Transportation Tenders
Transportation Tenders
Autobahnen Und Schnellstrassen Finanzierungs AG Tender
Others
Austria
Details: Asfinag Plans, Finances, Builds, Maintains And Operates The Entire Austrian Motorway And Expressway Network With A Length Of More Than 2,249 Km. Asfinag's Goal Is To Expand Austria's Motorway And Expressway Network Into The “intelligent Road Of The Future” And To Ensure Safety For Its Customers To Provide Convenient And Efficient Transportation Routes. Asfinag Maut Service Gmbh Is Responsible For The Collection Of Tolls On The Route Network, The Service Center, And The It Services. In The Security Environment, This Also Includes The Operation Of The Firewall Infrastructure For The Entire Austria-wide It Network. In Addition To Two Redundant Data Centers In The Area Of Vienna And The Central Office Location In Vienna, The Locations Are Primarily In The Traffic Management Centers In The Federal States As Well As Regional Highway Maintenance Depots. Today The Firewall Infrastructure Is Based On The “firepower” Product From Cisco. There Are Currently Three Types Of Hw Appliances From This Manufacturer In Use: - Type 9300 (including Virtual Instances): 6 Appliances - Type 4120: 2 Appliances - Type 2110: 29 Appliances Through The Locations Distributed Across Austria Is For The Provision Of Maintenance And Repair And In Order To Implement The Sla Specifications, An Austria-wide Service Organization Is Required. From An Architectural Perspective, A “destination Based Rule Set” Approach Is Used Today. However, A “source Based Rule Set” Approach Will Be Implemented In The Future. The Firewall Infrastructure (hardware And Software) Will Now Be Renewed In 2025. The Scope Of Services Includes The Following Points: - Hardware / Software (incl. Hw-lcm) / Firewall Management - Configuration Services / Change Management - Compliance And Audit Support - Maintenance And Servicing - Transition-in / Transition-out The Relevant Market Research In Accordance With Section 24 Is Also Included Bvergg 2018 Carried Out. The Aim Of Market Research Is To Evaluate The Current State Of Technology And The Potential Offer On The Market.
Closing Date26 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| Inspection Of Supplies--fixed-price (aug 1996)|2||| Time Of Delivery (june 1997)|20|0001aa|100|90|0002aa|90|124||||||||||||||| Stop-work Order (aug 1989)|1|| Wide Area Workflow Payment Instructions (jan 2023)|16|tbd|tbd|tbd|n00104|tbd|tbd|see Schedule Page|tbd|tbd|tbd|tbd|||||| Navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| Value Engineering (jun 2020)|3|||| Equal Opportunity (sep 2016)|2||| Small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2||| Integrity Of Unit Prices (nov 2021)|1|| Equal Opportunity For Veterans (jun 2020)|4||||| Warranty Of Data--basic (mar 2014)|2||| Small Business Subcontracting Plan (sep 2023)|4||||| Safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023))|9|||||||||| Equal Opportunity For Workers With Disabilities (jun 2020)|2||| Transportation Of Supplies By Sea (oct 2024)|2||| Limitations On Pass-through Charges (jun 2020)|1|| List Of Award Attachments|5|||||| Alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| Buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| Annual Representations And Certifications (may 2024)|13|333914|750|||||||||||| Cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1|| Instructions To Offerors -- Competitive Acquisition (nov 2021)|2||| Requirements For Submission Of Proposals Via Electronic Media (jan 2018)|1|email| Type Of Contract (apr 1984)|1|firm-fixed-price| Notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||| All Pricing Is Firm. Please Consider The Following When Providing Price: Include Repair Price With All Costs Associated With Receipt And Complete Repair Of Material That May Be In Unwhole Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts And Wear Damage. Due To System Limitations Section L: Instructions, Conditions, And Notices To Offerors Or Quoters And Section M: Evaluation Factors For Award Are Provided As Enclosures To The Solicitation. All Offerors Are Advised To Closely Read And Comply With Submission Requirements. Casrep Accelerated Delivery Is Encouraged And Accepted At No Additional Cost To Government. Your Proposal Should Include The Following Information: Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days If Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints? T&e Fee/price (if Asset Is Determined Br): If An Item Is Determined Beyond Physical Repair And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to Exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. Awardee Cage:_________ Inspection Cage:_______ Acceptance Cage:_________ Important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A Price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. In Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________ Per Unit. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Pump,centrifugal . 1.2 ;perform In Accordance With This Technical Data Package And External Documents.; 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2 ;this Technical Data Package Has External Documents, That Are Required To Perform The Necessary Requirements And Repairs For This Item. The Below Document References Are Sections Listed In Publication S9261-a2-tmm-072 Lcac Fuel Service And Transfer System Technical Manual Rev. 04 Issue Date 31oct2018 Below Documents Are Required To Assist In The Performance Of Repairs. Request For The Below Documents, Shall Be Sent To: Nswc Panama City Division, Lcac Support, Poc: Len Barron, Leonard.d.barron.civ@us.navy.mil, Phone: 760-815-8761 Fuel Transfer Pump 2525-1 And 2526-2 Refurb Procedures Rev. 03 23 June 2022 Figure 8-60 Transfer Pump Ipb Figure 8-68 Service Pump Ipb Table 6-3 Materials Table 6-32 Main Fuel Boost Pump Test Equipment And Material List 3. Requirements 3.1 Part/reference Number Items - The Pump,centrifugal Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements Of This Specification Tdp And Part Number(s) Listed Below. All Repair Work Shall Be Performed In Accordance With This Repair/overhaul Specification Tdp, Practices, Manuals, Directives, And External Technical Documents. But Not Limited To Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. Cage___ref. No. ;2526-2 H2526-2; 3.2 ;perform In Accordance With This Technical Data Package And External Documents. This Repair Requirement Is For Nsn 4320 013186355 Part Number 2526-2. All Requirements And Procedures Shall Be Followed, And Those That Are Specific For Part Number 2526-2. Requirements And Procedures That Are Specific To Part Number 2525-1 May Be Omitted.; 3.3 ;the Following Procedures Are Minimum Requirements For Complete Disassembly, Cleaning, Inspection, Refurbishment And Repair Of The 2525-1 And 2526-2 Lcac Fuel Pumps. Procedural Order Can Be Altered To Improve Workflow. 6-5.2.3 Disassembly: A. Conduct Preliminary Motor Winding Insulation Resistance Test. Grouped Pins A,b,c,d (2525-1) And J,k,l,m On 2526-2. Any Reading Less Than 1000 Mega-ohms Will Require A New Motor Assy As Part Of The Repair. B. Remove Throat (5, Figure 8-60 / 8-68) Flange By Removing Three Attaching Screws (6). Remove And Discard O-rings (7 And 8). C. Remove Impeller Screw (9) And Impeller (10). D. Remove Shaft Key (11) And, If Used, Shims (12 And 13). E. Remove Electrical Receptacle (2) With Four Attaching Screws (1). F. Remove Wires From Back Of Receptacle To Facilitate Removing Stator Assembly.mark All Wire Pin Locations For Reference During Reassembly. G. Remove Terminal Lug Wire (18) With Screw (19). Remove And Discard O-ring (3) H. Remove Cover Assembly (14) With Four Attaching Screws (15) And Washers (16).remove And Discard O-ring (17) From Cover (14). I. Remove Sleeve (20). J. Remove Rotor Assembly (22) From Housing Assembly (31). K. Extract Stator Assembly (23) From Housing (31) By Heating Housing (31) To 250 +/- 10 �f L. Remove Dowel (21) From Stator Assembly (23). 6-5.2.4 Cleaning: A. Refer To Table 6-3 And Table 6-6 For Recommended Cleaning Materials. Equivalent Cleaning Materials May Be Substituted For The Items Listed. B. Clean All Nonmetallic Parts By Wiping With Clean, Lint-free Tissues Or Cloth Slightly Moistened With Isopropyl Alcohol. C. Immerse All Nonelectrical Components In Cleaning Solvent Or Detergent. Dip Components In And Out Of Solvent To Clean All Passages. D. Using A Stiff, Nonmetallic Brush Moistened With Cleaning Solvent, Clean All Machined Surfaces To Remove Accumulations Of Foreign Matter. Pump Housing May Require Media Blast Cleaning To Remove All Corrosion And Provide Proper Surface Preparation For New Anodize (clear Or Red) Coating. E. If Detergent Is Used, Clean Parts With Water. Dry All Parts Using Lint-free, Clean Cloth And/or Clean Compressed Air At 15 Psig Maximum. F. Clean Electrical Receptacle And Stator Assembly With A Clean, Lintfree Cloth Slightly Moistened With Cleaning Solvent. G. Dry All Parts Using A Lint-free Cloth And/or Clean Compressed Air At 15 Psig. 6-5.2.5 Repair Or Replacement: A. Refer To Table 6-3 And Table 6-6 For Recommended Repair Materials Materials(not An All Inclusive List). Equivalent Repair Materials May Be Substituted. B. Remove And Polish Out Minor Burrs, Nicks, And Scratches On Metal Parts. Use Crocus Cloth For Steel Parts And Aluminum Oxide-abrasive Cloth For Aluminum Parts. Glass Bead Blasting For Larger Exterior Surface Prep. C. Apply A Protective Chemical Film To Repair A Worn Anodized Finish Or To Protect An Aluminum Surface Finish. Exterior Pump Housing Surfaces Shall Receive All New Anodize Coating (clear Or Red). D. Repair Threaded Parts, If Damage To One Thread Is 50 Percent Or Less, By Chasing Threads With Appropriate Tap Or Die. Replace All Threaded Parts With Greater Than One Thread/50% Loss Damage. E. When Disconnecting An Electrical Lead From A Connector, Mark The Pin Position Of The Lead To Aid In Reassembly. F. Prepare Ends Of A Lead For Terminal Or Pin Connection By Removing 1/4 Inch Of Insulation From Ends Of Lead. G. Solder Leads To Connector Pin Or Terminal Using Solder Per Mil-std-454. H. Shrink All Heat-shrink Tubing In Place Using A Thermogun. I. Make A Replacement Lead Using The Appropriate Wire And The Removed Lead As A Template. J. Replace All O-rings Regardless Of Condition.c 6-5.2.6 Inspection: Note: Replace Any Part That Fails To Meet The Requirements Of The Inspections With A Serviceable Part.; 3.4 Marking - This Item Shall Be Physically Identified In Accordance With ;mil-std-130, Rev N, 16 Nov 2012; . 3.5 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And Approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The Substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government Evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: Code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. Code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. Code 3: Part Not Furnished Separately - Use Assembly. Code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. Code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. Code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 ;perform In Accordance With This Technical Data Package And External Documents. ; 4.2 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, The Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The Specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any Inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.4 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.5 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 4.6 ;upon Completion Of Testing Each Pump Will Be Packaged With An Acceptance Test Data Sheet Listing Actual Recorded Parameters For All Test Steps Listed Above. Any Substitution, Reduction Or Modification In Scope/criteria Of This Procedure Must Be Approved By The Government.; 4.7 ;repair Activity Will Submit Proposed Repair Practices, Procedures, And Acceptance Test Procedures For Both The 2525-1 And 2526-2 Lcac Fuel Pumps For Government Approval Prior To Conducting Any Repair Work. Repair Activity Shall Submit Proposed Repair Practices, Procedures, And Acceptance Test Procedures To Navsup Wss Technical, Via Navsup Wss Contracting Officer. Navsup Technical Will Submit Documents To The In-service Engineering Activity (isea) For Review And Approval. Isea Will Need 10 Working Days For Review And Approval. If Submission Is Returned Back To Repair Activity For Additional Comments Or Updates, Repair Activity Will Have 10 Working Days To Submit For Final Approval.; 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information Contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: A... Approved For Public Release; Distribution Is Unlimited. B... Distribution Authorized To Us Governments Agencies Only. C... Distribution Authorized To Us Government Agencies And Their Contractors. D... Distribution Authorized To Dod And Dod Contractors Only. E... Distribution Authorized To Dod Components Only. F... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. X... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.2 ;perform In Accordance With This Technical Data Package And External Documents. ; Date Of First Submission=asreq Block 10, 12 - Submit One Copy Of The Repair Procedure Prior To Performing Any Repair Work. Repair Activity Will Submit Proposed Repair Practices, Procedures, And Acceptance Test Procedures For Both The 2525-1 And 2526-2 Lcac Fuel Pumps For Government Approval Prior To Conducting Any Repair Work. Repair Activity Shall Submit Proposed Repair Practices, Procedures, And Acceptance Test Procedures To Navsup Wss Technical, Via Navsup Wss Contracting Officer. Navsup Technical Will Submit Documents To The In-service Engineering Activity (isea) For Review And Approval. Isea Will Need 10 Working Days For Review And Approval. If Submission Is Returned Back To Repair Activity For Additional Comments Or Updates, Repair Activity Will Have 10 Working Days To Submit For Final Approval. Repair Activity Shall Provide Documentation In Adobe Acrobat Version, 7.0 Or Later. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Pump,centrifugal . 1.2 ;perform In Accordance With This Technical Data Package And External Documents.; 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2 ;this Technical Data Package Has External Documents, That Are Required To Perform The Necessary Requirements And Repairs For This Item. The Below Document References Are Sections Listed In Publication S9261-a2-tmm-072 Lcac Fuel Service And Transfer System Technical Manual Rev. 04 Issue Date 31oct2018 Below Documents Are Required To Assist In The Performance Of Repairs. Request For The Below Documents, Shall Be Sent To: Nswc Panama City Division, Lcac Support, Poc: Len Barron, Leonard.d.barron.civ@us.navy.mil, Phone: 760-815-8761 Fuel Transfer Pump 2525-1 And 2526-2 Refurb Procedures Rev. 03 23 June 2022 Figure 8-60 Transfer Pump Ipb Figure 8-68 Service Pump Ipb Table 6-3 Materials Table 6-32 Main Fuel Boost Pump Test Equipment And Material List 3. Requirements 3.1 Part/reference Number Items - The Pump,centrifugal Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements Of This Specification Tdp And Part Number(s) Listed Below. All Repair Work Shall Be Performed In Accordance With This Repair/overhaul Specification Tdp, Practices, Manuals, Directives, And External Technical Documents. But Not Limited To Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. Cage___ref. No. ;2525-1 H2525-1; 3.2 ;perform In Accordance With This Technical Data Package And External Documents. This Repair Requirement Is For Nsn 4320 013311678 Part Number 2525-1. All Requirements And Procedures Shall Be Followed, And Those That Are Specific For Part Number 2525-1. Requirements And Procedures That Are Specific To Part Number 2526-2 May Be Omitted.; 3.3 ;the Following Procedures Are Minimum Requirements For Complete Disassembly, Cleaning, Inspection, Refurbishment And Repair Of The 2525-1 And 2526-2 Lcac Fuel Pumps. Procedural Order Can Be Altered To Improve Workflow. 6-5.2.3 Disassembly: A. Conduct Preliminary Motor Winding Insulation Resistance Test. Grouped Pins A,b,c,d (2525-1) And J,k,l,m On 2526-2. Any Reading Less Than 1000 Mega-ohms Will Require A New Motor Assy As Part Of The Repair. B. Remove Throat (5, Figure 8-60 / 8-68) Flange By Removing Three Attaching Screws (6). Remove And Discard O-rings (7 And 8). C. Remove Impeller Screw (9) And Impeller (10). D. Remove Shaft Key (11) And, If Used, Shims (12 And 13). E. Remove Electrical Receptacle (2) With Four Attaching Screws (1). F. Remove Wires From Back Of Receptacle To Facilitate Removing Stator Assembly.mark All Wire Pin Locations For Reference During Reassembly. G. Remove Terminal Lug Wire (18) With Screw (19). Remove And Discard O-ring (3) H. Remove Cover Assembly (14) With Four Attaching Screws (15) And Washers (16).remove And Discard O-ring (17) From Cover (14). I. Remove Sleeve (20). J. Remove Rotor Assembly (22) From Housing Assembly (31). K. Extract Stator Assembly (23) From Housing (31) By Heating Housing (31) To 250 +/- 10 �f L. Remove Dowel (21) From Stator Assembly (23). 6-5.2.4 Cleaning: A. Refer To Table 6-3 And Table 6-6 For Recommended Cleaning Materials. Equivalent Cleaning Materials May Be Substituted For The Items Listed. B. Clean All Nonmetallic Parts By Wiping With Clean, Lint-free Tissues Or Cloth Slightly Moistened With Isopropyl Alcohol. C. Immerse All Nonelectrical Components In Cleaning Solvent Or Detergent. Dip Components In And Out Of Solvent To Clean All Passages. D. Using A Stiff, Nonmetallic Brush Moistened With Cleaning Solvent, Clean All Machined Surfaces To Remove Accumulations Of Foreign Matter. Pump Housing May Require Media Blast Cleaning To Remove All Corrosion And Provide Proper Surface Preparation For New Anodize (clear Or Red) Coating. E. If Detergent Is Used, Clean Parts With Water. Dry All Parts Using Lint-free, Clean Cloth And/or Clean Compressed Air At 15 Psig Maximum. F. Clean Electrical Receptacle And Stator Assembly With A Clean, Lintfree Cloth Slightly Moistened With Cleaning Solvent. G. Dry All Parts Using A Lint-free Cloth And/or Clean Compressed Air At 15 Psig. 6-5.2.5 Repair Or Replacement: A. Refer To Table 6-3 And Table 6-6 For Recommended Repair Materials Materials(not An All Inclusive List). Equivalent Repair Materials May Be Substituted. B. Remove And Polish Out Minor Burrs, Nicks, And Scratches On Metal Parts. Use Crocus Cloth For Steel Parts And Aluminum Oxide-abrasive Cloth For Aluminum Parts. Glass Bead Blasting For Larger Exterior Surface Prep. C. Apply A Protective Chemical Film To Repair A Worn Anodized Finish Or To Protect An Aluminum Surface Finish. Exterior Pump Housing Surfaces Shall Receive All New Anodize Coating (clear Or Red). D. Repair Threaded Parts, If Damage To One Thread Is 50 Percent Or Less, By Chasing Threads With Appropriate Tap Or Die. Replace All Threaded Parts With Greater Than One Thread/50% Loss Damage. E. When Disconnecting An Electrical Lead From A Connector, Mark The Pin Position Of The Lead To Aid In Reassembly. F. Prepare Ends Of A Lead For Terminal Or Pin Connection By Removing 1/4 Inch Of Insulation From Ends Of Lead. G. Solder Leads To Connector Pin Or Terminal Using Solder Per Mil-std-454. H. Shrink All Heat-shrink Tubing In Place Using A Thermogun. I. Make A Replacement Lead Using The Appropriate Wire And The Removed Lead As A Template. J. Replace All O-rings Regardless Of Condition.c 6-5.2.6 Inspection: Note: Replace Any Part That Fails To Meet The Requirements Of The Inspections With A Serviceable Part.; 3.4 Marking - This Item Shall Be Physically Identified In Accordance With ;mil-std-130, Rev N, 16 Nov 2012; . 3.5 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And Approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The Substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government Evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: Code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. Code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. Code 3: Part Not Furnished Separately - Use Assembly. Code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. Code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. Code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 ;perform In Accordance With This Technical Data Package And External Documents. ; 4.2 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, The Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The Specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any Inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.4 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.5 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 4.6 ;upon Completion Of Testing Each Pump Will Be Packaged With An Acceptance Test Data Sheet Listing Actual Recorded Parameters For All Test Steps Listed. Any Substitution, Reduction Or Modification In Scope/criteria Of This Procedure Must Be Approved By The Government. 4.7 ;repair Activity Will Submit Proposed Repair Practices, Procedures, And Acceptance Test Procedures For Both The 2525-1 And 2526-2 Lcac Fuel Pumps For Government Approval Prior To Conducting Any Repair Work. Repair Activity Shall Submit Proposed Repair Practices, Procedures, And Acceptance Test Procedures To Navsup Wss Technical, Via Navsup Wss Contracting Officer. Navsup Technical Will Submit Documents To The In-service Engineering Activity (isea) For Review And Approval. Isea Will Need 10 Working Days For Review And Approval. If Submission Is Returned Back To Repair Activity For Additional Comments Or Updates, Repair Activity Will Have 10 Working Days To Submit For Final Approval.; 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information Contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: A... Approved For Public Release; Distribution Is Unlimited. B... Distribution Authorized To Us Governments Agencies Only. C... Distribution Authorized To Us Government Agencies And Their Contractors. D... Distribution Authorized To Dod And Dod Contractors Only. E... Distribution Authorized To Dod Components Only. F... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. X... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.2 ;perform In Accordance With This Technical Data Package And External Documents. ; Date Of First Submission=asreq Block 10, 12 - Submit One Copy Of The Repair Procedure Prior To Performing Any Repair Work. Repair Activity Will Submit Proposed Repair Practices, Procedures, And Acceptance Test Procedures For Both The 2525-1 And 2526-2 Lcac Fuel Pumps For Government Approval Prior To Conducting Any Repair Work. Repair Activity Shall Submit Proposed Repair Practices, Procedures, And Acceptance Test Procedures To Navsup Wss Technical, Via Navsup Wss Contracting Officer. Navsup Technical Will Submit Documents To The In-service Engineering Activity (isea) For Review And Approval. Isea Will Need 10 Working Days For Review And Approval. If Submission Is Returned Back To Repair Activity For Additional Comments Or Updates, Repair Activity Will Have 10 Working Days To Submit For Final Approval. Repair Activity Shall Provide Documentation In Adobe Acrobat Version, 7.0 Or Later.
Closing Date24 Jan 2025
Tender AmountRefer Documents
DMT Jelinek sro Tender
Civil And Construction...+2Civil Works Others, Excavation
Czech Republic
Details: The subject of the delivery is the delivery of 2 pcs of CNC lathes with accessories for the company Dmt Jelinek Sro with the possibility of partial fulfillment. Definition of Partial Fulfillments: Partial Fulfillment A: Cnc Lathe With Accessories (larger machine) Partial Fulfillment B: Cnc Lathe With Accessories (smaller machine) Delivery of Technology Means Delivery of All Required Elements of Equipment, Including Installation of Technology itself. Transporting the Technology to the Place of Designation, Installation or Assembly, Its Involvement, Including All Possible Assembly Work Necessary for the Proper Completion of the Delivery, and Furthermore, All Activities Related to the Delivery, Including Personnel Training. • Supplier Must Guarantee Warranty Service Support. • The Supplier Must Provide Training Related to the Operation of the Technology. The Equipment Supplied Must Be New, Unused, First Class Quality, Wrapped In Original Packaging. As part of fulfilling the subject of the contract, the selected supplier will be obliged to carry out and include in the bid price all other activities related to the implementation of the contract. If specific trade names are mentioned in the tender documentation or their annexes, this is only a definition of the required standard, and the contracting authority also allows other technically and qualitatively comparable solutions. The Technical Specification of the Required Technology is given in Appendix No. 2 For Partial Fulfillment of Parts A, B of this Call for Tenders. For the Specification of Technical Modifications of Individual Elements of Technology/Software of the Machine From Each Partial Fulfillment, Technical Drawing Documentation is Part of the Appendices - Appendix No. 5 A Annex No. 6. The Contractor undertakes to hand over the relevant premises, which are to be the place of operation of the machine, in a condition suitable for putting the machine into operation. The Seller will ensure the transportation of the machines to the customer's place, the removal of the machine from the means of transport, its transfer to the place of operation and installation at its own expense. The Principal shall provide the Seller with the cooperation necessary to put the machine into operation. The Seller will send the documents for this cooperation to the Buyer within 10 days of concluding the contract. Without undue delay after the delivery of these documents, the client will prepare the place of operation for anchoring the machine and putting it into operation in accordance with these documents. The implementation of the anchoring of the machine and the construction of the foundations for the machine shall be agreed by the seller before the delivery of the machine.
Closing Date9 Jan 2025
Tender AmountCZK 9.5 Million (USD 387.9 K)
DEPT OF THE NAVY USA Tender
Machinery and Tools...+1Chemical Products
United States
Details: This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Subpart 12.6, As Supplemented With Far Part 13 Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued.
request For Quotation (rfq) N5523625q0040 Is Issued As A Total Small Business Set-aside. The Subject Solicitation Is Being Processed Using Far Part 12 And 13. Any Quote From A Large Business Is Ineligible For Award. The Applicable North American Industry Classification System (naics) Code Is 332911 – Industrial Valve Manufacturing.
this Solicitation Documents And Incorporates Provisions And Clauses That Are Those In Effect Through Federal Acquisition Circular 2024-07 (effective 30 September 2024) And Dfars Publication Notice 20241001.
description: Southwest Regional Maintenance Center (swrmc) Requires Procurement And Delivery Of Long Lead Time Material (lltm) In Support Of Swrmc At Naval Base San Diego As Follows: Quote Shall Provide Lltm Delivery Date.
see Product Description
the Full Text Of Far And Dfar References, Provisions And Clauses May Be Accessed At Https://acquisition.gov.
the Following Provisions And Clauses Apply To This Acquisition And Will Be Incorporated Into Any Resultant Purchase Or Delivery Order.
c-202-h001 Additional Definitions – Basic (navsea) Oct 2018
c-204-h001 Use Of Navy Support Contractors For Official Contract Files (navsea) Oct 2018
c-211-h017 Updating Specifications And Standards (navsea) Dec 2018
c-211-h018 Approval By The Government (navsea) Jan 2019
c-211-h019 Commonality And Standardization (navsea) Feb 2022
c-215-h002 Contractor Proposal (navsea) Oct 2018
c-223-h003 Exclusion Of Mercury (navsea) Mar 2019
c-247-h001 Permits And Responsibilities (navsea) Dec 2018
d-211-h004 Identification Marking Of Parts -- Basic (navsea) Oct 2018
d-211-h005 Identification Marking Of Parts -- Alternate I (navsea) Oct 2018
d-246-h002 Warranty Notification For Item(s) ____-- Basic (navsea) Oct 2018
d-246-h003 Warranty Notification For Item(s) ____-- Alternate I (navsea) Apr 2024
d-247-h004 Marking And Packing List(s) – Basic (navsea) Feb 2022
d-247-h005 Marking And Packing List(s) – Alternate I (navsea) Oct 2018
d-247-w001 Prohibited Packing Materials (navsea) Oct 2018
52.246-2 Inspections Of Supplies – Fixed Price Aug 1996
52.246-11 Higher-level Contract Quality Requirement Dec 2014
52.246-16 Responsibilities For Supplies Apr 1984
e-246-h022 Inspection And Test Records (navsea) Jan 2019
52.242-15 Stop-work Order Aug 1989
52.242-17 Government Delay Of Work Apr 1984
52.247-34 F.o.b. Destination Nov 1991
f-242-h001 Contractor Notice Regarding Late Delivery (navsea) Oct 2018
252.232-7003 Electronic Submission Of Payment Requests And Receiving Reports Dec 2018
252.232-7006 Wide Area Work Flow Payment Instructions Jan 2023
g-232-h002 Payment Instructions And Contract Type Summary For Payment Office (navsea) Feb 2024
g-232-h005 Supplemental Instructions Regarding Invoicing (navsea) Jan 2019
g-242-h001 Government Contract Administration Points Of Contact And Responsibilities (navsea) Oct 2023
g-242-h002 Hours Of Operation And Holiday Schedule (navsea) Jul 2021
52.203-19 Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements Jan 2017
52.204-7 System For Award Management Oct 2018
52.204-19 Incorporation By Reference Of Representations And Certifications Dec 2014
52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment Nov 2021
52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment Nov 2021
52.204-26 Covered Telecommunications Equipment Or Services-representation Oct 2020
52.209-10 Prohibition On Contracting With Inverted Domestic Corporations Nov 2015
52.209-11 Representation By Corporations Regarding Delinquent Tax Liability Or A Felony Conviction Under And
Federal Law Feb 2016
52.212-4 Contract Terms And Conditions--commercial Items Nov 2023
52.232-39 Unenforceability Of Unauthorized Obligations Jun 2013
52.232-40 Providing Accelerated Payments To Small Business Subcontractors Mar 2023
52.252-2 Clauses Incorporated By Reference Feb 1998
52.252-6 Authorized Deviations In Clauses Nov 2020
252.203-7000 Requirements Relating To Compensation To Former Dod Officials Sep 2011
252.203-7002 Requirements To Inform Employees Of Whistleblower Rights Dec 2022
252.203-7005 Representation Relating To Compensation Of Former Dod Officials Sep 2022
252.204-7000 Disclosure Of Information Oct 2016
252.204-7003 Control Of Government Work Product Apr 1992
252.204-7008 Compliance With Safeguarding Covered Defense Information Controls Oct 2016
252.204-7009 Limitations On The Use Or Disclosure Of Third-party Contractor Reported Cyber Incident
information Jan 2023
252.204-7012 Safeguarding Covered Defense Information And Cyber Incident Reporting Jan 2023
252.204-7015 Notice Of Authorized Disclosure Of Information By Litigation Support Jan 2023
252.204-7019 Notice Of Nistsp 800-171 Dod Assessment Requirements Nov 2023
252.204-7020 Nist Sp 800-171dod Assessment Requirements Nov 2023
252.204-7021 Cybersecurity Maturity Model Certification Requirements Jan 2023
252.204-7022 Expediting Contract Closeout May 2021
252.204-7024 Notice On The Use Of The Supplier Performance Risk System Mar 2023
252.211-7003 Item Unique Identification And Valuation Jan 2023
252.215-7013 Supplies And Services Provided By Nontraditional Defense Contractors Jan 2023
252.223-7008 Prohibition Of Hexavalent Chromium Jan 2023
252.225-7000 Buy American – Balance Of Payments Program Certificate Feb 2024
252.225-7001 Buy American And Balance Of Payment Program Feb 2024
252.225-7002 Qualifying Country Sources As Subcontractors Mar 2022
252.225-7048 Export Controlled Items Jun 2013
252.232-7010 Levies On Contract Payments Dec 2006
252.237-7010 Prohibition On Interrogation Of Detainees By Contractor Personnel Jan 2023
252.244-7000 Subcontracts For Commercial Items Nov 2023
252.246-7003 Notification Of Potential Safety Issues Jan 2023
252.247-7023 Transportation On Supplies By Sea Oct 2024
52.212-5 – Contract Terms And Conditions Required To Implement Statutes Or Executive Orders – Commercial Products And Commercial Services (may 2024)
(a) The Contractor Shall Comply With The Following Federal Acquisition Regulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
(1) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)).
(2) 52.204-23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (dec 2023) (section 1634 Of Pub. L. 115-91).
(3) 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115-232).
(4) 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015).
(5) 52.232-40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801).
(6) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553).
(7) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77 And 108-78 (19 U.s.c. 3805 Note)).
(b) The Contractor Shall Comply With The Far Clauses In This Paragraph (b) That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
___1) 52.203-6, Restrictions On Subcontractor Sales To The Government (jun 2020), With Alternate I (nov 2021) (41 U.s.c. 4704 And 10 U.s.c. 4655).
___2) 52.203-13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509).
___3) 52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009 (jun 2010) (section 1553 Of Pub. L. 111-5).
___4) 52.203-17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community—see Far 3.900(a)
_x__5) 52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards (jun 2020) (pub. L. 109-282) (31 U.s.c. 6101 Note).
___6) [reserved]
___7) 52.204-14, Service Contract Reporting Requirements (oct 2016) (pub. L. 111-117, Section 743 Of Div. C).
___8) 52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts (oct 2016) (pub. L. 111-117, Section 743 Of Div. C).
_x_9) 52.204-27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117-328).
___10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—federal Supply Schedules, Governmentwide Acquisition Contracts, And Multi-agency Contracts. (dec 2023) (pub. L. 115–390, Title Ii).
___11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—prohibition. (dec 2023) (pub. L. 115–390, Title Ii).
___ (ii) Alternate I (dec 2023) Of 52.204–30.
__x_12) 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment. (nov 2021) (31 U.s.c. 6101 Note).
___13) 52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters (oct 2018) (41 U.s.c. 2313).
___14) [reserved].
_ _15) 52.219-3, Notice Of Hubzone Set-aside Or Sole-source Award (oct 2022) (15 U.s.c. 657a).
___16) 52.219-4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (oct 2022) (if The Offeror Elects To Waive The Preference, It Shall So Indicate In Its Offer) (15 U.s.c. 657a).
___17) [reserved]
_x__18) (i) 52.219-6, Notice Of Total Small Business Set-aside (nov 2020) (15 U.s.c. 644).
___ (ii) Alternate I (mar 2020) Of 52.219-6.
___19) (i) 52.219-7, Notice Of Partial Small Business Set-aside (nov 2020) (15 U.s.c. 644).
___ (ii) Alternate I (mar 2020) Of 52.219-7.
___20) 52.219-8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)).
___21) (i) 52.219-9, Small Business Subcontracting Plan (sep 2023) (15 U.s.c. 637(d)(4)).
___ (ii) Alternate I (nov 2016) Of 52.219-9.
___ (iii) Alternate Ii (nov 2016) Of 52.219-9.
___ (iv) Alternate Iii (jun 2020) Of 52.219-9.
___ (v) Alternate Iv (sep 2023) Of 52.219-9.
___22) (i) 52.219-13, Notice Of Set-aside Of Orders (mar 2020) (15 U.s.c. 644(r)).
___ (ii) Alternate I (mar 2020) Of 52.219-13.
_x_23) 52.219-14, Limitations On Subcontracting (oct 2022) (15 U.s.c. 637s).
___24) 52.219-16, Liquidated Damages—subcontracting Plan (sep 2021) (15 U.s.c. 637(d)(4)(f)(i)).
__ 25) 52.219-27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) ( 15 U.s.c. 657f).
_x_26) (i) 52.219-28, Post Award Small Business Program Representation (feb 2024) (15 U.s.c. 632(a)(2)).
___ (ii) Alternate I (mar 2020) Of 52.219-28.
__ 27) 52.219-29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantaged Women-owned Small Business Concerns (oct 2022) (15 U.s.c. 637(m)).
___28) 52.219-30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15 U.s.c. 637(m)).
___29) 52.219-32, Orders Issued Directly Under Small Business Reserves (mar 2020) (15 U.s.c. 644(r)).
_x__30) 52.219-33, Nonmanufacturer Rule (sep 2021) (15 U.s.c. 637(a)(17)).
___31) 52.222-3, Convict Labor (jun 2003) (e.o.11755).
_x_32) 52.222-19, Child Labor-cooperation With Authorities And Remedies (feb 2024).
_x_33) 52.222-21, Prohibition Of Segregated Facilities (apr 2015).
_x_34) (i) 52.222-26, Equal Opportunity (sep 2016) (e.o.11246).
___ (ii) Alternate I (feb 1999) Of 52.222-26.
___35) (i) 52.222-35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212).
___ (ii) Alternate I (jul 2014) Of 52.222-35.
_x_36) (i) 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793).
___ (ii) Alternate I (jul 2014) Of 52.222-36.
___37) 52.222-37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212).
___38) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496).
_x_39) (i) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627).
___ (ii) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627).
___40) 52.222-54, Employment Eligibility Verification (may 2022) (executive Order 12989). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items Or Certain Other Types Of Commercial Products Or Commercial Services As Prescribed In Far 22.1803.)
___41) (i) 52.223-9, Estimate Of Percentage Of Recovered Material Content For Epa–designated Items (may 2008) (42 U.s.c. 6962(c)(3)(a)(ii)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.)
___ (ii) Alternate I (may 2008) Of 52.223-9 (42 U.s.c. 6962(i)(2)(c)).
___42) 52.223-11, Ozone-depleting Substances And High Global Warming Potential Hydrofluorocarbons (may 2024) (42 U.s.c. 7671).
___43) 52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners (may 2024) (42 U.s.c. 7671).
___44) 52.223-20, Aerosols (may 2024) (42 U.s.c. 7671).
___45) 52.223-21, Foams (may 2024) (42 U.s.c. 7671).
_x_46) 52.223-23, Sustainable Products And Services (may 2024) (e.o. 14057, 7 U.s.c. 8102, 42 U.s.c. 6962, 42 U.s.c. 8259b, And 42 U.s.c. 7671l).
___47) (i) 52.224-3 Privacy Training (jan 2017) (5 U.s.c. 552 A).
___ (ii) Alternate I (jan 2017) Of 52.224-3.
___48) (i) 52.225-1, Buy American-supplies (oct 2022) (41 U.s.c. Chapter 83).
___ (ii) Alternate I (oct 2022) Of 52.225-1.
___49) (i) 52.225-3, Buy American-free Trade Agreements-israeli Trade Act (nov 2023) ( 19 U.s.c. 3301 Note, 19 U.s.c. 2112 Note, 19 U.s.c. 3805 Note, 19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43.
___ (ii) Alternate I [reserved].
___ (iii) Alternate Ii (dec 2022) Of 52.225-3.
___ (iv) Alternate Iii (feb 2024) Of 52.225-3.
___ (v) Alternate Iv (oct 2022) Of 52.225-3.
___50) 52.225-5, Trade Agreements (nov 2023) (19 U.s.c. 2501, Et Seq., 19 U.s.c. 3301 Note).
_x_51) 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) (e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury).
___52) 52.225-26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note).
___53) 52.226-4, Notice Of Disaster Or Emergency Area Set-aside (nov 2007) (42 U.s.c. 5150).
___54) 52.226-5, Restrictions On Subcontracting Outside Disaster Or Emergency Area (nov 2007) (42 U.s.c. 5150).
_x_55) 52.226-18, Encouraging Contractor Policies To Ban Text Messaging While Driving (may 2024) (e.o. 13513).
___56) 52.229-12, Tax On Certain Foreign Procurements (feb 2021).
___57) 52.232-29, Terms For Financing Of Purchases Of Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805).
___58) 52.232-30, Installment Payments For Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805).
_x_59) 52.232-33, Payment By Electronic Funds Transfer-system For Award Management (oct 2018) (31 U.s.c. 3332).
___60) 52.232-34, Payment By Electronic Funds Transfer-other Than System For Award Management (jul 2013) (31 U.s.c. 3332).
___61) 52.232-36, Payment By Third Party (may 2014) (31 U.s.c. 3332).
_x_62) 52.239-1, Privacy Or Security Safeguards (aug 1996) (5 U.s.c. 552a).
___63) 52.242-5, Payments To Small Business Subcontractors (jan 2017) (15 U.s.c. 637(d)(13)).
___64) (i) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631).
___ (ii) Alternate I (apr 2003) Of 52.247-64.
___ (iii) Alternate Ii (nov 2021) Of 52.247-64.
(c) The Contractor Shall Comply With The Far Clauses In This Paragraph (c), Applicable To Commercial Services, That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
___1) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter67).
___2) 52.222-42, Statement Of Equivalent Rates For Federal Hires (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67).
___3) 52.222-43, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year And Option Contracts) (aug 2018) (29 U.s.c. 206 And 41 U.s.c. Chapter 67).
___4) 52.222-44, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67).
___5) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may 2014) (41 U.s.c. Chapter 67).
___6) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements (may 2014) (41 U.s.c. Chapter 67).
_x_7) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022).
___8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706).
___9) 52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792).
(d) Comptroller General Examination Of Record. The Contractor Shall Comply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of The Simplified Acquisition Threshold, As Defined In Far 2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At 52.215-2, Audit And Records-negotiation.
(1) The Comptroller General Of The United States, Or An Authorized Representative Of The Comptroller General, Shall Have Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract.
(2) The Contractor Shall Make Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart 4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminated Shall Be Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Of Claims Arising Under Or Relating To This Contract Shall Be Made Available Until Such Appeals, Litigation, Or Claims Are Finally Resolved.
(3) As Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law.
(e) (1) Notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract For Commercial Products Or Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Down Shall Be As Required By The Clause-
(i) 52.203-13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509).
(ii) 52.203-17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712).
(iii) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)).
(iv) 52.204-23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (dec 2023) (section 1634 Of Pub. L. 115-91).
(v) 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115-232).
(vi) 52.204-27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117-328).
(vii) (a) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—prohibition. (dec 2023) (pub. L. 115–390, Title Ii).
(b) Alternate I (dec 2023) Of 52.204–30.
(viii) 52.219-8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)), In All Subcontracts That Offer Further Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far 19.702(a) On The Date Of Subcontract Award, The Subcontractor Must Include 52.219-8 In Lower Tier Subcontracts That Offer Subcontracting Opportunities.
(ix) 52.222-21, Prohibition Of Segregated Facilities (apr 2015).
(x) 52.222-26, Equal Opportunity (sep 2015) (e.o.11246).
(xi) 52.222-35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212).
(xii) 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793).
(xiii) 52.222-37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212).
(xiv) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause 52.222-40.
(xv) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67).
(xvi) _x_ (a) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o 13627).
___ (b) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627).
(xvii) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may 2014) (41 U.s.c. Chapter 67).
(xviii) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements (may 2014) (41 U.s.c. Chapter 67).
(xix) 52.222-54, Employment Eligibility Verification (may 2022) (e.o. 12989).
(xx) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022).
(xxi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706).
(xxii) (a) 52.224-3, Privacy Training (jan 2017) (5 U.s.c. 552a).
(b) Alternate I (jan 2017) Of 52.224-3.
(xxiii) 52.225-26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note).
(xxiv) 52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause 52.226-6.
(xxv) 52.232-40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of 52.232-40.
(xxvi) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause 52.247-64.
(2) While Not Required, The Contractor May Include In Its Subcontracts For Commercial Products And Commercial Services A Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations.
(end Of Clause)
a. 52.212-1 Instructions To Offerors – Commercial Products And Commercial Services Sep 2023. Offerors Must Comply With All Instructions Contained Herein.
(1) Offerors May Submit Written Questions During The Quote Preparation Period. All Questions Must Be Received No Later Than 14 January 2025, 11:00 Am (pacific) To Allow Adequate Time To Prepare And Issue Responses To All Offerors Prior To The Date And Time Set For Receipt Of Quotes. Only Written Questions Will Receive A Response. All Questions And Quotes Shall Be Directed To:
southwest Regional Maintenance Center (swrmc) – C410a Procurement
email: Cite The Solicitation Number In The Subject Line - N5523625q0040
email Addresses: Michael.t.jones331.civ@us.navy.mil And Cynthia.y.urias.civ@us.navy.mil
b. 52.212-2 Evaluation Commercial Items, Evaluation – Commercial Products And Commercial Services Nov 2021.
(a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers:
evaluation Factors – The Evaluation Factors That Will Be Used Are:
technical Acceptability – Ability To Meet The Required Delivery Date And The Salient Characteristics Of The Product Description
technical Drawings Shall Be Requested Via The Swrmc Technical Documentation Request Form As A Part Of Technical Acceptability For This Acquisition. Vendors Must Show Evidence, Technical Drawing Was Reviewed To Ensure Correct Manufacturing Of The Valves.
price – Low Price Technically Acceptable (lpta)
past Performance – Based On The Supplier Performance Risk System Rating.
price: The Government Will Evaluate The Proposed Price For Reasonableness In Accordance With Far 13.106-3 (a)(1).
past Performance: The Government Will Consider The Recency And Relevancy Of Past Performance Information Compared To The Requirements Detailed In The Statement Of Work, The Source Of The Information, The Context Of The Data And General Trends In The Offeror's Performance And Any Associated Risk. The Government Will Also Consider The Extent Of The Offeror's Ability To Perform Previous Contracts Successfully. In Accordance With Dfars Provision 252.204-7024, Notice To Prospective Suppliers On Use Of Supplier Performance Risk System In Past Performance Evaluations Is Hereby Incorporated By Reference.
(b) Options. The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s).
(c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award.
(end Of Provision)
c. 52.212-3 Offeror Representations And Certifications – Commercial Products And Commercial Services May 2024. The Offeror Shall Complete Only Paragraph (b) Of This Provision If The Offeror Has Completed The Annual Representations And Certification Electronically In The System For Award Management (sam) Accessed Through Https://www.sam.gov/sam/ (only Complete And Return If There Are Changes To Current Sam Registration. If 52.212-3 Is Not Returned, The Contractor Is Affirming That The Current Sam Registration Is Current, Accurate, And Complete). If The Offeror Has Not Completed The Annual Representations And Certifications Electronically, The Offeror Shall Complete Only Paragraphs (c) Through (v) Of This Provision. The Provision Of Far 52.212-3 Must Be Submitted By The Offeror To Be Eligible For Award.
d. 52.212-4 Contract Terms And Conditions -- Commercial Products And Commercial Services Nov 2023
standard Commercial Warranties Apply.
applicable Provisions And Clauses:
the Far Requires The Use Of The System For Award Management (sam) In Federal Solicitations As A Part Of The Offer Submission Process To Satisfy Far 52.212-4. More Information On Sam Is Found At Https://www.sam.gov/portal/public/sam/.
packaging Requirements: Packaging And Preservation Shall Be Performed In Accordance With The Best Commercial Practices To Afford Maximum Protection Against Damage.
d-211-h005 Identification Marking Of Parts – Alternative I Oct 2018
delivery Instructions: Item Shall Be Priced For F.o.b. Destination. Inspection And Acceptance Shall Be At Destination By The Government.
special Contract Requirements:
please Submit Your Quote Via E-mail To Michael Jones, Michael.t.jones331.civ@us.navy.mil (primary) And Cynthia Urias, Cynthia.y.urias.civ@us.navy.mil (secondary).
quotes Must Be Received By The Destination Inbox No Later Than *22 January 2025, 11:00 Am (pacific)*
Closing Date22 Jan 2025
Tender AmountRefer Documents
Bureau Of Corrections leyte Regional Prison Abuyog Leyte Tender
Healthcare and Medicine
Philippines
Details: Description Bids & Awards Committee Invitation For Negotiated Procurement - Two-failed Biddings For The Request For Supply & Delivery Of Medical Supplies 2025 1. The Leyte Regional Prison (lrp) Intends To Procure Medical Supplies 2025 With An Approved Budget For The Contract (abc) Amounting To Five Hundred Ninety-six Thousand Four Hundred Seventy-seven Pesos Only (php 596,477.00). 2. The Lrp Bids And Award Committee (bac) Now Invites Technically, Legally, And Financially Capable Suppliers For The Said Project. 3. The Procurement Procedure For This Requirement Is Negotiated Procurement For Two-failed Bidding Pursuant To Section 53.1 Of 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. The Selection Of The Successful Offer Shall Be Based On The Best And Final Offer That Will Be Submitted On The Set Deadline By The Bac And Which Would Meet The Minimum Technical Specifications Required. 4. The Interested Bidders May Obtain Further Information From The Bac Secretariat At The Address Given Below From 09 January 2025 To 13 January 2025 Before 9:00am. 5. The Lrp Will Hold A Negotiation Meeting On 13 January 2025 At Exactly 9:00am At Conference Room, Admin Building, Lrp, Abuyog, Leyte, Which Shall Be Open To Prospective Bidders. 6. Four (4) Copies Of The Proposals (one Original And Three Copies) Must Be Submitted To The Bac Which Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 5:00 Pm Of 14 January 2025. Late Submission Shall Not Be Accepted. 7. Interested Bidders Shall Submit The Following Documents In Sealed Envelopes, Labeled As “negotiated Procurement For Two-failed Biddings”, With The Title Of The Procurement Project, Name Of The Bidder, Address, And The Contact Details Of The Bidder, Addressed To The Bac. I. Technical Component Envelope Class “a” Documents Legal Documents (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And (d) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (e) Conformity With The Schedule Of Requirements (annex “a”) & Technical Specifications (annex “b”), Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And (f) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (g) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (h) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (i) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (j) Original Of Duly Signed And Accomplished Price Schedule(s). 8. The Special Conditions Of The Contract (annex “c”) Shall Form Part Of The Contract. Other Conditions Of The Contract Shall Be Governed By The Implementation Of The Rules And Regulations Of Ra 9184 And Other Related And Applicable Laws. Issued This 8th Day Of January 2025. Mr. Tracy B. Soriano, Msca Chairperson, Bids And Awards Committee Company Letterhead Statement Of Ongoing Government & Private Contracts Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Value Of Outstanding Contract Total Value Of Outstanding Contract: Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Twenty-five Percent (25%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Delivery End User’s Acceptance Or Official Receipt(s) Or Sales Invoice Issued For The Contract, (attached Copy) Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Leyte Regional Prison I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [insert Name Of Bidder’s Authorized Representative] [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Section Vi. Schedule Of Requirements Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. # Description Qty Dosage Form Delivered, Weeks/months 1 Acid Fast Stain, Medic (ziel-neelsen Hot Method) 3 Pcs Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 2 Acepto Bulb Syringe 5 Pcs Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 3 Adult Pulse Oximeter Fingertip (durable) 5 Pcs Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 4 Alcohol 70% Gallon 100 Gallon Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 5 Aneroid Sphygmomanometer W/ Stethoscope (durable) 10 Set Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 6 Battery Double Aa (heavy Duty) 50 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 7 Battery Triple Aaa (heavy Duty) 50 Capsule Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 8 Blood Collection Tube 5ml (lavender) 1 Box Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 9 Blood Collection Tube 5ml (yellow) 1 Box Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 10 Cold Compress Bag 5 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 11 Denatured Alcohol 1l 2 Gallon Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 12 Disinfectant Solution 10 Litrs Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 13 Drug Testing Kit (urine) 1000 Unit Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 14 Dsn 10cc 500 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vi. Schedule Of Requirements Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. # Description Qty Dosage Form Delivered, Weeks/months 15 Dsn 3cc 700 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 16 Dsn 5cc 700 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 17 Dsn 1cc 500 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 18 Easy Touch Blood Glucose Strips 25's 20 Bottle Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 19 Easy Touch Blood Cholesterol Strips 25's 30 Bottle Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 20 Easy Touch Blood Uric Strips 25's 30 Bottle Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 21 Examination Disposable Latex Gloves Powder Free 100 Box Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 22 Face Mask 50's 100 Box Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 23 Heplock 20 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 24 Hot Water Bag 10 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 25 Hydrogen Peroxide 10 Volume 20 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 26 Iv Infusion Set Adult 500 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 27 Kidney Basin Stainless 4 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 28 Lubricating Jelly 80gms 50 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vi. Schedule Of Requirements Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. # Description Qty Dosage Form Delivered, Weeks/months 29 Medical Penlight 5 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 30 Medical Oxygen Regulator 5 Pcs Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 31 Muriatic Acid Solution 50 Gallon Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 32 Na Hypochlorite Solution 30 Gallon Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 33 Nebulizer 2 Set Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 34 One Touch Select Simple Test Strip 25's 50 Bottle Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed 35 Oxygen Mask Cannula 150 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed 36 Oxygen Trolley (5-20 Lbs) 2 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed 37 Petroleum Jelly 25gms 100 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed 38 Plastic Canister 3 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed 39 Plastic Splint Adult 10 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed 40 Rotahaler 50 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed 41 Sphygmomanometer Valve With Bulb 20 Set Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed 42 Sterile Latex Surgical Gloves #7, 50pairs/box 5 Box Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vi. Schedule Of Requirements Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. # Description Qty Dosage Form Delivered, Weeks/months 43 Soluset Infusion Set 5 Pcs Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 44 Urinal (male) 10 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. 45 Urine Container 50ml 1000 Pieces Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vii. Technical Specifications Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Item No. Qty. Dosage Form Agency Specification Bidder’s Statement Of Compliance 1 3 Pcs Acid Fast Stain, Medic (ziel-neelsen Hot Method) 2 5 Pcs Acepto Bulb Syringe 3 5 Pcs Adult Pulse Oximeter Fingertip (durable) 4 100 Gallon Alcohol 70% Gallon 5 10 Set Aneroid Sphygmomanometer W/ Stethoscope (durable) 6 50 Pieces Battery Double Aa (heavy Duty) 7 50 Capsule Battery Triple Aaa (heavy Duty) 8 1 Box Blood Collection Tube 5ml (lavender) 9 1 Box Blood Collection Tube 5ml (yellow) 10 5 Pieces Cold Compress Bag 11 2 Gallon Denatured Alcohol 1l 12 10 Litrs Disinfectant Solution 13 1000 Unit Drug Testing Kit (urine) 14 500 Pieces Dsn 10cc 15 700 Pieces Dsn 3cc 16 700 Pieces Dsn 5cc 17 500 Pieces Dsn 1cc I Hereby Certify That The Statement Of Compliance To The Foregoing Technical Specifications Are True And Correct, Otherwise, If Found To Be False Either During Bid Evaluation Or Post- Qualification, The Same Shall Give Rise To Automatic Disqualification Of Our Bid. ___________________________________________ Name Of Company In Print ___________________________________________ Signature Over Printed Name Of Authorized Representative Section Vii. Technical Specifications Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Item No. Qty. Dosage Form Agency Specification Bidder’s Statement Of Compliance 18 20 Bottle Easy Touch Blood Glucose Strips 25's 19 30 Bottle Easy Touch Blood Cholesterol Strips 25's 20 30 Bottle Easy Touch Blood Uric Strips 25's 21 100 Box Examination Disposable Latex Gloves Powder Free 22 100 Box Face Mask 50's 23 20 Pieces Heplock 24 10 Pieces Hot Water Bag 25 20 Pieces Hydrogen Peroxide 10 Volume 26 500 Pieces Iv Infusion Set Adult 27 4 Pieces Kidney Basin Stainless 28 50 Pieces Lubricating Jelly 80gms 29 5 Pieces Medical Penlight 30 5 Pcs Medical Oxygen Regulator 31 50 Gallon Muriatic Acid Solution 32 30 Gallon Na Hypochlorite Solution 33 2 Set Nebulizer 34 50 Bottle One Touch Select Simple Test Strip 25's I Hereby Certify That The Statement Of Compliance To The Foregoing Technical Specifications Are True And Correct, Otherwise, If Found To Be False Either During Bid Evaluation Or Post- Qualification, The Same Shall Give Rise To Automatic Disqualification Of Our Bid. ___________________________________________ Name Of Company In Print ___________________________________________ Signature Over Printed Name Of Authorized Representative Section Vii. Technical Specifications Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Item No. Qty. Dosage Form Agency Specification Bidder’s Statement Of Compliance 35 150 Pieces Oxygen Mask Cannula 36 2 Pieces Oxygen Trolley (5-20 Lbs) 37 100 Pieces Petroleum Jelly 25gms 38 3 Pieces Plastic Canister 39 10 Pieces Plastic Splint Adult 40 50 Pieces Rotahaler 41 20 Set Sphygmomanometer Valve With Bulb 42 5 Box Sterile Latex Surgical Gloves #7, 50pairs/box 43 5 Pcs Soluset Infusion Set 44 10 Pieces Urinal (male) 45 1000 Pieces Urine Container 50ml I Hereby Certify That The Statement Of Compliance To The Foregoing Technical Specifications Are True And Correct, Otherwise, If Found To Be False Either During Bid Evaluation Or Post- Qualification, The Same Shall Give Rise To Automatic Disqualification Of Our Bid. ___________________________________________ Name Of Company In Print ___________________________________________ Signature Over Printed Name Of Authorized Representative Company Letterhead Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply & Delivery Of Medical Supplies 2025 Of The Leyte Regional Prison As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Supply & Delivery Of Medical Supplies 2025 Of The Leyte Regional Prison, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The Supply & Delivery Of Medical Supplies 2025. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Certificate Of Net Financial Contracting Capacity (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _________________________(p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _______day Of __________2025. _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Bid Form Date: Invitation To Bid No: Bid 2024-08 To: Mr. Tracy B. Soriano, Msca Bac Chairperson Leyte Regional Prison Abuyog, Leyte Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers Bid2024-08, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply & Deliver Of Medical Supplies 2025 In Conformity With The Said Bidding Documents For The Sum Of __________________________________________₱ ________ Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements Of The Bidding Documents. I/we Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert]: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Supply & Delivery Of Medical Supplies 2025. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 20______. [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Schedule Of Prices Qty. Unit Of Issue Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat 3 Pcs Acid Fast Stain, Medic (ziel-neelsen Hot Method) 12,441.00 5 Pcs Acepto Bulb Syringe 350.00 5 Pcs Adult Pulse Oximeter Fingertip (durable) 10,500.00 100 Gallon Alcohol 70% Gallon 42,000.00 10 Set Aneroid Sphygmomanometer W/ Stethoscope (durable) 39,000.00 50 Pieces Battery Double Aa (heavy Duty) 5,400.00 50 Capsule Battery Triple Aaa (heavy Duty) 5,400.00 1 Box Blood Collection Tube 5ml (lavender) 130.00 1 Box Blood Collection Tube 5ml (yellow) 1,200.00 5 Pieces Cold Compress Bag 720.00 2 Gallon Denatured Alcohol 1l 1,200.00 10 Litrs Disinfectant Solution 21,600.00 1000 Unit Drug Testing Kit (urine) 108,000.00 500 Pieces Dsn 10cc 5,000.00 700 Pieces Dsn 3cc 4,900.00 [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Schedule Of Prices Qty. Unit Of Issue Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat 700 Pieces Dsn 5cc 5,600.00 500 Pieces Dsn 1cc 3,500.00 20 Bottle Easy Touch Blood Glucose Strips 25's 20,400.00 30 Bottle Easy Touch Blood Cholesterol Strips 25's 30,600.00 30 Bottle Easy Touch Blood Uric Strips 25's 30,600.00 100 Box Examination Disposable Latex Gloves Powder Free 42,000.00 100 Box Face Mask 50's 9,600.00 20 Pieces Heplock 360.00 10 Pieces Hot Water Bag 1,080.00 20 Pieces Hydrogen Peroxide 10 Volume 2,640.00 500 Pieces Iv Infusion Set Adult 25,000.00 4 Pieces Kidney Basin Stainless 2,976.00 50 Pieces Lubricating Jelly 80gms 4,200.00 5 Pieces Medical Penlight 3,000.00 5 Pcs Medical Oxygen Regulator 12,000.00 [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Supply & Delivery Of Medical Supplies For Cy 2025 Bid Reference No.: Bid2024-08 Schedule Of Prices Qty. Unit Of Issue Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat 50 Gallon Muriatic Acid Solution 15,000.00 30 Gallon Na Hypochlorite Solution 9,000.00 2 Set Nebulizer 3,840.00 50 Bottle One Touch Select Simple Test Strip 25's 51,000.00 150 Pieces Oxygen Mask Cannula 11,700.00 2 Pieces Oxygen Trolley (5-20 Lbs) 8,400.00 100 Pieces Petroleum Jelly 25gms 7,200.00 3 Pieces Plastic Canister 3,600.00 10 Pieces Plastic Splint Adult 10,800.00 50 Pieces Rotahaler 6,000.00 20 Set Sphygmomanometer Valve With Bulb 6,520.00 5 Box Sterile Latex Surgical Gloves #7, 50pairs/box 4,500.00 5 Pcs Soluset Infusion Set 500.00 10 Pieces Urinal (male) 1,020.00 1000 Pieces Urine Container 50ml 6,000.00 Total Bid Price Inclusive Of Vat In Words [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi. Schedule Of Requirements. Upon Delivery Of The Goods To The Project Site, The Supplier Shall Notify The Procuring Entity And Present The Following Documents To The Procuring Entity: (i) Original And Four Copies Of The Supplier’s Invoice Showing Goods’ Description, Quantity, Unit Price, And Total Amount; (ii) Delivery Receipt Detailing Number And Description Of Items Received Signed By The Procuring Entity’s Representative At The Project Site; (iii)certificate Of Acceptance/inspection Report Signed By The Procuring Entity’s Representative At The Project Site; For Purposes Of The Contract, “exw (extra Work),” “fob (“free On Board” Shipping Point),” “fca (“free Carrier” Shipping Point),” “cif (cost Insurance And Freight.),” “cip (carriage And Insurance Paid),” “ddp (delivered Duty Paid)” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: The Delivery Terms Applicable To This Contract Are Ddp Delivered To Supply Office, Leyte Regional Prison, Abuyog, Leyte. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is The Lrp Health And Welfare Services Section Chief As The End-user. All Medical Supplies Must Be Delivered On Working Days And Not Later Than 1:00pm, Forty-five (45) Calendar Days From The Receipt Of Notice To Proceed. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Additional Requirements On Box Or Bottle, Blister Packs, Inhaler And Tube. The Following Is Legibly Imprinted Or Stamped In Any Color. Date Of Manufacture __________________ Date Of Expiry ___________________ Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif (cost Insurance And Freight.), Cip (carriage And Insurance Paid), Or Ddp (delivered Duty Paid), Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif (cost Insurance And Freight.), Cip (carriage And Insurance Paid), Or Ddp (delivered Duty Paid), Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.1 Partial Payment Is Not Allowed 4 The Inspections And Tests That Will Be Conducted Are: Partial/complete Delivery Of Goods Shall Be Inspected By The Lrp Inspection And Acceptance Committee. Inspection And Acceptance Will Be Conducted By The Lrp Inspection And Acceptance Committee To The Actual Delivery At The Project Site (lrp). Goods With Defect Or Non-compliant With The Required Specifications As Stipulated In The Approved Purchase Order/technical Specifications Shall Be Rejected And Shall Be Replaced By The Supplier Free Of Cost To The Procuring Entity Within Seven (7) Calendar Days The Goods Shall Be Accepted By The End User After Passing The Inspection Of The Lrp Inspection And Acceptance Committee. The Inspections And Tests That Will Be Conducted Are; 1.) Upon Delivery, The Goods Shall Undergo Physical Inspection By The Lrp Inspection And Acceptance Committee Of The Procuring Entity To Ascertain The Physical Condition And Acceptability Of The Goods. 2.) Actual Counting Inspection To Determine The Quantity And Completeness Of The Medical Supplies Delivered In Accordance To The Schedule Of Requirements Set In The Bidding Documents.
Closing Date13 Jan 2025
Tender AmountPHP 596.4 K (USD 10.2 K)
DEPT OF THE NAVY USA Tender
Machinery and Tools
United States
Details: Amendment 0002
date Offers Due Extended To 29 January 2025
---
amendment 0001
date Offers Due Extended To 13 January 2025
----
this Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Subpart 12.6, As Supplemented With Far Part 13 Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued.
request For Quotation (rfq) N5523624q0063 Is Issued As A Total Small Business Set-aside. The Subject Solicitation Is Being Processed Using Far Part 12 And 13. Any Quote From A Large Business Is Ineligible For Award. The Applicable North American Industry Classification System (naics) Code Is 332722 – Bolt, Nut, Screw, Rivet, And Washer Manufacturing
this Solicitation Documents And Incorporates Provisions And Clauses That Are Those In Effect Through Federal Acquisition Circular 2024-07 (effective 30 September 2024) And Dfars Publication Notice 20241001.
description: Southwest Regional Maintenance Center (swrmc) Requires Procurement And Delivery Of Long Lead Time Material (lltm) In Support Of Swrmc At Naval Base San Diego As Follows:
- Two (2) Ea Washer (0.39 X 0.625 X 0.064 Thk)(critical Material); P/n 5310-00-188-4233
- Eight (8) Ea Bolt, 5/16-18 X 1.41 Inch (critical Material); P/n 5306-01-679-1688
- 672 Ea Nut, 1-1/4 Inch, 7unc-2b Hex Hvy Class A (critical Material); Material Specification: Astm A453 Gr 660 Ansi B18.2.2; P/n Not Available.
quote Shall Provide Lltm Delivery Date.
see Product Description
the Full Text Of Far And Dfar References, Provisions And Clauses May Be Accessed At Https://acquisition.gov.
the Following Provisions And Clauses Apply To This Acquisition And Will Be Incorporated Into Any Resultant Purchase Or Delivery Order.
c-202-h001 Additional Definitions – Basic (navsea) Oct 2018
c-204-h001 Use Of Navy Support Contractors For Official Contract Files (navsea) Oct 2018
c-211-h017 Updating Specifications And Standards (navsea) Dec 2018
c-211-h018 Approval By The Government (navsea) Jan 2019
c-211-h019 Commonality And Standardization (navsea) Feb 2022
c-215-h002 Contractor Proposal (navsea) Oct 2018
c-247-h001 Permits And Responsibilities (navsea) Dec 2018
d-211-h005 Identification Marking Of Parts -- Alternate I (navsea) Oct 2018
d-246-h003 Warranty Notification For Item(s) ____-- Alternate I (navsea) Apr 2024
d-247-h005 Marking And Packing List(s) – Alternate I (navsea) Oct 2018
d-247-w001 Prohibited Packing Materials (navsea) Oct 2018
52.246-2 Inspections Of Supplies – Fixed Price Aug 1996
52.246-16 Responsibilities For Supplies Apr 1984
e-246-h022 Inspection And Test Records (navsea) Jan 2019
52.242-15 Stop-work Order Aug 1989
52.247-34 F.o.b. Destination Nov 1991
f-242-h001 Contractor Notice Regarding Late Delivery (navsea) Oct 2018
252.232-7003 Electronic Submission Of Payment Requests And Receiving Reports Dec 2018
252.232-7006 Wide Area Work Flow Payment Instructions Jan 2023
g-232-h002 Payment Instructions And Contract Type Summary For Payment Office (navsea) Feb 2024
g-232-h005 Supplemental Instructions Regarding Invoicing (navsea) Jan 2019
g-242-h001 Government Contract Administration Points Of Contact And Responsibilities (navsea) Oct 2023
g-242-h002 Hours Of Operation And Holiday Schedule (navsea) Jul 2021
52.203-19 Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements Jan 2017
52.204-7 System For Award Management Oct 2018
52.204-19 Incorporation By Reference Of Representations And Certifications Dec 2014
52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment Nov 2021
52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment Nov 2021
52.204-26 Covered Telecommunications Equipment Or Services-representation Oct 2020
52.209-10 Prohibition On Contracting With Inverted Domestic Corporations Nov 2015
52.209-11 Representation By Corporations Regarding Delinquent Tax Liability Or A Felony Conviction Under And
Federal Law Feb 2016
52.212-4 Contract Terms And Conditions--commercial Items Nov 2023
52.232-39 Unenforceability Of Unauthorized Obligations Jun 2013
52.232-40 Providing Accelerated Payments To Small Business Subcontractors Mar 2023
52.252-2 Clauses Incorporated By Reference Feb 1998
52.252-6 Authorized Deviations In Clauses Nov 2020
252.203-7000 Requirements Relating To Compensation To Former Dod Officials Sep 2011
252.203-7002 Requirements To Inform Employees Of Whistleblower Rights Dec 2022
252.203-7005 Representation Relating To Compensation Of Former Dod Officials Sep 2022
252.204-7000 Disclosure Of Information Oct 2016
252.204-7003 Control Of Government Work Product Apr 1992
252.204-7008 Compliance With Safeguarding Covered Defense Information Controls Oct 2016
252.204-7009 Limitations On The Use Or Disclosure Of Third-party Contractor Reported Cyber Incident
information Jan 2023
252.204-7012 Safeguarding Covered Defense Information And Cyber Incident Reporting Jan 2023
252.204-7015 Notice Of Authorized Disclosure Of Information By Litigation Support Jan 2023
252.204-7019 Notice Of Nistsp 800-171 Dod Assessment Requirements Nov 2023
252.204-7020 Nist Sp 800-171dod Assessment Requirements Nov 2023
252.204-7022 Expediting Contract Closeout May 2021
252.204-7024 Notice On The Use Of The Supplier Performance Risk System Mar 2023
252.211-7003 Item Unique Identification And Valuation Jan 2023
252.215-7013 Supplies And Services Provided By Nontraditional Defense Contractors Jan 2023
252.223-7008 Prohibition Of Hexavalent Chromium Jan 2023
252.225-7000 Buy American – Balance Of Payments Program Certificate Feb 2024
252.225-7001 Buy American And Balance Of Payment Program Feb 2024
252.225-7002 Qualifying Country Sources As Subcontractors Mar 2022
252.225-7048 Export Controlled Items Jun 2013
252.232-7010 Levies On Contract Payments Dec 2006
252.237-7010 Prohibition On Interrogation Of Detainees By Contractor Personnel Jan 2023
252.244-7000 Subcontracts For Commercial Items Nov 2023
252.246-7003 Notification Of Potential Safety Issues Jan 2023
252.247-7023 Transportation On Supplies By Sea Oct 2024
52.212-5 – Contract Terms And Conditions Required To Implement Statutes Or Executive Orders – Commercial Products And Commercial Services (may 2024)
(a) The Contractor Shall Comply With The Following Federal Acquisition Regulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
(1) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)).
(2) 52.204-23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (dec 2023) (section 1634 Of Pub. L. 115-91).
(3) 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115-232).
(4) 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015).
(5) 52.232-40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801).
(6) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553).
(7) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77 And 108-78 (19 U.s.c. 3805 Note)).
(b) The Contractor Shall Comply With The Far Clauses In This Paragraph (b) That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
___1) 52.203-6, Restrictions On Subcontractor Sales To The Government (jun 2020), With Alternate I (nov 2021) (41 U.s.c. 4704 And 10 U.s.c. 4655).
___2) 52.203-13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509).
___3) 52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009 (jun 2010) (section 1553 Of Pub. L. 111-5).
___4) 52.203-17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community—see Far 3.900(a)
_x_5) 52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards (jun 2020) (pub. L. 109-282) (31 U.s.c. 6101 Note).
___6) [reserved]
___7) 52.204-14, Service Contract Reporting Requirements (oct 2016) (pub. L. 111-117, Section 743 Of Div. C).
___8) 52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts (oct 2016) (pub. L. 111-117, Section 743 Of Div. C).
_x_9) 52.204-27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117-328).
___10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—federal Supply Schedules, Governmentwide Acquisition Contracts, And Multi-agency Contracts. (dec 2023) (pub. L. 115–390, Title Ii).
___11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—prohibition. (dec 2023) (pub. L. 115–390, Title Ii).
___ (ii) Alternate I (dec 2023) Of 52.204–30.
_x_12) 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment. (nov 2021) (31 U.s.c. 6101 Note).
___13) 52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters (oct 2018) (41 U.s.c. 2313).
___14) [reserved].
_x_15) 52.219-3, Notice Of Hubzone Set-aside Or Sole-source Award (oct 2022) (15 U.s.c. 657a).
_x_16) 52.219-4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (oct 2022) (if The Offeror Elects To Waive The Preference, It Shall So Indicate In Its Offer) (15 U.s.c. 657a).
___17) [reserved]
__x_18) (i) 52.219-6, Notice Of Total Small Business Set-aside (nov 2020) (15 U.s.c. 644).
___ (ii) Alternate I (mar 2020) Of 52.219-6.
___19) (i) 52.219-7, Notice Of Partial Small Business Set-aside (nov 2020) (15 U.s.c. 644).
___ (ii) Alternate I (mar 2020) Of 52.219-7.
___20) 52.219-8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)).
___21) (i) 52.219-9, Small Business Subcontracting Plan (sep 2023) (15 U.s.c. 637(d)(4)).
___ (ii) Alternate I (nov 2016) Of 52.219-9.
___ (iii) Alternate Ii (nov 2016) Of 52.219-9.
___ (iv) Alternate Iii (jun 2020) Of 52.219-9.
___ (v) Alternate Iv (sep 2023) Of 52.219-9.
___22) (i) 52.219-13, Notice Of Set-aside Of Orders (mar 2020) (15 U.s.c. 644(r)).
___ (ii) Alternate I (mar 2020) Of 52.219-13.
_x_23) 52.219-14, Limitations On Subcontracting (oct 2022) (15 U.s.c. 637s).
___24) 52.219-16, Liquidated Damages—subcontracting Plan (sep 2021) (15 U.s.c. 637(d)(4)(f)(i)).
_x_25) 52.219-27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) ( 15 U.s.c. 657f).
_x_26) (i) 52.219-28, Post Award Small Business Program Representation (feb 2024) (15 U.s.c. 632(a)(2)).
___ (ii) Alternate I (mar 2020) Of 52.219-28.
_x_27) 52.219-29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantaged Women-owned Small Business Concerns (oct 2022) (15 U.s.c. 637(m)).
_x_28) 52.219-30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15 U.s.c. 637(m)).
___29) 52.219-32, Orders Issued Directly Under Small Business Reserves (mar 2020) (15 U.s.c. 644(r)).
_x_30) 52.219-33, Nonmanufacturer Rule (sep 2021) (15 U.s.c. 637(a)(17)).
___31) 52.222-3, Convict Labor (jun 2003) (e.o.11755).
_x_32) 52.222-19, Child Labor-cooperation With Authorities And Remedies (feb 2024).
_x_33) 52.222-21, Prohibition Of Segregated Facilities (apr 2015).
_x_34) (i) 52.222-26, Equal Opportunity (sep 2016) (e.o.11246).
___ (ii) Alternate I (feb 1999) Of 52.222-26.
___35) (i) 52.222-35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212).
___ (ii) Alternate I (jul 2014) Of 52.222-35.
_x_36) (i) 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793).
___ (ii) Alternate I (jul 2014) Of 52.222-36.
___37) 52.222-37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212).
_x_38) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496).
_x_39) (i) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627).
___ (ii) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627).
___40) 52.222-54, Employment Eligibility Verification (may 2022) (executive Order 12989). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items Or Certain Other Types Of Commercial Products Or Commercial Services As Prescribed In Far 22.1803.)
___41) (i) 52.223-9, Estimate Of Percentage Of Recovered Material Content For Epa–designated Items (may 2008) (42 U.s.c. 6962(c)(3)(a)(ii)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.)
___ (ii) Alternate I (may 2008) Of 52.223-9 (42 U.s.c. 6962(i)(2)(c)).
___42) 52.223-11, Ozone-depleting Substances And High Global Warming Potential Hydrofluorocarbons (may 2024) (42 U.s.c. 7671).
___43) 52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners (may 2024) (42 U.s.c. 7671).
___44) 52.223-20, Aerosols (may 2024) (42 U.s.c. 7671).
___45) 52.223-21, Foams (may 2024) (42 U.s.c. 7671).
_x_46) 52.223-23, Sustainable Products And Services (may 2024) (e.o. 14057, 7 U.s.c. 8102, 42 U.s.c. 6962, 42 U.s.c. 8259b, And 42 U.s.c. 7671l).
___47) (i) 52.224-3 Privacy Training (jan 2017) (5 U.s.c. 552 A).
___ (ii) Alternate I (jan 2017) Of 52.224-3.
_x_48) (i) 52.225-1, Buy American-supplies (oct 2022) (41 U.s.c. Chapter 83).
___ (ii) Alternate I (oct 2022) Of 52.225-1.
___49) (i) 52.225-3, Buy American-free Trade Agreements-israeli Trade Act (nov 2023) ( 19 U.s.c. 3301 Note, 19 U.s.c. 2112 Note, 19 U.s.c. 3805 Note, 19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43.
___ (ii) Alternate I [reserved].
___ (iii) Alternate Ii (dec 2022) Of 52.225-3.
___ (iv) Alternate Iii (feb 2024) Of 52.225-3.
___ (v) Alternate Iv (oct 2022) Of 52.225-3.
___50) 52.225-5, Trade Agreements (nov 2023) (19 U.s.c. 2501, Et Seq., 19 U.s.c. 3301 Note).
_x_51) 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) (e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury).
___52) 52.225-26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note).
___53) 52.226-4, Notice Of Disaster Or Emergency Area Set-aside (nov 2007) (42 U.s.c. 5150).
___54) 52.226-5, Restrictions On Subcontracting Outside Disaster Or Emergency Area (nov 2007) (42 U.s.c. 5150).
_x_55) 52.226-8, Encouraging Contractor Policies To Ban Text Messaging While Driving (may 2024) (e.o. 13513).
___56) 52.229-12, Tax On Certain Foreign Procurements (feb 2021).
___57) 52.232-29, Terms For Financing Of Purchases Of Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805).
___58) 52.232-30, Installment Payments For Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805).
_x_59) 52.232-33, Payment By Electronic Funds Transfer-system For Award Management (oct 2018) (31 U.s.c. 3332).
___60) 52.232-34, Payment By Electronic Funds Transfer-other Than System For Award Management (jul 2013) (31 U.s.c. 3332).
___61) 52.232-36, Payment By Third Party (may 2014) (31 U.s.c. 3332).
_x_62) 52.239-1, Privacy Or Security Safeguards (aug 1996) (5 U.s.c. 552a).
___63) 52.242-5, Payments To Small Business Subcontractors (jan 2017) (15 U.s.c. 637(d)(13)).
___64) (i) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631).
___ (ii) Alternate I (apr 2003) Of 52.247-64.
___ (iii) Alternate Ii (nov 2021) Of 52.247-64.
(c) The Contractor Shall Comply With The Far Clauses In This Paragraph (c), Applicable To Commercial Services, That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
___1) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter67).
___2) 52.222-42, Statement Of Equivalent Rates For Federal Hires (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67).
___3) 52.222-43, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year And Option Contracts) (aug 2018) (29 U.s.c. 206 And 41 U.s.c. Chapter 67).
___4) 52.222-44, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67).
___5) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may 2014) (41 U.s.c. Chapter 67).
___6) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements (may 2014) (41 U.s.c. Chapter 67).
_x_7) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022).
___8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706).
___9) 52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792).
(d) Comptroller General Examination Of Record. The Contractor Shall Comply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of The Simplified Acquisition Threshold, As Defined In Far 2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At 52.215-2, Audit And Records-negotiation.
(1) The Comptroller General Of The United States, Or An Authorized Representative Of The Comptroller General, Shall Have Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract.
(2) The Contractor Shall Make Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart 4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminated Shall Be Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Of Claims Arising Under Or Relating To This Contract Shall Be Made Available Until Such Appeals, Litigation, Or Claims Are Finally Resolved.
(3) As Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law.
(e) (1) Notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract For Commercial Products Or Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Down Shall Be As Required By The Clause-
(i) 52.203-13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509).
(ii) 52.203-17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712).
(iii) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)).
(iv) 52.204-23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (dec 2023) (section 1634 Of Pub. L. 115-91).
(v) 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115-232).
(vi) 52.204-27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117-328).
(vii) (a) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—prohibition. (dec 2023) (pub. L. 115–390, Title Ii).
(b) Alternate I (dec 2023) Of 52.204–30.
(viii) 52.219-8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)), In All Subcontracts That Offer Further Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far 19.702(a) On The Date Of Subcontract Award, The Subcontractor Must Include 52.219-8 In Lower Tier Subcontracts That Offer Subcontracting Opportunities.
(ix) 52.222-21, Prohibition Of Segregated Facilities (apr 2015).
(x) 52.222-26, Equal Opportunity (sep 2015) (e.o.11246).
(xi) 52.222-35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212).
(xii) 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793).
(xiii) 52.222-37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212).
(xiv) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause 52.222-40.
(xv) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67).
(xvi) _x_ (a) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o 13627).
___ (b) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627).
(xvii) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may 2014) (41 U.s.c. Chapter 67).
(xviii) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements (may 2014) (41 U.s.c. Chapter 67).
(xix) 52.222-54, Employment Eligibility Verification (may 2022) (e.o. 12989).
(xx) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022).
(xxi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706).
(xxii) (a) 52.224-3, Privacy Training (jan 2017) (5 U.s.c. 552a).
(b) Alternate I (jan 2017) Of 52.224-3.
(xxiii) 52.225-26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note).
(xxiv) 52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause 52.226-6.
(xxv) 52.232-40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of 52.232-40.
(xxvi) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause 52.247-64.
(2) While Not Required, The Contractor May Include In Its Subcontracts For Commercial Products And Commercial Services A Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations.
(end Of Clause)
a. 52.212-1 Instructions To Offerors – Commercial Products And Commercial Services Sep 2023. Offerors Must Comply With All Instructions Contained Herein.
(1) Offerors May Submit Written Questions During The Quote Preparation Period. All Questions Must Be Received No Later Than 27 January 2025, 11:00 Am (pacific) To Allow Adequate Time To Prepare And Issue Responses To All Offerors Prior To The Date And Time Set For Receipt Of Quotes. Only Written Questions Will Receive A Response. All Questions And Quotes Shall Be Directed To:
southwest Regional Maintenance Center (swrmc) – C410a Procurement
email: Cite The Solicitation Number In The Subject Line - N5523625q0063
email Addresses: Scott.s.quiambao.civ@us.navy.mil And Ricardo.barraza-cobos.civ@us.navy.mil
b. 52.212-2 Evaluation Commercial Items, Evaluation – Commercial Products And Commercial Services Nov 2021.
(a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers:
evaluation Factors – The Evaluation Factors That Will Be Used Are:
technical Acceptability – Ability To Meet The Required Delivery Date And The Salient Characteristics Of The Product Description
technical Drawings Shall Be Requested Via The Swrmc Technical Documentation Request Form As A Part Of Technical Acceptability For This Acquisition.
price – Low Price Technically Acceptable (lpta)
past Performance – Based On The Supplier Performance Risk System
price: The Government Will Evaluate The Proposed Price For Reasonableness In Accordance With Far 13.106-3 (a)(1).
past Performance: The Government Will Consider The Recency And Relevancy Of Past Performance Information Compared To The Requirements Detailed In The Statement Of Work, The Source Of The Information, The Context Of The Data And General Trends In The Offeror's Performance And Any Associated Risk. The Government Will Also Consider The Extent Of The Offeror's Ability To Perform Previous Contracts Successfully. In Accordance With Dfars Provision 252.204-7024, Notice To Prospective Suppliers On Use Of Supplier Performance Risk System In Past Performance Evaluations Is Hereby Incorporated By Reference.
(b) Options. The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s).
(c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award.
(end Of Provision)
c. 52.212-3 Offeror Representations And Certifications – Commercial Products And Commercial Services May 2024. The Offeror Shall Complete Only Paragraph (b) Of This Provision If The Offeror Has Completed The Annual Representations And Certification Electronically In The System For Award Management (sam) Accessed Through Https://www.sam.gov/sam/ (only Complete And Return If There Are Changes To Current Sam Registration. If 52.212-3 Is Not Returned, The Contractor Is Affirming That The Current Sam Registration Is Current, Accurate, And Complete). If The Offeror Has Not Completed The Annual Representations And Certifications Electronically, The Offeror Shall Complete Only Paragraphs (c) Through (v) Of This Provision. The Provision Of Far 52.212-3 Must Be Submitted By The Offeror To Be Eligible For Award.
d. 52.212-4 Contract Terms And Conditions -- Commercial Products And Commercial Services Nov 2023
standard Commercial Warranties Apply.
applicable Provisions And Clauses:
the Far Requires The Use Of The System For Award Management (sam) In Federal Solicitations As A Part Of The Offer Submission Process To Satisfy Far 52.212-4. More Information On Sam Is Found At Https://www.sam.gov/portal/public/sam/.
packaging Requirements: Packaging And Preservation Shall Be Performed In Accordance With The Best Commercial Practices To Afford Maximum Protection Against Damage.
d-211-h005 Identification Marking Of Parts – Alternative I Oct 2018
delivery Instructions: Item Shall Be Priced For F.o.b. Destination. Inspection And Acceptance Shall Be At Destination By The Government.
special Contract Requirements:
please Submit Your Quote Via E-mail To Scott Quiambao, Scott.s.quiambao.civ@us.navy.mil (primary) And Ricardo Barraza-cobos, Ricardo.barraza-cobos.civ@us.navy.mil (secondary).
quotes Must Be Received By The Destination Inbox No Later Than *29january 2025, 11:00 Am (pacific)* Or They Will Not Be Considered For Award.
Closing Date29 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Scraps
United States
Description: Contact Information|4|n743.49|wvm|7176052147|benjamin.t.spangler.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001aa|25|365|0001ab|lot|see Dd1423|0001ac|1|150||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a
|n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.t.spangler.civ@us.navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
first Article Approval--government Testing (sep 1989)|7|1|0001ac|150|receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240. (207-438-5445) Kittery, Me 03904-5000|30|x||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
progress Payments (nov 2021)|4|||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|13|335931|600||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
instructions To Offerors -- Competitive Acquisition (nov 2021)|2|||
type Of Contract (apr 1984)|1|firm Fixed|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x||
evaluation Of First Article Testing|3|x|$42,000||
this Amendment Is Issued To Update Solicitation Clauses.
this Requirement Is Not A Small Business Set-aside And Is Full And Open.
\
---this Requirement Is Not A Small Business Set-aside.---
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already Onfile At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286.
3. The Following Proposed Delivery Schedule Applies:
submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery.
weld Procedure And Qual Data 120 Days Adc Lt
approval Of Weld Procedures And Qual Data
60 Days After Receipt
fat Report 150 Days After Approval Of Pr Lt
approval Of Fat Report 30 Days After Receipt
Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 365 Days After Effective Date Of The Resulting Contract.
4. Any Contract Awarded As A Result Of This Solicitation Will Be "dx" Rated Order; "dx" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
5. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000.
6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contracts Opportunities On The Government's Beta.sam Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation.
7. This Solicitation Requires First Article Testing. Far 52.290-4 First Article Approval - Government Testing For More Details.
8. The Complete Rfp Package Must Be Signed And Returned Prior To The Closing Date. Emailed Or Faxed Proposals Are Acceptable. Neco Quotes Will Not Be Accepted And Will Be Determined Non-responsive.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=1197258 |53711| C| |d|0001 | C|49998|0876328
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=mil-std-2132 | | |d |080211|f| |01|
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-24231 | | |e |130426|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;the Electrical Hull Fitting And Transmitter Cable Assembly For The An/bst-1 Must Be In Accordance With Naval Ship Engineering Center Drawing 803-1197258, Except As Amplified Or Modified Herein.;
3.2 ;ls2swu-12 Cable Is To Be Used In Lieu Of Ls2swua-12 Cable.;
3.3 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required.
3.4 ;the First Article Test (fat) Sample(s) Must Not Be Delivered Against The Contract Quantity.;
3.5 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;receptacle Body, Item 14;
material - ;qq-n-281, Class A;
part - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
material - ;qq-n-286, Form 2, Cold Drawn Or Hot Finished, Annealed And Age Hardened And Must Meet The Mechanical Requirements Cited In Note 2.h Of Drawing 803-1197258 Except The Brinell Hardness Minimum Is 250 Instead Of 265 As Listed In Note 2.h;
3.6 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Quality Conformance/compliance Inspection
item - ;each Electrical Hull Fitting Assembly;
performance - ;mil-dtl-24231, Table I For Type Iv And Note 22 On Drawing 803-1197258;
acceptance - ;mil-dtl-24231;
test - ;dye Penetrant Inspection;
item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
attribute - Annealing And Age Hardening
item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
performance - Qq-n-286
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.7 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.8 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.12 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.13 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not
permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.17 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.17.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.19 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.19.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.20 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1); Unit(s) To ;receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240.
(207-438-5445) Kittery, Me 03904-5000; For First Article Tests In Accordance With The ;requirements Of Mil-dtl-24231, Table I For Type Iv And Note 21 On Drawing 803-1197258; .
3.21 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.21.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.21.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.21.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.21.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.21.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.22 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.22.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.22.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.23 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.23.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.23.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.23.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.23.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.23.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.24.2 Inspection For Completeness And Proper Type.
3.24.3 Verification Of Material Quality Received.
3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.24.6 Identification And Protection From Improper Use Or Disposition.
3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.24.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.26.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.26.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.27 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.27.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.27.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.27.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.27.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.27.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.28 Material Handling - The Written Material Control Process Must Include The Following:
3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.29 Receiving Inspection -
3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.29.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.30 Discrepancy Reporting -
3.30.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Jun 28 2012 - Updated Ut Of Qq-n-286 Bar 4" And Over
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 22 2009 - Added Evidence Of Dcma Observing Test Plate Welding & Ndt
- Mar 18 2008 - Identify Applicable Weld Joints With Weld Procedures
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt.
date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 12 - See Clause 52.209-3 For Submittal Timeframes.
Closing Date9 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Chemical Products
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.7|wve|717-605-3875|jill.sabol@navy.mil|
item Unique Identification And Valuation (mar 2022)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Section C|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
wide Area Workflow Payment Instructions (dec 2018)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report |material - Inspection & Acceptance At Source Certifications - Inspection At Destination & Acceptance At Other
|tbd|n00104|tbd|certifications - N39040; Material -s4306a |n50286|tbd|133.2|n/a|n/a|certifications - N39040|n/a|n/a|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From The Date Of Delivery |one Year From The Date Of Delivery |||||
warranty Of Data--basic (mar 2014)|2|||
transportation Of Supplies By Sea (feb 2019)|2|||
first Article Approval--government Testing (sep 1989)|7|one|0001ac|180|receiving Officer, Code 526, Portsmouth Naval Shipyard, Portsmouth, Nh 03804-5000; Mf Equipment Testing Laboratory, Code 270.1 |30|||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
annual Representations And Certifications (may 2022)|13|334220|1250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 31 January 2025.
the Small Business Set-aside Is Been Dissolved.
1. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
2. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See 52.211-14, Notice Of Priority Rating For National Defense, Emergency
preparedness, And Energy Program Use.
3. Only Those Sources With An Acceptable Quality Assurance Manual Are Eligible For Award Under This Solicitation. The Navy Has Found From Past Experience That Quality Control Is Essential To Assure Personnel Safety In Critical Areas And To Provide For The Safe
operation Of Submarines And Certain Systems On Surface Ships. See Wssterm Lz02. Vendors Submitting Quality Manuals Shall Submit Them To Jill.sabol@navy.mil Instead Of 0243.qamanual@navy.mil.
4. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
5. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers.
6. If Drawings Are Included In The Solicitation, Access Must Be Requested On The Individual Solicitation Page On Contract Opportunities Via The Government's Sam.gov Website. Include Your Cage Code In Your Request.
7. Unless Otherwise Stated On The Dd1423, Submission Of Dd1423 Certification Data (cdrls) Will Be On Or Before 20 Days Prior To The Material (line Item 0001aa) Delivery Date. Pnsy Review/acceptance Of Cdrls Shall Be 6 Working Days After Receipt Of Cdrls. Final
delivery Of Material Will Be On Or Before 500 Days After The Effective Date Of The Order.
8. This Procurement Has First Article Test Requirements.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
drawing Data=cpg1022-1 |96169| D| |d|0000.a | D|49998|0074948
drawing Data=cpg1022-1 |96169| D| |d|0000.b | C|49998|0129832
drawing Data=cpg1022-1 |96169| D| |d|0000.c | D|49998|0016731
drawing Data=cpg1022-1 |96169| D| |d|0001 | D|49998|0095662
drawing Data=cpg1022-1 |96169| D| |d|0002 | C|49998|0048488
drawing Data=cpg1022-1 |96169| D| |d|0003 | C|49998|0049407
drawing Data=cpg1022-1 |96169| D| |d|0004 | D|49998|0061828
drawing Data=cpg1022-1 |96169| D| |d|0005 | B|49998|0017369
drawing Data=cpg1022-1 |96169| D| |d|0006 | D|49998|0024738
drawing Data=cpg1022-1 |96169| D| |d|0007 | B|49998|0020905
drawing Data=cpg1022-1 |96169| D| |d|0008 | D|49998|0019097
drawing Data=cpg1022-1 |96169| D| |d|0009 | C|49998|0017763
drawing Data=cpg1022-1 |96169| D| |d|0010 | D|49998|0055696
drawing Data=cpg1022-1 |96169| D| |d|0011 | B|49998|0015906
drawing Data=cpg1025 |96169| P| |d|0001 | P|49998|0031294
drawing Data=cpg1025 |96169| P| |d|0002 | P|49998|0013077
drawing Data=cpg1025 |96169| P| |d|0003 | P|49998|0011923
drawing Data=cpg1025 |96169| P| |d|0004 | P|49998|0021385
drawing Data=cpg1025 |96169| P| |d|0005 | P|49998|0020123
drawing Data=cpg1025 |96169| P| |d|0006 | P|49998|0012596
drawing Data=cpg1025 |96169| P| |d|0007 | P|49998|0020575
drawing Data=cpg1025 |96169| P| |d|0008 | P|49998|0025829
drawing Data=cpg1025 |96169| P| |d|0009 | P|49998|0025129
drawing Data=cpg1025 |96169| P| |d|0010 | P|49998|0025305
drawing Data=cpg1025 |96169| P| |d|0011 | P|49998|0026218
drawing Data=cpg1025 |96169| P| |d|0012 | P|49998|0023610
drawing Data=cpg1025 |96169| P| |d|0013 | P|49998|0024504
drawing Data=cpg1025 |96169| P| |d|0014 | P|49998|0020909
drawing Data=cpg1025 |96169| P| |d|0015 | P|49998|0025043
drawing Data=cpg1025 |96169| P| |d|0016 | P|49998|0024761
drawing Data=cpg1025 |96169| P| |d|0017 | P|49998|0027299
drawing Data=cpg1025 |96169| P| |d|0018 | P|49998|0042937
drawing Data=cpg1025 |96169| P| |d|0019 | P|49998|0040502
drawing Data=cpg1025 |96169| P| |d|0020 | P|49998|0036449
drawing Data=cpg1025 |96169| P| |d|0021 | P|49998|0036830
drawing Data=cpg1025 |96169| P| |d|0022 | P|49998|0033796
drawing Data=cpg1025 |96169| P| |d|0023 | P|49998|0027339
drawing Data=cpg1025 |96169| P| |d|0024 | P|49998|0041721
drawing Data=cpg1025 |96169| P| |d|0025 | P|49998|0036782
drawing Data=cpg1025 |96169| P| |d|0026 | P|49998|0037911
drawing Data=cpg1025 |96169| P| |d|0027 | P|49998|0019706
drawing Data=cpg1025 |96169| P| |d|0028 | P|49998|0031258
drawing Data=cpg1025 |96169| P| |d|0029 | P|49998|0028386
drawing Data=cpg1025 |96169| P| |d|0030 | P|49998|0034996
drawing Data=cpg1025 |96169| P| |d|0031 | P|49998|0037489
drawing Data=cpg1025 |96169| P| |d|0032 | P|49998|0026677
drawing Data=cpg1025 |96169| P| |d|0033 | P|49998|0017312
drawing Data=cpg1025 |96169| P| |d|0034 | P|49998|0030851
drawing Data=cpg1025 |96169| P| |d|0035 | P|49998|0028589
drawing Data=cpg1025 |96169| P| |d|0036 | P|49998|0009063
drawing Data=cpg1025 |96169| P| |d|0037 | P|49998|0004112
drawing Data=cpg1025 |96169| P| |d|0038 | P|49998|0013152
drawing Data=cpg1025 |96169| P| |d|0039 | P|49998|0009572
drawing Data=cpg1025 |96169| P| |d|0040 | P|49998|0012321
drawing Data=cpg1025 |96169| P| |d|0041 | P|49998|0009310
drawing Data=cpg1025 |96169| P| |d|0042 | P|49998|0006784
drawing Data=cpg1025 |96169| P| |d|0043 | P|49998|0006124
drawing Data=cpg1025 |96169| P| |d|0044 | P|49998|0008489
drawing Data=cpg1025 |96169| P| |d|0045 | P|49998|0007044
drawing Data=cpg1025-1 |96169| M| |d|0000.a | M|49998|0758554
drawing Data=cpg1025-1 |96169| M| |d|0000.b | G|49998|1277830
drawing Data=cpg1025-1 |96169| M| |d|0000.c | M|49998|0763525
drawing Data=cpg1025-1 |96169| M| |d|0001 | L|49998|1091102
drawing Data=cpg1025-1 |96169| M| |d|0002 | M|49998|1201771
drawing Data=cpg1025-1 |96169| M| |d|0003 | L|49998|1102853
drawing Data=cpg1025-1 |96169| M| |d|0004 | E|49998|0841196
drawing Data=cpg1025-1 |96169| M| |d|0005 | D|49998|0392069
drawing Data=cpg1025-1 |96169| M| |d|0006 | B|49998|0547744
drawing Data=cpg1025-1 |96169| M| |d|0007 | D|49998|0409468
drawing Data=cpg1025-1 |96169| M| |d|0008 | B|49998|0424196
drawing Data=cpg1025-1 |96169| M| |d|0009 | L|49998|0555538
drawing Data=cpg1025-1 |96169| M| |d|0010 | J|49998|0536845
drawing Data=cpg1025-1 |96169| M| |d|0011 | B|49998|0594238
drawing Data=cpg1025-1 |96169| M| |d|0012 | A|49998|0635118
drawing Data=cpg1025-1 |96169| M| |d|0013 | F|49998|0683845
drawing Data=cpg1025-1 |96169| M| |d|0014 | C|49998|0649459
drawing Data=cpg1025-1 |96169| M| |d|0015 | A|49998|0543639
drawing Data=cpg1025-1 |96169| M| |d|0016 | C|49998|0683318
drawing Data=cpg1025-1 |96169| M| |d|0017 | D|49998|0554866
drawing Data=cpg1025-1 |96169| M| |d|0018 | D|49998|0421953
drawing Data=cpg1025-1 |96169| M| |d|0019 | K|49998|0559184
drawing Data=cpg1025-1 |96169| M| |d|0020 | K|49998|0762215
drawing Data=cpg1025-1 |96169| M| |d|0021 | M|49998|0397387
drawing Data=cpg1025-2 |96169| K| |d|0000.a | K|49998|0360625
drawing Data=cpg1025-2 |96169| K| |d|0000.b | D|49998|0070485
drawing Data=cpg1025-2 |96169| K| |d|0000.c | K|49998|0359139
drawing Data=cpg1025-2 |96169| K| |d|0001 | J|49998|0498469
drawing Data=cpg1025-2 |96169| K| |d|0002 | K|49998|0607194
drawing Data=cpg1025-2 |96169| K| |d|0003 | G|49998|0491202
drawing Data=cpg1025-2 |96169| K| |d|0004 | E|49998|0491268
drawing Data=cpg1025-2 |96169| K| |d|0005 | F|49998|0659594
drawing Data=cpg1025-2 |96169| K| |d|0006 | F|49998|0049431
drawing Data=cpg1025-2 |96169| K| |d|0007 | F|49998|0566711
drawing Data=cpg1025-2 |96169| K| |d|0008 | D|49998|0028577
drawing Data=cpg1025-2 |96169| K| |d|0009 | D|49998|0032712
drawing Data=cpg1025-2 |96169| K| |d|0010 | D|49998|0014537
drawing Data=cpg1025-2 |96169| K| |d|0011 | D|49998|0017877
drawing Data=cpg1025-2 |96169| K| |d|0012 | D|49998|0014800
drawing Data=cpg1025-2 |96169| K| |d|0013 | D|49998|0017435
drawing Data=cpg1025-2 |96169| K| |d|0014 | D|49998|0019633
drawing Data=cpg1025-2 |96169| K| |d|0015 | H|49998|0360727
drawing Data=cpg1025-2 |96169| K| |d|0016 | K|49998|0452047
drawing Data=cpg1025-2 |96169| K| |d|0017 | K|49998|0289051
drawing Data=d135925 |13030| J| |d|0001 | J|49998|0172425
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=mil-std-2132 | | |d |080310|f| |01|
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;hull Penetrator Assembly Must Be In Accordance With Spears Associates Inc. Drawing D135925; Assembly D135925-1, And General Dynamics Specification Cpg 1025, Less Piece 19, Except As Amplified Or Modified Herein.;
3.2 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required.
3.3 ;the Fat Sample(s) Must Not Be Delivered Against The Contract Quantity.;
3.4 ;paragraph 4.1 Of Cpg 1025 Does Not Apply.;
3.5 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;hull Penetrator Body (cpg 1025/2-003), Nut (cpg 1022/1-005), And Washer (cpg 1025/1-005);
material - ;qq-n-286, Form 2 Or Form 7, Annealed And Age Hardened. Mechanical Properties To Be In Accordance With Cpg 1025, Paragraph 3.3.2;
3.6 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Quality Conformance/compliance Inspection
item - ;each Hull Penetrator Assembly;
performance - ;cpg 1025, Paragraph 4.5;
acceptance - ;cpg 1025, Paragraph 4.5;
attribute - Annealing And Age Hardening
item - ;each Hull Penetrator Body (cpg 1025/2-003), Nut (cpg 1022/1-005), And Washer (cpg 1025/1-005);
performance - Qq-n-286
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
attribute - Time Temperature Plots And Certified Calibration Records Of Furnace Temperature Measuring Devices
item - ;each Hull Penetrator Body (cpg 1025/2-003), Nut (cpg 1022/1-005), And Washer (cpg 1025/1-005);
performance - ;when Required By Cpg 1025, Paragraph 3.3.1.2;
test - ;dye Penetrant Inspection;
item - ;each Penetrator Body (cpg 1025/2-003), Nut (cpg 1022/1-005), And Washer (cpg 1025/1-005);
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
3.7 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.8 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.8.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.8.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.8.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.9 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not Permitted On ;hull
penetrator Body (cpg 1025/2-003), Nut (cpg 1022/1-005), And Washer (cpg 1025/1-005); . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.10 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.11 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.12 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.13 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.14 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.14.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.14.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.14.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.15 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.15.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.17 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.19 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The
contract.
3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.19.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.20 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.20.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.20.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.20.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.20.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.20.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.21 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.21.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.21.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.22 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.22.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.22.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.22.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.22.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.22.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.23 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.23.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.23.2 Inspection For Completeness And Proper Type.
3.23.3 Verification Of Material Quality Received.
3.23.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.23.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.23.6 Identification And Protection From Improper Use Or Disposition.
3.23.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.23.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.23.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.24 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.24.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.25 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.25.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.25.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.25.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.25.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.26 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.26.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.26.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.26.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.26.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.26.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.27 Material Handling - The Written Material Control Process Must Include The Following:
3.27.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.27.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.27.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.27.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.27.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.27.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.28 Receiving Inspection -
3.28.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.28.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.29 Discrepancy Reporting -
3.29.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.30 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.30.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.30.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.30.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.30.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.31 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1) Each Penetrator Assembly, One (1) Each Header Assembly, And One (1) Each Inboard Plug Assembly; Unit(s) To ;receiving Officer, Code 526, Portsmouth Naval
shipyard, Portsmouth, Nh 03804-5000; Mf Equipment Testing Laboratory, Code 270.1; For First Article Tests In Accordance With The ;requirements Of Cpg 1025, Paragraph 4.4. Underwater Explosion Testing Is Not Required; .
3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And
Closing Date31 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001aa|5 Ay|tbd|0001ab|15 Ay|tbd|||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n
/a|see Dd Form 1423 | Port_ptnh_wawf_notification@navy.mil |
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (nov2023))|5||||||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7||||||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (nov 2023))|5||||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (mar 2023)|13|332919|750||||||||||||
type Of Contract (apr 1984)|1|firm Fixed|
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
dd1423 Data Item A001 May Be Waived If Already On File Atnavsup Wss Mechanicsburg.
any Contract Awarded As A Result Of This Solicitation Will Be Do Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;s1e10203 99517 G B
s3c10053 99517 E B
s3c10054 99517 E B
v3e10103 99517 J B
v3d10436 99517 E B
v3d10425 99517 G B
v3d10424 99517 D B
f3c10321 99517 D B
wi-s1e10203 99517 A B
ptp-s1e10203-03 99517 C B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b138 | | | |110101|a| | |
document Ref Data=astm-b150 | | | |190401|a| | |
document Ref Data=astm-a182 | | |a |191101|a| | |
document Ref Data=astm-a240 | | |a |201115|a| | |
document Ref Data=astm-a262 | | | |150901|a| | |
document Ref Data=astm-a574 | | | |211201|a| | |
document Ref Data=astm-a581 | | |b |950910|a| | |
document Ref Data=astm-a582 | | | |211101|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=sae Ams 5643 | | |v |180101|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | | |950801|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;complete Pressure Reducing Manifold Assembly To Be In Accordance With Vacco Drawing S1e10203, Assembly Part Number S1e10203-03 With Vacco Document Wi-s1e10203, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
;vacco Drawing S1e10203, Assembly Part Number S1e10203-03 (manifold Assembly);
part - ;body, Item 1;
material - ;sae Ams-qq-s-763, Class 304, Condition A Or Astm-a182, Class 304 Or Astm-a240, Class 304;
part - ;filter Cap, Item 2 And Tube, Item 8;
material - ;astm-a582, Type 303;
part - ;port Adapter (inlet), Item 3; Port Adapter (outlet), Item 7; Inlet Thread Piece, Item 12; And Outlet Thread Piece, Item 13;
material - ;sae Ams 5643, Condition H-1025;
part - ;self-locking Socket Head Cap Screws, Items 23, 27, 28, 29, 30, 31, 32, And 34;
material - ;sae Ams 5643, Condition H-1025 With Self-locking Element Per Mil-dtl-18240;
part - ;plug, Item 4;
material - ;astm-a581, Type 303 Or Astm-a582, Type 303;
;vacco Drawing S3c10053, Assembly Part Number S3c10053-01 (gage Connector);
part - ;body, Item 1;
material - ;sae Ams-qq-s-763, 300 Series Or Astm-a582, 300 Series;
part - ;stem, Item 2;
material - ;sae Ams 5643, Condition H-1025 With Self-locking Element To Meet The Intent Of Mil-dtl-18240, Type N;
;vacco Drawing S3c10054, Assembly Part Number S3c10054-01 (pressure Bleed Block);
part - ;body, Item 1;
material - ;astm-a582, 300 Series Or Sae Ams-qq-s-763, 300 Series;
part - ;stem, Item 2;
material - ;sae Ams 5643, Condition H-1025 With Self-locking Element To Meet The Intent Of Mil-dtl-18240, Type N;
;vacco Drawing V3e10103, Assembly Part Number V3e10103-02 (pressure Regulator);
part - ;poppet, Item 4 And Guide, Item 17;
material - ;sae Ams 5643, Condition H-1025;
part - ;seat Retainer, Item 2;
material - ;sae Ams 5643, Condition H-1025 With Self-locking Element To Meet The Intent Of Mil-dtl-18240, Type N;
part - ;self-locking Socket Head Cap Screws, Item 28;
material - ;sae Ams 5643, Condition H-1025 With Self-locking Element Per Mil-dtl-18240, Type L;
part - ;seat Plate, Item 10;
material - ;sae Ams 5643, Condition H-1150;
part - ;dome Cap, Item 21;
material - ;sae Ams-qq-s-763, Class 304, Condition A;
part - ;retainer, Item 5;
material - ;astm-a582, Type 303;
part - ;plug, Item 29 And Bleed Plug, Item 30;
material - ;sae Ams-qq-s-763, Class 304, Condition A With Self-locking Element To Meet The Intent Of Mil-dtl-18240, Type N;
;vacco Drawing V3d10436, Assembly Part Number V3d10436-01 (loading Block);
part - ;body, Item 1 And Orifice Block, Item 2;
material - ;sae Ams-qq-s-763, Class 304, Condition A;
part - ;seat, Item 3;
material - ;astm-b138, C67500 Or Astm-b150, Alloy C62400 Or Alloy C63200;
part - ;stem, Item 5;
material - ;sae Ams 5643, Condition H-1025;
part - ;gland, Item 6;
material - ;astm-b138, Alloy C67500, Half Hard;
;vacco Drawing V3d10425, Assembly Part Number V3d10425-01 (inlet / Bypass Valve);
part - ;bonnet, Item 4;
material - ;astm-a582, Type 303, Condition A;
part - ;poppet, Item 3;
material - ;sae Ams 5643, Condition H-1025;
;vacco Drawing V3d10424, Assembly Part Number V3d10424-01 (outlet Valve);
part - ;bonnet, Item 1;
material - ;astm-a582, Type 303;
part - ;orifice Block, Item 2 And Poppet, Item 3;
material - ;sae Ams 5643, Condition H-1025;
;vacco Drawing F3c10321, Assembly Part Number F3c10321-225 (dp Indicator);
part - ;body, Item 1 And Bonnet, Item 4;
material - ;astm-a582, Type 303;
part - ;adjusting Screw, Item 9;
material - ;astm-a582, Type 303 With Self-locking Element To Meet The Intent Of Mil-dtl-18240, Type N;
part - ;piston, Item 2;
material - ;sae Ams 5643, Condition H-1025;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;visual Inspection (root And Final Layer);
item - ;weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;item 1 Of Drawing S1e10203; Item 1 Of Drawing S3c10053; Item 1 Of Drawing S3c10054; Items 21, 29, And 30 Of Drawing V3e10103; And Items 1 And 2 Of Drawing V3d10436;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - ;quality Conformance Tests;
item - ;each Manifold Assembly;
performance - ;ptp-s1e10203-03;
acceptance - ;ptp-s1e10203-03;
test - ;liquid Penetrant Inspection;
item - ;items 23, 27, 28, 29, 30, 31, 32, And 34 Of Drawing S1e10203 And Item 28 Of Drawing V3e10103;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - Intergranular Corrosion Testing
item - ;item 1 Of Drawing S1e10203 (only For Astm-a240 Material);
performance - Astm-a262, Practice E
acceptance - Astm-a262
3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.5 Heat Treat Requirements - Mechanical Properties (via Tension Testing And Hardness Testing If Hardness Is Required By The Applicable Material Specification) Are Required For Each Heat In Each Heat Treat Charge For Astm-a234, Astm-a403, Astm-a182, And
astm-a105 Material.
3.5.1 If Heat Treatment Is Performed In Continuous-type Furnaces With Suitable Temperature Control And Equipped With Recording Pyrometers So That Complete Heat-treatment Records Are Available, A Heat-treatment Charge Must Be Considered As Any Continuous Run
not Exceeding An 8-hr Duration. One Tension Test Must Be Taken From One Forging Per Heat In Each Heat Treatment Charge At A Minimum Of Every 8 Hours.
3.5.2 Certification Of Mechanical Properties (mechanical Analysis, Tension Testing) Must Include The Condition Furnished. The Contractor Must Maintain A Complete Record On File Of The Heat Treatment Given Each Piece, Including Stress Relief. The Contractor
must Provide Either The Record Of The Final Heat Treatment Or A Heat Treatment Certification Statement. The Certification Statement Must Be Signed By The Heat-treater And Include The Date Of Heat Treatment, Duration And Temperature Of Heat Treatment Operations
and Quenching Medium (if Required).
3.6 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.6.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.6.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.6.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.7 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.8 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887355434; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.9 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be
submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.10 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.11 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.11.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.11.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.11.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.12 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.12.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.13 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.13.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.13.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.13.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.14 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.15 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.16 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.17 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.17.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.17.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.17.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.17.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.17.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.17.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.17.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.17.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.17.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.17.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.17.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.17.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.18 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.18.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.18.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.18.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.18.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.18.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.19 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.19.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.19.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.20 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.20.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.20.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.20.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.20.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.20.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.21 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.21.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.21.2 Inspection For Completeness And Proper Type.
3.21.3 Verification Of Material Quality Received.
3.21.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.21.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.21.6 Identification And Protection From Improper Use Or Disposition.
3.21.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.21.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.21.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.22 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.22.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.23 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.23.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.23.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.23.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.23.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.24 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.24.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.24.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.24.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.24.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.24.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.25 Material Handling - The Written Material Control Process Must Include The Following:
3.25.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.25.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.25.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.25.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.25.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.25.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.26 Receiving Inspection -
3.26.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.26.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.27 Discrepancy Reporting -
3.27.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.28 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.28.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.28.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.28.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.28.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.29 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222. Sae-ams-5643, Condition H-1025 Material Is Material Designator Smm; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For
grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A
minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds.
3.29.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.30 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.2.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.2.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.2.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.2.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.2.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.2.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.2.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.2.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.2.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.2.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.2.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.2.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.2.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.2.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.2.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.2.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.2.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.2.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.2.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.2.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.2.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.3.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
; - 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Feb 03 2011 - Clarified Intergranular Corrosion Test On Raw Stock
- Oct 22 2012 - Identified Intergranular Corrosion Test Material Classes
- Dec 17 2011 - Began Using Ecds For Submis
Closing Date8 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001|four|750||||||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |na|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|na|na|n39040 - Certifications|na|na|s
ee Dd 1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
progress Payments (nov 2021)|4|||||
limitation Of Liability--high-value Items ($100k)(feb 1997)|1||
limitations On Pass-through Charges (jun 2020)|1||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|13|332919|750 Employees||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
instructions To Offerors -- Competitive Acquisition (nov 2021)|2|||
facsimile Proposals (oct 1997)|1||
type Of Contract (apr 1984)|1|firm Fixed Price|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
this Amendment Is Issued Due To Quantity Change Of Requirement. Closing Date Extended To 27 Jan 2025.
this Amendment Is Issued To Extend Closing Date To 10 Sep 2024.
1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mech.
2.drawings Associated With This Solicitation Will Be Made Available On The New Beta.sam Website, But Will Be Restricted Access Which Needs To Be Approved. Once Access Has Been Requested, Interested Vendors Should Email The Poc Listed On The Solicitation To Inform
them Of The Request.
3. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000.
4. This Is A Rated Order Certified For National Defense Use,and The Contractor Will Follow All The Requirements Ofthe Defense Priorities And Allocations Systemregulation (15 Cfr 700).
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
drawing Data=h684-1505a01 |53711| A|er |d|0001 | A|49998|0059711
drawing Data=h684-1505a01 |53711| A|er |d|0002 | A|49998|0060531
drawing Data=h684-1505a01 |53711| A|er |d|0003 | A|49998|0166290
drawing Data=h684-1505a05 |53711| A|er |d|0001 | A|49998|0039892
drawing Data=h684-1505a05 |53711| A|er |d|0001.1 | A|49998|0011824
drawing Data=h684-1505a05 |53711| A|er |d|0002 | A|49998|0068709
drawing Data=h684-1505a05 |53711| A|er |d|0003 | A|49998|0049591
drawing Data=h684-1505a05 |53711| A|er |d|0004 | A|49998|0064381
drawing Data=h684-1505a05 |53711| A|er |d|0005 | A|49998|0066716
drawing Data=h684-1505a05 |53711| A|er |d|0006 | A|49998|0019662
drawing Data=h684-1505a05 |53711| A|er |d|0007 | A|49998|0277934
drawing Data=h684-1505a05 |53711| A|er |d|0008 | A|49998|0228605
drawing Data=h684-1505a05 |53711| A|er |d|0009 | A|49998|0202813
drawing Data=h684-1505a08 |53711| A|er |d|0001 | A|49998|0063220
drawing Data=h684-1505a08 |53711| A|er |d|0001.1 | A|49998|0023665
drawing Data=h684-1505a08 |53711| A|er |d|0002 | A|49998|0111529
drawing Data=h684-1505a08 |53711| A|er |d|0003 | A|49998|0076624
drawing Data=h684-1505a08 |53711| A|er |d|0004 | A|49998|0043485
drawing Data=h684-1505a08 |53711| A|er |d|0005 | A|49998|0052444
drawing Data=h684-1505a08 |53711| A|er |d|0006 | A|49998|0060448
drawing Data=h684-1505a08 |53711| A|er |d|0007 | A|49998|0228873
drawing Data=h684-1505a10 |53711| A|er |d|0001 | A|49998|0051242
drawing Data=h684-1505a10 |53711| A|er |d|0001.1 | A|49998|0019823
drawing Data=h684-1505a10 |53711| A|er |d|0002 | A|49998|0064955
drawing Data=h684-1505a10 |53711| A|er |d|0003 | A|49998|0016187
drawing Data=h684-1505a10 |53711| A|er |d|0004 | A|49998|0039176
drawing Data=h684-1505a10 |53711| A|er |d|0005 | A|49998|0092840
drawing Data=h684-1505a11 |53711| A|er |d|0001 | A|49998|0044912
drawing Data=h684-1505a11 |53711| A|er |d|0001.1 | A|49998|0030478
drawing Data=h684-1505a11 |53711| A|er |d|0002 | A|49998|0072815
drawing Data=h684-1505a11 |53711| A|er |d|0003 | A|49998|0192093
drawing Data=h684-1505a11 |53711| A|er |d|0004 | A|49998|0178728
drawing Data=h684-1505a17 |53711| B|er |d|0001 | B|49998|0037760
drawing Data=h684-1505a17 |53711| B|er |d|0001.1 | B|49998|0035207
drawing Data=h684-1505a17 |53711| B|er |d|0001.2 | B|49998|0022573
drawing Data=h684-1505a17 |53711| B|er |d|0002 | B|49998|0054795
drawing Data=h684-1505a17 |53711| B|er |d|0003 | B|49998|0069519
drawing Data=h684-1505a17 |53711| B|er |d|0004 | B|49998|0033609
drawing Data=h684-1505a18 |53711| B|er |d|0001 | B|49998|0036238
drawing Data=h684-1505a18 |53711| B|er |d|0001.1 | B|49998|0028959
drawing Data=h684-1505a18 |53711| B|er |d|0001.2 | B|49998|0017111
drawing Data=h684-1505a18 |53711| B|er |d|0002 | B|49998|0054081
drawing Data=h684-1505a18 |53711| B|er |d|0003 | B|49998|0030868
drawing Data=h684-1505a22 |53711| A|er |d|0001 | A|49998|0041854
drawing Data=h684-1505a22 |53711| A|er |d|0001.1 | A|49998|0031258
drawing Data=h684-1505a22 |53711| A|er |d|0002 | A|49998|0049185
drawing Data=h684-1505a22 |53711| A|er |d|0003 | A|49998|0041149
drawing Data=h684-1505a22 |53711| A|er |d|0004 | A|49998|0200472
drawing Data=h684-1505a26 |53711| A|er |d|0001 | A|49998|0042850
drawing Data=h684-1505a26 |53711| A|er |d|0001.1 | A|49998|0021670
drawing Data=h684-1505a26 |53711| A|er |d|0002 | A|49998|0053195
drawing Data=h684-1505a26 |53711| A|er |d|0003 | A|49998|0201664
drawing Data=h684-1505a41 |53711| B|er |d|0001 | A|49998|0679677
drawing Data=h684-1505a45 |53711| A|er |d|0001 | A|49998|0259819
drawing Data=h684-1505a47 |53711| A|er |d|0001 | A|49998|0209879
drawing Data=h684-1505a53 |53711| B|er |d|0001 | B|49998|9999999
drawing Data=h684-1505a54 |53711| A|er |d|0001 | A|49998|1149113
drawing Data=h684-1505a63 |53711| A|er |d|0001 | A|49998|0231978
drawing Data=2621-625-03 |96169|al| |d|0001 |al|00026|0000000
drawing Data=2640-809x10 |96169| C| |d|0001 | C|00026|0000000
drawing Data=7285297 |53711| E| |d|0001 | E|49998|0862180
drawing Data=7285297 |53711| E| |d|0002 | E|49998|0392982
drawing Data=7285297 |53711| E| |d|0003 | E|49998|0280881
drawing Data=7285297 |53711| E| |d|0004 | E|49998|0204692
drawing Data=7286781 |53711| A| |d|0000.cov | A|49998|0039333
drawing Data=7286781 |53711| A| |d|0001 | A|49998|0079794
drawing Data=7286781 |53711| A| |d|0002 | A|49998|0037296
drawing Data=7286781 |53711| A| |d|0003 | A|49998|0009867
drawing Data=7286781 |53711| A| |d|0004 | A|49998|0010513
drawing Data=7286781 |53711| A| |d|0005 | A|49998|0026590
drawing Data=7286781 |53711| A| |d|0006.1 | A|49998|0060938
drawing Data=7286781 |53711| A| |d|0006.2 | A|49998|0058985
drawing Data=7286781 |53711| A| |d|0006.3 | A|49998|0056660
drawing Data=7286781 |53711| A| |d|0006.4 | A|49998|0057452
drawing Data=7286781 |53711| A| |d|0006.5 | A|49998|0062979
drawing Data=7286781 |53711| A| |d|0006.6 | A|49998|0022145
drawing Data=7286781 |53711| A| |d|0006.7 | A|49998|0036865
drawing Data=7286781 |53711| A| |d|0007.1 | A|49998|0024658
drawing Data=7286781 |53711| A| |d|0007.10 | A|49998|0039600
drawing Data=7286781 |53711| A| |d|0007.11 | A|49998|0038232
drawing Data=7286781 |53711| A| |d|0007.12 | A|49998|0026294
drawing Data=7286781 |53711| A| |d|0007.2 | A|49998|0034537
drawing Data=7286781 |53711| A| |d|0007.3 | A|49998|0034247
drawing Data=7286781 |53711| A| |d|0007.4 | A|49998|0034359
drawing Data=7286781 |53711| A| |d|0007.5 | A|49998|0035392
drawing Data=7286781 |53711| A| |d|0007.6 | A|49998|0034156
drawing Data=7286781 |53711| A| |d|0007.7 | A|49998|0033150
drawing Data=7286781 |53711| A| |d|0007.8 | A|49998|0039657
drawing Data=7286781 |53711| A| |d|0007.9 | A|49998|0040668
drawing Data=7286781 |53711| A| |d|0008.1 | A|49998|0028730
drawing Data=7286781 |53711| A| |d|0008.2 | A|49998|0043722
drawing Data=7286781 |53711| A| |d|0008.3 | A|49998|0012156
drawing Data=7286781 |53711| A| |d|0008.4 | A|49998|0008759
drawing Data=7286781 |53711| A| |d|0009 | A|49998|0175577
drawing Data=7286781 |53711| A| |d|0010 | A|49998|0134538
drawing Data=7286781 |53711| A| |d|0011 | A|49998|0172553
drawing Data=7286781 |53711| A| |d|0011.1 | A|49998|0087153
drawing Data=7286781 |53711| A| |d|0012 | A|49998|0126678
drawing Data=7286781 |53711| A| |d|0013 | A|49998|0100923
drawing Data=7286781 |53711| A| |d|0014 | A|49998|0137217
drawing Data=7286781 |53711| A| |d|0015 | A|49998|0088404
drawing Data=7286781 |53711| A| |d|0016 | A|49998|0138405
drawing Data=7286781 |53711| A| |d|0017 | A|49998|0112913
drawing Data=7286781 |53711| A| |d|0018 | A|49998|0112286
drawing Data=7286781 |53711| A| |d|0019 | A|49998|0114952
drawing Data=8617511 |53711| N| |d|0001 | N|49998|3447332
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b138 | | | |110101|a| | |
document Ref Data=astm-b150 | | | |190401|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=astm-b367 | | | |220401|a| | |
document Ref Data=astm-b369 | | | |200401|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=astm-e1417 | | | |160615|a| | |
document Ref Data=astm-e1444 | | | |160601|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=astm-d4066 | | | |130701|a| | |
document Ref Data=astm-d6456 | | | |100801|a| | |
document Ref Data=sae Ams 6931 | | |d |171201|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=qpl 25027 | | |17 |000207|a| | |
document Ref Data=mil-dtl-32258 | | | |210601|a|2 | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | |
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;complete Towed Sonar Hull And Backup Ball Valve Assembly Must Be In Accordance With Naval Sea Systems Command Drawing 7286781 And All Drawings And Engineering Referrals Provided With This Contract/purchase Order, Except As Amplified Or Modified Herein.;
3.2 ;adiprene L100, Durometer 50-60 Shore A Is An Acceptable Alternate Material For The Static Seal (part 27) Of Navsea Drawing 7286781.;
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;body, Part 1, And Dynamic Seal Housing, Part 3 Of Drawing 7286781;
material - ;astm-b369, Alloy Uns C96400;
part - ;shear Sleeve, Part 18 Of Drawing 7286781;
material - ;astm-b138, Uns C67500, Temper H02;
part - ;shear Seal Rod, Part 20 Of Drawing 7286781;
material - ;qq-n-286, Form 2, Annealed And Age Hardened;
part - ;valve Stem, Part 23, And Static Seal Shaft, Part 26 Of Drawing 7286781;
material - ;astm-b150, Alloy C63200, Rod, Temper Tq50 Or Tq55;
part - ;plug, Piece 17a Of Drawing 2621-625-03;
material - ;qq-n-281 With Mechanical Properties In Accordance With General Note 16 On Drawing 2621-625-03;
part - ;studs, Part 88 Of Drawing 7286781;
material - ;mil-dtl-1222, Type Iv, Qq-n-286, Annealed And Age Hardened;
part - ;self-locking Heavy Hex Nuts, Part 89 Of Drawing 7286781;
material - Qq-n-281, Class A Or B, With Chemical Composition In Accordance With Mil-dtl-32258.
note: All Material Must Be The Same Class.
self-locking Element - For 250 Degree Nuts Use Astm-d6456, Type 1 Or Astm-d4066, Group 01, Class 1 Or 2, Grade 1, 2, 3, 4, 5,or 6. For 450 Degree Nuts Use Astm-d6456, Type 1.
part - ;ball, Piece 17li Of Drawing 8617511;
material - Sae-ams-6931
or
centrifugally Cast 6al-4v, Astm-b367, Grade C-5, With Mechanical Properties As Listed In Supplementary Requirement S6.
note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6"
to 10", Must Be Applied.
part - ;seats (q3), Piece 16 Of Drawing 7285297;
material - Md71-gg Mearthane (graphite Filled Urethane). Material Must Be Manufactured By Mearthane Products Inc. Cranston, Ri. (properties Specified Below Only)
item Property Astm Test Method Value
(a) Hardness D2240 70 +/- 5 Shore D
(b) Specific Gravity D792 1.18 +/- 0.02
(c) Tensile Strength D412 (diec) 5000 Psi Min
(d) Compression-defl D575 700 Psi Min @ 2% Def.
(e) Tensile Impact D1822 300 Ft-lb/sq In
(note 1) (type L Specimen)
(f) Water Absorption D570 1.5% Max
(1 Week At R.t.)
note 1: These Values Are Minimum Averages. Separate Specimen Values May Not Vary More Than 25% Under The Specified Minimum.
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
attribute - Annealing And Age Hardening
item - ;shear Seal Rod, Part 20, And Stud, Part 88 Of Drawing 7286781;
performance - Qq-n-286
test - ;dye Penetrant Inspection For Non-magnetic Grades;
item - ;self-locking Heavy Hex Nuts, Part 89 Of Drawing 7286781;
performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444
(method C Solvent Removal Techniques Must Not Be Used On Thread)
acceptance - ;nasm25027 With Sampling In Accordance With Mil-dtl-32258;
test - ;visual Inspection (root Layer);
item - ;weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - ;visual Inspection (final Layer);
item - ;weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - Weldability Test Of Astm-b369 Material
item - ;body, Part 1, And Dynamic Seal Housing, Part 3 Of Drawing 7286781;
performance - Astm-b369
acceptance - Astm-b369
test - Pressure Tests
item - Each Assembly
performance - ;general Notes 7001, 7003, 7006, And 7008;
acceptance - ;general Notes 7001, 7003, 7006, And 7008;
test - Quality Conformance Tests
item - Self-locking Nuts
performance - ;mil-dtl-32258;
acceptance - ;mil-dtl-32258;
attribute - Certificate Of Compliance
item - Self-locking Nuts
performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex
self-locking Nuts.
attribute - Certificate Of Completion
item - Self-locking Nut Nonmetallic Insert
performance - ;astm D6456, Type 1 Or Astm D4066, Group 01, Class 1 Or 2, Grade 1, 2, 3, 4, 5, Or 6;
3.5 Radiography Is Required On ;body, Part 1, And Dynamic Seal Housing, Part 3 Of Drawing 7286781; .
3.6 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.7 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On The
drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be
required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension.
3.8 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/.
3.9 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must
apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay.
3.10 ;surface Waviness Must Be Verified Prior To Teflon Coating.;
3.11 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;8;
of Drawing ;8617511; .
3.11.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/
3.11.2 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing.
3.12 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd099; In Ecds At Https://register.nslc.navy.mil/
3.13 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.14 Specification Change - For Qq-n-281, Class B Material:
1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply.
2 - When Starting Material Is Round Bar Greater Than 3" Dia,
The Mechanical Properties Of Hex Bar Apply.
3.15 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222.
3.15.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of
the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows:
a. Proper Product Lot Control And Traceability Must Be In Place.
b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar.
c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar.
e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be
performed On Studs As Required In Paragraph 4.5.2.7.e.
3.15.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The
"alternate Mechanical Testing" Provision.
3.15.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners
must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To
the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above.
3.16 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286.
3.16.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The
annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286.
3.16.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be
cut Or Ground Only.
3.17 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must
be Performed On A Full Size Fastener.)
3.17.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222.
3.17.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order.
3.18 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.19 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.19.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.19.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.19.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.20 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.21 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not
permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.22 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.23 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887245356; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.24 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.24.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.24.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.24.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.25 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.26 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.26.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.27 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.28 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level I Per The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The
applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable.
3.28.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing The Radiography Must Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketch Approval Is Not Required For
radiography Of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend
only On The Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Data Has Been
previously Approved By A Navy Activity, The Original Approval Letter Must Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal.
3.28.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable To The Rt Film.)
3.28.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiography Requires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior To
shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection.
(a) Film
(b) Rss/rsss
(c) Rs (reader Sheets)
(d) Documentation Record Listing The Part Number, Heat/lot Traceability, And Theunique Rt Serial Number (which Is Traceable To The Rt Film And Reader Sheet)
3.29 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.30 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.30.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.30.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.30.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.30.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.30.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.30.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.30.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.30.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.30.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.30.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.30.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.30.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.31 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Heavy Hex Nuts Must Be Marked In Accordance With Mil-dtl-32258; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of
mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To
coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds.
3.31.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.32 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.32.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/non-acceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.32.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.32.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.32.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.32.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.33 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.33.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices
and For Verification Of Their Accuracy And Condition.
3.33.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.34 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.35 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.35.1 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.35.2 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.35.3 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must
be Established. Records Of This Effort Must Be Available For Review By The Government.
3.35.4 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.36 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.36.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.36.2 Inspection For Completeness And Proper Type.
3.36.3 Verification Of Material Quality Received.
3.36.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.36.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.36.6 Identification And Protection From Improper Use Or Disposition.
3.36.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.36.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.36.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.37 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.37.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein.
3.38 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number For Metallic Material Or Batch Of Non-metallic Material, As Applicable, Which Must Also Be Marked On The
material. This Traceability Marking On The Material Must Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples
must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The
finished Component.
3.38.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.38.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.38.3 Permanent Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;ball Must Be Marked In The Waterway And The Seats Must Be Marked On The Outer Cylindrical Surface.;
3.38.4 Seat Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size
scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats.
seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification.
3.38.5 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.39 See Cdrl-di-misc-81020 (chemical And Mechanical) And Cdrl Di-misc-80678 (seat Material) - Material Certifications - The Following Material Certification Requirements Apply:
3.39.1 Metallic Material - Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As
applicable, Of The Material Supplied.
3.39.2 Non-metallic Material - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The Class, Form, Grade, Type, Process, And/or
composition, As Applicable, Of The Material Supplied.
3.39.3 Re-identification And Re-certification Of Metallic Material Is Required When The Material Is Subjected To A Process Which Alters Its Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical
composition Or Mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A
process Is Used During Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The
altered Material Must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties
are Altered, The Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number _______________ And Heat Treat Number ______________________
(when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.39.4 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.39.5 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.39.6 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.40 Material Handling - The Written Material Control Process Must Include The Following:
3.40.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.40.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.40.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.40.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption.
Closing Date27 Jan 2025
Tender AmountRefer Documents
4801-4810 of 4825 archived Tenders