Transportation Tenders

Transportation Tenders

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Civil Works Others
United States
Closing Date13 Jan 2025
Tender AmountRefer Documents 
Details: This Sources Sought Notice Is Being Issued For Market Research Purposes To Determine The Availability, Capability, And Interest Of Small Business Firms For A Potential Government Requirement. No Solicitation Is Available; Requests For A Solicitation Will Go Unanswered. No Award Will Be Made From This Notice. Responses Will Be Used To Determine Potential Acquisition Strategies, Understand Current Market Capabilities, And To Gain Knowledge Of Potential Sources. general Scope: the United States Army Corps Of Engineers (usace) Sacramento District (spk) Anticipates A Potential Requirement To Remove Two (2) Existing Aircraft Shelters (b1044 And B1045), The Maintenance Shed (b1046), Existing Utility (b1006) And Jet Blast Deflectors, Along With The Design And Construct Of A New Multi-domain Operations Complex (mdoc) At Beale Air Force Base In California (ca). ***the Slabs, Subsoils, And Building Material At The Buildings Are Anticipated To Be Pfas-impacted Due To The Historic Use Of Afff Fire Suppressant Systems. Contractor Shall Implement All Necessary Precautionary Measures To Prevent The Spread Of Pfas During Demolition Activities. The Project Scope Includes Characterization, Profiling And Disposal Of Pfas-impacted Materials As Well As Measures To Prevent Spread Of Pfas Laden Dust And Water, In Accordance With Local, State, And Federal Regulations. Handling, Transportation And Disposal Of Pfas Impacted Materials Must Be Accounted For In All Pavements Testing And Geotechnical Investigations. Refer To The Part Titled Demolition In Section 01 10 10.01 Design Requirements - General For More Information Pertaining To Characterization, Profiling And Disposal Requirements For Pfas-impacted Concrete And Soil.*** the Mdoc Is Anticipated To Consist Of Two (2) Aircraft Hangar Bays And Central Squadron Operations Facility Between The Hangars In A T-shape And In Harmony With The Adjacent Dock 11 Building, With Matching Heights And Facades. The Project Is Anticipated To Include All Utilities, Site Improvements, New Apron, Pavements, Detection And Protection Features, Security Enhancements, Secure Compartmented Information Facility (scif), And Other Supporting Work Necessary To Make A Complete And Useable Facility. the Potential Requirement May Result In A Firm-fixed-price Solicitation Issued Approximately March 2025. If Solicited, The Government Intends To Award The Anticipated Requirement By Approximately December 2025. the Government Estimates That Design Of The Anticipated Requirement Can Be Completed Within Two-hundred-forty-six (246) Calendar Days. It Is Estimated That Construction Of The Anticipated Requirement Can Be Completed Within Nine-hundred-fifteen (915) Calendar Days. If Market Conditions Indicate This Estimate May Be Unrealistic, Respondents Are Encouraged To Provide Specific Information (such As Known Equipment Lead Times Or Other Timeline Concerns) For Government Consideration When Responding To This Sources Sought Notice. in Accordance With Defense Federal Acquisition Regulation Supplement (dfars) 236.204(iii), The Government Currently Estimates The Magnitude Of Construction For The Potential Project Is Between $100,000,000 And $250,000,000 the North American Industrial Classification System (naics) Code For The Potential Requirement Is Anticipated To Be 236220, Commercial And Institutional Building Construction. The Small Business Size Standard For The Naics, As Established By The U.s. Small Business Administration, Is $45,000,000 Annual Revenue. The Product Service Code For The Potential Requirement Is Anticipated To Be Y1bz Construction Of Other Airfield Structures. if There Is A Reasonable Expectation That At Least Two (2) Responsible Small Business Concerns Under This Naics Can Provide The Anticipated Services At Fair Market Prices, The Contracting Officer Is Required To Set The Acquisition Aside For Small Business Concerns. If Competition Is Set-aside For Small Businesses, Federal Acquisition Regulation (far) 52.219-14, Limitations On Subcontracting, Requires That General Construction Small Business Contractors Self-perform At Least Fifteen Percent (15%) Of The Cost Of The Contract, Not Including The Cost Of Materials. If No Set Aside Is Made, The Requirement Is Competed With Full And Open Competition, And The Awarded Contractor Is Not A Small Business, The Contractor Will Be Required To Self-perform The Percent Of Work Identified In The Solicitation Under Far 52.236-1,performance Of Work By The Contractor. contractors With The Skill, Capabilities, Workload Capacity, And Ability To Obtain Bonding To Complete The Project Described Above (either Through Self-performance And/or Subcontractor Management) Are Invited To Provide Capability Statements To The Primary Point Of Contact Listed Below. Other Than Small Businesses Are Also Encouraged To Submit Capability Statements. capability Statement: responses Must Be Limited To Twelve (12) 8.5 X 11 Inch Pages With A Minimum Font Size Of Point 10. please Provide The Following Information: 1) Company Name, System For Award Management Unique Entity Identification Number (sam Ueid) Or Employer Identification Number(ein), Address, Point Of Contact Name, Contact Phone Number, Contact E-mail Address, And Statement Identifying Whether The Company Employs Union Or Non-union Workers. 2) Experience And Capability To Complete Contracts Of Similar Magnitude And Complexity To The Potential Requirement, Including At Least Three (3) Examples Of Comparable Work Performed Within The Past Six (6) Years. Each Example Should Include A Brief Description Of The Project, Description Of The Work Performed (identification Of Self-performance And/or Subcontractor Management), Customer Name, Customer Satisfaction, Timeliness Of Performance, Dollar Value Of The Project, Whether A Project Labor Agreement (pla) Was Used (see The Pla Survey Section Below), And Whether There Were Any Challenges Experienced During The Project (delays, Investigations, Health And Safety Issues, Labor Shortages, Management/organizational Issues, Etc.). 3) Business Size And Socioeconomic Type For The Applicable Naics (ex: Woman-owned Small Business, Serviced-disabled Veteran-owned Small Business (sdvosb), Veteran-owned Small Business (vosb), Certified Historically Underutilized Business Zone (hubzone), 8(a) Participant, Small Business, Or Other Than Small Business (large Business)). 4) Bonding Capability (in The Form Of A Surety Letter). .5) Pla Survey. A Pla Is A Pre-hire Collective Bargaining Agreement With Labor Organization(s) That Establishes The Terms And Conditions Of Employment For A Specific Construction Project. Pursuant To Executive Order 14063, Use Of Project Labor Agreements For Federal Construction Projects, Agencies Are Mandated To Use Plas For Large-scale Construction Projects (defined As Projects Where The Total Cost To The Government Of The Project Is Estimated To Be At Least $35,000,000.00) Unless Exempted By The Agency Senior Procurement Executive. a) Do You Have Knowledge That A Pla Has Been Used In The Local Area On Projects Of This Kind? If So, Please Provide Supporting Documentation. b) Are You Aware Of Skilled Labor Shortages In The Area For Those Crafts That Will Be Needed To Complete The Referenced Project? If So, Please Elaborate And Provide Supporting Documentation Where Possible. c) Are You Aware Of Time Sensitive Issues/scheduling Requirements That Would Affect The Rate At Which The Referenced Project Should Be Completed? If So, Please Elaborate And Provide Supporting Documentation Where Possible. d) Identify Specific Reasons Why Or How You Believe A Pla Would Advance The Federal Government’s Interest In Achieving Economy And Efficiency In Federal Procurement. e) Identify Specific Reasons Why You Do Not Believe A Pla Would Advance The Federal Government’s Interest In Achieving Economy And Efficiency In Federal Procurement. f) Identify Any Additional Information You Believe Should Be Considered On The Use Of A Pla On The Referenced Project. g) Identify Any Additional Information You Believe Should Be Considered On The Non-use Of A Pla On The Referenced Project. please Also Provide The Following Information On Projects Completed In The Last 2-5 Years: a) Project Name And Location b) Detailed Project Description c) Initial Cost Estimate Vs. Actual Final Cost d) Was The Project Completed On Time? e) Number Of Craft Trades Present On The Project f) Was A Pla Used? g) Were There Any Challenges Experienced During The Project? please Submit All Capabilities Statements, Information, Brochures, And/or Marketing Material As One (1) Document, Limited To The Page Maximum Above. responses Will Not Be Considered An Offer, Proposal, Or Bid For Any Solicitation That May Result From This Notice. Moreover, Responses Will Not Restrict The Government To An Acquisition Approach. This Notice Is For Information And Planning Purposes Only. Respondents Will Not Be Notified Of The Results Of Any Review Conducted Or The Capability Statements Received. If Your Company Has Already Responded To The Previous Sources Sought (w9123824s0031), You Can Revalidate Your Information By Sending An Email To The Contract Specialist Below Confirming The Previous Submission Of Your Capabilities Statement. please Provide Responses And/or Questions By E-mail To The Contract Specialist, Melanie A. Dewing, At (melanie.a.dewing@usace.army.mil) By 10:00 A.m. (pdt) Monday, 13 January 2025. please Include The Sources Sought Notice Number, ‘w9123825s0008’ In The E-mail Subject Line.

DEPT OF THE ARMY USA Tender

Electrical and Electronics...+1Electrical Works
Corrigendum : Closing Date Modified
United States
Closing Date24 Jan 2025
Tender AmountRefer Documents 
Details: Statement Of Work troy Lock Automatic Transfer Switch Replacement albany Field Office (afo), Troy, Ny sw-1 Location: Albany Field Office, Troy, Ny. Arrangements For Entrance Onto Afo Must Be Made By Contacting Afo At (518) 273-0870 Between The Hours Of 7:00 A.m. And 3:00 P.m., Monday Through Friday. Access Is Restricted, Escorts Shall Be Provided By Albany Field Office Personnel. sw-2 Scope Of Work: The Work Covered In This Contract Consists Of Furnishing All Labor, Expertise, Equipment, Materials, Facilities, Transportation, And Appliances Necessary To Perform Operations In Connection With The Work Described In Paragraph Sw-3. It Is The Intent Of The Government For The Contractor To Provide A Complete And Useable System. Any Relevant Details Required For A Complete System That Are Omitted In The Contract Plans And Specifications Will Be Provided By The Contractor At No Cost To The Government. sw-3 Summary Of Work: Work Shall Consist Of But Is Not Limited To The Following: remove Existing Automatic Transfer Switch (ats) And Furnish And Install A With New Ats Of An Appropriate Type, Rating, And Size For The System (see Characteristics Below). Contractor Will Dispose Of The Removed Ats. Functionally Test The Ats After Installation Per The Troy Lock Ats Specifications. See Attached Drawing And Specifications For More Details. Continuous Temporary Power To The Lockhouse Will Be Required During The Ats Replacement. The Lock And Lockhouse Shall Not Be Without Power For More Than 30 Minutes. The Ats And Connected Switchgear Are All Outside. ats Requirements– 208v 600a, 3 Phase, 4 Wire, 35,000 A.i.c., Nema 3r With Maintenance Bypass. The New Ats Will Have A Manual Actuation Handle In Addition To The Automatic Function. The New Ats Must Be Service Rated. current Ats (for Information Only): Asco 300 Series. See Attached O+m Manual the Contractor Shall Conduct A Load Test Of The Existing Generator Up To 80% Of Its Maximum Load For Three Hours And Prepare A Report Documenting The Load Test And Its Results. as Part Of Functional Testing Of The Ats, The Contractor Shall Troubleshoot And Document Issues Encountered In A Report. sw-4 Timing Of Work: Workdays For Which The Lock Shall Be Without Power For Any Length Of Time Shall Be Scheduled No Less Than Two Weeks In Advance To Allow For Posting Of Notice To Mariners. The Period Of Performance Is 30 Days After 15 April, 2025. The Contractor Shall Notify The Government Of Any Material Delays They Encounter. sw-5 Codes & Standards: All Work Performed Under This Contract Shall Be In Accordance With Federal, State And Local Codes & Standards, As Well As Widely Accepted Industry Standards, Including But Not Limited To: American Institute Of Architects, American Institute Of Electrical Engineers, American National Standards Institute, American Society Of Mechanical Engineers, American Society Of Testing Materials, National Bureau Of Standards, National Electric Code, National Fire Protection Association, National Electric Code, Occupational Safety & Health Administration, Rubber Manufacturers Association, Underwriters Laboratories, And The New York Dot Standard Specification. Additionally, All Requirements Of The New York Department Of Health Must Be Satisfied In Their Entirety For Any Work Performed Or Materials Bought Under This Contract. Failure To Comply With Any Of The Aforementioned Codes And Standards Shall Be Considered As A Failure To Comply To Contract Specifications. sw-6 Utilities: Contractors Shall Coordinate With All Local Utilities Having Jurisdiction. The Local Power Utility Company Is National Grid. sw-7 Materials: The Materials Shall Conform To Specifications, Applicable Industry Codes And Standards And The Manufacturer's Recommendations, Whichever Is More Stringent. Certificates Of Compliance And Technical Data Sheets Are Required For All Materials Supplied. sw-8 Site Inspection: The Contractor Shall Have The Opportunity To Visit The Site Before The Bid Opening. The Contractor Is Required To Acknowledge At Time Of Bid Opening That Said Contractor Has Inspected And Is Fully Cognizant Of Conditions At The Site. No Allowance Or Consideration Will Be Given After Award For Any Condition Which Existed At The Time Of The Site Visit. sw-9 Security And Facility Access: The Contractor Shall Be Granted Access To The Afo Site. Contractor Personnel Must Sign In At The Administration Building When They Arrive On Site And Sign Out Before They Leave The Site. The Government Reserves The Right To Deny Access To Any Person, With No Consequence To The Contract. 1. General Security Requirements And Guidance: The Security Requirements Described Below Apply To All Contract Personnel (including Employees Of The Prime Contractor ("contractor") And All Subcontractor Employees) Supporting The Performance Requirements Of This Contract. The Contractor Is Responsible For Compliance With These Security Requirements. Questions Regarding Security Matters Shall Be Addressed To The Designated Government Representative (e.g., Contracting Officer Representative (cor), Requiring Activity (ra) Representative, Or Contracting Officer (if A Cor Or Other Ra Representative Is Not Appointed)). Contract Personnel Are Critical To The Overall Security And Safety Of Us Army Corps Of Engineers (usace) Installations, Facilities And Activities, And Security Awareness Training Contributes To Those Efforts. The Department Of Defense (dod) And Army Security Training Requirements Specified Below, If Applicable, Are Performance Requirements; All Applicable Contract Personnel Shall Complete Initial Training Within 30 Days Of Contract Award Or The Date New Contract Personnel Begin Performance On The Contract. Within Five Business Days From The Completion Of Training, The Contractor Shall Provide Written Documentation (e.g., Email Or Memorandum) To The Government Representative. The Documentation Shall Include The Names Of Contract Personnel Trained And Which Training They Completed; The Contractor Shall Maintain Training Records As Part Of Their Contract Files And Be Prepared To Provide Copies Of Training Certificates To The Government Representative. Contractor Personnel And Vehicles Are Subject To Search When Entering Federal Installations. Additionally, All Contract Personnel Shall Comply With Force Protection Condition (fpcon) Measures, Random Antiterrorism Measures (commonly Referred To As "rams"), And Health Protection Condition (hpcon) Measures. The Contractor Is Responsible For Meeting Performance Requirements During Elevated Fpcon And/or Hpcon Levels In Accordance With Applicable Ra Plans And Procedures --this Includes Identifying Mission Essential And Non-mission Essential Personnel. In Addition To The Changes Otherwise Authorized By The Changes Clause Of This Contract, Should The Fpcon Or Hpcon Levels At Any Individual Facility Or Installation Change, The Government May Implement Security Changes That Affect Contract Personnel. The Contractor Shall Ensure All Contract Personnel Are Aware Of Their Security Responsibilities, Including Any Site-specific Requirements Identified In Local Policies Or Procedures. 2. Physical Security And Access Control Requirements: All Contract Personnel Requiring Physical Access To A Federal Installation Or Facility Shall Comply With The Access Control Procedures Of That Location. Contract Personnel Requiring Unescorted Access To Meet Contract Performance Requirements On A Dod Installation In The Us Shall Be Vetted By The Installation/facility Provost Marshal/directorate Of Emergency Services/security Office Using The National Crime Information Center-interstate Identification Index (commonly Referred To As "ncic-111") And Terrorist Screening Database (commonly Referred To As "tsdb"). Contract Personnel Shall Comply With All Personal Identity Verification Requirements Specified In Installation/facility Policies And Procedures. Contract Personnel Who Do Not Meet Requirements For Unescorted Access To Usace Facilities Shall Coordinate Escorted Access With The Government Representative, As Needed. Contract Personnel Who Receive Keys, Access Cards, Or Lock Combinations That Provide Access To Government-owned Property Shall Comply With Key And Lock Control Procedures Of The Ra. sw-10 Safety: Compliance With Osha And Other Applicable Laws And Regulations For The Protection Of Employees Is Exclusively The Obligation Of The Commercial Contractor. Government And Contractor Employees Must Comply With The Corps Of Engineers Safety Manual Em 385-1-1. All Contractors And Employees Will Attend A Pre-construction Meeting Prior To Project Work Beginning. sw-11 Clean-up: Clean-up And Remove Debris Generated By This Contract To An Approved Off-site Location. Two (2) Copies Of The Receiving (tipping Or Dumping) Tickets, With A Cover Letter From The Prime Contractor Stating The Full Name And Address Of The Location To Which Debris Was Taken. sw-12 Government Resources: No Government Resources Shall Be Made Available To The Contractor, Unless Otherwise Stated In This Statement Of Work. The Contractor Shall Provide For All Necessary Resources To Provide A Complete And Usable Facility Or Systems As Described In The Contract Documents. The Contractor Shall Not Obligate Government Resources In Any Manner. The Government Shall Seek Remedy For Any Obligation Or Encumbrance Imposed By The Contractors Actions. Government Resources Include, But Are Not Limited To, Government Owned Materials, Equipment, Tools, Vehicles, Personnel, And Facilities. sw-13 Supplemental Attachments: troy Lock Electrical One Line Riser Diagram troy Lock Ats Specifications asco 300 Series Operation And Maintenance Manual generator Data Plate power System Analysis

Public Service Delivery Tender

Laboratory Equipment and Services...+1Machinery and Tools
Canada
Closing Date30 Jan 2025
Tender AmountRefer Documents 
Details: Manitoba Reference Number: Mb-mbpb-03y-00028 Issuing Department: Procurement And Supply Chain Date Issued: 09/01/2025 Issued By: Darren Derksen Telephone: 204 794-3395 The Government Of Manitoba (manitoba) Is Requesting Bid Submissions For The Supply And Delivery Of Laboratory Equipment For Department Of Agriculture. Note: For Information Or Item Clarification, If Required Contact: Darren Derksen At Bids@gov.mb.ca F.o.b Destination, Freight Prepaid To: Food Development Center 810 Phillips St Portage La Prairie, Manitoba R1n 4a4 Please Contact The Individual Noted Above If Additional Information Or Clarification Is Required On The Following Items. Bidder Must Indicate If You Are Able To Meet The Requested Delivery Date Of March 31st, 2025 Yes ___ No ____ If No, Then Indicate A Realistic Delivery Time As Follows: Delivery In ___ Working Days Or ____weeks From Receipt Of The Order. Actual Delivery Date Will Be According To Agreement With Department. This Rfq Is Subject To The Manitoba General Terms And Conditions: Https://www.gov.mb.ca/central/psc/pubs/form/mb_terms_conditions.pdf The Purchase Order To Be Issued To The Top Ranked Vendor(s) Is Subject To The Manitoba Purchase Order Terms And Conditions: Https://www.gov.mb.ca/central/psc/pubs/form/manitoba_po_terms_ Conditions.pdf Submission Terms And Conditions: The Bid Must Be Signed By A Representative Of The Bidder With The Authority To Bind The Bidder. The Name And Title Of The Representative Signing The Bid Should Also Be Printed Below Their Signature. Bids Must Be Received At The Submission Address No Later Than The Closing Date And Time. Vendor's E-mail Address: (if Available) ____________________ Quantity Clarification: Quantity Listed Contains 2 Or 3 Decimals. _________________________________________________________________________ Item Qty Description Delivery No. Date ======================================================== Item 10 31/03/2025 2.00 Each Gsin: N6600material: 99181030 Industrial Laboratory Equipment As Described Below: The Membrane Filtration Unit Can Operate At Up To 40 Bar And 60°c For Many Mf/uf/nf/ro Applications. The Unit Can Be Used With Different Types Of Membrane Modules: Flat Channel Module, Tubular Modules And Spiral Wound Element Modules Or Customer Membrane Modules. The Unit Has A Stainless Steel Control Cabinet With On/off Switch, Frequency Converter Setting For The Feed Pump, Emergency Button, Pressure High/low Reset Button And A Pid Controller With Display For Electronic Temperature Control And An Electronic Data Recorder And Display For All Electronically Measured Operating Parameters. Vendor Operational Training And Commissioning Are Required. Equal Equivalent To Maximem Bench Scale Membrane Filtration Unit Maximem Membrane Unit Including: · Feed Pump, Max 40 Bar. Feed Flow Up To 660 L/h. With Frequency Converter For Adjustment Of Cross Flow Velocity · Stainless Steel Feed Vessel 5 L Volume (any External Vessel Can Be Connected Alternatively) · 2 Electronic Pressure Sensors 0-40bar +/- 0.1% (feed+retentate Pressure) · 1 Manual Spring Loaded Pressure Control Valve, Ball Vavle For Low Pressure Operation · All Valves For Operation And Emptying · Pt100 Temperature Sensor · Pid Controller For Temperature, Operating A Magnetic Valve Which Controls Flow Of Cooling Or Heating Liquid From Any Cooling Or Heating Liquid Source. · 8-channel Electronic Data Recorder For Pressures, Temperature, Feed Flow (via Pump Speed). Display As Numbers Or Trends Over Time On Lcd Display And Storage Of Data. Can Be Transferred By Usb Stick Into Pc And Excel. Can Be Connected To Ethernet For Remote View. · Frame: Stainless Steel 304 Or Equivalent. Footprint 0.50 X 0.85m, Height 0.80m · Product Contacting Metal Parts Stainless Steel 316l Or Equivalent. · Seals Epdm · Operating Instructions In English · Ready To Run And Tested Unit. Please Indicate: Manufacturers Name________________ Brand Name______________________ Product / Style Number ________ Bidder's Catalogue/reference Number (if Applicable) ___________ ======================================================== Quotation Evaluation: Generally The Lowest Overall Price Of An Acceptable Item(s) In Accordance With The Terms & Conditions Of The Rfq Will Be Awarded The Order. Quotations Will Be Evaluated Based On Suitability Of Unit Offered Compared To The End Users Needs, Product Specifications, Delivery, Warranty, Price, Quality Of The Bidder's Performance In Past Awards And Any Other Terms & Conditions Indicated On This Rfq. Failure To Provide Adequate Information To Evaluate The Item Offered May Be Cause For Rejection Of Your Quote By The Manitoba Government (manitoba). Suitability Selection To Be At Manitoba's Sole Discretion. Product Offered: The Product Offered Must Meet The Requirements And Expectations For Its Intended Use. If It Is Your Intention To Offer An Item, Which Does Not Meet All The Specs/description As Outlined, Then You Must Indicate All Intended Deviations Or Changes On The Return Quote. Please Indicate: Manufacturers Name__________ Brand Name______________ Product / Style Number ________ Bidders Catalogue/reference Number (if Applicable) ___________ Note: If Any Of The Above Items/features Are Accessories That Are To Be Included And Installed Prior To Delivery. It Is The Supplier's Responsibility To Test All Systems To Ensure They Are Functioning Properly Prior To Delivery. Products/brands: Brand Names, Where Indicated, Are Shown For Reference Purposes Only And Are Not Intended As Endorsement Of A Particular Product. Delivery: Food Development Center 810 Phillips St Portage La Prairie, Manitoba R1n 4a4 Unit Prices Are F.o.b Destination, Include All Necessary Charges E.g. Freight, Insurance, Handling Etc. If Any Charges Are Not Included Please Explain In Detail Any/all Charges That Will Be Extra To The Unit Prices Quoted And That Will Be Charged On The Invoice. Authorized Vendor: Manitoba Reserves The Right, Prior To Any Contract Award, To Secure Evidence To Manitoba's Satisfaction That Any Bidder Is The Manufacturer Or An Authorized Distributor, Dealer Or Retailer Of The Goods Offered And Is Authorized To Sell These Goods In Manitoba, Canada And Upon Request Will Provide Manitoba With Written Evidence Thereof. Manufacturer's Warranty: State Warranty Of Units Offered (as Applicable To Manitoba's Use). (manitoba's Use Would Usually Be Considered Commercial Application Not Consumer) Product _________ Months Or _______ Years Labor _________ Months Or _______ Years Parts _________ Months Or _______ Years Please Note: During The Period Of The Warranty Offered, All Labour, Transportation, Parts, Surcharges Including Shipping And Brokerage Will Be Included. The Province Of Manitoba "will Not" Pay Additional Charges While The Item(s) Offered Are Under The Above Stated Warranty. Potential Costs Associated With The Location Of Warranty Service Might Be Used In The Evaluation Of This Quote. If The Warranty Offered Is The Vendor's Warranty In Combination With Or In Place Of The Manufacturer's Warranty Then A Complete Explanation Must Be Provided. Warranty Service/location: Is Warranty Service Provided On Site At Our Premises Yes___ Or No____ If No, Indicate The Location The Unit Must Be Sent To For Manufacturer's Certified And/or Approved Warranty Service Company Name_______________________ Location (city & Province)______________ Do You Have A Toll Free Phone Number For Warranty Service Yes______ Or No______ If Yes Please Provide:________________________ After Warranty Service: Is After Warranty Service Provider The Same As Above? Yes ___ Or No_____ If No, Please Advise Company Name_______________________ Location (city & Province)______________ Accounts Receivable Address: Due To Our Computerized Accounts Payable System Please Advise If Your Invoice Address (accounts Receivable) Is The Same As The Address For Orders / Quotes Shown Above Yes ____ Or No ______ If No Provide Complete Details I.e. Box #, Street Address, City Province, Postal Code, Etc. _________________ Manitoba's Retail Sales Tax License: Are You Licensed By Manitoba Finance To Collect And Remit Manitoba's Retail Sales Tax Yes_____ Or No_____ If No Disregard The Following Paragraph. Manitoba's Retail Sales Tax Is The Product(s) Offered Subject To Manitoba's Retail Sales Tax Yes____ Or No _____ If The Quote Consists Of Both Taxable (t) And Non-taxable ( Nt) Items Please Indicate T Or Nt Opposite Each Item Offered. Payment Terms: Manitoba Will Consider Early Payment Terms. Manitoba's Standard Payment Term Is Net Thirty (30) Days. The Bidder Shall Specify Their Standard Invoice Term: _____________________________ Is There Any Applicable Discounts For Early Payment? Yes _____ No _____ Initial __________ If Yes, Please Specify: _____________________________________________________ Does Your Early Payment Clause Appear On Your Invoice? Yes _____ No _____ Initial __________ Your Quotation Reference # (if Applicable) _________. Proposed Delivery Address: Food Development Center 810 Phillips St Portage La Prairie, Manitoba R1n 4a4 Attn: Robin Young - 204-871-7459 Tenders To Be Returned To: Merx Electronic Bid Submission Www.merx.com

U S COAST GUARD USA Tender

Others
United States
Closing Date8 Jan 2025
Tender AmountRefer Documents 
Details: Scope Of Work And Specifications For Uscg Station Juneau sewage Lift Station Replacement located At uscg Station Juneau 345 Egan Drive juneau, Ak 99801 commanding Officer united States Coast Guard scope: provide Material And Labor To Replace The Sewage Lift Stations Two Lift Pumps, Rails, Floats, Discharge Piping Contained In The Lift Station, Discharge Cutout Valves With Remote Operators, And The Systems Electrical Controller. System Shall Have An Alarm And Control Panel, Float Actuated Alarms At High Level Alarm, Lead And Lag Pump Floats, Low Level Float Pump Off With Two Inch Insulated Pvc Discharge Pipe. Contractor To Furnish An In-kind Sewage Lift System Meeting The Same Ratings Of The Old System That Includes And All Applicable Valves And Fittings At Us Coast Guard Station Juneau, In Accordance With All Manufacturers Specifications, And General Industry Standards government Facilities And Utilities: electrical Power And Potable Water Are Available On The Site; The Contractor Will Be Permitted To Utilize These Utilities In Performing The Work, Provided That The Existing Systems Are Not Overloaded. Telephone Services Will Not Be Available For Use By The Contractor. period Of Perfomance: once Contractor Is Given The Notice To Proceed, All Long Lead Time Items Shall Be Purchased/ordered By The Contractor. Estimated Delivery Dates To Be Provided To The Cor/ko As They Become Available. Once All Materials Have Arrived On The Job Site, Contractor Will Commence The Replacement Within 5 Business Days And Complete All Work No Later Than 14 Business Days From The Start Of Work. materials And Locations: materials Shall Be Delivered To The Jobsite In Their Original Unopened Packages, Clearly Marked With The Manufacturer’s Name, Brand Name, And Description Of Contents. Storage Shall Be In Accordance With Manufacturer’s Recommendations In A Clean, Dry, Well-ventilated Area. Stored Materials Shall Be Protected From Sunlight, And Kept Away From Excessive Heat. The Contractor Shall Not Store Any Highly Flammable Materials In The Work Area. Sufficient Area For Staging Is Available On Site; Storage Areas Will Be Pre-approved By The Contracting Officers Representative (cor) And/or Contracting Officer (ko). Special Precautions Shall Be Taken To Ensure Construction Materials And Debris Does Not Enter The Roadways And/or Parking Lot. Contractor Is Responsible For Safeguarding All Equipment, Tools, And Materials From Damage And Theft. the Contractor Is Required To Comply With Local Voc Laws And Regulations. All Applicable Material Safety Data Sheets Shall Be Available Upon Request. schedule Of Work: the Contractor Shall Perform All Work During Housing Office Work Hours. The Base Normal Working Hours Are 7:00 Am To 4:00 Pm, Monday Through Friday. If The Contractor Is Going To Work Outside Normal Working Hours, Permission Must Be Obtained From The Ko. contractor Must Submit A Written Request At Least 48 Hours Prior If They Intend To Work Outside Of Business Hours. only The Ko Can Authorize Any Work Hour Changes. existing Conditions: the Offeror Should Visit The Site And Take Such Other Steps As May Be Reasonably Necessary To Ascertain The Nature And Location Of The Work, The General And Local Conditions Which Can Affect The Cost Of The Work Thereof. Failure To Do So Will Not Relieve Bidders From Responsibility For Estimating Properly The Difficulty Or Cost Of Successfully Performing The Work. The Government Will Assume No Responsibility For Any Understanding Or Misrepresentations Concerning Conditions Made By Any Of Its Officers Or Agents Prior To The Execution Of The Contract, Unless Included In The Request For Quotes, The Specification, Or Related Documents. site Visit: One (1) Organized Site Visit/walk Be Held On Tuesday, 10 December 2024 At 12:30 Pm (alaska Time). located At uscg Station Juneau 345 Egan Drive juneau, Ak 99801 all Potential Contractors Shall Meet At The Below Location, Have Proper Id & Be Prepared To Sign In. contractors Shall Coordinate Access To The Job Site Through Mkcm Ty Widner Ty.c.widner@uscg.mil 808-388-1486. request Advanced Notification (no Later Than 7 Calendar Days Prior To The Date Of Site Walk). That You Plan On Attending The Site Walk provide The Following Information In Advance Via Email To Both Deno Stamos & Mkcm Widner *name Of Company *cage Code. / Uei *# Of Attendees & Full Name Of Each Individual liability Of Contractor: any Damage To Government Property Caused By The Contractor Shall Be Repaired Or Replaced By The Contractor At No Cost To The Government. The Contractor Shall Not Disconnect Any Service Without Approval From The Cor And/or Ko.the Contractor Shall Be Responsible For Cleanup And Disposal Of All Waste Generated Due To The Work Performed. All Waste Generated Shall Be Disposed Of In Accordance With All Federal, State, And Local Regulations And Laws, And Be The Responsibility Of The Contractor. No Waste Or Materials Shall Remain On Site After Work Is Accepted. inspection And Acceptance: The Cor And/or Ko Will Accomplish Inspection And Acceptance Of Work. safety: The Contractor Is Wholly Responsible For Work Site Safety. The Contractor Shall Implement A Safety Program That Protects The Lives And Health Of Personnel In The Construction Area, Prevents Damage To Property, And Avoids Work Interruptions. To Accomplish This End, The Contractor Shall Provide Appropriate Safety Barricades, Signs, Signal Lights, Etc. As Well As Complying With The Requirements Of All Federal, State And Local Safety Laws, Rules, And Regulations.government Facilities And Regulations: The Contractor, Their Employees, And Any Sub-contractors Shall Become Familiar With And Obey All Coast Guard And Local Unit Regulations. All Personnel Employed On The Project Shall Keep Within The Limits Of The Work Area, And Shall Not Enter Any Other Area Outside Of The Work Site Unless Authorized To Do So In The Performance Of Their Duties. There Shall Be No Smoking In Any Coast Guard Building. technical Requirements: general: The Contractor Shall Provide All Labor, Materials, Tools, Equipment, Supervision, Engineering Services, And Transportation Necessary To Replace With In-kind Lift Station To Include All Required Valves, Pipe Fittings And Electrical Connections, Electronic Controls, And Monitoring Devices. the Contractor Shall Consider All Risk To Equipment And Personnel And Incorporate Safe Work Practices, Hazard Analysis, And Hazard Mitigation Procedure To Ensure The Risks And Hazards Of The Proposed Work Are Mitigated. The Contractor Shall Participate In All Utility Outages And Lock Out Tag Out Procedures Required To Isolate Energy Sources And Set Up The Work Site Of The Performance Of The Work. contractor Shall Provide Proof Of Experience And Qualification To Perform Work. once New Lift Station System Has Been Tested And Commissioned For Service, Contractor Will Provide The Coast Guard All Manuals And Instructions For All Equipment Installed. Contractor To Also Provide Copies Of All Test Results Associated With Commissioning This System. any Additional Materials, Parts, And/or Labor Not Covered Under This Statement Of Work Will Require Prior Approval With Written Quote Submitted To Sector Southeast Ak. government Furnished Equipment: N/a delivery Schedule The Contractor Shall Deliver To Location / Fob Destination Within [specified Time Frame] From The Date Of Contract Award. note: This Requirement Is Lowest Priced, Technically Acceptable (lpta) In Accordance With Far 13 Simplified Acquisition Procedures. any Shipping Costs To Required Delivery Address Shall Be Included In Final Contractors Priced Quote. liability Of Damages: The Contractor Shall Be Liable For All Damages To Government Equipment And Property When Such Damage Is Due To Fault Or Negligence Of The Contractor. The Contractor Shall Be Responsible For All Damages Or Injury To Persons That Occur Because Of The Contractor’s Fault Or Negligence. The Contractor Shall Take Proper Safety And Health Precautions To Protect The Work The Workers The Public, And The Property Of Others. payment Terms Will Be As Specified In Subsequent Purchase Order/ Contract Award Documentation Which Is (net 30) Upon Completion Of All Work. point Of Contact: for Any Questions Or Clarifications Regarding This Requirement, Please Contact The Contracting Officer(ko) Via Email At Least 10 Business Days Before Closing Date/time Of This Request For Propsal (rfp). closing Date & Time: Proposals/quotes And Any Supporting Documentation Shall Be Received No Later Than: 3:00 Pm Alaska Time Zone On: tuesday,7 January 2025 To The United States Government Contracting Officer Listed Herein. Deno.a.stamos@uscg.mil note: In Accordance With Federal Acquisition Regulation 36.204, (disclosure Of The Magnitude Of Construction Projects). the Estimated Price Range Is $25,000-$100,000 Us Dollars. supporting Documenation--internal Document #70z04524pkodi0113==project/task # Ucgi43jy24 / 3cceuworko deno Stamos senior Field Contracting Officer (sfco) uscg Ketchikan deno.a.stamos@uscg.mil

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Healthcare and Medicine
United States
Closing Date28 Jan 2025
Tender AmountRefer Documents 
Details: Sources Sought Notice: The Department Of Veterans Affairs, Network Contracting Office 4 (nco 04), Is Conducting A Market Survey To Identify Potential Sources To Provide A 12-month Contract To Supply Ga68 Dotatate (netspot). This Radiopharmaceutical Is Required For Imaging Procedures For The Corporal Michael J. Crescenz Va Medical Center- 3900 Woodland Avenue, Philadelphia, Pennsylvania 19104. this Notice Is Issued For Informational Planning Purposes Only And Is Not A Request For Quote Or Announcement Of A Solicitation. Submitting Information For This Notice Is Voluntary And Va Assumes No Responsibility For Any Costs Incurred Associated With The Preparation Of Responses Submitted Because Of This Notice. No Solicitation Is Available At This Time. If A Solicitation Is Issued It Will Be Announced At A Later Date, And All Interested Parties Must Respond To That Solicitation Announcement Separately From The Responses To This Announcement. the Purpose Of This Market Research Is To Identify Capable Sources That Are Both Experienced And Qualified To Provide The Desktop Automated Csf In Accordance With Performance Work Statement. the North American Industry Classification System Code (naics) Is 325412 Medical Laboratories, And The Small Business Size Standard Is 1300 Employees For This Type Of Effort. vendors Must Be Registered In The System For Award Management (sam) At Https://www.sam.gov And Shall Complete Electronic Annual Representations And Certifications In Sam Prior To Award Of Contract. If You Are Responding As A Service-disabled Veteran Owned Small Businesses Or Veteran Owned Small Businesses (sdvosb S And Vosb S), Your Company Must Be Registered In Vetcert And Maintain A Current Certification (https://veterans.certify.sba.gov). capability Statement And Documentation: companies Are To Provide A Summary Of Your Firm S Capabilities, Experience, And Knowledge In Providing These Services. Sources Are Asked To Provide The Following Information: 1. Company Information: Company Name Company Address Company Uei Sam Company Naics Code(s) Point Of Contact Name Point Of Contact Phone Number Point Of Contact Email Address Company Website (if Available) 2. The North American Industry Classification System Code (naics) Is 325412 Medical Laboratories, And The Small Business Size Standard Is 1300. based On This Information, Please Indicate Whether Your Company Is A: service-disabled Veteran Owned Small Business (sdvosb) veteran Owned Small Business (vosb) 8(a) hub Zone Small Business women Owned Small Business small Disadvantaged Business (sdb) small Business Concern large Business 3. Provide A Summary Of Your Firm S Ability/ Capability To Meet The Services Described In This Notice (see Attached Pws). 4. Government Contracts For These Services In The Last 3 Years. Include: government Agency contract Number dollar Value period Of Performance government Point Of Contact Information (name, Email, Phone Number) information Regarding Your Company S Capacity And Capability To Provide Such Services Are To Be Submitted Electronically On Or Before 4:00 Pm, Wednesday, 01/29/2025 Addressed To Christa Stine, Contract Specialist Christa.stine@va.gov. performance Work Statement date december 6, 2024 client philadelphia Veterans Affairs Medical Center job Name netspot Ga68 Dotatate requested By betty Taylor, Supervisor from tarideana Breazeale, Administration Officer summary the Corporal Michael J. Crescenz Va Medical Center (cmc Vamc) Requires A Vendor Licensed By The Nuclear Regulatory Commission To Provide The Radiopharmaceutical Netspot And Calibration Sources For The Nuclear Medicine Service. This Radiopharmaceutical Is Required For Imaging Procedures. The Calibration Sources Are Required For Equipment Quality Control Testing. This Product Is A Patented Drug Kit For The Preparation Of Gallium Ga 68 Dotatate For Injection. It Is Used For Pet Imaging For Localization Of Somatostatin Receptor Positive Neuroendocrine Tumors (nets) In Adult Patients. These Items Are To Be Delivered Directly To The Nuclear Medicine Service S Secured Receiving Areas, Room 3a101b Of The Corporal Michael J. Crescenz Va Medical Center 3900 Woodland Avenue, Philadelphia, Pennsylvania 19104. project Scope this Pws Covers The Following Activities And Deliverables. The Vendor Agrees To Perform These Services With The Standard Of Care, Skill, And Diligence Normally Provided By A Professional Organization In The Performance Of Similar Services. It Is Understood That The Contractor Must Perform The Services Based, In Part, On Information Furnished By This Medical Center; However, The Vendor Is Given Notice That The Medical Center Will Be Relying On The Accuracy, Competence And Completeness Of The Contractor S Services In Utilizing The Results Of Such Services. The Nuclear Medicine Authorized Staff Of Cmc Vamc, When Needed For Next Day Delivery During Work Hours Will Place All Orders Daily. There May Be Orders Placed During Other Than Normal Working Hours, To Be Delivered Within A 45-minute Window For An Emergency. The Vendor Must Be Able To Fulfill This Requirement. All Items Delivered To The Nuclear Medicine Department As Specified Above. Cmc Vamc Will Require Credit Statements (itemized Returned Doses) And Monthly Invoices. Electronic Daily Dose Tracking Systems Should Be Available For The Medical Center S Use In Certifying And Tracking Of Patient Doses Delivered. deliverables: unit Per Dose netspot the Contractor Shall Have Available An Adequate Supply Of Contract Products To Meet The Requirements Of The Corporal Michael J. Crescenz Va Medical Center. the Contractor Shall Label All Unit Doses Of Delivered Radiopharmaceuticals, With The Amounts, Preparation Time, Expiration Time, Date, Etc., And Provide A Bar Labeled Insert To Allow Scanning Data Into The Nuclear Medicine Information Management System (nmis).if The Contractor S System Varies From Our Current (pinestar) Nmis Information System, The Contractor Shall Provide Their System As Well As Data Migration, Technical Support And Training Of Staff On Its Use At No Additional Price To The Government. all Packaging Of Radioactive Material Must Be Clearly Labeled Radioactive With The Proper Class And Exposure Levels On The Outside Of The Shipping Container. the Contractor Shall Perform All Quality Control Procedures As Required By Federal And State Regulatory Agencies. the Contractor Shall Meet All Nuclear Regulatory Commission, Department Of Transportation, Nhpp, Fda, Osha And All Other Agency Rules And Regulations (federal And State). radiopharmaceutical Returns For Credit: the Contractor Shall Be Responsible To Accept Returns For Full Credit Toward Future Orders Only Under The Following Conditions: product(s) Ordered Or Shipped In Error product(s) Damaged In Shipment concealed Shipping Damages recalled Product(s) outdated Products In Unopened, Original Container (specifically Authorized For Return By Manufacture) the Contractor Shall Invoice At Least Once Per Month Showing Period Covered, Billing Date, Name Of Preparation, Quantity, And Amount. schedule only Authorized Cmc Vamc Nuclear Medicine Service Personnel Shall Place Orders During The Normal Workday, And First Delivery Shall Be Received No Later Than 08:00 Am The Following Workday To The Cmcvamc Nuclear Medicine Department. depending On Medical Center Patient Care Requirements, The Contractor Shall Provide Routine Delivery And Pick-up As Many Times As Required By The Cmcvamc. the Delivery Order Shall Include The Following Information: contract Item(s) And Quantity, Time (s) Of Delivery, And Applicable Va Order Number. authorized Cmcvamc Personnel Via Telephone, Fax, Or E-mail Shall Only Place Orders. Contractor Agrees To Accept Unused Radiopharmaceutical And Provide Reimbursement Per Unit Dose Applicable Towards Future Orders. after Award, The Cmcvamc Will Furnish The Name(s) Of Personnel Who Are Authorized To Place Orders Against The Contract. the Contractor Will Be Furnished With A Copy Of The User S License As Per Nuclear Regulatory Commission Guidelines. same-day Delivery same-day Delivery Requires Delivery And Receipt At The Cmcvamc Nuclear Medicine Department No Later Than 2 Hours After Order Is Placed During Normal Business Hours. Nuclear Medicine Normal Business Hours Are Considered Monday Through Friday: 8:00 Am 4:30 Pm Except Federal Holidays. the Following Are Federal Holidays: new Year S Day martin Luther King, Jr. Day president S Day memorial Day juneteenth independence Day labor Day columbus Day veteran S Day thanksgiving christmas Day pricing items Will Be In Unit Dose, Daily, And On An As Needed Basis In Accordance With Patient Requirements. key Assumptions all Annual Quantities Are Estimates, Contractor Will Only Be Paid For Items And Quantities That Are Ordered And Delivered.

DEPT OF THE ARMY USA Tender

Civil And Construction...+2Civil Works Others, Building Construction
United States
Closing Date20 Jan 2025
Tender AmountRefer Documents 
Details: (1) Action Code: Sources Sought this Is A Sources Sought Notice Only. This Is Not A Request For Proposal, But A Survey To Locate Potential Sources. This Sources Sought Does Not Constitute An Invitation For Bids, Request For Proposals, Or A Request For Quotations, And Is Not To Be Construed As A Commitment By The Government To Issue An Order Or Otherwise Pay For The Information Solicited, Nor Is It A Guarantee Of A Forthcoming Solicitation Or Contract. It Is For Market Research Purposes Only. Respondents Will Not Be Notified Of The Results Of The Evaluation. the Purpose Of This Sources Sought Notice Is To Gain Knowledge Of Interest, Capabilities, And Qualifications Of Various Members Of Industry, To Include The Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (hub-zone), Service-disabled Veteran-owned Small Business (sdvosb), Women-owned Small Business (wosb), And Economically Disadvantaged Women-owned Small Business (edwosb). The Government Must Ensure There Is Adequate Competition Among The Potential Pool Of Responsible Contractors. Small Business, Section 8(a), Hubzone, Sdvosb, Wosb, & Edwosb Businesses Are Highly Encouraged To Participate. (2) Date: 13 January 2025 (3) Classification Code: F0 (4) Naics Code: 813312 (5) Naics Size Standard: $19.5m (6) Contracting Office Address: 2800 Powder Mill Road bldg. 601 adelphi, Maryland 20783 (7) Subject: Sources Sought For Canada Goose Management To Include Nest Management (8) Proposed Solicitation Number: W911qx25q0034 (9) Sources Sought Closing Response Date: 20 January 2025 (10) Contact Point: Swati Jain, Contract Specialist, Swati.jain2.civ@army.mil (11) a. Objective: to Find Sources That Are Qualified To Meet The Supplies/services As Listed In Section 11b. Note That The Specific Requirements In Section C Are Subject To Change Prior To The Release Of Any Solicitation. b. Canada Goose Management - Usag Aberdeen Proving Ground Adelphi Laboratory Center performance Work Statement (pws) 1.0 Introduction. The Purpose Of This Effort Is To Provide Canada Goose Management At Alc. The Contractor Shall Provide All Personnel, Equipment, Supplies, Facilities, Transportation, Tools, Materials, Supervision, And Other Items And Non-personal Services Necessary To Perform Canada Goose Management As Defined In This Performance Work Statement (pws), Section 5, Except For Those Items Specified As Government Furnished Property And Services. The Contractor Shall Perform To The Standards In This Contract. 1.1 Background. Alc Is Home To Anywhere From Five (5) To Ten (10) Pairs Of Canada Geese That Return Each Year To Nest On Alc’s Installation. Each Year, The Directorate Of Public Works (dpw) Environmental Division Obtains A U.s. Fish And Wildlife Service (usfws) Resident Canada Goose Nest And Egg Depredation Permit. This Permit Allows Dpw To Oil Goose Eggs To Prevent The Population From Increasing. This Strategy Can Effective If Nests Are Found In Time But It Does Not Prevent The Health Hazards Associated With Geese Droppings Left On The Sidewalks. Furthermore, The Egg Oiling Program Does Not Prevent The Safety Hazards That Are Created When Installation Personnel Come Into Contact With Aggressive Geese Guarding Their Nest. Generally, On The Alc Site Most Geese Nest In The Area Surrounding The Main Complex Of Buildings. alc Is Located In Adelphi, Maryland. The Site Straddles The Border Between Two (2) Maryland Jurisdictions, Prince George’s And Montgomery Counties. Of The Total 207 Acre Area, 84 Acres Are Within Montgomery County And 123 Acres Are Within Prince George’s County. Alc Is Approximately Six (6) Miles From Washington, District Of Columbia. The Installation Is Located Within One (1) Mile Of The Capital Beltway (interstate 495) And Interstate 95 (i-95). Alc Lies In The Anacostia River Drainage Basin Which Is A Tributary Of The Potomac River. It Is Bordered By Residential Areas On The East And South And By The General Service Administration’s Federal Center On The North And West. Alc Consists Of Four (4) Main Building Areas With Parking Lots, Forested Lands And Two Stream Corridors, Paint Branch And Hillandale Tributary. The Alc Is Home To The Headquarters For The Army Research Laboratory (arl). Arl Provides America's Soldiers A Technological Edge Through Scientific Research, Technology Development, And Analysis. The Mission Of Arl Is To Provide The Underpinning Science, Technology, And Analysis That Enable Full-spectrum Operations. 1.2 Objectives. During The Performance Of This Contract, The Contractor Shall Be Responsible For Providing All Personnel, Equipment, Supplies, Transportation, Tools, Materials, Supervision, And Other Items And Non-personal Services Necessary To Provide Canada Goose Management At Alc. The Objectives Of This Project Are To Provide Canada Goose Management Support Activities On Alc. 2.0 Requirements. 2.1 Description Of Services. This Is A Non-personnel Services Contract To Provide Canada Goose Management Support At Alc. 2.2 Required Tasks. 2.2.1 Canada Goose Site Aversion. The Contractor Shall Provide A Trained Border Collie/collies And Dog Handling Professional/professionals To Deter The Canada Geese Away From Alc. The Contractor Will Be Responsible For The Improved Areas Of Alc. This Includes The Areas Around All Buildings, Roads, Stormwater Management Features, Maintenance Yards And Parking Lots. The Government Will Provide A Map Of The Installation And Historical Nest Data Prior To The Start Of The Project. the Contractor Shall Conduct Site Visits For A Minimum Of Five (5) Days A Week. Success Of The Project Will Be Measured By The Absence Of Geese On Alc For 7 Consecutive Days During And At The End Of The Period Of Performance. the Contractor Shall Use Techniques That Are Approved By The State Of Maryland Department Of Natural Resources (mdnr) And The Usfws And That Do Not Violate The Migratory Bird Treaty Act (mbta). The Contractor Shall Obtain Any Required Licenses And Permits By The Mdnr And The Usfws. the Contractor Shall Always Remain In Control Of The Border Collies. The Contractor Shall Remove Any Waste Left By The Border Collies. 2.2.2 Canada Goose Nest Management. The Contractor Shall Provide Egg Addling Services For Nests Found On Alc. The Contractor Shall Oil And Number The Eggs That Are Deemed To Be Less Than 14 Days Old. The Contractor Shall Provide The Nest Treatment Data To The Cor Which Will Include: The Date, Nest Number, And Location Description. Data Will Be Provided To The Cor Within One Week Of The Nest Treatment. 2.2.3 Deliverables. The Contractor Shall Provide Data For Nest Addling Services, When Conducted. The Contractor Shall Provide The Nest Treatment Data To The Cor Which Will Include: The Date, Nest Number And Location Description. 2.3 General Information. 2.3.1 Federal Observed Holidays. The Contractor Shall Provide Canada Goose Management During The Period Of Performance Except During The Following Federal Holidays: new Year’s Day martin Luther King Jr.’s Birthday president’s Day memorial Day juneteenth independence Day labor Day columbus Day veteran’s Day thanksgiving Day christmas Day 2.3.2 Hours Of Operation. The Contractor Is Responsible For Providing Services Five (5) Days A Week Which Can Occur Monday Through Sunday Except During Local Or National Emergencies, Administrative Closings, Or Similar Government Directed Facility Closings. 2.3.3 Place Of Performance. The Work To Be Performed Under This Contract Shall Be Performed At Alc. 2.3.4 Period Of Performance. The Period Of Performance Of This Contract Overlaps Nesting Season And The Time Of Year When The Geese Are On Site Which Is From 1 February Through 31 October Each Year Of The Contract Award. There Are Four (4) Option Years If Funding Is Available. 2.3.5 Key Personnel. The Following Personnel Are Considered Key Personnel By The Government: Garrison Natural Resources Manager/conservation Specialist, Chief, Environmental Integration Branch And The U.s. Army Combat Capabilities Development Command (devcom) Army Research Laboratory (arl) Chief, Environmental Management Branch. the Contractor Shall Provide A Contract Manager Who Is Considered Key Personnel By The Government For The Performance Of The Contract. The Contract Manager Shall Be Responsible For The Performance Of The Work. The Name Of This Person And An Alternate, Who Shall Act For The Contractor When The Contract Manager Is Absent, Shall Be Designated In Writing To The Ko. The Contract Manager Or Alternate Shall Have Full Authority To Act For The Contractor On All Contract Matters Relating To Daily Operation Of This Contract. The Contract Manager Or Alternate Shall Be Available Between 0700 And 1530 Monday Thru Friday Except Federal Holidays Or When The Government Facility Is Closed For Administrative Reasons. the Contractor Shall Have Fully Trained Working Border Collies And Personnel Trained To Handle Them. The Contractor Shall Have Personnel Trained In Goose Management Including Egg Oiling And Nest Removal. The Contractor Shall Be Listed On The Alc Usfws Resident Canada Goose Nest And Egg Depredation Permit. The Contractor Shall Hold Any Other Necessary State Or Federal Permits And Or Licenses To Conduct The Work Described In This Pws. 2.3.6 Organizational Conflict Of Interest. Contractor And Subcontractor Personnel Performing Work Under This Contract May Receive, Have Access To, Or Participate In The Development Of Proprietary Or Source Selection Information (e.g., Cost Or Pricing Information, Budget Information Or Analyses, Specifications, Or Work Statements, Etc.), Or Perform Evaluation Services Which May Create A Current Or Subsequent Organizational Conflict Of Interests (oci) As Defined In Far Subpart 9.5. The Contractor Shall Notify The Ko Immediately Whenever It Becomes Aware That Such Access Or Participation May Result In Any Actual Or Potential Oci And Shall Promptly Submit A Plan To The Ko To Avoid Or Mitigate Any Such Oci. The Contractor’s Mitigation Plan Will Be Determined To Be Acceptable Solely At The Discretion Of The Ko, And In The Event The Ko Unilaterally Determines That Any Such Oci Cannot Be Satisfactorily Avoided Or Mitigated, The Ko May Affect Other Remedies As Deemed Necessary, Including Prohibiting The Contractor From Participation In Subsequent Contracted Requirements Which May Be Affected By The Oci. 2.3.7 Contractor Furnished Items And Responsibilities. The Contractor Shall Furnish All Supplies, Equipment, Facilities, And Services Required To Perform Work Under This Contract. 2.3.8 Applicable Publications (current Editions). The Contractor Shall Abide By All Applicable Regulations, Publications, Manuals, And Local Policies And Procedures. Any Contractor Provided Publications Are To Be Procured And Maintained At Contractor’s Expense. 3.0 Anti-terrorism /operational Security (at/opsec) Requirements 3.1. General Security Requirements And Guidance. The Security Requirements Described Below Apply To All Contract Personnel (including Employees Of The Prime Contractor ("contractor") And All Subcontractor Employees) Supporting The Performance Requirements Of This Contract. The Contractor Is Responsible For Compliance With These Security Requirements. Questions Regarding Security Matters Shall Be Addressed To The Designated Government Representative (e.g., Contracting Officer Representative (cor), Requiring Activity (ra) Representative, Or Contracting Officer (if A Cor Or Other Ra Representative Is Not Appointed)). Contract Personnel Are Critical To The Overall Security And Safety Of Us Army Corps Of Engineers (usage) Installations, Facilities And Activities, And Security Awareness Training Contributes To Those Efforts. The Department Of Defense (dod) And Army Security Training Requirements Specified Below, If Applicable, Are Performance Requirements; All Applicable Contract Personnel Shall Complete Initial Training Within 30 Days Of Contract Award Or The Date New Contract Personnel Begin Performance On The Contract. Within Five Business Days From The Completion Of Training, The Contractor Shall Provide Written Documentation (e.g., Email Or Memorandum) To The Government Representative. The Documentation Shall Include The Names Of Contract Personnel Trained And Which Training They Completed; The Contractor Shall Maintain Training Records As Part Of Their Contract Files And Be Prepared To Provide Copies Of Training Certificates To The Government Representative. Contractor Personnel And Vehicles Are Subject To Search When Entering Federal Installations. Additionally, All Contract Personnel Shall Comply With Force Protection Condition (fpcon) Measures, Random Antiterrorism Measures (commonly Referred To As "rams"), And Health Protection Condition (hpcon) Measures. The Contractor Is Responsible For Meeting Performance Requirements During Elevated Fpcon And/or Hpcon Levels In Accordance With Applicable Ra Plans And Procedures --this Includes Identifying Mission Essential And Non-mission Essential Personnel. In Addition To The Changes Otherwise Authorized By The Changes Clause Of This Contract, Should The Fpcon Or Hpcon Levels At Any Individual Facility Or Installation Change, The Government May Implement Security Changes That Affect Contract Personnel. The Contractor Shall Ensure All Contract Personnel Are Aware Of Their Security Responsibilities, Including Any Site-specific Requirements Identified In Local Policies Or Procedures. 3.2. Physical Security And Access Control Requirement. All Contract Personnel Requiring Physical Access To A Federal Installation Or Facility Shall Comply With The Access Control Procedures Of That Location. Contract Personnel Requiring Unescorted Access To Meet Contract Performance Requirements On A Dod Installation In The Us Shall Be Vetted By The Installation/facility Provost Marshal/directorate Of Emergency Services/security Office Using The National Crime Information Center-interstate Identification Index (commonly Referred To As "ncic-iii") And Terrorist Screening Database (commonly Referred To As "tsdb"). Contract Personnel Shall Comply With All Personal Identity Verification Requirements Specified In Installation/facility Policies And Procedures. Contract Personnel Who Do Not Meet Requirements For Unescorted Access To Usage Facilities Shall Coordinate Escorted Access With The Government Representative, As Needed. Contract Personnel Who Receive Keys, Access Cards, Or Lock Combinations That Provide Access To Government-owned Property Shall Comply With Key And Lock Control Procedures Of The Ra. 3.3. Pre-screen Candidates Using E-verify Program. Contractors Shall Comply With The Requirements Set Forth In Far Clause 52.222-54 Employment Eligibility Verification And Far Subpart 22.18 In Using The E-verify Program At (https://www.e-verify.gov/) (website Subject To Change) To Meet The Contract Employment Eligibility Requirements. Contractors Are Encouraged To Cooperate With Federal And State Agencies Responsible For Enforcing Labor Requirements To Include Eligibility For Employment Under United States Immigration Laws In Accordance With Far 22.102-1 (i). An Initial List Of Verified/ Eligible Candidates Shall Be Provided To The Cor No Later Than Three Business Days After The Initial Contract Award. When Contracts Are With Individuals, The Individuals Will Be Required To Complete A Form 1-9, Employment Eligibility Verification, And Submit Ii To The Contracting Officer To Become Part Of The Official Contract File. 4.0 Non-personal Services. arl/alc/garrison Non-personal Services (jul 2012) the Contractor, As An Independent Contractor And Not As An Agent Of The Government, Shall Provide The Necessary Resources (except Those Furnished By The Government) To Accomplish Tasks Of The Type Set Forth In The Performance Work Statement. contractor Employees Performing Services Under This Contract Shall Be Controlled, Directed And Supervised At All Times By Management Personnel Of The Contractor. The Contractor's Management Shall Ensure That Employees Properly Comply With The Performance Standards Outlined In This Performance Work Statement And As Required By The Contracting Officer Or The Contracting Officer's Representative (cor). Contractor Employees Shall Perform Independent Of And Without The Supervision Of Any Government Official. Actions Of Contractor Employees May Not Be Interpreted Or Implemented In Any Manner That Results In Any Contractor Employee Creating Or Modifying Federal Policy, Obligating The Appropriated Funds Of The U.s. Government, Overseeing The Work Of Federal Employees, Providing Direct Personal Services To Any Federal Employee Or Otherwise Violating The Prohibitions Set Forth In Parts 7.5 And 37.1 Of The Federal Acquisition Regulation (far). The Government Shall Control Access To The Facility And Shall Perform The Inspection And Acceptance Of Completed Work And Tasks. 5.0. Distribution Statement. 5.1. Determination Of Contract Submission Documents Are: distribution Statement A: Approved For Public Release, Distribution Is Unlimited. 5.2. Determination For Information Generated From The Performance Of The Contract: distribution Statement A: Approved For Public Release, Distribution Is Unlimited c. Responses: all Interested Parties Should Notify This Office In Writing, Mail, Fax, Or E-mail Within The Posted Date. Responses Shall Include: to What Extent Each Of The Specifications Can Be Met. include Your Type Of Business (i.e. Commercial, Academia), Whether Your Organization Is Classified As A Large Or Small Business Based On The $19.5m Employees Standard That Accompanies Naics Code 813312. If A Small Business, You Must Also List Any Small Disadvantaged Status You Hold [hubzone, 8(a), Service Disabled Veteran Owned Small Business (sdvosb), Women Owned Small Business (wosb), Economically Disadvantaged Women-owned Small Business (edwosb), Etc.]. past Experience/ Performance Through The Description Of Completed Projects. (12) Responses To This Sources Sought Are Due No Later Than 11:59 Am Eastern Standard Time 20 January 2025. Submissions Should Be Emailed To Swati Jain, Contract Specialist, Swati.jain2.civ@army.mil Or Acquisition Specialist, Alex Gilliam, Alex.p.gilliam.ctr@army.mil questions Concerning This Sources Sought May Be Directed To Swati Jain, Contract Specialist, Swati.jain2.civ@army.mil. Or Acquisition Specialist, Alex Gilliam, Alex.p.gilliam.ctr@army.mil. Please Be Advised That .zip And .exe Files Cannot Be Accepted. (13) Place Of Contract Performance: Garrison-adelphi Laboratory Center 2800 Powder Mill Road adelphi Md 20783 (14) Estimated Delivery Timeframe Or Period Of Performance: period Of Performance (pop): 01 February 2025 – 31 October 2029

Limited Liability Partnership Department For Water Production And Transportation Tender

Others
Kazakhstan
Closing Date27 Jan 2025
Tender AmountKZT 22.8 Million (USD 43.8 K)
Purchaser Name: Limited Liability Partnership Department For Water Production And Transportation | Medical Examination Services for Personnel, Including Preliminary, Periodic and Unscheduled (unscheduled) Examinations

Limited Liability Partnership Department For Water Production And Transportation Tender

Others
Kazakhstan
Closing Date29 Jan 2025
Tender AmountKZT 208 K (USD 399)
Purchaser Name: Limited Liability Partnership Department For Water Production And Transportation | Portland cement

Çorum Special Provincial Administration Road and Transportation Services Directorate Tender

Civil And Construction...+2Civil Works Others, Excavation
Turkey
Closing Date9 Jan 2025
Tender AmountRefer Documents 
Purchaser Name: Çorum Special Provincial Administration Road and Transportation Services Directorate | 3x16 M Dimensions 80 Ton Capacity Floor Mounted Scale (Including Assembly)

MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE IZMIR III REGIONAL DIRECTORATE Tender

Civil And Construction...+2Civil Works Others, Building Construction
Turkey
Closing Date7 Jan 2025
Tender AmountRefer Documents 
Purchaser Name: MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE IZMIR III REGIONAL DIRECTORATE | Car Rental Service Will Be Taken
4311-4320 of 4524 archived Tenders