Transportation Tenders
Transportation Tenders
Province Of Occidental Mindoro Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description Republic Of The Philippines Province Of Occidental Mindoro Municipality Of Abra De Ilog Invitation To Bid Construction Of Retaining Wall 1. The Local Government Unit Of Abra De Ilog, Occidental Mindoro Through The 20% Development Fund Intends To Apply The Sum Of Three Million Six Hundred Thousand Pesos Only. (p 3,600,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Construction Of Retaining Wall Infra # 03-2024 For Each Lot. Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Local Government Unit Of Abra De Ilog, Occidental Mindoro Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required 80 Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From October 30, 2024 To November 26, 2024; 8:00 Am To 5:00 Pm Procuring Entity And Inspect The Bidding Documents At Bac Office Local Government Unit Of Abra De Ilog, Occ. Mindoro. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 30, 2024 To November 26, 2024; 8:00 Am – 5:00 Pm During Weekdays Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only ( Php 5,000.00) The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees On Or Before The Opening Of Bid. 6. The Local Government Unit Of Abra De Ilog Will Hold A Pre-bid Conference On November 8, 2024; 2:30 Pm At Bac Office, Municipal Building, Lgu Abra De Ilog, Occ. Mindoro Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac Office, Municipal Building Lgu, Abra De Ilog, Occ. Mindoro. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On November 26, 2024; 2:30 Pm At Bac Office, Municipal Building, Lgu Abra De Ilog, Occ. Mindoro. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Local Government Unit Of Abra De Ilog Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Engr. Adriel S. Dacara Municipal Engineer Office Of The Municipal Engineer Abra De Ilog, Occ. Mindoro 0939-925-5745 Asdhteb@gmail.com Linda B. Ramos Municipal Budget Officer Bac Chairperson Bac Office Municipal Building Barangay Poblacion, Abra De Ilog, Occ. Mindoro Baclguabradeilog@yahoo.com Cp# 0908-888-7026 September 30, 2024 Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Abra De Ilog, Occ. Mindoro Invites Bids For The Construction Of Retaining Wall, With Project Identification Number Infra No 03-2024. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Construction Of Retaining Wall In The Amount Of Three Million Six Hundred Thousand Pesos Only (p 3,600,000.00) 2.2. The Source Of Funding Is: A. 20% Development Fund 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On November 8, 2024; 2:30 Pm At Bac Office, Municipal Building, Lgu Abra De Ilog, Occ. Mindoro. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet (bds) The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Removal Of Structure & Obstraction, Excavation For Structures, Embankment, Steel Works, Structural Concrete – Class A, Cement Plastering, Formworks & Falseworks, Metal Structures, Asbc & Pccp. 7.1 [specify The Portions Of Works And The Maximum Percentage Allowed To Be Subcontracted, Which Shall Not Be Significant Or Material Components Of The Project As Determined By The Procuring Entity.] 10.3 Sub-contracting Not Allowed 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience Project Engineer General Engineer Road Construction Foreman General Construction Road Construction 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Road Grader 80.4 Hp/6710a 1 Road Roller 10 Mt 1 Water Truck 1000 Gal 1 One Bagger Mixer 5hp 1 Concrete Vibrator Blade 14 Inch/7.5 Hp 1 Concrete Saw Blade 12 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than P 100,000.00 (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than P 250,000.00 (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 20 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Contractor, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 4.1. The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 4.2. If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Works Procured. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 2 Not Applicable 4.1 6 The Site Investigation Reports Are: [list Here The Required Site Investigation Reports.] Not Applicable 7.2 [select One, Delete The Other.] Five (5) Years. 10 [select One, Delete The Other:] A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 120 Calendar Days 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 10 Days Of Delivery Of The Notice Of Award. 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is 1% Of The Total Contract Price. 13 The Amount Of The Advance Payment Is 15% Of The Total Contract Price 14 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Excluded For Payment. Not Applicable 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is Before Final Inspection. (november 24, 2023) The Date By Which “as Built” Drawings Are Required Is Before Final Inspection. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is 1% Of The Total Contract Price Section Vi. Specifications Notes On Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Or Conditioning Their Bids. In The Context Of International Competitive Bidding, The Specifications Must Be Drafted To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Economy, Efficiency, And Fairness In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation Facilitated. The Specifications Should Require That All Goods And Materials To Be Incorporated In The Works Be New, Unused, Of The Most Recent Or Current Models, And Incorporate All Recent Improvements In Design And Materials Unless Provided Otherwise In The Contract. Samples Of Specifications From Previous Similar Projects Are Useful In This Respect. The Use Of Metric Units Is Mandatory. Most Specifications Are Normally Written Specially By The Procuring Entity Or Its Representative To Suit The Works At Hand. There Is No Standard Set Of Specifications For Universal Application In All Sectors In All Regions, But There Are Established Principles And Practices, Which Are Reflected In These Pbds. There Are Considerable Advantages In Standardizing General Specifications For Repetitive Works In Recognized Public Sectors, Such As Highways, Ports, Railways, Urban Housing, Irrigation, And Water Supply, In The Same Country Or Region Where Similar Conditions Prevail. The General Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Construction, Although Not Necessarily To Be Used In A Particular Works Contract. Deletions Or Addenda Should Then Adapt The General Specifications To The Particular Works. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Goods, Materials, And Workmanship, Recognized International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Goods, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure Substantially Equal Or Higher Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Scc. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Contract To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished, And Work Performed Or Tested, The Provisions Of The Latest Current Edition Or Revision Of The Relevant Standards And Codes In Effect Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National, Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure A Substantially Equal Or Higher Quality Than The Standards And Codes Specified Will Be Accepted Subject To The Procuring Entity’s Representative’s Prior Review And Written Consent. Differences Between The Standards Specified And The Proposed Alternative Standards Shall Be Fully Described In Writing By The Contractor And Submitted To The Procuring Entity’s Representative At Least Twenty-eight (28) Days Prior To The Date When The Contractor Desires The Procuring Entity’s Representative’s Consent. In The Event The Procuring Entity’s Representative Determines That Such Proposed Deviations Do Not Ensure Substantially Equal Or Higher Quality, The Contractor Shall Comply With The Standards Specified In The Documents. These Notes Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Bidding Documents. Section Vii. Drawings Annex Bid In To Separate Folder Section Viii. Bill Of Quantities Notes On The Bill Of Quantities Objectives The Objectives Of The Bill Of Quantities Are: A. To Provide Sufficient Information On The Quantities Of Works To Be Performed To Enable Bids To Be Prepared Efficiently And Accurately; And B. When A Contract Has Been Entered Into, To Provide A Priced Bill Of Quantities For Use In The Periodic Valuation Of Works Executed. In Order To Attain These Objectives, Works Should Be Itemized In The Bill Of Quantities In Sufficient Detail To Distinguish Between The Different Classes Of Works, Or Between Works Of The Same Nature Carried Out In Different Locations Or In Other Circumstances Which May Give Rise To Different Considerations Of Cost. Consistent With These Requirements, The Layout And Content Of The Bill Of Quantities Should Be As Simple And Brief As Possible. Daywork Schedule A Daywork Schedule Should Be Included Only If The Probability Of Unforeseen Work, Outside The Items Included In The Bill Of Quantities, Is High. To Facilitate Checking By The Entity Of The Realism Of Rates Quoted By The Bidders, The Daywork Schedule Should Normally Comprise The Following: A. A List Of The Various Classes Of Labor, Materials, And Constructional Plant For Which Basic Daywork Rates Or Prices Are To Be Inserted By The Bidder, Together With A Statement Of The Conditions Under Which The Contractor Will Be Paid For Work Executed On A Daywork Basis. B. Nominal Quantities For Each Item Of Daywork, To Be Priced By Each Bidder At Daywork Rates As Bid. The Rate To Be Entered By The Bidder Against Each Basic Daywork Item Should Include The Contractor’s Profit, Overheads, Supervision, And Other Charges. Provisional Sums A General Provision For Physical Contingencies (quantity Overruns) May Be Made By Including A Provisional Sum In The Summary Bill Of Quantities. Similarly, A Contingency Allowance For Possible Price Increases Should Be Provided As A Provisional Sum In The Summary Bill Of Quantities. The Inclusion Of Such Provisional Sums Often Facilitates Budgetary Approval By Avoiding The Need To Request Periodic Supplementary Approvals As The Future Need Arises. Where Such Provisional Sums Or Contingency Allowances Are Used, The Scc Should State The Manner In Which They Will Be Used, And Under Whose Authority (usually The Procuring Entity’s Representative’s). The Estimated Cost Of Specialized Work To Be Carried Out, Or Of Special Goods To Be Supplied, By Other Contractors Should Be Indicated In The Relevant Part Of The Bill Of Quantities As A Particular Provisional Sum With An Appropriate Brief Description. A Separate Procurement Procedure Is Normally Carried Out By The Procuring Entity To Select Such Specialized Contractors. To Provide An Element Of Competition Among The Bidders In Respect Of Any Facilities, Amenities, Attendance, Etc., To Be Provided By The Successful Bidder As Prime Contractor For The Use And Convenience Of The Specialist Contractors, Each Related Provisional Sum Should Be Followed By An Item In The Bill Of Quantities Inviting The Bidder To Quote A Sum For Such Amenities, Facilities, Attendance, Etc. Signature Box A Signature Box Shall Be Added At The Bottom Of Each Page Of The Bill Of Quantities Where The Authorized Representative Of The Bidder Shall Affix His Signature. Failure Of The Authorized Representative To Sign Each And Every Page Of The Bill Of Quantities Shall Be A Cause For Rejection Of His Bid. These Notes For Preparing A Bill Of Quantities Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Documents. Section Ix. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document; And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (e) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (h) Philippine Contractors Accreditation Board (pcab) License; Or Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (i) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (j) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (k) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (l) The Prospective Bidder’s Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (m) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (n) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (o) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (p) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (q) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (r) Cash Flow By Quarter.
Closing Soon26 Nov 2024
Tender AmountPHP 3.6 Million (USD 60.9 K)
Province Of Occidental Mindoro Tender
Civil And Construction...+1Road Construction
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Province Of Occidental Mindoro Municipality Of Abra De Ilog Invitation To Bid Construction Of Local Access Road In Pambuhan, San Vicente 1. The Local Government Unit Of Abra De Ilog, Occidental Mindoro Through The 20% Development Fund (current) Intends To Apply The Sum Of Five Million Pesos Only. (p 5,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Construction Of Local Access Road In Pambuhan, San Vicente Infra # 02-2024 For Each Lot. Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Local Government Unit Of Abra De Ilog, Occidental Mindoro Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required 36 Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From November 7, 2024 To November 26, 2024; 8:00 Am To 5:00 Pm Procuring Entity And Inspect The Bidding Documents At Bac Office Local Government Unit Of Abra De Ilog, Occ. Mindoro. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 7, 2024 To November 26, 2024; 8:00 Am – 5:00 Pm During Weekdays Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only ( Php 5,000.00) The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees On Or Before The Opening Of Bid. 6. The Local Government Unit Of Abra De Ilog Will Hold A Pre-bid Conference On November 13, 2024; 2:30 Pm At Bac Office, Municipal Building, Lgu Abra De Ilog, Occ. Mindoro Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac Office, Municipal Building Lgu, Abra De Ilog, Occ. Mindoro. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On November 26, 2024; 2:30 Pm At Bac Office, Municipal Building, Lgu Abra De Ilog, Occ. Mindoro. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Local Government Unit Of Abra De Ilog Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Engr. Adriel S. Dacara Municipal Engineer Office Of The Municipal Engineer Abra De Ilog, Occ. Mindoro 0939-925-5745 Asdhteb@gmail.com Linda B. Ramos Municipal Budget Officer Bac Chairperson Bac Office Municipal Building Barangay Poblacion, Abra De Ilog, Occ. Mindoro Baclguabradeilog@yahoo.com Cp# 0908-888-7026 November 6, 2024 Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Abra De Ilog, Occ. Mindoro Invites Bids For The Construction Of Local Access Road In Pambuhan, San Vicente, With Project Identification Number Infra No 02-2024. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Construction Of Local Access Road In Pambuhan, San Vicente In The Amount Of Five Million Pesos Only (p 5,000,000.00) 2.2. The Source Of Funding Is: A. 20% Development Fund (cerrent) 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On November 13, 2024; 2:30 Pm At Bac Office, Municipal Building, Lgu Abra De Ilog, Occ. Mindoro. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet (bds) The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Removal Of Structure & Obstraction, Excavation For Structures, Embankment, Steel Works, Structural Concrete – Class A, Cement Plastering, Formworks & Falseworks, Metal Structures, Asbc & Pccp. 7.1 [specify The Portions Of Works And The Maximum Percentage Allowed To Be Subcontracted, Which Shall Not Be Significant Or Material Components Of The Project As Determined By The Procuring Entity.] 10.3 Sub-contracting Not Allowed 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience Project Engineer General Engineer Road Construction Foreman General Construction Road Construciton 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Road Grader 80.4 Hp/6710a 1 Road Roller 10 Mt 1 Water Truck 1000 Gal 1 One Bagger Mixer 5hp 1 Concrete Vibrator Blade 14 Inch/7.5 Hp 1 Concrete Saw Blade 12 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than P 100,000.00 (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than P 250,000.00 (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 20 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Contractor, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 4.1. The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 4.2. If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Works Procured. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 2 Not Applicable 4.1 6 The Site Investigation Reports Are: [list Here The Required Site Investigation Reports.] Not Applicable 7.2 [select One, Delete The Other.] Five (5) Years. 10 [select One, Delete The Other:] A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 120 Calendar Days 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 10 Days Of Delivery Of The Notice Of Award. 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is 1% Of The Total Contract Price. 13 The Amount Of The Advance Payment Is 15% Of The Total Contract Price 14 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Excluded For Payment. Not Applicable 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is Before Final Inspection. The Date By Which “as Built” Drawings Are Required Is Before Final Inspection. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is 1% Of The Total Contract Price Section Vi. Specifications Notes On Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Or Conditioning Their Bids. In The Context Of International Competitive Bidding, The Specifications Must Be Drafted To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Economy, Efficiency, And Fairness In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation Facilitated. The Specifications Should Require That All Goods And Materials To Be Incorporated In The Works Be New, Unused, Of The Most Recent Or Current Models, And Incorporate All Recent Improvements In Design And Materials Unless Provided Otherwise In The Contract. Samples Of Specifications From Previous Similar Projects Are Useful In This Respect. The Use Of Metric Units Is Mandatory. Most Specifications Are Normally Written Specially By The Procuring Entity Or Its Representative To Suit The Works At Hand. There Is No Standard Set Of Specifications For Universal Application In All Sectors In All Regions, But There Are Established Principles And Practices, Which Are Reflected In These Pbds. There Are Considerable Advantages In Standardizing General Specifications For Repetitive Works In Recognized Public Sectors, Such As Highways, Ports, Railways, Urban Housing, Irrigation, And Water Supply, In The Same Country Or Region Where Similar Conditions Prevail. The General Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Construction, Although Not Necessarily To Be Used In A Particular Works Contract. Deletions Or Addenda Should Then Adapt The General Specifications To The Particular Works. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Goods, Materials, And Workmanship, Recognized International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Goods, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure Substantially Equal Or Higher Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Scc. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Contract To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished, And Work Performed Or Tested, The Provisions Of The Latest Current Edition Or Revision Of The Relevant Standards And Codes In Effect Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National, Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure A Substantially Equal Or Higher Quality Than The Standards And Codes Specified Will Be Accepted Subject To The Procuring Entity’s Representative’s Prior Review And Written Consent. Differences Between The Standards Specified And The Proposed Alternative Standards Shall Be Fully Described In Writing By The Contractor And Submitted To The Procuring Entity’s Representative At Least Twenty-eight (28) Days Prior To The Date When The Contractor Desires The Procuring Entity’s Representative’s Consent. In The Event The Procuring Entity’s Representative Determines That Such Proposed Deviations Do Not Ensure Substantially Equal Or Higher Quality, The Contractor Shall Comply With The Standards Specified In The Documents. These Notes Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Bidding Documents. Section Vii. Drawings Annex Bid In To Separate Folder Section Viii. Bill Of Quantities Notes On The Bill Of Quantities Objectives The Objectives Of The Bill Of Quantities Are: A. To Provide Sufficient Information On The Quantities Of Works To Be Performed To Enable Bids To Be Prepared Efficiently And Accurately; And B. When A Contract Has Been Entered Into, To Provide A Priced Bill Of Quantities For Use In The Periodic Valuation Of Works Executed. In Order To Attain These Objectives, Works Should Be Itemized In The Bill Of Quantities In Sufficient Detail To Distinguish Between The Different Classes Of Works, Or Between Works Of The Same Nature Carried Out In Different Locations Or In Other Circumstances Which May Give Rise To Different Considerations Of Cost. Consistent With These Requirements, The Layout And Content Of The Bill Of Quantities Should Be As Simple And Brief As Possible. Daywork Schedule A Daywork Schedule Should Be Included Only If The Probability Of Unforeseen Work, Outside The Items Included In The Bill Of Quantities, Is High. To Facilitate Checking By The Entity Of The Realism Of Rates Quoted By The Bidders, The Daywork Schedule Should Normally Comprise The Following: A. A List Of The Various Classes Of Labor, Materials, And Constructional Plant For Which Basic Daywork Rates Or Prices Are To Be Inserted By The Bidder, Together With A Statement Of The Conditions Under Which The Contractor Will Be Paid For Work Executed On A Daywork Basis. B. Nominal Quantities For Each Item Of Daywork, To Be Priced By Each Bidder At Daywork Rates As Bid. The Rate To Be Entered By The Bidder Against Each Basic Daywork Item Should Include The Contractor’s Profit, Overheads, Supervision, And Other Charges. Provisional Sums A General Provision For Physical Contingencies (quantity Overruns) May Be Made By Including A Provisional Sum In The Summary Bill Of Quantities. Similarly, A Contingency Allowance For Possible Price Increases Should Be Provided As A Provisional Sum In The Summary Bill Of Quantities. The Inclusion Of Such Provisional Sums Often Facilitates Budgetary Approval By Avoiding The Need To Request Periodic Supplementary Approvals As The Future Need Arises. Where Such Provisional Sums Or Contingency Allowances Are Used, The Scc Should State The Manner In Which They Will Be Used, And Under Whose Authority (usually The Procuring Entity’s Representative’s). The Estimated Cost Of Specialized Work To Be Carried Out, Or Of Special Goods To Be Supplied, By Other Contractors Should Be Indicated In The Relevant Part Of The Bill Of Quantities As A Particular Provisional Sum With An Appropriate Brief Description. A Separate Procurement Procedure Is Normally Carried Out By The Procuring Entity To Select Such Specialized Contractors. To Provide An Element Of Competition Among The Bidders In Respect Of Any Facilities, Amenities, Attendance, Etc., To Be Provided By The Successful Bidder As Prime Contractor For The Use And Convenience Of The Specialist Contractors, Each Related Provisional Sum Should Be Followed By An Item In The Bill Of Quantities Inviting The Bidder To Quote A Sum For Such Amenities, Facilities, Attendance, Etc. Signature Box A Signature Box Shall Be Added At The Bottom Of Each Page Of The Bill Of Quantities Where The Authorized Representative Of The Bidder Shall Affix His Signature. Failure Of The Authorized Representative To Sign Each And Every Page Of The Bill Of Quantities Shall Be A Cause For Rejection Of His Bid. These Notes For Preparing A Bill Of Quantities Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Documents. Section Ix. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document; And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (e) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (h) Philippine Contractors Accreditation Board (pcab) License; Or Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (i) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (j) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (k) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (l) The Prospective Bidder’s Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (m) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (n) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (o) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (p) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (q) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (r) Cash Flow By Quarter.
Closing Soon26 Nov 2024
Tender AmountPHP 5 Million (USD 84.6 K)
City Of Dobruska Tender
Software and IT Solutions
Czech Republic
Details: The subject of the contract is the supply of new Hw and Sw for the modernization of the Technology Center (in particular): - Servers incl. Accessories (management Server, Host Server), - Backup Tape Library, - Disk Array, - Infrastructure Monitoring, - Virtualization Software, - Software License Set, - Backup Software, - Security Software, - Ndr - Network Detection And Response, - Log Management , - Installation, Implementation And Configuration. The Subject of the Public Contract is specified in more detail in Appendix No. 1 Tender Documentation ("technical specification") AND in Appendix No. 6 Tender Documentation ("binding Text of the Contract for the Supply of Hardware and Software and the Provision of Related Services"). The components of the subject of the Public Contract and thus also the bid prices for its fulfillment are, in particular, but not exclusively: - Transportation of the subject of the Public Contract to the place of fulfillment, its unpacking and inspection, - Installation of equipment at the place of fulfillment and putting it into full operation, which includes its testing And verifying the correct function, possibly setting it up and performing other actions necessary for it The equipment was able to fulfill the agreed or usual purpose and at the same time was fully in accordance with the existing environment of the client (see Appendix No. 12 of the tender documentation), - Delivery of the necessary accessories of the equipment, - Delivery of technical documentation, and this in English (or Czech as well, will be- li Officially Available) AND IN THE RANGE AND PERFORMANCE WHICH WILL ENABLE PROBLEM-FREE OPERATION OF THE EQUIPMENT AND COMMISSIONING, PERMANENT Operation And Its Maintenance, - Training of 2 employees of the Client in the operation and maintenance of the equipment in the range of 16 hours on the delivered equipment at the place of fulfillment.
Closing Date6 Jan 2025
Tender AmountCZK 7.5 Million (USD 309.8 K)
Municipality Of Carmen, Bohol Tender
Automobiles and Auto Parts
Philippines
Details: Description 1 Land Ambulance (type 1) 1 Unit I. Vehicle Specifications And Requirements · Vehicle Type: Four-wheel Passenger Van With 4 Doors (2 At The Front For The Driver And Passenger, One Sliding Door Or Barn Door At The Right Side And Tailgate Or Barn Door At The Rear) · Wheelbase: At Least 2,500-2,800 Mm · Drive Type: Rear Wheel Drive · Engine Size/displacement: 2,500 To 3,000 Cc · Engine Type: 4 Cylinders, In-line Type, 16 Valves, Double Over Head Cam (dohc), Maximum 3,400 Rpm · Alternator And Battery The Capacity Of The Alternator And Battery Must Be Sufficient To Supply The Additional Load Demands Of All Medical Equipment. The Amperage Capacity Of The Alternator Must Be At Least 110 Amperes. · Fuel-injector System: Direct Injection · Emission Compliance: Euro 4 · Fuel Type: Diesel · Fuel Tank Capacity: At Least 65 Liters · Transmission: Manual With At Least Five (5) Speed + One (1) Reverse · Steering: Left Hand Drive With Power-steering System · Brakes: Ventilated Disk On The Front And Ventilated Disk Or Drum Type On The Rear. With Anti-lock Braking System. With Parking Brake · Front Suspensions: Mcpherson Strut Or Double Wishbone Or Torsion Bar With Stabilizer · Rear Suspensions: Rigid Axle With Leaf Spring And Double Acting Shock Absorbers · Wheels: At Least 15 Inch, Aluminum Mag Wheels Or Steel Wheels With Full Cover · Tires: Radial Type And At Least 195 Mm Tire Width Standard Vehicle Lamps: Head Lamps, Tail Lamps, Stop Lamps, Signal Lamps, License Plate Lamps, Fog Lamps And Step Lamps · Vehicle Body Color: White · Floor Material: Metal With Anti-static Floor Matting. Each Entry Point Of The Patient Compartment Must Be Fitted With A Diamond Tread Plate Flooring. · Standard Dashboard Instrumentations: Speedometer, Odometer, Fuel Gauge, Digital Clock, Warning Lamps For Low Oil Pressure, Cooling Water Level, Overheating, Low Battery Charge, Indicator Lamps For Parking Brake And Head Light High-beam, Engine Check, Door Open. · Dashboard And Rear-view Camera System: Resolution Of At Least 1920x1080@30fps, Angle Of View At Least 120 Degrees Diagonal, At Least 2 Inch Led Display, Minimum Storage Capacity Of 64gb, With Loop Recording, Automatic On/off And Night Vision Recording In Low Light. The Cameras Must Be Permanently Installed On The Dashboard Or Windshield And At The Rear Part Of Vehicle. Rear-view Camera Must Be Have Color-coded Parking Grid Features. The Power Supply Must Be From The Vehicle Battery. · Standard Driver’s Cabin Accessories: Am/fm Radio With Speakers, Usb Connector, Front Personal Lamp For Driver And Passenger, Rear View Mirror, Sun Visor And Assist Grips For The Driver And Passenger. · Vehicle Doors Glass Windows: Central Or Power Door Locking System. Hydraulic / Electric Windows For Driver And Front Passenger Sides. The Vehicle Glass Windows (except The Windshield) Must Be Installed With Medium Shade (35% Visible Light Transmitted) Glass Tint. · Windshield Wipers: With At Least Three (3) Speed Intermittent With Washer · Air Conditioning System: Dual Type; At The Driver’s Cabin And At The Patient Compartment With Independent Controls. · Seat Belts: 3 Point Emergency Locking Retractor (elr) Seatbelts For The Driver And Front Passenger. · Airbags: Supplemental Restraint System (srs) Airbags For The Driver And For The Front Passenger. · Driver And Passenger Side Mirrors: Standard Convex Type, Manual Or Power Adjustment · Vehicle Interior Trim: Moulded Trim. The Ceiling Must Be Provided With Insulation. · Stainless Steel Plate On The Rear Bumper To Protect The Bumper When The Ambulance Stretcher Is Being Loaded To The Ambulance. · Set Of Tools: Hydraulic Jack, Tire Wrench, Flat And Philips Screw Drivers, Set Of Pliers, Adjustable Wrench, Early Warning Device And Spare Wheel And Tire. Ii. Emergency Lights, Sirens And Public Address System · Emergency Lights: Roof Mounted Light Bar With Red And Green Flashing Led Lights. The Length Of The Light Bar Must Be The Same As The Width Of The Vehicle Roof. Electric Siren And Public Address System: Standard Ambulance Siren Tones (horn, Manual, Wail, Yelp, Phaser, Hilo/two Tone) And With At Least Two 100 Watts Amplifier And Siren Speakers. With Rotary Switch And Momentary Push-button Override Control. Public Address Override With Attached Microphone And Volume Control Knob · Red And Green Flashing Led Lights Mounted On The Upper Part Of The Rear Of The Ambulance · Red And Green Led Flashing Lights Mounted On The Front Grill Of The Ambulance Iii. Ambulance Body Marking · The Front Of The Ambulance Shall Be Marked With A Reflectorized And Capitalized Word “ambulance” Which Is Spelled Out In Reverse (mirror Image). The Height Of Each Letter Shall Be No Less Than 10 Centimeters And The Word Shall Be Seen At Least Six (6) Meters Away. · Each Side Of The Ambulance Body Shall Have The Capitalized Word “ambulance” Not Less Than 15 Cm In Height And The Letters Must Be In Red Color. · The Rear Side Of The Ambulance Body Shall Be Marked With A Reflectorized And Capitalized Word “ambulance” Not Less Than 15 Cm In Height And The Letters Must Be In Red Color. · The Prescribed Doh Logo With A Diameter Of Not Less Than 36 Cm Shall Be Placed On The Driver’s Door And On The Front Passenger Door. Iv. Patient Compartment · Compartment Interior Height: At Least 1600mm · Compartment Interior Width: At Least 1500mm · Partition Between The Driver And Patient Compartment: Air Tight Bulkhead Made Of Non-porous Material With A Transparent And Shatter-proof Sliding Window At Least 35 Cm X 30 Cm. · Storage Cabinet For Medicines, Instruments And Medical Equipment > Built-in Cabinet Made Of White Painted Aluminum Panels Or Other Lightweight, Equivalent Strength Material Such As Fiberglass, Composites And Fiberglass Reinforced Plastics. The Cabinet Must Be Mounted On The Upper Left Side Of The Patient Compartment And Must Be At Least 200 Cm But Must Not Be More Than 210 Cm In Length. The Cabinet Must Be Firmly Anchored (bolted Or Welded) To Tapping Plates Of The Body Structure. > The Cabinet Must Have Transparent And Shatter-proof Sliding Doors With Low Profile Handles. The Sliding Doors Must Be Easily Opened But Must Not Open During Transit. The Sliding Doors Must Be Fitted With Automatic Latch Or Friction Holding Device. > The Cabinet Must Have At Least 4 Shelves With At Least One Shelf Designed To Fit And Carry Heavy Medical Equipment Such As The Defibrillator And Nebulizer. The Shelves Must Have A Depth At Least 30 Cm But Must Not Be More Than 50 Cm. · Compartment For The Folding Stretcher And Scoop Stretcher: Installed Below The Storage Cabinet, Made Of White Painted Aluminum Panels Or Other Lightweight, Equivalent Strength Material Such As Fiberglass, Composites And Fiberglass Reinforced Plastics. The Compartment Must Be At Least 200 Cm But Must Not Be More Than 210 Cm In Length. The Cabinet Must Be Firmly Anchored (bolted Or Welded) To Tapping Plates Of The Body Structure. Bench For Medical Personnel: The Ambulance Must Be Fitted With 3-seater Bench Permanently Mounted On The Ambulance Floor; One On The Head Side Of The Patient And One On The Right Side Of The Patient Compartment. The Bench (seat And Backrest) Must Be Made Of Sturdy Aluminum Frame And Panels Coated With White Color Paint Or Other Lightweight, Equivalent Strength Material Such As Fiberglass Reinforced · Plastics Or Plastic Laminated. The Seat And Backrest Must Be Fitted With Mattress Made Of Polyurethane Foam Covered With A Washable Leatherette Material. The Construction Of The Bench Must Be In Such A Way That The Underneath Can Be Used As A Compartment. The Bench Must Have A 2 Point Seatbelt For Each Person. > Overhead Lighting: At Least 2 Led White Lights With Low Light Option > Grab Rail: Aluminum Or Stainless Steel Grab Rail At Least 120 Cm Long, 10 Cm Depth (maximum) Installed On The Ceiling Right Above The Patient/ambulance Stretcher. > 220v Ac Supply: The Patient Compartment Must Be Installed With An Electronic Inverter With A Capacity Of At Least 3kva And An Output Voltage Of 220v, 60 Hz. At Least Five (5) Convenience Outlets Must Be Installed At The Different Points On The Compartment To Supply Power To The Medical Equipment. > Intercom System: Intra-vehicle Intercom System Must Be Fitted To Serve As Voice Communication Between The Driver And Personnel In The Patient Compartment. V. Communication Equipment Two (2) Pieces Cellular Phones (one For The Ambulance And One For The Hospital/base). The Cellular Phones Must Be 4g Network Capable, With Internal Memory Of At Least 64gb And 4gb Ram Smartphones. The Phones Must Be Provided With Sim Cards And Battery Charger. Vi. Medical Equipment And Instruments · Ambulance Stretcher > Length: 180 – 185 Cm > Width: 48 – 55 Cm > Loading Height Should Match The Vehicle Floor Height > Loading Capacity: At Least 175 Kg > Materials: Stainless Steel, High Grade Aluminum Alloy > Head Part Rising Angle: At Least 75° Knee Part Rising Angle: At Least 15° > With Collapsible Side Rails And Quick Release Patient Restrain System > With Durable Folding Leg Mechanism > The Mattress Must Be Made Of High-density Polyester Fiber Foam With A Thickness Of At Least 5 Cm And Covered With Waterproof Vinyl Material. > Wheels: 200 - 210mm Diameter, Fixed Front With Locking Brakes And Auto-directional Rear And With 50-55 Cm Loading Carriage Wheels > Loading Rail Mounted In The Ambulance With Latching System > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment. · Automatic External Defibrillator (aed) > Compact, Lightweight, Easy To Use, Bi-phasic Defibrillator With Manual (with Easy 1-2-3 Operation) > Waveform: Rectilinear Biphasic > Defibrillator Charge Hold Time: Not More Than 30 Seconds > Patient Safety: All Patient Connections Are Electrically Isolated > Charge Time: Less Than 10 Seconds With New Battery Charge To 200j With A Fully-charged Battery > Battery Operated > Self-test: Configurable Automatic Self-test When Device Is Turned-on > Monthly Full-energy Test (200j) > Automatic Self-test Checks: > Battery Capacity > Electrode Connection > Electrocardiogram And Discharge Circuits > Microprocessor Hardware And Software > Cpr Circuitry And Cpr-d Sensor And Audio Circuitry > Cpr: Metronome Rate (variable 60 To 100 Cpm) > Defibrillator Advisory: Evaluates Electrode Connection And Patient Ecg To Determine If Defibrillation Is Required > Shockable Rhythms: > Ventricular Fibrillation With Average Amplitude Of > 100 Microvolts > Wide Complex Ventricular Tachycardia With Rated Greater Than 150 Bpm For Adults And 200 Bpm For Pediatrics > Patient Impedance Measurement Range: At Least 0 To 300 Ohms > Defibrillator: Protected Ecg Circuitry > Display Format: Optional Lcd With Moving Bar > Size: Approximately 2.6” X 1.3” > Ecg Viewing Window: At Least 2.6 Seconds > Optional Ecg Display Sweep Speed: Not More Than 25mm/sec; 1”/sec > Data Recording And Storage > At Least 50 Minutes Of Ecg And Cpr Data. > If Audio Recording Is Installed And Enabled, At Least 20 Minutes Of Audio Recording, Ecg And Cpr Data. > If Audio Recording Is Disabled, At Least 7 Hours Of Ecg And Cpr Data. > Pc Minimum Requirements For Configuration And Patient Data Recovery: Windows® 98, Windows® 2000, Windows® Nt, Windows® Xp, Ibm Compatible Pii With 16550 Uart (or Higher) Computer. 64mb Ram. Vga Monitor Or Better. Cd-rom Drive. Irda Port. 2mb Disk Space. > Available With Pediatric Pacing Cable And Pads Synchronized And Direct Defibrillation > Biphasic Energy Waveform, Adjustable Output, From Approximately 1 Up To 200 Joules > Load Compensation Circuit Allows Precise Delivery Of Selected Energy, Based On Patient’s Impedance > Energy Selection > Charge Controls - Push-button Controls On Front Panel > Charge Time - Less Than 10 Seconds With New Battery Charge To 200j With A Fully-charged Battery > Charge/ready Is Indicated Via Audiovisual > Defibrillator Energy - Approximately ±15% At 50ω > Accuracy - Approximately ±30% Over The Range Of 25 To 100 Ω > Defibrillator Waveform - 5ms Monophasic Pulse Display Shows Ecg, Heart Rate, Battery Status And Energy Output Pre-set > Monitor Display Size: Bright Back-lit Alphanumeric Lcd, Approximately 10 X 6 Cm > Frequency Response: Non-diagnostic > Heart Rate Meter: Three-digit Readout Displays Rates From 20 To 300 Bpm > Heart Rate Alarm: User Selectable Alarm Limits > Self-test Is Performed Each Time The Device Is Switched On > System Reports, With Audiovisual Alert: Status, Operation, Malfunctions And Low Battery > Internal Safety Discharge Upon 40seconds Non-delivery Of Accumulated Energy, Switch-off And Technical Failure > Sensitivity, Adjustable 5, 10 And 20mm/mv Pads: > Shelf Life: 5 Years > Conductive Gel: Polymer Hydrogel > Conductive Element: Tin > Packaging: Multilayer Foil Laminate Pouch > Impedance Class: Low > Cable Length: At Least 36 In (91 Cm) > Sternum: Length: At Least 6.1 In (15.5 Cm); Width: At Least 5.0 In (12.7 Cm); Length, Conductive Gel: At Least 3.5 In (8.9 Cm); Width, Conductive Gel: At Least 3.5 In (8.9 Cm); Area, Conductive Gel: At Least 12.3 Sq In (79.0 Sq Cm) > Apex: Length: At Least 6.1 In (15.5 Cm); Width: At Least 5.6 In (14.1 Cm); Length, Conductive Gel: At Least 3.5 In (8.9 Cm); Width, Conductive Gel: At Least 3.5 In (8.9 Cm); Area, Conductive Gel: At Least 12.3 Sq In (79.0 Sq Cm) > Complete Assembly: Folded Length: At Least 7.6 In (19.4 Cm); Folded Width: At Least 7.0 In (17.8 Cm); Folded Height: At Least 1.5 In (3.8 Cm) > Design Standards: Meets Applicable Requirements Of Ansi/aami/iso Df-39-1993. > Shock Resistant Housing Allows System To Function In Demanding Environment > Integrated Carry Handle Facilitates Transport > Splash-resistant Alphanumeric Function Keys Power Supply: > User Replaceable Battery Is Removable/replaceable By The Operator. (10 Type 123a Photo Flash Lithium Manganese Dioxide Batteries. > Battery Capacity: Typical New (20°c) = 5 Years (at Least 225 Shocks) Or At Least 13 Hours Continuous Monitoring. End Of Life Designated By Red X (typical Remaining = At Least 9 Shocks). Battery Compartment To Be Clearly Labeled, Splash-proof And Requiring Tool For Opening For Battery Replacement > Electrical Source Requirements: Battery Operated > Operating Temperature: 32° To 122°f; 0° To 50°c > Storage Temperature: -22° To 140°f; -30° To 60°c > Humidity: 10 To 95% Relative Humidity, Non-condensing > Vibration: Mil Std. 810f, Min. Helicopter Test > Shock: Iec 68-2-27; 100g > Altitude: 300 To 15,000 Ft.; -91m To 4573m > Particle And Water Ingress: Ip-55. > Defibrillator Pads (self- Adhesive, Disposable And Non-polarized) At Least Five (5) Pairs For Adult And At Least Five (5) Pairs For Pedia Ø Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment. · Nebulizer > Portable, Compressor-driven Nebulizer Pump, And A Four-pole Single Phase Motor Design In Metal Frame Construction > Easy To Operate With Sturdy Design For Use In Demanding Environment > Cup Capacity Minimum 3ml To Maximum 10ml > Nebulization, Approximately 0.1 To 0.2ml/minute > Residual Volume Maximum 2ml > Flow Delivery Range (under Load) 0.5 To Maximum 12 Liters/minute Or Greater > Median Mass Aerodynamic Diameter (mmad) Of Particles 0.5 To 4 Microns > Operating Temperature Range 5 To 50 ⁰c > Operating Relative Humidity Range Up To 65% > Compressor Requires No Maintenance And Delivers Oil-free Flow Diaphragm Type And Maximum Compressor Pressure Of 30 Psig Or Greater > Device, With Carry Handle, Is Provided With Accessory Storage Compartment > Power Supply, 220v/60hz > Power Consumption, Approximately 90w > System Configuration Accessories, Spares And Consumables: · System As Specified · Nebulizer Atomizer Body Piece (dome) · Reusable Mouth Piece, Pediatric Size (fitting Atomizer Body Piece) · Reusable Mouth Piece, Adult Size (fitting Atomizer Body Piece) · Air Tubing, Diameter Approximately 6/9mm (inner/outer), Length Approximately 1 Meter · Dosage Cup · Reusable Mask, Size Pediatric · Reusable Mask, Size Adult · Spare Inlet Filters · Spare Particle Filters · Set Of Spare Fuses · Portable Suction Machine > Electrical Suction Pump Supporting Medical Interventions Such As Resuscitation Or Minor Surgery > With Graduated Plastic Jar Auto-clavable, Capacity 1.2 Liters > Jar Is Covered And Fit With Overflow Valve And Antibacterial Filter > Suction Flow Maximum, Approximately 17l/minute > Vacuum Adjustable From 0 To Approximately - 600mmhg > Vacuum Control Button And On/off-switch > Sturdy Shock Resistant Casing, Easy To Carry And Easy Clean > Silent Operation Supplied With: > 2 X Set Of Silicone Tubes, Diameter 8/14mm (inner / Outer), Length Approximately 2.5m > 2 X Bi-conical Connectors Fitting The Silicone Tubes > 1 X Spare Jar Of 1l With Cover, Gasket And Overflow Valve > 1 X Set Of Spare Antibacterial Filters > 1 X Set Of Spare Fuses > 1 X Instructions For Assembly, Use And Maintenance, And List Of Accessories And Spare Parts With Product Reference Code In English Language > Consumables Should Be Available In The Local Market Power Supply > Power Input To Be 220-240vac (single Phase) / 60hz As Appropriate Fitted With Philippine Standard Plug > Voltage Corrector/stabilizer Of Appropriate Ratings Meeting Philippines Standard Specifications (input 160-260 V And Output 220-240 V And 60 Hz) > Power Consumption Approximately 50 Watts > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Examining Light (mounted On The Head Side Of The Patient) > Mobile Examination Light, Sturdy Construction. > On Heavy Base With 5 Swivel Castors, 2 With Brakes. Low Center Of Gravity For Optimal Stability And Reach > Single Lamp With Led Bulb: White Led Approximately 50,000 Hours Life > Field-of-view Diameter, Approximately 0.15 M At Working Distance > Homogeneous Illumination Across Entire Field-of-view, Approximately 20,000 Lux At 30.5 Cm To 50 Cm Working Distance > Color Temperature, Approximately 5500⁰k > Light Head Mounted On Spring Loaded Articulating Arm, Height Approximately 1.50 M > Touch Less On/off Switch And Electronic Control Box Incorporated In Base Or Spring Loaded Articulating Arm Power Supply: > -power Input To Be 220 Vac (single Phase) / 60hz As Appropriate Fitted With > Philippine Standard Plug > -power Consumption, Approximately 35 Watts Dimensions: > -weight: Total Mobile Stand: Approximately 5.78 Kg. > -height: Total Mobile Stand: Approximately 150.0 Cm (including Luminaire And Control Box) > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Aneroid Sphygmomanometer (mounted On The Ambulance Wall On The Head Side Of The Patient) > The Sphygmomanometer Is Composed Of Cloth Cuff Containing An Inflatable Bag (adult-25 Cm To 35 Cm) > Connected Via A Tube To A Flexible Bulb With Valve And Integrated Manometer Needle Gauge. > Latex And Mercury Free. > Bp Cuffs Are Anti-microbial Treated. > The Adult (25 Cm To 35 Cm) Cuff With Double Velcro Fastening, Enabling It To Be Adjusted To Fit Tightly > Around The Arm. > The Cuff Is Washable, Very Strong And Reinforced At Both Ends. > The Bag Is Inflated By Means Of The Flexible Bulb Connected Via A Tube (length Approximately 60 Cm, > Flexible And With Reliable Quick Connector) > The Quick Connector Can Easily Be Connected To All Types Of Inflation Bulbs > Inflation Bulb With Integrated Manometer Needle Gauge > Dial Graduated Up To 300 Mmhg Aneroid Instrument Mounted At A 20º Angle For Ease Of Viewing Clinical Sphygmomanometer For Desk Type, With Pressure Release Valve > Pressure Gauge To Allow Reading Of Pressure To 2mmhg Accuracy > Gauge Body To Allow Recalibration Of Readings, Yet In Normal Operation Be Sealed And Secure > Plastic Manometer With Chrome Plated Steel Bracket > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Folding Stretcher > Length: At Least 1900 Mm > Width: At Least 530 Mm > Loading Capacity: At Least 120 Kg > The Stretcher Must Have A Quick Release Patient Restrain System > Frame Material: High Grade Aluminum > Frame Must Be Made Of Sturdy Lightweight, Non-twisting Construction And With Rubber Handles > Stretcher Bed Material Must Be Washable > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Scoop Stretcher > Length: At Least 200 Cm > Adjustable Length > Width: At Least 42 Cm > Loading Capacity: At Least 150 Kg > The Stretcher Must Have At Least Three (3) Quick Release Patient Restrain System > Frame Material: High Grade Aluminum > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Heavy Duty Stethoscopes (dual) > Easy To Dismantle, Clean, And Disinfect. > Double Cup, Dual-use (adult And Pediatric Auscultation) In Stainless Steel Or Chromed Brass. > Adult Diaphragm: Approximately 43mm > Bell Diameter: Approximately 32mm > Y Tube Treated Rubber With Large Diameter: Approximately 10 Mm > Arms: Stainless Steel Or Chrome Brass Or Aerospace Alloy, With Spring Treated To Give Lasting Spring And Maximum Reliability And Comfort. > Removable Plastic/rubber Ear-pieces. > Supplied With Spare Diaphragms Or Diaphragm Membrane, Y Tube And A Pair Of Ear-pieces > Environmental Factors: > The Unit Shall Be Capable Of Being Stored Continuously In Ambient Temperature Of 0 - 50 ⁰c And Relative Humidity Of 15-90%. > The Unit Shall Be Capable Of Operating In Ambient Temperature Of 20-30 ⁰c And Relative Humidity Of Less Than 70%. > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Container Box · Non-contact Thermometer > Measuring Scale: Degree Celsius > Lcd Or Led Display With At Least Three (3) Digit Measurement Display > Components Must Have No Glass And Mercury Materials > Measurement Range: 34°c To 42°c Or Wider Range. > Beep Sound Upon Measurement > Switch Off Automatically When Not In Use. > Battery Operated. > With Low Battery Indicator > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Blood-glucose Meter With Strip > Hand Held Meter > No Routine Maintenance Reading Range/linearity From 20 To 600 Mg/dl > Maximum Reading Time Of Less Than 10 Seconds > Use Of Electrochemical Technology > Use A Minimum Blood Sample Of Less Than 1.5µl > Lcd Display > Measuring Unit In Mg/dl. > Wide Operating Temperature > A Minimum Memory Of 50 Test Results > Should Have Easy Code Entry Technique > Battery Should Be Replaceable Without Using Any Tools > Should Have Facility To Ensure Accuracy Of Measurements. > Should Be Supplied With Three Types Of Control Solutions Of Each At Least 3 Ml > Item Should Have Data Transfer Facility Through Usb Device Or Blue Tooth > The Unit Should Be Cleanable And Sterilizable With Alcohol · Glucose Strips > Should Be Able To Use Capillary Blood Samples. > Should Have A Minimum 4 Months Shelf Life After Opening The Strip Vial. > All Strips Should Have At Least One Year Expiry Date From The Date Of Supply. > Minimum Of 10 Strips, 10 Lancets, And 1 Lancing Device Should Be Supplied Along With The Equipment. > Strips Should Be Available In The Local Market. Power Requirements > Shall Be Battery Operated 3-volt Lithium Ion Cell Battery Or 2 X (aaa) Alkaline Battery. Battery Should Be Supplied With Item And Should Last At Least 1000 Tests. > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Manual Resuscitators For Adult > Resuscitator To Ventilate Adult (body Weight Over 30kg) > Resuscitator Operated By Hand > Ventilation With Ambient Air > Resuscitator Shall Be Easy, To Disassemble And Reassemble, To Clean And Disinfect, And Be Autoclavable. > All Parts Must Be Manufactured From High-strength, Long-life Materials And Require No Special Maintenance Or Storage Conditions. Resuscitator Shall Be Supplied As A Complete Set With: > Compressible Self-refilling Ventilation Bag, Capacity: 1500-2000 Ml > Non-rebreathing Patient Valve With Or Without Pressure Limiting Valve, Patient Connector Outside/inside Diameter (od/id): 22/15 Mm > Inlet Valve With Nipple For 02 Tubing > Oxygen Reservoir Bag Complete, Capacity: 2000-2600 Ml > Masks, Transparent, In 3 Sizes: > 1 Mask, Face Shape Type, Size Adult Small/teenager > 1 Mask, Face Shape Type, Size Adult Medium > 1 Mask, Face Shape Type, Size Adult Large Resuscitator Supplied In A Box As A Complete Set, With Clear Instructions / Diagrams For Use Covering The Technical Performances, The Use And The Maintenance Of The Resuscitator And Assembly In English Language > Materials: Latex-free > Compressible Self-refilling Ventilation Bag: Silicone Rubber, > Non-rebreathing Patient Valve With Pressure Limiting Valve: Polycarbonate/polysulfone/silicone, > Inlet Valve With Nipple For O2 Tubing: Polycarbonate/polysulfone/silicone, > Oxygen Reservoir Bag: Plastic > Masks: Transparent Silicone Rubber. Standards, Safety And Training: > Should Be Fda, Ce, And Ul Approved Product > Conforming To International Standards: Iso, Ce Certification, Fda > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment Or Container · Manual Resuscitators For Neonate/infant > Resuscitator To Ventilate Preterm, Newborn, Small Infant (body Weight 0-7 Kg) > Resuscitator Operated By Hand > Ventilation With Ambient Air > Resuscitator Shall Be Easy, To Disassemble And Reassemble, To Clean And Disinfect, And Be Autoclavable. > All Parts Must Be Manufactured From High-strength, Long-life Materials And Require No Special Maintenance Or Storage Conditions. Resuscitator Shall Be Supplied As A Complete Set With: > Compressible Self-refilling Ventilation Bag, Capacity: 200-250ml > Non-rebreathing Patient Valve With Pressure Limiting Valve, 40± 5 Cmh2o, Patient Connector Outside/inside Diameter (od/id): 22/15mm, > Inlet Valve With Nipple For 02 Tubing > Masks, Transparent, In 3 Sizes: > 1 Mask, One Piece, Round Shape Type, Size Preterm > 1 Mask, One Piece, Round Shape Type, Size Newborn > 1 Mask, One Piece, Round Shape Type, Size Infant Small > Resuscitator Supplied In A Box As A Complete Set, With Clear Instructions / Diagrams For Use Covering The Technical Performances, The Use And The Maintenance Of The Resuscitator And Assembly In English Language > Materials: Latex-free > Compressible Self-refilling Ventilation Bag: Silicone Rubber > Non-rebreathing Patient Valve With Pressure Limiting Valve: Polycarbonate/polysulfone/silicone > Inlet Valve With Nipple For O2 Tubing: Polycarbonate/polysulfone/silicone > Masks: Transparent Silicone Rubber Standards, Safety And Training: > Should Be Fda, Ce, And Ul Approved Product > Conforming To International Standards: Iso, Ce Certification, Fda Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment Or Container Manual Resuscitators For Pedia (child) > Resuscitator To Ventilate Child (body Weight 7-30 Kg) > Resuscitator Operated By Hand > Ventilation With Ambient Air > Resuscitator Shall Be Easy, To Disassemble And Reassemble, To Clean And Disinfect, And Be Autoclavable. > All Parts Must Be Manufactured From High-strength, Long-life Materials And Require No Special Maintenance Or Storage Conditions. > Compressible Self-refilling Ventilation Bag, Capacity: 500-700 Ml > Non-rebreathing Patient Valve With Pressure Limiting Valve, 40 ±5 Cmh2o, Patient Connector Outside/inside Diameter (od/id): 22/15 Mm > Inlet Valve With Nipple For 02 Tubing > Oxygen Reservoir Bag Complete, Capacity: 2000-2600 Ml > Masks, Transparent, In 3 Sizes: · 1 Mask, Round Shape Type, Size Child Small · 1 Mask, Round Shape Type, Size Child Medium · 1 Mask, Face Shape Type, Size Child Large > Resuscitator Supplied In A Box As A Complete Set, With Clear Instructions / Diagrams For Use Covering The Technical Performances, The Use And The Maintenance Of The Resuscitator And Assembly In English Language > Materials: Latex-free > Compressible Self-refilling Ventilation Bag: Silicone Rubber > Non-rebreathing Patient Valve With Pressure Limiting Valve: Polycarbonate/polysulfone/silicone, > Inlet Valve With Nipple For O2 Tubing: Polycarbonate/polysulfone/silicone, > Oxygen Reservoir Bag: Plastic > Masks: Transparent Silicone Rubber · Oxygen Cylinder With Oxygen Therapy Set > At Least 20 Pounds Capacity > Must Be Color Green > Oxygen Therapy Set · Gauge Reading: 1,800 Psi Or Higher · Flowmeter: 0 To 15 Li/min · Humidifier Bottle: Hard Plastic, Capacity: 200ml To 300ml · Accessories: Mouth Piece, Tubing, Open Wrench For Installing The Therapy Set To The Cylinder · The Cylinder Must Be Placed In A Holder Mounted On The Head Side Of The Patient · Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Equipment · Laryngoscopes Set > Constituted Of A Large Hollow, Cylindrical, Slightly Ribbed Handle And A Set Tongue Depressor In Fiber Optic. > The Handle Is Made Of Fiber Optic Led Light > The Handle Can Be Opened At One End To Insert Two Type C Alkaline Battery > The Other End Has A Stud Contact Which Fits The Various Sizes And Types Of Depressors > The Set Of Autoclavable Depressors Includes: A. 4 Curved Depressors, Macintosh Type: No. 1: Approximately 66 Mm Length No. 2: Approximately 85 Mm Length No. 3: Approximately 105 Mm Length No. 4: Approximately 140 Mm Length B. 5 Straight Depressors, Miller Type: No. 0: Approximately 56 Mm No. 1: Approximately 82 Mm No. 2: Approximately 135 Mm No. 3: Approximately 175 Mm No. 4: Approximately 185 Mm > Contained In Suitable Protective Plastic Box Or Vinyl Sturdy Padding Case > Battery Compartment (if Reusable) To Be Sealed Against Liquid Ingress, Yet Easily Opened > On/off Switch To Be Robust And Easy To Use > Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Container Box · Immobilization Devices A) Cervical Collars I. Rigid For Children Ages 2 Years Or Older Ii. Child And Adult Sizes (small, Medium, Large) B) Head Immobilization Device (not Sand Bags): Firm Padding Or Commercial Device C) Lower Extremity (femur) Traction Devices I. Limb-support Slings Ii. Padded Ankle Hitch Iii. Padded Pelvic Support Iv. Traction Strap (adult & Child Sizes) D) Upper And Lower Extremity Immobilization Devices I. Joint-above And Joint-below Fracture (sizes Appropriate For Adults And Children) Ii. Rigid- Support Constructed With Appropriate Material (cardboard, Metal, Pneumatic, Vacuum, Wood Or Plastic) – Various Sizes E) At Least 2 Pieces - Resistant Straps Or Cravats · Delivery Set All Instruments Must Be Surgical Grade Stainless Steel Material With ± 0.4 Inch Measurement Tolerance > 1 Pc. Sponge Holding Forceps, Rampley 9.5" > 1 Pc. Kidney Dish 10" > 1 Pc. Bowl 200mm > 1 Pc. Umbilical Scissors, American, Straight 4.5" > 1 Pc. Needle Holder Mayo Hegar Straight 6.5" > 1 Pc. Episiotomy Scissors 14.5 Cm > 1 Pc. Cusco Vaginal Speculum Medium > 1 Pc. Hartmann Mosquito Artery Forceps Straight 120mm > 1 Pc. Metal Catheter > 1 Pc. Uterine Curette > 1 Pc. Treves Dissecting Forceps, Plain, 200mm > 1 Pc. Spencerwells Artery Forceps Curved 6" > 1 Pc. Kocher Artery Forceps, Toothed Straight 6" Non-removable Doh Logo And The Words “for Ambulance Use Only” Must Be Marked On The Visible Part Of The Instrument Container Box. · Patient Monitor > Atleast 10 Inches Color Tft Led Display > 800 X 600 Pixels Resolution > Maximum Display Of 11 Channels; Auto Channel Height Adjustment Function > Lightweight & Ergonomic Design > Parameters: 3/5 Lead Ecg, Hr, Resp, Nbp, Spo2, Pr, Temp > With St Segment Analysis And 21 Calls Of Arrhythmia > Fast Spo2 Technology With Anti-motion And Low Perfusion Performance > Navigation Wheel For Information Input And Screen Navigation > Backlit Function Buttons For Quick Access To Key Functions > Bed-to-bed Overview Function For Up To 32 Monitors Without Central Monitoring System > Bi-directional Communication Via Lan Networking To A Central Monitoring System > Standard Hl7 Output > Fan-less Design To Reduce Dust Deposits > Applications From Neonate To Adult > With Oxycrg & Minitrend > With Big Number Screen, Dynamic Trend Screen, & Ocrg Screen > 4 User-defined Layout > Timing Clock Configurable From 5-30mins > 1,600 Sets Nbp Table > 1,200-hour Trend Graph Of All Parameters (with Data Manager Function) > 120-minute Full Disclosure Ecg 1 Waveform Review (with Data Manager Function) > 200 Sets Alarm Events & 200 Sets Arrhythmia Events > With Drug Calculation > With Hr Variation & Dynamic Blood Pressure Analysis > Rechargeable Lithium Ion Battery With 2.5 Hrs Of Operation > With Built-in 3-channel Recorder > Standard External Interface Available: Ecg Analog Output, Vga Output, Nurse Call, Lan, Usb > Patient Data Export Using A Usb Data Manager > Net Weight: Approximately 4.2kg Vii. Other Equipment And Accessories Note: The Items Below (except The Iv Holder) Must Be Marked With Non-removable Doh Logo And The Words “for Ambulances Use Only” On The Visible Part Of The Equipment. > Fire Extinguisher (rating 2a10bc), Five (5) Pounds, With Holder Mounted On The Ambulance Floor. > Heavy Duty Led Flashlight With At Least 1,000 Lumens Of Brightness With Extra Batteries. Iv Holder (mounted On The Ambulance Wall Head Side Of The Patient). > Digital Clock With At Least 4 Inch Display Mounted On The Ambulance Wall. > Air Purifier With Multi-stage Air Filters (pre-filter, Hepa, Carbon) And With Uv Light. > Garbage Container At Least 3 Liter Capacity And Made Of Fiberglass Reinforced Plastic Or Acrylonitrile Butadiene Styrene (abs) Plastic Material And With Lid Cover. The Container Must Be Properly Labelled And Must Be Mounted On The Ambulance Floor. > Sharps Container With Sliding Lid And At Least 1 Liter Capacity, Made Of Fiberglass Reinforced Plastic Or Abs Plastic Material. The Container Must Be Mounted On The Ambulance Wall. I. Other Requirments To Be Submitted During The Bid Opening 1. Product Brochure(s) Or Technical Data Sheet(s) In Hard And Soft Copies Showing The Technical Specifications Of The Following In English Language: A) Ambulance Vehicle B) Emergency Lights, Siren And Public Address C) Ambulance Stretcher D) Automatic External Defibrillator E) Nebulizer F) Examining Light G) Aneroid Sphygmomanometer H) Folding Stretcher I) Scoop Stretcher J) Heavy Duty Stethoscopes K) Non-contact Thermometer L) Blood Glucose Meter M) Manual Resuscitators N) Suction Machine O) Oxygen Therapy Set P) Laryngoscopes Set Q) Delivery Set R) Air Purifier S) Patient Monitor · Valid Marketing Authorization, Registration Approval Or Free Sale Certificate For The Automatic External Defibrillator Issued By The Health Authority In The Country Of Origin. · Valid Certificate Of Distributorship (as First Tier Distributor) Issued By The Foreign Manufacturers Or Local Distributors Of The Medical Equipment And Instruments Authorizing The Bidder To Sell/distribute Their Products. · Notarized Certificate From The Bidder: That The Brands Of The Medical Equipment And Instruments Have Been In The Local And/or International Market For At Least Ten (10) Years. > That Medical Equipment And Instruments Are Brand New, Unused, Not Discontinued Models And Were Not Subjected To Any Product Recall. · Bidder’s Valid And Current License To Operate (lto) As A Medical Device Distributor Issued By The Philippine Food And Drug Administration. · Valid And Current Certification Of Product Registration (cpr) For The Thermometer, Lancets In The Blood-glucose Meter And Manual Resuscitator Issued By The Philippine Food And Drug Administration (pfda) · Notarized Certificate From The Manufacturer Or Local Dealer Of The Ambulance/vehicle: > That The Manufacturer Has Been Manufacturing Vehicles With Diesel Engines For The Past Twenty Five (25) Years. > That The Ambulance/vehicle Is Brand New, Unused, Not A Discontinued Model And Was Not Subjected To Any Product Recall. · Proofs (such As Sales Invoice) That The Brand Of The Vehicle Has Already Been Sold In The Country As An Ambulance. Requirement/s If Declared The Lowest/single Calculated Bid · Site Inspection To The Bidder’s Facility To Verify/validate The Capability And Capacity Of The Bidder To Fabricate The Ambulances As Well As Sample Unit With Complete Medical Accessories. The Inspection Shall Be Conducted By The Procuring Entity Technical Working Group. This Requirement Is Not Applicable If The Facility Is Located Outside The Philippines. · Motor Vehicle Service Center Should Be Located In Each Province Namely Cebu, Bohol, & Negros Oriental In Order For The Recipient Facility To Have Easy Access During Preventive Maintenance. Requirements If Awarded The Contract · The Supplier Shall Provide Orientation/training On The Use And Maintenance Of The Ambulance, Medical Equipment And Instruments On A Schedule To Be Agreed Upon By Procuring Entity And The Winning Bidder. · The Supplier Shall Submit/provide The Following To The End User: > Operator’s Manual In English Language For The Ambulance, Medical Equipment And Instruments. > Certification Of Inclusive Preventive Maintenance Services From 10 Kilometer Up To 40 Kilometer With An Interval Of 10,000kms Or 6 Months Whichever Comes First At Any Manufacturer’s Service Center Branches In Central Visayas. > Warranty Certificate For Three (3) Years On Parts And Services For The Ambulance. The Manufacturer/dealer Shall Either Repair Or Replace Any Item Or Part In The Ambulance That Is Found To Be Defective In Material Or In Workmanship Under Normal Use. The Warranty Period Shall Commence From The Date Of Acceptance By The End-user After Testing And Commissioning. The Warranty Certificate Shall Include The Following: · That The Warranty For The Vehicle Shall Not Be Affected In Case A Change Of Dealer Occurs. That If The Ambulance Is Unable To Return To The Service Center During The Warranty Period, The Manufacturer/dealer Shall Provide Mechanics And/or Technicians That Can Perform On-site Service And Maintenance, Provided That The End User Will Shoulder The Travel Expenses. · Warranty Certificate For Two (2) Years On Parts And Services For Medical Equipment, Instruments And Ambulance Accessories. The Supplier Shall Either Repair Or Replace Any Item Or Part In The Said Equipment That Is Found To Be Defective In Material Or In Workmanship Under Normal Use. The Warranty Period Shall Commence From The Date Of Acceptance By The End-user After Testing And Commissioning. The Warranty Certificate Shall Include The Following: > The Bidder Shall Conduct The Necessary Corrective Maintenance Within Fifteen (15) Calendar Days Upon Notification Of Equipment Breakdown From The End-user. > The Bidder Shall Have The Primary Responsibility And Accountability To Ensure That In Case Of Defects, The Vehicle, Equipment, Instruments And/or Peripherals Are Appropriately Repaired Or Replaced And Shall Be In Good Working Condition Thereafter. · At Least Three (3) Years Validity Of The Vehicle From Land Transportation Office Region 7 (lto Ro7) Registration With Red Plate. This Is To Allow Easy Accessibility By The Recipient Lgus For The Processing And Transfer Of The Documents. · Third Party Liability (tpl) Vehicle Insurance For One (1) Year And Comprehensive Gsis Vehicle Insurance For One (1) Year. · Delivery > Delivery Schedule: Within 90 Calendar Days Upon The Receipt Of Purchase Order > Upon Delivery, Each Ambulance Shall Undergo Preliminary Physical Inspection By The Inspection Team Of The Procuring Entity To Ascertain The Physical Condition And Acceptability Of The Units. All Medical Equipment, Instruments, Ambulance Accessories And Peripherals Must Be Functioning And Must Have No Physical Damage. > All Land Ambulance Units Shall Be Filled Up With Crude Diesel At Full Tank Capacity Upon Delivery. · Terms And Conditions: > Supplier Must Not Have Any Pending Or Incomplete Delivery, Installation, Training And Demonstration Beyond The Delivery Period Indicated In The Purchase Order With Any Existing Doh-cvchd Projects. > The Supplier Must Coordinate With The Equipment Unit Head And Supply Officer On The Schedule Of The Delivery, Completion Of Training & Demonstration In Order To Facilitate Inspection Of The Doh Cvchd Inspection Team. Payment Will Only Be Made After Delivery And Installation. > Demonstration, Training & Completion Of The Accessories And Equipment Should Be Within 5 Days After The Delivery Of The Equipment. O *recipient Facility Shall Sign The Ptr Only If The Supplier Fully Complied With The Above The Supplier Shall Conduct Comprehensive Demonstration & Training For Staff And Support Services Till Familiarity With The Unit. A Copy Of The Certificate Of Training And Documentation During The Training Session Shall Be Provided To The End Users And Supply Office.
Closing Date10 Dec 2024
Tender AmountPHP 3 Million (USD 50.7 K)
Autobahnen Und Schnellstrassen Finanzierungs AG Tender
Others
Austria
Details: Asfinag Plans, Finances, Builds, Maintains And Operates The Entire Austrian Motorway And Expressway Network With A Length Of More Than 2,249 Km. Asfinag's Goal Is To Expand Austria's Motorway And Expressway Network Into The “intelligent Road Of The Future” And To Ensure Safety For Its Customers To Provide Convenient And Efficient Transportation Routes. Asfinag Maut Service Gmbh Is Responsible For The Collection Of Tolls On The Route Network, The Service Center, And The It Services. In The Security Environment, This Also Includes The Operation Of The Firewall Infrastructure For The Entire Austria-wide It Network. In Addition To Two Redundant Data Centers In The Area Of Vienna And The Central Office Location In Vienna, The Locations Are Primarily In The Traffic Management Centers In The Federal States As Well As Regional Highway Maintenance Depots. Today The Firewall Infrastructure Is Based On The “firepower” Product From Cisco. There Are Currently Three Types Of Hw Appliances From This Manufacturer In Use: - Type 9300 (including Virtual Instances): 6 Appliances - Type 4120: 2 Appliances - Type 2110: 29 Appliances Through The Locations Distributed Across Austria Is For The Provision Of Maintenance And Repair And In Order To Implement The Sla Specifications, An Austria-wide Service Organization Is Required. From An Architectural Perspective, A “destination Based Rule Set” Approach Is Used Today. However, A “source Based Rule Set” Approach Will Be Implemented In The Future. The Firewall Infrastructure (hardware And Software) Will Now Be Renewed In 2025. The Scope Of Services Includes The Following Points: - Hardware / Software (incl. Hw-lcm) / Firewall Management - Configuration Services / Change Management - Compliance And Audit Support - Maintenance And Servicing - Transition-in / Transition-out The Relevant Market Research In Accordance With Section 24 Is Also Included Bvergg 2018 Carried Out. The Aim Of Market Research Is To Evaluate The Current State Of Technology And The Potential Offer On The Market.
Closing Date26 Jan 2025
Tender AmountRefer Documents
GOVERNOR CELESTINO GALLARES MULTI SPECIALTY MEDICAL CENTER Tender
Healthcare and Medicine
Philippines
Details: Description Gov. Celestino Gallares Multi-specialty Medical Center Invitation To Bid For Supply, Delivery, Installation, Testing And Commissioning Of 4 Lots Various Medical Equipment (batch 2) For Gov. Celestino Gallares Multi-specialty Medical Center 1. The Gov. Celestino Gallares Multi-specialty Medical Center (gcgmsmc), Through The Health Facilities Enhancement Program 2024 Intends To Apply The Sum Of Ninety-two Million Pesos Only (php92,000,000.00) Being The Abc To Payments Under The Contract For Cb-2024-11-0004. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Gcgmsmc, Through The Health Facilities Enhancement Program 2024 Intends To Apply The Sum Of Ninety-two Million Pesos Only (php92,000,000.00) Being The Abc To Payments Under The Contract For Each Lot/item.et Al. Lot No. Item/description Quantity Unit Cost Total Cost 1 Treadmill With Electrocardiogram, Exercise / Stress Testing System + Cardiovascular Information System 1 35,000,000.00 35,000,000.00 2 Portable X-ray Machine 1 17,000,000.00 17,000,000.00 3 Ultrasound Machine 1 20,000,000.00 20,000,000.00 4 Flexible Endoscopy 1 20,000,000.00 20,000,000.00 Grand Total 92,000,000.00 Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Gcgmsmc, Now Invites Bids For The Above Procurement Project. Delivery And Installation Of The Goods Is Required Within 120 Calendar Days Upon Receipt Of Notice To Proceed. Bidders Should Have Completed, Within 3 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Gcgmsmc Through Electronic Mail Via Procurement@cpspecialtycenter.org Or Through The Cellular Number 09209437250. 5. A Complete Set Of Bidding Documents May Be Acquired And Downloaded By Interested Bidders From Gcgmsmc Google Drive From (procurement@cpspecialtycenter.org) On November 15- December 10, 2024 And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Indicated Below In Accordance With The Following Schedule: Lot No. Item/description Total Cost Bidding Documents Fee (in Philippine Peso) 1 Treadmill With Electrocardiogram, Exercise / Stress Testing System + Cardiovascular Information System 35,000,000.00 25,000.00 2 Portable X-ray Machine 17,000,000.00 25,000.00 3 Ultrasound Machine 20,000,000.00 25,000.00 4 Flexible Endoscopy 20,000,000.00 25,000.00 The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Through Online Banking Or Online Deposit With The Following Bank Details: Bank Name: Development Bank Of The Philippines Account Name: Gcg Multi-specialty Medical Complex Account Number: 00-0-15490-780-5 "for Bidders Choosing To Pay Via Online Transfer Or Bank Deposit, Please Ensure That Proof Of Your Successful Transaction Is Promptly Sent To The Procurement Email Address: Procurement@cpspecialtycenter.org. In Compliance With Coa Circular Number 2021-014, Clause 5.2, An Acknowledgement Receipt Will Be Issued As Proof Of Verified And Received Payment. Access To Bidding Documents Will Be Granted Only Upon Presentation Of This Acknowledgement Receipt. 6. The Gcgmsmc Will Hold A Pre-bid Conference On The 27th Day Of November 2024 At 0900h At Room 3c-e310 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur Cortes, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before The 10th Day Of December 2024 At 0900h At Gcgmsmc Procurement Office Room 3c-w327 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur, Cortes, Bohol. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On The 10th Day Of December 2024 At 0900h At Room 3c-e310 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur Cortes. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Together With Their Company Id. 10. The Gcgmsmc Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Submission Of Hardcopies: The Winning Bidders Shall Submit Their Original Eligibility And Technical Documents Described In Itb Clause 10 In One Sealed Envelope Marked "original - Technical Component", And The Original Of Their Financial Component In Another Sealed Envelope Marked "original Financial Component", Sealing Them All In An Outer Envelope Marked "original Bid". Each Copy Of The First And Second Envelopes Shall Have 2 Copies And Similarly Sealed Duly Marking The Inner Envelopes As "copy No. 1 Technical Component" And "copy No. 1- Financial Component” And "copy No. 2- Technical Component" And "copy No. 2- Financial Component" And The Outer Envelope As "copy No. 1" And "copy No. 2" Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. Please Take Note That All Notarized Documents Must Be Treated As Original Copies For All The Submitted Documents (original, Copy 1, And Copy 2). It Is Imperative That Each Copy Retains Its Original Notarization To Ensure Legal Validity And Compliance. The Original And The Number Of Copies Of The Bid As Indicated In The Itb Clause 15 Shall Be Typed Or Written In Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. All Envelopes Shall: A. Contain The Name Of The Contract To Be Bid In Capital Letters; B. Bear The Name And Address Of The Bidder In Capital Letters; C. Be Addressed To The Procuring Entity's Bac In Accordance With Itb Clause 1; D. Bear The Specific Identification Of This Bidding Process Indicated In The Itb Clause 1. 12. For Further Information, Please Refer To: Mary Grace L. Simbajon Jessa O. Quiñal Procurement Office Procurement Office Malayo Sur, Cortes, Bohol Malayo Sur, Cortes, Bohol Procurement@cpspecialtycenter.org Procurement@cpspecialtycenter.org +639209437250 +639452478632 November 14, 2024 Approved By, (signed) Doreen A. Lugo, Lpt Bac Chairperson Noted By, (signed) Laurence Elliot R. Tirol, Md, Fpcp Medical Center Chief I Head Of Procuring Entity --------------------------------------------------------------------------------------------------------- 1 1 Lot Supply, Delivery, Installation, Testing & Commissioning Of Treadmill With Electrocardiogram, Exercise / Stress Testing System + Cardiovascular Information System Treadmill With Electrocardiogram, Exercise / Stress Testing System Power Supply : Ac Operation; Input Voltage: 200 To 240 Volts Ac; Power Consumption: 350 Watts Max Display : At Least 22 Inch Diagonal Display Size; Resolution: At Least 1680 X 1050 Pixels; Tiltable Height Adjustable Flat Screen For Optimal Positioning Dedicated Workflow Keys Risk Stratification: Critical Algorithms, Including Heart Rate Recovery (hrr) And T-wave Alternans (twa) Functional Response: Metabolic Equivalents (mets) Level Indicated During Procedure Ischemia Detection: St/hr Hysteresis Analysis Which Improves Cad Detection Wireless Acquisition: Use Of Wireless Technology To Obtain Signals Or Data Capable Of Creating A Remote Workstation On Any Pc For Viewing Editing And Printing Stress Data Capable Of Adding Automated Blood Pressure And Oxygen Saturation Data Into The System System Is Capable Of Integrating With Stress Echocardiography, Nuclear Imaging, And Ambulatory Blood Pressure Analysis Open System Architecture Uses Industry Standard Communication Protocols Such As Dicom And Xml; Data Export Via Xml, Pdf And Xls To Match Emr Or His Files Automative Timeout And Log-in For Increased Security Advanced Security Protections Include Data Encryption, Username And Password Authentication, Secure Network Connections, Electronic Delivery Of Security Patches And Updates, Constant Threat Monitoring And Disaster Recovery Plan Weight: Patient Weight Capacity (kg): Up To 227; Treadmill Net Weight (kg): Up To 193 Power Requirements: 220/240 Vac, 1-phase, 50-60 Hertz, 20-amp Power Supply; Must Have Dedicated 15a Service Speed Range: 0.1 To 15.0 Miles Per Hour, 0.2 To 24.0 Kilometers Per Hour; Self-calibrating; Adjustable In 0.1 Mph Or 0.1 Kph Increments Incline Range: 0 To 25%, At Least 0.5% Incremental Movements; Self-calibrating Running Surface: At Least 56 By 160 Centimeters (cm); Running Belt Tracking System; Cushioned Running Deck Absorbs Shock Of Foot Falls; Self-lubricated And Reversible Running Deck; Step-up Low Profile Deck Height: At Least 18 Cm From Floor. Communication Ports: Rs232 Female Serial Port; Usb 1.0 “b” Port. Floor Surface Footprint: At Least 84 By 200 Cm Level Surface. Dual Comparative Speed Sensors Auto Runaway Shutdown Auto Communication Loss Shutdown Manual Twist Lock Emergency Stop Button Manual Stop Tether Braking System For Safe Patient Off-loading Fire Rated Motor Pan Hood Enclosure Cardiovascular Information System The System Shall Allow Cardiac Technologists To Enter Comments Which Will Not Be Reflected In The Report Or Distributed To Electronic Medical Record (emr). The Gui Should Allow Searching In Forms – Quick Search Of Specific Field Name, Label Or Value In Forms With Immediate Link Which Takes The User To The Field And Highlights It For Documentation. The Gui Should Allow Searching For Values Within Reports. The System Should Support Structured Reporting, With Quick Reports, Side By Side Reporting, And Real-time Synchronization Of The Report To Data Fields In The Form. Report Templates Must Be User-definable. The Reporting System Shall Be Able To Auto Populate Findings Where Relevant And The Cardiologist Must Be Able To Override Any Auto Populated Data. The System Should Support Comprehensive Reporting Functions For Structural Heart End-to-end Electrophysiology (ep) Workflow In Conjunction With Ep Recording System In The Market Pediatric Echo Reporting Incorporated With Boston Z-scores The System Should Support Ingestion And Non-editable Display Of Pdf Reports From 3rd Party Systems, Such As Hemodynamic Systems, Including Trackings/full Disclosure From Holter Monitoring Systems Or Ecg Management Systems The System Shall Be Able To Receive Studies Sent Directly From Modalities And Devices (without Drawing From Digital Imaging And Communications In Medicine (dicom) Modality Worklist). The System Shall Be Able To Automatically Create Patients From Received Studies, If The Patient Is Not Yet Available In The System Database. The System Shall Prevent Separate Cardiologists From Simultaneously Reporting On The Same Examination, And Alert The Users. The System Shall Have A Charge Verification And Communication Functionality To Hospital Billing It Systems. The System Should Support Result Distribution In A Variety Of Formats, Including Hl7, Pdf, And Sending Discrete Xml Values To External Systems Embedded Advanced Post-processing Tools For Cath And Us (2d, 3d And 4d) Via Dedicated Ultrasound Reporting System/picture Archive Communication System Embedded 3d Advanced Visualization With Advanced Processing Web-enabled Deployment Cardio Imaging Solution Integration 1280 X 1024 Resolution Particulars Workstation: (1) Unit Windows 10 64bit Or Newer Version X86 Microprocessor, Ram - At Least 32gb Ssd - At Least 512gb, Network - At Least 1gb With Peripheral Component Interconnect Express Slot For Medical Graphic Controller Worklist Monitor: (1) Unit Of At Least 27" Monitor Warranty : 5 Years And On The Graphic Controller, 20,000 Hours Backlight Warranty Guaranteed At 400cd/m2 Calibrated Luminance. Minimum Of Five (5) Year/s For Spare Parts & Service Upon Acceptance By End-user Conduct Free Preventive Maintenance At Least Semi-annually Or According To Manufacturer's Recommendation/s Within Warranty Period. Corrective Maintenance Within A Maximum Of Fourteen (14) Days Upon Notification From End-user; Technical Support Staff Response Time Within At Least Two (2) Hours Via Remote Access Or Maximum Of Twenty-four (24) Hours Either Via Physical Presence On Site. Equipment Down-time Within Warranty Period Due To Inherent Defect/s And/or Fault/s Shall Be Added To The Total Warranty Period Availability Of Support Staff Within Visayas Delivery, Installation, Commissioning, Permit/s, Training And Other Related Expenses Incurred Will Be Shouldered By Winning Bidder, Where Applicable Vendor Must Provide Intensive Operational Or Application Training With Certification/s For End-user/s And Intensive Technical Training For Maintenance/biomedical Staff. Vendor Must Have Existing/active Quality Management System Certification E.g. Ce0123 (medical Device), Or Its Equivalent For Importation, Warehousing, Installation & Servicing Of Active And Non-active Medical Services. Vendor And / Or Manufacturer Must Provide Fda Certificaton: Fda 510(k) K131246 Or Its Equivalent, If Applicable Vendor Shall Agree To Provide Factory Or Principal Manufacturer Training And/or Certification For At Least One (1) In-house Biomedical Technologist Or It Personnel And/or Other End User. Progress Billing And Payment May Be Availed By The Winning Bidder As Follows, Otherwise, Full Payment Is Due At The Completion Of The Project And Requirements: 15% Upon Delivery At Site; 30% Upon Complete Installation, And 55% Upon Completion Of Project And/or Acceptance Of End-user. Vendor Shall Warrant That The Product Supplied Shall Meet The Published Specifications. Vendor Shall Provide No Less Than Five (5) Years Warranty On Each Of The Equipment For Spare Parts And Service Upon Acceptance By End User/s. Vendor Agrees To Provide Free Of Charge All Parts And Labour Necessary To Repair Each Of The Equipment Purchased During The Period Covered By The Warranty And Replacement Of Any Item/s And/or Part/s Found To Be Defective In Material Or Workmanship Under Normal Use. Equipment Shall Be Delivered Complete With All Cabling, Connectors, And All Other Accessories Necessary For Full Operation Of The Equipment, Where Applicable. Vendor Must Certify That All Products Quoted Must Be In Current Production And Publicly Available As Of The Date Of This Tender. Unproven Future Products Shall Not Be Accepted. All Desired Features Listed Must Be In Current Production, Installed And In Use At The Time Of Quote/bid. Equipment Must Meet All Currently Applicable Safety Standards, Local And International Where Applicable. Vendor May Include Post-warranty Comprehensive Preventive Maintenance Program Proposal For The Next 3-4 Years And Must Also Indicate Cost Estimated For Major Spare Part/s. Any And All Components Not Manufactured By The Vendor/primary Manufacturer Shall Be Listed As Such With Name/address/contact Information Of The Manufacturer Supplied. Vendor Shall Provide Automatic Voltage Regulator (avr) And Uninterrupted Power Supply (ups) To Back Up The System. Equipment Shall Be Delivered With At Least Two (2) Copy Of All Service Manuals And At Least Two (2) Copy Of All User Manuals. Certification From The Manufacturer That The Units Are Brand New And Not With Any Issues Or Defect. Vendor Shall Confirm And Certify In Writing That Parts And Labor Will Be Available For The Quoted Equipment For Not Less Than Five (5) Years After The Warranty Period. Principal's/manufacturer's Product Portfolio Must Have Been Present In The Local Market For The Past Ten (10) Years. Equipment Must Be Manufactured By A Known And Reputable Company With Certificate Of Iso 9001:2015 And/or Iso 13485:2016 Or Its Equivalent. Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances. Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances. Principal’s / Manufacturer’s Products Must Have Been Present In The Local Market For The Past Ten (10) Years Vendor Shall Provide Integration, Interoperability And Migration Solutions Exclusively Using Filmless Platforms Such As Medical Grade Clinical Monitors, 2d/3d Workstations, Dicom Enabled Printers And Cd/dvd Medical Disc Publishers, Medical Film Digitizers , Dicom Archives, Foresight Analog To Digital Conversion System, Mri Compatible Infusion Pump And Patient Monitor, And Digital Or Suites ----------------------------------------------------------------------------------------------- 2 1 Lot Portable X-ray Machine General Information General Purpose Digital Mobile Xray For Patient In Recumbent And Seated 32 Kw At 100 Kv 100 Ms Large Focus And 16 Kw At 100 Kv 100 Ms Small Focus Non Motorized Examination Can Be Performed By Connecting To The Mainpower Switch 2-axis Counterbalanced Column Arm With 90° Tube Head Rotation And ± 317° Arm Rotation Allows Easy Adjustment For All The Different Projections Generator Power Output: Large Focus: At Least 32 Kw At 100 Kv 100 Ms Small Focus: At Least 16 Kw At 100 Kv 100 Ms Kvp Range: 40 Kv To 150 Kv Mas Range: 0.32 Mas To 200 Mas Kvp Accuracy: < ± 3 Kv (40 Kv To 60 Kv); < ± 5 Kv (60 Kv To 150 Kv) Mas Accuracy: At Least ± 0.1 Mas (0.32 Mas To 2 Mas); ± 6 % (> 2 Mas) Shortest Exposure Time: At Least 1 Ms Max. Exposure Time: At Least 3.2 S Exposure Release: Handswitch With 5 M Coiled Cord Or Infrared Remote Control 1 Protection Against Electric Shock: Class I Acc. To Iec 60601-1 Xray Tube Tube Housing (single Tank With Rotating-anode Tube) Stabilization: Microprocessor-based Adjustment And Regulation During Exposure Focal Spot Nominal Value: Dual (0.6 Mm / 1.2 Mm) Anode Angle: At Least 16° Anode Speed: At Least 180 Hz (high Speed) Heat Storage Capacity Of Tube Housing: At Least 830 Kj (1170 Khu) Heat Storage Capacity Of Anode: At Least 210 Kj (300 Khu) Collimator: Manually Adjustable Multileaf Collimator, Rotatable ± 90° Collimator Light And Light Field Intensity: Led Min. 180 Lux At 1 M Sid Advanced Collimator: Pediatric Filters For Lower Dose Imaging And V-laser For Even More Magnesium-alloy Shell-type Frame Dose Area Product Measurement Chamber Typical Filtration: At Least < 0.4 Mm Al Equivalent Dap Resolution: At Least 0.01 Μgym2 Maximum Measurable Dap: 1 X 105 Μgym2 Flat Panel Wireless Detector Wireless Detector: At Least 35 Cm X 43 Cm (14 In X 17 In) Detector Detector Technology: Csi Scintillator, Amorphous Silicon (a-si) Detector Acquisition Matrix: At Least 2304 X 2800 Pixels (full Iq Performance Area) Pixel Size: At Least 150 Μm Acquisition Depth (gray Scales): At Least 16 Bit Active Area: Up To 34.6 Cm X 42.0 Cm (13.6 In X 16.5 In) Thickness: At Least 15 Mm (0.6 In) Detector Weight: ≤ 3.7 Kg (8.2 Ibs) With Battery Max. Load: At Least 300 Kg (661 Ibs) (patient Lying Down) And At Least 100 Kg (220 Ibs) (patient Standing) Data Transfer: W-lan, 802.11 A/b/g/n/ac Battery Operation Capacity: At Least 8 Hours Operation Time With At Least 320 Images, 1 Image Every 90 Sec And At Least 840 Images In Operation Mode, 1 Image Every 30 Sec. Built-in Rechargeable Battery Battery Operating Time Of At Least 8 Hours Of Continuous Use Charging Location: External Battery Charger Charging Time From Empty State To Full Charge: Within 3 Hours Image Acquisition Image Display: Fit To Window View Of Full Image Image Processing Functions: Rotation, Vertical And Horizontal Flipping, Zoom,windowing For Contrast/brightness, Black/white Image Inversion Graphic Functions: Quantification With Angle Distance Measurement Text Functions: Marking, Annotations, Image Comments, R/l Markers Tube Line Enhancement: Amplified Display Of Tubes And Lines In The Image For Position Control Security: Malware Protection Data Transfer Dicom Network Interfaces: Transmission Of Images To A Dicom Network For Viewing And Archiving Confirmation From The Image Archive Storage Commitment Printing Of Images To A Dicom Laser Camera Via Virtual Film Sheet Retrieval Of Images To A Picture Archival System Get Worklist Function For Importing Patient Data From A Data Management System (ris/his) Cr And Dx Worklist Entries Modality Peroformance Procedure Step Function For Sending Examination Statistics And Dose Information To A Data Management System Sending Of Dose Values For Each Study To An Archiving System Documentation Image Data Management: Export To Usb Device In Jpg, Dicom Dcm Or Dicom Raw Transmission Of Images To Network Automatic And Selective Printing With Virtual Film Sheet Provide- Statistics Of Rejected Images Significant Features Wlan Connectivity For Increase Reach And Improved Connectivity Pediatric Filters Transparent Filters For Lowering The Patient Entry Dose Remote Service That Allows Hardware And Software Diagnosis, Customer Care Service And System Configuration Accessories Radiation Protection Equipment, Such As Lead Gowns, Gonadal Shields, And Thyroid Shields. Vendor Shall Warrant That The Product Supplied Shall Meet The Published Specifications. Warranty Period For Five (5) Years After The Acceptance. Minimum Of Five (5) Year/s For Spare Parts & Service Upon Acceptance By End-user. Vendor Must Repair Or Replace Any Item And/or Part/s Of The Equipment Found To Be Defective In Material Or In Workmanship Under Normal Use, Provided That The Equipment Is In Good Working Condition Thereafter, Within The Warranty Period. Conduct Free Preventive Maintenance At Least Semi-annually Or According To Manufacturer's Recommendation/s Within Warranty Period. Corrective Maintenance Within A Maximum Of Fourteen (14) Days Upon Notification From End-user; Technical Support Staff Response Time Within At Least Two (2) Hours Via Remote Access Or Maximum Of Twenty-four (24) Hours Either Via Physical Presence On Site. Equipment Down-time Within Warranty Period Due To Inherent Defect/s And/or Fault/s Shall Be Added To The Total Warranty Period. Availability Of Support Staff Within Visayas. Delivery, Installation, Commissioning, Permit/s, Training And Other Related Expenses Incurred Will Be Shouldered By Winning Bidder, Where Applicable. Vendor Must Provide Intensive Operational Or Application Training With Certification/s For End-user/s And Intensive Technical Training For Maintenance/ Biomedical Staff. Must Certify The Availability Of Spare Parts For The Next Five (5) Years. Vendor Must Have Existing/active Quality Management System Certification (e.g. Ce0123 Medical Device), Or Its Equivalent For Importation, Warehousing, Installation & Servicing Of Active And Non-active Medical Services. Vendor And / Or Manufacturer Must Provide Fda Certificaton: Fda 510(k) K170476 Or Its Equivalent. Shall Be Delivered With At Least Two (2) Copies Of User Manuals. Vendor Must Certify That All Products Quoted Must Be In Current Production And Publicly Available As Of The Date Of This Tender. Unproven Future Products Shall Not Be Accepted. All Desired Features Listed Must Be In Current Production For At Least 2 Years, Installed And In Use At The Time Of Quote/bid Vendor Shall Agree To Provide Factory Or Principal Manufacturer Training And/or Certification For At Least One (1) In-house Biomedical Technologist Or It Personnel And/or Other End User. Progress Billing And Payment May Be Availed By The Winning Bidder As Follows, Otherwise, Full Payment Is Due At The Completion Of The Project And Requirements: 15% Upon Delivery At Site; 30% Upon Complete Installation, And 55% Upon Completion Of Project And/or Acceptance Of End-user. Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances. Principal’s / Manufacturer’s Products Must Have Been Present In The Local Market For The Past Ten (10) Years Any And All Components Not Manufactured By The Vendor/primary Manufacturer Shall Be Listed As Such With Name/address/contact Information Of The Manufacturer Supplied Vendor Shall Confirm And Certify In Writing That Parts And Labor Will Be Available For The Quoted System For Not Less Than One (1) Year After The Warranty Period Vendor Shall Provide Integration, Interoperability And Migration Solutions Exclusively Using Filmless Platforms Such As Medical Grade Clinical Monitors, 2d/3d Workstations, Dicom Enabled Printers And Cd/dvd Medical Disc Publishers, Medical Film Digitizers , Dicom Archives, Foresight Analog To Digital Conversion System, Iramed, Mri Compatible Infusion Pump And Patient Monitor, And Digital Or Suites Vendor To Shoulder Any Expenses Related To Delivery, Installation, Commissioning, Permit/s,training And Other Sundries Necessary For The Complete Installation Of The Equipment ------------------------------------------------------------------------------------------------------------ 3 1 Lot Ultrasound Machine Electrical Power Voltage: 100 - 240 Vac Frequency: 50/60 Hz Power Consumption: Maximum Of 0.9 Kva With Peripherals Console Design At Least 4 Active Physical Probe Ports, At Least 1 Inactive Probe Storage Port Wireless Probe Connection, Capable Of Connecting Wireless And Linear Probe. Integrated Ssd (at Least 1 Tb) Integrated Dvd-r Multi Drive On-board Storage Of Thermal Printer With Inclusion Of At Least 10 Rolls Of Thermal Paper Integrated Locking Mechanism That Provides Rolling Lock And Caster Swivel Lock Front And Rear Handles Easily Removable Air Filters Operating System: Windows 10 Enterprise Ltsc 2019 (64-bit) Keyboard Operating Keyboard Adjustable In Height And Rotation Ergonomic Hard Key Layout Interactive Back-lighting Integrated Recording Keys For Remote Control Of Up To 4 Peripheral Devices Or Dicom Devices Integrated Gel Warmer Touch Screen At Least 12-inch High-resolution, Color, Touch, Display Screen Interactive Dynamic Software Menu Brightness Adjustment Key/feature Monitor At Least A 23.8-inch Wide, High-resolution High Definition Unit Display. Can Be Moved At Least 350 Mm (13.7 Inches) Horizontally In Both Directions. Can Be Moved At Least 150 Mm (5.9 Inches) Vertically At Least A 90° Swivel In Both Directions. Fold-down And Lock Mechanism For Transportation Resolution: At Least 1920 X 1080 Pixels. Anti-glare Viewing Angle: 89°/89°/89°/89°. Transducer Type Sector / Phased Array Curved Linear Array Microcurved Linear Array Linear Array Matrix Array (linear) Volume Probes (4d) Split Crystal Transesophageal Echocardiogram (tee) Probe Operating Modes Capability Brightness Mode / 2d Grayscale Motion Mode Color Flow Mode Power Doppler With Directional Map Non Doppler Color Flow For Hemodynamic Study Digital Tgc With 8 Independent Controls System Features Pre-programmable Categories Simplified User Interface For High Volume Workflow Maximum System Bandwidth: 25 Mhz Cine Memory: At Least 1 Gb Connectivity: (a) Can Do Lan Or Wireless (b) Dicom 3.0 (c) Public Sr Template (d) Structured Reporting Compatible With Vascular, Obstetric (ob), Cardiac And Breast Standards (e) Remote Monitoring Scanning Parameters Digital Beamforming;infinite Number Of Effective Channels Frame Rate: At Least 9,000 Hz Displayed Imaging Depth: 0 – 100 Cm Doppler Mode: (a) Prf: 0.4 Khz - 35.5 Khz (b) Velocity Range: ± 10 - 2,870 Cm/s Minimum Depth Of Field: 0 - 2 Cm (zoom) (probe Dependent) Maximum Depth Of Field: 0 – 100 Cm (probe Dependent) Continuous Dynamic Receive Focus Software Features Automatic Optimization Optimize B-mode Image To Help Improve Contrast Resolution With One Button Press Selectable Amount Of Contrast Resolution Improvement (low,medium, High) Continuously Adjusts B-mode Axial And Lateral Gain Uniformity And Overall Gain Level Suppressing The Noise Adjusts Region Of Interest Position, Sample Volume Position, And Steering With One Button Press Capable Of Non Doppler Color Flow For Hemodynamic Study Easy, Fast Visualization Of Tiny Vessels, Displaying As A 3d Effect. Available In Color, Power Doppler And Microvascular Imaging (mvi) Assistant Protocol Workflow Enhancement Tool For Standardized And Repetitive Exams Include Factory Programs User-defined Programs And Import Functionality Steps Include Image Annotations, Mode Transitions, Basic Imaging Controls And Measurement Image Comparison Side-by-side Comparison Of Previous Ultrasound And Other Modality Exams During Live Scanning Strain Elastography Qualitative And Semi-quantitative To Assess The Stiffness Of A Tissues. Should Be Able To Have A Qualitative Graph To Show Consistency Of Compression Available On Convex, Linear And Endovaginal Probe Shear Wave Elastography Quantitative Software For Assessing The Stiffness Of A Tissue. Measured In Kpa Or M/s Or Kpa And M/s With Quality Mode Can Do Multiple Acquisition Of Frames In One Breath Hold Able To Do A Re-measure In The Archives Available On Convex, Linear (low And High Frequency) And Endovaginal Probe Live Steatosis Quantification Able To Quantify Fatty Liver Hepatic Protocol Able To Measure Liver Steatosis And Liver Stiffness At The Same Frame. Able To Capture Multiple Frames In One Breath Hold. Virtual Convex Provides A Convex Field Of View Should Be Compatible To Spatial Compounding Available On All Linear And Sector Transducers Speckle Reduction Imaging High Definition Speckle Reduction Imaging Compatible With Side-by-side Dual-view Display Compatible With All Linear, Convex And Sector Transducers Compatible With B-mode, Color, Contrast Agent And 3d/4d Imaging Pre And Post Processing Panoramic Imaging Allows A Real-time Representation Of Long Anatomical Areas (e.g.patellar Tendon), Can Scan Up To 60 Cm Length Home Page Collection Of User’s Favorite Parameters From Measurement/comments/body Patterns Programmable Buttons Measurement For B/m/doppler User Defined Annotation For Selected Exam Category Continuous Optimization Delivers Continuously Optimized Images With Incredible Uniformity From Near To Far Field Artificial Intilligence (ai) Based Features System Capable That The User To Identify A Lesion In Breast, Thyroid Or Liver Lesion And On One Click, The Ultrasound Will Automatically Trace The Lesion System Capable To Automatically Measure The Fetal Biometry. Can Be Turned On And Off. An Ai Based Software That Automatically Determines The Location Of Vessels Both For Color Doppler And Pulsed Wave (pw) Mode. System Familiarization With The Color Preset For Abdominal Ultrasound. Automatic Measurement Of Kidney For Both Left And Right. Breast Measurement Package A Dedicated Breast-specific Measurement Package That Allows User To Make Labeling, Measuring And Describing Lesion Easy Leverage The Bi-rads Lexicon Criteria/assessment Organizes Multiple Measurements Into A Convenient Worksheet Thyroid Measurement Package Thyroid-specific Measurement Package Enables Labeling, Measuring And Describing Nodules, Lymph Nodes And Parathyroids Multiple Measurements Can Be Organized Into A Convenient Worksheet And Sends Results Via Dicom Sr Auto Intima Media Thickness (imt) Automated Method Of Measuring The Intima Media Thickness Of The Common Carotid Artery (cca) Or Internal Carotid Artery (ica) From Multiple Samples Across A User Defined Length. Photo Assistant Photograph Relevant Anatomy And Include Photos With The Clinical Images Provides Value Context For Documentation And Comparison After A Procedure Utilizes Tablet Or Phone Remote App With The Use Of Android Phone Or Tablet, The Ultrasound System Can Be Utilized Using Major Keys Like Major Modes, Freeze/print, Cursor And Etc Fusion Imaging The System Must Support A Technique That Fuses Two Different Imaging Modalities. For Hepatic Interventions, Real-time Ultrasound (us) Should Be Capable Of Being Fused With Other Imaging Modalities, Including Ct, Mri, And Pet/ct. Convex, Microconvex And Linear Probe To Have An Integrated Gps Tracker When Using The Fusion Feature. Improved Speckle Reduction Imaging Acquire Extraordinary Images Across A Broad Range Of Patients, With Incredible Uniformity From Near- To Far-field And The Penetration Power To Manage High-bmi Patients Efficiently. Micro Vascular Imaging Detects Slow Flow And Small Vessels With New Clutter Filtering, And Can Use Together With The 3d Like Feature Blood Flow. Start Protocol Automatically Select Category, Probe, Preset, Or Scan Assistant From Worklist Exam Description Learn The Category, Probe, Preset, And Scan Assistant Based On Exam Description 3d/4d Ultrasound Three-dimensional Image And Provide An Even Clear Image Of The Baby. Enhanced 3d Image A Skin Like Appearance Of A 3d/4d Image To Better Asses The Structure Of A Fetus. 3d/4d Image Rendering Automate Render Line Placement In 3d/4d Imaging, Enabling Clinicians To Easily Acquire Surface-rendered Images. Probes Convex Probe Application: Abdomen, Ob/gyn, Pediatric, Peripheral Vascular, General Musculoskeletal Bandwidth: 1.0 – 6.0 Mhz Number Of Elements: At Least 192 Field Of View (max.): 80° Cardiac/ Sector Probe Application: Adult Cardiac, Pediatric Cardiac, Adult Cephalic, Abdominal Imaging Bandwidth: 1.0 - 5.0 Mhz Number Of Elements: At Least 288 Field Of View (max.) : 120° Wireless Probe, Convex And Linear Convex Applications: Abdomen, Ob, Peripheral Vascular, General Musculoskeletal, Superficial Musculoskeletal, Cardiac And Pleural Bandwidth: 2 - 5 Mhz Number Of Elements: At Least 128 Field Of View (max.): 67° Linear Applications: Peripheral Vascular, Thyroid, Scrotal, Breast, General Musculoskeletal, Superficial Musculoskeletal, Pediatric Cephalic And Pleural Bandwidth: 3 - 12 Mhz Number Of Elements: At Least 192 Field Of View (max.): 38 Mm Linear Probe 1. Applications: Abdomen, Peripheral Vascular, Neonatal, Pediatric, Neonatal Transcranial, General Musculoskeletal, Superficial Musculoskeletal And Small Parts Inculding Breast, Thyroid And Scrotal 2. Bandwidth: 4.0 – 16.0 Mhz 3. Number Of Elements: At Least 1008 4. Field Of View (max.): 50 Mm Endocavitary Probe 1. Applications: Ob/gyn, Urology 2. Bandwidth 3.0 – 10.0 Mhz 3. Number Of Elements: At Least 192 4. Field Of View (max.): 180° Convex Volume Probe 1. Application: Abdomen, Ob/gyn, Pediatric, Neonatal 2. Bandwidth: 2.0 - 8.0 Mhz 3. Number Of Elements: At Least 192 4. Field Of View (max.): 80° Endocavitary Volume Probe 1. Application: Ob/gyn, Urology 2. Bandwidth: 3.0 - 10.0 Mhz 3. Number Of Elements: At Least 192 4. Field Of View (max.): 180° Vendor Shall Warrant That The Product Supplied Shall Meet The Published Specifications. Vendor Shall Provide (5) Years Warranty For Equipment Covering 1 Probe From 2nd Year To 5th Year Upon Acceptance By End User/s. Vendor Agrees To Provide Free Of Charge All Parts And Labour Necessary To Repair Each Of The Equipment Purchased During The Period Covered By The Warranty And Replacement Of Any Item/s And/or Part/s Found To Be Defective In Material Or Workmanship Under Normal Use. Equipment Shall Be Delivered Complete With All Cabling, Connectors, And All Other Accessories Necessary For Full Operation Of The Equipment, Where Applicable. Vendor Must Certify That All Products Quoted Must Be In Current Production And Publicly Available As Of The Date Of This Tender. Unproven Future Products Shall Not Be Accepted. All Desired Features Listed Must Be In Current Production, Installed And In Use At The Time Of Quote/bid. Conducts Bi-annnual Preventive Maintenance And Calibration With Corresponding Certificates And Stickers Attached To The Unit. Vendor Must Respond With Technical Support Staff, Either Remotely Within Two (2) Hours Or In-person Where Applicable, Within At Least Twenty-four (24) Hours Upon Notification Of End-user; Must Perform Corrective Maintenance Within A Maximum Of Fourteen (14) Days Upon Notification Of End-user; Equipment Must Meet All Currently Applicable Safety Standards, Local And International Where Applicable. Vendor May Include Post-warranty Comprehensive Preventive Maintenance Program Proposal For The Next 3-4 Years And Must Also Indicate Cost Estimated For Major Spare Part/s. Any And All Components Not Manufactured By The Vendor/primary Manufacturer Shall Be Listed As Such With Name/address/contact Information Of The Manufacturer Supplied. Vendor Shall Provide Automatic Voltage Regulator (avr) And Uninterrupted Power Supply (ups) To Back Up The System. Equipment Shall Be Delivered With At Least Two (2) Copy Of All Service Manuals And At Least Two (2) Copy Of All User Manuals. Certification From The Manufacturer That The Units Are Brand New And Not With Any Issues Or Defect. Vendor Shall Confirm And Certify In Writing That Parts And Labor Will Be Available For The Quoted Equipment For Not Less Than Five (5) Years After The Warranty Period. Vendor Shall Provide Comprehensive Training Of Users In Operation, Basic And Advance Maintenance Shall Be Provided With Certificates, Vendor Shall Agree To Provide Factory Or Principal Manufacturer Training And/or Certification For At Least Two (2) In-house Biomedical Technician Or Engineer And End User. Principal's/manufacturer's Product Portfolio Must Have Been Present In The Local Market For The Past Ten (10) Years. Equipment Must Be Manufactured By A Known And Reputable Company With Certificate Of Iso 9001:2015 And Iso 13485:2016 Or Its Equivalent. Progress Billing And Payment May Be Availed By The Winning Bidder As Follows, Otherwise, Full Payment Is Due At The Completion Of The Project And Requirements: 15% Upon Delivery At Site; 30% Upon Complete Installation, And 55% Upon Completion Of Project And/or Acceptance Of End-user. Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances. -------------------------------------------------------------------------------------------------------- 4 1 Lot Flexible Endoscopy Video Processor High Definition Video Outputs: Digital Visual Interface, Serial Digital Interface, Video Graphics Array Standard Video Outputs: S-video, Composite Video Baseband Signal Hd Video Recording: Built-in Workstation, Data Management & Report Editing After Procedure Can Access Data Management, Report Editing, Image Capture And Hd Video Recording Hard Disk: At Least 500gb Internal Capacity Power Requirement: 220-240 V, 60 Hz Chromoendoscopy Modes: Spectral Focused Imaging, Versatile Intelligent Staining Digital Zoom: 1.4x, 1.6x, 1.8x Color Adjustment: Red, Blue, Chroma, ±15 Levels Patient Data: At Least 10000 Records Lightsource Main Lamp: At Least 4 Light Emitting Diode Lamps With Average Working Hours Of At Least 10,000 Hours With Lifetime Indicator Light Control: Manual And Auto Adjust Air Pump: Off, Low, Mid, High Hot Plugging With Spectral Focused Imaging, Versatile Intelligent Staining With White Light Mode Power Requirement: 220-240 V, 60 Hz Monitor Medical Grade Light Emitting Diode Monitor With At Least 26 Inches Size Resolution: At Least Full Hd 1080p Visual Angle: Horizontal 178° / Vertical 178° Video Signal Input : Digital Visual Interface X1, Video Graphics Array X1, Video X1, Serial Digital Interface X1 Video Signal Output : Digital Visual Interface & Serial Digital Interface Power Requirement: 220-240 V, 60 Hz Trolley With Master Switch And Centralized Power Control With At Least Four (4) Layer Racks With Scope Holders With Built In Automatic Voltage Regulator Gastroscope Depth Of View (mm): 3-100 Field Of View: At Least 140° Distal End Diameter (mm): At Least 9.3 Bending Section Diameter (mm): At Least 9.3 Instrument Channel Diameter (mm): At Least 2.8 Angulations: At Least Up:210°; Down:90°; Left:100°; Right:100° Working Length (mm): At Least 1050 Total Length (mm): At Least 1350 Inclusion Of Distal End Cap Colonoscope Depth Of View (mm): 3-100 Field Of View: At Least 140° Distal End Diameter (mm): At Least 12 Bending Section Diameter (mm): At Least 12.5 Instrument Channel Diameter (mm): At Least 3.8 Angulations: At Least Up:180°; Down:180°; Left:160°; Right:160° Working Length (mm): At Least 1350 Total Length (mm): At Least 1700 Inclusion Of Distal End Cap Particulars Vendor Shall Warrant That The Product Supplied Shall Meet The Published Specifications. Vendor Shall Provide No Less Than Five (5) Years Warranty On Each Of The Equipment For Spare Parts And Service Upon Acceptance By End User/s. Vendor Agrees To Provide Free Of Charge All Parts And Labour Necessary To Repair Each Of The Equipment Purchased During The Period Covered By The Warranty And Replacement Of Any Item/s And/or Part/s Found To Be Defective In Material Or Workmanship Under Normal Use. Equipment Shall Be Delivered Complete With All Cabling, Connectors, And All Other Accessories Necessary For Full Operation Of The Equipment, Where Applicable. Vendor Must Certify That All Products Quoted Must Be In Current Production And Publicly Available As Of The Date Of This Tender. Unproven Future Products Shall Not Be Accepted. All Desired Features Listed Must Be In Current Production, Installed And In Use At The Time Of Quote/bid. Conducts Bi-annual Preventive Maintenance And Calibration With Corresponding Certificates And Stickers Attached To The Unit. Vendor Must Respond With Technical Support Staff, Either Remotely (2 Hours) Or In-person Where Applicable, Within At Least Twenty-four (24) Hours Upon Notification Of End-user; Must Perform Corrective Maintenance Within A Maximum Of Fourteen (14) Days Upon Notification Of End-user. Equipment Must Meet All Currently Applicable Safety Standards, Local And International Where Applicable. Vendor May Include Post-warranty Comprehensive Preventive Maintenance Program Proposal For The Next 3-4 Years And Must Also Indicate Cost Estimated For Major Spare Part/s. Any And All Components Not Manufactured By The Vendor/primary Manufacturer Shall Be Listed As Such With Name/address/contact Information Of The Manufacturer Supplied. Vendor Shall Provide Automatic Voltage Regulator (avr) And Uninterrupted Power Supply (ups) To Back Up The System . Equipment Shall Be Delivered With At Least Two (2) Copy Of All Service Manuals And At Least Two (2) Copy Of All User Manuals. Certification From The Manufacturer That The Units Are Brand New And Not With Any Issues Or Defect. Vendor Shall Confirm And Certify In Writing That Parts And Labor Will Be Available For The Quoted Equipment For Not Less Than Five (5) Years After The Warranty Period. Vendor Shall Provide Comprehensive Training Of Users In Operation, Basic And Advance Maintenance Shall Be Provided With Certificates, Vendor Shall Agree To Provide Factory Or Principal Manufacturer Training And/or Certification For At Least Two (2) In-house Biomedical Technician Or Engineer And/or End User. Principal's/manufacturer's Product Portfolio Must Have Been Present In The Local Market For The Past Ten (10) Years. Equipment Must Be Manufactured By A Known And Reputable Company With Certificate Of Iso 9001:2015 And/or Iso 13485:2016 Or Its Equivalent. Progress Billing And Payment May Be Availed By The Winning Bidder As Follows, Otherwise, Full Payment Is Due At The Completion Of The Project And Requirements: 15% Upon Delivery At Site; 30% Upon Complete Installation, And 55% Upon Completion Of Project And/or Acceptance Of End-user. Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances.
Closing Date10 Dec 2024
Tender AmountPHP 92 Million (USD 1.5 Million)
DEPT OF THE AIR FORCE USA Tender
Software and IT Solutions
United States
Details: Proposal Due Date And Time: This Baa Will Remain Open For A Period Of Seven (7) Years From The Date Of Publication. No Proposals Should Be Submitted Against This Overarching Baa. Proposal Due Dates And Times Will Be Specified In Calls Published Separately From The Overarching Announcement. Proposals Received After The Due Date And Time Specified In The Call Shall Be Governed By The Provisions Of Far 52.215- 1(c)(3). It Should Be Noted That This Installation Observes Strict Security Procedures To Enter The Facility. These Security Procedures Are Not Considered An Interruption Of Normal Government Processes, And Proposals Received After The Above Stated Date And Time As A Result Of Security Delays Will Be Considered “late”. Note: If Offerors Use Commercial Carriers For Delivery Of Proposals, Carriers May Not Honor Time-of-day Delivery Guarantees On Military Installations. Early Proposal Submission Is Encouraged.
i. Program Description
1. Program Background
vanguard Center (formerly Known As Maui High Performance Computing Center Mhpcc) Is One Of Five Defense Supercomputing Resource Centers (dsrcs) For The Department Of Defense (dod) High Performance Computing Modernization Program (hpcmp), And Provides Advanced, High-performance Computing Tools Based On The Latest Technologies To Government Researchers. The Mission Of The Vanguard Center Is To Evaluate And Optimize Early-production Hpc Technology And Provide Breakthrough Software Solutions To Significantly Increase The Breadth And Impact Of The Hpcmp. The Strategic Focus Areas Of The Vanguard Center Are: ‐ Exploring And Evaluating Emerging Hpc Architectures And Technologies ‐ Developing Breakthrough, Hpc-backed Solutions For High Priority Dod Use Cases ‐ Lowering Barriers To High Productivity Computing By Creating A Modern Hpc Ecosystem In Addition To The Hpcmp-focused Mission, The Vanguard Center Contributes To The Afrl Modeling, Simulation, And Data Analytics (ms&a) Enterprise Which May Include Supporting Real Time, Physics-based Campaign Level As Well As Space Situational Analyses. The Vanguard Center Also Plans To Demonstrate High Impact Hpc Integration And Federation To Address Dod Needs In The Pacific Theater.
requirement Description
the R&d Requirement For This Baa Is Based On The Vanguard Center’s Mission To Evaluate And Optimize Earlyproduction Hpc Technology And Provide Breakthrough Software Solutions To Significantly Increase The Breadth And Impact Of The Hpcmp. In Particular, Research Objectives Center On Emerging Technologies And Lowering Barriers To The Use Of Hpc. Vanguard Center Is Seeking To Reduce Risk And Improve Performance By Transitioning Hpc Research And Benchmarking Hardware, Application Software, Networking And Refactoring Approaches Into Hpcmp Research System Procurement Activities; Identify And Exploit Trends In Hpc Hardware And Software To Deliver Capability And Decrease Time To Solution For R&d. Additionally, The Vanguard Center Is Seeking To Advance Dod Productivity Through A Modern Hpc Ecosystem. This Ecosystem Will Integrate Hardware (hw) And Software (sw) To Create Dynamic Workflows, Increased Accessibility, And Enhanced Collaboration By Identifying Trends In Best Software And Command And Control (c2) Practices To Improve Effectiveness And Productivity Of R&d, Including Secure Access To Hpc Using Modern Hardware And Software. Tasks Associated With These Technical Objectives May Include:
‐ Exploring New Architectures For Hpc Applicability Such As: Many Core; Gpgpus; Arm64; Next Generation X86; Data-intensive; Cognitive; Quantum; Mls
‐ Developing New Software Approaches For Hpc Applicability Such As: Python (+ Extensions); Domain Specific Languages (dsl)
‐ Researching New Networking Approaches For Hpc Applicability And Utility, To Include Programmable Networks
‐ Exploring New Network And System Interfaces Such As Optical Networks Fused With Optical Interconnections And Chip Photonics
‐ Exploring And Developing New Computer/software/network Ecosystems Such As Interactive Computing And Rendered Results Via Jupyter Notebooks Over Application Driven Networks
‐ Developing New And/or Updating Legacy Software (aka: Code Refactoring) For Use With New And Emerging Hpc Architectures
‐ Researching New Network And Software Interfaces And Developing Software To Provide Secure Access Of Hpc At Different Levels Of Security Through Modern Browsers And Devices, To Include Application Driven Networks
‐ Researching And Developing Hpc Workflow Extractions To Support A Broad Class Of Physics-based Modeling And Simulation Techniques For Test And Integration And Speeding Time To Solution Through Innovative Use Of Hpc Hardware And Software
afrl May Seek Teaming-approaches For Testing And Disseminating Capabilities As Ancillary To These Technical Areas. The Teams May Be Established By Parties External To The Research Or In Addition To Government Personnel.
deliverable Items: The Following General Data Deliverables Are Representative Of The Types Of Data That May Be Required For Any Call: (1) Program Plan With Updates As Needed; (2) Test Plans; (3) Monthly Status/financial Reports; (4) Technical Reports; (5) Computer Program Documentation/software User Manuals; (6) Computer Program/software Source Code; (7) Final Scientific And Technical Reports; (8) Presentation Materials; (9) Patent Reports; And (10) Prototypes. Data Deliverables Are Subject To Negotiations On Each Individual Call. The Scientific And Technical Report Shall Be Prepared Iaw The Most Current Afrl Ansi/niso Standard Z39.18-2005 Guidelines, Or Other Most Current Report Preparation Guidance.
2. Schedule: The Period Of Performance Will Be Stated In The Call.
3. White Papers/proposals: White Papers Are Brief Descriptive Summaries That Can Be Submitted By Offerors For Consideration In Response To This Baa Solicitation As Specified Per Individual Call (see Section V For Information On White Paper Evaluation Procedures). Offerors Whose White Papers Are Evaluated As Satisfying The Technical Merit Factor (section V, Paragraph 2), And For Which It Is Determined There Is Sufficient Funding Available, Will Be Asked To Submit A Full Technical And Cost/business Proposal. Offerors Whose White Papers Were Not Selected To Submit A Technical Cost/business Proposal Will Be Notified.
4. Organizational Conflict Of Interest (oci): Oci, If Applicable, Will Be Determined And Addressed At The Call Level.
5. System For Award Management (sam): Unless Exempted By 2 Cfr 25.110 All Offerors Must: (1) Be Registered In The System For Award Management (sam) Prior To Submitting An Application (for An Award) Or Proposal; (2) Maintain An Active Sam Registration With Current Information At All Times During Which It Has An Active Federal Award Or An Application Or Proposal Under Consideration By An Agency; And (3) Provide Itsduns Number In Each Application Or Proposal It Submits To The Agency. On-line Registration Instructions Can Be Accessed From The Sam Home Page At Www.sam.gov.
potential Offerors That Are Notified As Eligible For An Award Must Submit Annual Electronic Representations And Certifications Via The System For Award Management (sam) Website At Www.sam.gov. These Far And Dfars Level Representations And Certifications Are Required In Addition To The Representations And Certifications That Will Be Attached To Each Call. Before Submitting The Electronic Representations And Certifications, Contractors Must Be Registered In The Systems For Award Management (sam) Database.
ii. Award Information
1. Anticipated Funding: The Estimated Overarching Baa Ceiling Is $48.0m. All Funding Is Subject To Change Due To Government Discretion And Availability. All Potential Offerors Should Be Aware That Funding In Any Or All Areas May Change With Little Or No Notice Due To Unanticipated Budget Fluctuations.
2. Anticipated Number Of Awards: The Air Force Anticipates Awarding One Or More Contracts, And May Consider An Assistance Instrument, Or Other Transaction Procurements (otps). The Air Force Reserves The Right To Select All, Part, Or None Of The Proposals Received, Subject To The Availability Of Funds. * A Version Of This Baa For Assistance Instrument Opportunities Will Be Posted On Www.grants.gov.
3. Anticipated Award Date: It Is Anticipated This Baa Will Remain Open For A Period Of Seven (7) Years From The Date Of Publication. This Baa Will Be Reviewed Annually. Any Updates Or Possible Cancellation Will Be Issued As An Amendment To The Baa. This Annual Review And Subsequent Amendment To The Baa Shall Meet The Requirement Of Far 35.016 To Publish The Baa No Less Frequently Than Annually.
4. Anticipated Period Of Performance: The Period Of Performance Will Be Determined For Each Contract Award Based On The Requirements Of The Effort.
5. Funding Restrictions: The Cost Of Preparing White Papers And/or Proposals In Response To A Call Is Not Considered An Allowable Direct Charge To Any Resulting Contract Or Any Other Contract, But May Be An Allowable Expense To The Normal Bid And Proposal Indirect Costs Specified In Far 31.205-18(c), Independent Research And Development And Bid And Proposal Costs.
iii. Eligibility Information
1. Eligible Offeror/applicants: All Responsible Sources Capable Of Satisfying The Government's Needs May Submit A Proposal. Small Businesses, Small Disadvantaged Business (sdb), Woman-owned Businesses, And Service-disabled Veteran-owned Businesses Are Encouraged To Submit Proposals; However, No Part Of This Announcement Will Be A Set-aside. Foreign Or Foreign-owned Offerors Are Advised That Their Participation Is Subject To Foreign Disclosure Review Procedures. Foreign Or Foreign-owned Offerors Should Immediately Contact The Contracting Office Focal Point Identified In The Call For Information If They Contemplate Responding. All Correspondence Must Reference The Baa Number, The Baa Title And The Call Number.
2. Federally Funded Research And Development Centers: The Following Guidance Is Provided For Federally Funded Research And Development Centers (ffrdcs) Contemplating Submitting A Proposal, As Either A Prime Or Subcontractor, In Response To A Call Against This Baa. Far 35.017-1(c)(4) Prohibits An Ffrdc From Competing With Any Non-ffrdc Concern In Response To A Federal Agency Request For Proposal For Other Than The Operation Of An Ffrdc (with Exceptions Stated In Dfars 235.017-1(c)(4)). There Is No Regulation Prohibiting An Ffrdc From Responding To A Solicitation. However, The Ffrdc’s Sponsoring Agency Must First Determine Whether The Proposed Effort Falls Within The Purpose, Mission, General Scope Of Effort, Or Special Competency Of The Ffrdc, And That Determination Must Be Included In The Ffrdc’s Proposal. In Addition, The Non-sponsoring Agency Must Determine If The Work Proposed Would Place The Ffrdc In Direct Competitionwith Domestic Private Industry. Only After These Initial Determinations Are Made Will A Determination Be Made Concerning The Ffrdc’s Eligibility To Receive An Award.
3. Government Agencies: If A Government Agency Is Interested In Performing Work, Please Contact The Technical Point Of Contact (tpoc) Identified In The Call. If Discussions Result In A Mutual Interest To Pursue Your Agency's Participation, The Effort Will Be Pursued Independently Of This Baa.
4. Security Classification: Depending On The Work To Be Performed, The Offeror May Require A Classified Facility Clearance And Safeguarding Capability; Therefore, Personnel Identified Must Be Cleared For Access To Information At The Equivalent Level Of Security At The Time Of Award. In Addition, The Offeror May Be Required To Have, Or Have Access To, A Certified And Government-approved Facility To Support Work Under A Call. If A Dd Form 254 Is Applicable, It Will Be Specified In The Individual Call With The Applicable Far Clause Attached. Offerors Must Verify Their Cognizant Security Office Information Is Current With Defense Security Service (dss) At Www.dss.mil. Calls Are Anticipated To Be Unclassified. For Calls Requiring Access To Classified Information, Offerors Must Have A Valid U.s. Security Clearance Of Secret Or Higher In Order To Respond. Calls Including Information Classified At The Secret Or Higher Level Will Be Released Only To Offerors Possessing The Appropriate Clearance. All Classified Material Will Be Handled In Accordance With E.o. 13526, National Industrial Security Program Operating Manual (nispom) Dod 5220.22-m, Dod Industrial Security Program 5200.01 Volume 1 Through 4, And Afi 16-1406.
5. Foreign Participation:
a. Foreign Or Foreign-owned Offerors Are Advised Their Participation Is Subject To Foreign Disclosure Review Procedures. Foreign Or Foreign-owned Offerors Should Immediately Contact The Contracting Office Focal Point Identified In Section Vii For Information If They Contemplate Responding. Foreign Contractors Will Not Be Permitted To Participate At The Prime Contractor Level If It Is Determined The Acquisition Requires Access To Classified Information.
b. Afrl Policy On Employment Of Non-us Citizen Contractors Applies To This Baa. Contractor Employees Requiring Access To Usaf Bases, Afrl Facilities, And/or Access To U.s. Government Information Technology Networks In Connection With The Work On This Contract Must Be U.s. Citizens. Possession Of A Permanent Resident Card (“green Card”) Does Not Equate To U.s. Citizenship. This Requirement Does Not Apply To Foreign Nationals Approved By The U.s. Department Of Defense Or U.s. State Department Under International Personnel Exchange Agreements With Foreign Governments. Any Waivers To This Requirement Must Be Granted In Writing By The Contracting Officer Prior To Providing Access. The Above Requirements Are In Addition To Any Other Contract Requirements Related To Obtaining A Common Access Card (cac).
c. This Acquisition Involves Data That Are Subject To Export Control Laws And Regulations. Only Contractors Who Are Registered And Certified With The Defense Logistics Services Center (dlsc) And Have A Legitimate Business Purpose May Participate In This Solicitation. Contact The Defense Logistics Services Center, 74 Washington Avenue N., Battle Creek, Michigan 40937-3084 (1-877-352-2255) For Further Information On The Certification Process. You Must Submit A Copy Of Your Approved Dd Form 2345, Militarily Critical Technical Data Agreement, With Your Proposal.
6. Export Control: Information Involved In This Research Effort Will Be Subject To Export Control (international Traffic In Arms Regulation (itar) 22 Cfr 120-130 Or Export Administration Regulations (ear) 15 Cfr 730- 774). If The Effort Is Subject To Export Control, Then A Certified Dd Form 2345, Militarily Critical Technical Data Agreement, Will Be Required To Be Submitted With Proposal.
export-controlled Items: As Prescribed By Dfars 225-7901, Dfars 252.225-7048, “export-controlled Item (jun 2013)” Is Contained In This Solicitation (as Shown Below). This Clause Shall Be Contained In All Solicitations And Resulting Contracts.
export-controlled Items (jun 2013)
(a) Definition. “export-controlled Items,” As Used In This Clause, Means Items Subject To The Export Administration Regulations (ear) (15 Cfr Parts 730-774) Or Theinternational Traffic In Arms Regulations (itar) (22 Cfr Parts 120-130). The Term Includes:
(1) “defense Items,” Defined In The Arms Export Control Act, 22 U.s.c. 2778(j)(4)(a), As Defense Articles, Defense Services, And Related Technical Data And Further Defined In The Itar, 22 Cfr Part 120.
(2) “items,” Defined In The Ear As “commodities”, “software”, And “technology,” Terms That Are Also Defined In The Ear, 15 Cfr 772.1.
(b) The Contractor Shall Comply With All Applicable Laws And Regulations Regarding Exportcontrolled Items, Including, But Not Limited To, The Requirement For Contractors To Register With The Department Of State In Accordance With The Itar. The Contractor Shall Consult With The Department Of State Regarding Any Questions Relating To Compliance With The Itar And Shall Consult With The Department Of Commerce Regarding Any Questions Relating To Compliance With The Ear.
(c) The Contractor's Responsibility To Comply With All Applicable Laws And Regulations Regarding Export-controlled Items Exists Independent Of, And Is Not Established Or Limited By, The Information Provided By This Clause.
(d) Nothing In The Terms Of This Contract Adds, Changes, Supersedes, Or Waives Any Of The Requirements Of Applicable Federal Laws, Executive Orders, And Regulations, Including But Not Limited To—
(1) The Export Administration Act Of 1979, As Amended (50 U.s.c.app.2401, Et Seq.);
(2) The Arms Export Control Act (22 U.s.c. 2751, Et Seq.);
(3) The International Emergency Economic Powers Act (50 U.s.c.1701, Et Seq.);
(4) The Export Administration Regulations (15 Cfr Parts 730-774);
(5) The International Traffic In Arms Regulations (22 Cfr Parts 120-130); And
(6) Executive Order 13222, As Extended;
7. Government Property Availability: Gp (to Include Government Furnished Equipment, Property Or Information Or Contractor Acquired Property), If Applicable, Will Be Identified At The Call Level. If Applicable, The Contractor Is Responsible For All Costs Related To Making The Property Available For Use, Such As Payment Of All Transportation, Installation, Or Rehabilitation Costs In Accordance With Far 45.201(b).
if Gp Is Included In The Call Or Requested In The White Paper And/or Proposal, The Following Clauses/provisions Apply:
a. Far 52.245-1 Government Property (apr 2012) Or Far 52.245-1, Alt Ii (jan 2017) If The Resulting Contract Is For Basic Or Applied Research At A Nonprofit Institution Of Higher Education Or At A Nonprofit Whose Primary Purpose Is The Conduct Of Scientific Research.
b. Far 52.245-9 Use And Charges (apr 2012),
c. Dfars 252.211.7007 Reporting Of Government-furnished Property (aug 2012),
d. Dfars 252.245-7001 Tagging, Labeling, And Marking Of Government-furnished Property (apr 2012),
e. Dfars 252.245-7002 Reporting Loss Of Government Property (apr 2012)
f. Dfars 252.245-7003 Contractor Property Management System Administration (apr 2012)
g. Dfars252.245-7004 Reporting, Reutilization, And Disposal (sep 2016)
8. Government Furnished Information (gfi) Availability: Gfi, If Applicable, Will Be Identified At The Call Level. If Applicable, Technical Data Or Computer Software Provided To The Contractor As Government-furnished Information (gfi) Under This Contract May Be Subject To Restrictions On Use, Modification, Reproduction,release, Performance, Display, Or Further Disclosure. The Contractor Will Take All Reasonable Steps To Protect The Technical Data Or Computer Software Against Any Unauthorized Release Or Disclosure. Gfi Provided Could Consist Of, But Not Be Limited To, Technical Specifications, Manuals, Drawings, Test Data, And Software.
if Gfi Is Included In The Solicitation Or Requested In The Proposal The Following Clauses/provisions Apply:
dfars 252.227-7025 Limitations On The Use Or Disclosure Of Government-furnished Information Marked With Restrictive Legends Applies.
9. Base Support/network Access: Base Support/network Access May Be Provided Under Any Resulting Contract And Will Be Specified In The Individual Call.
10. Data Rights: Required Data Rights Will Be Identified Per Call; Minimum Required Data Rights Are:
a. Technical Data: Unlimited Rights Or Government Purpose Rights
b. Non-commercial Software (ncs): Unlimited Rights Or Government Purpose Rights
c. Ncs Documentation: Unlimited Rights Or Government Purpose Rights
d. Commercial Computer Software Rights: Customary License, Etc.
e. Third Party Software (commercial And Noncommercial)
the Air Force Research Laboratory Is Engaged In The Discovery, Development, And Integration Of Warfighting Technologies For Our Air, Space, And Cyberspace Forces. As Such, Rights In Technical Data And Ncs Developed Or Delivered Under This Contract Are Of Significant Concern To The Government. The Government Will Therefore Carefully Consider Any Restrictions On The Use Of Technical Data, Ncs, And Ncs Documentation Which Could Result In Transition Difficulty Or Less-than Full And Open Competition For Subsequent Development Of This Technology.
in Exchange For Paying For Development Of The Data, The Government Expects Technical Data, Ncs, And Ncs Documentation Developed Entirely At Government Expense To Be Delivered With Unlimited Rights.
technical Data, Ncs, And Ncs Documentation Developed With Mixed Funding Are Expected To Be Delivered With At Least Government Purpose Rights. Offerors Proposing Delivery Of Technical Data, Ncs, Or Ncs Documentation (subject To Government Purpose Rights) Should Fully Explain What Technical Data, Ncs, Or Ncs Documentation (developed With Costs Charged To Indirect Cost Pools And/or Costs Not Allocated To A Government Contract) Will Be Incorporated, How The Incorporation Will Benefit The Program, And Address Whether Those Portions Or Processes Are Able To Be Segregated. The Government Expects Delivery Of Technical Data, Ncs, And Ncs Documentation Subject To Government Purpose Rights Will Fully Meet Program Needs.
offers Proposing Delivery Of Technical Data, Ncs, Or Ncs Documentation Subject To Limited Rights, Restricted Rights, Or Specifically Negotiated License Rights Will Be Considered. Proposals Should Fully Explain What Technical Data, Ncs, Or Ncs Documentation Developed With Costs Charged To Indirect Cost Pools And/or Costs Not Allocated To A Government Contract Will Be Incorporated And How The Incorporation Will Benefit The Program.
offerors Are Reminded That The Identification And Assertion Of Restrictions On The Government’s Use, Release, Or Disclosure Of Technical Data Or Computer Software (the Assertions List), Required Under Dfars 252.227- 7013 And Dfars 252.227-7014, Is Included In Section K And Due At Time Of Proposals. Assertions Must Be Completed With Specificity With Regard To Each Item, Component, Or Process Listed.
note That Dfars 252.227-7014(d) Describes Requirements For Incorporation Of Third Party Computer Software (commercial And Noncommercial). Any Commercial Software To Be Incorporated Into A Deliverable Must Be Clearly Identified In The Proposal. Prior To Delivery Of Any Third Party Software, The Contractor Will Obtain An Appropriate License For The Government, And The Written Approval Of The Contracting Officer.
as Used In This Subparagraph, The Terms Unlimited Rights, Government Purpose Rights, Specifically Negotiated License Rights, And Limited Rights In Technical Data Are As Defined In Dfars 252.227-7013. The Terms Unlimited Rights, Government Purpose Rights, Specifically Negotiated License Rights, And Restricted Rights In Noncommercial Computer Software And Noncommercial Software Documentation Are As Defined In Dfars 252.227-7014. The Term Commercial Computer Software Is As Defined In Dfars 252.227-7014.
iv. Application And Submission Information No Proposals Or White Papers Should Be Submitted Against This Baseline Baa
1. 1-step And 2-step Procedures: The Application Process For Opportunities Presented In This Baa Will Be Identified In Calls Published Separately From The Overarching Announcement. Each Call Will Identify The Procedure To Accept And Evaluate Offeror Responses (one Step Or Two Step) And If Applicable, Specify A Date And Time For Receipt Of Proposals Or White Papers. Below Is A Description Of One Step And Two Step Procedures For Acceptance And Evaluation Of Offeror Responses:
when A One-step Process Is Utilized By The Government, Proposals Submitted In Response To Calls Should Be Submitted In Accordance With This Baa And The Individual Call Instructions. The Government Reserves The Right To Select All, Part, Or None Of The Proposals Received In Response To A Call, Subject To The Availability Of Funds And Without Negotiation/discussion. However, The Government Reserves The Right To Negotiate With Those Offeror(s) Whose Proposal Is Selected For Funding.
when A Large Volume Of Responses Are Anticipated By The Government, A Two-step Process Will Be Utilized Requesting White Papers. This Two-step Process Is To Streamline The Proposal Process And To Assist Offerors In Determining Whether To Incur The Cost Of Generating A Formal Call Proposal (not All Calls Will Require A Submittal Of A White Paper). Offerors Of Those White Papers Evaluated As Satisfying Technical Merit Factor (section V, Paragraph 2) And For Which It Is Determined There Is Sufficient Funding Available, Will Be Sent A Letter Request For Proposal (rfp) To Submit A Formal Technical And Cost Proposal. An Rfp Does Not Assure An Offeror Of A Subsequent Contract Award. White Papers Not Selected For Full Proposal Submission Or Proposals Not Selected For Immediate Funding Will Be Disposed Of/destroyed After The Indicated Holding Period For Each Call.
2. Monitoring Government-wide Point Of Entry: Offerors Should Monitor Www.sam.gov Regularly For Any Baa Amendments That May Permit Extensions To The Proposal Submission Date Or Make Other Changes. Offerors Are Advised That Only Contracting Officers Are Legally Authorized To Contractually Bind Or Otherwise Commit The Government.
3. Response Costs: The Cost Of Preparing A Response To Calls Issued Under This Baa Are Not Considered An Allowable Direct Charge To Any Resulting Or Any Other Contract; However, It May Be An Allowable Expense To The Normal Bid And Proposal Indirect Costs As Specified In Far 31.205-18.
4. Submitting Classified Information: Do Not Submit Classified Information In The Proposal. If Necessary, Classified Material Shall Be Submitted As A Separate Addendum. Specific Instructions For Submitting A Classified Addendum, Up To Secret, Will Need To Be Coordinated And Arranged With The Technical Pocs For Each Call Prior To Submission.
5. White Paper Submissions: Content And Form Of Submission For White Papers (2-step Process): The Paragraphs Below Identify White Paper Format And Content. White Papers Should Be Addressed And Delivered As Specified In The Call.
a. General Instructions White Papers (2-step Process Only): Offerors Including Data In Their Proposals They Do Not Want Disclosed To The Public For Any Purpose Or Used By The Government Should Mark Restriction On Disclosure And Use Of Data. Technical And Cost Volumes Should Be Submitted As Separate Volumes And Must Be Valid For 180 Days. The White Paper Volumes Must Reference The Baa Number Fa9451-18-s-0002, Call Number, And Title.
b. White Paper Format: The Following Format Shall Be Used For Submission Of White Papers In A 2-step Process Unless Otherwise Stated In The Call.
i. Page Size: 8 ½ X 11
ii. Microsoft Word Format.
iii. Margins – One-inch On Each Side
iv. Font - Arial 11+ Point
v. Spacing: Single
vi. Page Limit: Five Pages Maximum (one-side Only)
all Text, Including Text In Tables And Charts, Must Adhere To All Font Size And Line Spacing Requirements Listed Herein. No Hard Copies Of The White Papers Are Requested Unless Otherwise Stated In The Individual Call.
c. Instructions For White Paper Content:
i. Cover Page (not To Exceed One Page): The White Paper Cover Page Shall Include At A Minimum: Title Of The White Paper; Name Of The Organization Submitting The White Paper; Organization Size; Technical And Contracting Points Of Contact; Telephone Number; Fax; And Email. Additionally, The Cover Page Shall Include Baa And Call Number And Call Title.
ii. Technical/business Content (not To Exceed Three Pages): The Technical Content In White Papers Should Capture The Following Information: Innovative And Technically Sound Approach To Accomplish The Call’s Objective(s) And/or Advances In Knowledge, Understanding, Technology, And State-of-the-art. The Cost/business Content (which Includes The Rom) Should Provide Toplevel Details On Major Cost Items Such As Labor, Special Equipment That Must Be Purchased, Materials, And Any Subcontracts Or Other Organizations’ Costs (to Include Government Furnished Facilities, Equipment, Or Personnel) For The Proposed Effort. The Rom Cost Section Shall Not Exceed One Page.
iii. Addendum (not To Exceed One Page): Include Biographical Sketches Of The Key Personnel Who Will Perform The Research, Highlighting Their Qualifications And Experience.
iv. After The Review Of White Papers, The Government Will Determine Whether A Formal Proposal Will Be Requested Based On The Evaluation Criteria Listed In Section V, White Paper Evaluation Criteria. Offerors Of Those White Papers Evaluated As Satisfying The Technical Merit Factor (section V, Paragraph 2) And For Which It Is Determined There Is Sufficient Funding Available, Will Be Sent A Request For Proposal (rfp) Letter To Submit A Formal Technical And Cost/business Proposal To The Contracting Point Of Contact. An Rfp Does Not Assure An Offeror Of A Subsequent Contract Award. White Papers Not Selected For Full Proposal Submission Or Proposals Not Selected For Immediate Funding Will Be Disposed Of/destroyed After The Indicated Holding Period For Each Call.
v. Any Questions Concerning The White Paper Preparation Shall Be Referred To The Technical Or Contracting Pocs Identified In The Call.
d. Handling And Transmittal Instructions: Electronic Submission Via Dod Safe Site Or Email Is Required, Specific Instructions Will Be Provided At The Call. Offerors Are Responsible For Confirming Receipt With Afrl/rkdb. Afrl/rkdb Is Not Responsible For Undelivered Documents.
6. Full Proposal Submissions: The Paragraphs Below Identify Proposal Format And Content. Proposals Should Be Addressed And Delivered As Specified In The Call. (note Full Proposal Instructions Apply To 1 And 2-step Processes)
a. General Instructions Proposals: Offerors That Including Data In Their Proposals They Do Not Want Disclosed To The Public For Any Purpose Or Used By The Government Should Mark Restriction On Disclosure And Use Of Data. Technical And Cost/business Volumes Should Be Submitted In Separate Volumes, And Must Be Valid For 180 Days. Proposals Must Reference The Baa Announcement Number Fa9451-18-s-0002, Call Number And Title.
b. Proposal Format:
i. The Technical Proposal Shall Be Limited To 30 Pages Unless Otherwise Stated In The Call And Shall Be Prepared And Submitted In Microsoft Word Format. The Statement Of Work (sow) Does Not Count Against The Page Limit.
ii. Cost/business Proposals Have No Page Limitations; However, Offerors Are Requested To Keep Cost Proposals Under 100 Pages (cost Break-outs Should Be Submitted In Microsoft Excel With The Formulas, All Other Information Should Be Provided In Microsoft Word).
iii. Paper Size – 8.5 Inch X 11 Inch
iv. Margins – One-inch On Each Side
v. Font - Arial 11+ Point Font Or Equivalent, To Include Tables, Diagrams, And Charts. Any Other Information (e.g. Captions, Restrictive Markings) Shall Not Be Smaller Than Calibri 10 Point Font Or Equivalent.
vi. Pages Shall Be Single-spaced And Double-sided (each Side Counts As One Page)
vii. All Text, Including Text In Tables And Charts, Must Adhere To All Font Size And Line Spacing Requirements Listed Herein
viii. The Technical Proposal Page Limit Does Not Include The Offeror’s Proposed Sow; However, The Same Formatting Rules Apply To The Sow, Which Is Limited To Ten (10) Pages.
note: The Number Of Hard Copies And Submission Instructions Will Be Stated In The Individual Call.
c. Technical Volume: The Technical Volume Shall Include A Discussion Of The Following Information: Creative Or Innovative And Technically Sound Approach To Accomplish The Call’s Objective(s) And/or Advances In Knowledge, Understanding, Technology, State-of-the-art, And Rationale Of The Offeror’s Technical Approach And The Relevance To The Directed Energy Directorate/vanguard Center’s Program Objective(s).
the Offeror Shall Provide Any Information On Prior Work In The Technical Areas, Descriptions Of Available Equipment, Data And Facilities As Attachments To The Technical Proposal. This Information Will Be Used In The Proposal Evaluation To Help Determine The Soundness Of The Technical Approach. This Volume Shall Include A Sow Detailing The Technical Tasks Proposed To Be Accomplished Under The Proposed Effort. The Offeror Shall Provide A Proposed Sow Suitable For Contract Incorporation Into A Resulting Contract, If Any, And Thus Shall Not Have Any Company Proprietary Information Contained Within The Document. If Government Furnished Property Is Requested, Offerors Are Required To Submit The Following Information With Their Offer:
i. A List Or Description Of Government Property The Offeror Or Its Subcontractors Request To Use. The List Shall Identify The Accountable Contract Under Which The Property Is Held And The Authorization For Its Use (from The Contracting Officer Having Cognizance Of The Property).
ii. The Dates During Which The Property Will Be Required For Use (including The First, Last, And All Intervening Months), And For Any Property That Will Be Used Concurrently In Performing Two Or More Contracts, The Values Of The Respective Uses In Sufficient Detail To Support Prorating The Rent.
iii. The Amount Of Rent That Would Otherwise Be Charged In Accordance With Far 52.245-9, Use And Charges, And Be Used In The Management Of Government Property, Or Existing Property Management Plans, Methods, Practices, Or Procedures For Accounting For Property.
iv. The Voluntary Consensus Standard Or Industry Leading Practices And Standards To Be Used In The Management Of Government Property Or Existing Property Management Plans, Methods, Practices, Or Procedures For Accounting For Property. Any Questions Concerning The Technical Volume Or Sow Preparation Shall Be Referred To The Technical Poc Cited In Section Vii.
d. Cost/business Volume:
i. Separate The Volume Into A Cost Section And Business Section. The Business Section Should Contain All Business Aspects Of The Proposed Contract Such As: Resumes Of Personnel Who Will Be Participating In This Effort; Contractual Instrument Type; Any Exceptions To Terms And Conditions Of The Announcement; And Any Information Not Technically Related. Provide Rationale For Exceptions. Identify Any Technical Data That Will Be Delivered With Less Than Unlimited Rights. Cost Proposals Have No Page Limitations; However, Offerors Are Requested To Keep Cost Proposals Under 100 Pages As A Goal. The Proposal Shall Be Furnished With Supporting Schedules And Shall Contain A Labor Hour Breakdown Per Task.
ii. Subcontracting Plans For Efforts Anticipated To Exceed $750,000 Shall Be Submitted Along With The Technical And Cost Proposals. Reference Far 19.704, Dfars 219.704, And Affars 5319.704(a)(1) For Subcontracting Plan Requirements. Small Businesses Are Exempt From This Requirement.
iii. All Direct Costs (labor, Material, Travel, Computer, Etc.) As Well As Labor And Overhead Rates Should Be Provided By Contractor Fiscal Year (cfy). A Separate Breakout By Government Fiscal Year (gfy) Is Not Required.
iv. Submit Fully-disclosed Electronic Cost Spreadsheets With Formulas. Include Rate Table For All Direct And Indirect Rates That Support The Cost Element Summaries.
e. Proposal Content Summary: You May Be Ineligible For Award If All Requirements Of This Solicitation Are Not Met On The Proposal Due Date. Reference Section Viii For A Checklist Of The Requirements.
7. Proposal Submission Dates And Times: Proposals Submitted Shall Be In Accordance With This Announcement And Any Instructions In The Individual Call For Proposals. Proposals Should Be Submitted In Accordance With Any Modifications Or Amendments Of The Full Text Baa And Individual Call. Proposals Received After The Due Date And Time Specified Shall Be Governed By The Provisions Of Far 52.215-1(c)(3).
8. Data Right Assertions: It Is Desired That All Data Delivered Under Any Resulting Award Will Be Delivered With Unlimited Rights; However Different Rights May Be Negotiated As Appropriate. The Offeror Shall Identify Data Rights Assertions, Licenses, Patents, Etc. That Apply To Any Proprietary Materials, Technical Data, Products, Software, Or Processes To Be Used By The Prime Or Subcontractor(s) In The Performance Of This Program. The Proposal Shall Address Acquisition Of Data Rights Or Licenses Or Expected Recoupment Of Development Costs For Those Proprietary Items That Will Be Integral To Any Contracts Awarded Under This Baa. Any Data Delivered Or Anticipated To Be Delivered With Less Than Unlimited Rights Must Be Reported In A Separate, Appropriately Marked Appendix To The Final Report Of Any Awarded Contract Resulting From This Baa.
9. Other Submission Requirements: Proposals Must Be Submitted To The Contracting Point Of Contact Identified At The Call Level.
v. Evaluation Criteria And Application Review Information
1. General Information: Evaluations Will Vary Based Upon A One Step Or Two Step Approach. Evaluations Of Proposals/white Papers Will Be Conducted By A Peer Or Scientific Review Process Using The Criteria Described Below.
2. White Paper Evaluation Criteria (two-step Process Only): The Following Criteria Will Be Used To Determine If A Formal Proposal Will Be Requested. The Offeror’s White Paper Must Satisfactorily Addressthe Scientific And/or Technical Merit Factor Identified Below In Order For The Rough Order Of Magnitude (rom) To Be Evaluated For Affordability. White Papers Satisfying Both The Scientific And/technical Merit And Affordability Factors Will Result In A Request For Proposal.
a. Technical Merit: Innovative And Technically Sound Approaches Proposed To Accomplish The Technical Objectives And/or Advances In Knowledge; Understanding, Technology, And State-of-the-art
b. Affordability: Roms Will Be Evaluated To Determine If Sufficient Funding Is Available. White Papers Satisfying The Technical Merit Factor, And For Which Sufficient Funding Is Determined To Be Available, Will Be Evaluated As Affordable
3. White Paper Selection Process: The Offeror’s White Paper Must Satisfactorily Address The Scientific And/technical Merit Factor And Be Determined To Be Affordable To Result In A Request For Proposal.
4. Proposal Evaluation Criteria (one-step Process): The Following Criteria, Which Is Listed In Descending Order Of Importance, Will Be Used To Determine Whether One Or More Sources Should Be Recommended For Award. The Government Reserves The Right To Select All, Part, Or None Of The Proposals Received In Response To A Call For Award Subject To The Availability Of Funds.
a. Technical Merit: Technical Merit Is First In Order Of Priority And Shall Be Evaluated Based On The Following Criteria That Are Of Equal Importance.
i. Creative Or Innovative Approach Proposed To Accomplish The Technical Objectives And/or Advances In Knowledge, Understanding, Technology, And State-of-the-art
ii. Soundness Of The Offeror’s Technical Approach
iii. Relevance Towards Vanguard Center For Hpc Program Objectives
b. Cost/price: The Cost/price Criterion Includes The Realism Of The Proposed Cost. Cost/price Is A Substantial Factor, But Ranked As Second Order Priority. (if An Offeror Proposes The Use Of Gfp Other Than Any Gfp Identified In This Baa, And That Proposed Gfp Provides The Offeror An Unfair Competitive Advantage, Then Far 45.202 Requires Rental Equivalent Be Applied To The Cost Factor For Evaluation Purposes Only).
5. Proposal Review And Selection Process (one-step Process): The Technical And Cost/business Proposals Satisfying Both Technical Merit And Cost/price Evaluation Criteria Will Be Categorized:
a. Highly Recommended: Well-conceived Scientifically And Technically Sound Proposal Pertinent To Accomplish Goals And Objectives. Proposals Are Recommended For Acceptance (subject To Availability Of Funds) And Normally Are Displaced Only By Other Highly Recommended Proposals.
b. Selectable: Scientifically Or Technically Sound Proposals That May Need Additional Development. Proposals Are Recommended For Acceptance If Sufficient Funding Is Available, But At A Lower Priority Than Highly Recommended Proposals. To Ensure A Diversity Of Approaches, A Selectable Proposal May Be Prioritized Over A Highly Recommended Proposal If The Selectable Proposal Presents A Unique Approach Unlike Any Of The Highly Recommended Proposals.
c. Not Selectable: Proposal Is Not Technically Sound Or Does Not Meet Agency Needs. Even If Sufficient Funding Existed, The Proposal Will Not Be Funded.
note: Prior To Award Of A Potentially Successful Offer, The Contracting Officer Will Make A Determination Regarding Price Reasonableness.
note: When The Government Elects To Award Only Part Of A Proposal, The Selected Part May Be Categorized As Highly Recommended Or Selectable Although The Proposal As A Whole May Not Merit Such A Categorization.
vi. Award Administration Information
award Notices: Offerors Will Be Notified Whether Their Proposal Is Recommended For Award In Writing By Letter. The Notification Of Recommendation For Award Is Not To Be Construed To Mean The Award Of A Contract Is Assured As Availability Of Funds And Successful Negotiations Are Prerequisites To Any Award.
vii. Agency Contacts
1. Technical Points Of Contact: Any Correspondence Must Reference The Baa Title And Number. Questions Of A Technical Nature Shall Be Directed To The Following Technical Points Of Contact:
program Manager: Usaf Capt. Alexandra A. Mihaylova,afrl/rdsme, Kihei, Hi 96753’ Phone: (808)-891-7704, Email: Alexandra.mihaylova.1@us.af.mil
technical Director:usaf Lt. Col. Scott Pierce, Afrl/rdsme, Kihei, Hi, Phone: (808)891-7744, Email: Scott.pierce.2@us.af.mil.
2. Contracting Points Of Contact:questions Of A Contractual/business Nature Shall Be Directed To The Contracting Officer Or Contract Specialist Specified In The Contact Information Below.
note: Each Call Will Also Include Specific Technical And Contracting Points Of Contact.
3. Ombudsman: The Ombudsman Clause, Affars 5352.201-9101 Ombudsman (jan 2017) Will Be Contained In Any Contracts Or Agreements Resulting From This Solicitation.
the Afrl Ombudsman Is: Director Of Contracting, Afrl/pk 1864 Fourth Street. Wright-patterson Afb Oh 45433-7130, Phone 937-904-9700
alternate Ombudsman: Deputy Director Of Contracting, Afrl/pk 1864 Fourth Street, Wright Patterson Afb, Oh 45433- 7130, Phone 937-255-4967
viii. Other Information
1. Support Contractors:
a. The Air Force Research Laboratory's Directed Energy (rd) And Space Vehicles (rv) Directorates Have Contracted For Various Business And Staff Support Services, Some Of Which Require Contractors To Obtain Administrative Access To Proprietary Information Submitted By Other Contractors. Administrative Access Is Defined As "handling Or Having Physical Control Over Information For The Sole Purpose Of Accomplishing The Administrative Functions Specified In This Contract Or Order, Which Do Not Require The Review, Reading, Or Comprehension Of The Content Of The Information On The Part Of Non-technical Professionals Assigned To Accomplish The Specified Administrative Tasks."
b. The Required Administrative Access Will Be Granted To Non-technical Professionals. Examples Of The Administrative Tasks Performed Include: I. Assembling And Organizing Information For R&d Case Files; Ii. Accessing Library Files For Use By Government Personnel In The Rd And Rv Directorates
c. Offerors Shall Provide Written Objection To Administrative Access. Any Objection To Administrative Access: I. Shall Be Provided In Writing To The Contracting Officer Within 10 Days Of Rfp ( Baa, Etc., As Appropriate) Issuance; And Ii. Shall Include A Detailed Statement Of The Basis For The Objection.
2. Communication: Dialogue Between Prospective Offerors And Government Representatives Is Encouraged Until Submission Of Proposals. Discussions With Any Of The Points Of Contact Shall Not Constitute A Commitment By The Government To Subsequently Fund Or Award Any Proposed Effort. Only Contracting Officers Are Legally Authorized To Commit The Government.
3. Debriefings: Debriefings Will Be In Accordance With 10 Usc 2305(b)(5), But The Debriefing Content Will Vary To Be Consistent With The Procedures Set Out In Far 35.016 Governing Baas.
4. Wide Area Work Flow Notice: Any Far-based Contract Award Resulting From This Announcement Will Contain The Clause At Dfars 252.232-7003, Electronic Submission Of Payment Requests And Receiving Reports (jun 2012), Which Requires Electronic Submission Of All Payment Requests. The Clause Cites Three Possible Electronic Formats Through Which To Submit Electronic Payment Requests. Effective 01 October 2006, The Department Of Defense Adopted Wide Area Work Flow-receipt And Acceptance (wawf-ra) As The Electronic Format For Submission Of Electronic Payment Requests. Any Contract Resulting From This Announcement Will Establish A Requirement To Use Wawf-ra For Invoicing And Receipt/acceptance And Provide Coding Instructions Applicable To This Contract. Contractors Are Encouraged To Take Advantage Of Available Training (both Web-based And Through Your Cognizant Dcma Office) And To Register In The Wawf-ra System. Information Regarding Wawf-ra, Including The Web-based Training And Registration, Can Be Found At Https://wawf.eb.mil/. Note: Wawf-ra Requirement Does Not Apply To Universities That Are Audited By An Agency Other Than Dcaa.
5. Forward Pricing Rate Agreements: Offerors Who Have Forward Pricing Rate Agreements (fpras) And Forward Pricing Rate Recommendations (fprrs) Should Identify Them In Their Proposal.
6. Pre-award Clearance: Pursuant To Far 22.805, A Pre-award Clearance Must Be Obtained From The U.s. Department Of Labor, Employment Standards Administration, Office Of Federal Contract Compliance Program’s (ofccp) Prior To Award Of A Contract (or Subcontract) Of $10,000,000 Or More Unless The Contractor Is Listed In Ofccp’s National Pre-award Registry Http://www.dol-esa.gov/preaward. This Registry Indicates The Contractor Has Been Found To Be “in Compliance” Within The Past Two Years With The Equal Employment Opportunity (eeo) Regulations The Ofccp Is Mandated To Enforce. The Registry Is Updated Nightly; Facilities Reviewed More Than Two Years Ago Are Removed And New Ones Are Added. Award May Be Delayed If You Are Not Currently Listed In The Registry And The Contracting Officer Must Request A Pre-award Clearance From The Ofccp.
7. Limitations On Pass-through Charges: As Prescribed In Far 15.408(n)(1) & 15.408(n)(2), Provisions 52.215-22, “limitations On Pass Through Charges – Identification Of Subcontract Effort (oct 2009),” And 52.215-23, “limitations On Pass-through Charges (oct 2009),” Are Contained In This Solicitation. Any Contract Valued Greater Than The Threshold For Cost Or Pricing Data Threshold, Except Fixed Price Contracts Awarded On The Basis Of Adequate Price Competition Resulting From This Solicitation, Shall Contain The Clause At Far 52.215-23 (or Alt I).
8. Associate Contractor Agreements: Associate Contractor Agreements (acas) Are Agreements Between Contractors Working On Government Contracts That Specify Requirements For Them To Share Information, Data, Technical Knowledge, Expertise, Or Resources. The Contracting Officer May Require Acas When Contractors Working On Separate Government Contracts Must Cooperate, Share Resources, Or Otherwise Jointly Participate In Working On Contracts Or Projects. Prime Contractor To Subcontractor Relationships Do Not Constitute Acas. For Each Award, The Contracting Officer Will Identify Associate Contractors With Whom Agreements Are Required.
9. Post-award Small Business Program Representation: As Prescribed In Far 19.308, Far Clause 52.219-28, “post-award Small Business Program Representation (jul 2013),” Is Incorporated Byreference In This Solicitation. This Clause Will Be Contained In Any Contracts Resulting From This Solicitation. This Clause Requires A Contractor To Represent Its Size Status When Certain Conditions Apply. The Clause Provides Detail On When The Representation Must Be Complete And What The Contractor Must Do When A Representation Is Required.
10. Employment Eligibility Verification: As Prescribed By Far 22.1803, Far Clause 52.222-54, Employment Eligibility Verification (oct 2015), Is Hereby Incorporated By Reference In This Solicitation. Any Contract Awarded As A Result Of This Baa That Is Above The Simplified Acquisition Threshold And Contains A Period Of Performance Greater Than 120 Days Shall Include This Clause. This Clause Provides The Requirement For Contractors To Enroll As A Federal Contractor In The E-verify Program Within 30 Days After Contract Award.
11. Reporting Executive Compensation And First-tier Sub-contract/sub-recipient Awards: As Prescribed By Far 4.1403(a), Far 52.204-10 Reporting Executive Compensation And First-tier Subcontract Awards (oct 2016) Is Hereby Incorporated By Reference In This Solicitation. Any Contract Valued At $25,000 Or More, Excluding Classified Contracts Or Contractors With Individuals, Must Contain This Clause. Any Grant Or Agreement Award Resulting From This Announcement May Contain The Award Term Set Forth In 2 Cfr, Appendix A To Part 25.
12. Updates Of Publicly Available Information Regarding Responsibility Matters: Any Contract Award That Exceeds $500,000.00; And When An Offeror Checked “has” In Paragraph (b) Of The Provision Far 52.209-7, Shall Contain The Clause/article, Far 52.209-9 Updates Of Publicly Available Information Regarding Responsibility Matters (jan 2013).
13. Contractor Business Systems: Dfars 252.242-7005, Contractor Business Systems (feb 2012), Is Hereby Incorporated By Reference.
14. Proposal Content Checklist: You May Be Ineligible For Award If All Requirements Of This Solicitation Are Not Met On The Proposal Due Date.
a. Proposals Are Due To The Point Of Contact Specified On The Call.
b. Proposals Are Due No Later Than The Due Date And Time Specified In The Call.
c. Proposal Page Limits Are Strictly Enforced. See Section Iv Of The Solicitation For Page Limits.
d. Completed Certifications And Representations (section K) Are Due With The Proposal. Certifications And Representations (section K) Can Be Found At Www.sam.gov.
e. The Cost/business Proposal Must Contain All Information Described In The Content And Form Of Proposal Section.
f. For Any Subcontracts Proposed, The Cost/business Proposal Must Contain A Subcontractor Analysis Iaw Far 15.404-3(b).
g. Offerors Other Than Small Businesses Are To Include A Subcontracting Plan In Microsoft Word Readable Or Adobe Format On A Cd Rom As Well As A Hard Copy.
h. Proposals Must Be Submitted In The Format Specified In Section Iv.
i. Offerors Who Have Forward Pricing Rate Agreements (fpra’s) And Forward Pricing Rate Recommendations (fprr’s) Should Submit Them With Their Proposal.
j. If A Dd254 Is Applicable, Offerors Must Verify Their Cognizant Security Office Information Is Current With Defense Security Service (dss) At Www.dss.mil.
Closing Date16 Dec 2024
Tender AmountRefer Documents
Ministry Of Science And Technology Cotabato City Maguindan Tender
Solar Installation and Products...+1Electrical and Electronics
Philippines
Details: Description Procurement Of Supply, Delivery, Installation, And Commissioning Of Processing Equipment Under Bangsamoro Assistance For Grassroots Innovation (bagi) - Tdif 2023 Ben. #1 Supply, Delivery And Installation Of Processing Equipment Of Charcoal Briquetting Process Of Sabaken Maguyaga Fishermen Cooperative Place Of Delivery: Brgy. Sabaken Northern Kabuntalan, Maguindanao Del Norte 1 .) Charcoal Crusher Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 2.2kw – 3.5kw (high-torque Electric Motor) Crushing Capacity: 300 – 500 Kg/h (depending On Charcoal Hardness And Moisture Content) Rotor Speed: 1,500 – 2,000 Rpm Feed Inlet Size: 300mm X 200mm Crushing Mechanism: Charcoal (lump Charcoal, Briquettes), Coal, And Biomass (optional) Hopper Capacity: 50 – 100 Kg Per Batch Machine Dimensions: Approx. 1200mm (l) X 800mm (w) X 1100mm (h) Construction Material: Frame: Heavy-duty Steel Frame Blades/hammers: Hardened Steel For Durability Screens: Replaceable Stainless Steel Or Carbon Steel Mesh Discharge System: Gravity-based Or Optional Conveyor For Continuous Discharge Cooling System: Air-cooled Motor With Thermal Protection Safety Features: Emergency Stop Button Protective Covers Over Moving Parts Safety Lock On The Hopper Lid Lubrication: Manual Grease Lubrication For Bearings And Other Moving Parts Dust Control: Optional Dust Collection System Or Enclosed Design To Minimize Dust Dispersion Control System: On/off Switch With Overload Protection Adjustable Speed Control (optional For Certain Models) Operating Temperature: 5°c – 40°c Mobility: Equipped With Durable Wheels Or Skid Base For Easy Movement Accessories Included: Spare Blades/hammers Set Of Replacement Screens With Different Mesh Sizes Basic Toolkit For Maintenance Maintenance Requirements: Regular Lubrication And Periodic Blade Sharpening Or Replacement Power Cable Length: 5 Meters (with Waterproof Plug) Warranty: 1-year Warranty On Parts And Labor 2.) Charcoal Briquette Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 2.2kw – 3kw (high-torque Electric Motor For Heavy-duty Operation) Briquetting Capacity: 150 – 300 Kg/h (depending On Feed Material And Moisture Content) Briquette Size: Diameter: 50mm – 70mm (customizable) Length: Adjustable (40mm – 100mm) Biomass Materials (optional) Feed Inlet Size: 300mm X 200mm Hopper Capacity: 50 – 100 Kg Binding Material: Optional Binder Feed System (for Starch Or Clay Binders) Moisture Content Requirement: 8% – 12% For Optimal Briquette Formation Heating System: Optional Pre-heating For Better Briquette Cohesion Output Shape: Cylindrical, Hexagonal, Or Square (based On Mold Type) Construction Material: Frame: Heavy-duty Steel Construction Compression Chamber: Hardened Steel For Durability Operating Pressure: 30 – 60 Mpa (adjustable For Different Materials) Cooling System: Air-cooled Motor With Thermal Overload Protection Discharge System: Manual Or Automatic Conveyor Discharge (optional) Lubrication: Manual Grease Lubrication For Bearings And Compression System Control System: On/off Switch With Overload Protection Emergency Stop Button Machine Dimensions: Approx. 1500mm (l) X 1000mm (w) X 1200mm (h) Safety Features: Protective Covers Over Moving Parts Emergency Stop Button Overload Protection Mobility: Equipped With Durable Wheels Or Skid Base For Ease Of Movement Dust Control: Optional Dust Collection System Or Enclosed Feed System Accessories Included: Set Of Molds For Different Briquette Shapes And Sizes Maintenance Toolkit Operating Manual Maintenance Requirements: Regular Lubrication And Periodic Mold Inspection And Replacement Power Cable Length: 5 Meters (with Waterproof Plug) Warranty: 1-year Warranty On Parts And Labor 3.) Charcoal Mixer = 1 Pc Specifications: Power Source: Diesel Engine Engine Power: 10 Hp Mixing Capacity: 200 – 500 Kg/h (depending On Material Type And Moisture Content) Mixing Type: Horizontal Or Vertical Ribbon Mixer Mixing Chamber Volume: 200 Liters Material Compatibility: Charcoal Powder Charcoal Dust Biomass Materials (e.g., Wood Shavings, Sawdust) Binder Additives (if Applicable) Feed Inlet Size: 150mm X 150mm (with Safety Cover) Discharge Outlet Size: 100mm X 100mm (manual Or Pneumatic Discharge Options) Mixing Speed: 30 – 50 Rpm (fixed Speed) Construction Material: Frame: Heavy-duty Carbon Steel Or Stainless Steel Mixing Blades: Hardened Steel For Long-lasting Durability Fuel Tank Capacity: 3.5 – 5 Liters (diesel Fuel) Fuel Consumption: 0.8 – 1.5 Liters Per Hour (depending On Load And Engine Type) Cooling System: Air-cooled Diesel Engine Safety Features: Emergency Stop Button Protective Guards Over Moving Parts Engine Overload Protection Machine Dimensions: Approx. 1400mm (l) X 900mm (w) X 1200mm (h) Mobility: Equipped With Heavy-duty Wheels Or Skid Base For Easy Movement Included Accessories: Basic Maintenance Toolkit Operating Manual Spare Mixing Blades (optional) Control System: On/off Switch For Engine Control Throttle Control For Engine Speed Adjustment Maintenance Requirements: Regular Lubrication And Cleaning Of Mixing Components Diesel Engine Maintenance (oil Change, Filter Cleaning) Operating Temperature: 5°c – 40°c Warranty: 1-year Warranty On Parts And Labor 4.) Fabricated Solar Dryer House = 1 Pc Specifications: Drying Area: 20 M² Can Be Customized Based On Available Space And Drying Capacity. Structure Frame: Material: Galvanized Steel Or Aluminum Alloy Frame Frame Dimensions: Approx. 3m (w) X 6m (l) X 2.5m (h) For A 20 M² House Corrosion-resistant Material For Outdoor Durability. Covering Material: Uv-stabilized Polyethylene Or Polycarbonate Plastic Sheeting Thickness: 200 Microns – 300 Microns Lifespan: 3 – 5 Years (depending On Maintenance) Light Transmittance: 80% – 90% (for Optimal Drying Efficiency) Ventilation System: Adjustable Air Vents Or Windows On Sidewalls And Roof For Airflow Control. Optional Exhaust Fans (solar-powered) For Better Air Circulation. Flooring: Raised Mesh Or Perforated Flooring For Air Circulation Underneath Drying Materials Material: Food-grade Stainless Steel Or Heavy-duty Plastic. Optional: Concrete Flooring With Drainage System. Shelving: Multi-layer Drying Racks (3 To 5 Layers, Adjustable) Frame: Stainless Steel Or Galvanized Metal Mesh: Uv-resistant Plastic Or Food-grade Stainless Steel Shelving Space Per Layer: 1.5m X 6m (adjustable). Entry/exit: Sliding Or Hinged Doors With Uv Plastic Covering Optional Lockable Doors For Security Temperature Control: Natural Solar Heating (temperature Up To 50°c – 70°c Inside The Dryer) Optional Thermostat For Monitoring Temperature Levels. Moisture Control: Adjustable Air Vents To Control Humidity Levels. Optional Hygrometer For Humidity Measurement. Rain Protection: Sloped Roof Design For Rainwater Runoff. Sealed Edges To Prevent Water Seepage. Wind Resistance: Windproof Design, Capable Of Withstanding Wind Speeds Up To 80 Km/h. Capacity: Suitable For Drying Fruits, Vegetables, Seaweed, Fish, Spices, And Herbs. Approx. 100 – 500 Kg Of Materials Per Batch (depending On House Size And Product Type). Installation: Modular Design For Easy Assembly And Disassembly. Includes Assembly Manual And Required Hardware. Maintenance: Uv Plastic Requires Periodic Cleaning To Remove Dust And Debris. Frame And Ventilation System Should Be Inspected Regularly. Accessories Included: Solar-powered Exhaust Fans (optional). Digital Thermometer And Hygrometer (optional). Extra Uv Plastic Sheeting For Future Replacements. Operating Temperature: 5°c – 45°c (ambient Temperature Range For Optimal Operation). Weight: Approx. 100 – 300 Kg (depending On Size And Materials Used). Lifespan: Uv Plastic Cover Expected To Last 3 – 5 Years; Frame Expected To Last 10 – 15 Years With Proper Maintenance. Warranty: 1-year Warranty On Structure And Uv Plastic Covering. ----------------nothing Follows------------------ Ben. #2 Supply, Delivery And Installation Of Processing Equipment Of Livestock Feeds Production Of Igabay Coconut Farmers Organization Place Of Delivery: Brgy. Igabay, Balabagan, Lanao Del Sur 1.) Heavy-duty Hammer Mill Machine = 1 Pc Specifications: Power Source: Diesel Engine Engine Power: 15hp – 20hp (diesel-powered, Air-cooled) Fuel Consumption: 1.5 – 2.5 Liters Per Hour (depending On Material And Load) Production Capacity: 400 – 500 Kg/h (depending On Material Type And Moisture Content) Rotor Speed: 1,800 – 2,500 Rpm Hammer Type: Grain (corn, Wheat, Sorghum, Etc.) Biomass (wood Chips, Agricultural Waste) Stalks And Straw Dry Grasses And Forage Various Other Materials For Processing Screen Size Options: Multiple Screen Sizes (2mm – 10mm) For Different Output Particle Sizes Feed Inlet Size: Approx. 300mm X 200mm (customizable Based On Material Size) Machine Dimensions: Approx. 1500mm (l) X 1000mm (w) X 1300mm (h) Material Of Construction: Frame: Stainless Steel Hammers: Hardened Steel Screens: Replaceable Mesh Screens Made Of Stainless Discharge System: Gravity-based Or Optional Conveyor Belt Discharge Safety Features: Emergency Stop Button Heavy-duty Guards For Moving Parts Vibration-dampening Mounts For Stable Operation Lubrication System: Manual Grease Points For Bearings And Other Moving Parts Mobility: Equipped With Durable Wheels Or Skid Base For Ease Of Transport Included Accessories: Set Of Replacement Hammers Set Of Screens (with Different Mesh Sizes) Basic Toolkit For Maintenance Warranty: 1-year Warranty On Parts And Labor 2.) Feeds Pellet Mill Machine = 1 Set Specifications: Power Source: Diesel Engine Engine Power: 15hp – 20hp (air-cooled Or Water-cooled) Fuel Consumption: 1.5 – 2.5 Liters Per Hour (depending On Load And Material) Production Capacity: 400 – 500 Kg/h (varies With Material Type And Pellet Size) Pellet Size: Adjustable From 2mm To 8mm (customizable Die Sizes) Die Type: Flat Die Or Ring Die (interchangeable Dies Available) Agricultural Waste Fish Meal And Other Feed Ingredients Hopper Capacity: 50 – 80 Kg Pelletizing Speed: 150 – 200 Rpm Feed Form: Dry Pellets Material Of Construction: Frame: Heavy-duty Steel Construction Rollers And Dies: Hardened Steel For Durability And Wear Resistance Discharge System: Gravity-based Or Optional Conveyor Pellet Length: Adjustable (via Cutting Knife At The Die) Machine Dimensions: Approx. 1600mm (l) X 900mm (w) X 1500mm (h) Cooling System: Air Or Water Cooling (to Prevent Overheating During Extended Use) Lubrication System: Manual Grease Lubrication For Bearings And Rollers Operating Temperature: 5°c – 40°c Safety Features: Emergency Stop Button Safety Guards On All Moving Parts Overload Protection Mobility: Mounted On Wheels Or Skid Base For Ease Of Transportation Included Accessories: Set Of Spare Dies (with Different Hole Sizes) Tool Kit For Basic Maintenance Operating Manual Fuel Tank Capacity: 10 – 15 Liters Pelletizing Efficiency: 90% – 95% Conversion Of Feedstock Into Pellets Warranty: 1-year Warranty On Parts And Labor 3.) Mixer Borrow Machine =1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 1.5kw – 2.2kw (high-torque Electric Motor) Mixing Capacity: 100 – 150 Liters (approximately 3 – 4 Bags Of Mortar Mix Per Batch) Drum Material: Heavy-duty Steel (rust-resistant Coating) Drum Capacity: 120 – 160 Liters (total Capacity, Including Mixing And Overspill) Drum Speed: 25 – 30 Rpm (optimal For Thorough Mortar Mixing) Concrete (light) Plaster Mixes Discharge System: Manual Tilting Mechanism For Easy Discharge Drum Tilt Range: 360° Tilting For Complete Emptying Machine Dimensions: Approx. 1200mm (l) X 800mm (w) X 1000mm (h) Weight: 80 – 120 Kg (depending On Model And Drum Size) Frame Construction: Heavy-duty Steel Frame For Durability Wheels: Pneumatic Or Solid Rubber Wheels For Easy Transport Across Job Sites Control System: On/off Switch With Thermal Overload Protection Emergency Stop Button Safety Features: Protective Cover For Motor And Moving Parts Safety Guards For Drum And Paddle Non-slip Base For Stability During Operation Lubrication: Sealed Bearings For Minimal Maintenance Operating Temperature: 5°c – 40°c Cable Length: 5 Meters (with Waterproof Plug) Mobility: Fitted With Handles For Manual Movement Included Accessories: Maintenance Toolkit Operating Manual Mixing Time: 3 – 5 Minutes Per Batch (depending On Material Consistency) Energy Efficiency: Low Power Consumption, Suitable For Continuous Operation Warranty: 1-year Warranty On Parts And Labor 4.) Siever Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 0.75kw – 1.5kw (electric Motor With Variable Speed Control) Sieving Capacity: 300 – 500 Kg/h (depending On Material Type And Screen Size) Screen Type: Multiple-layer Vibrating Screens Stainless Steel Mesh (food-grade Or Standard Options Available) Fine Powders (flour, Starch, Etc.) Granular Materials (sand, Grains, Seeds) Dry Food Products Fertilizers Aggregates (cement, Construction Materials) Feeding System: Manual Or Automatic Feed Hopper With Adjustable Feed Rate Machine Dimensions: Approx. 1700mm (l) X 800mm (w) X 9000mm (h) Frame Construction: Heavy-duty Stainless Steel (rust-resistant, Suitable For Industrial Use) Control System: On/off Switch With Vibration Adjustment Thermal Overload Protection Vibration Mechanism: Eccentric Motor-driven Vibration System Operating Temperature: 5°c – 45°c Mobility: Fitted With Wheels Or Skid Base For Easy Movement Safety Features: Safety Guards On Moving Parts Emergency Stop Button Overload Protection Power Cable Length: 5 Meters (with Waterproof Plug) Included Accessories: Set Of Different Screen Meshes (with Various Sizes) Tool Kit For Maintenance And Screen Changes Warranty: 1-year Warranty On Parts And Labor ----------------nothing Follows------------------ Ben. #3 Supply, Delivery And Installation Of Processing Equipment Of Livestock Feeds Production Of Kauran Allience Farmers Marketing Cooperative Place Of Delivery Brgy. Kauran, Ampatuan, Maguindanao Del Sur 1.) Heavy-duty Hammer Mill Machine = 1 Pc Specifications: Power Source: Diesel Engine Engine Power: 15hp – 20hp (diesel-powered, Air-cooled) Fuel Consumption: 1.5 – 2.5 Liters Per Hour (depending On Material And Load) Production Capacity: 400 – 500 Kg/h (depending On Material Type And Moisture Content) Rotor Speed: 1,800 – 2,500 Rpm Hammer Type: Grain (corn, Wheat, Sorghum, Etc.) Biomass (wood Chips, Agricultural Waste) Stalks And Straw Dry Grasses And Forage Various Other Materials For Processing Screen Size Options: Multiple Screen Sizes (2mm – 10mm) For Different Output Particle Sizes Feed Inlet Size: Approx. 300mm X 200mm (customizable Based On Material Size) Machine Dimensions: Approx. 1500mm (l) X 1000mm (w) X 1300mm (h) Material Of Construction: Frame: Stainless Steel Hammers: Hardened Steel Screens: Replaceable Mesh Screens Made Of Stainless Discharge System: Gravity-based Or Optional Conveyor Belt Discharge Safety Features: Emergency Stop Button Heavy-duty Guards For Moving Parts Vibration-dampening Mounts For Stable Operation Lubrication System: Manual Grease Points For Bearings And Other Moving Parts Mobility: Equipped With Durable Wheels Or Skid Base For Ease Of Transport Included Accessories: Set Of Replacement Hammers Set Of Screens (with Different Mesh Sizes) Basic Toolkit For Maintenance Warranty: 1-year Warranty On Parts And Labor 2.) Feeds Pellet Mill Machine = 1 Set Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 1.5kw – 2.2kw (high-torque Electric Motor) Mixing Capacity: 100 – 150 Liters (approximately 3 – 4 Bags Of Mortar Mix Per Batch) Drum Material: Heavy-duty Steel (rust-resistant Coating) Drum Capacity: 120 – 160 Liters (total Capacity, Including Mixing And Overspill) Drum Speed: 25 – 30 Rpm (optimal For Thorough Mortar Mixing) Concrete (light) Plaster Mixes Discharge System: Manual Tilting Mechanism For Easy Discharge Drum Tilt Range: 360° Tilting For Complete Emptying Machine Dimensions: Approx. 1200mm (l) X 800mm (w) X 1000mm (h) Weight: 80 – 120 Kg (depending On Model And Drum Size) Frame Construction: Heavy-duty Steel Frame For Durability Wheels: Pneumatic Or Solid Rubber Wheels For Easy Transport Across Job Sites Control System: On/off Switch With Thermal Overload Protection Emergency Stop Button Safety Features: Protective Cover For Motor And Moving Parts Safety Guards For Drum And Paddle Non-slip Base For Stability During Operation Lubrication: Sealed Bearings For Minimal Maintenance Operating Temperature: 5°c – 40°c Cable Length: 5 Meters (with Waterproof Plug) Mobility: Fitted With Handles For Manual Movement Included Accessories: Maintenance Toolkit Operating Manual Mixing Time: 3 – 5 Minutes Per Batch (depending On Material Consistency) Energy Efficiency: Low Power Consumption, Suitable For Continuous Operation Warranty: 1-year Warranty On Parts And Labor 3.) Mixer Borrow Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 1.5kw – 2.2kw (high-torque Electric Motor) Mixing Capacity: 100 – 150 Liters (approximately 3 – 4 Bags Of Mortar Mix Per Batch) Drum Material: Heavy-duty Steel (rust-resistant Coating) Drum Capacity: 120 – 160 Liters (total Capacity, Including Mixing And Overspill) Drum Speed: 25 – 30 Rpm (optimal For Thorough Mortar Mixing) Concrete (light) Plaster Mixes Discharge System: Manual Tilting Mechanism For Easy Discharge Drum Tilt Range: 360° Tilting For Complete Emptying Machine Dimensions: Approx. 1200mm (l) X 800mm (w) X 1000mm (h) Weight: 80 – 120 Kg (depending On Model And Drum Size) Frame Construction: Heavy-duty Steel Frame For Durability Wheels: Pneumatic Or Solid Rubber Wheels For Easy Transport Across Job Sites Control System: On/off Switch With Thermal Overload Protection Emergency Stop Button Safety Features: Protective Cover For Motor And Moving Parts Safety Guards For Drum And Paddle Non-slip Base For Stability During Operation Lubrication: Sealed Bearings For Minimal Maintenance Operating Temperature: 5°c – 40°c Cable Length: 5 Meters (with Waterproof Plug) Mobility: Fitted With Handles For Manual Movement Included Accessories: Maintenance Toolkit Operating Manual Mixing Time: 3 – 5 Minutes Per Batch (depending On Material Consistency) Energy Efficiency: Low Power Consumption, Suitable For Continuous Operation Warranty: 1-year Warranty On Parts And Labor 4.) Siever Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 0.75kw – 1.5kw (electric Motor With Variable Speed Control) Sieving Capacity: 300 – 500 Kg/h (depending On Material Type And Screen Size) Screen Type: Multiple-layer Vibrating Screens Stainless Steel Mesh (food-grade Or Standard Options Available) Fine Powders (flour, Starch, Etc.) Granular Materials (sand, Grains, Seeds) Dry Food Products Fertilizers Aggregates (cement, Construction Materials) Feeding System: Manual Or Automatic Feed Hopper With Adjustable Feed Rate Machine Dimensions: Approx. 1700mm (l) X 800mm (w) X 9000mm (h) Frame Construction: Heavy-duty Stainless Steel (rust-resistant, Suitable For Industrial Use) Control System: On/off Switch With Vibration Adjustment Thermal Overload Protection Vibration Mechanism: Eccentric Motor-driven Vibration System Operating Temperature: 5°c – 45°c Mobility: Fitted With Wheels Or Skid Base For Easy Movement Safety Features: Safety Guards On Moving Parts Emergency Stop Button Overload Protection Power Cable Length: 5 Meters (with Waterproof Plug) Included Accessories: Set Of Different Screen Meshes (with Various Sizes) Tool Kit For Maintenance And Screen Changes Warranty: 1-year Warranty On Parts And Labor ----------------nothing Follows------------------ Ben. #4 Supply, Delivery And Installation Processing Equipment Of Seaweeds Chips Of Abs-mhet Aquamarine Producer. Place Of Delivery Brgy. San Reymundo, Jolo, Sulu 1.) Electric Dough Sheeter Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 1.5 Kw Rolling Width: 600 Mm Dough Thickness Adjustment: Adjustable From 0.5 Mm To 10 Mm Manual Or Automatic Thickness Adjustment System Frame: Heavy-duty Stainless Steel Or Painted Carbon Steel Rollers: Food-grade Stainless Steel For Easy Cleaning And Durability Dimensions: Approx. 1200 Mm (l) X 800 Mm (w) X 1100 Mm (h) Safety Features: Emergency Stop Button Safety Guards On Rollers Overload Protection Control System: On/off Switch With Overload Protection Variable Speed Control For Conveyor And Roller Speed Cleaning System: Easy Access For Cleaning Rollers And Conveyor Removable Parts For Thorough Cleaning Mobility: Equipped With Sturdy Wheels Or Skid Base For Easy Transport Power Cable Length: 5 Meters (with Waterproof Plug) Included Accessories: Maintenance Toolkit Operating Manual Operating Temperature: 5°c – 40°c Warranty: 1-year Warranty On Parts And Labor 2.) Seaweeds Grinder Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 3 Kw (high-torque Electric Motor For Heavy-duty Operation) Grinding Capacity: 100 – 200 Kg/h (depending On Seaweed Type And Moisture Content) Grinding Mechanism: Hammer Mill Or Knife Mill Grinding System Adjustable Grinding Fineness (1 Mm To 5 Mm Particle Size) Other Plant Materials (optional) Screen Type: Removable Stainless Steel Screen For Varying Particle Sizes Cooling System: Air-cooled Motor With Thermal Overload Protection Discharge System: Gravity-based Discharge Or Optional Conveyor For Continuous Operation Construction Material: Frame: Heavy-duty Carbon Steel Or Stainless Steel Grinding Chamber: Corrosion-resistant Material Suitable For Marine Products Machine Dimensions: Approx. 1500 Mm (l) X 800 Mm (w) X 1200 Mm (h) Safety Features: Emergency Stop Button Protective Guards Over Moving Parts Overload Protection Control System: On/off Switch With Overload Protection Variable Speed Control (optional) Lubrication: Manual Grease Lubrication For Bearings And Grinding Components Mobility: Equipped With Sturdy Wheels For Easy Movement Power Cable Length: 5 Meters (with Waterproof Plug) Included Accessories: Spare Screens Of Different Mesh Sizes Maintenance Toolkit Operating Manual Cleaning System: Easy Access For Cleaning And Maintenance Dust Control: Optional Dust Extraction System Or Enclosed Design To Minimize Dust Dispersion Operating Temperature: 5°c – 40°c Warranty: 1-year Warranty On Parts And Labor 3.) Seaweeds Solar Dryer Machine = 1 Pc Specifications: Power Supply: 12v Dc (powered By Solar Panel And Battery System) Solar Panel: Type: Monocrystalline Or Polycrystalline Power Output: 100w – 200w Voltage: 12v Battery: Drying Method: Natural Convection Drying With Solar Heat Optional Fan-assisted Airflow For Improved Efficiency Drying Chamber Dimensions: Approx. 1200mm (l) X 800mm (w) X 800mm (h) Adjustable Shelving For Effective Drying 7 Layer Tray Rack Compatible To Drying Chamber Material Compatibility: Fresh Or Dried Seaweeds (e.g., Agar, Carrageenan) Other Plant Materials (optional) Construction Material: Frame: Heavy-duty Aluminum Or Stainless Steel Chamber: Uv-resistant Polycarbonate Or Insulated Metal Temperature Control: Thermostat With Temperature Gauge (up To 60°c) Adjustable Airflow Control For Optimal Drying Conditions Ventilation System: Adjustable Vents For Moisture Control Optional Exhaust Fan (12v Dc) For Enhanced Airflow Weight: Approx. 50 – 80 Kg (depending On Materials Used) Mobility: Equipped With Wheels Or A Skid Base For Easy Movement Included Accessories: Solar Panel Mounting Brackets Battery Charger And Controller Shelving Units For Drying Operating Manual Cleaning System: Easy Access For Cleaning The Drying Chamber Dust Control: Enclosed Design To Minimize Dust Ingress Warranty: 1-year Warranty On Parts And Labor ----------------nothing Follows------------------ Ben. #5 Supply, Delivery And Installation Of Processing Equipment Of Charcoal Briquetting Process Of Sabaken Maguyaga Fishermen Cooperative Place Of Delivery Brgy. Panosolen, Gen. Salipada K. Pendatun, Maguindanao Del Sur 1.) Charcoal Crusher Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 2.2kw – 3.5kw (high-torque Electric Motor) Crushing Capacity: 300 – 500 Kg/h (depending On Charcoal Hardness And Moisture Content) Rotor Speed: 1,500 – 2,000 Rpm Feed Inlet Size: 300mm X 200mm Crushing Mechanism: Charcoal (lump Charcoal, Briquettes), Coal, And Biomass (optional) Hopper Capacity: 50 – 100 Kg Per Batch Machine Dimensions: Approx. 1200mm (l) X 800mm (w) X 1100mm (h) Construction Material: Frame: Heavy-duty Steel Frame Blades/hammers: Hardened Steel For Durability Screens: Replaceable Stainless Steel Or Carbon Steel Mesh Discharge System: Gravity-based Or Optional Conveyor For Continuous Discharge Cooling System: Air-cooled Motor With Thermal Protection Safety Features: Emergency Stop Button Protective Covers Over Moving Parts Safety Lock On The Hopper Lid Lubrication: Manual Grease Lubrication For Bearings And Other Moving Parts Dust Control: Optional Dust Collection System Or Enclosed Design To Minimize Dust Dispersion Control System: On/off Switch With Overload Protection Adjustable Speed Control (optional For Certain Models) Operating Temperature: 5°c – 40°c Mobility: Equipped With Durable Wheels Or Skid Base For Easy Movement Accessories Included: Spare Blades/hammers Set Of Replacement Screens With Different Mesh Sizes Basic Toolkit For Maintenance Maintenance Requirements: Regular Lubrication And Periodic Blade Sharpening Or Replacement Power Cable Length: 5 Meters (with Waterproof Plug) Warranty: 1-year Warranty On Parts And Labor 2.) Charcoal Briquette Machine = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Motor Power: 2.2kw – 3kw (high-torque Electric Motor For Heavy-duty Operation) Briquetting Capacity: 150 – 300 Kg/h (depending On Feed Material And Moisture Content) Briquette Size: Diameter: 50mm – 70mm (customizable) Length: Adjustable (40mm – 100mm) Biomass Materials (optional) Feed Inlet Size: 300mm X 200mm Hopper Capacity: 50 – 100 Kg Binding Material: Optional Binder Feed System (for Starch Or Clay Binders) Moisture Content Requirement: 8% – 12% For Optimal Briquette Formation Heating System: Optional Pre-heating For Better Briquette Cohesion Output Shape: Cylindrical, Hexagonal, Or Square (based On Mold Type) Construction Material: Frame: Heavy-duty Steel Construction Compression Chamber: Hardened Steel For Durability Operating Pressure: 30 – 60 Mpa (adjustable For Different Materials) Cooling System: Air-cooled Motor With Thermal Overload Protection Discharge System: Manual Or Automatic Conveyor Discharge (optional) Lubrication: Manual Grease Lubrication For Bearings And Compression System Control System: On/off Switch With Overload Protection Emergency Stop Button Machine Dimensions: Approx. 1500mm (l) X 1000mm (w) X 1200mm (h) Safety Features: Protective Covers Over Moving Parts Emergency Stop Button Overload Protection Mobility: Equipped With Durable Wheels Or Skid Base For Ease Of Movement Dust Control: Optional Dust Collection System Or Enclosed Feed System Accessories Included: Set Of Molds For Different Briquette Shapes And Sizes Maintenance Toolkit Operating Manual Maintenance Requirements: Regular Lubrication And Periodic Mold Inspection And Replacement Power Cable Length: 5 Meters (with Waterproof Plug) Warranty: 1-year Warranty On Parts And Labor 3.) Charcoal Mixer = 1 Pc Specifications: Power Source: Diesel Engine Engine Power: 10 Hp Mixing Capacity: 200 – 500 Kg/h (depending On Material Type And Moisture Content) Mixing Type: Horizontal Or Vertical Ribbon Mixer Mixing Chamber Volume: 200 Liters Material Compatibility: Charcoal Powder Charcoal Dust Biomass Materials (e.g., Wood Shavings, Sawdust) Binder Additives (if Applicable) Feed Inlet Size: 150mm X 150mm (with Safety Cover) Discharge Outlet Size: 100mm X 100mm (manual Or Pneumatic Discharge Options) Mixing Speed: 30 – 50 Rpm (fixed Speed) Construction Material: Frame: Heavy-duty Carbon Steel Or Stainless Steel Mixing Blades: Hardened Steel For Long-lasting Durability Fuel Tank Capacity: 3.5 – 5 Liters (diesel Fuel) Fuel Consumption: 0.8 – 1.5 Liters Per Hour (depending On Load And Engine Type) Cooling System: Air-cooled Diesel Engine Safety Features: Emergency Stop Button Protective Guards Over Moving Parts Engine Overload Protection Machine Dimensions: Approx. 1400mm (l) X 900mm (w) X 1200mm (h) Mobility: Equipped With Heavy-duty Wheels Or Skid Base For Easy Movement Included Accessories: Basic Maintenance Toolkit Operating Manual Spare Mixing Blades (optional) Control System: On/off Switch For Engine Control Throttle Control For Engine Speed Adjustment Maintenance Requirements: Regular Lubrication And Cleaning Of Mixing Components Diesel Engine Maintenance (oil Change, Filter Cleaning) Operating Temperature: 5°c – 40°c Warranty: 1-year Warranty On Parts And Labor 4.) Fabricated Solar Dryer House = 1 Pc Specifications: Drying Area: 20 M² Can Be Customized Based On Available Space And Drying Capacity. Structure Frame: Material: Galvanized Steel Or Aluminum Alloy Frame Frame Dimensions: Approx. 3m (w) X 6m (l) X 2.5m (h) For A 20 M² House Corrosion-resistant Material For Outdoor Durability. Covering Material: Uv-stabilized Polyethylene Or Polycarbonate Plastic Sheeting Thickness: 200 Microns – 300 Microns Lifespan: 3 – 5 Years (depending On Maintenance) Light Transmittance: 80% – 90% (for Optimal Drying Efficiency) Ventilation System: Adjustable Air Vents Or Windows On Sidewalls And Roof For Airflow Control. Optional Exhaust Fans (solar-powered) For Better Air Circulation. Flooring: Raised Mesh Or Perforated Flooring For Air Circulation Underneath Drying Materials Material: Food-grade Stainless Steel Or Heavy-duty Plastic. Optional: Concrete Flooring With Drainage System. Shelving: Multi-layer Drying Racks (3 To 5 Layers, Adjustable) Frame: Stainless Steel Or Galvanized Metal Mesh: Uv-resistant Plastic Or Food-grade Stainless Steel Shelving Space Per Layer: 1.5m X 6m (adjustable). Entry/exit: Sliding Or Hinged Doors With Uv Plastic Covering Optional Lockable Doors For Security Temperature Control: Natural Solar Heating (temperature Up To 50°c – 70°c Inside The Dryer) Optional Thermostat For Monitoring Temperature Levels. Moisture Control: Adjustable Air Vents To Control Humidity Levels. Optional Hygrometer For Humidity Measurement. Rain Protection: Sloped Roof Design For Rainwater Runoff. Sealed Edges To Prevent Water Seepage. Wind Resistance: Windproof Design, Capable Of Withstanding Wind Speeds Up To 80 Km/h. Capacity: Suitable For Drying Fruits, Vegetables, Seaweed, Fish, Spices, And Herbs. Approx. 100 – 500 Kg Of Materials Per Batch (depending On House Size And Product Type). Installation: Modular Design For Easy Assembly And Disassembly. Includes Assembly Manual And Required Hardware. Maintenance: Uv Plastic Requires Periodic Cleaning To Remove Dust And Debris. Frame And Ventilation System Should Be Inspected Regularly. Accessories Included: Solar-powered Exhaust Fans (optional). Digital Thermometer And Hygrometer (optional). Extra Uv Plastic Sheeting For Future Replacements. Operating Temperature: 5°c – 45°c (ambient Temperature Range For Optimal Operation). Weight: Approx. 100 – 300 Kg (depending On Size And Materials Used). Lifespan: Uv Plastic Cover Expected To Last 3 – 5 Years; Frame Expected To Last 10 – 15 Years With Proper Maintenance. Warranty: 1-year Warranty On Structure And Uv Plastic Covering. ----------------nothing Follows------------------ Ben. #6 Supply, Delivery And Installation Of Processing Equipment Of Fresh Water Fish Processing Of Bangsamoro Grassroot Anti-poverty Agriculture Cooperative Place Of Delivery Brgy. Lagunde Pikit, North Cotabato 1.) Production And Packaging Equipment = 1 Set Working Table = 1 Pc Table Dimensions: Length: 1500mm (1.5m) Width: 700mm (0.7m) Height: 850mm (standard Working Height) Material: Tabletop: Food-grade Stainless Steel (grade 304), Corrosion-resistant And Easy To Clean. Frame And Legs: Heavy-duty Stainless Steel Or Galvanized Steel For Durability And Stability. Undershelf: Optional Stainless Steel Shelf For Additional Storage. Surface Finish: Smooth, Non-porous, And Polished Surface To Prevent Bacteria Buildup And Ensure Easy Cleaning. Edge Corners Rounded For Safety And Cleanliness. Load Capacity: Capable Of Holding Up To 200 Kg Of Fish And Processing Tools. Stainless Steel Collander (double Ears) = 10 Pcs "material Type: High-quality Food-grade Stainless Steel (grade 304). Corrosion Resistance: Rust-proof And Corrosion-resistant, Suitable For Handling Fish And Other Seafood. Finish: Polished Or Brushed Stainless Steel For Easy Cleaning And Hygiene. Sizes: 2 Pcs Small: Diameter: 250mm (25cm), Depth: 120mm (12cm), Capacity: 4 Liters, Weight: 0.7 Kg 2 Pcs Medium: Diameter: 300mm (30cm), Depth: 150mm (15cm), Capacity: 7 Liters, Weight: 1 Kg 3 Pcs Large: Diameter: 350mm (35cm), Depth: 170mm (17cm), Capacity: 10 Liters, Weight: 1.3 Kg 3 Pcs Extra-large: Diameter: 400mm (40cm), Depth: 200mm (20cm), Capacity: 15 Liters, Weight: 1.8 Kg " Household Scales = 2 Pcs "capacity And Accuracy Maximum Capacity: 10 Kg (22 Lbs) Graduation/accuracy: 1 Gram (0.001 Kg) Weighing Units: Kg, G, Lb, Oz Type: Large Lcd Digital Display With Backlight For Clear Visibility. Screen Size: 50mm X 30mm (approximately) Display Features: Shows Weight, Low Battery, Overload Indicator, And Tare Function. Button Functions: Power, Tare, Unit Conversion. Power Source: 2 X Aaa Batteries Or Rechargeable Battery (depending On Model) And Ac Adapter Option For Continuous Use In Commercial Settings. Dimensions And Weight Overall Dimensions: 250mm (l) X 230mm (w) X 60mm (h) Weight: 1.2 Kg Compliance Food Safety: Compliant With Haccp Standards For Safe Use In Food Processing Environments. Calibration: Factory Calibrated And Can Be Re-calibrated As Needed " Measuring Cups And Spoon, Set = 2 Pcs "measuring Cups Specifications: Material: Food-grade Stainless Steel Or Bpa-free Plastic Sizes: 1 Cup, 1/2 Cup, 1/3 Cup, 1/4 Cup Measuring Spoons Specifications: Material: Food-grade Stainless Steel Or Bpa-free Plastic Sizes: 1 Tablespoon, 1/2 Tablespoon, 1 Teaspoon, 1/2 Teaspoon, 1/4 Teaspoon " Stainless Steel Knife Set = 2 Pcs Stainless Basin = 5 Pcs * Deep Stainless Steel Basin And Stainless Steel Basins Digital Weighing Scale = 2 Pcs "capacity: 10 Kg (22 Lbs) Accuracy: 1 Gram (0.001 Kg) Units: Kg, G, Lb, Oz Display: Large Lcd Digital Display With Backlight. Shows Weight, Low Battery, And Overload Indicators. Platform: Material: Food-grade Stainless Steel Size: 250mm X 250mm Power: Powered By 2 X Aaa Batteries Or Rechargeable Battery (optional Ac Adapter) Auto-off After 2 Minutes Of Inactivity " Utensils, Set (spatula, Paddle, Bowls,) = 3 Pcs Impluse Sealer = 2 Pcs "sealing Length: 300mm, Material: Durable Metal Housing, Corrosion-resistant And Heat-resistant Sealing Strip For Continuous Use Sealing Width: 2mm – 5mm (adjustable, Depending On Model) Heating Time: Adjustable (0.2 - 1.5 Seconds) For Various Bag Thicknesses Power Supply: Standard 220v, Single-phase Seal Types: Works With Pp, Pe, And Laminated Packaging Films Ideal For Sealing Plastic Bags Up To 0.2mm In Thickness Weight: Approximately 2–4 Kg, Depending On Model " Stainless Steel Knife = 4 Set "material: Blades: High-carbon Stainless Steel For Sharpness And Corrosion Resistance Handles: Ergonomic, Non-slip, And Easy-to-grip Polypropylene Or Stainless Steel Handles Knife Types (common In Fish Processing): Fillet Knife: Flexible Blade, 6-8 Inches, For Precise Filleting Boning Knife: 5-6 Inches, Stiff Blade For Deboning Chef’s Knife: 8 Inches, Multipurpose For Cutting, Slicing Utility Knife: 4-6 Inches, For Smaller Tasks And Trimming Cleaver: Heavy-duty, Ideal For Cutting Through Bones (optional In Some Sets)" Tray Rack,24 Trays Cap = 1 Pc "material: Stainless Steel Or Aluminum For Durability And Corrosion Resistance, Ideal For Food Processing Environments. Capacity: Holds Up To 24 Trays (compatible With Standard Trays Approximately 18"" X 26""). Dimensions: Overall Size: Approx. 180 Cm (h) X 60 Cm (w) X 50 Cm (d)" Soaking, S/s, 20l Cap, With Strainer = 10 Set "material: Stainless Steel (s/s) For Durability, Rust Resistance, And Easy Cleaning. Food-grade Material Safe For Direct Food Contact. Capacity: 20 Liters (suitable For Soaking Larger Batches Of Fish Or Other Food Items). Bowl Diameter: Approx. 35 Cm Height: Approx. 25 Cm" Stainless Mixing Bowl (different Sizes) = 10 Set "material: High-quality Stainless Steel For Durability, Rust Resistance, And Easy Maintenance. Food-grade, Safe For All Food Preparation Tasks. Sizes: Small: 1.5 Liters Medium: 3 Liters Large: 5 Liters Extra Large: 7 Liters" Stainless Steel Double Handle Frying Pan = 10 Set "material: Stainless Steel For Durability, Even Heat Distribution, And Rust Resistance. Food-grade, Suitable For High-heat Cooking. Size: Diameter: Available In Various Sizes, Commonly 30 Cm To 40 Cm. Depth: Approximately 5 Cm To 7 Cm, Ideal For Frying " Stainless Steel Colander = 10 Pcs "material: High-quality Stainless Steel, Rust-resistant And Durable. Food-grade, Suitable For Rinsing And Draining Food Items. Size: Available In Various Sizes, Typically 2 To 5 Liters Capacity. Diameter: 20 Cm To 30 Cm (varies By Model)." Measuring Cups And Spoons For Liquid = 10 Set "material: Food-grade Plastic Bpa-free If Plastic, For Safe Use With Liquids. Sizes: Measuring Cups: Commonly Includes 1 Cup (240 Ml), 1/2 Cup (120 Ml), 1/3 Cup (80 Ml), And 1/4 Cup (60 Ml). Measuring Spoons: Includes 1 Tablespoon (15 Ml), 1 Teaspoon (5 Ml), 1/2 Teaspoon (2.5 Ml), And 1/4 Teaspoon (1.25 Ml)." Cutting/chopping Board = 10 Pcs "material: Food-grade Plastic Non-porous And Stain-resistant To Prevent Bacterial Growth. Sizes: Small: 20 Cm X 15 Cm, Ideal For Small Tasks. Medium: 30 Cm X 20 Cm, Suitable For General Chopping. Large: 40 Cm X 30 Cm, Ideal For Cutting Larger Items." Kitchen Shears = 10 Set "material: Stainless Steel Blades For Durability, Rust Resistance, And Sharpness. Comfortable Handle Made Of Plastic Or Rubber, Often Ergonomic For Better Grip. Blade Length: Typically 8-10 Cm Cutting Length; Overall Length Around 20 Cm." Stainless Steel Knife = 2 Set "material: Stainless Steel Blades For Sharpness, Durability, And Corrosion Resistance. Handles Made From Plastic, Wood, Or Rubber For A Comfortable And Secure Grip. Set Includes (common Options): Chef's Knife (8 Inches): For Slicing, Dicing, And Chopping. Bread Knife (8 Inches): Serrated For Slicing Bread. Utility Knife (5 Inches): For Cutting Smaller Foods And Herbs. Paring Knife (3.5 Inches): For Peeling And Intricate Tasks." Casserole With Glass Lid = 3 Pcs "material: Stainless Steel Or Aluminum For Durability And Even Heat Distribution. Tempered Glass Lid With Steam Vent To Monitor Cooking Without Lifting The Lid. Capacity: Available In Various Sizes, Commonly 2 Liters To 6 Liters." Mixing Bowl Different Sizes (10l, 20l, 30l, 50l) = 10 Set "material: Food-grade Plastic (bpa-free) For Safety And Durability. Lightweight And Resistant To Staining And Odors. Sizes: 10 Liters: Suitable For Small To Medium Mixing Tasks. 20 Liters: Ideal For Larger Mixing Jobs Or Food Prep. 30 Liters: Great For Mixing Large Batches Of Ingredients. 50 Liters: Perfect For Heavy-duty Mixing In Commercial Kitchens." Plastic Food Grade Storage Boxes = 10 Pcs "material: Food-grade Polypropylene (pp) Or Polyethylene (pe), Safe For Food Storage. Sizes: 20 Kg Box (5pcs): Dimensions: Approximately 600mm (l) X 400mm (w) X 300mm (h) Capacity: Suitable For Storing Up To 20 Kg Of Food Items. 30 Kg Box(5 Pcs): Dimensions: Approximately 700mm (l) X 500mm (w) X 350mm (h)" 2.) Cooking Facility = 1 Set Gas Oven = 1 Pc "type: Gas Oven With Thermostat Capacity: Number Of Trays: 12 Trays Tray Size: Standard Size (approximately 40cm X 60cm Or Customizable Based On Design) Temperature Control: Thermostat: Adjustable Thermostat For Precise Temperature Control. Temperature Range: Typically Between 100°c To 300°c. Burners: Number Of Burners: 2 To 4 Gas Burners (depending On Model). Ignition Type: Manual Or Automatic Ignition System. Construction: Material: Heavy-duty Stainless Steel For Durability And Easy Cleaning. Insulation: Insulated Walls To Maintain Temperature And Reduce Heat Loss. Dimensions: Overall Size: Approximately 100cm (w) X 80cm (d) X 70cm (h) Fuel Type: Lpg " Complete Set Of Stove And Gas Tank = 2 Pcs Double Boiler Pot = 2 Pcs "capacity: 1.5 Liters To 4 Liters. " Stainless Steel Streamer = 1 Pc "material: High-quality Stainless Steel For Durability And Resistance To Rust And Corrosion. Size: 3 Liters To 10 Liters Capacity." Stainless Mixing Bowl = 5 Set "material: Made Of High-quality Stainless Steel For Durability, Corrosion Resistance, And Easy Cleaning. Sizes: Small: 1.5 Liters (1.6 Quarts) Medium: 3 Liters (3.2 Quarts) Large: 5 Liters (5.3 Quarts) Extra Large: 7 Liters (7.4 Quarts)" 3.) Upright Freezer = 1 Set Specifications: Power Supply: Single-phase (220v, 50hz) Capacity: 250 – 300 Liters (8.8 – 10.6 Cubic Feet) Temperature Range: -18°c To -25°c (adjustable Thermostat) Cooling System: Direct Cooling Or Fan-assisted Cooling (optional) Compressor Type: High-efficiency Inverter Compressor For Energy Savings Number Of Shelves: 4 – 6 Adjustable Wire Shelves Or Glass Shelves Door Type: Double Door, Swing Type Magnetic Door Seal For Air-tight Closure Defrosting: Manual Or Automatic Defrost (optional) Interior Lighting: Led Lighting For Energy Efficiency And Visibility Temperature Control: Digital Temperature Display With External Control Dimensions: Approx. 1210mm (w) X 730mm (d) X 1900mm (h) Weight: 45 – 60 Kg Safety Features: Overload And Overheat Protection Lockable Door For Security Mobility: Equipped With Caster Wheels For Easy Relocation Warranty: 2-year Warranty On Parts And Labor, 5-year Warranty On Compressor 4.) Food Dehydrator = 1 Pc Specifications: Power Supply: Single-phase (220v, 50hz) Power Consumption: 2.5kw Drying Capacity: 50 – 200 Kg Per Batch (depending On Machine Size And Type Of Fish) Drying Method: Hot Air Circulation System (electric Heating Elements With Fans) Temperature Range: 30°c – 90°c (adjustable) Drying Time: 4 – 12 Hours (depending On The Type Of Fish, Thickness, And Moisture Content) Tray Material: Stainless Steel Food-grade Trays (removable And Stackable) Number Of Trays: 10 Trays (upper And Lower Rack Gap: 34mm) Air Circulation System: Forced Air With Multiple Fans For Uniform Drying Construction Material: Exterior: Stainless Steel Or Powder-coated Mild Steel Interior: Stainless Steel (food-grade, Corrosion-resistant) Insulation: High-density Insulation Material To Minimize Heat Loss Humidity Control: Adjustable Humidity Control To Ensure Precise Drying Control System: Digital Temperature And Timer Control Overheat Protection Automatic Shut-off With Alarm Moisture Removal: 80% – 95% Moisture Reduction (depending On Drying Settings) Airflow: Horizontal Or Vertical Airflow (adjustable Based On Tray Configuration) Ventilation: Adjustable Vents For Moisture Release Mobility: Equipped With Caster Wheels For Easy Movement Included Accessories: Spare Heating Elements Tray Cleaning Kit User Manual And Maintenance Guide Warranty: 1-year Warranty On Parts And Labor ----------------nothing Follows------------------
Closing Date9 Dec 2024
Tender AmountPHP 1.7 Million (USD 30.2 K)
FOREST SERVICE USA Tender
Others
United States
Details: (i) This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Subpart 12.6 Of The Federal Acquisition Regulation, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Proposals Are Being Requested And A Written Solicitation Will Not Be Issued.
(ii) This Solicitation Is Issued As An Request For Quotation (rfq).
(iii) The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2023-05.
(iv) This Procurement Is Set Aside For Total Small Business. The Naics Code Is 561990 And The Small Business Size Standard Is $16.5 Million.
(v) Schedule Of Items/price Schedule
See Attachment 05 Schedule Of Items
(vi) Description Of Requirement (including A List Of Any Attachments)
the Contractor Shall Furnish All Labor, Equipment, Supplies, Incidentals, Insurance, And Transportation Necessary To Perform Trail Grooming Of Snowmobile Trails On The Calaveras Ranger District Of The Stanislaus National Forest. The Trails Are To Be Groomed To Maintain A Smooth Surface Where An Average Snowmobile User Could Travel At A Maximum Safe Speed Of And 35 Mph On Hwy 4 And Spicer Road (forest Road 7n01). See Performance Work Statement For Additional Requirements.
list Of Attachments:
attachment 01 Performance Work Statement
attachment 02 Snow Grooming Monitoring Map
attachment 03 Wage Determination
attachment 04 Calaveras Rd Snow Grooming Questionnaire
attachment 05 Schedule Of Items
(vii) Date(s) And Place(s) Of Delivery And Acceptance/location
the California State Highway 4 Winter Parking/ Snowmobile Staging/trailhead Area (lake Alpine Sno-park And Spicer Road Sno-park) Located In The Calaveras Ranger Station Of The Stanislaus National Forest.
a) The Trails To Be Groomed Consist Of The Following:
bear Valley Trail, Approximately 2 Miles, From Bear Valley, Across State Highway 4, To The Silvertip Campground And Lake Alpine Sno Park.
highway 4, Approximately 10 Miles, From The Silvertip Campground Unloading Area At The Lake Alpine Sno-park, Around The Road Closure Gate, East On Highway 4 And 1 Mile Down Into The Stanislaus Meadow And Back Up To Highway 4, Continuing East On Highway 4 Past Mosquito Lakes, Into Pacific
valley To Hermit Valley And T The Dear Valley Ohv Trail Head. This Is Considered This A ½ Groom.
highway 4, Approximately 5 Miles, From The Dear Valley Ohv Trail Head 8n02, East On Highway 4 To The Highland Lakes Road 8n01 Junction, Then 1.5 Miles To Top Of Ebbetts Pass And Back To Highland Lakes Road Junction, Then South On Highland Lakes Road, And 5 Miles To Highland Lakes. This Is Considered A Full Groom.
spicer Reservoir Road 7n01, Approximately 13.5 Miles, From Highway 4 To Spicer Reservoir Powerhouse, Union Reservoir Road 7n75 And Utica Reservoir Roads 7n17 And To The Entrance Of Slick Rock Road 7n17.
(viii) 52.212-1 Instructions To Offerors – Commercial Products And Commercial Services (sep 2023) (provision)
addenda To Provision 52.212-1:
addenda To Provision 52.212-1:
for Simplified Acquisitions, The Word Quote Or Quoter Is Substituted In Provision 52.212-1 For The Word Offer Or Offeror.
addenda To Provision 52.212-1 Paragraph (b) Submission Of Offers:
1) Offerors Must Have An Active Entity Registration In The System For Award Management In Order To Submit An Offer. Https://www.sam.gov/sam/
2) Offers Submitted In Response To This Solicitation Shall Include A Technical Proposal, A Price Proposal, And Contractor Representations And Certifications.
A) Technical Proposal – The Technical Proposal Shall Address The Evaluation Factors In 52.212-2. At A Minimum Technical Proposal Shall Include: Completed Questionnaire, Equipment Description, Back-up Plan, Emergency Plan.
I) Past Performance – Provide A List Of Similar Projects Completed By Your Firm Over The Past Three Years. Include A Brief Description Of The Project, Dollar Amount, Year Completed, And Project Owner Contact Information (name, Phone, And Email). The Government May Use Past Performance Information From Any Available Source. If A Company Does Not Have Past Performance Information Available, Information May Be Provided For Predecessor Companies, Key Personnel, Or Subcontractors. In The Event That There Is No Past Performance Information Available, The Offeror Will Receive A Neutral Rating In This Factor.
Ii) Technical Capability – Provide A List Of Equipment And Key Personnel (with Qualifications) That Will Be Used To Complete This Project.
B) Price Proposal – Include The Following: 1) The Completed Schedule Of Items From List Of Attachments, Attachment 05 Of This Solicitation, And 2) Acknowledgement Of Any Amendments To This Solicitation By Following The Instructions That Accompany The Amendment(s).
C) Representations And Certifications – Fill In The Check Boxes For Provisions 52.204-24, 52.209-7, 52.212-3, And Employment Of Eligible Workers-workforce Certification Found In Paragraph X Of This Solicitation And Include A Copy With Your Offer.
3) Submit Offer By Email To Robert.briney@usda.gov So That It Is Delivered Into This Inbox By The Due Date And Time. Emails Should Contain 3 Separate Attachments (technical Proposal, Price Proposal, And Representations And Certifications) In Microsoft Word, Excel, Or Adobe Pdf Format. Be Aware That Large Attachments May Increase The Time Required To Deliver An Email. It Is The Offerors Responsibility To Confirm Receipt Of The Offer From Robert Briney, At Robert.briney@usda.gov.
4) Address Questions About This Solicitation To Robert Briney At Robert.briney@usda.gov.
addenda To Provision 52.212-1 Paragraph (f) Late Submissions:
replace (f)(2)(i) With The Following:
any Offer, Modification, Revision, Or Withdrawal Of An Offer Received At The Government Office Designated In The Solicitation After The Exact Time Specified For Receipt Of Offers Is "late" And Will Not Be Considered Unless It Is Received Before Award Is Made And The Contracting Officer Determines That Accepting The Late Offer Would Not Unduly Delay The Acquisition. Delete 52.212-1 (f)(2)(i) Paragraphs A, B, & C.
(ix) 52.212-2 Evaluation – Commercial Products And Commercial Services (nov 2021) (provision)
(a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers:
_price, Technical, And Past Performance _______________________________________
technical And Past Performance, When Combined, Are Equal To Price.
(b) Options. The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s).
(c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award.
(x) Representations And Certifications (complete Highlighted Items In This Section And Return With Your Offer)
vendor Name: _____________________________________________
vendor Uei: _____________________________________________
52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) (provision)
the Offeror Shall Not Complete The Representation At Paragraph (d)(1) Of This Provision If The Offeror Has Represented That It "does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument" In Paragraph (c)(1) In The Provision At 52.204-26, Covered Telecommunications Equipment Or Services—representation, Or In Paragraph (v)(2)(i) Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Products Or Commercial Services. The Offeror Shall Not Complete The Representation In Paragraph (d)(2) Of This Provision If The Offeror Has Represented That It "does Not Use Covered Telecommunications Equipment Or Services, Or Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services" In Paragraph (c)(2) Of The Provision At 52.204-26, Or In Paragraph (v)(2)(ii) Of The Provision At 52.212-3.
(a) Definitions. As Used In This Provision—
Backhaul, Covered Telecommunications Equipment Or Services, Critical Technology, Interconnection Arrangements, Reasonable Inquiry, Roaming, And Substantial Or Essential Component Have The Meanings Provided In The Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment.
(b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. Nothing In The Prohibition Shall Be Construed To—
(i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or
(ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles.
(2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. Nothing In The Prohibition Shall Be Construed To—
(i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or
(ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles.
(c) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For "covered Telecommunications Equipment Or Services".
(d) Representation. The Offeror Represents That—
(1) It ☐ Will, ☐ Will Not Provide Covered Telecommunications Equipment Or Services To The Government In The Performance Of Any Contract, Subcontract Or Other Contractual Instrument Resulting From This Solicitation. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(1) Of This Section If The Offeror Responds "will" In Paragraph (d)(1) Of This Section; And
(2) After Conducting A Reasonable Inquiry, For Purposes Of This Representation, The Offeror Represents That—
It ☐ Does, ☐ Does Not Use Covered Telecommunications Equipment Or Services, Or Use Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(2) Of This Section If The Offeror Responds "does" In Paragraph (d)(2) Of This Section.
(e) Disclosures. (1) Disclosure For The Representation In Paragraph (d)(1) Of This Provision. If The Offeror Has Responded "will" In The Representation In Paragraph (d)(1) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer:
(i) For Covered Equipment—
(a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Original Equipment Manufacturer (oem) Or A Distributor, If Known);
(b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And
(c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision.
(ii) For Covered Services—
(a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or
(b) If Not Associated With Maintenance, The Product Service Code (psc) Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision.
(2) Disclosure For The Representation In Paragraph (d)(2) Of This Provision. If The Offeror Has Responded "does" In The Representation In Paragraph (d)(2) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer:
(i) For Covered Equipment—
(a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Oem Or A Distributor, If Known);
(b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And
(c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision.
(ii) For Covered Services—
(a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or
(b) If Not Associated With Maintenance, The Psc Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision.
52.212-3 Offeror Representations And Certifications – Commercial Products And Commercial Services (sep 2023) (deviation Nov 2022) (provision)
[if Offeror Representations And Certifications Are Not Complete In Sam The Offeror Shall Submit A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services, With Your Offer. The Full Provision Is Available From Http://www.acquisition.gov/far/.
if Offeror Representations And Certifications Are Complete In Sam, The Offeror Shall Complete The Following:]
(b)(1) Annual Representations And Certifications. Any Changes Provided By The Offeror In Paragraph (b)(2) Of This Provision Do Not Automatically Change The Representations And Certifications In Sam.
(2) The Offeror Has Completed The Annual Representations And Certifications Electronically In Sam Accessed Through Http://www.sam.gov. After Reviewing Sam Information, The Offeror Verifies By Submission Of This Offer That The Representations And Certifications Currently Posted Electronically At Far 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services, Have Been Entered Or Updated In The Last 12 Months, Are Current, Accurate, Complete, And Applicable To This Solicitation (including The Business Size Standard(s) Applicable To The Naics Code(s) Referenced For This Solicitation), At The Time This Offer Is Submitted And Are Incorporated In This Offer By Reference (see Far 4.1201), Except For Paragraphs ______________.
[offeror To Identify The Applicable Paragraphs At (c) Through (v) Of This Provision That The Offeror Has Completed For The Purposes Of This Solicitation Only, If Any. Write “none” If There Are No Changes Needed To Your Online Reps And Certs.
(xi) 52.212-4 Contract Terms And Conditions – Commercial Products And Commercial Services (dec 2022) (deviation 2017-1)
(xii) 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders– Commercial Products And Commercial Services (sep 2023) (deviation 2017-1)
(a) The Contractor Shall Comply With The Following Federal Acquisition Regulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
(1) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)).
(2) 52.204-23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (nov 2021) (section 1634 Of Pub. L. 115-91).
(3) 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115-232).
(4) 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015)
(5) 52.232-40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c.3903 And 10 U.s.c. 3801)
(6) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553).
(7) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77 And 108-78 (19 U.s.c. 3805note)).
(b) The Contractor Shall Comply With The Far Clauses In This Paragraph (b) That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
[contracting Officer Check As Appropriate.]
☒ (1) 52.203-6, Restrictions On Subcontractor Sales To The Government (june 2020), With Alternate I (nov 2021) (41 U.s.c. 4704 And 10 U.s.c. 4655).
☐ (2) 52.203-13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509)).
☐ (3) 52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009 (jun 2010) (section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.)
☒ (4) 52.203-17, Contractor Employee Whistleblower Rights And Requirement To Inform Employees Of Whistleblower Rights (jun 2020) (deviation 2017-1) (whistleblower Guidance To Contractor Employees)
☒ (5) 52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards (jun 2020) (pub. L. 109-282) (31 U.s.c. 6101 Note).
☐ (6) 52.204-14, Service Contract Reporting Requirements (oct 2016) (pub. L. 111-117, Section 743 Of Div. C).
☐ (7) 52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts (oct 2016) (pub. L. 111-117, Section 743 Of Div. C).
☒ (8) 52.204-27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117-328).
☒ (9) 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment. (nov 2021) (31 U.s.c. 6101note).
☐ (10) 52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters (oct 2018) (41 U.s.c. 2313).
☐ (11) [reserved].
☐ (12) (i) 52.219-3, Notice Of Hubzone Set-aside Or Sole-source Award (oct 2022) (15 U.s.c.657a).
☐ (13) (i) 52.219-4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (oct 2022) (if The Offeror Elects To Waive The Preference, It Shall So Indicate In Its Offer) (15 U.s.c. 657a).
☐ (14) [reserved]
☒ (15) (i) 52.219-6, Notice Of Total Small Business Set-aside (nov 2020) (15 U.s.c.644).
☐ (ii) Alternate I (mar 2020) Of 52.219-6.
☐ (16) (i) 52.219-7, Notice Of Partial Small Business Set-aside (nov 2020) (15 U.s.c. 644).
☐ (ii) Alternate I (mar 2020) Of 52.219-7.
☒ (17) 52.219-8, Utilization Of Small Business Concerns (sep 2023) (15 U.s.c. 637(d)(2) And (3)).
☐ (18) (i) 52.219-9, Small Business Subcontracting Plan (sep 2023) (15 U.s.c. 637(d)(4)).
☐ (ii) Alternate I (nov 2016) Of 52.219-9.
☐ (iii) Alternate Ii (nov 2016) Of 52.219-9.
☐ (iv) Alternate Iii (jun 2020) Of 52.219-9.
☐ (v) Alternate Iv (sep 2023) Of 52.219-9.
☐ (19) (i) 52.219-13, Notice Of Set-aside Of Orders (mar 2020) (15 U.s.c. 644(r)).
☐ (ii) Alternate I (mar 2020) Of 52.219-13
☒ (20) 52.219-14, Limitations On Subcontracting (oct 2022) (15 U.s.c.637s)
[contracting Officer Check As Appropriate.]
☐ By The End Of The Base Term Of The Contract And Then By The End Of Each Subsequent Option Period; Or
☐ By The End Of The Performance Period For Each Order Issued Under The Contract.
☐ (21) 52.219-16, Liquidated Damages-subcontracting Plan (sep 2021) (15 U.s.c. 637(d)(4)(f)(i)).
☐ (22) 52.219-27, Notice Of Service-disabled Veteran-owned Small Business Set-aside (oct 2022) (15 U.s.c. 657f).
☒ (23) (i) 52.219-28, Post Award Small Business Program Rerepresentation (sep 2023) (15 U.s.c. 632(a)(2)).
☐ (ii) Alternate I (mar 2020) Of 52.219-28.
☐ (24) 52.219-29, Notice Of Set-aside For, Or Sole Source Award To, Economically Disadvantaged Women-owned Small Business Concerns (oct 2022) (15 U.s.c. 637(m)).
☐ (25) 52.219-30, Notice Of Set-aside For, Or Sole Source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15 U.s.c. 637(m)).
☐ (26) 52.219-32, Orders Issued Directly Under Small Business Reserves (mar 2020) (15 U.s.c. 644(r)).
☐ (27) 52.219-33, Nonmanufacturer Rule (sep 2021) (15 U.s.c. 637(a)(17)).
☒ (28) 52.222-3, Convict Labor (jun 2003) (e.o.11755).
☐ (29) 52.222-19, Child Labor-cooperation With Authorities And Remedies (dec 2022) (e.o.13126).
☒ (30) 52.222-21, Prohibition Of Segregated Facilities (apr 2015).
☒ (31) (i) 52.222-26, Equal Opportunity (sep 2016) (e.o.11246).
☐ (ii) Alternate I (feb 1999) Of 52.222-26.
☒ (32) (i) 52.222-35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212).
☐ (ii) Alternate I (jul 2014) Of 52.222-35.
☒ (33) (i) 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c.793).
☐ (ii) Alternate I (jul 2014) Of 52.222-36.
☒ (34) 52.222-37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212).
☒ (35) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496).
☒ (36) (i) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627).
☐ (ii) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter78 And E.o. 13627).
☒ (37) 52.222-54, Employment Eligibility Verification (may 2022). (executive Order 12989). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items Or Certain Other Types Of Commercial Products Or Commercial Services As Prescribed In Far 22.1803.)
☐ (38) (i) 52.223-9, Estimate Of Percentage Of Recovered Material Content For Epa–designated Items (may 2008) (42 U.s.c. 6962(c)(3)(a)(ii)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.)
☐ (ii) Alternate I (may 2008) Of 52.223-9 (42 U.s.c. 6962(i)(2)(c)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.)
☐ (39) 52.223-11, Ozone-depleting Substances And High Global Warming Potential Hydrofluorocarbons (jun 2016) (e.o. 13693).
☐ (40) 52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners (jun 2016) (e.o. 13693).
☐ (41) (i) 52.223-13, Acquisition Of Epeat®-registered Imaging Equipment (jun 2014) (e.o.s 13423 And 13514).
☐ (ii) Alternate I (oct 2015) Of 52.223-13.
☐ (42) (i) 52.223-14, Acquisition Of Epeat®-registered Televisions (jun 2014) (e.o.s 13423 And 13514).
☐ (ii) Alternate I (jun 2014) Of 52.223-14.
☐ (43) 52.223-15, Energy Efficiency In Energy-consuming Products (may 2020) (42 U.s.c. 8259b).
☐ (44) (i) 52.223-16, Acquisition Of Epeat®-registered Personal Computer Products (oct 2015) (e.o.s 13423 And 13514).
☐ (ii) Alternate I (jun 2014) Of 52.223-16.
☒ (45) 52.223-18, Encouraging Contractor Policies To Ban Text Messaging While Driving (jun 2020) (e.o. 13513).
☐ (46) 52.223-20, Aerosols (jun 2016) (e.o. 13693).
☐ (47) 52.223-21, Foams (jun 2016) (e.o. 13693).
☐ (48) (i) 52.224-3 Privacy Training (jan 2017) (5 U.s.c. 552 A).
☐ (ii) Alternate I (jan 2017) Of 52.224-3.
☐ (49)(i) 52.225-1, Buy American-supplies (oct 2022) (41 U.s.c. Chapter 83).
☐(ii) Alternate I (oct 2022) Of 52.225-1
☐ (50) (i) 52.225-3, Buy American-free Trade Agreements-israeli Trade Act (dec 2022) (19 U.s.c. 3301 Note, 19 U.s.c. 2112 Note, 19 U.s.c. 3805 Note, 19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43.
☐(ii) Alternate I [reserved]
☐(iii) Alternate Ii (dec 2022) Of 52.225-3.
☐(iv) Alternate Iii (jan 2021) Of 52.225-3.
☐(v) Alternate Iv (oct 2022) Of 52.225-3.
☐ (51) 52.225-5, Trade Agreements (dec 2022) (19 U.s.c. 2501, Et Seq., 19 U.s.c. 3301 Note).
☒ (52) 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) (e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury).
☐ (53) 52.225-26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note).
☐ (54) 52.226-4, Notice Of Disaster Or Emergency Area Set-aside (nov 2007) (42 U.s.c. 5150).
☐ (55) 52.226-5, Restrictions On Subcontracting Outside Disaster Or Emergency Area (nov 2007) (42 U.s.c. 5150).
☐ (56) 52.229-12, Tax On Certain Foreign Procurements (feb 2021).
☐ (57) 52.232-29, Terms For Financing Of Purchases Of Commercial Products And Commercial Services (nov 2021) (41 U.s.c.4505, 10 U.s.c.3805).
☐ (58) 52.232-30, Installment Payments For Commercial Products And Commercial Services (nov 2021) (41 U.s.c.4505, 10 U.s.c.3805).
☒ (59) 52.232-33, Payment By Electronic Funds Transfer-system For Award Management (oct 2018) (31 U.s.c. 3332).
☐ (60) 52.232-34, Payment By Electronic Funds Transfer-other Than System For Award Management (jul 2013) (31 U.s.c.3332).
☐ (61) 52.232-36, Payment By Third Party (may 2014) (31 U.s.c.3332).
☐ (62) 52.239-1, Privacy Or Security Safeguards (aug 1996) (5 U.s.c. 552a).
☐ (63) 52.242-5, Payments To Small Business Subcontractors (jan 2017) (15 U.s.c. 637(d)(13)).
☐ (64) (i) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631).
☐ (ii) Alternate I (apr 2003) Of 52.247-64.
☐ (iii) Alternate Ii (nov 2021) Of 52.247-64.
(c) The Contractor Shall Comply With The Far Clauses In This Paragraph (c), Applicable To Commercial Services, That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
contracting Officer Check As Appropriate.]
☒ (1) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67).
☒ (2) 52.222-42, Statement Of Equivalent Rates For Federal Hires (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67).
in Compliance With The Service Contract Labor Standards Statute And The Regulations Of The Secretary Of Labor (29 Cfr Part 4), This Clause Identifies The Classes Of Service Employees Expected To Be Employed Under The Contract And States The Wages And Fringe Benefits Payable To Each If They Were Employed By The Contracting Agency Subject To The Provisions Of 5 U.s.c.5341 Or 5 332.
this Statement Is For Information Only: It Is Not A Wage Determination
employee Class Monetary Wage/fringe Benefits
heavy Equipment Operator Gs-7 $23.87 Per Hour
☒ (3) 52.222-43, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year And Option Contracts) (aug 2018) (29 U.s.c. 206 And 41 U.s.c. Chapter 67).
☐ (4) 52.222-44, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67).
☐ (5) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may 2014) (41 U.s.c. Chapter 67).
☐ (6) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements (may 2014) (41 U.s.c. Chapter 67).
☒ (7) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022).
☒ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706).
☐ (9) 52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792).
(d) Comptroller General Examination Of Record. The Contractor Shall Comply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of The Simplified Acquisition Threshold, As Defined In Far 2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At 52.215-2, Audit And Records-negotiation.
(1) The Comptroller General Of The United States, Or An Authorized Representative Of The Comptroller General, Shall Have Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract.
(2) The Contractor Shall Make Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart 4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminated Shall Be Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Of Claims Arising Under Or Relating To This Contract Shall Be Made Available Until Such Appeals, Litigation, Or Claims Are Finally Resolved.
(3) As Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law.
(e) (1) Notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract For Commercial Products Or Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Down Shall Be As Required By The Clause-
(i) 52.203-13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509).
(ii) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)).
(iii) 52.204-23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab And Other Covered Entities (nov 2021) (section 1634 Of Pub. L. 115-91).
(iv) 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115-232).
(v) 52.204-27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117-328)
(v) 52.219-8, Utilization Of Small Business Concerns (sep 2023) (15 U.s.c.637(d)(2) And (3)), In All Subcontracts That Offer Further Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far 19.702(a) On The Date Of Subcontract Award, The Subcontractor Must Include 52.219-8 In Lower Tier Subcontracts That Offer Subcontracting Opportunities.
(vi) 52.222-21, Prohibition Of Segregated Facilities (apr 2015).
(vii) 52.222-26, Equal Opportunity (sep 2015) (e.o.11246).
(viii) 52.222-35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c.4212).
(ix) 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c.793).
(x) 52.222-37, Employment Reports On Veterans (jun 2020) (38 U.s.c.4212).
(xi) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause 52.222-40.
(xii) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67).
(xiii) (a) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o 13627).
(b) Alternate I (mar 2015) Of 52.222-50(22 U.s.c. Chapter 78 And E.o 13627).
(xiv) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may 2014) (41 U.s.c. Chapter 67).
(xv) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements (may 2014) (41 U.s.c. Chapter 67).
(xvi) 52.222-54, Employment Eligibility Verification (may 2022) (e.o. 12989).
(xvii) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022).
(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706).
(xix) (a) 52.224-3, Privacy Training (jan 2017) (5 U.s.c. 552a).
(b) Alternate I (jan 2017) Of 52.224-3.
(xx) 52.225-26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note).
(xxi) 52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause 52.226-6.
(xxii) 52.232-40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801)
(xxiii) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c.2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause 52.247-64.
(2) While Not Required, The Contractor May Include In Its Subcontracts For Commercial Products And Commercial Services A Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations.
(xiii) Additional Requirements/terms And Conditions:
clauses:
52.203-3 Gratuities (apr 1984)
52.204-4 Printed Or Copied Double-sided On Postconsumer Fiber Content Paper (may 2011)
52.204-13 System For Award Management Maintenance (oct 2018)
52.217-8 Option To Extend Services (nov 1999)
the Government May Require Continued Performance Of Any Services Within The Limits And At The Rates Specified In The Contract. These Rates May Be Adjusted Only As A Result Of Revisions To Prevailing Labor Rates Provided By The Secretary Of Labor. The Option Provision May Be Exercised More Than Once, But The Total Extension Of Performance Hereunder Shall Not Exceed 6 Months. The Contracting Officer May Exercise The Option By Written Notice To The Contractor Within 30.
52.217-9 Option To Extend The Term Of The Contract (mar 2000)
(a)the Government May Extend The Term Of This Contract By Written Notice To The Contractor Within 30 Days; Provided That The Government Gives The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least 60days Before The Contract Expires. The Preliminary Notice Does Not Commit The Government To An Extension.
(b)if The Government Exercises This Option, The Extended Contract Shall Be Considered To Include This Option Clause.
(c)the Total Duration Of This Contract, Including The Exercise Of Any Options Under This Clause, Shall Not Exceed _5_ Years.
52.228-5 Insurance – Work On A Government Installation (jan 1997)
52.242-17 Government Delay Of Work (apr 1984)
52.252-2 Clauses Incorporated By Reference (feb 1998)
this Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es):
federal Acquisition Regulation (far) Clauses:
https://www.acquisition.gov/browse/index/far (far Clauses Begin With 52)
department Of Agriculture Acquisition Regulation (agar) Clauses: Https://www.acquisition.gov/agar (agar Clauses Begin With 452)
far And Agar Deviations To Clauses May Be Viewed At: Policies & Regulations | Usda
52.252-6 Authorized Deviations In Clauses (nov 2020)
(a) The Use In This Solicitation Or Contract Of Any Federal Acquisition Regulation (48 Cfr Chapter 1) Clause With An Authorized Deviation Is Indicated By The Addition Of “(deviation)” After The Date Of The Clause.
(b) The Use In This Solicitation Or Contract Of Any Agriculture Acquisition Regulation (48 Cfr 4) Clause With An Authorized Deviation Is Indicated By The Addition Of “(deviation)” After The Name Of The Regulation.
452.204-70 Modification For Contract Closeout (deviation Jul 2022)
upon Contract Closeout For Contracts Utilizing Simplified Acquisition Procedures (sap) According To Far 13:
(a) If Unobligated Funds In The Amount Of $1000 Or Less Remain On The Contract, The Contracting Officer (co) Shall Issue A Unilateral Modification For Deobligation. The Contractor Will Receive A Copy Of The Modification But Will Not Be Required To Provide A Signature. The Co Shall Immediately Proceed With Contract Closeout Upon Completion Of The Period Of Performance, Receipt And Acceptance Of Supplies Or Services, And Final Payment.
(b) If Unobligated Funds Of More Than $1000 Remain On The Contract, The Co Shall Issue A Bilateral Modification For Deobligation. The Contractor Will Receive A Copy Of The Modification And Will Be Required To Provide A Signature. (the Co May Also Request A Release Of Claims Be Completed By The Contractor, Although Not Required For Contract And Orders Using Sap Procedures.) If The Bilateral Modification And Release Of Claims Are Not Returned To The Co Within 60 Days, The Co Shall Release The Modification As Unilateral And Proceed With Contract Closeout Upon Completion Of The Period Of Performance, Receipt And Acceptance Of Supplies Or Services, And Final Payment.
452.211-74 Period Of Performance (feb 1988)
the Period Of Performance Of This Contract Is From 15 Dec 2023 Through 30 Nov 2024 With The Possibility Of Four Option Years Through 30 Nov 2028.
452.228-71 Insurance Coverage (nov 1996)
pursuant To Far Clause 52.228-5, Insurance-work On A Government Installation, The Contractor Will Be Required To Present Evidence To Show, As A Minimum, The Amounts Of Insurance Coverage Indicated Below:
(a) Workers Compensation And Employer's Liability. The Contractor Is Required To Comply With Applicable Federal And State Workers' Compensation And Occupational Disease Statutes. If Occupational Diseases Are Not Compensable Under Those Statutes, They Shall Be Covered Under The Employer's Liability Section Of The Insurance Policy, Except When Contract Operations Are So Commingled With A Contractor's Commercial Operations That It Would Not Be Practical To Require This Coverage. Employer's Liability Coverage Of At Least $100,000 Shall Be Required, Except In States With Exclusive Or Monopolistic Funds That Do Not Permit Worker's Compensation To Be Written By Private Carriers.
(b) General Liability. (1) The Contractor Shall Have Bodily Injury Liability Coverage Written On A Comprehensive Form Of Policy Of At Least $500,000 Per Occurrence. (2) The Contractor Shall Have Property Damage Liability Insurance Shall Be Required In The Amount Of $500,000 Per Occurrence.
(c) Automobile Liability. The Contractor Shall Have Automobile Liability Insurance Written On A Comprehensive Form Of Policy. The Policy Shall Provide For Bodily Injury And Property Damage Liability Covering The Operation Of All Automobiles Used In Connection With Performing The Contract. Policies Covering Automobiles Operated In The United States Shall Provide Coverage Of At Least $200,000 Per Person And 500,000 Per Occurrence For Bodily Injury And $20,000 Per Occurrence For Property Damage Or Loss.
(d) Aircraft Public And Passenger Liability. When Aircraft Are Used In Connection With Performing The Contract, The Contractor Shall Have Aircraft Public And Passenger Liability Insurance. Coverage Shall Be At Least $200,000 Per Person And $500,000 Per Occurrence For Bodily Injury, Other Than Passenger Injury. Coverage For Passenger Injury Shall Be At Least $200,000 Multiplied By The Number Of Seats Or Passengers, Whichever Is Greater.
452.236-73 Archaeological Or Historic Sites (feb 1988)
if A Previously Unidentified Archaeological Or Historic Site(s) Is Encountered, The Contractor Shall Discontinue Work In The General Area Of The Site(s) And Notify The Contracting Officer Immediately.
452.237-74 Key Personnel (feb 1988)
(a) The Contractor Shall Assign To This Contract The Following Key Personnel: Primary Equipment Operator.
(b) During The First Ninety (90) Days Of Performance, The Contractor Shall Make No Substitutions Of Key Personnel Unless The Substitution Is Necessitated By Illness, Death, Or Termination Of Employment. The Contractor Shall Notify The Contracting Officer Within 15 Calendar Days After The Occurrence Of Any Of These Events And Provide The Information Required By Paragraph (c) Below. After The Initial 90-day Period, The Contractor Shall Submit The Information Required By Paragraph (c) To The Contracting Officer At Least 15 Days Prior To Making Any Permanent Substitutions.
(c) The Contractor Shall Provide A Detailed Explanation Of The Circumstances Necessitating The Proposed Substitutions, Complete Resumes For The Proposed Substitutes, And Any Additional Information Requested By The Contracting Officer. Proposed Substitutes Should Have Comparable Qualifications To Those Of The Persons Being Replaced. The Contracting Officer Will Notify The Contractor Within 15 Calendar Days After Receipt Of All Required Information Of The Decision On Substitutions. The Contract Will Be Modified To Reflect Any Approved Changes Of Key Personnel.
provisions:
52.201-1 Acquisition 360: Voluntary Survey (sep 2023)
(a)all Actual And Potential Offerors Are Encouraged To Provide Feedback On The Preaward And Debriefing Processes, As Applicable. Feedback May Be Provided To Agencies Up To 45 Days After Award. The Feedback Is Anonymous, Unless The Participant Self-identifies In The Survey. Actual And Potential Offerors Can Participate In The Survey By Selecting The Following Link: Https://www.acquisition.gov/360.
(b)the Contracting Officer Will Not Review The Information Provided Until After Contract Award And Will Not Consider It In The Award Decision. The Survey Is Voluntary And Does Not Convey Any Protections, Rights, Or Grounds For Protest. It Creates A Way For Actual And Potential Offerors To Provide The Government Constructive Feedback About The Preaward And Debriefing Processes, As Applicable, Used For A Specific Acquisition.
52.204-7 System For Award Management (oct 2018)
52.204-16 Commercial And Government Entity Code Reporting (aug 2020)
52.217-5 Evaluation Of Options. (july 1990)
except When It Is Determined In Accordance With Far 17.206(b) Not To Be In The Government’s Best Interests, The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. Evaluation Of Options Will Not Obligate The Government To Exercise The Option(s).
52.237-1 Site Visit (apr 1984)
offerors Or Quoters Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award.
52.252-1 Solicitation Provisions Incorporated By Reference (feb 1998)
this Solicitation Incorporates One Or More Solicitation Provisions By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Offeror Is Cautioned That The Listed Provisions May Include Blocks That Must Be Completed By The Offeror And Submitted With Its Quotation Or Offer. In Lieu Of Submitting The Full Text Of Those Provisions, The Offeror May Identify The Provision By Paragraph Identifier And Provide The Appropriate Information With Its Quotation Or Offer. Also, The Full Text Of A Solicitation Provision May Be Accessed Electronically At This/these Address(es):
federal Acquisition Regulation (far) Provisions:
https://www.acquisition.gov/browse/index/far (far Provisions Begin With 52)
department Of Agriculture Acquisition Regulation (agar) Provisions: Https://www.acquisition.gov/agar (agar Provisions Begin With 452)
far And Agar Deviations To Provisions May Be Viewed At: Policies & Regulations | Usda
52.252-5 Authorized Deviations In Provisions (nov 2020)
(a) The Use In This Solicitation Of Any Federal Acquisition Regulation (48 Cfr Chapter 1) Provision With An Authorized Deviation Is Indicated By The Addition Of "(deviation)" After The Date Of The Provision.
(b) The Use In This Solicitation Of Any Agriculture Acquisition Regulation (48 Cfr Chapter 4) Provision With An Authorized Deviation Is Indicated By The Addition Of "(deviation)" After The Name Of The Regulation.
(xiv) Defense Priorities And Allocation System (dpas) Rating: N/a
(xv) Date, Time, And Place Offers Are Due
6 December 2023, 3:00 P.m. Pst, All Offers Must Be Emailed To Robert.briney@usda.
(xvi) Government Point Of Contact
Robert Briney, Contracting Officer, Robert.briney@usda.gov
Closing Date6 Dec 2024
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|combo||tbd|n00104|tbd|tbd|tbd|tbd|tbd|tbd|tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
contractor Purchasing System Administration-basic (may 2014)|1||
authorized Deviations In Clauses (nov 2020)|2|federal Acquisition Regulation |chapter 1|
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7||||||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||||
royalty Information (apr 1984)|1||
certification Regarding Knowledge Of Child Labor For Listed End Products(feb 2021))|4|||||
annual Representations And Certifications (may 2024)|13|334412|750 Employees||||||||||||
requirements For Submission Of Proposals Via Electronic Media (jan 2018)|1|email Only|
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021))|7||||||||
type Of Contract (apr 1984)|1|ffp|
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data (may 2024))|1||
the Reason For This Amendment Is The Add The Below Terms To This Solicitation / Resultant Contract:
1: The Government's Required Delivery Date (rdd) Is 31 December 2026 Or Earlier On All Deliveries.
2: The Following Term Applies To This Solicitation And Resultant Contract/order:
"this Order �solicitation� Is Issued Under And Pursuant To The Provisions Of The Basic Ordering Agreement (boa). The Terms And Conditions Of The Boa Are Hereby Incorporated By Reference And, Except As Provided Herein By This Order �solicitation�, Remain In Full
force And Effect. If Any Conflict Arises In The Terms Of This Order Versus The Terms In The Boa, The Terms Of The Boa Shall Apply."
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Heater Assembly,rad .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Heater Assembly,rad Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;53711 5188230;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; .
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Modulator .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Modulator Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;53711 5336325;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;53711 6166870;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Electrostatic Discharge Control - The Contractor Shall Comply With The Electrostatic Discharge Control Requirements Established In Mil-std-1686.
3.5 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; .
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;53711 5543728;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Supply,electric .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Supply,electric Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;15090 6309885;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Radar Set .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Radar Set Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;53711 6170342;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;53711 6570452;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cable Assembly,spec .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Cable Assembly,spec Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;53711 7044468;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Ot
Closing Date5 Dec 2024
Tender AmountRefer Documents
4491-4500 of 4508 active Tenders