 4.2.1.14.3 U. S. Government Point Of Contact. 4.2.1.15 What Software Operating System Does The Uas Use? Was The Software Developed And Coded In The U.s.? Does The Operating Software Interface With Dod Software And Dod Mapping Imagery Software Or Does It Require Company Proprietary Software To Operate The System? 4.2.1.16 How Does The Uas Download And Store Data Through The Ground Control Station And For How Long? 4.2.1.17 Is The Uas Controlled Under The International Traffic In Arms Regulations (itar)? 4.2.1.18 Do You Have An Export Configuration? If So, Please Describe The Export Configuration. 4.2.1.19 Has Critical Program Information (cpi) Or Critical Technology (as Defined In The Dodi 5200.39) That Requires Anti-tamper Protection And/or Low Observable Requirements Been Identified For The Uas? (unclassified Responses Only) 4.3 Training And Field Support: 4.3.1 Describe Any Other Ancillary Equipment That Is Not Included As Part Of The System Configuration, Such As Calibration Equipment. 4.3.2 Indicate Whether There Are Existing Operational And Maintenance Publications Or Manuals. 4.3.3 Provide The Uas’s Sparing Requirements Based On 9,000 Flight-hours Per Year Per Site For Land-based Isr Services And 2,400 Flight-hours Per Year For Ship-based Isr Services. 4.3.4 Describe The Uas’s Facility And Infrastructure Requirements At A Fielded Site. 4.3.5 Describe Continental United States (conus) And Outside The Continental United States (oconus) Field Support On The Uas While Deployed To Include Harsh Or Hostile Environments Overseas. 4.3.6 Describe The Existing Training Curriculum (course Type Classes, Devices, Duration, Training Location And Any Certification Requirement Timelines). 4.3.7 Provide Any Other System Features That The Uas Has That Are Unique And Stand Out From Other System Platforms. 4.4 Cybersecurity Support 4.4.1 Describe Whether The System Has Undergone A Dod Sanctioned Ato Or Iatt Using The Risk Management Framework (rmf) Process Prescribed In Dodi 8510.01. 4.4.2 Does The System Have An Active Ato/iatt From A Dod Service Branch? If So, Which Branch? 4.4.3 Can Artifacts Be Provided To Support A Navy/navair Ato? 4.4.4 Is The Service Branch Ao Possessing The Ato Amenable To Supporting A Reciprocity Ato And Engaging In A Memorandum Of Agreement With Navair? 4.4.5 Describe The Current Processes That You Have Implemented To Ensure The System Meets The Information Security Requirements Established Within The Nist 800-53 Sp Framework. 4.4.6 Has The System Undergone Cybersecurity Test And Evaluation? 4.4.7 Is There A Network Architectural Diagram For The System? If So, Does This Include Component/subcomponent Interfaces, Information Flow, Ports, Protocols, And Ip Addressing Used? 4.4.8 Does The System Have A System Security Plan (ssp) Outlining Its Implementation Status With Security Controls? 4.4.9 Has The System Undergone Network Vulnerability Scans, And Network Enumeration Scans (nessus, Wireshark, Nmap, Etc.)? 4.4.10 Does The System Have A List Of Hardware Used To Process, Store, And Transmit Information? (i.e., Full Bill Of Material (bom)) 4.4.11 Does The System Have A Complete List Of The Software Used On The System And Its Function(s)? (i.e., Software Bill Of Material (sbom) 4.4.12 Have Software Assurance Techniques Been Applied To The System, Ensuring Origins Of The Code And That It Is Free From Vulnerabilities (secure Sdlc, Code Scanning, Quality Checks, Patch Management Planning, Software Testing, Configuration Control, And Sbom)? 4.4.13 Describe How Your Company Has Implemented Enterprise Cybersecurity Standards Onto Your Resident It Equipment To Be Ability To Process, Store, And Transmit Dod Controlled Unclassified Information (cui). 4.4.14 Is The Company’s It Infrastructure Capable Of Meeting The Requirements Directed In Dfars 252.204-7012 For Safeguarding Covered Defense Information And Cyber Incident Reporting? 4.4.15 Has The Company Assessed Their Cybersecurity Implementation Against The Nist Sp 800-171 Sp Framework? 4.4.16 Has Your Company Undergone A Cybersecurity Maturity Model Certification (cmmc)? 4.4.17 Does The Company Have An Enterprise Ssp? 5.0 Responses/submission all Interested Sources Shall Submit Responses Electronically, Consisting Of A Capability Statement (paragraph 3.0) As Wells As Addressing The Information Required By Paragraph 4.0 Above Via Email To Contract Specialist, Ms. Heather Buckler At Heather.m.buckler.civ@us.navy.mil And Procuring Contracting Officer, Ms. Kristen Ferro At Kristen.w.ferro.civ@us.navy.mil. e-mail Must Contain The Following In The Subject Line: "rfi Response To Notice 243-24-189 Uas Coco Isr Services, (pma-263)” note That File Sizes Larger Than 5mb Are Not Recommended, As They May Not Be Receivable Due To Navy Marine Corps Intranet Security Protocol. 6.0 Format request For Information Responses Are Limited To 15 Pages, In 12-point Font, Not Including Preprinted (pre-published) Information Material. in Order To Maximize Efficiency And Minimize The Effort Involved In The Evaluation Process, All Submissions Must Comply With The Following Format And Content: 8.5 X 11 Inch Page single-spaced Typed Lines newspaper Column Formatting Is Not Permitted 1 Inch Margins On All Sides not Smaller Than A 12 Point Font Without Condensing photographs, Pictures Or Hyperlinks Are Permitted files Shall Be Microsoft Office 2016 Compatible Or Pdf Format; No Zip Files all Material Provided In Response To This Request For Information Shall Be Unclassified. to The Maximum Extent Practicable, Respondents Should Limit The Delivery Of Non-proprietary Information. Responses To This Request For Information Will Not Be Returned. If The Response Includes Proprietary Information, (1) Ensure Proprietary Information Is Marked Appropriately, (2) Identify Disposition Instructions, And (3) Indicate Whether You Require Government Support Contractors Providing Advisory And Assistance Services To The Government To Facilitate The Execution Of Information/proprietary Exchange Agreements With You. Government Support Contractors May Assist In The Review Of Any Data Provided By Applicants. government Support Contractors Have Entered Into Non-disclosure Agreements (ndas) With The Government, Which Precludes Them From Disclosing Any Proprietary Data Outside Of The Government. However, If Respondents Desire A Separate Nda With Government Support Contractors, Respondents Should Submit An Nda Form, Along With Instructions, To The Points Of Contact Listed In This Notice At The Time Of Their Submission. If Respondents Choose Not To Submit An Nda Form For Completion, Their Submission Of A Response To This Announcement Constitutes Consent That The Government Support Contractors Will Have Access To Their Proprietary Information. The Government Will Not Be Responsible For The Disclosure Of Any Confidential/proprietary Information Not Clearly Marked. At Any Time After Receipt Of Request For Information Responses, The Government May Contact Respondents Independently For Further Clarification Of The Submittal. 7.0 Past Responses To Questions Received 7.1 The Below Questions And Answers Are In Previous Responses To An Inquiry Regarding Section 3.0, Requirements From Past Industry Days: 7.1.1 Is This [operational] Range Based On A Maritime Deployment/installation? answer: The 75nm Range Is For Both Sea-based And Land-based Uas Operations. 7.1.2 Is This [operational Range] Considered A Connection Between The Ground Control System At The Launch Site Or Could That Also Include A “handoff” Between The Air Vehicle And A Forward Node To Extend Operational Flexibility? answer: A Single Air Vehicle Must Be Able To Operate A Minimum Of 75nm From The Ground Control Station Located At The Launch Site. 7.1.3 Is The Operational Range Based On A Customer Concept Of Operation Or Is There Any Additional Information Available? answer: There Is No Additional Information That Can Be Provided. 7.1.4 Is There Any Additional Information On This Jam-to-signal Calculation? answer: There Is No Additional Information That Can Be Provided. 7.2 The Below Questions And Answers Are In Response To An Inquiry Regarding Section 4.0, Requested Information, Part 4.3.3. 7.2.1 Is 54,000 [flight-hours Per Year] Intended To Be 5,400 [flight-hours Per Year]? answer: 54,000 Flight-hours Per Year Was For All Six Sites Currently Operating. Part 4.3.3 Has Been Updated To Reflect 9,000 Flight-hours Per Year Per Site. 7.2.2 Are The Sparing Requirements For Spare Air Vehicles Or Component Parts Based On Mean Time Before Failure? answer: Sparing Requirements And Details Are Based Solely On The Original Equipment Manufacturer (oem) Assessments Of What Is Required To Meet The Previously Stated Flight-hour Requirements
Bureau Of Corrections Muntinlupa City Metro Manila Tender
Automobiles and Auto Parts
Philippines
Closing Date20 Jan 2025
Tender AmountPHP 17.3 Million (USD 295.3 K)
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Supply And Delivery Of Various Bucor Vehicles 2025 (procurement/contract No. 010) Sixth Edition July 2020 Bids And Awards Committee 2024 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 16 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 22 Section Vi. Schedule Of Requirements 27 Section Vii. Technical Specifications 29 Section Viii. Bidding Forms 34 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid For Supply And Delivery Of Various Bucor Vehicles 2025 1. The Bureau Of Corrections, Through The National Expenditure Program Fy 2025 (capital Outlay) Intends To Apply The Sum Of Seventeen Million Three Hundred Thousand Pesos Only (₱17,300,000.00) Being The Abc To Payments Under The Contract For Supply And Delivery Of Various Bucor Vehicles 2025 With Identification Number __epa-010__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Within Thirty (30) Calendar Days. Bidders Should Have Completed, Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below During Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On __december 29, 2024 (08:00am To 05:00pm) To January 20, 2025 (08:00am To 01:29pm)___ From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty-five (₱25,000.00) Thousand Pesos Only. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees And Presented In Person. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On __january 06, 2025 (01:30pm)____ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before __january 20, 2025 (01:29pm)__. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)__ At The Given Address Below Bac Conference Room Nbp Reservation Muntinlupa City, Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Schedule Of Bidding Activities Shall Be As Follows: Activites Date/time Venue 1. Sale And Issuance Of Bid Documents December 29, 2024 (08:00am To 05:00pm) To January 20, 2025 (08:00am To 01:29pm)_ Supply Division Bureau Of Corrections Muntinlupa City 2. Pre-bid Conference January 06, 2025 (01:30pm Bac Conference Room Bureau Of Corrections Muntinlupa City 3. Submission And Opening Of Bid Documents January 20, 2025 (01:30pm) Bac Conference Room Bureau Of Corrections Muntinlupa City 11. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Maria Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt. Celso S. Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Wishes To Receive Bids For The Supply And Delivery Of Various Bucor Vehicles 2025 {[insert, If Applicable:] Under A Framework Agreement}, With Identification Number [indicate Number]. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Supply And Delivery Of Various Bucor Vehicles 2025 Is Composed Of One (1) Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For National Expenditure Program Fy 2025 (capital Outlay) In The Amount Of Seventeen Million Three Hundred Thousand Pesos Only (₱17,300,000.00). 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. [select One, Delete Other/s] A. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I. When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii. Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv. When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. B. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.2. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.3. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.4. Subcontracting Of Any Portion Of The Project Does Not Relieve The Supplier Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Supplier’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address Bac Conference Room Nbp Reservation, Poblacion, Muntinlupa, City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within The Last Four (4) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.5. [include If Framework Agreement Will Be Used:] Financial Proposals For Single Or Multi-year Framework Agreement Shall Be Submitted Before The Deadline Of Submission Of Bids As Prescribed In The Ib. For Multi-year Framework Agreement, Evaluation Of The Financial Proposal During This Stage Is For Purposes Of Determining Eligibility And Whether Or Not Such Financial Proposal Is Within The Abc. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 12.2. [include If Framework Agreement Will Be Used:] For Framework Agreement, The Following Should Also Apply In Addition To Clause 12.1: A. For A Single Year Framework Agreement, The Prices Quoted By The Bidder Shall Be Fixed During The Bidder’s Performance Of The Contract And Not Subject To Variation Or Escalation On Any Account. Price Schedules Required Under Clause 12.1 Shall Be Submitted With The Bidding Documents. B. For A Multi-year Framework Agreement, The Prices Quoted By The Bidder During Submission Of Eligibility Documents Shall Be The Ceiling And The Price Quoted During Mini-competition Must Not Exceed The Initial Price Offer. The Price Quoted During Call For Mini-competition Shall Be Fixed During The Bidder’s Performance Of That Call-off And Not Subject To Variation Or Escalation On Any Account. Price Schedules Required Under Clause 12.1 Shall Be Submitted With The Bidding Documents. 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14.3. [include If Framework Agreement Will Be Used:] In The Case Of Framework Agreement, Other Than The Grounds For Forfeiture Under The 2016 Revised Irr, The Bid Security May Also Be Forfeited If The Successful Bidder Fails To Sign The Framework Agreement, Or Fails To Furnish The Performance Security Or Performance Securing Declaration. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Posting Of Performance Security Or Performance Securing Declaration, As The Case May Be, By The Winning Bidder Or Compliant Bidders And The Signing Of The Framework Agreement. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 16.2. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, The Submission Of Bids Shall Be For The Initial Evaluation Of Their Technical And Financial Eligibility. Thereafter, Those Declared Eligible During The Said Initial Eligibility Evaluation And Entered Into A Framework Agreement With The Procuring Entity Shall Submit Anew Their Best Financial Offer At The Address And On Or Before The Date And Time Indicated In The Call For Each Mini-competition. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, Determination Of Margin Of Preference Shall Be Conducted Every Call For Mini-competition. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. [include The Following Options If Framework Agreement Will Be Used:] A. In The Case Of Single-year Framework Agreement, The Lowest Calculated Bid Shall Be Determined Outright After The Detailed Evaluation; B. For Multi-year Framework Agreement, The Determination Of The Eligibility And The Compliance Of Bidders With The Technical And Financial Aspects Of The Projects Shall Be Initially Made By The Bac, In Accordance With Item 7.4.2 Of The Guidelines On The Use Of Framework Agreement. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Option 1 – One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.1. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, All Bidders Initially Determined To Be Eligible And Financially Compliant Shall Be Subject To Initial Post-qualification. The Bac Shall Then Recommend The Execution Of A Framework Agreement Among All Eligible, Technically And Financially Compliant Bidders And The Procuring Entity And Shall Be Issued By Hope A Notice To Execute Framework Agreement. The Determination Of The Lowest Calculated Bid (lcb) Shall Not Be Performed By The Bac Until A Mini-competition Is Conducted Among The Bidders Who Executed A Framework Agreement. When A Call For Mini-competition Is Made, The Bac Shall Allow The Bidders To Submit Their Best Financial Proposals On Such Pre-scheduled Date, Time And Place To Determine The Bidder With The Lcb. 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, {[include If Framework Agreement Will Be Used:] Or In The Case Of Multi-year Framework Agreement, That It Is One Of The Eligible Bidders Who Have Submitted Bids That Are Found To Be Technically And Financially Compliant,}the Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. {[include If Framework Agreement Will Be Used:] For Every Mini-competition In Framework Agreement, The Lcb Shall Likewise Submit The Required Documents For Final Post Qualification.} 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. [include The Following Clauses If Framework Agreement Will Be Used:] 21.2. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Framework Agreement Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 21.3. Within Ten (10) Calendar Days From Receipt Of The Notice To Execute Framework Agreement With The Procuring Entity, The Successful Bidder Or Its Duly Authorized Representative Shall Formally Enter Into A Framework Agreement With The Procuring Entity For An Amount Of One Peso To Be Paid To The Procuring Entity As A Consideration For The Option Granted By The Procuring Entity To Procure The Items In The Framework Agreement List When The Need Arises. 21.4. The Procuring Entity Shall Enter Into A Framework Agreement With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 21.5. The Following Documents Shall Form Part Of The Framework Agreement: A. Framework Agreement Form; B. Bidding Documents; C. Call-offs; D. Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; E. Performance Security Or Performance Securing Declaration, As The Case May Be; F. Notice To Execute Framework Agreement; And G. Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Motor Vehicle. B. Completed Within The Last Four (4) Years Equivalent To At Least Fifty Percent (50%) Of The Abc, Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 The Price Of The Goods Shall Be Quoted Ddp Bureau Of Corrections Iwahig Prison And Penal Farm (ippf) Puerto Prinsesa City, Palawan Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Two Percent (2%) Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 19.3 One Project Having Several Items That Shall Be Awarded As One Contract. 20.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (sales Invoice Or Official Receipt Or End-users Acceptance) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Audited Financial Statement 7. 2 Sets Photo Copy Of Eligibility And Financial Envelope Marked As “copy 1” And “copy 2” 21.2 No Additional Contract Documents. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. [include The Following Clauses If Framework Agreement Will Be Used:] 2.3. For A Single-year Framework Agreement, Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under A Call-off Shall Not Vary From The Prices Quoted By The Supplier In Its Bid. 2.4. For Multi-year Framework Agreement, Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under A Call-off Shall Not Vary From The Prices Quoted By The Supplier During Conduct Of Mini-competition. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184.{[include If Framework Agreement Will Be Used:] In The Case Of Framework Agreement, The Bidder May Opt To Furnish The Performance Security Or A Performance Securing Declaration As Defined Under The Guidelines On The Use Of Framework Agreement.} 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project {[include If Framework Agreement Will Be Used:] Or Framework Agreement} Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 1 [list Here Any Additional Requirements For The Completion Of This Contract. The Following Requirements And The Corresponding Provisions May Be Deleted, Amended, Or Retained Depending On Its Applicability To This Contract:] Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: The Delivery Terms Applicable To This Contract Are Delivered To Bureau Of Corrections Iwahig Prison And Penal Farm (ippf) Puerto Prinsesa City, Palawan. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is The Acting Director, Directorate For Engineering Services. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B. In The Event Of Termination Of Production Of The Spare Parts: I. Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii. Following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Are Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of [indicate Here The Time Period Specified. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 Not Applicable 4 The Inspections And Tests That Will Be Conducted Are: Partial/complete Goods Shall Be Inspected By The Tiac Technical Inspection And Acceptance Committee. Representative From Supply Division To Be Witnessed By: Coa Representative The Goods Shall Be Accepted By The End User After Passing The Inspection Of The Tiac (technical Inspection And Acceptance Committee). 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. Section Vi. Schedule Of Requirements Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Section Vi. Schedule Of Requirements Supply And Delivery Of Various Bucor Vehicles 2025 The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Delivered, Weeks/months 1 Prison Van 6 30 Calendar Days 2 Staff Car 2 30 Calendar Days 3 Staff Car 4 30 Calendar Days I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vii. Technical Specifications Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 1 Prison Van Overall Dimensions L X W X H (mm): 4,600 X 1,695 X 1,955 Wheelbase: 2400 Seating Capacity: 3 Engine Type Type: 4ja1 Direct Injection Common Rail Displacement (cc):2499 Maximum Output (ps/rpm): 78 Hp @3900 Rpm Maximum Torque (nm/rpm): 176.5 Nm @ 1800 Rpm Fuel Type: Diesel Fuel Tank Capacity: 50 Liters Transmission: 5-speed Manual Brakes: Front: Ventilated Discs Rear: Drum. Leading & Trailing Tires: 195r 14c 8pr Wheels (size): 14 X 5.5jj (6 Studs) Color: Camouflage Safety And Security Blinker And Siren Comm. Sys. Basic Tools, Jack And Manual Others: Bucor Logo Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 2 Staff Car Overall Dimensions L X W X H (mm): 4,735 X 1,830 X 1,795 Seating Capacity:8 Engine Type Type: 4-cylinder, In-line, 16-valve Double Overhead Camshaft (variable Nozzleturbo Charger W/ Intercooler) Engine Displacement (cc): 2755 Maximum Output (ps/rpm) 174 / 3,400 Maximum Torque (nm/rpm): 360 / 1,200 - 3,400 Fuel Type: Diesel 1 Gd - Ftv 6 - Speed At Multi - Reflector Halogen Black+silver Front Grille Function Fabric (black)* With Keyless Entry Eco+power Apple Carplay + Android Auto Safety And Security Driver + Front Passenger + Knee (d) With + Brake Assist + Ebd With Vehicle Stability Control ( Vsc) With Hill-start Assist Control (hsa) With Reverse Camera Other Modification: Color- Black Blinker And Siren Com. Sys. Basic Tools, Jack And Manual Others: Bucor Logo- Magnetic Type Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance _________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 3 Staff Car Overall Dimensions L X W X H (mm): 4,395 X 1,730 X 1,690 Wheelbase(mm): 2750 Seating Capacity: 7 Engine Type Type: 4-cylinder, In-line, 16-valve Dohc With Duel Vvt-idisplacement (cc):1329 Maximum Output (ps/rpm) 98/6000 Maximum Torque (nm/rpm): 122/4200 Fuel Type: Gasoline Fuel Tank Capacity: 43l Chassis Drivetrain: Front Wheel Drive Cvt Transmission 1nr-ve Brakes: Front: Disc Rear: Drum Tires: 185/ 65 R15 Alloy 15" Alloy Wheels __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 3 Continuation: Exterior Segment Lcd Mid Headlamps: Split Type Led Rear Combination: Led Lamp 2-tone Interior Function Key Start Digital Aircon Control Back Camera & Sensor 8" Audio Display With Apple Carplay And Android Auto Safety And Security Driver And Front Passenger Airbags Alarm+immobilizer+indicator Back Camera Color: Black Metallic 1 Blinker And Siren Comm. Sys. Basic Tools, Jack And Manual Others: Bucor Logo- Magnetic Type Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Viii. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Eligibility Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (f) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Bidders Should Have Completed, Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (g) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (h) Conformity With The Schedule Of Requirements; And ⬜ (i) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And A. Certificate Of Dealership B. List Of Service Centers Nationwide C. Certificate Of Availability Of Spare Parts D. Brochure And ⬜ (j) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate/board Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (k) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc; Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation At Least Equal To Ten Percent (10%) Of The Abc. Class “b” Documents ⬜ (l) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements Ii. Financial Component Envelope ⬜ (m) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (n) Original Of Duly Signed And Accomplished Price Schedule(s). Bidding Forms Company Letterhead Statement Of Ongoing Government & Private Contracts Supply And Delivery Of Various Bucor Vehicles 2025 Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Value Of Outstanding Contract Total Value Of Outstanding Contract: Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Supply And Delivery Of Various Bucor Vehicles 2025 Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Delivery Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Certificate Of Net Financial Contracting Capacity (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2025 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Ten (10) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1 Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: A) If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; B) If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting ; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The Supply And Delivery Of Various Bucor Vehicles 2025. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Bid Form Date: Invitation To Bid No: [insert Reference Number] To: Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply And Delivery Of Various Bucor Vehicles 2025 In Conformity With The Said Bidding Documents For The Sum Of ________________________________________₱_________________ Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. We Agree To Abide By This Bid For The Bid Validity Period Specified In Bds Provision For Itb Clause 17.1 And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period. Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Of Agent Amount And Currency Purpose Of Commission Or Gratuity (if None, State “none”) Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And You’re Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements As Per Itb Clause 5 Of The Bidding Documents. We Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections. [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract On The Latter’s Behalf For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 2025. [signature Over Printed Name] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of __________________________ Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Schedule Of Prices Supply And Delivery Of Various Bucor Vehicles 2025 Quantity Units Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat 6 Units Prison Van ₱8,700,000.00 2 Units Staff Car ₱3,600,000.00 4 Units Staff Car ₱5,000,000.00 Total: ₱17,300,000.00 Total Bid Price Inclusive Of Vat In Words [signature Over Printed Name] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of _______________________________ Sixth Edition July 2020 Bids And Awards Committee 2024
5961-5970 of 6030 archived Tenders